WO2004103052A1 - Systeme de montage de pieces electroniques - Google Patents

Systeme de montage de pieces electroniques Download PDF

Info

Publication number
WO2004103052A1
WO2004103052A1 PCT/JP2004/006766 JP2004006766W WO2004103052A1 WO 2004103052 A1 WO2004103052 A1 WO 2004103052A1 JP 2004006766 W JP2004006766 W JP 2004006766W WO 2004103052 A1 WO2004103052 A1 WO 2004103052A1
Authority
WO
WIPO (PCT)
Prior art keywords
component
electronic component
supply device
components
component supply
Prior art date
Application number
PCT/JP2004/006766
Other languages
English (en)
Japanese (ja)
Inventor
Seigo Kodama
Hiroyuki Haneda
Original Assignee
Fuji Machine Mfg. Co., Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuji Machine Mfg. Co., Ltd. filed Critical Fuji Machine Mfg. Co., Ltd.
Priority to JP2005506233A priority Critical patent/JPWO2004103052A1/ja
Publication of WO2004103052A1 publication Critical patent/WO2004103052A1/fr

Links

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/04Mounting of components, e.g. of leadless components
    • H05K13/0452Mounting machines or lines comprising a plurality of tools for guiding different components to the same mounting place
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • H05K13/086Supply management, e.g. supply of components or of substrates

Definitions

  • the present invention relates to an electronic component mounting system including a plurality of electronic component mounting machines, and more particularly to component management of the electronic component mounting system.
  • Patent Document 1 an electronic component mounter that mounts components supplied from a plurality of component supply devices on a substrate has been known (for example, Patent Document 1).
  • This electronic component mounter manages the number of remaining components in each component supply device, and gives advance notice based on the order in which component supply devices are cut out and the time at which they will occur. With this notice, the operator of the electronic component mounting machine had replaced the component supply device.
  • Patent Document 1 is Japanese Patent Application Laid-Open No. H04-164439 (page 4, FIG. 7).
  • the present invention has been made in order to solve the above-described problem.
  • the burden on the operator of the electronic component mounter is reduced.
  • the purpose is to provide an electronic component mounting system with reduced production efficiency. Disclosure of the invention
  • the present invention provides a plurality of electronic component mounters for mounting components respectively supplied from a plurality of component supply devices on a substrate, and manages the components of each component supply device by being communicably connected to each electronic component mounter.
  • the component management device is an electronic component mounting system provided with a means for notifying a component management operator of a component supply device to be set in the electronic component mounting machine to a component management operator.
  • the component management device notifies the component management operator of the component supply device to be set in the electronic component mounting machine, so the component management operator prepares the component supply device to be set and prepares the component supply device.
  • the supplied component supply device is delivered to the electronic component mounter. Then, the operator of the electronic component mounting machine sets the component supply device. Therefore, since the component management operator performs the component preparation work which has been performed by the operator of the electronic component mounting machine, the burden on the operator of the electronic component mounting machine can be reduced.
  • the notifying unit is configured to give a notification together with the remaining time until the set time at which the component supply device should be set in the electronic component mounting machine.
  • the component management operator prepares a component supply device to be set and delivers it to the electronic component mounting machine by the set time. Then, the operator of the electronic component mounter sets the component supply device. But Therefore, when the component supply device is set, the electronic component mounting machine is not stopped or is stopped as short as possible, so that the operation rate of the electronic component mounting machine can be prevented from lowering. .
  • a plurality of electronic component mounters for mounting components respectively supplied from a plurality of component supply devices on a substrate are installed in a production area, and each of the component supply devices is communicably connected to each of the electronic component mounters.
  • a component management device that manages the components of each component is installed in a component preparation error that sets components in each component supply device in advance.
  • This is an electronic component mounting system provided with a notice means for giving a notice to a component management operator together with the remaining time until the set time at which the component supply device should be set.
  • the component management device notifies the component management operator of the component supply device to be set in the electronic component mounter and the remaining time until the set time, so the component management operator in the component preparation area can Prepare the component supply device to be set and deliver the prepared component supply device to the electronic component mounting machine in the production area before the set time. Then, the operator of the electronic component mounter sets the component supply device.
  • This allows the parts management operator to centrally manage the parts in the parts preparation area and efficiently operate the parts in addition to the operation and effects of the invention described above. As a result, the cost of parts can be reduced.
  • the component management device includes: a component remaining number managing unit that manages the component remaining number of each component supply device; and a component remaining number managed by the component remaining number managing unit.
  • a component replenishment time calculation means for calculating the remaining time for replenishing components to the component supply device, and a component supply device requiring component replenishment are specified as component supply devices to be set in the electronic component mounting machine.
  • the notice means, The parts supply device specified by the specifying means and the remaining time of the parts supply device calculated by the parts replenishment time calculating means are notified to the parts management operator in advance.
  • the component management device when a component supply device that causes a component shortage during board manufacturing is detected, the component management device notifies the component management operator of the component supply device and the remaining time when the component shortage occurs.
  • the parts management operator at the rear prepares a new parts supply device in place of the parts supply device that will run out of parts, and replaces the prepared parts supply device with the production area by the time the parts run out. and c is delivered to the electronic component mounting apparatus, the new component supply devices are therefore replaced the operator of the electronic component mounting apparatus. Therefore, the parts can be replenished by setting a new component supply device in the electronic component mounter immediately before or immediately after the component runs out, and the operating rate of the electronic component mounter associated with the component replenishment is low. The bottom can be prevented.
  • the component management device grasps a plurality of board types on which components are mounted and the component types mounted on each board type, and determines a component type mounted on the next board type to be produced.
  • the component supply device is specified as the component supply device to be set in the electronic component mounting machine, and the notification means sets the component supply device by matching the specified component supply device with the production start time of the next board to be produced. Notice is given to the management operator.
  • the component management apparatus when there is a board type to be produced next, notifies the component supply device and the production start time relating to the board type to the component management operator. Prepares the component supply device for the next type of board to be produced, and delivers the prepared component supply device to the electronic mounting machine in the production area by the production start time. And the new component supply device is an electronic component mounting machine Replaced by the operator. Therefore, the setup can be changed by setting a new component supply device in the electronic component mounting machine before or immediately after the completion of the current production. The rate can be prevented from lowering as much as possible.
  • FIG. 1 is an overall configuration diagram showing an electronic component mounting system according to one embodiment of the present invention.
  • FIG. 2 is a production diagram in which the electronic component mounting line of FIG. 1 is installed.
  • FIG. 3 is a functional block diagram showing the electronic component mounting machine shown in FIG. 2
  • FIG. 4 is a functional block diagram showing the electronic component mounting machine shown in FIG. 2.
  • FIG. 5 is a functional block diagram showing the computer for computer management
  • FIG. 5 is a functional block diagram showing the computer for component management in FIG. 1
  • FIG. 7 is a diagram illustrating a feeder component information database stored in a storage unit in FIG. 7.
  • FIG. 7 is a diagram illustrating a feeder position information database stored in the storage unit in FIG.
  • FIG. 8 is a functional block diagram showing the computer for registering parts shown in FIG.
  • FIG. 10 is a flowchart showing a program executed by the parts management computer
  • FIG. 10 is a flowchart showing a program executed by the parts management computer.
  • Is a flowchart showing a program executed on the parts management computer
  • FIG. 12 is a flowchart showing a program executed on the parts management computer.
  • FIG. 13 is a diagram showing a display state on a display unit of the component management computer
  • FIG. 14 is created by a component management computer according to a modification of the present invention.
  • FIG. 15 is a diagram illustrating component mounting information
  • FIG. 15 is a diagram illustrating mounting completion time information created by a component management computer according to a modification of the present invention.
  • FIG. 1 is an overall configuration diagram showing an electronic component mounting system in which a plurality of electronic component mounting machines are installed in the production area and a component management device is installed in the component preparation area.
  • FIG. 2 is a configuration diagram illustrating a production area in which a plurality of electronic component mounting lines including machines are installed.
  • the electronic component mounting system consists of a plurality of electronic component mounting lines 10 installed in the production area As, an electronic component mounting machine management computer 30 installed in the production area As, and a component preparation area. It consists of a parts management computer 40 that constitutes a parts management device installed in Ab.
  • the electronic component mounting line 10, the electronic component mounting machine management computer 30, and the component management computer 40 are a local area network (hereinafter referred to as LAN) that constitutes a network in the factory. ) It is communicably connected via 50.
  • LAN local area network
  • a component supply device (a component supply feeder which is a feeder type component supply device) in which components (for example, electronic component reels R) are set in the vicinity of each electronic component mounting line 10 in advance.
  • a shelf T as for storing D f is installed.
  • the component preparation area A b has a shelf T ab1 for receiving and storing the electronic component reels R registered and processed in the loading area A t, a shelf T ab 2 for storing an empty component supply device D f, and A shelf T ab that stores the component supply device D f on which the electronic component reel R is set and registered.
  • each electronic component mounting line 10 is a production line configured by arranging a plurality of electronic component mounting machines 20.
  • Each electronic component mounter 20 is to produce printed boards by mounting electronic components on the boards transported in cooperation.
  • Each electronic component mounter 20 is a so-called robot type.
  • the X-axis robot which moves in the X-axis and Y-axis directions orthogonal to each other in the same horizontal plane, has a component transfer unit 28 provided with a mounting head on the robot, and a fixed component supply unit 27 After the components are sucked, they are mounted on a board supported by the board transport section 26.
  • This electronic component mounter 20 includes a control unit 21 as shown in FIG.
  • the communication unit 22 connected to the control unit 21 is connected to the electronic component mounting machine management computer 30 and the component management computer 40 via LAN 50.
  • the control unit 21 has a microcomputer (not shown).
  • the microcomputer has an input / output interface, a CPU, a RAM, and a ROM (all not shown) connected via a bus. Have.
  • the CPU executes a predetermined program to control the mounting of electronic components on the board.
  • RAM temporarily stores variables required for executing the program
  • ROM stores the program.
  • the input unit 23, output unit 24, rewritable storage unit 25, board transfer unit 26, component supply unit 27, component transfer unit 28, and image processing unit 29 are connected to the control unit 21. Have been.
  • the input unit 23 is operated by an operator to input commands, data, and the like necessary for mounting the board.
  • the output unit 24 displays and prints various states relating to the board mounting control.
  • the storage unit 25 includes a system program for controlling the entire apparatus, a control program for individually controlling each element of the apparatus on the system program, a board production program, a calibration program, various other application programs, and the like. This is for storing data.
  • the board transfer section 26 carries in the board. ⁇ Carries out and carries out positioning and support.
  • the component supply unit 27 supplies electronic components to be mounted on the board, and a plurality of electronic component reels R each containing the electronic components are detachably mounted.
  • the component supply device D f is detachably mounted side by side.
  • the component transfer section 28 picks up the electronic components supplied by the component supply section 27 and mounts the electronic components on the board positioned and supported by the board transport section 26.
  • the image processing unit 29 processes the image data of the part which is being transferred and the image data of the board which has been imaged.
  • the board transfer section 26, the component supply section 27, and the component transfer section 28 are provided with drive mechanisms such as a servomotor and a stepping motor.
  • the electronic component mounter management computer 30 mainly controls the operation of each electronic component mounter 20.
  • the electronic component mounter management computer 30 includes a control unit 31, and a communication unit 32 connected to the control unit 31 electronically connects via the LAN 50. It is connected to the component mounter 20 and the component management computer 40.
  • the control unit 31 has a microcomputer (not shown).
  • the microcomputer has an input / output interface, a CPU, a RAM, and a ROM (all not shown) connected via a bus. .
  • the CPU executes a predetermined program to execute control for controlling the operation of each electronic component mounter 20.
  • RAM is for temporarily storing variables required for executing the program
  • ROM is for storing the program.
  • the control section 31 has an input section 3.3, an output section 34, a rewritable storage section 35, an electronic component mounting machine registration processing section 36, an electronic component mounting machine production control section 37, and information acquisition. Section 3 8 is connected.
  • the input unit 33 is used by the operator to input necessary information, data, and the like.
  • the output unit 34 displays and prints various states related to control.
  • the storage unit 35 stores information on the operation status taken from each electronic component mounter 20, for example, the number of components consumed, the number of components used per board, and the number of components used per board. It stores the production time, the number of sheets to be produced, the number of boards produced, and the like.
  • the electronic component mounting machine registration processing section 36 is a computer for electronic component mounting machine management.
  • the registration processing is performed when the line organization of each electronic component mounting line 10 that is comprehensively managed by 30 is changed.
  • the updated latest line organization data is stored in the storage unit 35.
  • the electronic component mounter production general control section 37 controls (cooperates with) the operation of each electronic component mounter 20.
  • the information capturing unit 38 is used to provide information on the status (operating status) of each electronic component mounting machine 20 (for example, the number of components consumed, the number of components used per board, the production time per board, the production schedule) Number of boards and the number of boards produced).
  • the component management computer 40 centrally manages electronic components consumed by the electronic component mounter 20 of each electronic component mounting line 10 installed in the production area As. As shown in FIG. 5, the component management computer 40 includes a control unit 41, and a communication unit connected to the control unit 41.
  • the microphone-equipped computer has an input / output interface, a CPU, a RAM, and a ROM (all not shown) connected via paths.
  • the CPU executes a predetermined program and sends the component status of the component supply device D f, production information (planned number of production, per board) from the electronic component mounter 20 or the electronic component mounter management computer 30. (Production time, etc.) to manage the electronic component reels R of these component supply devices Df, and to set the component supply device Df to be set in the electronic component mounter 20 and the component supply device Df. Performs control to notify the parts management operator of the remaining time until the set time to reset.
  • RAM is the same program And a ROM for temporarily storing variables required for executing the program.
  • the control unit 41 includes an input unit 43, a display unit (output unit) 44, a rewritable storage unit 45, a remaining parts management unit 46, a parts replenishment notice unit 47, and an information acquisition unit 48. It is connected.
  • the input unit 43 is used by the operator to input necessary information, data, and the like.
  • the input section 43 has a bar code reader 43a, and indicates the par code R a and D fa pasted to the electronic component reel R and the component supply device D f by the bar code reader 43a. Read each ID (identification symbol) that has been assigned.
  • the display unit 44 displays the component supply device Df to be set in the electronic component mounter 20 and the remaining time until the set time for setting the component supply device Df.
  • the storage unit 45 stores information about the operation status taken from each electronic component mounter 20 (for example, the number of components consumed, the number of components used per board, the production time per board, the number of scheduled production). And the number of boards produced, etc.), and as shown in Fig. 6, the ID of the mounted electronic component reel R and the remaining number of components using the ID of the component supply device D f as a key.
  • the feeder component information database (feeder component information DB), which consists of the component names, component names, and component run-out times, and as shown in Fig. 7, the component supply device Df Of the electronic component mounter 20, the set position ID of the component supply unit 27 of the electronic component mounter 20, and the ID of the electronic component mounting line 10 to which the electronic component mounter 20 belongs.
  • the remaining components management unit 46 determines the number of components held by the component supply device D f before the start of mounting and the number of components received from the electronic component mounter 20 based on the number of components consumed. It calculates the number of remaining components of each component supply device D f of the child component mounter 20.
  • the parts replenishment notice unit 47 supplies components based on the number of remaining components in each component supply device D f stored in the storage unit 45 and the production time per board received from the electronic component mounting apparatus 20. It calculates the time when the parts held by the device D f are empty (part time out), that is, the remaining time to replenish the parts (or the time to replenish). The remaining time for replenishing the components is the remaining time until the set time for setting the component supply device D f in the electronic component mounter 20.
  • the set time refers to the time when the component becomes empty, that is, the time when the component should be refilled.
  • the information capturing unit 48 stores information on the status (operating status) of each electronic component mounting machine 20 (for example, the number of components consumed, the number of components used per board, the production time per board, the production time). The planned number of boards and the number of boards produced) are taken in.
  • the component management computer 40 is preferably installed in the component preparation area Ab, but may be installed in another area. Also, instead of providing the component management computer 40, the above-described component management function of the component management computer 40 may be mounted on the electronic component mounting machine management computer 30 or the component registration computer 60. It may be. In this case, the operator of the electronic component mounting machine management computer 30 or the component registration operator OP1 of the component registration computer 60 also has the role of the component management operator OP2.
  • the component registering combo 60 installed in the receiving area At shown in FIG. 1 is for registering the electronic component reels R received in the receiving area At.
  • the component registration computer 60 has a control unit 61, and a communication unit 62 connected to the control unit 61 has an electronic component mounting machine 2 via a LAN 50. 0, connected to electronic component mounter management computer 30 and component management computer 40.
  • Control unit 6 1 The micro computer has an input / output interface, a CPU, a RAM, and a ROM (all not shown) connected via a bus.
  • the CPU executes a predetermined program to perform control for managing the electronic component reel R.
  • RAM temporarily stores variables required for executing the program
  • ROM stores the program.
  • the control unit 61 is connected to an input unit 63, an output unit 64, a rewritable storage unit 65, a barcode reader 66 and a barcode printer 67, and the input unit 63 is used by an operator. They operate and enter necessary information and data.
  • the output unit 64 displays various states related to control.
  • the storage unit 65 stores the ID of each electronic component reel R, the mounted component name, and the number of mounted components in association with each other.
  • the bar code reader 66 reads a per code label originally attached to the electronic component reel R and acquires the mounted component name and the number of mounted components.
  • the bar code printer 67 prints the ID of the electronic component reel R, the name of the mounted component, and the bar code label Ra indicating the number of mounted components.
  • the computer 60 for registering parts registers an ID on an electronic component reel in which the name of the mounted parts and the number of mounted parts are input by the input operation of the parts registration operator OP 1 or the bar code reader 66.
  • the ID of each electronic component reel R, the mounted component name, and the number of mounted components are stored in association with each other automatically.
  • control units 21, 31, 41, 61 of the electronic component mounting machine 20, the electronic component mounting machine management computer 30, the component management computer 40, and the component registration computer 60 are the same. Each of them performs their own processing in parallel, and exchanges data as necessary. Is going.
  • the component management computer 40 repeatedly executes a program corresponding to the above-mentioned flow chart every predetermined short time. Each time the part management computer 40 starts executing the program in step 100 of FIG. 9, the part reel management routine 40 executes the parts reel management routine in steps 102, 104, and 106. Each part remaining number management routine and the parts replenishment notice routine are executed.
  • the component management operator OP2 sets the electronic component reel R in the component supply device Df
  • the barcode labels Dfa and Ra attached to both are read by the barcode reader 43a, and the information is read.
  • the ID of the component supply device Df indicated by the code label Dfa is associated with the ID of the electronic component reel R, the name of the mounted component, and the number of mounted components, which are indicated by the barcode label Ra.
  • register that is, when the feeder component information is input by the component management operator OP2, the component management computer 40 enters the feeder component information DB shown in FIG. 6 in the component reel management routine shown in FIG. Additional registration of new feeder part information is performed (steps 202 and 204).
  • the component management computer 40 executes the remaining component count management routine shown in FIG. Specifically, the ID of the component supply device D f in which the component has been consumed in mounting the component on the board from the electronic component mounter 20 (or the computer 30 for managing the electronic component mounter) and the consumption of the component.
  • the feeder component information of the component supply device D # of the corresponding ID is read from the storage unit 45 (steps 302, 304), and the consumed number is subtracted from the remaining component number.
  • the feeder component information is updated and registered in the storage unit 45 as a result of the subtraction as a new component remaining number (step 300).
  • the component management computer 40 counts all remaining components of the component supply device D f set in the electronic component mounter 20 connected via the LAN 50. to manage.
  • the parts management computer 40 executes a parts replenishment notification routine shown in FIG.
  • the component management computer 40 determines whether the flag F force S is "0".
  • Flag F is a flag indicating whether or not the component management computer 40 has received the production time per board from the electronic component mounter 20 or the electronic component mounter management computer 30. When "1", it indicates that the production time has been received. Since the flag F is reset to ⁇ 0 '' when the component management computer 40 is started, the component management computer 40 determines YES and NO in steps 402 and 404, respectively. Proceed to step 4 to terminate the execution of this program.
  • the component management computer 40 When the component management computer 40 receives the production time per board from the electronic component mounting machine 20 (or the electronic component mounting machine management computer 30), it determines YES in step 404. Then, in step 400, the flag F is set to “1”. As a result, the program can be determined to be NO at step 402 next time, and the program can proceed to step 408 by skipping the processing of steps 404 and 406.
  • the component management computer 40 reads out all the IDs of the component supply devices D ⁇ currently involved in the production based on the feeder position information DB shown in FIG. 7, and reads the feeder component information of those component supply devices D f. It is read from the feeder part information DB stored in the storage unit 45 (step 4 08), and the part supply time when the part supply device D f is out of parts is calculated from the remaining number of parts and the production time, and the calculation result is included.
  • the registered feeder component information is updated and registered in the feeder component information DB (step 410).
  • the component management computer 40 manages all the component outage times of the component supply device D f set in the electronic component mounter 20. In addition, when parts run out The interval is calculated by the following equation (1).
  • the number of components used per board is obtained from the electronic component mounter 20 or the electronic component mounter management computer 30.
  • the component management computer 40 displays the component supply devices D f on the display unit 44 in ascending order of the component outage time calculated in step 410 (step 412). Specifically, as shown in Fig. 13, the ID of the component supply device D f is used as a key, and the set position of the component supply device D f is displayed. .
  • the feeder set position indicates a line ID, an electronic component mounter ID, and a set position ID in order from the left, and specifies a place where the component supply device D f is set.
  • the part supply device D f at which a part runs out can be notified to the parts management operator OP2 together with the time at which the part runs out.
  • the component management computer 40 monitors the component supply device Df that is running out of components during production, and warns the component supply device Df.
  • the production completion time is calculated from the planned number of productions and the production time (step 4 14), and when the production completion time is shorter than the part outage time compared with the previously calculated part outage time, The component supply device Df determines that the component has run out during production, and displays a warning on the display unit 44 (steps 4 16 and 4 18). As a result, even if the parts outage time is the same or longer, the parts supply device D f for which parts replacement should be performed with priority can be notified to the parts management operator OP2.
  • the planned production quantity is obtained from the electronic component mounting machine 20 or the electronic component mounting machine management computer 30 power.
  • the component management operator OP 2 preliminarily sets the component supply device D f having the electronic component reel R required for the electronic component mounter 20 based on the notice or warning of component shortage by the component management computer 40 described above. This is to prepare and deliver to the shelf T as of the electronic component mounting line 10 constituting the corresponding electronic component mounter 20 before the components run out.
  • the information about the above-mentioned warning about running out of components issued by the component management computer 40 is transmitted to the electronic component mounter 20, and the electronic component mounter 20 also issues a warning.
  • the operator OP 3 of the electronic component mounter 20 takes out a new component supply device D f instead of the component supply device D f used to run out of components from the shelf T as which is delivered and stored in advance.
  • the component management computer 40 transmits the component supply device D f
  • the part management operator OP 2 in the parts preparation area A b notifies the part management operator OP 2 of the remaining time when the parts run out and the remaining time when the parts run out.
  • the new component supply device D # is mounted on the component supply unit 27 by the operator # 3 of the electronic component mounter 20.
  • the electronic component mounter 20 detects that the new component supply device D f has been attached to the component supply unit 27, and when the component supply device D f, which is used to cut components, runs out of components, a new component supply device D f. Parts will be sampled from D f. Therefore, since the component management operator OP 2 performs the component preparation work which was previously performed by the operator OP 3 of the electronic component mounting machine 20, the burden on the operator OP 3 of the electronic component mounting machine 20 can be reduced. .
  • the parts management operator OP 2 can centrally manage the parts in the parts preparation area A b and operate the parts efficiently, the parts cost can be reduced as a whole. .
  • the component supply device D f of the electronic component mounter 20 runs out of parts during production.
  • the component supply device D f to be set in the mounter 20 (steps 410 to 418)
  • the component management computer 40 grasps a plurality of board types on which components are to be mounted and the component types mounted on each board type, and obtains all the component types mounted on the next board type to be produced.
  • the component supply device Df of the component is specified as the component supply device Df to be set in the electronic component mounter 20, and the component supply device Df thus identified and the production start time of the next board type to be produced are determined. Parts management operator Notice to Data OP 2.
  • the production start time is a set time at which the component supply device D f should be set in the electronic component mounter 20. The remaining time until the start of production may be displayed together, or only this remaining time may be displayed.
  • the component management combinator 40 notifies the component management operator OP 2 of the component supply device D f and the production start time for the board type.
  • the component management operator OP2 in the component preparation area Ab prepares the component supply device Df for the next board type to be produced, and prepares the prepared component supply device Df by the production start time.
  • the product is delivered to the electronic component mounting machine 20 in the production area A s.
  • the new component supply device D f is set by the operator OP 3 of the electronic component mounter 20.
  • the setup can be changed by setting a new component supply device D f to the electronic component mounter 20 before or immediately after the completion of the current production, and the operation of the electronic component mounter accompanying the setup change can be performed.
  • the rate can be prevented from lowering as much as possible.
  • the component outage time was calculated based on the number of remaining components and the production time per board. However, the component outage time was calculated based on the remaining number of components and the mounting time per component. Time may be calculated.
  • the component management computer 40 receives the component mounting information (see FIG. 14) from the electronic component mounting machine 20 (or the electronic component mounting machine management computer 30), and receives the component mounting information. Calculates mounting completion time information (see Fig. 15.) for each component type (mounted component name) based on the.
  • the component mounting information includes the component mounting order, the component ID, the mounted component name (component type), the mounting time, which is the time required from the time when the previous mounting was completed to the time when the next mounting was completed, and the mounting order. It is composed of the total time obtained by integrating the mounting time.
  • the mounting time can be obtained by actual measurement or calculation.
  • Wearing Completion time information consists of a component ID and mounting completion time.The same mounting component name is picked up from the component mounting information, and is created by associating the component ID with the mounting completion time in the component mounting order. is there. For example, the mounting completion time information of the mounted component name RA001 created from the component mounting information of FIG. 14 is shown in FIG.
  • component IDP001 which is the first component of scale 01
  • component IDPO50 the second component of RAO01
  • the mounting of the component IDPO 51 is completed when T 3 has elapsed.
  • the component management computer 40 reads out all the IDs of the component supply devices D f that are currently involved in production based on the feeder position information DB shown in FIG. 7, and reads the feeder component information of those component supply devices D f.
  • the feeder component information read from the feeder component information DB stored in the storage unit 45, and the component supply device Df calculates the component outage time at which the component supply device Df will run out of components based on the number of remaining components and the mounting completion time, and includes the calculation result and includes the calculation result Is updated and registered in the feeder parts information DB.
  • the component management computer 40 manages all the component outage times of the component supply device D f set in the electronic component mounter 20.
  • the component outage time is the sum of the quotient of the number of remaining components divided by the amount of components used per board multiplied by the production time per board, and the mounting completion time corresponding to the remainder of the division. Represented by According to this, the component outage time can be calculated more accurately.
  • the present invention is applied to the robot-type electronic component mounter 20.
  • the present invention may be applied to a rotary-type electronic component mounter.
  • a mounting head for picking up and mounting electronic components is fixed rotatably, and after picking up components from a component supply unit fixedly slidable, the components are conveyed by a loader unit.
  • XY tape It is mounted on a substrate positioned by a tool (movable in the X-axis and Y-axis directions).
  • the production area A s is stopped after the component supply device D f has run out of components and the electronic component mounting machine 20 stops.
  • the new component supply device D f delivered to the electronic component mounter 20 is replaced and mounted on the component supply unit 27 by the operator OP3 of the electronic component mounter 20.
  • the component supply device D f is a feeder-type component supply device to which the electronic component reel R is detachably attached.
  • the present invention is not limited to this. The present invention can also be applied to a tray type, a stick type, a balcar cartridge type, and the like.
  • the component registration computer 60 installed in the receiving area At will notify the component registration operator OP1 of the component supply device to be set in the electronic component mounter 20. It may be.
  • the electronic component reel R to be set in the electronic component mounter 20 can be preferentially delivered to the component preparation area Ab.
  • the component management function of the electronic component mounting machine is assigned to a component management device separate from the electronic component mounting machine, and the component management operator is dedicated.
  • the electronic part It is suitable for reducing the burden on the operator of the component mounting machine and improving production efficiency.

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Operations Research (AREA)
  • Supply And Installment Of Electrical Components (AREA)

Abstract

L'invention concerne une système de montage de pièces électroniques qui comprend : une pluralité de dispositifs de montage de pièces électroniques permettant de monter des pièces fournies par une pluralité de dispositifs d'approvisionnement en pièces (Df) sur un substrat ; et un ordinateur de gestion des pièces (40) communiquant avec les dispositifs de montage de pièces électroniques et gérant les pièces des dispositifs d'approvisionnement en pièces. L'ordinateur de gestion des pièces (40) signale à un opérateur de gestion des pièces (OP2) quel est le dispositif d'approvisionnement en pièces qui doit être programmé sur le dispositif de montage de pièces électroniques.
PCT/JP2004/006766 2003-05-14 2004-05-13 Systeme de montage de pieces electroniques WO2004103052A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005506233A JPWO2004103052A1 (ja) 2003-05-14 2004-05-13 電子部品実装システム

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2003-136175 2003-05-14
JP2003136175 2003-05-14

Publications (1)

Publication Number Publication Date
WO2004103052A1 true WO2004103052A1 (fr) 2004-11-25

Family

ID=33447209

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2004/006766 WO2004103052A1 (fr) 2003-05-14 2004-05-13 Systeme de montage de pieces electroniques

Country Status (2)

Country Link
JP (1) JPWO2004103052A1 (fr)
WO (1) WO2004103052A1 (fr)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014064938A1 (fr) * 2012-10-23 2014-05-01 パナソニック株式会社 Système de montage de composant électronique
WO2016013107A1 (fr) * 2014-07-25 2016-01-28 富士機械製造株式会社 Système de remplacement automatique de distributeur
JP2017130593A (ja) * 2016-01-22 2017-07-27 富士機械製造株式会社 フィーダ自動交換システム
JP2017224721A (ja) * 2016-06-15 2017-12-21 富士機械製造株式会社 スプライシングユニット及び電子部品供給システム
WO2019187007A1 (fr) * 2018-03-30 2019-10-03 ヤマハ発動機株式会社 Dispositif et procédé de gestion de flux de composant et système de montage de composant
WO2019187033A1 (fr) * 2018-03-30 2019-10-03 ヤマハ発動機株式会社 Système de gestion d'opérations et système de montage de composants
WO2019229882A1 (fr) * 2018-05-30 2019-12-05 ヤマハ発動機株式会社 Système de gestion de réapprovisionnement en composants et système de montage de composants
EP3487276A4 (fr) * 2016-07-14 2020-03-11 Fuji Corporation Système de gestion de composants, dispositif de montage de composants, et procédé de gestion de composants
WO2024161552A1 (fr) * 2023-02-01 2024-08-08 株式会社Fuji Dispositif d'information de production et procédé d'information de production
WO2024161553A1 (fr) * 2023-02-01 2024-08-08 株式会社Fuji Dispositif de guidage de production et procédé de guidage de production

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5665616B2 (ja) * 2011-03-17 2015-02-04 富士機械製造株式会社 電気回路製造システム用製造数管理装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04346298A (ja) * 1991-05-23 1992-12-02 Matsushita Electric Ind Co Ltd 供給部品段取り方法
JPH09223896A (ja) * 1996-02-16 1997-08-26 Sharp Corp 電子部品実装機の部品管理システム
JP2001127487A (ja) * 1999-10-29 2001-05-11 Matsushita Electric Ind Co Ltd プリント基板実装システムを対象とした部品管理装置および部品管理方法
JP2002164697A (ja) * 2000-11-27 2002-06-07 Matsushita Electric Ind Co Ltd 実装工程における材料部品供給支援方法および装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04346298A (ja) * 1991-05-23 1992-12-02 Matsushita Electric Ind Co Ltd 供給部品段取り方法
JPH09223896A (ja) * 1996-02-16 1997-08-26 Sharp Corp 電子部品実装機の部品管理システム
JP2001127487A (ja) * 1999-10-29 2001-05-11 Matsushita Electric Ind Co Ltd プリント基板実装システムを対象とした部品管理装置および部品管理方法
JP2002164697A (ja) * 2000-11-27 2002-06-07 Matsushita Electric Ind Co Ltd 実装工程における材料部品供給支援方法および装置

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014086517A (ja) * 2012-10-23 2014-05-12 Panasonic Corp 電子部品実装システム
CN104663012A (zh) * 2012-10-23 2015-05-27 松下知识产权经营株式会社 电子部件安装系统
CN104663012B (zh) * 2012-10-23 2017-09-05 松下知识产权经营株式会社 电子部件安装系统
US9807920B2 (en) 2012-10-23 2017-10-31 Panasonic Intellectual Property Management Co., Ltd. Electronic component mounting system
WO2014064938A1 (fr) * 2012-10-23 2014-05-01 パナソニック株式会社 Système de montage de composant électronique
WO2016013107A1 (fr) * 2014-07-25 2016-01-28 富士機械製造株式会社 Système de remplacement automatique de distributeur
JPWO2016013107A1 (ja) * 2014-07-25 2017-04-27 富士機械製造株式会社 フィーダ自動交換システム
US9814168B2 (en) 2014-07-25 2017-11-07 Fuji Machine Mfg. Co., Ltd. Automatic feeder exchanging system
JP2017130593A (ja) * 2016-01-22 2017-07-27 富士機械製造株式会社 フィーダ自動交換システム
JP2017224721A (ja) * 2016-06-15 2017-12-21 富士機械製造株式会社 スプライシングユニット及び電子部品供給システム
EP3487276A4 (fr) * 2016-07-14 2020-03-11 Fuji Corporation Système de gestion de composants, dispositif de montage de composants, et procédé de gestion de composants
US11612090B2 (en) 2016-07-14 2023-03-21 Fuji Corporation Component management system, component mounting device, and component management method for predicting component exhaustion
CN111919522B (zh) * 2018-03-30 2021-06-22 雅马哈发动机株式会社 作业管理系统及元件安装系统
CN111919522A (zh) * 2018-03-30 2020-11-10 雅马哈发动机株式会社 作业管理系统及元件安装系统
JPWO2019187007A1 (ja) * 2018-03-30 2021-01-07 ヤマハ発動機株式会社 部品補給管理装置、部品実装システムおよび部品補給管理方法
JPWO2019187033A1 (ja) * 2018-03-30 2021-02-12 ヤマハ発動機株式会社 作業管理システム及び部品実装システム
WO2019187033A1 (fr) * 2018-03-30 2019-10-03 ヤマハ発動機株式会社 Système de gestion d'opérations et système de montage de composants
US11350551B2 (en) 2018-03-30 2022-05-31 Yamaha Hatsudoki Kabushiki Kaisha Operation management system and component mounting system
WO2019187007A1 (fr) * 2018-03-30 2019-10-03 ヤマハ発動機株式会社 Dispositif et procédé de gestion de flux de composant et système de montage de composant
WO2019229882A1 (fr) * 2018-05-30 2019-12-05 ヤマハ発動機株式会社 Système de gestion de réapprovisionnement en composants et système de montage de composants
JPWO2019229882A1 (ja) * 2018-05-30 2021-04-01 ヤマハ発動機株式会社 部品補給管理システム及び部品実装システム
US11968786B2 (en) 2018-05-30 2024-04-23 Yamaha Hatsudoki Kabushiki Kaisha Component replenishment management system and component mounting system
WO2024161552A1 (fr) * 2023-02-01 2024-08-08 株式会社Fuji Dispositif d'information de production et procédé d'information de production
WO2024161553A1 (fr) * 2023-02-01 2024-08-08 株式会社Fuji Dispositif de guidage de production et procédé de guidage de production

Also Published As

Publication number Publication date
JPWO2004103052A1 (ja) 2006-07-20

Similar Documents

Publication Publication Date Title
JP5511456B2 (ja) 部品供給ユニット、電子部品実装機および電子部品実装システム
EP3487276B1 (fr) Système de gestion de composants, dispositif de montage de composants, et procédé de gestion de composants
JP6411365B2 (ja) 支援装置
JP2001127487A (ja) プリント基板実装システムを対象とした部品管理装置および部品管理方法
JP6255243B2 (ja) 支援装置
WO2019187033A1 (fr) Système de gestion d'opérations et système de montage de composants
JP4372522B2 (ja) 表面実装機
WO2004103052A1 (fr) Systeme de montage de pieces electroniques
JP5588827B2 (ja) 対回路基板作業機群に対する作業者作業の計画作成方法
JP6694767B2 (ja) スプライシングユニット及び電子部品供給システム
JP6704451B2 (ja) スプライシングユニット
JP2000101291A (ja) プリント板ユニット生産における部品供給管理システム
WO2019038829A1 (fr) Dispositif de traitement d'informations, système de montage et procédé de traitement d'informations
WO2018073867A1 (fr) Unité d'épissurage
CN111903203B (zh) 元件补给管理装置、元件安装系统以及元件收纳部件的使用历史的管理方法
JP4119179B2 (ja) マルチベンダー対応smd搭載システム
WO2022085107A1 (fr) Système de production
JP7393566B2 (ja) 部品補給作業支援装置、部品補給作業支援方法、部品補給作業支援プログラムおよび記録媒体
JP7105390B2 (ja) 情報処理システム、実装システム及び情報処理方法
WO2018105073A1 (fr) Système de service et serveur
CN113597827B (zh) 管理装置以及安装系统
JP7374940B2 (ja) スプライシングユニット
JP2003332796A (ja) 電子部品実装装置および電子部品実装方法
JPH11312899A (ja) 同一機種生産における部品切れ予測システム
JPH05294416A (ja) 部品装着装置

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): GM KE LS MW MZ NA SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2005506233

Country of ref document: JP

122 Ep: pct application non-entry in european phase