WO2004093359A1 - ネットワーク管理方法及びネットワーク管理装置 - Google Patents

ネットワーク管理方法及びネットワーク管理装置 Download PDF

Info

Publication number
WO2004093359A1
WO2004093359A1 PCT/JP2003/004829 JP0304829W WO2004093359A1 WO 2004093359 A1 WO2004093359 A1 WO 2004093359A1 JP 0304829 W JP0304829 W JP 0304829W WO 2004093359 A1 WO2004093359 A1 WO 2004093359A1
Authority
WO
WIPO (PCT)
Prior art keywords
path
cross
alarm
disconnection
connect
Prior art date
Application number
PCT/JP2003/004829
Other languages
English (en)
French (fr)
Inventor
Yuichi Nagahama
Original Assignee
Fujitsu Limited
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Limited filed Critical Fujitsu Limited
Priority to PCT/JP2003/004829 priority Critical patent/WO2004093359A1/ja
Publication of WO2004093359A1 publication Critical patent/WO2004093359A1/ja

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/50Testing arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/06Management of faults, events, alarms or notifications
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L43/00Arrangements for monitoring or testing data switching networks
    • H04L43/08Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters
    • H04L43/0805Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability
    • H04L43/0811Monitoring or testing based on specific metrics, e.g. QoS, energy consumption or environmental parameters by checking availability by checking connectivity

Definitions

  • the present invention relates to a network management method and apparatus, and more particularly, to a network management method and apparatus for managing a network including a transmission device and a link.
  • FIG 11 shows a typical ring network management system.
  • transmission devices (Network Elements) 20_1-20 are connected in a ring by sequential links 30-1 through 30-4.
  • the transmission device 20-1 is connected to a network management device (NE-OPS) 100zJL and a craft terminal 40, and the transmission device 20-2 is connected to a network management device 2-2.
  • NE-OPS network management device 100zJL
  • a craft terminal 40 the transmission device 20-2 is connected to a network management device 2-2.
  • Network management apparatus 100 Z _1 is manages the transmission device 20-1, The transmission device 20-1, the cross-connect (Cross other network management device 100z_2 or craft terminal 40 Niyotsu Te own device Connect: In the following, it may be abbreviated as XC.) In other words, the function of sending an alarm to the network management device II-1 when the transmission path is connected / disconnected at the path signal level is disconnected (alarm function ) None (see steps S51 and S52).
  • the network management device 100zombl determines whether or not the cross-connect has been disconnected based on the notification. Was.
  • the database change notification function executes the executed command and the status change In other words, this is a function to notify the network management device of status changes of equipment / settings (Equipment / Facility) and connection / disconnection of XC, etc., and not alarm notification.
  • the status notification with occurrence / recovery is called an alarm, and the other status notifications are called events.
  • the network management device 100z_l cannot instantly detect the XC deleted from the other network management device ⁇ -2, and the XC It was necessary to perform a state reading operation and compare it with the current state.
  • the alarm function and the database change notification function are the same in a network management system other than the ring system.
  • Fig. 12 shows an example of the operation of the path misconnection notification alarm (Trace Mismatch Alarm) that monitors the misconnection of a path (or a mouth connect) established between the start point transmission device 20_2 and the end point transmission device 20_1.
  • This operation example particularly shows the operation in VC4 in SDH. This operation example will be described below.
  • the transmission side inserts the transmission trace value in the signal overhead.>
  • the reception side has the expected reception trace value, and the actual reception trace value and the expected reception trace value are This function generates an alarm when a mismatch occurs.
  • the function of the path error connection notification alarm when the J1 Pite is used in the SDH system, the function of the path error connection notification alarm when the J1 Pite is used, and in the WDM system, the same function is used when the J0 Pite is used.
  • this path erroneous connection notification alarm does not occur, for example, when the network management device 2-2 disconnects the above path of the end point transmission device 201-11 by the cross connect 26.
  • the network monitoring system method used in the network monitoring system uses a failure impact list and maintenance work information when a failure occurs in the monitored object (for example, cross-connect).
  • a failure impact list and maintenance work information when a failure occurs in the monitored object (for example, cross-connect).
  • the self-state count value corresponding to the monitored object in which the fault has occurred and the affected state count value corresponding to the monitored object affected by the generated fault whether the fault has occurred in the own device.
  • an influence failure caused by a failure occurring in the above is determined and an actual failure state is reliably notified to an administrator (for example, see Patent Document 1).
  • this system is effective when a failure is detected, but is effective when no failure is detected, such as when a path misconnection alarm does not occur.
  • the network management device shown in Fig. 11 and the above-mentioned network management device is erroneously operating when there is a transmission device managed by multiple network management devices and the cross-connect disconnection operation is performed without communication. It is not possible to instantly monitor disconnection.
  • the network management device cannot instantaneously monitor the disconnection when the cross-connect disconnection is mistakenly performed during the operation using the craft terminal in the managed transmission device.
  • the present invention manages a network composed of transmission devices and links. It is an object of the present invention to provide a network management method and apparatus which, when a path managed by its own apparatus is disconnected from another network management apparatus or terminal, immediately detects the disconnection of the path. Disclosure of the invention
  • a network management method provides a transmission device having a path error connection notification alarm function, a transmission trace value of a path start point transmission device and an expected reception trace value of a path end point transmission device.
  • the first step is to set the path to be different, and, when receiving a path error connection notification alarm from the path end point transmission device, it is determined that the path is in a normal connection state, and the path error connection notification alarm is restored.
  • the transmission device under the control of the network management device has a path misconnection notification alarm function (Trace Mismatch Alarm).
  • a transmission trace value is set in the path start point transmission apparatus, and an expected reception trace value different from the transmission trace value is set in the path end point transmission apparatus.
  • the transmission device transmits a path error connection notification alarm to the network management device that executes the network management method by using the path error connection notification alarm function.
  • the path end point transmission lightning does not transmit the path error notification alarm to the network management device due to the path error notification alarm function, but sends a report indicating the recovery of the path error connection notification alarm to the network management device.
  • the path was disconnected Is determined. This makes it possible to instantly recognize that the path has been disconnected.
  • a path normal connection signal is generated, and when it is determined that the path is disconnected, A path disconnection alarm can be generated.
  • the path normal connection signal and the path disconnection alarm can be a cross-connection normal connection signal and a cross-connection disconnection alarm, respectively. That is, normal connection and disconnection of a path can be regarded as normal connection and disconnection of a cross-connect, respectively.
  • a third step of registering the cross-connect disconnection alarm before the first step, and a step of receiving the cross-connect disconnection alarm after the second step It is possible to have a fourth step of determining that the registered cross-connect corresponding to the alarm is disconnected, and determining that the cross-connect corresponding to this signal is not disconnected when the cross-connect normal connection signal is received. .
  • a cross-connect disconnection alarm is registered.
  • this alarm upon receiving a cross-connect disconnection alarm, it is determined whether or not this alarm has already been registered. If it has been registered, it is determined that the cross-connect has been disconnected, and the cross-connect normal When a connection signal is received, it is determined that there is no disconnection of the cross-connect.
  • a network management method of the present invention includes a first step of registering information on a database state change notification corresponding to disconnection and restoration of a predetermined cross-connect, and the registered step. And a second step of determining whether or not the predetermined cross-connect has been disconnected, based on the received information and the information indicated in the database state change notification from the transmission device.
  • a status change notification that is notified when a database is changed is used in each transmission device for managing the path connection status in the network management device.
  • the database is changed in response to the commands of cross-connect disconnection (disconnection effort) and cross-connect connection (or disconnection recovery), and the database status change notification (event) notified at this time
  • the information of the predetermined notification is registered as information for semi-determining disconnection and restoration of the predetermined cross-connect.
  • the third step of registering a database state change notification corresponding to the predetermined cross-connect disconnection and disconnection recovery in the cross-connect disconnection alarm template may further include a step. As a result, it becomes possible to register a predetermined cross-connect and a corresponding database state change notification.
  • the transmission trace value of the path start point transmission apparatus and the reception trace value of the path end point transmission apparatus are transmitted to the transmission apparatus having the path error connection notification alarm function.
  • a fifth step of setting the expected trace value differently is further provided, and in the second step, a path error notification alarm from the path destination transmission device is further notified by a state change notification indicating a normal path connection state. Then, the recovery report of the path error connection notification alarm can be used as a state change notification indicating disconnection of the path.
  • the transmission trace value of the path start point transmission device and the expected reception trace value of the path end point transmission device are intentionally set to be different.
  • the path end transmission device determines that the path between the path start transmission device and the path end transmission device is correct.
  • the path error notification alarm is sent to the network management device by the path error notification alarm function, and if the path is disconnected, the recovery report of the path error alarm is sent.
  • the path error connection notification alarm is a status change notification indicating a normal connection state when the path is not disconnected, and the recovery report is a state change notification indicating the path disconnection.
  • the path (cross-connect) disconnection can be detected instantaneously by using the path error connection notification alarm function which has been used conventionally.
  • the network management device that implements the above-described method of the present invention differs from the transmission device having the path error connection notification alarm function in that the transmission trace value of the path start transmission device and the expected reception trace value of the path end transmission device differ.
  • a path setting unit configured to make a setting such that the path is in a normal connection state when a path error connection notification alarm is received from the path end point transmission device, and a recovery report of the path error connection notification alarm is issued.
  • a reception report determining unit for determining that the path has been disconnected when receiving the path.
  • the transmission device under the control of the present network management device has a path error connection notification alarm function.
  • the path setting unit sets a transmission trace value in the path start point transmission device, and sets an expected reception trace value different from the transmission trace value in the path end point transmission device.
  • the path end point The transmission device transmits a path error connection notification alarm to the network management device by the path error connection notification alarm function. Upon receiving this alarm, the reception report determination unit determines that the path is not disconnected and is in a normal connection state.
  • the path end point transmission device sends a path error connection notification alarm to its network, Not sent to the network management device, but a report indicating the restoration of the path error connection notification alarm is sent to the network management device.
  • This recovery report The reception report determination unit of the received network management device determines that the path has been disconnected.
  • the reception report determination unit generates a path normal connection signal when determining that the path is in a normal connection state, and generates a path disconnection alarm when determining that the path is disconnected. Can occur.
  • the path normal connection signal and the path disconnection alarm can be a cross-connect normal connection signal and a mouth disconnection alarm, respectively.
  • the reception report determination unit further comprises: a cross-connection loss alarm table for managing the cross-connection loss alarm; and an input unit for registering the cross-connect managed by the cross-connection loss alarm table.
  • a cross-connection loss alarm table for managing the cross-connection loss alarm
  • an input unit for registering the cross-connect managed by the cross-connection loss alarm table.
  • the network management device further includes a cross-connect disconnection alarm table and an input unit.
  • the cross-connect disconnection alarm table manages cross-connect disconnection alarms, and the cross-connects managed in this table can be registered from the input unit.
  • the reception report determination unit determines whether or not the cross-connect corresponding to this alarm is registered in the cross-connection loss alarm table.
  • the cross-connect is determined to be disconnected in the table, and the cross-connect corresponding to the cross-connect normal connection signal is determined not to be disconnected.
  • a normal alarm table that manages a normal cross-connect not registered in the cross-connect disconnection alarm table is further provided.
  • the reception report determination unit registers the normal cross-connect in the normal alarm table based on the path erroneous connection notification alarm and the recovery report. can do.
  • the normal cross-connect (path) is managed based on the normal path error notification alarm and its recovery report, and registered in the cross-connect loss alarm table based on the cross-connect normal connection signal and the cross-connect loss alarm.
  • Cross-connect management is possible.
  • the network management device of the present invention has a cross-connection disconnection alarm table in which information relating to a database state change notification corresponding to disconnection and disconnection recovery of a predetermined cross-connect is registered, and which manages whether or not the predetermined cross-connect has been disconnected. And a reception report determining unit that determines whether or not the predetermined cross-connect has been disconnected based on the registered information and the information indicated in the database state change notification from the transmission device. . .
  • a status change notification that is notified when a database is changed is used in each transmission device for managing the path connection status in the network management device.
  • the database is changed in response to the commands of cross-connect disconnection (disconnection occurrence) and cross-connect connection (or disconnection recovery).
  • the notification information is registered in the cross-connection disconnection alarm table as information for determining the disconnection and restoration of the prescribed cross-connect.
  • the reception report determination unit determines whether or not the corresponding cross-connection has been disconnected. Set whether to disconnect the relevant cross-connect in the cross-connect disconnection alarm table.
  • the cross-connect disconnection alarm table includes a database state change corresponding to the predetermined cross-connect disconnection and disconnection recovery.
  • An input unit for registering the information on the update notification may be further provided.
  • a display unit for displaying a cross-connect disconnection alarm based on the cross-connect disconnection alarm table it is possible to display the presence or absence of the disconnection on the display unit based on the cross-connect disconnection alarm table.
  • a setting unit wherein the reception report determination unit uses the path error connection notification alarm from the path end point transmission device as a state change notification indicating a normal connection state of the path, and outputs a recovery report of the path error connection notification alarm.
  • This can be a status change notification indicating path disconnection.
  • the path setting unit intentionally sets the transmission trace value of the path start point transmission device and the expected reception trace value of the path end point transmission device so as to be different from each other.
  • the path end point transmission device When the path between the path start point transmission apparatus and the path end point transmission apparatus is normally connected, the path end point transmission device sends a path error connection notification alarm to the network management device by the path error notification alarm function. If the path is disconnected, send a recovery report for a path error connection notification alarm.
  • the reception report determination unit sets the path error connection notification alarm as a state change notification indicating a normal connection state in which the path is not disconnected, and sets the recovery report as a state change notification indicating the path disconnection.
  • FIG. 1 is a block diagram showing a configuration example of embodiments (1) and (2) of a network management method and apparatus according to the present invention.
  • FIG. 2 is a diagram illustrating a network management method and apparatus according to the present invention.
  • FIG. 9 is a diagram illustrating an example of a service setting screen.
  • FIG. 3 is a diagram showing an example of a cross-connect disconnection alarm table in the embodiment (1) of the network management method and apparatus according to the present invention.
  • FIG. 4 is a block diagram showing an operation example of the transmission device in the embodiment (1) of the network management method and device according to the present invention.
  • FIG. 5 is a flowchart showing an operation procedure example (1) in the embodiment (1) of the network management method and apparatus according to the present invention.
  • FIG. 6 is a flowchart showing an operation procedure example (2) in the embodiment (1) of the network management method and apparatus according to the present invention.
  • FIG. 7 is a diagram showing an example of an XC disconnection alarm registration screen in the embodiment (2) of the network management method and apparatus according to the present invention.
  • FIG. 8 is a diagram showing an example of a cross connect disconnection alarm table in the embodiment (2) of the network management method and apparatus according to the present invention.
  • FIG. 9 is a flowchart showing an operation procedure example in the embodiment (2) of the network management method and apparatus according to the present invention.
  • FIG. 10 is a diagram showing an example of a cross-connect disconnection alarm display in the embodiment (2) of the network management method and apparatus according to the present invention.
  • FIG. 11 is a block diagram showing a cross-connect management example of a network management method and device in a general ring system.
  • FIG. 12 is a diagram showing an operation of a path error connection notification alarm in a conventional transmission device.
  • Embodiment (1) When a path connection error notification alarm is used
  • FIG. 1 shows an embodiment (1) of a network management device 100a according to the present invention.
  • the network management device 100a includes an input unit 10, a control unit (path setting unit) 11, a command transmission unit 12, an interface 13, a reception report determination unit 14a, a cross-connect disconnection alarm table 15a (hereinafter, an XC disconnection alarm table). ), A normal alarm table 16, a cross-connect connection table 17, an alarm display control unit 18a, and a display unit 19a.
  • the operator of the network management apparatus 100a inputs the information from the input unit 10 through, for example, the transmission apparatus 20_2 (named “KAWASAKI-01") and the transmission apparatus 20_1 (named “YOKOHAMA” in FIG. 12). -02 ".)
  • the command transmitting unit 12 transmits the cross-connect setting command 70a-1 and the trace value setting command 71a_l to the start point transmission device 20_1 via the interface 13, and outputs the cross-connect setting command 70a-2 and the trace value setting command 71a-2. To the destination transmission device 20-2.
  • Configuration examples of the cross-connect setting commands 70a-1 and 70a-2 and the trace value setting commands 71a-1 and 71a_2 are shown below.
  • ERR is "connection setting”
  • XC-VC4J is:” VC4 level signal cross-connect "”
  • AWASAKI-01 is the transmission device name
  • 5-1-1, 1-1-1
  • Means connection between identifier 5-1-1 and identifier 1-1-1
  • rcOOOOlJ means” command serial number ", and” 2WAY “means” two-way connection ".
  • EXPTRC “change setting”
  • KAWASAKI-01J is the transmission device name
  • 5-1-1 is“ setting for 5-1-1
  • ETR-XC-VC4 YOKOHAMA- 02: 1-1-1, 6-1-1: C00003 ::: 2WAY;
  • EDT-VC4 YOKOHAMA-02: 6-1-1: C00004 ::: SNDTR035, EXPTR035;
  • a path of signal level 2 "VC4" is set between the start point transmission apparatus 20_2 and the end point transmission apparatus 20_1.
  • the transmission trace value and expected reception trace value of the source transmission device 20_2 are both set to "01", and the transmission trace direct and reception expected trace values of the destination transmission device 20-1 are both set to "35".
  • Fig. 3 shows an example of the configuration of the XC disconnection alarm table 15a.
  • the table 15a is composed of a number 15a-1, a transmission device name 15a_2, a signal level 15a-3, an identifier 15a_4, and whether or not XC is disconnected 15a-5. Have been.
  • the path specified in FIG. 2 is registered in the XC disconnection alarm table 15a.
  • the transmission device name 15a_2 of the number 15a—1 “1”, the signal level 15a—3, and the identifier 15a — For “4”, “vasa ASA-01”, “VC4”, and “5-1-1” are registered, respectively.
  • For the number 15a1-1 “2”, “YOKOHAMA-02”, “ VC4, 'and "6-1-1" are registered.
  • FIG. 4 shows the transmission devices 20_1 and 20_2 for which a path has been set by the above-described cross-connect setting commands 70a-1 and 70a-1-2.
  • An operation example in a one-way path ending at the transmission device 20-1 is shown.
  • the J1 byte input unit 21 inserts the transmission trace value- “01” into the J1 byte.
  • the transmission trace value “01” is transmitted to the destination transmission device 20-1 via the path signal transmission unit 22, the cross-connect 23, and the optical signal transmission unit 24.
  • FIG. 5 shows an example of an operation procedure when a path incorrect connection notification alarm 72 is received from the network management device 100a and the terminal transmission device 20_1. An example of this operation procedure will be described below.
  • Step S21 In the network management apparatus 100a, the reception report determination section 14a (see FIG. 1) receives the path error alarm 72 from the interface transmission apparatus 201.
  • the reception report determination unit 14a receives the path error connection notification alarm It is determined whether 72 is registered in the XC disconnection alarm table 15a.
  • the alarm display control unit 18 sets the number 15a_l of the XC disconnection alarm table 15a to "2".
  • Step S24 If not registered, the reception report judging unit 14a registers the occurrence of the path incorrect connection notification alarm in the normal alarm table 16.
  • the alarm display control unit 18 refers to the normal alarm table 16 and displays a path erroneous connection notification alarm of the path on the display unit 19.
  • FIG. 6 shows an example of an operation procedure when the path error connection recovery report 73 is received from the network management apparatus 100a and the terminal transmission apparatus 20_1. An example of this operation procedure will be described below.
  • the reception report determination unit 14a receives the path error connection recovery report 73 from the end point transmission device 20-1.
  • Step S32 The reception report determination section 14a determines whether or not the path connection error notification alarm corresponding to the path connection recovery report 73 is registered in the XC disconnection alarm table 15a.
  • Step S34 When not registered, contrary to the case of step S33, the normal setting, that is, the transmission trace value of the transmission side and the expected reception trace value of the reception side are set to the same value.
  • the recovery report shows the traditional path Connect) indicates restoration of disconnection. Therefore, the reception report determination unit 14a registers the restoration of the cross-connection disconnection in the normal alarm table 16.
  • the alarm display control unit 18 refers to the normal alarm table 16 and clears the path and the Kure connection notification alarm of the path and does not display the alarm on the display unit 19.
  • Embodiment (2) When status change notification is used
  • the configuration of the network management device 100b in this embodiment (2) is basically the same as that of the network management device 100a in the embodiment (1) shown in FIG.
  • FIG. 1 also includes a configuration example of the network management device 100b.
  • the configuration of the network management device 100b is different from the configuration of the network management device 100a in that the control unit llb, the reception report determination unit 14b , And the operation of the alarm display control unit 18b and the configuration of the XC disconnection alarm table 15b are different from those of the control unit lla, reception report determination unit 14a, XC disconnection alarm table 15a, and XC disconnection alarm table 15a, respectively. That is.
  • control unit lib can register two status change notifications designated by the network administrator from the input unit 10 in the XC disconnection alarm table 15b. Then, one status change notification can be assigned to “equivalent to alarm occurrence” and the other status change notification can be assigned to “alarm recovery equivalent”.
  • the administrator of the network management device 100a inputs the information from the input unit 10, for example, in FIG. 11, the transmission device 201-2 (device name is "KAWASAKI-01") and the transmission device 201-1 (device An example of a screen image of the display unit 19 when inputting data for judging a path disconnection when a path is set between the name and "YOKOHAMA-02") is shown.
  • This screen displays the occurrence notification type 19b-1, the generating transmission device identifier 19b_2, the generation-related parameter 19b_3, the recovery notification type 19b-4, the recovery transmission device identifier 19b_5, the recovery-related parameter 19b_6, the setting 19b-7, and Cancel 19b—8 is displayed.
  • the occurrence notification type 19b_l “Database change notification (DB Change Report)”
  • the identifier of the generating transmission device 19b-2 “5-1-1”
  • the generation-corresponding parameter 19b_3 “DLT-XC;”
  • Recovery notification type 19b—4 “database change notification”
  • recovery transmission device identifier 19b-1 5 “6-1-1”
  • recovery equivalent parameter 19b—6 “ETR-XC”
  • FIG. 8 shows an example of the configuration of the XC disconnection alarm table 15b.
  • the table 15b includes a number 15b_l, a transmission device name 15b_2, a notification type 15b-13, a transmission device identifier 15b-14, and an occurrence-related parameter 15b-5. , Restoration equivalent parameters 15b-6, and the presence or absence of XC disconnection 15b-7.
  • 15b— 5 "DLT-XC”
  • recovery equivalent parameter 15b— 6 "ETR_XC”
  • transmission device name 15b-2, identifier 15b-4: Transmission device corresponding to "6-1-1” "YOKOHAMA" -02 "is registered.
  • FIG. 9 shows an operation example when the network management device 100b receives any of the status change notifications 80 to 82 from the transmission device 20-1. An example of this operation will be described below with reference to FIG.
  • Steps S41, S42 In the network management device 100b, the reception report determination unit 14b receives the status change notification 80, 81, or 82, and registers data corresponding to the received status change notification in the XC disconnection alarm table 15b. It is determined whether or not it has been performed.
  • the reception report judgment unit 14b processes the status change notification as a normal status change notification 82.
  • the reception report determination unit 14b determines whether the status change notification is registered as the status change notification 80 corresponding to the occurrence.
  • Step S46 The alarm display control section 18 refers to the XC disconnection alarm table 15b. To display the XC disconnection alarm on the display section 19b.
  • FIG. 10 shows a display example of the XC disconnection alarm on the display unit 1%.
  • the XC disconnection alarm is composed of a transmission device name 1_11, a signal type 1% _12, a transmission device identifier 19b-13, an alarm name 1_14, and an urgency level 19b_15.
  • the reception report determination unit 14b determines whether the status change notification is registered as the status change notification 81 corresponding to recovery.
  • Step S48 If not registered, the reception report judging unit 14b processes it as a normal state change notification 82.
  • the transmission trace value of the source transmission device and the expected trace value of the reception of the destination transmission device are set differently, and the generated path misconnection notification alarm and recovery report are used as the database status change notification. It is also possible to detect the presence or absence of a cross-connect break.
  • step S43 corresponds to step S34 of FIG. 6, and steps S45 and S49 can be processed corresponding to step S33, respectively.
  • the transmission trace value of the path start point transmission device and the expected reception trace value of the path end point transmission device are set differently, when a path misconnection notification alarm is received from the path endpoint transmission device, the path is determined to be in a normal connection state, and when a recovery report of the path misconnection notification alarm is received, Either judge that the path has been disconnected, or set whether or not the cross-connect has been disconnected in the cross-connect disconnection alarm tape based on the database status change notification corresponding to the specified cross-connect disconnection and restoration.
  • the disconnection of the path can be detected instantaneously.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Environmental & Geological Engineering (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

 伝送装置とリンクで構成されたネットワークを管理するネットワーク管理方法及び装置に関し、ネットワーク管理方法を実施するネットワーク管理装置が管理しているパスが他のネットワーク管理装置又は端末等から切断されたとき、このパス切断を瞬時に検出するため、パス始点伝送装置の送信トレース値とパス終点伝送装置の受信期待トレース値とを異なるように設定し、パス終点伝送装置からパス誤接続通知アラームを受信したとき、パスが正常な接続状態にあると判定し、該パス誤接続通知アラームの復旧レポートを受信したとき、パスが切断されたと判断するようにするか、又は所定のクロスコネクトの切断及び切断復旧に対応したデータベース状態変更通知に基づき、該クロスコネクトの切断の有無を該クロスコネクト断アラームテーブルに設定する。

Description

明 細 書 ネットワーク管理方法及びネットワーク管理装置 技術分野
本発明はネットワーク管理方法及び装置に関し、 特に、 伝送装置とリンクで構 成されたネットワークを管理するネットワーク管理方法及び装置に関するもの である。
近年、 通信技術の急速な発展に伴い、 データ通信は、 ますます、 高速化及び信 賴性が要求されている。 これに伴い、 ネットワーク管理装置における瞬時の障害 検出が、 ますます重要になって来ている。 背景技術
図 11 は、 一般的なリング状のネットワーク管理システムを示している。 この システムでは、伝送装置 (Network Element) 20_1〜20一 4力 順次リンク 30— 1〜30— 4 でリング状に接続されている。
そして、伝送装置 20— 1には、ネットワーク管理装置 (NE- OPS) lOOzJL及びクラ フト端末 40が接続され、 伝送装置 20—2には、 ネットワーク管理装置 ΙΟΟζ— 2が 接続されている。
ネットワーク管理装置 100Z_1は、 伝送装置 20— 1を管理しているが、 この伝送 装置 20— 1には、 他のネットワーク管理装置 100z_2又はクラフト端末 40によつ て自装置のクロスコネクト (Cross Connect :以後、 XCと略称することがある。)、 すなわち、 パス信号レベルで伝送路を接続/切断する部分、 が切断された場合に アラームをネットワーク管理装置 ΙΟΟζ— 1 に送出する機能 (アラーム機能) はな い (ステップ S51, S52参照)。
この場合、 ネットワーク管理装置 100z„lは、 伝送装置 20—1がデータベース変 更通知 (DB Change Report)機能を持つ場合は、 その通知を見てクロスコネクトが 切断されたか否かの判断を行っていた。
データベース変更通知機能は、 実行されたコマンドとそれによる状態変更、 す なわち、 装置/設定 (Equipment/Facility)の状態変更、 及び XCの接続/切断等、 をネットワーク管理装置 ΙΟΟζ一 1に通知する機能であり、アラーム通知ではない。 なお、 ここで、 発生/復旧の有る状態通知をアラームと称し、 それ以外の状態 通知をィベントと称する。
また、 ネットワーク管理装置 100z_lは、 伝送装置 20—1がデータベース変更通 知機能を持たない場合、他のネットワーク管理装置 ΙΟΟζ— 2から削除された XCを 瞬時に検出することは不可能であり、 XC状態読出しの操作を行つて現状との比較 を行う必要があった。
なお、 アラーム機能及びデータベース変更通知機能は、 リングシステムでない ネットワーク管理システムにおいても同様である。
図 12は、 始点伝送装置 20_2と終点伝送装置 20_1に張られたパス(又は、 ク口 スコネク ト)の誤接続を監視するパス誤接続通知アラーム(Trace Mismatch Alarm)の動作例を示しており、 この動作例では特に SDHにおける VC4における動 作を示している。 この動作例を以下に説明する。
パス誤接続通知アラームは、送信側において、信号のオーバーへッドに送信ト レース値を揷入し > 受信側において、 受信期待トレース値を持たせ、 実際の受信 トレース値と受信期待トレース値が不一致になったときにアラームを発生する 機能である。
例えば、 SDHシステムにおいては、 J1パイトを使った場合のパス誤接続通知ァ ラーム機能、 WDMシステムにおいては、 J0パイトを使った場合も同様の機能であ る。
まず、 始点伝送装置 20一 2及び終点伝送装置 20_1には、 それぞれ、 同じ値の送 信トレース値 = "01" 及ぴ受信期待トレース値 = "01" が設定されている。 ステップ S61:始点伝送装置 20—2において、 J1バイト揷入部 21は、 例えば、 信号 VC4の J1パイ トに送信トレース値 = "01" を揷入する。 この送信トレース 値 = "01" は、 パス信号送信部 22、 クロスコネクト 23、 及び光信号送信部 24を 経由して、 終点伝送装置 20—1に送出される。
ステップ S62:終点伝送装置 20一 1において、光信号受信部 25は、受信した信号 VC4を、 クロスコネクト 26及びパス信号受信部 27を介して J1パイト受信部 28 に送る。 Jlバイト受信部 28は、 J1に挿入された送信トレース値 = "01" を受信 し、 この値を受信トレース値 = "01" として、 J1バイト判断部 29に与える。
S63: J1バイト判断部 29は、 受信トレース値 = "01" と受信期待トレ ース値 = "01" とを比較して両者が一致した結果、 パス誤接続無しと判断する。 また、 J1バイト判断部 29は、 パスが誤接続されているため、 例えば、 受信トレ ース値 = "35" を受信した場合、 受信期待トレース値 = "01" と異なるので、 パ ス誤接続通知ァラ一ムをネットワーク管理装置 ΙΟΟζ一 1に出力する。
ただし、このパス誤接続通知アラームは、例えば、ネットワーク管理装置 ΙΟΟζ— 2 が終点伝送装置 20一 1の上記のパスをクロスコネクト 26で切断した場合、発生し ない。
また、 ネッ トワーク監視システム (ネッ トワーク管理装置) で使用するネッ ト ワーク監視システム方法には、 被監視物 (例えば、 クロスコネクト) に障害が発 生したとき、障害影響リストと保守作業情報を用 、て障害が発生した被監視物に 対応する自己状態カウント値と、該発生した障害の影響を受ける被監視物に対応 する影響状態カウント値を用いて、 自装置で発生した障害か、 他装置で発生した 障害に起因する影響障害かの切り分けを行い、実際の障害状態を確実に管理者に 通知するように図ったものもある (例えば、 特許文献 1参照)。
しかしながら、 このシステムは、 障害が検出された場合に有効であるが、 パス 誤接続アラームが発生しないような、 障害が検出されない場合には有効でなレ、。
(特許文献 1 )
特開平 5-207015号
すなわち、 図 11及び上記のネットワーク管理装置は、 複数のネットワーク管 理装置から管理されている伝送装置がある時に、連絡無しでクロスコネクト切断 の操作を行っている場合に、誤って運用中のものが切断されたことを瞬時に監視 することができない。
また、 ネットワーク管理装置は、 管理している伝送装置において、 クラフト端 末を用いた操作中に誤ってクロスコネクト切断が行われた場合、 この切断を瞬時 に監視することができない。
したがって、 本発明は、 伝送装置とリンクで構成されたネットワークを管理す るネットワーク管理方法及び装置において、 自装置が管理しているパスが他のネ ットワーク管理装置又は端末から切断されたとき、そのパス切断を瞬時に検出す ることを課題とする。 発明の開示
上記の課題を解決するため、 本発明のネットワーク管理方法は、 パス誤接続通 知アラーム機能を備えた伝送装置に対して、パス始点伝送装置の送信トレース値 とパス終点伝送装置の受信期待トレース値を異なるように設定する第 1のステ ップと、 該パス終点伝送装置からパス誤接続通知アラームを受信したとき、 パス が正常な接続状態にあると判定し、該パス誤接続通知アラームの復旧レポ一ト—を 受信したとき、該パスが切断されたと判定する第 2のステップとを備えたことを 特徴とする。 ·
すなわち、 例えばネットワーク管理装置の管理下にある伝送装置は、 パス誤接 続通知アラーム(Trace Mismatch Alarm)機能を備えている。 第 1のステップにお いて、 パス始点伝送装置に送信トレース値を設定し、 パス終点伝送装置に送信ト' レース値と異なる値の受信期待トレース値を設定する。
このように送信トレース値と受信期待トレース値とを意図的に異なる値に設 定したことにより、パス始点伝送装置とパス終点伝送装置との間のパスが正常に 接続されている場合、 パス終点伝送装置は、 そのパス誤接続通知アラーム機能に より、パス誤接続通知アラームを本ネットワーク管理方法を実行するネットヮー ク管理装置に送信する。
第 2のステップにおいて、 アラームを受信したとき、 パスが切断されていない 正常接続状態であると判定する。
パス始点伝送装置とパス終点伝送装置との間のパスが何らかの原因で切断さ れた場合、 例えば、他のネットワーク管理装置によつてパス終点伝送装置のク口 スコネクトが切断された場合、パス終点伝送装雷はそのパス誤接続通知アラーム 機能により、 パス誤接続通知アラームをネットワーク管理装置に送信せず、 パス 誤接続通知アラームの復旧を示すレポートをネットワーク管理装置に送信する。 第 2のステップにおいては、 復旧レポートを受信したとき、 パスが切断された と判断する。 これにより、 パスが切断されたことを瞬時に認識することが可能に なる。
また、 上記の本発明において、 該第 2のステップにおいて、 さらに、 該パスが 正常な接続状態にあると判定したとき、 パス正常接続信号を発生し、 該パスが切 断されたと判断したとき、 パス切断アラームを発生することができる。
また、上記の本発明において、該パス正常接続信号及び該パス切断ァラームを、 それぞれ、 クロスコネクト正常接続信号及びクロスコネクト断アラームとするこ とができる。 すなわち、 パスの正常接続及ぴ切断を、 それぞれ、 クロスコネク ト の正常接続及び断と見倣すことができる。
さらに、 上記の本発明において、 該第 1のステップの前に、 該クロスコネクト 断アラームを登録する第 3のステップと、 該第 2のステップの後に、 該クロスコ ネクト断アラームを受信したとき、 このアラームに対応する登録されたクロスコ ネクトを断有りと判定し、 該クロスコネクト正常接続信号を受信したとき、 この 信号に対応するクロスコネク トを断無しと判定する第 4のステップを有するこ とができる。
すなわち、 第 3のステップにおいて、 クロスコネク ト断アラームを登録する。 第 4のステップにおいて、 クロスコネク ト断アラームを受信したとき、 このァラ ームが既に登録されている否かを判定し、 登録されている場合、 クロスコネク ト の断有りと判定し、 クロスコネクト正常接続信号を受信したとき、 クロスコネク トの断無しと判定する。
これにより、登録したクロスコネクトの断の有無を管理することが可能になる。 また、 上記の課題を解決するため、 本発明のネットワーク管理方法は、 所定の クロスコネク トの切断及び切断復旧に対応したデータベース状態変更通知に関 する情報を登録する第 1のステップと、該登録された情報と伝送装置からのデー タベース状態変更通知に示された情報とに基づき、該所定のクロスコネク トの切 断の有無を判定する第 2のステップとを備えたことを特徴とする。
本発明では、 ネットワーク管理装置におけるパス接続状態の管理に、 各伝送装 置において、データベースが変更されたときに通知される状態変更通知を利用す る。 すなわち、 例えば、 一般的にクロスコネクト切断 (切断努生) とクロスコネク ト接続 (又は切断復旧) のコマンドに対してデータベースが変更されるが、 この とき通知されるデータベース状態変更通知 (イベント) の内の所定の通知の情報 を、 第 1のステップにおいて、 該所定のクロスコネクトの切断及び切断復旧を半 lj 定する情報として登録する。
第 2のステップにおいては、 上記の如く登録された情報に基づき、 伝送装置か ら受信したデータベース状態変更通知に示された情報が所定のクロスコネク ト の切断又は切断復旧を示しているとき、対応するクロスコネクトの切断の有無を 判定する。 .
これにより、登録されたクロスコネクトの切断の有無を認識することが可能に なる。 ' また、 上記の本発明において、 該第 1のステップの前に、 該クロスコネクト断 アラームテ一プルに、該所定のクロスコネクト切断及び切断復旧に対応したデー タベース状態変更通知を登録する第 3のステップをさらに備えることができる。 これにより、所定のクロスコネク トとそれに対応したデータベース状態変更通 知を登録することが可能になる。
また、 上記の本発明において、 該第 3のステップの後に、 該クロスコネクト断 有無の判定結果を表示する第 4のステップをさらに備えることができる。
すなわち、 該クロスコネク ト断の有無を表示することが可能になる。
さらに、 上記の本発明において、 該第 1のステップの前に、'パス誤接続通知ァ ラーム機能を備えた該伝送装置に対して、パス始点伝送装置の送信トレース値と パス終点伝送装置の受信期待トレース値を異なるように設定する第 5のステツ プをさらに備え、 該第 2のステップにおいて、 さらに該パス終点伝送装置からの パス誤接続通知アラームをパスの正常な接続状態を示す状態変更通知とし、該パ ス誤接続通知アラームの復旧レポ一トを該パスの切断を示す状態変更通知とす ることが可能である。
すなわち、 第 5のステップにおいて、 パス始点伝送装置の送信トレース値とパ ス終点伝送装置の受信期待トレース値を意図的に異なるように設定する。
パス終点伝送装置は、 パス始 伝送装置とパス終点伝送装置との間のパスが正 常に接続されている場合、 そのパス誤接続通知アラーム機能により、 パス誤接続 通知アラームをネットワーク管理装置に送信し、パスが切断された場合、 パス誤 接続通知アラームの復旧レポ一トを送信する。
第 2のステップにおいて、 パス誤接続通知アラームを、 パスが切断されていな レ、正常接続状態を示す状態変更通知とし、復旧レポートを該パスの切断を示す状 態変更通知とする。 これによつても、 従来から使用されているパス誤接続通知ァ ラーム機能を利用してパス(クロスコネクト)切断を瞬時に検出することが可能 になる。
上記の本発明方法を実施するネットワーク管理装置は、パス誤接続通知アラー ム機能を備えた伝送装置に対して、パス始点伝送装置の送信トレース値とパス終 点伝送装置の受信期待トレース値を異なるように設定するパス設定部'と、該パス 終点伝送装置からパス誤接続通知アラームを受信したとき、パスが正常な接続状 態にあると判定し、 該パス誤接続通知アラームの復旧レポ一トを受信したとき、 該パスが切断されたと判定する受信レポ一ト判断部とを備えたことを特徴とす る。
すなわち、 本ネットワーク管理装置の管理下にある伝送装置は、 パス誤接続通 知アラーム機能を備えている。 パス設定部は、 パス始点伝送装置に送信トレース 値を設定し、パス終点伝送装置に送信トレース値と異なる値の受信期待トレース 値を設定する。 '
このように送信トレース値と受信期待トレース値とを意図的に異なる値に設 定したことにより、パス始点伝送装置とパス終点伝送装置との間のパスが正常に 接続されている場合、 パス終点伝送装置は、 そのパス誤接続通知アラーム機能に より、 パス誤接続通知アラームをネットワーク管理装置に送信する。 このアラー ムを受信した受信レポ一ト判断部は、パスが切断されていない正常接続状態であ ると判断する。
パス始点伝送装置とパス終点伝送装置との間のパスが何らかの原因で切断さ れた場合、 パス終点伝送装置はそのパス誤接続通知アラーム機能により、 パス誤 接続通知アラームをネッ 1、ワーク管理装置に送信せず、パス誤接続通知アラーム の復旧を示すレポートをネットワーク管理装置に送信する。 この復旧レポートを 受信したネットワーク管理装置の受信レポート判断部は、パスが切断されたと判 断する。
これにより、 ネットワーク管理装置は、 パスが切断されたことを瞬時に認識す ることが可能になる。
また、 上記の本発明において、 該受信レボート判断部は、 該パスが正常な接続 状態にあると判定したとき、 パス正常接続信号を発生し、 該パスが切断されたと 判断したとき、 パス切断アラームを発生することができる。
また、上記の本発明において、該パス正常接続信号及び該パス切断アラームを、 それぞれ、 クロスコネク ト正常接続信号及びク口スコネクト断アラームとするこ とができる。
また、 上記の本発明において、 該クロスコネクト断アラームを管理するクロス コネクト断アラームテーブルと、該クロスコネクト断アラームテーブルで管理さ れるクロスコネク トを登録する入力部とをさらに備え、該受信レポート判断部が、 受信した該クロスコネク ト断アラームに対応するクロスコネク トが該テーブル に登録されているとき、 該クロスコネクトを断有りと判定し、 該クロスコネクト 正常接続信号に対応するクロスコネクトを断無しと判定することができる。
すなわち、 ネットワーク管理装置は、 クロスコネクト断アラームテーブル及び 入力部をさらに備えている。 クロスコネク ト断アラームテーブルには、 クロスコ ネクト断アラームを管理し、 このテーブルで管理されるクロスコネクトは入力部 から登録することが可能である。
受信レポート判断部は、 クロスコネクト断アラームを受信したとき、 このァラ ームに対応するクロスコネク トがクロスコネク ト断アラームテーブルに登録さ れている否かを判定し、 登録されている場合、 該テーブルに該クロスコネクトを 断有りと判定し、該クロスコネクト正常接続信号に対応するクロスコネクトを断 無しと判定する。
これにより、 クロスコネク ト断アラームテーブルで、 クロスコネク ト断の有無 を管理することが可能になる。
さらに、 上記の本発明において、 該クロスコネクト断アラームテーブルに登録 されていない通常のクロスコネクトを管理する通常アラームテーブルをさらに 有し、 該受信レポ一ト判断部は、 該通常のクロスコネクトをパス誤接続通知ァラ —ム及び該復旧レポ一トに基づき、該通常のクロスコネク トの接続状態を該通常 アラームテーブルに登録することができる。
これにより、通常のパス誤接続通知アラーム及びその復旧レポートに基づく通 常のクロスコネク ト (パス) の管理と共に、 クロスコネクト正常接続信号及びク ロスコネクト断アラームに基づくクロスコネク ト断アラームテーブルに登録さ れたクロスコネク トの管理が可能になる。
また、 本発明のネットワーク管理装置は、 所定のクロスコネク トの切断及び切 断復旧に対応したデータベース状態変更通知に関する情報が登録され、該所定の クロスコネク 卜の切断の有無を管理するクロスコネクト断アラームテーブルと、 該登録された情報と伝送装置からのデータベース状態変更通知に示された情報 とに基づき、該所定のクロスコネクトの切断の有無を判定する受信レポート判断 部とを備えたことを特徴とする。 。
本発明では、 ネットワーク管理装置におけるパス接続状態の管理に、 各伝送装 置において、データベースが変更されたときに通知される状態変更通知を利用す る。
すなわち、例えば、 クロスコネク ト切断(切断発生) とクロスコネク ト接続(又 は切断復旧) のコマンドに対してデータベースが変更されるが、 このとき通知さ れるデータベース状態変更通知 (イベント) の内の所定の通知の情報を、 この所 定のクロスコネクトの切断及び切断復旧を判定する情報として、 クロスコネク ト 断アラームテーブルに登録する。
受信レポ一ト判断部は、伝送装置から受信したデータベース状態変更通知に示 された情報が、 クロスコネクト断アラームテーブルに登録されている場合、 対応 するクロスコネクトの切断の有無を判定し、 例えば、 クロスコネクト断アラーム テーブルの当該クロスコネク トの切断の有/無を設定する。
これにより、 ネットワーク管理装置は、 クロスコネクト断アラームテーブルに 登録されたクロスコネク トの切断の有無を認識することが可能になる。
また、 上記の本発明において、 該クロスコネクト断アラームテーブルに、 該所 定のクロスコネク ト切断及び切断復旧にそれぞれ対応したデータベース状態変 更通知に関する該情報を登録する入力部をさらに備えることができる。
これにより、所定のクロスコネクトとそれに対-応したデータベース状態変更通 知を登録することが可能になる。
また、 上記の本発明において、 該クロスコネクト断アラームテーブルに基づき クロスコネクト断アラームを表示する表示部をさらに備えることができる。 これにより、 クロスコネクト断アラームテーブルに基づき、 表示部にクロスコ ネク ト切断の有無を表示することが可能になる。
さらに、 上記の本発明において、 パス誤接続通知アラーム機能を備えた該伝送 装置に対して、パス始点伝送装置の送信トレース値とパス終点伝送装置の受信期 待トレース値を異なるように設定するパス設定部を備え、該受信レポ一ト判断部 、該パス終点伝送装置からのパス誤接続通知アラームをパスの正常な接続状態 を示す状態変更通知とし、該パス誤接続通知アラームの復旧レポートを該パスの 切断を示す状態変更通知とすることができる。
すなわち、 パス設定部は、 パス始点伝送装置の送信トレース値とパス終点伝送 装置の受信期待トレース値を意図的に異なるように設定する。
パス終点伝送装置は、パス始点伝送装置とパス終点伝送装置との間のパスが正 常に接続されている場合、 そのパス誤接続通知アラーム機能により、 パス誤接続 通知アラームをネットワーク管理装置に送信し、 パスが切断された場合、 パス誤 接続通知アラームの復旧レポートを送信する。
受信レポ一ト判断部は、パス誤接続通知アラームをパスが切断されていない正 常接続状態を示す状態変更通知とし、復旧レポートを該パスの切断を示す状態変 更通知とする。
これによつても、パス(クロスコネクト)切断を瞬時に検出することが可能にな る。 図面の簡単な説明
図 1は、本発明に係るネットワーク管理方法及び装置の実施例(1)及び (2)の構 成例を示したプロック図である。
図 2は、 本発明に係るネットワーク管理方法及び装置の実施例(1)におけるパ ス設定画面例を示した図である。
図 3は、 本発明に係るネットワーク管理方法及び装置の実施例(1)におけるク ロスコネクト断アラームテーブル例を示した図である。
図 4は、 本発明に係るネットワーク管理方法及び装置の実施例(1)における伝 送装置の動作例を示したブロック図である。
図 5は、 本発明に係るネットワーク管理方法及び装置の実施例(1)における動 作手順例(1)を示したフローチャート図である。
図 6は、 本発明に係るネットワーク管理方法及び装置の実施例(1)における動 作手順例(2)を示したフローチャート図である。
図 7は、 本発明に係るネットワーク管理方法及び装置の実施例(2)における XC 断アラーム登録画面例を示した図である。
図 8は、 本発明に係るネットワーク管理方法及び装置の実施例(2)におけるク ロスコネクト断アラームテーブル例を示した図である。
図 9は、 本発明に係るネットワーク管理方法及び装置の実施例 (2)における動 作手順例を示したフローチャート図である。
図 1 0は、 本発明に係るネットワーク管理方法及び装置の実施例 (2)における クロスコネクト断アラーム表示例を示した図である。
図 1 1は、一般的なリングシステムにおけるネットワーク管理方法及び装置の クロスコネクト管理例を示したプロック図である。
図 1 2は、従来の伝送装置におけるパス誤接続通知アラームの動作を示した図 である。
符号の説明
100a, 100b, 100ζ_1, 100ζ_2 ネッ トワーク管理装置
10 入力部 lla, lib 制御部、 パス設定部
12 コマンド送信部 13 インタフェース
14a, 14b 受信レポート判断部
15a, 15b クロスコネク ト断アラームテーブル
15a一 1 番号 15a_2 伝送装置名
15a_3 信号レベル 15a— 4 識別子 15a— 5 XC断の有無 15b一 1 番号
15b一 2 伝送装置名 15b一 3 通知種別
15b_4 識別子 15b一 5 発生相当パラメータ
15b_6 復旧相当パラメータ 15b— 7 XC断の有無
16 通常アラームテーブル 17 クロスコネク ト接続テープノレ
18a, 18b アラーム表示制御部 19a, 19b 表示部
19a— 1 始点伝送装置名 19a— 2 識別子
19a_3 終点伝送装置名 19a— 4 識別子
19a_5 信号レベル 19a_6 XC断アラームの有効
19a一 7 XC断アラームの無効 19a_8 設定
19a_9 キャンセノレ 19b_l 発生通知種別
19b_2 発生識別子 19b_3 発生相当パラメータ
19b— 4 復旧通知種別 19b一 5 復旧識別子
19b_6 復旧相当パラメータ 19b_7 設定
19b_8 キャンセノレ 19b— 11 伝送装置名
19b一 12 信号種類 19b_13 伝送装置の識別子
19b_14 アラーム名 19b_15 緊急度
20_1〜20_4 伝送装置 21 J1バイト揷入部
22 パス信号送信部 23 クロスコネク ト (XC)
24 光信号送信部 25 光信号受信部
26 クロスコネク ト (XC) 27 パス信号受信部
28 J1バイ ト受信部 29 J1バイ ト判断部
30_1〜30_4 リンク 40 クラフト端末
70a— 1, 70a— 2 クロスコネク ト設定コマンド
71a_l, 71a— 2 トレース値設定コマンド
72 パス誤接続通知アラーム 73 パス誤接続復旧レボート
80 通常の状態変更通知 81 アラーム発生相当の状態変更通知
82 アラーム復旧相当の状態変更通知
図中、 同一符号は同一又は相当部分を示す。 発明を実施するための最良の形態
実施例(1) :パス誤接続通知アラームを用いた場合
図 1は、 フ 発明に係るネットワーク管理装置 100aの実施例(1)を示している。 このネットワーク管理装置 100aは、 入力部 10、 制御部 (パス設定部) 11、 コマ ンド送信部 12、 インタフェース 13、 受信レポ一ト判断部 14a、 クロスコネク ト断 アラームテーブル 15a (以下、 XC断アラームテーブルと称することがある。)、 通 常アラームテーブル 16、 クロスコネクト接続テーブル 17、 アラーム表示制御部 18a、 及び表示部 19aで構成されている。
図 2は、 ネットワーク管理装置 100aの操作者が、 入力部 10から、 例えば、 図 12において、伝送装置 20_2 (装置名を "KAWASAKI-01" とする。) と伝送装置 20_1 (装置名を "YOKOHAMA - 02" とする。) との間にパスを設定するときの表示部 19 の画面イメージ例を示している。
この画面では、 始点伝送装置名 19a— 1 = "KAWASAKI- 01"、 その識別子 19a_2 = "5-1-1"、終点伝送装置名 19a_3= "YOKOHAMA- 02"、その識別子 19a— 4= "6-1-1"、 及び信号レベル 19a_5= "VC4" が入力され、 XC断アラームの有効 19a_6及び XC 断アラームの無効 19a— 7の内の "XC断アラームの有効"力 S で選択されてい る。
これらの入力データは、 "設定" がクリックされると、 パス設定部 11a (図 1参 照) に与えられる。 パス設定部 11aは、 XC断アラームが "有効" であるので、 ク ロスコネクト設定コマンド 70a_l,.70a— 2とトレース値設定コマンド 71a— 1, 71a_2 を作成し、 コマンド送信部 12に与える。
コマンド送信部 12は、インタフェース 13を介してクロスコネクト設定コマン ド 70a一 1及びトレース値設定コマンド 71a_lを始点伝送装置 20_1に送信し、 ク ロスコネク ト設定コマンド 70a— 2及びトレース値設定コマンド 71a— 2を終点伝送 装置 20— 2に送信する。
クロスコネクト設定コマンド 70a一 1, 70a— 2とトレ一ス値設定コマンド 71a— 1, 71a_2の構成例を以下に示す。
•始点伝送装置 20„2に対するクロスコネク ト設定コマンド 70a— 1: ETR-XC-VC4: KAWASAKI-01: 5-1-1, 1-1 - 1 : C00001: : : 2 Y ;
ここで、 「ETR」 は "接続設定"、 「XC - VC4J は: "VC4 レベルの信号のクロスコネ タト"、 「 AWASAKI- 01」 は伝送装置名、 「5-1- 1, 1 - 1 - 1」 は "識別子 5 - 1-1 と識別 子 1-1-1との間の接続"、 rcOOOOlJは "コマンドのシリアル番号"、 「2WAY」は "双 方向の接続" を意味する。
•始点伝送装置 20一 2におけるトレース値設定コマンド 71a— 1:
EDT-VC4: AWASAKI-01: 5 - 1-1 : 000002::: SNDTRC=01, EXPTRO01;
ここで、 「EDT」は"変更設定"、「KAWASAKI - 01Jは伝送装置名、「5-1-1」は" 5- 1-1 に対する設定"、「SNDTRC=01」は"送信トレース値の設定を 01とする"、「EXPTRC=01」 は "受信期待トレース値を 01とする" を意味する。
•終点伝送装置 20„1に対するクロスコネクト設定コマンド 70a— 2:
ETR-XC-VC4: YOKOHAMA- 02: 1-1-1, 6-1-1: C00003::: 2WAY;
•終点伝送装置 20_1におけるトレース値設定コマンド 71a_2:
EDT-VC4: YOKOHAMA - 02: 6-1-1: C00004::: SNDTR035, EXPTR035;
これにより、 始点伝送装置 20_2 と終点伝送装置 20_1 との間に信号レベル二 "VC4" のパスが設定される。 始点伝送装置 20_2の送信トレース値及び受信期待 トレース値は共に "01" が設定され、 終点伝送装置 20„1 の送信トレースィ直及び 受信期待トレース値は共に "35" が設定される。
さらに、 パス設定部 11aは、 XC断アラームテーブル 15にパスを登録する。 図 3は、 XC断アラームテーブル 15aの構成例を示しており、 このテーブル 15a は番号 15a— 1、 伝送装置名 15a_2、 信号レベル 15a— 3、 識別子 15a_4、 及び XC断 の有無 15a— 5で構成されている。
また、 この XC断アラームテーブル 15aには、 図 2で指定されたパスが登録さ れており、 番号 15a— 1 = "1" の伝送装置名 15a_2、 信号レベル 15a— 3、 及ぴ識別 子 15a— 4には、 それぞれ、 "膽 ASA - 01"、 "VC4"、 及び "5-1-1" が登録され、 番号 15a一 1 = "2" には、 それぞれ、 "YOKOHAMA- 02"、 "VC4,'、 及ぴ "6-1-1" が登 録されている。
図 4は、 上記のクロスコネクト設定コマンド 70a一 1, 70a一 2でパスが設定され た伝送装置 20_1, 20_2が示されており、 同図では、 特に、 伝送装置 20_2を始点 とし伝送装置 20—1を終点とする片方向のパスにおける動作例が示されている。 また、 トレース値設定コマンド 71a_lで始点伝送装置 20—2には、 送信トレー ス値 = "01" が設定され、 トレース値設定コマンド 71a— 2 で終点伝送装置 20—1 には、 受信期待トレース値- "35" が設定されている。
始点伝送装置 20_2と終点伝送装置 20— 1との間におけるパス誤接続通知アラー ム動作を以下に説明する。
S11:始点伝送装置 20一 2において、 J1バイ ト揷入部 21は、 J1バイ ト に送信トレース値- "01" を挿入する。 この送信トレース値- "01" は、 パス信 号送信部 22、クロスコネクト 23、及び光信号送信部 24を介して終点伝送装置 20—1 に送信される。
ステップ S12:終点伝送装置 20„1において、 送信トレース'値 = "01" は、 光信 号受信部 25、 クロスコネクト 26、及びパス信号受信部 27を経由して、 J1バイ ト 受信部 28で受信トレース値 = "01" として受信される。 J1バイト受信部 28は、 受信トレース値を J1バイ ト判断部 29に与える。
S13: J1バイ ト判断部 29は、 受信トレース値 = "01" と受信期待トレ 一ス値ニ "35" とを比較し、 両者が異なっているのでパス誤接続通知アラーム 72 をネットワーク管理装置 100aに送信する。
ここで、 例えば、 他のネットワーク管理装置 ΙΟΟζ— 2 (図 11参照) 力 終点伝 送装置 20„1のクロスコネクト 26を切り替えてパスを切断した場合、 J1バイト判 断部 29は、 送信トレース値を受信しなくなるので、 パス誤接続復旧レポ一ト 73 = "DLT- XC-VC4: YOKOHAMA- 02 : 6- 1-1 : C00005 ; " をネットワーク管理装置 100aに 送出する。
図 5は、 ネットワーク管理装置 100a力 終点伝送装置 20_1からパス誤接続通 知アラーム 72 を受信したときの動作手順例を示している。 この動作手順例を以 下に説明する。
ステップ S21:ネットワーク管理装置 100aにおいて、 受信レポ一ト判断部 14a (図 1参照) は、 インタフェース伝送装置 20一 1からパス誤接続通知アラーム 72 を受信する。
S22:受信レポ一ト判断部 14aは、 受信したパス誤接続通知アラーム 72が XC断アラームテーブル 15aに登録されているか否かを判定する。
7° S23:登録されている時、 受信レポ一ト判断部 14aは、 XC断アラーム テーブル 15aの番号 15a一 1 = "2" の XC断の有無 15a— 5= "無" にする。
アラーム表示制御部 18は、 XC断アラームテーブル 15aの番号 15a_l = "2" の
XC断の有無 15a_5= "無" であるので、 表示部 19に当該パス (クロスコネクト) 断アラームを表示しない。
ステップ S24:登録されていないとき、 受信レポ一ト判断部 14aは、通常アラー ムテーブル 16 にパス誤接続通知アラームの発生を登録する。 アラーム表示制御 部 18は、通常アラームテーブル 16を参照して当該パスのパス誤接続通知アラー ムを表示部 19に表示する。
図 6は、 ネットワーク管理装置 100a力 終点伝送装置 20_1からパス誤接続復 旧レポート 73 を受信したときの動作手順例を示している。 この動作手順例を以 下に説明する。
S31:ネットワーク管理装置 100aにおいて、 受信レポ一ト判断部 14a は、 終点伝送装置 20—1からパス誤接続復旧レポ一ト 73を受信する。
ステップ S32:受信レポ一ト判断部 14aは、 パス誤接続復旧レポ一ト 73に対応 するパス誤接続通知アラームが、 XC断アラームテーブル 15aに登録されているか 判断する。
7° S33:登録されているとき、 これは送信側の送信トレース値と受信側の 受信期待トレース値とを意図的に異ならせる設定がなされていることを示して いるので、 この状態で復旧レポートを受信することはパス(クロスコネクト)が切 断状態であることを示している。 そこで、 受信レポート判断部 14aは、 対応する 番号 15a— 1 = "2" の XC断の有無 15a_5= "無" を "有" に変更する。
アラーム表示制御部 18は、 XC断アラームテーブル 15aの番号 15a_l = "2" の XC断の有無 15a— 5= "有" であるので、 表示部 19に当該パス切断のアラームを 表示する。
ステップ S34:登録されていないとき、 これは、 ステップ S33の場合と逆に、 通 常の設定、すなわち送信側の送信トレース値と受信側の受信期待トレース値とを 同じ値に設定がなされていることを示し、 復旧レポートは従来からのパス(ク口 スコネクト)切断の復旧を示している。 そこで、 受信レポート判断部 14aは、 通 常アラームテーブル 16の当該クロスコネクト切断の復旧を登録する。 アラーム 表示制御部 18は、通常アラームテーブル 16を参照して当該パスのパス,呉接続通 知アラームをクリァして表示部 19に表示しない。
実施例 (2) :状態変更通知を用いた場合
本発明のネットワーク管理装置 100bの実施例(2)を説明する。 この実施例(2) におけるネットワーク管理装置 100b の構成は、 基本的には図 1に示した実施例 (1)におけるネットワーク管理装置 100aと同様である。
図 1には、 ネットワーク管理装置 100bの構成例も含まれており、 このネット ワーク管理装置 100bの構成が、ネットワーク管理装置 100aの構成と異なる点は、 制御部 llb、 受信レポ一ト判断部 14b、 及びアラーム表示制御部 18bの動作、 並 びに XC断アラームテーブル 15bの構成が、 それぞれ、 制御部 lla、 受信レポ一ト 判断部 14a,及び XC断アラームテーブル 15a,並びに XC断アラームテーブル 15a と異なることである。
本実施例(2)では、 制御部 libは、 ネットワーク管理者が入力部 10から指定し た 2つの状態変更通知を、 XC断アラームテーブル 15bに登録できる。 そして、一 方の状態変更通知を 「アラーム発生相当」 に、 他方の状態変更通知を 「アラーム 復旧相当」 に割り当てることができる。
図 7には、 ネットワーク管理装置 100aの管理者が、 入力部 10力 ら、 例えば、 図 11において、 伝送装置 20一 2 (装置名を "KAWASAKI- 01") と伝送装置 20一 1 (装 置名を "YOKOHAMA- 02") との間にパスが設定されているとき、 パスの切断を判定 するためのデータを入力する際の表示部 19の画面イメージ例を示している。 この画面は、 発生通知種別 19b— 1、 発生伝送装置の識別子 19b_2、 発生相当の パラメータ 19b_3、復旧通知種別 19b— 4、復旧伝送装置の識別子 19b_5、復旧相当 のパラメータ 19b_6、 設定 19b— 7、 及びキャンセル 19b— 8が表示されている。 また、 この画面では、発生通知種別 19b_l = "データベース変更通知 (DB Change Report) ", 発生伝送装置の識別子 19b— 2= "5-1-1"、 発生相当パラメータ 19b_3 = "DLT- XC;"、 復旧通知種別 19b— 4= "データベース変更通知"、 復旧伝送装置の 識別子 19b一 5= "6-1-1"、 復旧相当パラメータ 19b— 6= "ETR-XC" が示されてい る。
図 8は、 XC断アラームテーブル 15bの構成例を示しており、 このテーブル 15b は、 番号 15b_l、 伝送装置名 15b_2、 通知種別 15b一 3、 伝送装置の識別子 15b一 4、 発生相当パラメータ 15b— 5、 復旧相当パラメータ 15b一 6、 及び XC断の有無 15b— 7 で構成されている。
また、 同図の XC断アラームテーブル 15bには、 図 7の表示部 19の画面で設定 されたデータが登録されており、 番号 15b_l = T の通知種別 15b— 3= "データ ベース変更通知"、伝送装置の識別子 15b— 4= "5- 1_Γ、発生相当パラメータ 15b— 5 二 "DLT-XC"、 復旧相当パラメータ 15b— 6= "ETR - XC"、 及ぴ伝送装置名 15b_2に 識別子 15b_4= "5-1-1" に対応する伝送装置 = "KAWASAKI- 01" が登録されてい る。
さらに、 テーブル bには、 番号 15b— 1 = "2" の通知種別 15b— 3= "データべ ース変更通知"、 伝送装置の識別子 15b— 4= "6-1-1"、 発生相当パラメータ 15b— 5 = "DLT- XC"、 復旧相当パラメータ 15b— 6= "ETR_XC"、 及ぴ伝送装置名 15b— 2に 識別子 15b— 4= "6-1-1" に対応する伝送装置 = "YOKOHAMA- 02" が登録されてい る。
図 9は、 ネットワーク管理装置 100bが、 伝送装置 20—1から状態変更通知 80 〜82のいずれかを受信したときの動作例を示している。 この動作例を、図 1を参 照して以下に説明する。
ステップ S41, S42:ネットワーク管理装置 100bにおいて、受信レポ一ト判断部 14bは、 状態変更通知 80, 81, 又は 82を受信し、 XC断アラームテーブル 15bに 受信した状態変更通知に対応するデータが登録されているか否かを判定する。
S43:登録されていないとき、受信レポ一ト判断部 14bは、状態変更通 知を通常の状態変更通知 82として処理する。
7° S44:登録されているとき、受信レポ一ト判断部 14bは、状態変更通知 が、 発生相当の状態変更通知 80として登録されているか否かを判定する。
ステップ S45:登録されているとき、 受信レポート判断部 14bは、 XC断アラー ムテーブル 15bの XC断の有無 15b— 7= "有" に更新する。
ステップ S46:アラーム表示制御部 18は、 XC断アラームテーブル 15bを参照し て XC断アラームを表示部 19bに表示する。
図 10は、 表示部 1%における XC断アラームの表示例を示している。 この例で は、 XC断アラームは、 伝送装置名 1 _11、 信号種類 1%_12、 伝送装置の識別子 19b— 13、 アラーム名 1 _14、 及び緊急度 19b_15で構成されている。
同図の表示部 19bには、例えば、識別子 19b— 13= "5-1-1"の伝送装置名 19b— 11 = "KAWASAKI- 01" において、 信号種類 19b_12= "VC4" のパスに関連するアラー ム名 19b一 14= "XC断検出(XC Disconnection Detected) " が発生し、 しかもこの アラームは緊急度 19b— 15= "最重要" であることが表示されている。
7° S47 :登録されていないとき、 受信レポート判断部 14bは、 状態変更通 知が復旧相当の状態変更通知 81として登録されているか否か判定する。
ステップ S48:登録されていないとき、 受信レポート判断部 14bは、 通常の状態 変更通知 82として処理する。
なお、 同図には、 通常のパス誤接続通知アラームとして、 伝送装置名 = "KAWASAKI - 01"、 信号 = "VC4,,、 識別子 = "5-2-1" が、 信号アラーム名 = "誤 接続パス(Trace Mismatch-Path) " で表示されている。
S49:復旧相当の状態変更通知 81 として登録されているとき、 受信レ ポート半 IJ断咅 14bは、 XC断アラームテーブル 15bの XC断の有無 15b_7= "無" に変更する。
ステップ S50:アラーム表示制御部 18は、 XC断アラームテーブル 15bの XC断 の有無 15b_7== "無" を参照して、 表示部 19bに表示された、 対応する XC断ァラ 一ムをクリアする。
なお、 実施例(1)と同様に始点伝送装置の送信トレース値と終点伝送装置の受 信期待トレース値を異なるように設定し、発生するパス誤接続通知アラーム及び 復旧レポートをデータベース状態変更通知として、 クロスコネク ト断の有無を検 出することも可能である。
すなわち、 ステップ S43は、 図 6のステップ S34に対応し、 ステップ S45及び S49は、 ステップ S33にそれぞれ対応して処理させることができる。
以上説明したように、 本発明に係るネットワーク管理方法及び装置によれば、 パス始点伝送装置の送信トレース値とパス終点伝送装置の受信期待トレース値 を異なるように設定し、パス終点伝送装置からパス誤接続通知アラームを受信し たとき、 パスが正常な接続状態にあると判定し、 該パス誤接続通知アラームの復 旧レポートを受信したとき、 パスが切断されたと判断するようにするか、 又は所 定のクロスコネクトの切断及ぴ切断復旧に対応したデータベース状態変更通知 に基づき、該クロスコネクトの切断の有無をクロスコネクト断アラームテープノレ に設定するようにしたので、 自装置が管理しているパスが他のネットワーク管理 装置又は端末から切断されたとき、 このパス切断を瞬時に検出することが可能に なる。

Claims

請 求 の 範 囲
1 . パス誤接続通知アラーム機能を備えた伝送装置に対して、パス始点伝送装置 の送信トレース値とパス終点伝送装置の受信期待トレース値を異なるように設 定する第 1のステップと、
該パス終点伝送装置からパス誤接続通知アラームを受信したとき、パスが正常 な接続状態にあると判定し、該パス誤接続通知アラームの復旧レポートを受信し たとき、 該パスが切断されたと判定する第 2のステップと、
を備えたことを特徴とするネットワーク管理方法。
2 . 請求の範囲 1において、
該第 2のステップにおいて、 さらに、該パスが正常な接続状態にあると判定し たとき、 パス正常接続信号を発生し、 該パスが切断されたと判断したとき、 パス 切断アラームを発生することを特徴としたネットワーク管理方法。
3 . 請求の範囲 2において、
該パス正常接続信号及び該パス切断アラームが、 それぞれ、 クロスコネクト正 常接続信号及びクロスコネクト断アラームであることを特徴としたネットヮ一 ク管理方法。
4 . 請求の範囲 3において、
該第 1のステップの前に、該クロスコネクト断アラームを登録する第 3のステ ップと、該第 2のステップの後に、該クロスコネクト断ァラームを受信したとき、 このアラームに対応する登録されたクロスコネクトを断有りと判定し、該クロス コネクト正常接続信号を受信したとき、 この信号に対応するクロスコネクトを断 無しと判定する第 4のステップを有することを特徴としたネットワーク管理方 法。
5 . 所定のクロスコネクトの切断及び切断復旧に対応したデータベース状態変更 通知に関する情報を登録する第 1のステップと、
該登録された情報と伝送装置からのデータベース状態変更通知に示された情 報とに基づき、該所定のクロスコネクトの切断の有無を判定する第:
と、 を備えたことを特徴とするネットワーク管理方法。
6 . 請求の範囲 5において、
該第 1のステップの前に、 該クロスコネク ト断アラームテーブルに、 該所定の クロスコネク ト切断及び切断復旧に対応したデータベース状態変更通知を登録 する第 3のステップをさらに備えたことを特徴とするネットワーク管理方法。
7 . 請求の範囲 6において、
該第 3のステップの後に、該クロスコネクト断有無の判定結果を表示する第 4 のステップをさらに備えたことを特徴とするネットワーク管理方法。
8 . 請求の範囲 5において、
該第 1のステップの前に、パス誤接続通知アラーム機能を備えた該伝送装置に 対して、 パス始点伝送装置の送信トレース値とパス終点伝送装置の受信期待トレ 一ス値を異なるように設定する第 5のステップをさらに備え、
該第 2のステップにおいて、 さらに該パス終点伝送装置からのパス誤接続通知 アラームをパスの正常な接続状態を示す状態変更通知とし、該パス誤接続通知ァ ラームの復旧レポ一トを該パスの切断を示す状態変更通知とすることを特徴と したネットワーク管理方法。
9 . パス誤接続通知アラーム機能を備えた伝送装置に対して、 パス始点伝送装置 の送信トレース値とパス終点伝送装置の受信期待トレース値を異なるように設 定するパス設定部と、
該パス終点伝送装置からパス誤接続通知アラームを受信したとき、パスが正常 な接続状態にあると判定し、該パス誤接続通知アラームの復旧レポートを受信し たとき、 該パスが切断されたと判定する受信レポート判断部と、
を備えたことを特徴とするネットワーク管理装置。
1 0 . 請求の範囲 9において、
該受信レポ一ト判断部は、 該パスが正常な接続状態にあると判定したとき、 パ ス正常接続信号を発生し、 該パスが切断されたと判断したとき、パス切断アラー ムを発生することを特徴としたネットワーク管理装置。
1 1 . 請求の範囲 1 0において、
該パス正常接続信号及ぴ該パス切断アラームが、 それぞれ、 クロスコネク ト正 常接続信号及びクロスコネクト断アラームであることを特徴としたネットヮ'
1 2 . 請求の範囲 1 1において、
該クロスコネク ト断アラームを管理するクロスコネク ト断アラームテーブル' と、 .
該クロスコネク ト断ァラ一ムテ一プルで管理されるクロスコネク トを登録す る入力部とをさらに備え、
該受信レポート判断部が、受信した該クロスコネクト断アラームに対応するク ロスコネク トが該テーブルに登録されているとき、該クロスコネクトを断有りと 判定し、該クロスコネクト正常接続信号に対応するクロスコネクトを断無しと判 定することを特徴としたネットワーク管理装置。
1 3 . 請求の範囲 1 2において、
該クロスコネク ト断アラームテーブルに登録されていない通常のクロスコネ ク トを管理する通常アラームテーブルをさらに有し、
該受信レポ一ト判断部は、該通常のクロスコネクトをパス誤接続通知アラーム 及び該復旧レポートに基づき、該通常のクロスコネクトの接続状態を該通常ァラ ームテーブルに登録することを特徴としたネットワーク管理装置。
1 4 . 所定のクロスコネクトの切断及び切断復旧に対応したデータベース状態変 更通知に関する情報が登録され、該所定のクロスコネクトの切断の有無を管理す るクロスコネク ト断アラームテーブルと、
該登録された情報と伝送装置からのデータベース状態変更通知に示された情 報とに基づき、該所定のクロスコネクトの切断の有無を判定する受信レポート判 断部と、
を備えたことを特徴とするネットワーク管理装置。
1 5 . 請求の範囲 1 4において、
該クロスコネクト断アラームテーブルに、該所定のクロスコネクト切断及び切 断復旧にそれぞれ対応したデータベース状態変更通知に関する該情報を登録す る入力部をさらに備えたことを特徴とするネットワーク管理装置。
1 6 . 請求の範開 1 4において、 該クロスコネクト断アラームテーブルに基づきクロスコネク ト断アラームを 表示する表示部をさらに備えたことを特徴とするネットワーク管理装置。
1 7 . 請求の範囲 1 4において、
パス誤接続通知アラーム機能を備えた該伝送装置に対して、パス始点伝送装置 の送信トレース値とパス終点伝送装置の受信期待トレース値を異なるように設 定するパス設定部を備え、
該受信レポ一ト判断部が、該パス終点伝送装置からのパス誤接続通知アラーム をパスの正常な接続状態を示す状態変更通知とし、該パス誤接続通知アラームの 復旧レポートを該パスの切断を示す状態変更通知とすることを特徴としたネッ トワーク管理装置。
PCT/JP2003/004829 2003-04-16 2003-04-16 ネットワーク管理方法及びネットワーク管理装置 WO2004093359A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2003/004829 WO2004093359A1 (ja) 2003-04-16 2003-04-16 ネットワーク管理方法及びネットワーク管理装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2003/004829 WO2004093359A1 (ja) 2003-04-16 2003-04-16 ネットワーク管理方法及びネットワーク管理装置

Publications (1)

Publication Number Publication Date
WO2004093359A1 true WO2004093359A1 (ja) 2004-10-28

Family

ID=33193237

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2003/004829 WO2004093359A1 (ja) 2003-04-16 2003-04-16 ネットワーク管理方法及びネットワーク管理装置

Country Status (1)

Country Link
WO (1) WO2004093359A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014040470A1 (zh) * 2012-09-11 2014-03-20 中兴通讯股份有限公司 告警消息的处理方法及装置

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0974395A (ja) * 1995-09-06 1997-03-18 Nec Corp パストレース終端装置
JPH1155264A (ja) * 1997-08-05 1999-02-26 Nec Corp 受信パス選択方法及び装置
JPH11261512A (ja) * 1998-03-13 1999-09-24 Fujitsu Ltd パス情報構築方法
JPH11261513A (ja) * 1998-03-16 1999-09-24 Fujitsu Ltd パストレースチェック方法および装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0974395A (ja) * 1995-09-06 1997-03-18 Nec Corp パストレース終端装置
JPH1155264A (ja) * 1997-08-05 1999-02-26 Nec Corp 受信パス選択方法及び装置
JPH11261512A (ja) * 1998-03-13 1999-09-24 Fujitsu Ltd パス情報構築方法
JPH11261513A (ja) * 1998-03-16 1999-09-24 Fujitsu Ltd パストレースチェック方法および装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014040470A1 (zh) * 2012-09-11 2014-03-20 中兴通讯股份有限公司 告警消息的处理方法及装置
CN103684821A (zh) * 2012-09-11 2014-03-26 中兴通讯股份有限公司 告警消息的处理方法及装置

Similar Documents

Publication Publication Date Title
KR100898432B1 (ko) 링 네트워크 및 마스터 노드
CN112436885B (zh) 基于kvm坐席的光纤链路互备方法及系统
EP2456127A1 (en) Method, system and apparatus for diagnosing physical downlink failure
US20080002569A1 (en) Method and apparatus for identifying a fault in a communications link
CN107431655B (zh) 分段保护中的故障传播的方法和设备
JP4562081B2 (ja) 光クロスコネクト装置と伝送装置の連係方式
WO2004093359A1 (ja) ネットワーク管理方法及びネットワーク管理装置
CN115549775A (zh) 光信号传输异常的处理方法、光传输设备及系统
JP5548160B2 (ja) 障害監視用ノード装置および障害検知回復方法
US6484202B1 (en) Method and apparatus for determining the status of a transmission link
KR100439366B1 (ko) 파이버 채널 조정 루프에 적응가능한 전자 장치 및 파이버채널 조정 루프의 장해 검출 방법
JP2005268889A (ja) 伝送路切替システムおよび伝送路切替システムの動作方法
CN102386972B (zh) 检测光纤错接的方法、装置及系统
KR20010048294A (ko) 디지틀 회선분배장치를 사용한 고장회선 시험의 장애 자동복구 방법
US6650449B1 (en) Method and device for network protection
JP3883285B2 (ja) トンネル防災システム
KR100748681B1 (ko) 동기식 디지털 계위 전송 시스템의 단방향 절체 제어 방법
JP2008011150A (ja) ネットワーク監視方法及びシステム
JP3467681B2 (ja) 二重化構成を有するパスの故障管理方法
JP4892665B2 (ja) 加入者線検査システム及び加入者線検査方法並びに加入者線検査プログラム
KR20070037847A (ko) Ipc 진단 및 복구 장치 및 방법
KR20050001128A (ko) 원격 관리 장치 및 그 방법
KR20060126619A (ko) 이더넷 기반 통신시스템에서의 장애 관리 시스템 및 방법
JP2024004705A (ja) ネットワークシステム及びその制御方法
CN116405810A (zh) 一种多厂商otn设备互通方法

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): JP US

NENP Non-entry into the national phase

Ref country code: JP

WWW Wipo information: withdrawn in national office

Country of ref document: JP