WO2006085371A1 - 列車運行管理システム - Google Patents
列車運行管理システム Download PDFInfo
- Publication number
- WO2006085371A1 WO2006085371A1 PCT/JP2005/001961 JP2005001961W WO2006085371A1 WO 2006085371 A1 WO2006085371 A1 WO 2006085371A1 JP 2005001961 W JP2005001961 W JP 2005001961W WO 2006085371 A1 WO2006085371 A1 WO 2006085371A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- crew
- information
- train
- latest
- management system
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/18—Crew rosters; Itineraries
Definitions
- the present invention relates to a train operation management system that restores the disturbance of train operation to a schedule on the day.
- the present invention relates to a train operation management system for efficient operation of drivers and conductors on board trains.
- the interlocking device is operated with a lever board installed at each station to control the traffic light and the switch. Then, the latest track status data is transmitted to the central processing unit via the station control device local area network connected to the interlocking device.
- the restoration diagram creation device performs simulation for each train based on the latest on-line status data sent to the central processing unit and the daily dial. Train operation is determined based on the simulation results and the diagram creation decision rules entered in advance, and the simulation is repeated until all registered trains arrive at the final station, creating a restoration diagram.
- the recovery is performed by the created recovery diagram.
- the operation commander instructs the crew to change the operation of the route such as the crew section and time of each crew member via telephone or fax.
- the attendant at the crew ward will consider changing the route of the crew based on the instructed recovery schedule and give instructions to each crew member via telephone or fax.
- Patent Document 1 Japanese Patent Laid-Open No. 7-132833 Disclosure of the invention
- the train operation management system is a train operation management system in which when a scheduled train operation on the same day becomes impossible, the train operation management system restores the current day to the current day status data and the current day.
- Predicting and predicting schedule disturbances based on schedules Diagram disturbance prediction means for creating schedules, crew crew operation information registration means for recording crew crew operational information for crews traveling on the day of the schedule, and crew Crew operational turbulence prediction means that detects operational turbulence that occurs on the route on which the crew members are occupying from the operation information and prediction diagrams, and outputs warning information on operational turbulence, and recovery information that recovers the operational turbulence of crew members based on the alarm information
- a ground access point to which message information and the latest crew operation information are transmitted via a wide area network
- a ground radio apparatus to transmit message information and the latest crew operation information to the train
- Onboard radio equipment placed on trains where message information and latest crew operation information are transmitted from ground radio equipment, and on trains where message information and latest crew operation information are sent from this onboard radio equipment It is equipped with on-board access points and information acquisition means that can browse message information and the latest crew operation information from each access point.
- the present invention is provided with a crew member operation information management device for detecting a crew member's presence location when the crew member accesses each access point by means of information acquisition means.
- the train operation management system of the present invention creates a prediction diagram by predicting a disruption of the train based on the current line status data and the schedule on the day, and the crew member can create a prediction diagram from the crew operation information and the prediction diagram.
- Operational disturbances that occur on the route in which the crew is traveling are detected, warning information for operational disturbances is output, recovery information that recovers the operational disturbances of crew members is proposed based on the warning information, and the proposed recovery information is received by the operation commander.
- the operation commander who manages the train operation can easily change the operation to recover the disruption of the crew operation by rewriting the crew operation information to the content proposed in the recovery information. be able to.
- a ground access point to which message information and the latest crew operation information are transmitted via a wide area network and an on-board access point arranged on a train to which message information and the latest crew operation information are transmitted from a wireless device.
- the crew can easily view the crew operation information by enabling the information acquisition means to view the message information and the latest crew operation information.
- the crew member's location on the ground and the on-board access point is detected by the information acquisition means, so that the crew member's place on the ground is detected. It can be monitored, and it can be grasped whether the on-board crew members are riding correctly and where the vacant crew is V.
- FIG. 1 is an overall configuration diagram of a train operation management system according to Embodiment 1 of the present invention
- FIG. 2 is a block diagram showing details of the crew member operation recovery device of FIG.
- a lever (la-lc) installed at each station is manually operated, and a signal device (not shown) or a turning machine (not shown) is connected via the interlocking device 2a-2c.
- the latest track status data of the train is transmitted to the central processing unit 5 via the local area network 4 from the station control devices 3a-3c connected to the interlocking devices 2a-2c.
- the display device 6 connected to the central processing unit 5 displays a train operation chart with the distance on the vertical axis and the horizontal axis on time.
- the restoration diagram creation device 7 the data such as the change information of the current day diagram inputted by the operation commander from the input device 8, and the latest information transmitted from each station control device 3a-3c to the central processing unit 5 Based on the current line status data and the schedule on the day registered in the central processing unit 5, a simulation is performed on the route of each train. Based on the simulation results and the diagram creation decision rules entered in advance, train operation is determined, and the simulation is repeated until all registered trains arrive at the final station, creating a recovery schedule. To do.
- This restoration diagram is connected to the diagram on the day by the central processing unit 5.
- the crew member operation recovery device 9 is a characteristic part of the present embodiment, and as shown in detail in FIG. 2, the latest information input via the data receiving means 10 connected to the central processing unit 5 is shown.
- the current line status data and the current day diamond are registered in the current line status data registration means 11 and the current day diamond registration means 12, respectively.
- the crew member operation information registration means 13 records crew member operation information (original) specifying the crew section, time, and other routes.
- the diamond disturbance prediction means 14 creates a prediction diagram that predicts the diamond disturbance by the same method as the simulation of restoration diagram creation based on the latest track status data and the running time and operation interval of the current day diamond.
- the created prediction diagram is registered in the prediction diagram registration means 15 for each train number. Create a forecast diamond up to several hours ahead It is common.
- the crew member operation disorder predicting means 16 outputs a warning content for each warning item as shown in FIG. 3 for each route of the crew member based on the prediction diagram and the crew member operation information (original). Subsequently, the crew member operation disorder recovery suggestion means 17 outputs the content of the proposal for solving the problem as shown in FIG.
- the alarm contents output from the crew operation disorder prediction means 16 are registered in the alarm contents registration means 18.
- the proposal contents output from the crew member operation disorder recovery proposal means 17 are recorded in the proposal contents registration means 19.
- FIG. 3 is an explanatory diagram showing an example of alarm contents and proposal contents for each alarm item.
- the crew in the crew operation information has not ended.
- it detects and warns that the predicted diamond result force is over the prescribed crew kilometers and crew hours.
- the last stop station on the route that has not been completed in the crew operation information detects a different route from the last stop station in the crew operation information (original).
- the alarm contents and the proposal contents are displayed on the display device 22 through the approval means 20 and the man-machine IZF means 21.
- the operation commander inputs approval from the input device 23 to the approval means 20 for the warning content and the proposal content displayed on the display device 22, the crew operating information (original) is copied and based on the proposal content! Crew operation information (latest) is created and registered in the crew operation information registration means 13. Then, the crew member operation information (original) (latest) and the predicted diamond are displayed on the display device 22 via the diamond display means 24 and the man-machine IZF means 21 in accordance with the operation command from the input device 23.
- the operation disruption prediction means 16 detects an operation disruption that occurs in the crew's route, outputs the operation disruption alarm information, and proposes a crew operation recovery proposal based on the alert information. By suggesting recovery information that restores the crew's operation disruption with means 17, it is possible to easily change the operation to recover the crew's operation disruption at the discretion of the operation commander who manages the train operation.
- Fig. 4 is an overall configuration diagram of the train operation management system according to the second embodiment
- Fig. 5 is a block diagram showing details of the crew operation recovery device 25 of Fig. 4
- Fig. 6 is a crew operation information management device of Fig. 4.
- FIG. 28 is a block diagram showing details of 28. 4 to 6, la-lc, 2a-2c, 3a-3c, 4-8, 10-19, and 21-24 are the same as those in the first embodiment.
- the crew member operation recovery device 25 is composed of the above-mentioned 10-19, 21, 24, the approval means 26 and the data transmission means 27 described later.
- the alarm contents and the proposal contents are displayed on the display device 22 through the approval means 26 and the man-machine IZF means 21.
- the operation commander inputs the warning contents and proposal contents displayed on the display device 22 from the input device 23 to the approval means 26, so that the crew operating information (original) is copied and based on the proposal contents! Crew operation information (latest) is created and registered in the crew operation information registration means 13. Then, the crew member operation information (original) (latest) and the prediction diagram are displayed on the display device 22 via the diagram display means 24 and the man-machine IZF means 21 in accordance with the operation command from the input device 23.
- the crew operation information, warning contents and proposal contents approved by the approval means 26 are transmitted as data to be sent to the crew management information management apparatus 28 described later by the data transmission means 27.
- the crew member operation information management device 28 includes a day schedule registration unit 29, data reception units 30 and 31, a proposal content registration unit 32, a crew member operation information (latest) registration unit 33, a message transmission unit 34, and a line control unit 35.
- the information browsing means 38 is configured.
- the same day diamond received from the central processing unit 5 via the data receiving means 30 is registered in the same day diamond registration means 29.
- the proposal content received from the crew member operation recovery device 25 via the data receiving means 31 is registered in the proposal content registration means 32.
- the crew member operation information (latest) received from the crew member operation recovery device 25 via the data receiving unit 31 is registered in the crew member operation information (latest) registration unit 33.
- the message transmission means 34 uses e-mail or the like, which is an application software of the Internet, from the line control means 35 to the later-described boarding area terminal 37 via the wide-area network 36 described later. Send a message.
- e-mail or the like which is an application software of the Internet
- a URL address that can be deciphered by browsing software, which is Internet application software, is added to the e-mail message sent from the message transmission means 34.
- browsing software which is Internet application software
- the line control means 35 of the crew member operation information management device 28 is connected to the wide area network 36 !.
- This wide area network 36 is set up between multiple boarding areas where crew members on board the train are waiting.
- Each crew ward office is equipped with a terminal 37 for the crew ward that can browse the latest crew operation information output from the information browsing means 38. As described above, the latest crew operation information transmitted via the wide area network 36 can be viewed on the crew terminal 37.
- Fig. 7 is an overall configuration diagram of the train operation management system according to the third embodiment
- Fig. 8 is a block diagram showing details of the crew member operation recovery device 39 in Fig. 7
- Fig. 9 is a crew member operation information management device in Fig. 7.
- 47 is a block diagram showing details of 47.
- FIG. 7 to 9, la-lc, 2a-2c, 3a-3c, 4 and 8, 10-16, 18, 21-24 are the same as those in the first embodiment.
- the crew member operation recovery device 39 shown in FIG. 8 includes the aforementioned 10-16, 18, 21, 24, and 40 1 and 46 described later.
- the crew operation disorder recovery proposal means 40 is used to solve the problem as shown in FIG. 3 according to the alarm contents output from the crew operation disorder prediction means 16 and the crew position management information of the crew management information recording means 46 described later. Output the proposal.
- the proposal contents output from the crew operation disorder recovery proposal means 40 are registered in the proposal contents registration means 41.
- the alarm contents and the proposal contents are displayed on the display device 22 through the approval means 42 and the man-machine IZF means 21.
- the operation commander inputs the alarm content and the proposal content displayed on the display device 22.
- the crew operation information (original) is copied to create the crew operation information (latest) based on the proposal contents, and is registered in the crew operation information registration means 13.
- the crew member operation information (original) (latest) and the prediction diagram are displayed on the display device 22 via the diagram display means 24 and the man-machine IZF device 21 in response to a command from the operation commander from the input device 23.
- the crew member operation information, warning contents, and proposal contents approved by the approval unit 42 are transmitted to the crew member operation information management device 47 (to be described later) via the line control unit 44 as transmission data by the data transmission unit 43.
- the crew member position management information received from the crew member operation information management device 47 via the line control unit 44 is recorded in the crew member position management information recording unit 46 via the data receiving unit 45.
- the crew member operation information management device 47 shown in FIG. 9 includes a day registration unit 48, a data reception unit 49, a line control unit 50, a data reception unit 51, a proposal content registration unit 52, and a crew member operation information (latest) registration. It comprises means 53, message transmission means 54, line control means 55, information browsing means 56, crew member position management means 65, crew member position management information registration means 66, and data transmission means 67.
- the same day diamond received from the central processing unit 5 through the data receiving means 49 is registered in the current day diamond registration means 48.
- the proposal content received from the crew member operation recovery device 39 via the line control means 50 and the data reception means 51 is registered in the proposal content registration means 52.
- the crew member operation information (latest) received from the crew member operation recovery device 39 via the line control unit 50 and the data receiving unit 51 is registered in the crew member operation information (latest) registration unit 53.
- the message transmission means 54 uses the Internet application software, e-mail, etc., and the message from the operation commander is sent to the terminal 58 for the passenger ward described later via the line control means 55 and the wide area network 57 described later. Send.
- a URL address that can be deciphered by browsing software which is Internet application software, is added to the e-mail message sent from the message transmission means 54.
- browsing software which is Internet application software
- the crew can browse the crew operation information (latest) output from the information browsing means 56 by the information acquisition means 60 (see FIG. 7) such as a portable terminal via the ground access point 59.
- the line control means 55 of the crew member operation information management device 47 is connected to the wide area network 57 !.
- This wide area network 57 is installed between multiple boarding areas where crew members on board the train are waiting.
- Each crew ward office is equipped with a terminal for crew ward 58 that can browse the latest crew operating information output from the information browsing means 56.
- the line control means 55 of the crew member operation information management device 47 is connected to the terrestrial radio device 61.
- the terrestrial wireless device 61 is arranged so that the traveling train 62 can receive the signal.
- an on-vehicle wireless device 63 capable of communicating with the ground wireless device 61 and an on-vehicle access point 64 connected to the on-vehicle wireless device 63 are installed.
- the crew can view the latest crew operating information by communicating with the information acquisition means 60 through the ground access point 59 on the ground.
- a crew member on the train 62 can browse the latest crew operation information and the like by communicating with the information acquisition means 60 through the on-board access point 64.
- the crew position management means 65 stores the crew position management information corresponding to the position of the ground access point 59 with the crew position management information registration means 66. Register with.
- the crew member position management information registered in the crew member position management information registration unit 66 is transmitted from the data transmission unit 67 to the crew member operation recovery device 39 via the line control unit 50. Further, the crew member position management information registered in the crew member position management information registration unit 66 is transmitted from the information browsing unit 56 to the crew station terminal 58 via the wide area network 57. This makes it possible to monitor where the crew members are.
- the crew position management means 65 corresponds to the position of the on-board access point 64.
- the number is determined and the train number is registered in the crew member position management information registration means 66. This makes it possible to ascertain whether the crew is riding correctly and where there are vacant crew.
- the message information and the latest information are transmitted from the ground access point to which the message information and the latest crew operation information are transmitted via the wide area network.
- the crew member's location is detected by accessing the ground and on-board access points using the information acquisition means, the crew member's location can be monitored on the ground. It is possible to know whether the crew is riding correctly and where the vacant crew is V.
- FIG. 1 is an overall configuration diagram of a train operation management system according to Embodiment 1 of the present invention.
- FIG. 2 is a block diagram showing details of the crew member operation recovery device of FIG.
- FIG. 3 An explanatory diagram showing alarm contents and proposal contents.
- FIG. 4 is an overall configuration diagram of a train operation management system according to Embodiment 2 of the present invention.
- FIG. 5 is a block diagram showing details of the crew member operation recovery device of FIG.
- FIG. 6 is a block diagram showing details of the crew member operation information management device of FIG.
- FIG. 7 is an overall configuration diagram of a train operation management system according to Embodiment 3 of the present invention.
- FIG. 8 is a block diagram showing details of the crew member operation recovery device of FIG.
- FIG. 9 is a block diagram showing details of the crew member operation information management device of FIG. 7.
- Onboard access point crew position management means.
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Mechanical Engineering (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Game Theory and Decision Science (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Traffic Control Systems (AREA)
Abstract
Description
Claims
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2005/001961 WO2006085371A1 (ja) | 2005-02-09 | 2005-02-09 | 列車運行管理システム |
US11/661,660 US20080097660A1 (en) | 2005-02-09 | 2005-02-09 | Train Service Managing System |
CNA2005800263684A CN1993260A (zh) | 2005-02-09 | 2005-02-09 | 列车运行管理系统 |
EP05710013A EP1847435A1 (en) | 2005-02-09 | 2005-02-09 | Train operation management system |
TW094120911A TWI296589B (en) | 2005-02-09 | 2005-06-23 | Management system of train operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2005/001961 WO2006085371A1 (ja) | 2005-02-09 | 2005-02-09 | 列車運行管理システム |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2006085371A1 true WO2006085371A1 (ja) | 2006-08-17 |
Family
ID=36792946
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2005/001961 WO2006085371A1 (ja) | 2005-02-09 | 2005-02-09 | 列車運行管理システム |
Country Status (5)
Country | Link |
---|---|
US (1) | US20080097660A1 (ja) |
EP (1) | EP1847435A1 (ja) |
CN (1) | CN1993260A (ja) |
TW (1) | TWI296589B (ja) |
WO (1) | WO2006085371A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017218140A (ja) * | 2016-06-01 | 2017-12-14 | 東日本旅客鉄道株式会社 | 乗務員運用支援システム |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8364632B2 (en) * | 2008-08-26 | 2013-01-29 | Hitachi, Ltd. | Operation arrangement support system and method thereof |
JP5869276B2 (ja) * | 2011-09-27 | 2016-02-24 | 株式会社日立製作所 | 資源運用計画作成装置及びその方法、及びプログラム |
CN108805414B (zh) * | 2018-05-21 | 2020-07-10 | 青岛海信网络科技股份有限公司 | 一种公交车辆计划发车时刻表的调整方法及装置 |
CN108791368B (zh) * | 2018-06-08 | 2021-02-05 | 上海新千科技发展有限公司 | 轨道交通乘务管理系统 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004243857A (ja) * | 2003-02-13 | 2004-09-02 | Toshiba Solutions Corp | 乗務員運用整理支援装置及び乗務員運用整理支援方法 |
JP2005059782A (ja) * | 2003-08-18 | 2005-03-10 | Mitsubishi Electric Corp | 列車運行管理システム |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1789274A (en) * | 1918-05-04 | 1931-01-13 | Gen Railway Signal Co | Automatic train-control system |
US5377938A (en) * | 1992-12-01 | 1995-01-03 | Pulse Electronics, Inc. | Railroad telemetry and control systems |
US6073062A (en) * | 1995-05-31 | 2000-06-06 | Fujitsu Limited | Mobile terminal and moving body operation management system |
US5836529A (en) * | 1995-10-31 | 1998-11-17 | Csx Technology, Inc. | Object based railroad transportation network management system and method |
US6145792A (en) * | 1998-04-29 | 2000-11-14 | Penza; George Gregory | Railroad worker warning system for train conductors |
US6691957B2 (en) * | 2001-06-21 | 2004-02-17 | General Electric Company | Control and method for optimizing the operation of two or more locomotives of a consist |
US20020198747A1 (en) * | 2001-06-26 | 2002-12-26 | Boyer Stanley Gene | Event driven airport |
US20030158943A1 (en) * | 2002-01-28 | 2003-08-21 | Kim Bong Kyum | Real time data retrieving method of off-land transportation |
JP3822126B2 (ja) * | 2002-03-27 | 2006-09-13 | 松下電器産業株式会社 | 輸送管理システム |
US20030191678A1 (en) * | 2002-04-03 | 2003-10-09 | Shetty Ravindra K. | Disruption handling for scheduling system |
US7668744B2 (en) * | 2003-07-31 | 2010-02-23 | The Boeing Company | Method and system for conducting fleet operations |
US20050165628A1 (en) * | 2004-01-27 | 2005-07-28 | Carmen Systems Ab | Method and system for rescheduling passengers |
US20070219834A1 (en) * | 2006-02-21 | 2007-09-20 | Fred Gluckman | System and method for transportation crew logistic management |
WO2007098161A2 (en) * | 2006-02-21 | 2007-08-30 | Dynamic Intelligence Inc. | Transportation scheduling system |
US9120494B2 (en) * | 2006-12-04 | 2015-09-01 | General Electric Company | System, method and computer software code for remotely assisted operation of a railway vehicle system |
-
2005
- 2005-02-09 US US11/661,660 patent/US20080097660A1/en not_active Abandoned
- 2005-02-09 EP EP05710013A patent/EP1847435A1/en not_active Withdrawn
- 2005-02-09 WO PCT/JP2005/001961 patent/WO2006085371A1/ja not_active Application Discontinuation
- 2005-02-09 CN CNA2005800263684A patent/CN1993260A/zh active Pending
- 2005-06-23 TW TW094120911A patent/TWI296589B/zh not_active IP Right Cessation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004243857A (ja) * | 2003-02-13 | 2004-09-02 | Toshiba Solutions Corp | 乗務員運用整理支援装置及び乗務員運用整理支援方法 |
JP2005059782A (ja) * | 2003-08-18 | 2005-03-10 | Mitsubishi Electric Corp | 列車運行管理システム |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2017218140A (ja) * | 2016-06-01 | 2017-12-14 | 東日本旅客鉄道株式会社 | 乗務員運用支援システム |
Also Published As
Publication number | Publication date |
---|---|
US20080097660A1 (en) | 2008-04-24 |
TW200628351A (en) | 2006-08-16 |
EP1847435A1 (en) | 2007-10-24 |
TWI296589B (en) | 2008-05-11 |
CN1993260A (zh) | 2007-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101600613B (zh) | 用于铁路车辆系统的远程辅助操作的系统、方法和计算机软件代码 | |
US8532851B2 (en) | Train information display system and train information display device | |
CN101571996A (zh) | 城市公交智能化应急管理方法 | |
CN204548158U (zh) | 铁路列车车地联控系统 | |
KR101095982B1 (ko) | 전동차 운용 데이터 저장 시스템 및 그 방법 | |
CN111137328B (zh) | 一种有轨电车行车调度管理系统 | |
WO2006085371A1 (ja) | 列車運行管理システム | |
KR100831387B1 (ko) | 열차 운행 관리 시스템 | |
JP4790637B2 (ja) | 旅客案内システム | |
Neil | On board train control and monitoring systems | |
JP2011255766A (ja) | 列車位置・乗継接続情報管理装置 | |
JP3981829B2 (ja) | 列車運行情報システム | |
JP4721812B2 (ja) | 車両・乗務員運用復旧装置 | |
JP2002002486A (ja) | 列車運行管理システム | |
RU2307041C1 (ru) | Система контроля технологической дисциплины процесса управления движением поездов (сктд) | |
JP4180996B2 (ja) | 列車運行管理システム | |
KR20070066498A (ko) | 열차무선데이터 통신시스템 | |
CN107767663A (zh) | 一种智能的公交调度系统 | |
JP2004294236A (ja) | 目覚ましシステム | |
KR100840808B1 (ko) | 열차 운행 관리 시스템 | |
JP2002347623A (ja) | 列車運行関連情報の伝送方法及びシステム | |
KR100529357B1 (ko) | 버스 운행관리시스템 및 그 방법 | |
JP3183777B2 (ja) | 列車運行管理システム | |
AU2018222880B2 (en) | System, method and computer software code for remotely assisted operation of a railway vehicle system | |
KR100934238B1 (ko) | 승강장 안내 표시기 운영 장치 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
WWE | Wipo information: entry into national phase |
Ref document number: 200580026368.4 Country of ref document: CN |
|
WWE | Wipo information: entry into national phase |
Ref document number: 1020077003786 Country of ref document: KR |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2005710013 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 11661660 Country of ref document: US |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWP | Wipo information: published in national office |
Ref document number: 2005710013 Country of ref document: EP |
|
NENP | Non-entry into the national phase |
Ref country code: JP |
|
WWW | Wipo information: withdrawn in national office |
Country of ref document: JP |
|
WWP | Wipo information: published in national office |
Ref document number: 11661660 Country of ref document: US |