WO2004088442A1 - 工程遅れモニターシステム - Google Patents

工程遅れモニターシステム Download PDF

Info

Publication number
WO2004088442A1
WO2004088442A1 PCT/JP2003/016584 JP0316584W WO2004088442A1 WO 2004088442 A1 WO2004088442 A1 WO 2004088442A1 JP 0316584 W JP0316584 W JP 0316584W WO 2004088442 A1 WO2004088442 A1 WO 2004088442A1
Authority
WO
WIPO (PCT)
Prior art keywords
information
terminal
database
function unit
order
Prior art date
Application number
PCT/JP2003/016584
Other languages
English (en)
French (fr)
Inventor
Shiyouji Sugamura
Takeshi Nishikido
Hideyuki Kuroda
Original Assignee
Honda Motor Co.,Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honda Motor Co.,Ltd. filed Critical Honda Motor Co.,Ltd.
Priority to BRPI0318225-8A priority Critical patent/BR0318225A/pt
Publication of WO2004088442A1 publication Critical patent/WO2004088442A1/ja

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q20/00Payment architectures, schemes or protocols
    • G06Q20/08Payment architectures
    • G06Q20/20Point-of-sale [POS] network systems
    • G06Q20/203Inventory monitoring
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0633Lists, e.g. purchase orders, compilation or processing
    • G06Q30/0635Processing of requisition or of purchase orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/0601Electronic shopping [e-shopping]
    • G06Q30/0641Shopping interfaces

Definitions

  • the present invention relates to a process delay monitoring system for monitoring a process delay of an ordered product of a motorcycle, a four-wheeled vehicle, and a general-purpose product (such as a generator and a cultivator).
  • the contractor Prandme Ichiichi, receives the same order every day from multiple orderers in Japan and overseas.
  • the ordering party notifies the ordering party of the order contract number PC (Purchase Contract) number for each ordering unit.
  • PC Policy Contract
  • the contractor manages the parts ordered for each PC number.
  • the promotion results are managed in PC number units for each process after receiving an order. Management at the PC number level uses the normal supply chain management method. In recent years, along with the supply chain, the promotion performance management database on the order receiving side has been opened to the ordering side. This is usually called tracking.
  • the management server updates the target inventory amount at each sales base based on the order information from each sales base terminal in order to improve the immediate delivery ratio from the sales base for customer orders. Also, based on the new orders and the fluctuations in the target inventory, calculate the replenishment amount of parts for each sales base, output replenishment instruction information to the logistics bases under the jurisdiction, and further calculate the target inventory at each sales base. The excess inventory amount is calculated based on the difference between the amount and the actual available inventory amount, and the collection information is output to the corresponding sales base and distribution base under the jurisdiction.
  • the replenishment amount of parts for each sales base is calculated based on the new order amount and the fluctuation amount of the target inventory amount, and the target inventory amount and the actual available inventory are calculated. Based on the difference from the amount, the excess inventory is maintained appropriately.
  • JP-A-2002-342431 As described above, only the promotion results are managed, and since the ordering party does not know when the ordered parts arrive, safety stocks are excessively held. There is a possibility that it will be.
  • the present invention has been made in view of such a situation, and provides a process delay monitor system capable of reducing excess inventory, reducing costs due to unnecessary transportation costs, and improving credit. With the goal. Disclosure of the invention
  • the process delay monitoring system of the present invention is connected to the server owned by the brand manufacturer, the contractor, and the terminal of the plan maker so that the server can communicate with each other via a communication line.
  • a dealer has a dealer terminal that is owned by a dealer and a component manufacturer terminal that is connected to the server via a communication line so that they can communicate with each other, and that is owned by a component manufacturer.
  • a function that manages information on process and process delays from the ordering of parts ordered from the supplier to the scheduled delivery of parts, and information on the process and process delays of the managed components when there is access from the dealer terminal.
  • the brand maker terminal is used for inputting various information, has a communication function and a display function, and has a function of providing
  • the terminal is connected to the server and is used for ordering parts and browsing information on the parts process and process delays, and has a communication function and a display function.
  • the terminal on the side receives procurement information related to the procurement of parts from the terminal on one side, has a communication function and a display function, and transmits parts from the terminal on the dealer side and the terminal on the plan maker to the server. It is characterized in that the order contract number is used for accessing the information on the process and the process delay.
  • the server also stores the order data in which the contents of the order received from the dealer terminal are registered.
  • a work-in-progress database in which a database, order information included in the order content registered in the order database, an ITEM No. managing the order information, and an identification number associated with the ITEM No. are registered.
  • the procurement database in which the procurement information for the parts ordered by the parts manufacturer is registered, the inventory database in which the parts inventory information and the import information from the terminal of the parts manufacturer are registered, and the contents of the orders are registered in the order database.
  • a registration information management function unit that registers order information in the in-process database and also registers procurement information in the procurement database and the in-process database. When the order information is registered, the order information is registered.
  • the inventory database An inventory presence / absence check function unit having a function of checking the presence or absence of inventory; an allocation processing function unit having a function of performing an allocation process for inventory when the inventory presence / absence check function unit checks that there is inventory;
  • the check function unit that there is a shortage if the allocation calculation function unit that has a function to distribute and calculate the amount of the shortage based on the quantity and the allocation processing unit performs the allocation processing,
  • the schedule plan creation function unit that has the function of creating the schedule date and time of the allocation process and the schedule of the post-process, and the stock presence check function unit, the standard turn for the shortfall If it is late due to the comparison with the scheduler, a schedule plan correction function unit that has a function to calculate the correction turn of the post-process and create a correction schedule;
  • the registration information management function section registers the ITEM No. issued by the management number issuing function section and the identification number linked to the ITEM No. in the in-process database, and the distribution calculation function section The result calculated by the distribution is registered in the in-process database, the schedule created by the schedule planning function is registered in the in-process database, and the correction schedule created by the schedule planning correction function is processed in the in-process database. Can be registered in the database.
  • a server owned by a brand maker as a contractor and a terminal of the brand maker are connected so as to be able to communicate with each other via a communication line to a server, and a dealer as an orderer is provided.
  • the terminal has a dealer terminal that is connected to the server and a terminal that is connected to the server via a communication line so that they can communicate with each other and is owned by the component manufacturer.
  • This is a process delay monitoring method that monitors the process delay between the order of parts and the scheduled delivery of parts.
  • the server monitors the process from the order of parts ordered from the dealer terminal to the scheduled delivery of parts.
  • the brand maker's terminal is used for inputting various kinds of information, has a communication step and a display step, and the dealer's terminal is connected to a server. It is used when ordering parts and browsing information on parts processes and process delays, and has a communication process and a display process.
  • the part maker terminal receives procurement information related to parts procurement from the brand maker terminal and has a communication process and a display process. It is characterized in that the order contract number is used for access from the dealer terminal to the server for browsing information on component processes and process delays.
  • the server includes an order database in which order contents from the dealer terminal are registered, order information included in the order contents registered in the order database, an ITEM No. for managing the order information, and an ITEM.
  • a work-in-progress database in which the identification number linked to the No.
  • a procurement database in which the procurement information of the parts ordered to the parts manufacturer is registered, a parts inventory information and a part It has a stock database in which incoming information is registered.
  • Registration information management function registers order details in the order database, order information in the in-process database, and procurement information in the procurement database and the in-process database. And when the order information is registered by the control number issuing function section, a step of issuing an ITEM No.
  • the order information is registered by the registration information management function unit by the stock presence / absence check function unit, the process of checking whether or not stock is available from the stock database, and by the allocation processing function unit, the stock by the stock presence / absence check function unit
  • the process of allocating the stock is performed, and when the distribution calculation function checks that there is a shortage by the stock check function, the order amount of the shortage is calculated based on the quantity.
  • the process to calculate the corrective action in the post-process and create the corrective schedule and the in-process search function unit if there is access from one terminal of the derailleur, the in-process search instruction from the dealer terminal Searches for information registered in the in-process database according to the It has a process to provide it to one side terminal, and the management number issuing function unit is linked to the ITEM No. that manages procurement information when the inventory presence check function unit checks that there is a shortage
  • the method may include a step of issuing an identification number.
  • the registration information management function unit registers the ITEM No. issued by the management number issuance function unit and the identification number linked to the ITEM No. in the in-process database.
  • the process of registering the result calculated by the functional unit in the in-process database, the process of registering the schedule created by the schedule planning function in the in-process database, and the schedule plan correction function And registering the modification schedule created by the department in the work-in-progress database.
  • FIG. 1 is a diagram showing an outline of an embodiment of a process delay monitoring system according to the present invention.
  • FIG. 2 is a diagram for explaining details of the process delay monitoring system of FIG.
  • FIG. 3 is a flow chart for explaining the operation of the process delay monitor system of FIG.
  • FIG. 4 is a flow chart for explaining the operation of the process delay monitor system of FIG.
  • FIG. 5 is a flow chart for explaining the operation of the process delay monitor system of FIG.
  • FIG. 6 is a diagram for explaining screen contents related to the in-process search by the process delay monitor system of FIG.
  • Fig. 7 relates to in-process search by the process delay monitor system in Fig. 1. It is a figure for explaining screen content.
  • FIG. 8 is a diagram for explaining the screen contents related to the in-process search by the process delay monitor system of FIG. BEST MODE FOR CARRYING OUT THE INVENTION
  • FIG. 1 is a diagram showing an outline of an embodiment of a process delay monitoring system according to the present invention, in which a server 10 and a brand maker terminal 20 owned by a brand maker, which is an order receiving party, and an orderer.
  • the system includes a dealer terminal 30 owned by the dealer and a terminal 40 of the component manufacturer owned by the component manufacturer. These components can communicate with each other via a communication line 50.
  • a communication line 50 may be any of a web, a wide area network (WAN), and a dedicated line.
  • the server 10 manages processes and process delays from the ordering of parts ordered from the dealer terminal 30 to the scheduled delivery of the parts.
  • the order receiving database (D / B) 10a work in process It has a database (D / B) 10b, a procurement database (DZB) 10c, and an inventory database (D / B) 10d.
  • the in-process database 10b includes the following order information (1) to (11) included in the order contents registered in the order database 10a, and the ITEM No. that manages the order information. Is registered.
  • the order information is as shown in the following (1) to (11).
  • the account number is a part number consisting of numbers, alphabets, etc., to be put on the parts list.
  • Ordering area ⁇ ⁇ ⁇ Location of the ordering party eg, North America ⁇ Europe ⁇ Southeast Asia
  • the in-process database 10b is linked to the procurement information to be ordered from a component manufacturer when there is a shortage, but the ITEM No. that manages the procurement information.
  • the registered identification number is registered.
  • the procurement information is as shown in the following (1 2) to (18).
  • the procurement information of the above (12) to (18) registered in the in-process database 10b is registered.
  • stock information of parts In the stock database 10d, stock information of parts, incoming information, and the like are registered.
  • the server 10 has a registration information management function unit 11, a management number issuing function unit 12, an inventory check function unit 13, an allocation processing function unit 14, and a distribution calculation function. It has a function section 15, a schedule plan creation function section 16, a schedule plan correction function section 17, and a work in process search function section 18.
  • the registration information management function unit 11 registers the above-mentioned order contents in the order database 10a, registers the above-mentioned order information in the in-process database 10b, and further stores the above-mentioned procurement information in the procurement database 10c and the in-process database 10c. It has a function to register it with the database 10b.
  • the control number issuing function section 12 has a function of issuing the above-mentioned ITEM No. for managing order information and the above-mentioned identification number linked to the ITEM No. for managing procurement information. ing.
  • the stock presence / absence check function unit 13 has a function of checking the presence or absence of stock from the stock database 10d when the above-mentioned order information is registered by the registration information management function unit 11. When checking the presence or absence of stock, the above-mentioned ordered part number is used.
  • the allocation processing function unit 14 has a function of performing allocation processing for inventory when the stock presence / absence check function unit 13 checks that there is stock.
  • Shortage of distribution calculation function 15 due to inventory check function 13 When it is checked, the company has a function to calculate the amount of the shortage received on a quantity basis.
  • the result of the distribution calculation is registered in the in-process database 10b by the registration information management function unit 11.
  • the schedule plan creation function unit 16 When the allocation process is performed by the allocation processing function unit 14, the schedule plan creation function unit 16 has a function of creating a date and time when the allocation process was performed and a schedule of a post-process. The schedule is created based on a pre-determined reference turn (number of days). The created schedule is registered in the above-mentioned in-process database 10b by the registration information management function unit 11.
  • the schedule plan correction function unit 17 corrects the post-process if the inventory availability check function unit 13 checks that there is a shortage, and if the shortage is delayed due to comparison with the standard turn (days). It has a function to calculate a turn and create a correction schedule.
  • the created correction schedule is registered in the above-described in-process database 10b by the registration information management function unit 11.
  • the work-in-progress search function unit 18 responds to the work-in-progress search instruction from the dealer-side terminal 30 and processes the work-in-progress database.
  • the brand maker terminal 20 is used for inputting various information, and has a communication function, a display function, and the like.
  • the various types of information include, for example, the order information described above, the date and time of allocation processing, the order date and time of the parts manufacturer, the procurement information of the parts manufacturer, the date and time of receiving goods, the time of departure, the date and time of packing, the date and time of packing, the invoice number, and the departure port. Date and time, arrival date and time.
  • the dealer terminal 30 is used when ordering or browsing information registered in the in-process database 10b, and has a communication function, a display function, and the like. Also, when browsing the information registered in the in-process database 10b by the dealer terminal 30, the above described The PC (Purchase Contract) number, which is the order contract number, is used.
  • the component maker side terminal 40 receives the above-mentioned procurement information from the brand maker side terminal 20 and has a communication function, a display function, and the like.
  • an order is received from the dealer terminal 30 (step S1).
  • the order is input by the brand maker terminal 20
  • the input order is registered.
  • the information is registered in the order database 10a by the information management function unit 11 (step S2).
  • the order information (1) to (11) described above is registered in the in-process database 10b by the registration information management function unit 11 (step S3).
  • an ITEM No. for managing the order information is issued and registered in the in-process database 10b by the management number issuing function unit 12 (Step S4).
  • the inventory presence / absence check function unit 13 checks the availability of parts from the inventory database 10d using the above-mentioned ordered part number (step S). 5) If there is stock, the shortage is checked (step S6). If there is no shortage, the allocation processing section 14 performs the allocation processing for the inventory, and when the date and time of the allocation processing is input by the terminal 20 of the brand maker, the input date and time of the allocation processing is processed. Is registered in the database 10b (steps S7 to S9).
  • the schedule planning function unit 16 creates a schedule for the subsequent process and calculates a turn schedule (steps S10 and S11). The turn schedule is calculated based on a pre-determined reference turn (number of days). Then, the schedule of the post-process after the turn schedule is calculated is registered in the in-process database 10b. Step S 1 2).
  • Step S5 an order is placed with the parts manufacturer, and the date and time of the order is registered in the in-process database 10b (Steps S13 to S15). .
  • the procurement information of (1 2) to (18) described above is input by the brand maker terminal 20 for the order placed to the parts maker, the procurement information is registered in the in-process database 10b.
  • Step S16, SI7 The procurement information registered in the in-process database 10b is also registered in the procurement database 10c (step S18). Then, the procurement information registered in the procurement database 10c is transmitted to the component maker terminal 40.
  • step S1 Based on the procurement information, if there is a delivery from a parts manufacturer, the quality is confirmed, and if there is no return, the information on the delivered parts is registered in the inventory database 10d (step S1). 9-S2 1). Next, when the carry-in reception date and time are input, the carry-in reception date and time are registered in the in-process database 10b (steps S22 and S23).
  • Step S 6 if there is a shortage in (Step S 6) and if there is a return in (Step S 20), the control number issuing function unit 12 links the above-mentioned ITEM No. that manages the procurement information. The assigned identification number is issued, and the distribution calculation function unit 15 calculates the distribution amount of the order based on the quantity, and the result is registered in the in-process database 10b (step S24 to S27).
  • step S28 it is checked whether or not the product is an allocation product.
  • the products that have been allocated are the ones that have the greatest potential, and those that are not allocated are those that have been delivered by component manufacturers. If it is an allocation-processed product, it enters the next work, the outgoing process, and when the outgoing process is completed, the outgoing date and time are entered (step S29).
  • the delivery date and time may be automatically input by scanning the par code of the part specification attached to the part.
  • the product is not an allocation product, it is compared with the reference turn (number of days) (step S30). If there is no delay, the delivery date and time is entered in (step S29). If there is a delay, the schedule planning and correction function unit 17 corrects the schedule of the post-process based on the reference turn (number of days), and the created correction schedule is registered in the in-process database 10b (step S31, S32).
  • the reference turn (number of days) here is the turn in the first schedule calculated from the order receipt date and time.
  • the comparison target in (Step S30) is the actual delivery acceptance date for the first schedule.
  • the delivery date is compared with the reference turn (number of days) (step S33), and if there is no delay, the first schedule is registered in the in-process database 10b (step S34).
  • the schedule correction of the post-process is performed by the schedule plan correction function part 17 based on the reference turn (number of days) (Step S35), and the created correction schedule is It is registered in the in-process database 10b (step S34).
  • step S36 the date and time when packing was performed is input (step S36), and compared with the reference turn (number of days) (step S37). If there is no delay, packing is performed in the in-process database 10b. The date and time at which the operation was performed is registered (step S38). On the other hand, if there is a delay, the schedule correction of the post-process is performed by the schedule plan correction function unit 17 based on the reference turn (number of days) (step S39), and the created correction schedule is in process. Is registered in the database 10b (step S38).
  • Step S40 the date and time when packing was performed is entered (Step S40), and compared with the reference turn (number of days) (Step S41).
  • the date and time when packing was performed is registered in the database iob (Step S
  • step S43 the schedule correction of the post-process is performed by the schedule plan correction function unit 17 based on the reference turn (number of days) (step S43), and the created correction schedule is in process. Is registered in the database 10b (step S42).
  • step S44 when the panning date and time are input (step S44), as shown in FIG. 5, by comparing with the reference turn (number of days) (step S45), if there is no delay, the in-process database 1 is displayed. The date and time of Panjung is registered in 0b (step S46). On the other hand, if there is a delay, the schedule correction of the post-process is performed by the schedule plan correction function part 17 based on the reference turn (number of days) (Step S47), and the created correction schedule is It is registered in the in-process database 10b (step S46).
  • the customs clearance date is entered (step S48), and compared with the reference turn (number of days) (step S49). If there is no delay, the customs clearance date is registered in the in-process database 10b (step S48). S 50). On the other hand, if there is a delay, the schedule is corrected in the post-process by the schedule plan correction function unit 17 based on the reference turn (number of days) (step S51), and the created correction schedule is specified. It is registered in the hanging database 10b (step S50).
  • step S52 when the invoice number at the time of customs clearance is issued, the input invoice number is registered in the in-process database 10b (step S52, step S52).
  • the invoice number means that the departure has been confirmed, and is also a management number for the issuer when receiving the cargo.
  • the entered departure date and arrival date are registered in the in-process database 10b (steps S54 to S57), and then arrive at the DIST (distributor) (step S58).
  • the dealer terminal 30 from the dealer terminal 30 to the server 10 If there is any information, the information registered in the in-process database 10b can be browsed by the response of the in-process search function unit 18.
  • the above-mentioned PC number is used.
  • the dealer terminal 30 includes a screen for a work-in-progress search, a screen for a date list by process, a screen for a list of the number of items per section, and The book list screen is displayed.
  • the list of the number of records in each section and the list of details are those that are behind the first schedule plan.
  • a menu search screen as shown in Fig. 6 (a) is displayed, and when the item of "work in progress search" is clicked from the screen, the screen shown in Fig. 6 (b) is displayed.
  • the detailed screen of the in-process search as shown below is displayed.
  • (PC / NO), (ODR REF NO), and (ordering area + ordering area + part number) are set as check items for specifying the search pattern. Then, when (PC / NO) is selected and the PC number described above is input, the search result as shown in Fig. 7 (a) is displayed.
  • a list (delay) for each section will be displayed as shown in Fig. 8 (a).
  • the contents of this screen are updated in accordance with changes in the contents, as described above, so that the list of the number of records per section (delay) can be confirmed in real time.
  • a detailed list (delay) corresponding to each part number is displayed as shown in Fig. 8 (b). This screen is updated in accordance with the change of the contents, as described above, so that the estimated arrival date and the like can be confirmed in real time.
  • the server 10 and the terminal 20 of the plan maker owned by the brand maker that is the contractor are connected to the server 10 so that they can communicate with each other via the communication line 50.
  • the dealer terminal 30 owned by the dealer who is the orderer and the server 10 are connected to the server 10 via the communication line 50 so that they can communicate with each other, and the component manufacturer terminal 4 owned by the component manufacturer
  • the server 10 manages information on processes and delays from the order of parts ordered from the dealer terminal 30 to the scheduled delivery of parts from the dealer terminal 30 and stores the information in the dealer terminal 30. Provided in response to access from
  • the process from the ordering of parts to the scheduled delivery of parts Is registered in the in-process database 10b, and when there is a process delay due to comparison with the reference turn (day), information on the process delay is entered in each process in the in-process database 10b. Since the registration is made in advance, it is possible to manage the progress in the middle and to follow up the trouble easily, so that unnecessary transportation costs can be eliminated.
  • the server and the brand maker terminal owned by the brand maker, which is the contractor, are connected to the server so that they can communicate with each other via the communication line.
  • the dealer has a dealer terminal owned by the dealer that is the orderer, and a component manufacturer terminal that is connected to the server via a communication line so that they can communicate with each other, and is owned by the component manufacturer.
  • Information on processes and delays from the ordering of parts ordered from the terminal to the scheduled delivery of parts is managed, and the information is provided in response to access from the dealer terminal. Cost, wasteful transportation costs, etc., and credit improvement.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)
  • Computer And Data Communications (AREA)
  • Debugging And Monitoring (AREA)

Abstract

 過剰在庫の削減と、無駄な運送費等による経費削減と、信用向上とを図ることができるようにする。 受注者であるブランドメーカー側が保有するサーバ10及びブランドメーカー側端末20と、サーバ10に対し通信回線50を介して相互に通信できるように接続され、発注者であるデイラー側が保有するデイラー側端末30と、サーバ10に対し通信回線50を介して相互に通信できるように接続され、部品メーカー側が保有する部品メーカー側端末40とを備え、サーバ10により、デイラー側端末30から発注された部品の受注から部品の納品予定までの間の工程及び工程遅れの情報を管理し、その情報をデイラー側端末30からのアクセスに応じて提供するようにする。

Description

明細書
工程遅れモニターシステム 技術分野
本発明は、 二輪、 四輪、 汎用品 (発電機、 耕運機等)の部品の受注品の 工程遅れをモニターする工程遅れモニターシステムに関する。 背景技術
二輪、 四輪、 汎用品 (発電機、 耕運機等) の部品の流通においては、 プランドメ一力一が国内外のディラーからの受注が有ると、 自社倉庫の 在庫を確認し、 不足分を部品メーカーへ発注することが行われている。 ここで、 発注者であるディラーが海外 (たとえば北米)の場合、 発注した 部品が届くまでに通常 3ヶ月かかっている。 この間、次の発注が有ると、 発注者は最初の発注した部品が届く前に次の発注を行う。
受注者であるプランドメ一力一は、 国内外の複数の発注者から日々同 様の受注を受ける。 発注者は発注時に受注者へ発注契約番号である P C (Purchase Contract) 番号を発注単位毎に知らせる。 受注者は同 P C 番号毎に受注した部品を管理する。 部品を管理する場合、 受注後の各ェ 程について P C番号単位で推進実績を管理している。 P C番号単位での 管理は、 通常のサプライチェーンでの管理方法が用いられている。 近年 では、 サプライチェーンに伴い、 受注者側の推進実績管理データベース を発注者側に開放することも行われている。 通常、 これはトラッキング と呼ばれている。
ところで、 このような通常のサプライチェーンでの管理方法では、 推 進実績のみを管理しているため、 発注者側では発注した部品が何時届く かが分からない。 そのため、 発注者側では安全在庫を過剰に持つ傾向がある。 また、 受注 者側でも途中経過を管理していないため、 トラプルのフォローがされて いない。 そのため、 無駄な運送費等がかかってしまう。 さらには、 これ らの問題から、 発注者側への信用が無くなり、 無駄な安全在庫を助長さ せてしまっている。
ちなみに、 部品の納入比率を向上させるようにしたものとして、 特開 2002— 34243 1号公報に示された在庫補充管理システムがある。 これは、 顧客の注文に対して販売拠点からの即時納入比率を向上させる ために、 管理サーバが各販売拠点端末からの受注情報に基づいて、 各販 売拠点における目標在庫量の更新処理を行い、 また新規受注量及び目標 在庫量の変動量に基づいて、各販売拠点に対する部品の補充量を演算し、 管轄物流拠点に対して補充指示情報を出力し、 さらに各販売拠点におけ る目標在庫量と引当可能実在庫量との差分に基づき過剰在庫量を演算し、 該当する販売拠点及ぴ管轄物流拠点に対して回収情報を出力するように したものである。
ところで、 上述した特開 2002— 34243 1号公報では、 新規受 注量及び目標在庫量の変動量に基づいて、 各販売拠点に対する部品の補 充量を演算し、 目標在庫量と引当可能実在庫量との差分に基づき過剰在 庫量を適切に保つようにしている。
そのため、特開 2002— 34243 1号公報では、上述したように、 推進実績のみを管理することになり、 発注者側では発注した部品が何時 届くかが分からないことから、 安全在庫を過剰に抱えてしまうおそれが ある。
また、 特開 2002— 34243 1号公報では、 受注者側でも途中経 過を管理していないため、トラブルのフォローがされていないこと力 ら、 無駄な運送費等がかかってしまうおそれもある。 さらに、特開 2 0 0 2— 3 4 2 4 3 1号公報では、 これらの問題から、 発注者側への信用が無くなり、 無駄な安全在庫を助長させてしまうおそ れもある。
本発明は、 このような状況に鑑みてなされたものであり、 過剰在庫の 削減と、 無駄な運送費等による経費削減と、 信用向上とを図ることがで きる工程遅れモニターシステムを提供することを目的とする。 発明の開示
本発明の工程遅れモニターシステムは、 受注者であるブランドメ一力 一側が保有するサーバ及びプランドメーカー側端末と、 サーバに対し通 信回線を介して相互に通信できるように接続され、 発注者であるディラ 一側が保有するディラー側端末と、 サーバに対し通信回線を介して相互 に通信できるように接続され、 部品メ一力一側が保有する部品メーカー 側端末とを備え、 サーバは、 ディラー側端末から発注された部品の受注 から部品の納品予定までの間の工程及び工程遅れの情報を管理する機能 と、 ディラー側端末からアクセスが有ると、 管理している部品の工程及 ぴ工程遅れの情報を提供する機能とを有し、ブランドメーカー側端末は、 各種情報を入力する際に用いられるものであり、 通信機能及び表示機能 を有し、 ディラー側端末は、 サーバに接続され、 部品の発注の指示と部 品の工程及ぴ工程遅れの情報の閲覧とを行う際に用いられるものであり、 通信機能及び表示機能を有し、 部品メーカー側端末は、 プランドメ一力 一側端末からの部品の調達に関わる調達情報を受け取るものであり、 通 信機能及び表示機能を有し、 ディラー側端末及びプランドメーカー側端 末からサーバへの部品の工程及び工程遅れの情報を閲覧する際のァクセ スには、 発注契約番号が用いられることを特徴とする。
また、 サーバは、 ディラー側端末からの受注内容が登録される受注デ ータベースと、 受注データベースに登録された受注内容に含まれている 受注情報と、 その受注情報を管理する ITEM No.と、 ITEM No.に紐付け られた識別番号とが登録される仕掛りデータベースと、 部品メーカーに 発注する部品の調達情報が登録される調達データベースと、 部品の在庫 情報と部品メーカ一側端末からの搬入情報が登録される在庫データベー スと、 受注内容を受注データベースに登録し、 受注情報を仕掛りデータ ベースに登録し、 さらに調達情報を調達データベースと仕掛りデータべ ースとに登録する機能を有する登録情報管理機能部と、 受注情報が登録 されると、 受注情報を管理する ITEM No.を発番する機能を有する管理 番号発番機能部と、 登録情報管理機能部によって受注情報が登録される と、 在庫データベースから在庫の有無をチェックする機能を有する在庫 有無チェック機能部と、 在庫有無チェック機能部によって在庫有りとチ エックされたとき、 在庫分に関しての引当処理を行う機能を有する引当 処理機能部と、 在庫有無チェック機能部により不足が有るとチェックさ れたとき、 その不足分の受注金額を数量ベースで配布計算する機能を有 する配布計算機能部と、引当処理機能部によって引当処理が行われると、 その引当処理が行われた日時と後工程の日程計画を作成する機能を有す る日程計画作成機能部と、 在庫有無チェック機能部により不足が有ると チェックされたとき、 その不足分に関して基準手番との比較により遅れ ている場合には後工程の修正手番を計算し、 修正日程を作成する機能を 有する日程計画修正機能部と、 ディラー側端末及びプランドメーカー側 端末からのアクセスが有ると、 ディラー側端末及びプランドメーカー側 端末からの仕掛り検索指示に応じて仕掛りデータベースに登録されてい る情報を検索し、 ディラー側端末及びプランドメーカー側端末に提供す る機能を有する仕掛り検索機能部とを備え、 管理番号発番機能部は、 在 庫有無チェック機能部により不足が有るとチェックされたとき、 調達情 報を管理する、 ITEM No.に紐付けられた識別番号を発番する機能を有 するようにすることができる。
また、 登録情報管理機能部は、 管理番号発番機能部によって発番され た ITEM No.と、 ITEM No.に紐付けられた識別番号とを、 仕掛りデータ ベースに登録し、 配布計算機能部によって配布計算された結果を、 仕掛 りデータベースに登録し、 日程計画作成機能部によって作成された日程 計画を、 仕掛りデータベースに登録し、 日程計画修正機能部によって作 成された修正日程を、 仕掛りデータベースに登録するようにすることが できる。
本発明の工程遅れモニター方法は、 受注者であるブランドメーカー側 が保有するサーバ及びブランドメーカー側端末と、 サーバに対し通信回 線を介して相互に通信できるように接続され、 発注者であるディラー側 が保有するディラー側端末と、 サーバに対し通信回線を介して相互に通 信できるように接続され、 部品メーカ一側が保有する部品メーカ一側端 末とを備え、 ディラー側端末から発注された部品の受注から部品の納品 予定までの間の工程遅れをモユタ一する工程遅れモニター方法であって、 サーバは、 ディラー側端末から発注された部品の受注から部品の納品予 定までの間の工程及び工程遅れの情報を管理する工程と、 ディラー側端 末及びブランドメーカー端末からアクセスが有ると、 管理している部品 の工程及び工程遅れの情報を提供する工程とを有し、 ブランドメーカー 側端末は、 各種情報を入力する際に用いられるものであり、 通信工程及 び表示工程を有し、 ディラー側端末は、 サーバに接続され、 部品の発注 の指示と、 部品の工程及び工程遅れの情報の閲覧とを行う際に用いられ るものであり、 通信工程及ぴ表示工程を有し、
部品メーカー側端末は、 プランドメーカー側端末からの部品の調達に 関わる調達情報を受け取るものであり、 通信工程及び表示工程を有し、 ディラー側端末からサーバへの部品の工程及び工程遅れの情報を閲覧す る際のアクセスには、 発注契約番号が用いられることを特徴とする。 また、 サーバは、 ディラー側端末からの受注内容が登録される受注デ ータベースと、 受注データベースに登録された受注内容に含まれている 受注情報と、 その受注情報を管理する ITEM No.と、 ITEM No.に紐付け られた識別番号とが登録される仕掛りデータベースと、 部品メーカーに 発注する部品の調達情報が登録される調達データベースと、 部品の在庫 情報と部品メ一力一側端末からの搬入情報が登録される在庫データベー スとを備え、 登録情報管理機能部により、 受注内容を受注データベース に登録し、 受注情報を仕掛りデータベースに登録し、 さらに調達情報を 調達データベースと仕掛りデータベースとに登録する工程と、 管理番号 発番機能部により、受注情報が登録されると、受注情報を管理する ITEM No.を発番する工程と、 在庫有無チェック機能部により、 登録情報管理 機能部によって受注情報が登録されると、 在庫データベースから在庫の 有無をチ ックする工程と、 引当処理機能部により、 在庫有無チ ック 機能部によって在庫有りとチェックされたとき、 在庫分に関しての引当 処理を行う工程と、 配布計算機能部により、 在庫有無チェック機能部に より不足が有るとチェックされたとき、 その不足分の受注金額を数量べ ースで配布計算する工程と、 日程計画作成機能部により、 引当処理機能 部によって引当処理が行われると、 その引当処理が行われた日時と後ェ 程の日程計画を作成する工程と、 日程計画修正機能部により、 在庫有無 チェック機能部により不足が有るとチェックされたとき、 その不足分に 関して基準手番との比較により遅れている場合には後工程の修正手番を 計算し、 修正日程を作成する工程と、 仕掛り検索機能部により、 デイラ 一側端末からのアクセスが有ると、 ディラー側端末からの仕掛り検索指 示に応じて仕掛りデータベースに登録されている情報を検索し、 ディラ 一側端末に提供する工程とを有し、 管理番号発番機能部は、 在庫有無チ ヱック機能部により不足が有るとチェックされたとき、 調達情報を管理 する、 ITEM No.に紐付けられた識別番号を発番する工程を有するよう にすることができる。
また、 登録情報管理機能部は、 管理番号発番機能部によって発番され た ITEM No.と、 ITEM No.に紐付けられた識別番号とを、 仕掛りデータ ベースに登録する工程と、 配布計算機能部によつて配布計算された結果 を、 仕掛りデータベースに登録する工程と、 日程計画作成機能部によつ て作成された日程計画を、 仕掛りデータベースに登録する工程と、 日程 計画修正機能部によって作成された修正日程を、 仕掛りデータベースに 登録する工程とを有するようにすることができる。
図面の簡単な説明
第 1図は本発明に係る工程遅れモニターシステムの一実施の形態の概要 を示す図である。
第 2図は第 1図の工程遅れモニターシステムの詳細を説明するための図 である。
第 3図は第 1図の工程遅れモニターシステムの動作を説明するためのフ ローチャートである。 第 4図は第 1図の工程遅れモニターシステムの動作を説明するためのフ 口一チヤ一トである。 第 5図は第 1図の工程遅れモニターシステムの動作を説明するためのフ ローチャートである。 第 6図は第 1図の工程遅れモニターシステムによる仕掛り検索に関わる 画面内容を説明するための図である。
第 7図は第 1図の工程遅れモニターシステムによる仕掛り検索に関わる 画面内容を説明するための図である。
第 8図は第 1図の工程遅れモニターシステムによる仕掛り検索に関わる 画面内容を説明するための図である。 発明を実施するための最良の形態
以下、 本発明の実施の形態について説明する。 なお、 以下の説明にお いては、 ディラーが海外である場合について説明する。
第 1図は、 本発明に係る工程遅れモニターシステムの一実施の形態の 概要を示す図であり、 受注者であるブランドメーカー側が保有するサー パ 10及びブランドメーカー側端末 20と、 発注者であるディラー側が 保有するディラー側端末 30と、 部品メーカー側が保有する部品メーカ 一側端末 40とを備え、 これらは通信回線 50を介して相互に通信でき る構成となっている。 なお、 ディラー側端末 30及び部品メーカー側端 末 40は、 説明の都合上、 1台のみを示しているが、 それぞれ複数台で あってもよいことは勿論である。 また、 ディラー側端末 30は、 国内外 のいずれにあってもよレ、。 また、 通信回線 50としては、 We b、 WA N (Wide Area Network) , 専用回線のいずれであってもよい。
サーバ 1 0は、 ディラー側端末 30から発注された部品の受注から部 品の納品予定までの間の工程及び工程遅れを管理するものであり、 受注 データベース (D/B) 1 0 a、 仕掛りデータベース (D/B) 1 0 b、 調達データベース (DZB) 1 0 c、 在庫データベース (D/B) 1 0 dを備えている。
受注データベース 1 0 aには、 発注者であるディラー側のディラー側 端末 30からの受注内容が登録される。仕掛りデータベース 1 0 bには、 受注データベース 1 0 aに登録された受注内容に含まれている下記の (1) 〜 (1 1 ) の受注情報と、 その受注情報を管理する ITEM No.と が登録される。
受注情報としては、 次の (1 ) 〜 (1 1 ) のようなものである。
( I ) 受注部品番号 · · · 口座番号とも言う。 口座番号とは、 パーツリ ストに載せられる数字やアルファべット等からなる部品の番号である。
(2) 品名 · · ·部品名
(3) 現旧区分 · · ·現:現在量産中の機種用部品である。 旧 :既に旧 モデルになつた部品である。
(4) 2Z4汎区分 · · · 2 :二輪である。 4 :四輪である。 汎:汎用 品 (発電機、 耕運機等)である。
(5) 年代区分 · · ·量産中 · 旧型期 5年経過 · 旧型期 1 0年経過 ·そ れ以上古いモデルに区分けするための識別記号である。
(6) 受注日
(7) 受注時刻
( 8 ) P C (Purchase Contract) 番号
(9) 受注金額
(1 0) 発注地域 · · ·発注者の所在地域 (例:北米 ·欧州 ·東南アジ ァ等)
( I I ) 発注タイプ · · ·発注者が望む運送方法 (例:海上輸送 ·飛行 機等)
また、 仕掛りデータベース 1 0 bには、 在庫有無のチェックにより、 在庫は有るが不足分が発生した場合の部品メーカーに発注する調達情報 と、 その調達情報を管理する ITEM No.に紐付けられた識別番号とが登 録される。
調達情報としては、 次の (1 2) 〜 (1 8) のようなものである。 (1 2) 発注数量
(1 3) F O C · · · Forecast of Control (予測管理) (14) 発注識別 · · ·発注方法の識別
(1 5) メーカーコード
(1 6) 注文番号
(1 7) 調達担当者 · · · コード番号で表示
(1 8) 搬入場所
調達データベース 1 0 cには、 仕掛りデータベース 1 0 bに登録され た上述の (1 2) 〜 ( 18) の調達情報が登録される。
在庫データベース 1 0 dには、 部品の在庫情報や搬入情報等が登録さ れる。
また、 サーバ 1 0は、 第 2図に示すように、 登録情報管理機能部 1 1、 管理番号発番機能部 1 2、 在庫有無チ ック機能部 1 3、 引当処理機能 部 14、 配布計算機能部 1 5、 日程計画作成機能部 1 6、 日程計画修正 機能部 1 7、 仕掛り検索機能部 1 8を備えている。
登録情報管理機能部 1 1は、 上述した受注内容を受注データベース 1 0 aに登録し、上述した受注情報を仕掛りデータベース 1 0 bに登録し、 さらに上述した調達情報を調達データベース 10 cと仕掛りデータべ一 ス 1 0 bとに登録する機能等を有している。管理番号発番機能部 1 2は、 上述した受注情報を管理する ITEM No.と、 上述した調達情報を管理す る ITEM No.に紐付けられた識別番号とを発番する機能等を有している。 在庫有無チェック機能部 1 3は、 登録情報管理機能部 1 1によって上 述した受注情報が登録されると、 在庫データベース 1 0 dから在庫の有 無をチェックする機能を有している。 在庫の有無をチェックする場合、 上述した受注部品番号が用いられる。 引当処理機能部 14は、 在庫有無 チェック機能部 1 3によって在庫有りとチェックされたとき、 在庫分に 関しての引当処理を行う機能を有している。
配布計算機能部 1 5は、 在庫有無チェック機能部 1 3により不足が有 るとチェックされたとき、 その不足分の受注金額を数量ベースで配布計 算する機能を有している。 その配布計算された結果は、 登録情報管理機 能部 1 1により、 上述した仕掛りデータベース 1 0 bに登録される。 日 程計画作成機能部 1 6は、 引当処理機能部 1 4によって引当処理が行わ れると、 その引当処理が行われた日時と後工程の日程計画を作成する機 能を有している。 その日程計画は、 事前に決められた基準手番 (日数) を基にして作成される。 また、 その作成された日程計画は、 登録情報管 理機能部 1 1により、上述した仕掛りデータベース 1 0 bに登録される。
日程計画修正機能部 1 7は、 在庫有無チェック機能部 1 3により不足 が有るとチェックされたとき、 その不足分に関して基準手番 (日数) と の比較により遅れている場合には後工程の修正手番を計算し、 修正日程 を作成する機能を有している。 その作成された修正日程は、 登録情報管 理機能部 1 1により、上述した仕掛りデータベース 1 0 bに登録される。 仕掛り検索機能部 1 8は、ディラー側端末 3 0からのアクセスが有ると、 ディラ一側端末 3 0からの仕掛り検索指示に応じて仕掛りデータベース
1 0 bに登録されている情報を検索し、 ディラー側端末 3 0に提供する 機能を有している。
プランドメーカー側端末 2 0は、 各種情報を入力する際に用いられる ものであり、 通信機能や表示機能等を有している。 各種情報としては、 たとえば上述した受注情報、 引当処理の日時、 部品メーカ一^ ·の発注日 時、 部品メーカ一^ ·の調達情報、 搬入受付日時、 出庫日時、 梱包日時、 インボイス番号、 出港日時、 入港日時等がある。
ディラー側端末 3 0は、 発注の指示や仕掛りデータベース 1 0 bに登 録されている情報の閲覧等を行う際に用いられるものであり、 通信機能 や表示機能等を有している。 また、 ディラー側端末 3 0により、 仕掛り データベース 1 0 bに登録されている情報の閲覧等を行う際、 上述した 発注契約番号である P C (Purchase Contract) 番号が用いられる。 部品メーカー側端末 4 0は、 プランドメーカー側端末 2 0からの上述 した調達情報を受け取るものであり、 通信機能や表示機能等を有してい る。
次に、 工程遅れモニターシステムの動作について説明する。
まず、第 3図に示すように、ディラー側端末 3 0からの受注が有り (ス テツプ S 1 )、ブランドメーカー側端末 2 0によってその受注内容が入力 されると、 入力された受注内容が登録情報管理機能部 1 1によって受注 データベース 1 0 aに登録される (ステップ S 2 )。 また、 受注内容が登 録されると、 上述した (1 ) 〜 (1 1 ) の受注情報が登録情報管理機能 部 1 1によって仕掛りデータベース 1 0 bに登録される(ステップ S 3 )。 このとき、 仕掛りデータベース 1 0 bには、 その受注情報を管理する ITEM No.が管理番号発番機能部 1 2により発番されて登録される (ス テツプ S 4 )。
仕掛りデータベース 1 0 bに受注情報が登録されると、 在庫有無チェ ック機能部 1 3により在庫データベース 1 0 dから、 上述した受注部品 番号を用いて部品の在庫有無がチェックされ(ステップ S 5 )、在庫が有 る場合には不足数がチェックされる (ステップ S 6 )。不足数が無ければ、 引当処理機能部 1 4により在庫分に関して引当処理が行われ、 ブランド メーカー側端末 2 0によってその引当処理の日時が入力されると、 入力 されたその引当処理の日時が仕掛りデータベース 1 0 bに登録される (ステップ S 7〜S 9 )。引当処理の日時が仕掛りデータベース 1 0 bに 登録されると、 日程計画作成機能部 1 6により後工程の日程作成と手番 日程算出とが行われる (ステップ S 1 0, S 1 1 )。 手番日程算出は、 事 前に決められた基準手番(日数)を基に行われる.。 そして、 手番日程が算 出された後工程の日程は、 仕掛りデータベース 1 0 bに登録される (ス テツプ S 1 2 )。
一方、 (ステップ S 5) において、 在庫が無い場合は、 部品メーカーに 発注することになり、 そのときの発注日時が仕掛りデータベース 1 0 b に登録される (ステツヅ S 1 3〜S 1 5)。 次いで、 部品メーカーに発注 した分については、 ブランドメーカー側端末 20によって上述した (1 2) 〜 (1 8) の調達情報が入力されると、 その調達情報が仕掛りデー タベース 1 0 bに登録される (ステップ S 1 6, S I 7)。 仕掛りデータ ベース 1 0 bに登録された調達情報は、 調達データベース 1 0 cにも登 録される (ステップ S 1 8)。 そして、調達データベース 1 0 cに登録さ れた調達情報が部品メーカー側端末 40に送信される。 調達情報に基づ いて、 部品メーカーからの搬入が有ると、 その品質が確認され、 返品無 しの場合には、 搬入された部品の情報が在庫データベース 1 0 dに登録 される (ステップ S 1 9〜S 2 1)。 次いで、 搬入受付日時が入力される と、 その搬入受付日時が仕掛りデータベース 1 0 bに登録される (ステ ップ S 2 2, S 2 3)。
一方、 (ステップ S 6) において不足分が有る場合と、 (ステップ S 2 0) において返品が有る場合には、 管理番号発番機能部 1 2により上述 した調達情報を管理する ITEM No.に紐付けられた識別番号が発番され、 さらに配布計算機能部 1 5により数量をベースにした受注金額の配布計 算が行われ、 その結果が仕掛りデータベース 1 0 bに登録される (ステ ップ S 24〜S 2 7)。
次に、 第 4図に示すように、 引当処理品か否かのチェックが行われる (ステップ S 2 8)。つまり、引当処理品とはプランドメ一力一の在庫品 であり、 引当処理品でないものは部品メーカーからの納入品である。 引 当処理品である場合には、 次の作業である出庫工程に入り、 出庫工程が 終了すると出庫日時が入力される (ステップ S 2 9)。 その出庫日時は、 仕掛りデータベース i o bに登録される。
この場合、 部品に付けられている部品明細書のパーコードをスキャンす ることで、 出庫日時が自動的に入力されるようにしてもよい。
これに対し、 引当処理品でない場合には、 基準手番 (日数) との比較 を行い (ステップ S 3 0)、 遅れ無しの場合は (ステップ S 2 9) での出 庫日時の入力となり、 遅れ有りの場合は日程計画修正機能部 1 7により 基準手番 (日数) を基に、 後工程の日程修正が行われ、 作成された修正 日程が仕掛りデータベース 1 0 bに登録される (ステップ S 3 1, S 3 2)。 ここでの基準手番 (日数) とは、 受注日時から計算して作られた最 初の日程にある手番のことである。 また、 (ステップ S 3 0)での比較対 象は、 最初の日程に対し、 搬入受付日実績である。
そして、 出庫日が基準手番 (日数) と比較され (ステップ S 3 3)、 遅 れ無しの場合は、 最初の日程が仕掛りデータベース 1 0 bに登録される (ステップ S 34)。 これに対し、遅れが有る場合は、 日程計画修正機能 部 1 7により基準手番 (日数) を基に、 後工程の日程修正が行われ (ス テツプ S 3 5)、作成された修正日程が仕掛りデータベース 1 0 bに登録 される (ステップ S 34)。
次いで、梱包①が行われた日時が入力され (ステップ S 3 6)、 基準手 番 (日数) との比較により (ステップ S 3 7)、 遅れ無しの場合は仕掛り データベース 1 0 bに梱包①が行われた日時が登録される (ステップ S 3 8)。 これに対し、 遅れが有る場合は、 日程計画修正機能部 1 7により 基準手番 (日数) を基に、 後工程の日程修正が行われ (ステップ S 3 9)、 作成された修正日程が仕掛りデータベース 1 0 bに登録される (ステツ プ S 3 8 )。
同様に、梱包②が行われた日時が入力され (ステップ S 40)、 基準手 番 (日数) との比較により (ステップ S 4 1)、 遅れ無しの場合は仕掛り データベース i o bに梱包②が行われた日時が登録される (ステップ S
4 2)。 これに対し、 遅れが有る場合は、 日程計画修正機能部 1 7により 基準手番 (日数) を基に、 後工程の日程修正が行われ (ステップ S 4 3)、 作成された修正日程が仕掛りデータベース 1 0 bに登録される (ステツ プ S 4 2)。
同様に、 パンニング日時が入力されると (ステップ S 44)、 第 5図に 示すように、 基準手番 (日数) との比較により (ステップ S 4 5)、 遅れ 無しの場合は仕掛りデータベース 1 0 bにパンユング日時が登録される (ステップ S 4 6)。 これに対し、 遅れが有る場合は、 日程計画修正機能 部 1 7により基準手番 (日数) を基に、 後工程の日程修正が行われ (ス テツプ S 4 7)、作成された修正日程が仕掛りデータベース 1 0 bに登録 される (ステップ S 4 6)。
同様に、 通関日時が入力され (ステップ S 48)、 基準手番 (日数) と の比較により (ステップ S 49)、遅れ無しの場合は仕掛りデータベース 1 0 bに通関日時が登録される (ステップ S 50)。 これに対し、 遅れが 有る場合は、 日程計画修正機能部 1 7により基準手番 (日数) を基に、 後工程の日程修正が行われ(ステップ S 5 1 )、作成された修正日程が仕 掛りデータベース 1 0 bに登録される (ステップ S 5 0)。
次いで、 通関時のインボイス番号が発行されると、 入力されたインポ イス番号が仕掛りデータベース 1 0 bに登録される (ステップ S 5 2,
55 3)。 ここで、 インポイス番号は、 出港が確定したことを意味し、 発 注者側にとって荷受け時の管理番号ともなる。 また、入力された出港日 時及び入港日時がそれぞれ仕掛りデータベース 1 0 bに登録され (ステ ップ S 54〜S 5 7)、 その後、 D I S T (ディストリビューター)到着と なる (ステップ S 58)。
ここで、 たとえばディラー側端末 3 0からサーバ 1 0に対してァクセ スが有ると、 仕掛り検索機能部 1 8の応答により、 仕掛りデータペース 1 0 bに登録されている情報を閲覧することができる。 仕掛りデータべ ース 1 0 bに登録されている情報を閲覧する場合には、 上述した P C番 号が用いられる。 そして、 たとえばディラー側端末 3 0には、 (ステップ S 6 0〜S 6 3) に示すように、 仕掛り検索の画面と、 工程別日付一覧 の画面と、 セクション毎件数一覧の画面と、 明細書一覧の画面とが表示 される。 なお、 セクション毎件数一覧と明細鲁一覧とは、 最初の日程計 画より遅れたもののデータを表示するものである。
ここで、 たとえばディラー側端末 3 0には、 第 6図 (a) に示すよう なメニュー検索画面が表示され、 その画面から 「仕掛り検索」 の項目を クリックすると、 第 6図 (b) に示すような仕掛検索の詳細画面が表示 される。 ここでは、 検索パターンを指定するチェック項目として、 (P C /NO), (ODR R E F NO)、 (発注地域 +受注地域 +部番) が設 けられている。 そこで、 (P C/NO) を選択し、 さらに上述した P C番 号を入力すると、 第 7図 (a) に示すような検索結果が表示される。 こ の検索結果により、 上述した受注部品番号である部番毎に、 工程が完了 したかどうかが分かるとともに、 その工程完了日や到着予定日等を確認 することができる。 また、 第 7図 (a) の検索結果において、 たとえば 上述した受注部品番号である部番の欄のいずれかを選択すると、 第 7図 (b) に示すようなその選択した部番に対応する工程別日付一覧が表示 される。 これにより、 部番毎に、 発注から D I S T (デイストリビュータ 一)到着までの工程別の詳細を確認することができる。また、第 7図(a) の検索結果において、 たとえば数量の欄のいずれかを選択すると、 第 7 図 (c) に示すようなその選択した数量に関する詳細一覧が表示される。 これにより、 数量に関する詳細を確認することができる。 なお、 第 7図 (a) 〜第 7図 (c) に示す画面は、 その内容の変化に合わせて更新さ れるため、 第 7図 (a ) 〜第 7図 (c ) に示す内容をリアルタイムで確 認することができる。
また、 第 6図 (b ) の画面において、 (発注地域 +受注地域 +部番) を 選択すると、 第 8図 (a ) に示すようなセクション毎件数一覧 (遅れ) が表示される。 この画面では、 工程別及ぴ遅れ日数別に件数を確認する ことができる。 なお、 この画面の内容は、 上記同様に、 その内容の変化 に合わせて更新されるため、 セクション毎件数一覧 (遅れ) をリアルタ ィムで確認することができる。 さらにこの画面にて、 いずれかの件数を 選択すると、 第 8図 (b ) に示すようなそれぞれの部番に対応した明細 一覧 (遅れ) が表示される。 この画面は、 上記同様に、 その内容の変化 に合わせて更新されるため、 到着予定日等をリアルタイムで確認するこ とができる。
このように、 本実施の形態では、 受注者であるブランドメーカー側が 保有するサーバ 1 0及びプランドメーカー側端末 2 0と、 サーバ 1 0に 対し通信回線 5 0を介して相互に通信できるように接続され、 発注者で あるディラー側が保有するディラー側端末 3 0と、 サーバ 1 0に対し通 信回線 5 0を介して相互に通信できるように接続され、 部品メーカー側 が保有する部品メーカー側端末 4 0とを備え、 サーバ 1 0により、 ディ ラー側端末 3 0から発注された部品の受注から部品の納品予定までの間 の工程及び工程遅れの情報を管理し、 その情報をディラー側端末 3 0か らのアクセスに応じて提供するようにした。
これにより、 ディラー側端末 3 0により、 部品の受注から部品の納品 予定までの間の工程及ぴ工程遅れの情報をリアルタイムで確認できるの で、 発注者側では発注した部品が何時届くかを容易に知ることができ、 安全在庫を過剰に抱えてしまう必要がなくなる。
また、 受注者側では、 部品の受注から部品の納品予定までの間の工程 の情報を仕掛りデータベース 1 0 bに登録するとともに、基準手番(日) との比較により、 工程遅れが有った場合には、 その都度、 工程遅れの情 報を仕掛りデータベース 1 0 bに登録するようにしているので、 途中経 過の管理が確実に行われ、 トラブルのフォローが容易となることから、 無駄な運送費等を省くことが可能となる。
また、 発注者側へ工程遅れの情報をリアルタイムで提供できるので、 発注者側への信用を高めることができ、 無駄な安全在庫を助長させてし まうこともなくなる。
また、 発注者側への信用を高めることにより、 エンドユーザ一等への 信用も高められるので、 結果的に、 サプライチェーンの信頼性が高めら れる。 産業上の利用可能性
以上の如く本発明に係る工程遅れモニターシステムによれば、 受注者 であるブランドメーカー側が保有するサーバ及ぴブランドメーカー側端 末と、サーバに対し通信回線を介して相互に通信できるように接続され、 発注者であるディラー側が保有するディラー側端末と、 サーバに対し通 信回線を介して相互に通信できるように接続され、 部品メーカー側が保 有する部品メーカー側端末とを備え、 サーバにより、 ディラー側端末か ら発注された部品の受注から部品の納品予定までの間の工程及び工程遅 れの情報を管理し、 その情報をディラー側端末からのアクセスに応じて 提供するようにしたので、 過剰在庫の削減と、 無駄な運送費等による経 費削減と、 信用向上とを図ることができる。

Claims

請求の範囲
l . 受注者であるブランドメーカー側が保有するサーバ及びブラ ンドメーカー側端末と、
前記サーバに対し通信回線を介して相互に通信できるように接続され、 発注者であるディラー側が保有するディラー側端末と、
前記サーバに対し通信回線を介して相互に通信できるように接続され、 部品メーカ一側が保有する部品メーカ一側端末とを備え、
前記サーバは、
前記ディラ一側端末から発注された部品の受注から前記部品の納品予 定までの間の工程及び工程遅れの情報を管理する機能と、 前記ディラー 側端末からアクセスが有ると、 前記管理している前記部品の工程及びェ 程遅れの情報を提供する機能とを有し、
前記プランドメーカー側端末は、 各種情報を入力する際に用いられる ものであり、 通信機能及び表示機能を有し、
前記ディラー側端末は、 前記サーバに接続され、 前記部品の発注の指 示と前記部品の工程及び工程遅れの情報の閲覧とを行う際に用いられる ものであり、 通信機能及び表示機能を有し、
前記部品メーカ一側端末は、 前記ブランドメーカー側端末からの前記 部品の調達に関わる調達情報を受け取るものであり、 通信機能及び表示 機能を有し、
前記ディラー側端末及びブランドメーカー側端末から前記サーバへの 前記部品の工程及び工程遅れの情報を閲覧する際のアクセスに.は、 発注 契約番号が用いられる
ことを特徴とする工程遅れモニターシステム。
2 . 前記サーバは、
前記ディラー側端末からの受注内容が登録される受注データベースと、 前記受注データベースに登録された受注内容に含まれている受注情報 と、 その受注情報を管理する ITEM No.と、 前記 ITEM No.に紐付けら れた識別番号とが登録される仕掛りデータベースと、
前記部品メーカーに発注する前記部品の調達情報が登録される調達デ ータベースと、
前記部品の在庫情報と前記部品メ一力一側端末からの搬入情報が登録 される在庫データベースと、
前記受注内容を前記受注データベースに登録し、 前記受注情報を前記 仕掛りデータベースに登録し、 さらに前記調達情報を前記調達データべ ースと前記仕掛り
データベースとに登録する機能を有する登録情報管理機能部と、
前記受注情報が登録されると、 前記受注情報を管理する ITEM No.を 発番する機能を有する管理番号発番機能部と、
前記登録情報管理機能部によって前記受注情報が登録されると、 前記 在庫データベースから在庫の有無をチ ックする機能を有する在庫有無 チェック機能部と、
前記在庫有無チェック機能部によって在庫有りとチェックされたとき、 在庫分に関しての引当処理を行う機能を有する引当処理機能部と、 前記在庫有無チェック機能部により不足が有るとチェックされたとき、 その不足分の受注金額を数量ベースで配布計算する機能を有する配布計 算機能部と、
前記引当処理機能部によって引当処理が行われると、 その引当処理が 行われた日時と後工程の日程計画を作成する機能を有する日程計画作成 機能部と、
前記在庫有無チェック機能部により不足が有るとチェックされたとき、 その不足分に関して基準手番との比較により遅れている場合には後工程 の修正手番を計算し、 修正日程を作成する機能を有する日程計画修正機 能部と、
前記ディラ一側端末及ぴプランドメ一力一側端末からのアクセスが有 ると、 前記ディラー側端末及ぴプランドメーカー側端末からの仕掛り検 索指示に応じて前記仕掛りデータベースに登録されている情報を検索し、 前記ディラー側端末及びプランドメーカー側端末に提供する機能を有す る仕掛り検索機能部とを備え、
前記管理番号発番機能部は、 前記在庫有無チェック機能部により不足 が有ると
チェックされたとき、 前記調達情報を管理する、 前記 ITEM No.に紐付 けられた識別番号を発番する機能を有する
ことを特徴とする請求の範囲第 1項に記載の工程遅れモニターシステ ム。
3 . 前記登録情報管理機能部は、
前記管理番号発番機能部によって発番された前記 ITEM No.と、 前記 ITEM No.に紐付けられた識別番号とを、 前記仕掛りデータベースに登 録し、
前記配布計算機能部によつて配布計算された結果を、 前記仕掛りデー タベースに登録し、
前記日程計画作成機能部によって作成された日程計画を、 前記仕掛り データベースに登録し、 前記日程計画修正機能部によって作成された修正日程を、 前記仕掛り データベースに登録する ことを特徴とする請求の範囲第 2項に記載の工程遅れモニターシステ ム。
4 . 受注者であるブランドメーカー側が保有するサーバ及ぴブランドメ 一力一側端末と、 前記サーバに対し通信回線を介して相互に通信できる ように接続され、発注者であるディラー側が保有するディラー側端末と、 前記サーバに対し通信回線を介して相互に通信できるように接続され、 部品メーカー側が保有する部品メーカー側端末とを備え、 前記ディラー ' 側端末から発注された部品の受注から前記部品の納品予定までの間のェ 程遅れをモニターする工程遅れモニター方法であって、
前記サーバは、
前記ディラー側端末から発注された部品の受注から前記部品の納品予 定までの間の工程及び工程遅れの情報を管理する工程と、
前記ディラー側端末及びブランドメーカー端末からアクセスが有ると、 前記管理している前記部品の工程及び工程遅れの情報を提供する工程と を有し、
前記ブランドメーカー側端末は、 各種情報を入力する際に用いられる ものであり、 通信工程及び表示工程を有し、
前記ディラー側端末は、 前記サーバに接続され、 前記部品の発注の指 示と、 前記部品の ί程及び工程遅れの情報の閲覧とを行う際に用いられ るものであり、 通信工程及ぴ表示工程を有し、
前記部品メーカ一側端末は、 前記ブランドメーカ一側端末からの前記 部品の調達に関わる調達情報を受け取るものであり、 通信工程及び表示 工程を有し、
前記ディラー側端末から前記サーバへの前記部品の工程及び工程遅れ の情報を閲覧する際のアクセスには、 発注契約番号が用いられる
ことを特徴とする工程遅れモニター方法。
5 . 前記サーバは、
前記ディラー側端末からの受注内容が登録される受注データベースと、 前記受注データベースに登録された受注内容に含まれている受注情報 と、 その受注情報を管理する ITEM No.と、 前記 ITEM No.に紐付けら れた識別番号とが登録される仕掛りデータベースと、
前記部品メーカーに発注する前記部品の調達情報が登録される調達デ 一夕ベースと、
前記部品の在庫情報と前記部品メーカー側端末からの搬入情報が登録 される在庫データベースとを備え、
登録情報管理機能部により、 前記受注内容を前記受注データベースに 登録し、
前記受注情報を前記仕掛りデータベースに登録し、 さらに前記調達情報 を前記調達データベースと前記仕掛りデータベースとに登録する工程と、 管理番号発番機能部により、 前記受注情報が登録されると、 前記受注 情報を管理する ITEM No.を発番する工程と、
在庫有無チェック機能部により、 前記登録情報管理機能部によって前 記受注情報が登録されると、 前記在庫データベースから在庫の有無をチ エックする工程と、 ' +
引当処理機能部により、 前記在庫有無チェック機能部によって在庫有 りとチェックされたとき、 在庫分に関しての引当処理を行う工程と、 配布計算機能部により、 前記在庫有無チェック機能部により不足が有 るとチェックされたとき、 その不足分の受注金額を数量ベースで配布計 算する工程と、
日程計画作成機能部により、 前記引当処理機能部によって引当処理が 行われると、 その引当処理が行われた日時と後工程の日程計画を作成す る工程と、
日程計画修正機能部により、 前記在庫有無チェック機能部により不足 が有るとチェックされたとき、 その不足分に関して基準手番との比較に より遅れている場合には後工程の修正手番を計算し、 修正日程を作成す る工程と、
仕掛り検索機能部により、 前記ディラ一側端末からのアクセスが有る と、 前記ディラ一側端末からの仕掛り検索指示に応じて前記仕掛りデー タベースに登録されている情報を検索し、 前記ディラー側端末に提供す る工程とを有し、
前記管理番号発番機能部は、 前記在庫有無チェック機能部により不足 が有るとチェックされたとき、前記調達情報を管理する、前記 ITEM No. に紐付けられた識別番号を発番する工程を有する
ことを特徴とする請求の範囲第 4項に記載の工程遅れモニタ一方法。
6 . 前記登録情報管理機能部は、
前記管理番号発番機能部によって発番された前記 ITEM No.と、 前記 ITEM No.に紐付けられた識別番号とを、 前記仕掛りデータベースに登 録する工程と、
前記配布計算機能部によって配布計算された結果を、 前記仕掛りデー タベースに登録する工程と、
前記日程計画作成機能部によって作成された日程計画を、 前記仕掛り データベースに登録する工程と、 前記日程計画修正機能部によって作成された修正日程を、 前記仕掛り データベースに登録する工程とを有する ことを特徴とする請求の範囲第 5項に記載の工程遅れモニター方法。
PCT/JP2003/016584 2003-03-31 2003-12-24 工程遅れモニターシステム WO2004088442A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
BRPI0318225-8A BR0318225A (pt) 2003-03-31 2003-12-24 sistema e método de monitoração de atraso de processo

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2003-096753 2003-03-31
JP2003096753A JP2004303027A (ja) 2003-03-31 2003-03-31 工程遅れモニターシステム

Publications (1)

Publication Number Publication Date
WO2004088442A1 true WO2004088442A1 (ja) 2004-10-14

Family

ID=33127525

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2003/016584 WO2004088442A1 (ja) 2003-03-31 2003-12-24 工程遅れモニターシステム

Country Status (5)

Country Link
US (1) US7209894B2 (ja)
JP (1) JP2004303027A (ja)
CN (1) CN1759359A (ja)
BR (1) BR0318225A (ja)
WO (1) WO2004088442A1 (ja)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7805335B2 (en) 2004-03-08 2010-09-28 Sap Ag Purchase list having status indicators
US8050990B2 (en) 2004-03-08 2011-11-01 Sap Ag Method of and system for generating purchase orders using an auction process
US7813949B2 (en) 2004-03-08 2010-10-12 Sap Ag Method and system for flexible budgeting in a purchase order system
US7983962B2 (en) 2004-03-08 2011-07-19 Sap Aktiengesellschaft Method and system for purchase order data entry
US7660742B2 (en) 2004-03-08 2010-02-09 Sap Aktiengesellschaft Method of and system for processing purchase orders
US8423428B2 (en) 2004-03-08 2013-04-16 Sap Ag Method for allocation of budget to order periods and delivery periods in a purchase order system
US8046273B2 (en) 2004-03-08 2011-10-25 Sap Ag System and method for purchase order creation, procurement, and controlling
US8050956B2 (en) * 2004-03-08 2011-11-01 Sap Ag Computer-readable medium, program product, and system for providing a schedule bar with event dates to monitor procurement of a product
US8027886B2 (en) 2004-03-08 2011-09-27 Sap Aktiengesellschaft Program product for purchase order processing
US7647250B2 (en) 2004-03-08 2010-01-12 Sap Ag Method and program product for event monitoring
US7552860B2 (en) * 2004-04-23 2009-06-30 Seiko Instruments Inc. Product history management method, apparatus, and program, label issuing method, apparatus, and program, and identification information issuing apparatus
US20070220047A1 (en) * 2006-03-15 2007-09-20 Lucent Technologies Inc. Systems and methods for reducing stranded inventory
US8456302B2 (en) 2009-07-14 2013-06-04 Savi Technology, Inc. Wireless tracking and monitoring electronic seal
KR20120099631A (ko) 2009-08-17 2012-09-11 사비 테크날러지 인코퍼레이티드 자산의 상황 인식 모니터링
US20110054979A1 (en) * 2009-08-31 2011-03-03 Savi Networks Llc Physical Event Management During Asset Tracking
JP6978830B2 (ja) * 2016-09-27 2021-12-08 株式会社オービック 出荷制御装置、出荷制御方法、及び出荷制御プログラム

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020059110A1 (en) * 2000-09-22 2002-05-16 Masaaki Yamamoto Logistics management system managing distribution and schedule of product form order-acceptance to delivery, using a computer
JP2002169995A (ja) * 2000-12-05 2002-06-14 Nec Corp 海外生産における納期管理システム
JP2002182722A (ja) * 2000-12-19 2002-06-26 Tamotsu Miyamoto スケジュール管理方法
JP2002229620A (ja) * 2001-01-29 2002-08-16 Technoart:Kk 生産情報システムおよび生産管理方法
JP2002341927A (ja) * 2001-05-21 2002-11-29 Nec Tohoku Ltd 無線バーコードリーダ端末を利用した管理システム、および無線バーコードリーダ端末

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US59110A (en) * 1866-10-23 Improvement in double-barreled fire-arms
US5233533A (en) * 1989-12-19 1993-08-03 Symmetrix, Inc. Scheduling method and apparatus
JPH0964510A (ja) * 1995-08-21 1997-03-07 Hitachi Telecom Technol Ltd プリント回路板の生産装置とその生産計画立案方法
JP3497348B2 (ja) * 1997-06-20 2004-02-16 株式会社日立製作所 生産計画システム
JP3758454B2 (ja) * 2000-03-16 2006-03-22 株式会社デンソー 部品情報管理システム
US7668761B2 (en) * 2000-10-27 2010-02-23 Jda Software Group System and method for ensuring order fulfillment
US7283975B2 (en) * 2001-02-05 2007-10-16 Broughton W Curtis System and method for tracking and managing construction projects
JP2002342431A (ja) 2001-05-14 2002-11-29 Asahi Glass Co Ltd 在庫補充管理システム
AU2003228859A1 (en) * 2002-05-03 2003-11-17 Manugistics, Inc. Scheduling and sequencing supply chain resources

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020059110A1 (en) * 2000-09-22 2002-05-16 Masaaki Yamamoto Logistics management system managing distribution and schedule of product form order-acceptance to delivery, using a computer
JP2002169995A (ja) * 2000-12-05 2002-06-14 Nec Corp 海外生産における納期管理システム
JP2002182722A (ja) * 2000-12-19 2002-06-26 Tamotsu Miyamoto スケジュール管理方法
JP2002229620A (ja) * 2001-01-29 2002-08-16 Technoart:Kk 生産情報システムおよび生産管理方法
JP2002341927A (ja) * 2001-05-21 2002-11-29 Nec Tohoku Ltd 無線バーコードリーダ端末を利用した管理システム、および無線バーコードリーダ端末

Also Published As

Publication number Publication date
US7209894B2 (en) 2007-04-24
BR0318225A (pt) 2006-04-04
US20040249722A1 (en) 2004-12-09
JP2004303027A (ja) 2004-10-28
CN1759359A (zh) 2006-04-12

Similar Documents

Publication Publication Date Title
US7536321B2 (en) Estimated time of arrival (ETA) systems and methods
US7904975B2 (en) Real-time display of available products over the internet
US8005761B1 (en) Dynamically determining actual delivery information for orders based on actual order fulfillment plans
US7024382B2 (en) System and method for managing retail and wholesale operations
US6591243B1 (en) Method and system for supply chain control
WO2004088442A1 (ja) 工程遅れモニターシステム
US20020116241A1 (en) Enterprise resource planning system for ordering, tracking and shipping goods from a seller to a buyer
US20220092669A1 (en) Dynamic Cannabis Delivery Platform
JP2002245366A (ja) 通信ネットワークを利用した物流システム
JP2004051374A (ja) シームレス商品物流情報システム
US20090112739A1 (en) Product management system and methods
US20030135420A1 (en) Web-based method for managing and communicating information regarding an order of consumer goods
KR100561067B1 (ko) 부품 자동 발주 가공 시스템 및 그 방법
JP2020067990A (ja) 買い物代行サービスを提供するためのシステム、方法、及びプログラム
JP2001125976A (ja) 商品発注受注統合システム,商品情報管理プログラム記憶媒体および商品マスタデータ記憶媒体
US20030231604A1 (en) System and method for configuring merchandise layout by way of mobile commerce
JP2002006936A (ja) 生産管理システムおよび生産管理方法
US20060047583A1 (en) Method and system for empowering purchasers to maximize economies of scale
JP2005196484A (ja) 生産管理システム
JP2020068005A (ja) 買い物代行サービスを提供するためのシステム、方法、及びプログラム
JP2003015727A (ja) 情報処理装置及び方法
KR100385097B1 (ko) 인터넷을 이용한 스페어 파트 관리 보험 서비스 시스템 및그 운용방법
WO2004008357A1 (ja) 受発注システム
KR20230064147A (ko) 주문자 상물처리 프로세스와 상물관리 시스템
JP2002049794A (ja) 商品受発注システム及び商品受発注方法

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): BR CN

AL Designated countries for regional patents

Kind code of ref document: A1

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 20038B02286

Country of ref document: CN

ENP Entry into the national phase

Ref document number: PI0318225

Country of ref document: BR

122 Ep: pct application non-entry in european phase