WO2004063645A1 - 空調機器用フロンの回収・再生・充填装置及び空調機器潤滑用オイルの補充方法 - Google Patents

空調機器用フロンの回収・再生・充填装置及び空調機器潤滑用オイルの補充方法 Download PDF

Info

Publication number
WO2004063645A1
WO2004063645A1 PCT/JP2004/000057 JP2004000057W WO2004063645A1 WO 2004063645 A1 WO2004063645 A1 WO 2004063645A1 JP 2004000057 W JP2004000057 W JP 2004000057W WO 2004063645 A1 WO2004063645 A1 WO 2004063645A1
Authority
WO
WIPO (PCT)
Prior art keywords
cfc
freon
pressure
filling
tank
Prior art date
Application number
PCT/JP2004/000057
Other languages
English (en)
French (fr)
Inventor
Yuzo Fujino
Hiroshi Baba
Original Assignee
Nippon Oil Corporation
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Oil Corporation filed Critical Nippon Oil Corporation
Priority to JP2005507969A priority Critical patent/JPWO2004063645A1/ja
Publication of WO2004063645A1 publication Critical patent/WO2004063645A1/ja

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B45/00Arrangements for charging or discharging refrigerant
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60HARRANGEMENTS OF HEATING, COOLING, VENTILATING OR OTHER AIR-TREATING DEVICES SPECIALLY ADAPTED FOR PASSENGER OR GOODS SPACES OF VEHICLES
    • B60H1/00Heating, cooling or ventilating [HVAC] devices
    • B60H1/00507Details, e.g. mounting arrangements, desaeration devices
    • B60H1/00585Means for monitoring, testing or servicing the air-conditioning
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2345/00Details for charging or discharging refrigerants; Service stations therefor
    • F25B2345/001Charging refrigerant to a cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2345/00Details for charging or discharging refrigerants; Service stations therefor
    • F25B2345/002Collecting refrigerant from a cycle

Definitions

  • the present invention relates to a technology for easily and quickly replenishing lubricating oil to an air conditioner such as a car air conditioner (hereinafter referred to as “air conditioner”).
  • air conditioner such as a car air conditioner (hereinafter referred to as “air conditioner”).
  • a cooling system of an air conditioner as an air conditioner as an air conditioner, about 50 to 300 g of oil for compressor lubrication is mixed in addition to refrigerant (Freon gas). Some of the oil adheres to compressors and pipes, and the rest of the oil is circulated through the cooling system along with Freon gas.
  • Freon gas refrigerant
  • Oil can be replenished as follows: (1) After collecting Freon gas, evacuate the cooling system to a vacuum using a vacuum pump or the like, and replenish the oil using negative pressure (2) A method of refilling from the low-pressure side using a compressor of an air conditioner while filling with Freon gas is known, but both operations are complicated and time-consuming, so they must be skilled workers. Cann't do it.
  • An object of the present invention is to provide a device for collecting, regenerating, and filling an air conditioner fan and a method of replenishing oil for lubricating the air conditioner, which can easily and quickly replenish oil. Disclosure of the invention
  • the chlorofluorocarbon collection and recovery system for air conditioning equipment includes a chlorofluorocarbon collection system that collects chlorofluorocarbon from the air conditioning equipment into a chlorofluorocarbon tank, a chlorofluorocarbon regeneration system that regenerates fluorocarbon in the fluorocarbon tank, There is a CFC filling system for filling the air conditioning equipment with CFCs in the CFC tank, and a CFC replenishment system for filling the CFC tank with CFCs. That is, in the CFC recovery system, the oil separation section of the system oil separator is connected to the first pipe connecting the high-pressure connector, which can be freely connected to and removed from the CFC filling port of the air conditioner, and the CFC tank.
  • At least a heat exchanger for the filter dryer, compressor, and system oil separator are installed, and a pipe opening / closing device is installed at a predetermined position.
  • the second piping that exits from the chlorofluorocarbon tank and returns to the chlorofluorocarbon tank has a common system oil separator with the chlorofluorocarbon recovery system—evening oil separator, filter dryer, compressor, and system oil separator.
  • At least the replacement unit is interposed, and a pipe opening / closing device is interposed at a predetermined location.
  • the CFC filling system at least a pipe opening / closing device is interposed at a predetermined portion of the third pipe connecting the CFC tank and the high-pressure side connector.
  • At least a pipe opening / closing device is interposed at a predetermined portion of a fourth pipe connecting the low-pressure side connector detachably connected to the low-pressure side of the chlorofluorocarbon filling port of the air conditioner and the chlorofluorocarbon tank.
  • An oil supply port is connected to the fourth pipe via a check valve that opens when a predetermined pressure is applied.
  • the high pressure side connector is connected to the high pressure side of the CFC filling port of the air conditioner. Subsequently, for example, by operating the operation panel, CFCs in air conditioners can be automatically collected, regenerated, and filled without releasing CFCs into the atmosphere.
  • CFCs in air conditioners can be automatically collected, regenerated, and filled without releasing CFCs into the atmosphere.
  • oil can be automatically replenished from the oil can to the air conditioning equipment. For this reason, even if it is not a skilled worker, oil replenishment can be performed easily and quickly.
  • the oil replenishment system is provided with a check valve that opens only when a predetermined pressure is applied in the oil replenishment direction, air is introduced into the piping unless the oil can is connected. Can be prevented.
  • the fifth pipe connected to the purge port of the CFC tank has a first opening / closing device that periodically opens and closes the fifth pipe, and the pressure difference between the pressure inside the CFC tank and the reference pressure is a predetermined value. It is desirable to install a second switchgear that opens when the above situation occurs.
  • the non-condensable gas accumulated in the upper part of the front tank is discharged at an appropriate setting.
  • the inside of the tank is open to the atmosphere even after the non-condensable gas is released. Freon may be released into the atmosphere.
  • simply opening the valve when the pressure difference between the CFC internal pressure and the reference pressure exceeds a predetermined value may cause the valve to open due to a temperature difference regardless of the presence or absence of non-condensable gas.
  • some chlorofluorocarbons may be released into the atmosphere.
  • the conditions for purging the non-condensable gas accumulated in the upper part of the CFC tank are optimized, and the emission of CFCs into the atmosphere can be minimized.
  • the reference pressure be temperature compensated according to the temperature of the Freon collected in the Freon tank. This prevents the second switchgear from malfunctioning and opening the valve even when the ambient temperature changes.
  • a pressure detection device that detects whether or not the pressure in the pipe is within a predetermined range is connected near the high-pressure connector, and when the pressure detection device detects that the pressure in the pipe is within a predetermined range. It is desirable to have a control device that performs CFC recovery by the CFC recovery system. According to such a configuration, the nozzle is collected only when the pressure in the pipe near the high-pressure side connector is within a predetermined range. Therefore, when the air conditioner has no chlorofluorocarbon or the hose is loose or cracked, the nozzle is collected. Therefore, it is possible to prevent air as non-condensable gas from being mixed in from the air conditioner.
  • the air conditioner when the air conditioner is operated with the high-side connector and the low-side connector connected, the high-pressure side and low-side Freon pressures are measured. For this reason, the air conditioner can be diagnosed without reconnecting the high-voltage connector and the low-voltage connector before and after various operations, thereby shortening the operation time and the labor.
  • a freon filling weight setting device that sets the freon filling weight corresponding to the type of air conditioning equipment, and a freon filling weight that detects the actual freon filling weight based on the output from the scale that measures the weight of the froth tank It is desirable to have a detection device and a stop device for stopping the Freon filling by the Freon filling system when the actual mouth filling weight reaches the set mouth filling weight. In this way, if the type of air-conditioning equipment is determined and the CFC filling weight is set, it is possible to automatically fill the opening with the optimum weight.
  • the scale is connected to the upper surface of the load cell via an elastic body disposed on the lower surface of the upper member, with a base having an upper member whose lower surface extends substantially on a horizontal plane and a lower member on which the Freon tank is placed and fixed. It is desirable to measure the weight of the Freon tank.
  • the elastic body is disposed on the lower surface of the upper member of the gantry, even if the gantry is tilted, the inclination is absorbed by the elastic body, and a load is applied to the upper surface of the load cell for measuring the weight. Acts almost vertically. For this reason, the weight of the CFC tank can be measured with high accuracy regardless of the inclination of the gantry. Also, even if shocks such as vibrations are generated on the gantry, the shocks are reduced by the elastic members provided on the lower surface of the upper member, so that the shocks directly transmitted to the load cell are greatly reduced. Because of this, The load measurement accuracy of the load cell is prevented from deteriorating, and the labor required for maintenance and inspection can be reduced.
  • a system oil separator is connected to a pipe connecting a high pressure side connector detachably connected to a high pressure side of a CFC filling port of the air conditioning equipment and a CFC tank.
  • a fluorocarbon collection system with a piping opening and closing device installed at least in place of the evening oil separation section, filter dryer, compressor, and heat exchange section of the system oil separator.
  • it is connected via a check valve that opens when a predetermined pressure is applied to the piping connecting the low pressure side connector that is detachably connected to the low pressure side of the air inlet of the air conditioner and the CFC tank. Oil is supplied to the air conditioner from the oil refill port through the low pressure side of the Freon filling port using the CFC recovery pressure.
  • the low pressure side connector when collecting CFCs from the air conditioning equipment by the CFC recovery system, the low pressure side connector is connected to the low pressure side of the CFC filling port of the air conditioning equipment, and the oil can is connected to the oil supply port.
  • the oil can be automatically replenished from the oil can to the air conditioning equipment using the CFC recovery pressure. For this reason, oil replenishment can be performed easily and quickly even by a skilled worker.
  • the oil replenishment system is provided with a check valve that opens only when a predetermined pressure acts in the oil replenishment direction, so that when the oil can is not connected, air is introduced into the piping. Can be prevented.
  • FIG. 1 is a configuration diagram of an apparatus for collecting, regenerating, and filling CFCs for an air conditioner according to the present invention.
  • Figure 2 is a detailed view of a scale for measuring the weight of a CFC tank.
  • FIG. 3 is a flowchart showing the control sequence of the recycled CFC recovery.
  • Figure 4 is an explanatory diagram of the CFC recovery system.
  • FIG. 5 is a flowchart showing the control sequence of the recycled CFC regeneration.
  • Figure 6 is an explanatory diagram of a CFC regeneration system.
  • FIG. 7 is a flowchart showing the control sequence for filling the recycled Freon.
  • FIG. 8 is an explanatory diagram of a CFC filling system.
  • FIG. 9 is a flowchart showing the control of the recycle residual gas recovery sequence.
  • FIG. 10 is an explanatory diagram of a residual gas recovery system.
  • FIG. 11 is a flowchart showing the recycle oil discharge sequence control.
  • FIG. 12 is an explanatory diagram of the oil discharge system.
  • FIG. 13 is a flowchart showing oil replenishment sequence control.
  • FIG. 14 is an explanatory diagram of an oil replenishment system.
  • FIG. 15 is a flowchart showing the CFC supply sequence control.
  • FIG. 16 is an explanatory diagram of a CFC supply system.
  • FIG. 17 is a flowchart showing the CFC replenishment sequence control.
  • Figure 18 is an explanatory diagram of a CFC supplement system.
  • FIG. 19 is a flowchart showing the reproduction cleaning sequence control.
  • Fig. 20 is an explanatory diagram of a CFC regeneration system.
  • FIG. 21 is a flowchart showing the control of the regeneration residual gas recovery sequence.
  • FIG. 22 is an explanatory diagram of the evacuation system in the repair shop mode.
  • FIG. 23 is an explanatory diagram of a CFC regeneration system in the repair shop mode.
  • FIG. 24 is an explanatory diagram of a CFC filling system in the repair shop mode.
  • the equipment for collecting, regenerating, and filling CFCs for air conditioners as air conditioning equipment is equipped with a CFC collection system, a CFC regeneration system, a CFC filling system, a CFC supply system, and a CFC supplement system.
  • the configuration of each of these systems will be described in order with reference to FIG.
  • the chlorofluorocarbon means a specific chlorofluorocarbon such as CFC (clilorof luorocarbon) or an alternative chlorofluorocarbon such as HFC (hydrofluorocaron).
  • the CFC recovery system consists of a high-pressure fitting 1 (high-pressure connector) and a CFC tank 2 that are freely connected to and removed from the CFC filling port (high-pressure side) of the air conditioner.
  • a high-pressure fitting 1 high-pressure connector
  • CFC tank 2 that are freely connected to and removed from the CFC filling port (high-pressure side) of the air conditioner.
  • the first pipe that connects to the system oil separator 3A of the system oil separator 3, the filter dryer 4, the compressor 5, the heat exchanger 3B of the system oil separator 3, etc. It is configured with a piping opening and closing device such as a solenoid valve.
  • the high pressure gauge 7 (first pressure detector) is turned on from the upstream to the downstream of the pipe 6 connected to the high-pressure fitting 1, and turns on when the pressure in the pipe is within a predetermined range.
  • the end of the pipe 6 is connected to the oil separation section 3 A of the system oil separator 3.
  • An oil drain bottle OT is connected to the bottom of the system oil separator 3 via an oil drain solenoid valve SV-7 in order to discharge the oil separated in the oil separating section 3A to the outside.
  • a filter 4 downstream of the oil separating section 3A of the system oil separator 3 a filter 4, a valve 9, and a compressor 5 are interposed respectively.
  • the compressor 5 it is preferable to use an oilless compressor that does not require maintenance for oil change and reduces the labor required for maintenance.
  • a high pressure switch H — SW and a safety valve 11 are connected to the pipe 10 downstream of the compressor 5 to turn on and open when the pressure in the pipe exceeds a predetermined pressure, and the tip of the switch is connected to the heat exchange section of the system oil separator 3. 3 Connected to B.
  • the input solenoid valve SV-1, the check valve CV-1, the moisture indicator Ml and the auto air purge AA P (Second switchgear) are interposed respectively, and the ends are connected to the gas port 2 A of the CFC tank 2.
  • the auto air purge AAP is connected to the purge port 2B of the CFC tank 2 via a pipe 13 (fifth pipe) provided with an air purge solenoid valve SV-3 (first opening / closing device).
  • the auto air purge AAP is designed to release the inside of the Freon tank 2 to the atmosphere when the pressure difference between the new built-in Freon pressure (reference pressure) and the Freon pressure in the Freon tank 2 exceeds a predetermined value. The valve is opened. Note that the flow inside the automatic air purge AAP is The heat exchange is performed between the refrigerant and the chlorofluorocarbon supplied through the pipe 12, and the temperature is compensated.
  • the CFC tank 2 is provided with a scale for measuring the weight of the CFC in order to indirectly detect the CFC filling weight or the like from the change in the tank weight.
  • the scale is a load cell 14 in the present embodiment, and has an upper member 15A whose lower surface extends substantially on a horizontal plane and a lower member 15B on which the Freon tank 2 is placed and fixed, as shown in FIG.
  • the upper surface of the load cell 14 fixed to the frame such as the floor or the housing of various devices via the elastic member 16 such as a spring or rubber disposed on the lower surface of the upper member 15A. And suspended.
  • the froth regeneration system uses the system oil separator 3 common to the freon recovery system in the second pipe where the freon discharged from the liquid port 2C of the freon tank 2 returns to the gas port 2A. It has a separation section 3A, a filter dryer 4, a compressor 5, a heat exchange section 3B of the system oil separator 3, and a pipe opening / closing device such as a solenoid valve at a predetermined location.
  • the piping 17 connected to the liquid port 2C of the CFC tank 2 is connected to the vacuum switch V-SW connection point immediately downstream of the collection solenoid valve SV-6 in the CFC recovery system. You.
  • the pipe 17 is provided with a filter 18 and a regeneration solenoid valve SV-4, respectively, along the flow direction of the fluorocarbons.
  • the CFC filling system is configured by interposing at least a pipe opening / closing device such as a solenoid valve at a predetermined portion of a third pipe connecting the high-pressure fitting 1 and the CFC tank 2.
  • a pipe opening / closing device such as a solenoid valve
  • the pipe 17 connected to the liquid port 2 C of the CFC tank 2 branches to the pipe 19 upstream of the regeneration solenoid valve SV-4 in the CFC regeneration system.
  • a filling solenoid valve SV-5 and a check valve CV-5 are interposed in the pipe 19 from upstream to downstream, respectively.
  • the first pipe of the chlorofluorocarbon recovery system and the second pipe of the chlorofluorocarbon regeneration system are connected to the oil separator 3A of the system oil separator 3, the filter dryer 4, the compressor 5, and the system 5.
  • the heat exchange section 3B of Oil Separation 3 was interposed in this order, but the arrangement was changed appropriately as long as the functions of both systems could be exhibited. Is also good.
  • a piping 21 provided at the upstream end with a service can receiver 20 that is freely connected to and detached from a flon replenishment source such as a flour can is connected to a piping opening and closing device in the flon regeneration system. It is configured by connecting downstream.
  • the check valve CV—S is interposed in the pipe 21 connected to the service can receiver 20, and the downstream end of the check valve CV—S is located downstream of the regeneration solenoid valve SV 14 in the CFC regeneration system. Connected to.
  • the regeneration solenoid valve SV-4 is closed (OFF).
  • the CFC replenishment system is located at a specified location in the fourth pipe that connects the CFC tank 2 to the low-pressure fitting 22 (low-pressure connector) that is freely connected to and removed from the CFC filling port (low-pressure side) of the air conditioner. It is configured by interposing at least a pipe opening / closing device such as a solenoid valve.
  • the pipe 19 in the CFC filling system branches off upstream of the filling solenoid valve SV-5 to form a pipe 23, the tip of which is connected to the low-pressure fitting 22. From the upstream to the downstream, the pipe 23 has a replenishment solenoid valve SV-8, a check valve CV—O i 1 that opens when a predetermined pressure is applied, and an oil refill port 24 and a low pressure gauge 25. (Second pressure detecting device) are interposed.
  • the pressure and the Freon pressure in the Freon tank 2 are set to be approximately equal, and the oil separated by the system oil separator 3 is pushed out by Freon pressure.
  • the other end of the pipe 26 is connected to the pipe 6 downstream of the vacuum switch V-SW in the CFC recovery system.
  • a vacuum pump VP is provided as a vacuum generating device to evacuate the inside of the air conditioner piping connected to the high-pressure fitting 1 and remove moisture remaining inside the piping. That is, the pipe 27 connected to the vacuum pump VP is connected to the pipe 6 downstream of the high-pressure gauge 7 in the CFC recovery system.
  • the pipe 27 is provided with two vacuum pump solenoid valves SV-VP and a vacuum pump protection switch P-SW.
  • the vacuum pump VP and the vacuum pump solenoid valve SV The pipe 27 between the VP and the VP is branched on the way, and the branch pipe is provided with a solenoid valve SV-P for opening vacuum.
  • a freon filling weight setting device for setting a freon filling weight corresponding to the type of air conditioner, a froth filling weight detecting device for detecting an actual freon filling weight based on the weight measured by the load cell,
  • the stop device that stops the filling of the lip by the lip filling system when the lip filling weight of the lip reaches the set lip filling weight is realized by software by a control unit (not shown). .
  • control unit turns on or off the solenoid valve interposed in each system based on the signal from each switch, and performs sequence control (1) to sequentially control the operation of each system as shown below. (13) and the control modes (14) and (15) are executed.
  • the control unit implements a control device. (1) Recycling CFC recovery sequence control (Fig. 3)
  • step 1 it is determined whether the signal from the air protection switch C-SW is ON, that is, the pressure in the pipe 6 connected to the high-pressure fitting 1. Is determined to be within a predetermined range. If the signal is ON, proceed to step 2 (ON), and if the signal is OFF, proceed to step 13 (OFF). In step 13, since the pressure in the pipe 6 is not within the predetermined range, it is determined that the air conditioner on the vehicle side does not have Freon or the hose is loose or cracked. Activate the buzzer together (hereinafter referred to as “error indication”). In step 14, it is determined whether or not to continue the CFC recovery work. That is, it is determined whether or not the operator has instructed to continue the work, and if the work is to be continued, the process proceeds to step 2 (Yes), and if the work is to be stopped, the process proceeds to step 12. Go (No).
  • step 2 based on the weight signal from the load cell 14, it is determined whether the remaining amount of Freon in the Freon tank 2 is 1 kg or more. If the remaining amount of Freon is 1 kg or more, proceed to step 3 (Yes), and if the remaining amount of Freon is less than l kg, proceed to step 15 (No). In step 15, an error message is displayed to notify that the remaining amount of chlorofluorocarbon is low, and then the process proceeds to step 12.
  • step 3 it is determined whether the “start operation” button or the “cancel” button has been pressed. If the "start operation” button has been pressed, proceed to step 4 (start), and if the "cancel” button has been pressed, proceed to step 12 (cancel).
  • step 4 the input solenoid valve SV-1 and the collection solenoid valve SV-6 are each turned ON (operated).
  • step 5 the state is maintained for a predetermined time (for example, 10 seconds).
  • step 6 the compressor 5 is turned on.
  • step 7 the state is maintained for a predetermined time (for example, 60 seconds).
  • step 8 the air purge solenoid valve SV_3 is turned ON.
  • step 9 it is determined whether or not the signal from the vacuum switch V-SW is OFF, that is, whether or not the specified pressure has been reached by the collected Freon in the piping in the Freon recovery system. If the signal is OFF, proceed to step 10 (OFF), and if the signal is ON, proceed to step 16 (ON).
  • step 16 it is determined whether the elapsed time since the “operation start” button was pressed is within a specified time. If the elapsed time is within the specified time, the process returns to step 9 (Yes), and if the elapsed time reaches the specified time, the process proceeds to step 17 (No). In step 17, an error display is executed, and then the process proceeds to step 12.
  • step 10 the air purge solenoid valve SV-3 is turned off (stopped).
  • step 11 the state is maintained for a predetermined time (for example, 180 seconds).
  • step 12 all the operating solenoid valves and the compressor 5 are turned off.
  • this sequence control before collecting Freon from the air conditioner, it is determined whether or not the pressure in the pipe 6 connected to the high-pressure fitting 1 is within a predetermined range. That is, even if the high pressure fitting 1 is connected to the air conditioner, if the pressure in the pipe 6 is not within the predetermined range, the air conditioner has no Freon, or the connection hose is loose or cracked. You can judge that you are doing. For this reason, when such a phenomenon occurs, the collection work is stopped and the fact is displayed, so that the air, which is non-condensable gas, is sucked. Can be prevented.
  • a CFC recovery system as shown in Fig. 4 is constructed, and the CFC of the air conditioner is replaced with a CFC tank 2. Collected to At this time, since the oil is separated by the system oil separator 3 and the moisture and impurities are removed by the filter dryer 4, the Freon is recovered in a state where impurities and the like are removed as much as possible.
  • the solenoid valve SV-3 for the air purge is turned on at the stage when some CFC has been collected, but the auto air purge AAP is interposed in the pipe 13 connected to the purge port 2B of the CFC tank 2. Therefore, air purging with optimal control is possible.
  • the air purge solenoid valve SV-3 is turned on during the collection of CFCs, there is a danger that a small amount of H2 may be released to the atmosphere if the amount of non-condensable gas is small.
  • the valve may open due to a temperature difference regardless of the presence or absence of non-condensable gas, and similarly, a small amount of Freon may be released to the atmosphere.
  • an air purge solenoid valve SV-3 in the pipe 13 connecting the CFC tank 2 and the auto air purge AAP, air purging with optimal control becomes possible, and the emission of CFCs into the atmosphere is minimized. be able to.
  • step 21 it is determined whether or not the signal from the vacuum pump protection switch P-SW is OFF, that is, whether or not the inside of the pipe 27 connected to the vacuum pump VP has a positive pressure. If the signal is OFF, the process proceeds to step 22 (OF F), and if the signal is ON, the process proceeds to step 31 (ON). In step 31, an error display is executed, and then the process proceeds to step 30.
  • step 22 the vacuum pump solenoid valve SV-VP, the vacuum release solenoid valve SV-P, and the vacuum pump VP are turned ON, respectively.
  • step 23 the state is maintained for a predetermined time (for example, 5 seconds).
  • step 24 the input solenoid valve SV-1 and the regeneration solenoid valve SV-4 are set to N respectively.
  • step 25 the state is maintained for a predetermined time (for example, 10 seconds).
  • step 26 the compressor 5 is turned on.
  • step 27 the state is maintained for a predetermined time (for example, 180 to 240 seconds).
  • step 28 the air purge solenoid valve SV-3 is turned on.
  • step 29 it is determined whether a predetermined time has elapsed since the vacuum pump protection switch P-SW was turned off. If the predetermined time has elapsed, the process proceeds to step 30 (Yes), and if the predetermined time has not elapsed, the process stands by (No).
  • step 30 all the operating solenoid valves and the compressor 5 are turned off.
  • the solenoid valve for vacuum pump SV-VP, the solenoid valve for vacuum release SV_P, and the vacuum pump VP are each set to N, which corresponds to a part of the CFC regeneration system as shown in Fig. 6.
  • the evacuation system is constructed. In other words, by evacuating the air conditioner piping connected to the high-pressure fitting 1, moisture remaining in the air conditioner piping after removing the blower is removed, and when the freon is filled here In addition, it is possible to prevent the purity from lowering.
  • the Freon in the Freon tank 2 is replaced by the system oil separator 3 and the filter dryer 4. Circulates through the circuit in which oil, water and impurities are removed, and its purity gradually increases and is regenerated. Furthermore, when the CFC regeneration has progressed to some extent, the air purge solenoid valve SV-3 is turned on, so that air as non-condensable gas that exists in the upper part of the CFC tank 2 is released to the atmosphere, if necessary. Is done.
  • step 41 the charging solenoid valve SV-5 is turned on.
  • step 42 it is determined whether or not a specified filling time has elapsed since the filling solenoid valve SV-5 was turned on.
  • the prescribed filling time is set to a time when it is considered that the filling of the mouth would normally be completed regardless of the type of the air conditioner. And if the specified filling time has passed, It is determined that Freon could not be filled due to the cause of
  • step 45 the charging solenoid valve SV-5 is turned off, and an error message is displayed in step 46.
  • step 43 the process proceeds to step 43 (No).
  • step 43 based on the weight signal from the load cell 14, it is determined whether or not Freon has been charged by a set weight (Freon filling weight) preset according to the type of air conditioner. Then, if Freon has been filled by the set weight, the process proceeds to Step 44 (Yes), and if Freon has not been completed, the process returns to Step 42 (No).
  • a set weight Freon filling weight preset according to the type of air conditioner.
  • step 44 the filling solenoid valve SV-5 is turned off.
  • a CFC filling system as shown in FIG. 8 is configured by turning on the filling electromagnetic valve SV-5. Then, the refrigerant in the CFC tank 2 is filled from the CFC filling port of the air conditioner connected to the high-pressure fitting 1 by using the pressure. At this time, the Freon filling weight is controlled based on the change in the tank weight measured by the load cell 14.
  • step 51 the input solenoid valve SV-1 and the equalizing solenoid valve SV-2 are each turned ON.
  • step 52 the state is maintained for a predetermined time (for example, 5 seconds). Thereby, the internal pressure between the CFC 2 and the predetermined pipe becomes substantially equal.
  • step 53 the equalizing solenoid valve SV-2 is turned off.
  • step 54 the compressor 5 is turned on.
  • step 55 the state is maintained for a predetermined time (for example, 55 seconds).
  • step 56 the air purge solenoid valve SV-3 is turned on.
  • step 57 it is determined whether or not the signal from the vacuum switch V-SW has been turned off, that is, whether or not the pressure in the pipe has reached a specified pressure. If the signal is OFF, the process proceeds to step 58 (OFF), and if the signal is ON, the process waits (ON).
  • step 58 all active solenoid valves and compressor 5 are turned off, respectively. It is.
  • the residual gas recovery system as shown in FIG. 10 is configured by setting each of the input solenoid valve SV-1 and the compressor 5 to N. Then, CFCs remaining in the piping are compressed by the compressor 5 and collected into the CFC tank 2 via the system oil separator 1 and the filter dryer 4. Also, by turning on the air purge solenoid valve SV-3 when the CFC recovery has progressed to some extent, even if air as non-condensable gas is collected in the CFC tank 2, it is released to the atmosphere. .
  • step 61 the equalizing solenoid valve SV-2 is turned on in order to supply the pressure in the CFC tank 2 to the system oil separator 3.
  • step 62 the state is maintained for a predetermined time (for example, 5 seconds).
  • step 63 the equalizing solenoid valve SV-2 is turned off, and the oil drain solenoid valve SV-7 is turned on.
  • step 64 the state is maintained for a predetermined time (for example, 10 seconds).
  • step 65 the operating oil drain solenoid valve SV-7 is turned off.
  • the equalizing solenoid valve SV-2 when the equalizing solenoid valve SV-2 is turned on, the Freon tank 2 is communicated with the system oil separator 3 as shown in FIG. 12, and the pressure in the Freon tank 2 is reduced. Supplied to System Oil Separator 3.
  • the oil drain solenoid valve SV-7 is turned on, the oil separated here is discharged to the oil drain port O T by the pressure supplied to the system oil separator 3.
  • step 71 it is confirmed whether the oil can is connected to the oil filling port 24 or not. If the oil can is connected, the process proceeds to step 72 (Yes), and if the oil can is not connected, the process waits (No).
  • step 72 it is checked whether the low-pressure fitting 22 is connected to the CFC filling port (low-pressure side) of the air conditioner and whether the air conditioner is operating. If both conditions are satisfied, the process proceeds to step 73 (Ye s) If both conditions are not satisfied, it waits (No).
  • step 73 it is checked whether the output from the low pressure gauge 25 is stable. If the output is stable, the process proceeds to step 74 (Yes), and if the output is not stable, the process waits (No). '
  • step 74 the state is maintained for a predetermined time (for example, 30 seconds).
  • step 75 the operating air conditioner is stopped, and the low pressure fitting 22 and the oil can are removed.
  • step 81 the input solenoid valve SV-1 is turned on.
  • step 82 the state is maintained for a predetermined time (for example, 10 seconds).
  • step 83 the compressor 5 is turned on.
  • step 84 the state is maintained for a predetermined time (for example, 60 seconds).
  • step 85 the air purge solenoid valve SV-3 is turned on.
  • step 86 it is determined whether or not the signal from the vacuum switch V-SW is OFF. If the signal is OFF, proceed to step 87 (OF
  • step 87 it is determined whether or not there is an instruction to continue the supply of CFCs, that is, the supply of CFCs from the service can to the CFC tank 2. Then, if there is an instruction to continue the supply of Freon, the process returns to step 81 (Yes), and the instruction to continue the supply of Freon is given. If not, go to step 88 (No).
  • step 88 all the operating solenoid valves and the compressor 5 are turned off.
  • the service can is transferred from the service can to the Freon tank 2.
  • CFC is supplied.
  • the air purge solenoid valve SV-3 is turned on, and if necessary, air as non-condensable gas accumulated in the upper part of the CFC tank 2 is discharged to the atmosphere. It is.
  • step 91 the replenishment solenoid valve SV-8 is turned on.
  • step 92 it is determined whether or not a specified replenishment time has elapsed since the replenishment solenoid valve SV-8 was turned on.
  • the specified replenishment time is usually the set weight
  • step 95 it is determined that CFC could not be replenished for some reason, and the process proceeds to step 95 to perform error processing (Yes), and the replenishment solenoid valve SV-8 is activated. Turns off and error display is executed in step 96. On the other hand, if the prescribed replenishment time has not elapsed, proceed to step 93.
  • step 93 based on the weight signal from the load cell 14, it is determined whether Freon has been replenished by the set weight. Then, if Freon has been replenished by the set weight, the process proceeds to step 94 (Yes), and if Freon has not been replenished, returns to step 92 (No).
  • step 94 the replenishment solenoid valve SV-8 is turned off.
  • the CFC replenishment system as shown in FIG. 18 is configured by turning on the replenishment solenoid valve SV-8. Then, when the vehicle engine is started, the set weight of Freon is refilled from the Freon filling port (low-pressure side) of the air conditioner connected to the low-pressure fitting 22 using the negative pressure of the vehicle-side compressor. At this time, the CFC replenishment weight is measured in the tank measured by the load cell 14. It is controlled based on the change in weight.
  • step 101 the input solenoid valve SV-1 and the regeneration solenoid valve SV-4 are turned ON.
  • step 102 the state is maintained for a predetermined time (for example, 10 seconds).
  • step 103 the compressor 5 is turned on.
  • step 104 the state is maintained for a predetermined time (for example, 180 to 240 seconds).
  • step 105 the air purge solenoid valve SV-3 is turned on.
  • step 106 the state is maintained for a predetermined time (for example, 20 minutes).
  • step 107 all the operating solenoid valves and the compressor 5 are turned off.
  • a CFC regeneration system as shown in FIG. 20 is configured by turning on the input solenoid valve SV-1, the regeneration solenoid valve SV-4, and the compressor 5, respectively. Then, through the same process as the control of the recycled CFC recycling sequence, oil, water and impurities are removed from the CFC in the CFC tank 2, and the CFC is regenerated. At a stage where the CFC regeneration has progressed to some extent, the air purge solenoid valve SV13 is turned on, and if necessary, air as non-condensable gas is released from the CFC tank 2 into the atmosphere.
  • step 111 the input solenoid valve SV-1 is turned on.
  • step 112 the state is maintained for a predetermined time (for example, 5 seconds).
  • step 113 the compressor 5 is turned on.
  • step 114 the state is maintained for a predetermined time (for example, 60 seconds).
  • step 115 the air purge solenoid valve SV-3 is turned on.
  • step 116 it is determined whether or not the signal from the vacuum switch V-SW is OFF. If the signal is OFF, proceed to step 117 (
  • step 117 all active solenoid valves and compressor 5 are turned off Is done.
  • the chlorofluorocarbon remaining in the pipes is collected in the chlorofluorocarbon tank 2 in the same manner as in the sequence control of the residual gas recovery shown in FIGS. 9 and 10.
  • the solenoid valve for the vacuum pump SV_VP, the solenoid valve for the vacuum release SV_P and the vacuum pump VP are respectively set to N, and the CFC filling of the air conditioner connected to the high-pressure fitting 1 is performed. Inlet the air inside from the port (high pressure side).
  • a CFC regeneration system as shown in FIG. 23 is configured so that the CFC in the CFC tank 2 can be regenerated.
  • a CFC filling system as shown in Fig. 24 is constructed by the same processing as the CFC filling sequence control shown in Fig. 7, and the CFC tank 2 Fill the conditioner with Freon.
  • an oil can be connected to the low-pressure fitting 22 connected to the low-pressure side and the oil refilling port 24 directly below the air-conditioner. Oil can be refilled automatically. That is, when Freon is recovered from the high-pressure fitting 1, the low pressure side of the air conditioner becomes negative pressure, and the recovered pressure is used to replenish the oil from the oil can to the compressor. At this time, the oil replenishment system is provided with a check valve CV_0i1 that opens only when a predetermined pressure is applied in the oil replenishment direction. When not connected, the inside of the pipe 23 connected to the low-pressure fitting 22 is prevented from being opened to the atmosphere.
  • the air accumulated in the upper part of the Freon tank 2 is periodically released into the atmosphere by opening and closing the air purge solenoid valve SV-3 periodically.
  • Freon The pipe 13 connected to the purge port 2 B of the tank 2 is provided with an automatic air purge AAP that opens when the pressure difference between the CFC internal pressure and the reference pressure exceeds a predetermined value. Therefore, air purging can be performed by optimal control.
  • the fluorocarbon built into the auto air purge AAP to determine the reference pressure exchanges heat with the fluorocarbon supplied from the compressor 5 through the pipe 12 so that temperature compensation according to the ambient temperature can be performed. Done.
  • the ambient temperature changes it is possible to prevent the automatic air purge AAP from malfunctioning and opening the valve.
  • an air protection switch C-SW is connected directly below the high-pressure fitting 1 so that CFCs are collected from the air conditioner only when this switch is turned on. If there is a slack or crack in the refrigeration system, it is possible to prevent collection of CFCs. For this reason, mixing of air as non-condensable gas from the vehicle side is prevented, and for example, it is possible to prevent the pressure in the Freon tank 2 from unnecessarily increasing.
  • the high pressure gauge 7 is connected directly below the high pressure fitting 1 and the low pressure gauge 25 is connected directly below the low pressure fitting 2 2, operate the air conditioner with the hose connected before and after each work. Then, the CFC pressure on the high pressure side and the low pressure side can be measured. For this reason, it is possible to diagnose the air conditioner without reconnecting the hose, thereby shortening the working time and the working labor.
  • the pedestal 15 having the upper member 15A whose lower surface extends substantially on a horizontal plane and the lower member 15B on which the Freon tank 2 is placed and fixed is attached to the upper member 15A. It is connected to the upper surface of a load cell 14 fixed to a frame such as the floor or the housing of various devices via an elastic body 16 such as a spring or rubber provided on the lower surface, and suspended.
  • the lowered configuration allows the load cell 14 to have improved impact resistance while ensuring weight measurement accuracy. That is, since the elastic body 16 is provided on the lower surface of the upper member 15 A of the gantry 15, even if the gantry 15 is inclined, the inclination is absorbed by the elastic body 16 and the weight is measured.
  • the load acts approximately perpendicular to the upper surface of the opening cell 14. Therefore, the weight of the Freon tank 2 can be measured with high accuracy regardless of the inclination of the gantry 15.
  • the shocks are mitigated by the elastic body 16 disposed on the lower surface of the upper member 15 A, so that the shocks directly transmitted to the load cell 14 are reduced.
  • Significantly reduced. Therefore, a decrease in the weight measurement accuracy of the load cell 14 due to the impact is suppressed, and the labor required for maintenance and inspection is reduced.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Compressors, Vaccum Pumps And Other Relevant Systems (AREA)
  • Drying Of Gases (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

空調機器のフロン充填口の高圧側に対して着脱自由に接続される高圧側コネクタとフロンタンクとを繋ぐ配管に、システムオイルセパレータのオイル分離部,フィルタドライヤ,コンプレッサ及びシステムオイルセパレータの熱交換部を少なくとも介装すると共に、所定部位に配管開閉装置を介装したフロン回収系統を構成する。そして、フロン回収系統により空調機器からフロンを回収するときに、空調機器のフロン充填口の低圧側に対して着脱自由に接続される低圧側コネクタとフロンタンクとを繋ぐ配管に所定圧力が作用すると開弁する逆止弁を介して接続されたオイル補充口から、フロン回収圧力を利用して、フロン充填口の低圧側を経てオイルを補充する。

Description

空調機器用フロンの回収 ·再生 ·充填装置及び空調機器潤滑用オイルの補充方 法 技術分野
本発明は、 カーエアコンディショナ (以下 「エアコンディショナ」 という) な どの空調機器に対して、 その潤滑用オイルを容易かつ迅速に補給可能とする技術 に関する。 背景技術
一般に、 空調機器としてのエアコンディショナの冷却システム内には、 冷媒 ( フロンガス) の他に、 コンプレッサ潤滑用のオイルが約 5 0〜3 0 0 g程度混入 されている。 オイルの一部は、 コンプレッサや配管などに付着すると共に、 残り のオイルは、 フロンガスに同伴して冷却システム内を循環している。
ところで、 エアコンディショナのフロンガスは、 長年の使用に伴い水分などが 混入し、 冷媒機能が徐々に低下することは公知である。 このため、 特開平 4一 1 6 5 2 7 3号公報に示すように、 エアコンディショナから回収したフロンガスを ドライヤ及びオイルセパレー夕で水分やオイルなどを除去して再生し、 その冷媒 機能を回復させるリフレッシュ技術が提案されている。
しかしながら、 エアコンディショナからフロンガスを回収するときに、 1回の 作業で約 0〜3 0 gのオイルもフロンガスに同伴して回収されてしまう。 また、 エアコンディショナでは、 主にエンジン振動や走行時の揺れにより、 冷却システ ムの配管ゃパッキンなどから 2 0〜1 0 0 g Z年程度のガス漏れが発生してしま う。 このため、 エアコンディショナでは、 フロンガスに伴ってオイルが回収又は 放出され、 冷却システム内のオイル量も徐々に減少してしまうことから、 定期的 にオイルを補充する必要がある。
オイルの補充方法としては、 (1)フロンガスを回収した後に、 真空ポンプなど で冷却システム内を真空状態まで真空引きし、 負圧を利用してオイルを補充する 方法、 (2)フロンガスを充填したまま、 エアコンディショナのコンプレッサを利 用してその低圧側から補充する方法が公知であるが、 ともに作業が煩雑で手間を 要すため、 熟練作業者でなければ行えないものであった。
そこで、 本発明は以上のような従来の問題点に鑑み、 空調機器からフロンを回 収するときに、 その回収圧力を利用してオイルを自動的に補充することで、 熟練 作業者でなくともオイル補充を容易かつ迅速に行えるようにした空調機器用フ口 ンの回収 ·再生 ·充填装置及び空調機器潤滑用オイルの補充方法を提供すること を目的とする。 発明の開示
このため、 本発明に係る空調機器用フロンの回収 ·再生 '充填装置では、 空調 機器からフロンをフロンタンクに回収するフロン回収系統と、 フロンタンク内の フロンを再生するフ口ン再生系統と、 フロン夕ンク内のフロンを空調機器に充填 するフロン充填系統と、 フロンタンクにフロンを補充するフロン補充系統と、 が 備えられる。 即ち、 フロン回収系統では、 空調機器のフロン充填口の高圧側に対 して着脱自由に接続される高圧側コネクタとフロンタンクとを繋ぐ第 1の配管に、 システムオイルセパレ一夕のオイル分離部, フィルタドライヤ, コンプレッサ及 びシステムオイルセパレー夕の熱交換部が少なくとも介装されると共に、 所定部 位に配管開閉装置が介装される。 フロン再生系統では、 フロンタンクから出てフ ロンタンクに戻る第 2の配管に、 フ口ン回収系統と共通のシステムオイルセパレ —夕のオイル分離部, フィルタドライヤ, コンプレッサ及びシステムオイルセパ レー夕の熱交換部が少なくとも介装されると共に、 所定部位に配管開閉装置が介 装される。 フロン充填系統では、 フロンタンクと高圧側コネクタとを繋ぐ第 3の 配管の所定部位に少なくとも配管開閉装置が介装される。 フロン補充系統では、 空調機器のフロン充填口の低圧側に対して着脱自由に接続される低圧側コネクタ とフロンタンクとを繋ぐ第 4の配管の所定部位に少なくとも配管開閉装置が介装 される。 そして、 第 4の配管には、 所定圧力が作用すると開弁する逆止弁を介し てオイル補充口が接続される。
かかる構成によれば、 高圧側コネクタを空調機器のフロン充填口の高圧側に接 続し、 例えば、 操作パネルを操作すると、 フロンを大気中に放出させずに、 空調 機器のフロンを自動的に回収, 再生及び充填することができる。 そして、 空調機 器からフロンを回収するときに、 低圧側コネクタを空調機器のフ口ン充填口の低 圧側に接続し、 オイル補充口にオイル缶を接続するようにすれば、 フロン回収圧 力を利用して、 オイル缶から空調機器にオイルを自動的に補充することができる。 このため、 熟練作業者でなくともオイル補充を容易かつ迅速に行うことができる。 また、 オイル補充系統には、 オイル補充方向に所定圧力が作用したときのみ開弁 する逆止弁が介装されているため、 オイル缶が接続されていないとぎに、 配管内 に大気が導入されるを防止できる。
また、 フロンタンクのパージポー卜に接続された第 5の配管に、 第 5の配管を 定期的に開閉する第 1の開閉装置、 及び、 フロンタンク内圧力と基準圧力との圧 力差が所定値以上になったときに開弁する第 2の開閉装置を直列介装することが 望ましい。
かかる構成によれば、 フロン夕ンク上部に溜まった不凝縮ガスが適切な夕ミン グで放出される。 即ち、 定期的に第 5の配管を開閉するだけでは、 フロンタンク 上部に溜まった不凝縮ガスが少なければ、 不凝縮ガスが放出された後でもその内 部が大気開放されているため、 若干のフロンが大気中に放出されてしまうおそれ がある。 一方、 フロンタンク内圧力と基準圧力との圧力差が所定値以上になった ときに開弁するだけでは、 不凝縮ガスの有無にかかわらず温度差を原因として開 弁することがあるので、 同様に若干のフロンが大気中に放出されてしまうおそれ がある。 しかし、 これらの構成を共に備えることで、 フロンタンク上部に溜まつ た不凝縮ガスをパージする条件が適正化され、 大気中へのフロン排出を極力抑制 することができる。 このとき、 基準圧力は、 フロンタンクに回収されるフロンの 温度に応じて温度補償されることが望ましい。 このようにすれば、 雰囲気温度が 変化しても、 第 2の開閉装置が誤動作して開弁することを防止できる。
ここで、 高圧側コネクタ近傍に、 配管内圧力が所定範囲にあるか否かを検出す る圧力検知装置を接続し、 圧力検知装置により配管内圧力が所定範囲にあること が検出されたときに、 フロン回収系統によるフロン回収を実行する制御装置を備 えることが望ましい。 かかる構成によれば、 高圧側コネクタ近傍の配管内圧力が所定範囲にあるとき のみフ口ン回収が実行されるので、 空調機器にフロンがなかったりホースに弛み や亀裂があるときにはフ口ン回収が行われず、 空調機器から不凝縮ガスとしての エアーが混入されることを防止することができる。
また、 高圧側コネクタ近傍に、 配管内圧力を検出する第 1の圧力検出装置を接 続すると共に、 低圧側コネクタ近傍に、 配管内圧力を検出する第 2の圧力検出装 置を接続することが望ましい。
かかる構成によれば、 高圧側コネクタ及び低圧側コネクタを接続したまま空調 機器を作動させると、 その高圧側及び低圧側のフロン圧力が計測される。 このた め、 各種作業の前後に、 高圧側コネクタ及び低圧側コネクタを繋ぎ直さなくとも、 空調機器の診断が可能となり、 作業時間の短縮及び作業労力の軽減を図ることが できる。
さらに、 空調機器の種類に対応したフロン充填重量を設定するフロン充填重量 設定装置と、 フ口ンタンクの重量を測定するスケールからの出力に基づいて実際 のフロン充填重量を検出するフ口ン充填重量検出装置と、 実際のフ口ン充填重量 が設定されたフ口ン充填重量になったときに、 フロン充填系統によるフロン充填 を停止する停止装置と、 を備えることが望ましい。 このようにすれば、 空調機器 の種類を見極めてフロン充填重量を設定するようにすれば、 自動的に最適重量の フ口ンを充填することができる。
このとき、 スケールは、 下面が略水平面上に延びる上部部材及びフロンタンク が載置固定される下部部材を有する架台を、 上部部材の下面に配設した弾性体を 介して、 ロードセルの上面に連結して吊り下げ、 フロンタンクの重量を測定する ことが望ましい。
かかる構成によれば、 架台の上部部材の下面に弾性体が配設されているため、 架台が傾いても、 その傾きが弾性体により吸収され、 重量を計測するロードセル の上面に対して荷重が略垂直に作用する。 このため、 架台の傾きにかからわず、 フロンタンクの重量を高精度に測定することができる。 また、 架台に振動などの 衝撃が発生しても、 上部部材の下面に配設された弾性体により衝撃が緩和される ので、 ロードセルに直接伝達される衝撃が大幅に軽減する。 このため、 衝撃によ るロードセルの重量計測精度の低下が抑制され、 保守点検に要する労力を軽減す ることができる。
一方、 本発明に係る空調機器潤滑用オイルの補充方法では、 空調機器のフロン 充填口の高圧側に対して着脱自由に接続される高圧側コネクタとフロンタンクと を繋ぐ配管に、 システムオイルセパレ一夕のオイル分離部, フィルタドライヤ, コンプレッサ及びシステムオイルセパレ一夕の熱交換部を少なくとも介装すると 共に、 所定部位に配管開閉装置を介装したフロン回収系統により空調機器からフ ロンを回収するときに、 空調機器のフ口ン充填口の低圧側に対して着脱自由に接 続される低圧側コネクタとフロンタンクとを繋ぐ配管に所定圧力が作用すると開 弁する逆止弁を介して接続されたオイル補充口から、 フロン回収圧力を利用して、 フロン充填口の低圧側を経て空調機器にオイルを補充する。
かかる構成によれば、 フロン回収系統により空調機器からフロンを回収すると きに、 低圧側コネクタを空調機器のフロン充填口の低圧側に接続し、 オイル補充 口にオイル缶を接続するようにすれば、 フロン回収圧力を利用して、 オイル缶か ら空調機器にオイルを自動的に補充することができる。 このため、 熟練作業者で なくともオイル補充を容易かつ迅速に行うことができる。 また、 オイル補充系統 には、 オイル補充方向に所定圧力が作用したときのみ開弁する逆止弁が介装され ているため、 オイル缶が接続されていないときに、 配管内に大気が導入されるこ とを防止できる。
この発明の他の目的と諸相とは、 添付図面に関連する実施態様についての次の 説明で明白になるであろう。 図面の簡単な説明
図 1は、 本発明に係る空調機器用フロンの回収 ·再生 ·充填装置の構成図であ る。
図 2は、 フロンタンクの重量を測定するスケールの詳細図である。
図 3は、 リサイクルフロン回収シーケンス制御を示すフローチャートである。 図 4は、 フロン回収系統の説明図である。
図 5は、 リサイクルフロン再生シーケンス制御を示すフローチヤ一トである。 図 6は、 フロン再生系統の説明図である。
図 7は、 リサイクルフロン充填シーケンス制御を示すフローチャートである。 図 8は、 フロン充填系統の説明図である。
図 9は、 リサイクル残ガス回収シーケンス制御を示すフローチャートである。 図 10は、 残ガス回収系統の説明図である。
図 11は、 リサイクルオイル排出シーケンス制御を示すフローチャートである。 図 12は、 オイル排出系統の説明図である。
図 13は、 オイル補充シーケンス制御を示すフローチャートである。
図 14は、 オイル補充系統の説明図である。
図 15は、 フロン補給シーケンス制御を示すフローチャートである。
図 16は、 フロン補給系統の説明図である。
図 17は、 フロン補充シーケンス制御を示すフローチヤ一トである。
図 18は、 フロン補充系統の説明図である。
図 19は、 再生クリ一ニングシーケンス制御を示すフローチヤ一トである。 図 20は、 フロン再生系統の説明図である。
図 21は、 再生残ガス回収シーケンス制御を示すフローチヤ一トである。
図 22は、 修理工場モードにおける真空引き系統の説明図である。
図 23は、 修理工場モードにおけるフロン再生系統の説明図である。
図 24は、 修理工場モードにおけるフロン充填系統の説明図である。 発明を実施するための最良の形態
以下、 添付された図面を参照して本発明を詳述する。
空調機器としてのエアコンディショナ用フロンの回収 ·再生 ·充填装置は、 フ ロン回収系統, フロン再生系統, フロン充填系統, フロン補給系統及びフロン補 充系統を備えている。 これらの各系統の構成を、 図 1を参照して順に説明する。 なお、 フロンとは、 C F C (clilorof luorocarbon) などの特定フロン又は H F C (hydrofluorocar on) などの代替フロンを意味する。
フロン回収系統は、 エアコンディショナのフロン充填口 (高圧側) に対して着 脱自由に接続される高圧フィッティング 1 (高圧側コネクタ) とフロンタンク 2 とを繋ぐ第 1の配管に、 システムオイルセパレー夕 3のオイル分離部 3 A, フィ ルタドライヤ 4, コンプレッサ 5 , システムオイルセパレ一夕 3の熱交換部 3 B などを介装すると共に、 所定部位に電磁弁などの配管開閉装置を介装して構成さ れる。
この構成を詳述すると、 高圧フィッティング 1に接続された配管 6には、 上流 から下流にかけて、 高圧ゲージ 7 (第 1の圧力検出装置) , 配管内圧力が所定範 囲にあるときに ONとなるエア一保護スィッチ C— S W (圧力検知装置) , 逆止 弁 C V— 6, 回収用電磁弁 S V— 6及び配管内が規定圧力以下の負圧のときに 0 Nとなるバキュームスィッチ V— S Wが夫々介装される。 そして、 配管 6の先端 は、 システムオイルセパレ一夕 3のオイル分離部 3 Aに接続される。 システムォ ィルセパレー夕 3の底部には、 そのオイル分離部 3 Aで分離されたオイルを外部 に排出すべく、 オイルドレン用電磁弁 S V— 7を介して、 オイルドレンボトル O Tが接続される。
システムオイルセパレ一夕 3のオイル分離部 3 A下流の配管 8には、 フィル夕 ドライヤ 4 , バルブ 9及びコンプレッサ 5が夫々介装される。 コンプレッサ 5と しては、 オイル交換のメンテナンスを不要にして保守に要する労力を軽減すベぐ オイルレスコンプレッサを使用することが望ましい。 コンプレッサ 5下流の配管 1 0には、 配管内圧力が所定圧力以上になると O N及び開弁する高圧スィッチ H — S W及び安全弁 1 1が夫々接続され、 その先端がシステムオイルセパレー夕 3 の熱交換部 3 Bに接続される。
システムオイルセパレー夕 3の熱交換部 3 B下流の配管 1 2には、 上流から下 流にかけて、 入力電磁弁 S V— 1, 逆止弁 C V— 1, モイスチャーインジケ一夕 M l及びオートエアパージ AA P (第 2の開閉装置) が夫々介装され、 その先端 がフロンタンク 2の気体ポート 2 Aに接続される。 オートエアパージ A A Pは、 エアパージ用電磁弁 S V— 3 (第 1の開閉装置) が介装された配管 1 3 (第 5の 配管) を介して、 フロンタンク 2のパージポート 2 Bに接続される。 そして、 ォ —トエアパージ AA Pは、 内蔵した新品のフロン圧力 (基準圧力) とフロンタン ク 2内のフロン圧力との圧力差が所定値以上になったときに、 フロンタンク 2内 を大気開放すべく開弁される。 なお、 オートエアパージ AA Pに内蔵されたフロ ンは、 配管 1 2を介して供給されたフロンとの間で熱交換が行われ、 温度補償さ れる。
また、 フロンタンク 2には、 タンク重量の変化からフロン充填重量などを間接 的に検出すべく、 その重量を測定するスケールが設けられる。 このスケールは、 本実施形態においてロードセル 1 4であり、 図 2に示すように、 下面が略水平面 上に延びる上部部材 1 5 A及びフロンタンク 2が載置固定される下部部材 1 5 B を有する架台 1 5を、 上部部材 1 5 Aの下面に配設したスプリング, ゴムなどの 弾性体 1 6を介して、 床面や各種装置の筐体などのフレームに固定されたロード セル 1 4の上面に連結して吊り下げた構成となっている。
フ口ン再生系統は、 フロンタンク 2の液体ポ一ト 2 Cから出たフロンが気体ポ ート 2 Aに戻る第 2の配管に、 フロン回収系統と共通のシステムオイルセパレ一 タ 3のオイル分離部 3 A, フィル夕ドライヤ 4, コンプレッサ 5 , システムオイ ルセパレー夕 3の熱交換部 3 Bなどを介装すると共に、 所定部位に電磁弁などの 配管開閉装置を介装して構成される。
この構成を詳述すると、 フロンタンク 2の液体ポート 2 Cに接続された配管 1 7は、 フロン回収系統における回収用電磁弁 S V— 6の直下流のバキュームスィ ツチ V— S W接続箇所に接続される。 配管 1 7には、 フロン流通方向に沿って、 フィル夕 1 8及び再生用電磁弁 S V— 4が夫々介装される。
フロン充填系統は、 高圧フィッティング 1とフロンタンク 2とを繋ぐ第 3の配 管の所定部位に、 電磁弁などの配管開閉装置を少なくとも介装して構成される。 この構成を詳述すると、 フロンタンク 2の液体ポ一ト 2 Cに接続された配管 1 7は、 フロン再生系統における再生用電磁弁 S V— 4上流にて分岐して配管 1 9 となり、 その先端がフ口ン回収系統におけるエアー保護スィツチ C— S W下流の 配管 6に接続される。 そして、 配管 1 9には、 上流から下流にかけて、 充填用電 磁弁 S V— 5及び逆止弁 C V— 5が夫々介装される。
なお、 図 1に示す装置においては、 フロン回収系統の第 1の配管及びフロン再 生系統の第 2の配管に、 システムオイルセパレー夕 3のオイル分離部 3 A, フィ ルタドライヤ 4, コンプレッサ 5, システムオイルセパレ一夕 3の熱交換部 3 B をこの順序で介装したが、 両系統の機能が発揮できる限度で適宜配置を変更して もよい。
フ口ン補給系統は、 フ口ン缶などのフロン補給源に対して着脱自由に接続され るサービス缶受ロ 2 0を上流端に設けた配管 2 1を、 フロン再生系統における配 管開閉装置下流に接続して構成される。
この構成を詳述すると、 サービス缶受ロ 2 0に接続された配管 2 1には、 逆止 弁 C V— Sが介装され、 その下流端がフロン再生系統における再生用電磁弁 S V 一 4下流に接続される。 なお、 フロン補給系統を構成するときには、 再生用電磁 弁 S V— 4は O F F (閉弁) される。
フロン補充系統は、 エアコンディショナのフロン充填口 (低圧側) に対して着 脱自由に接続される低圧フィッティング 2 2 (低圧側コネクタ) とフロンタンク 2とを繋ぐ第 4の配管の所定部位に、 電磁弁などの配管開閉装置を少なくとも介 装して構成される。
この構成を詳述すると、 フロン充填系統における配管 1 9は、 充填用電磁弁 S V— 5上流にて分岐して配管 2 3となり、 その先端が低圧フィッティング 2 2に 接続される。 そして、 配管 2 3には、 上流から下流にかけて、 補充用電磁弁 S V - 8 , 所定圧力が作用すると開弁する逆止弁 C V— O i 1を介してオイル補充口 2 4及び低圧ゲージ 2 5 (第 2の圧力検出装置) が夫々介装される。
また、 配管中のフロンを回収するときに、 その圧力とフロンタンク 2内のフロ ン圧力とを略等圧にすると共に、 システムオイルセパレ一夕 3により分離された オイルをフロン圧力で押し出すようにすベく、 エアパージ用電磁弁 S V— 3上流 に、 均圧用電磁弁 S V— 2及び逆止弁 C V— 2が夫々介装された配管 2 6の一端 が接続される。 配管 2 6の他端は、 フロン回収系統におけるバキュームスィッチ V - S W下流の配管 6に接続される。
さらにォプションとして、 高圧フィッティング 1に接続されたエアコンディシ ョナの配管内を真空引きし、 その内部に残存する水分を除去すべく、 真空発生装 置としての真空ポンプ V Pが設けられる。 即ち、 真空ポンプ V Pに接続された配 管 2 7は、 フロン回収系統における高圧ゲージ 7下流の配管 6に接続される。 配 管 2 7には、 2つの真空ポンプ用電磁弁 S V— V P及び真空ポンプ保護スィッチ P— S Wが夫々介装される。 また、 真空ポンプ V Pと真空ポンプ用電磁弁 S V— VPとの間の配管 27は途中で分岐され、 その分岐配管に真空開放用電磁弁 SV —Pが介装される。
かかる構成において、 エアコンディショナの種類に対応したフロン充填重量を 設定するフロン充填重量設定装置と、 ロードセルによる計測重量に基づいて実際 のフロン充填重量を検出するフ口ン充填重量検出装置と、 実際のフ口ン充填重量 が設定されたフ口ン充填重量になったときにフ口ン充填系統によるフ口ン充填を 停止する停止装置と、 が図示しないコントロールュニットによりソフトウェア的 に実現される。
また、 コントロールユニットは、 各スィッチからの信号に基づいて、 各系統に 介装された電磁弁を ON又は OFFし、 以下に示すように、 各系統の動作を逐次 制御するシーケンス制御 (1) 〜 (13) 、 並びに、 制御モード (14) 及び ( 15) を実行する。 なお、 コントロールユニットにより、 制御装置が実現される。 (1) リサイクルフロン回収シーケンス制御 (図 3)
ステップ 1 (図では 「S 1」 と略記する。 以下同様) では、 エアー保護スイツ チ C一 SWからの信号が ONであるか否か、 即ち、 高圧フィッティング 1に接続 された配管 6内の圧力が所定範囲内にあるか否かが判定される。 そして、 信号が ONであればステップ 2へと進み (ON) 、 信号が OFFであればステップ 13 へと進む (OFF) 。 ステップ 13では、 配管 6内の圧力が所定範囲内にないの で、 車両側のエアコンディショナにフロンがなかったり、 ホースに弛みや亀裂が あると判断して、 例えば、 操作画面を赤色点滅させると共にブザーを作動させる (以下 「エラ一表示」 という) 。 ステップ 14では、 フロン回収作業を継続する か否かが判定される。 即ち、 作業者により強制的に作業を継続する指示がなされ たか否かが判定され、 作業を継続するのであればステップ 2へと進み (Ye s) 、 作業を中止するのであればステップ 12へと進む (No) 。
ステップ 2では、 ロードセル 14からの重量信号に基づいて、 フロンタンク 2 内のフロン残量が 1 kg以上であるか否かが判定される。 そして、 フロン残量が 1 k g以上であればステップ 3へと進み (Ye s) 、 フロン残量が l kg未満で あればステップ 15へと進む (No) 。 ステップ 15では、 フロン残量が少ない ことを報知すべく、 エラー表示が実行され、 その後ステップ 12へと進む。 ステップ 3では、 「運転開始」 ボタン又は 「キャンセル」 ボタンのどちらが押 されたか否かが判定される。 そして、 「運転開始」 ポタンが押されたのであれば ステップ 4へと進み (開始) 、 「キャンセル」 ポタンが押されたのであればステ ップ 12へと進む (キャンセル) 。
ステップ 4では、 入力電磁弁 SV— 1及び回収用電磁弁 SV— 6が夫々 ON ( 作動) される。
ステップ 5では、 所定時間 (例えば、 10秒間) その状態が保持される。
ステップ 6では、 コンプレッサ 5が ONされる。
ステップ 7では、 所定時間 (例えば、 60秒間) その状態が保持される。
ステップ 8では、 エアパージ用電磁弁 S V _ 3が O Nされる。
ステップ 9では、 バキュームスィッチ V—SWからの信号が OFFであるか否 力 即ち、 フロン回収系統における配管内が回収したフロンにより規定圧力に到 達したか否かが判定される。 そして、 信号が OFFであればステップ 10へと進 み (OFF) 、 信号が ONであればステップ 16へと進む (ON) 。 ステップ 1 6では、 「運転開始」 ポタンが押されてからの経過時間が規定時間内であるか否 かが判定される。 そして、 経過時間が規定時間内であればステップ 9へと戻り ( Ye s) 、 経過時間が規定時間に達したならばステップ 17へと進む (No) 。 ステップ 17では、 エラー表示が実行され、 その後ステップ 12へと進む。
ステップ 10では、 エアパージ用電磁弁 SV— 3が OFF (停止) される。 ステップ 11では、 所定時間 (例えば、 180秒間) その状態が保持される。 ステップ 12では、 作動中の全ての電磁弁及びコンプレッサ 5が夫々 OFFさ れる。
かかるシーケンス制御によれば、 エアコンディショナからフロンを回収する前 に、 高圧フィッティング 1に接続された配管 6内の圧力が所定範囲内であるか否 かが判定される。 即ち、 高圧フィッティング 1をエアコンディショナに接続した にもかかわらず、 配管 6内の圧力が所定範囲内になければ、 エアコンディショナ にフロンがないか、 又は、 接続ホースが弛んでいたり亀裂が発生していると判断 することができる。 このため、 かかる現象が発生したときには、 回収作業を停止 させると共にその旨を表示することで、 不凝縮ガスであるエアーを吸引すること を防止することができる。
また、 入力電磁弁 SV— 1, 回収用電磁弁 SV— 6及びコンプレッサ 5を夫々 ONすることで、 図 4に示すようなフロン回収系統が構成され、 エアコンデイシ ョナのフロンがフロンタンク 2へと回収される。 このとき、 フロンは、 システム オイルセパレー夕 3によりオイルが分離されると共に、 フィル夕ドライヤ 4によ り水分及び不純物が除去されるので、 不純物などが極力除去された状態で回収さ れる。
さらに、 フロンをある程度回収した段階でエアパ一ジ用電磁弁 SV— 3が ON されるが、 フロンタンク 2のパージポート 2 Bに接続された配管 13には、 ォー トエアパージ AAPが介装されているので、 最適な制御によるエアパージが可能 となる。 即ち、 エアパージ用電磁弁 SV— 3をフロン回収途中で ONする構成で は、 不凝縮ガスの混入が少なければ若干のフ口ンが大気中に放出されてしまうお それがある。 一方、 圧力開閉式のオートエアパージ AAPだけでは、 不凝縮ガス の有無にかかわらず温度差を原因として開弁することがあるので、 同様に若干の フロンが大気中に放出されてしまうおそれがある。 このため、 フロンタンク 2と ォートエアパージ A A Pとを接続する配管 13にエアパージ用電磁弁 S V— 3を 介装することで、 最適な制御によるエアパージが可能となり、 大気中へのフロン 放出を極力抑制することができる。
(2) リサイクルフロン再生シーケンス制御 (図 5)
ステップ 21では、 真空ポンプ保護スィッチ P— SWからの信号が OFFであ るか否か、 即ち、 真空ポンプ VPに接続された配管 27内が正圧になっているか 否かが判定される。 そして、 信号が OFFであればステップ 22へと進み (OF F) 、 信号が ONであればステップ 31へと進む (ON) 。 ステップ 31では、 エラー表示が実行され、 その後ステップ 30へと進む。
ステップ 22では、 真空ポンプ用電磁弁 SV— VP, 真空開放用電磁弁 SV— P及び真空ポンプ V Pが夫々 O Nされる。
ステップ 23では、 所定時間 (例えば、 5秒間) その状態が保持される。 ステップ 24では、 入力電磁弁 S V— 1及び再生用電磁弁 S V— 4が夫々〇 N される。 ステップ 25では、 所定時間 (例えば、 10秒間) その状態が保持される。 ステップ 26では、 コンプレッサ 5が ONされる。
ステップ 27では、 所定時間 (例えば、 180〜240秒間) その状態が保持 される。
ステップ 28では、 エアパージ用電磁弁 SV— 3が ONされる。
ステップ 29では、 真空ポンプ保護スィッチ P— SWが OFFになってから所 定時間経過したか否かが判定される。 そして、 所定時間経過したならばステップ 30へと進み (Ye s) 、 所定時間経過していなければ待機する (No) 。
ステップ 30では、 作動中の全ての電磁弁及びコンプレッサ 5が夫々 OFFさ れる。
かかるシーケンス制御によれば、 真空ポンプ用電磁弁 SV— VP, 真空開放用 電磁弁 S V _ P及び真空ポンプ V Pを夫々〇 Nすることにより、 図 6に示すよう なフロン再生系統の一部に相当する真空引き系統が構成される。 即ち、 高圧フィ ッティング 1に接続されたエアコンディショナの配管内を真空引きすることで、 フ口ン回収後のエアコンディショナの配管内に残存する水分が除去され、 ここに フロンを充填したときにその純度が低下することを抑制することができる。
また、 入力電磁弁 SV— 1, 再生用電磁弁 SV— 4及びコンプレッサ 5を夫々 ONすることにより、 同図に示すように、 フロンタンク 2内のフロンは、 システ ムオイルセパレ一夕 3及びフィルタドライヤ 4が介装された回路を循環するので、 オイル、 水分及び不純物が除去され、 徐々にその純度が高くなり再生される。 さらに、 フロン再生がある程度進んだ段階で、 エアパージ用電磁弁 SV— 3が ONされるので、 必要に応じて、 フロンタンク 2の上部に存在する不凝縮ガスと してのエアーが大気中に放出される。
(3) リサイクルフロン充填シーケンス制御 (図 7)
ステップ 41では、 充填用電磁弁 SV— 5が ONされる。
ステップ 42では、 充填用電磁弁 SV— 5を ONしてから規定充填時間経過し たか否かが判定される。 ここで、 規定充填時間としては、 エアコンディショナの 種類にかかわらず、 通常であればフ口ン充填が完了するであろうと考えられる時 間に設定することが望ましい。 そして、 規定充填時間が経過したならば、 何らか の原因によりフロンが充填できなかつたと判断し、 エラー処理をすべくステツプ
45へと進み (Ye s) 、 充填用電磁弁 SV— 5が OFFされ、 ステップ 46で エラ一表示が実行される。 一方、 規定充填時間が経過していなければステップ 4 3へと進む (No) 。
ステップ 43では、 ロードセル 14からの重量信号に基づいて、 エアコンディ ショナの種類に応じて予め設定した設定重量 (フロン充填重量) だけフロンが充 填されたか否かが判定される。 そして、 設定重量だけフロンが充填されたならば ステップ 44へと進み (Ye s) 、 フロン充填が未完了であればステップ 42へ と戻る (No) 。
ステップ 44では、 充填用電磁弁 S V— 5が O F Fされる。
かかるシーケンス制御によれば、 充填用電磁弁 SV— 5を ONすることで、 図 8に示すようなフロン充填系統が構成される。 そして、 フロンタンク 2内のフロ ンは、 その圧力を利用して、 高圧フィッティング 1に接続されたエアコンデイシ ョナのフロン充填口から充填される。 このとき、 フロン充填重量は、 ロードセル 14により計測したタンク重量の変化に基づいて制御される。
(4) リサイクル残ガス回収シーケンス制御 (図 9)
ステップ 51では、 入力電磁弁 SV— 1及び均圧用電磁弁 SV— 2が夫々 0N される。
ステップ 52では、 所定時間 (例えば、 5秒間) その状態が保持される。 これ により、 フロンタンク 2と所定の配管の内部圧力が略等圧になる。
ステップ 53では、 均圧用電磁弁 SV— 2が OFFされる。
ステップ 54では、 コンプレッサ 5が ONされる。
ステップ 55では、 所定時間 (例えば、 55秒間) その状態が保持される。 ステップ 56では、 エアパージ用電磁弁 SV— 3が ONされる。
ステップ 57では、 バキュームスィッチ V—SWからの信号が OFFになった か否か、 即ち、 配管内圧力が規定圧力に到達したか否かが判定される。 そして、 信号が OFFであればステップ 58へと進み (OFF) 、 信号が ONであれば待 機する (ON) 。
ステップ 58では、 作動中の全ての電磁弁及びコンプレッサ 5が夫々 OFFさ れる。
かかるシーケンス制御によれば、 入力電磁弁 SV— 1及びコンプレッサ 5を夫 々〇Nすることで、 図 10に示すような残ガス回収系統が構成される。 そして、 配管中に残存しているフロンは、 コンプレッサ 5により圧縮され、 システムオイ ルセパレ一夕 3及びフィルタドライヤ 4を介してフロンタンク 2へと回収される。 また、 フロン回収がある程度進んだ段階で、 エアパージ用電磁弁 SV— 3を ON することで、 不凝縮ガスとしてのエアーがフロンタンク 2へと回収されても、 こ れが大気中に放出される。
(5) リサイクルオイル排出シーケンス制御 (図 11)
ステップ 61では、 フロンタンク 2内圧力をシステムオイルセパレ一夕 3に供 給すべく、 均圧用電磁弁 SV— 2が ONされる。
ステップ 62では、 所定時間 (例えば、 5秒間) その状態が保持される。
ステップ 63では、 均圧用電磁弁 SV— 2が OFFされると共に、 オイルドレ ン用電磁弁 SV— 7が ONされる。
ステップ 64では、 所定時間 (例えば、 10秒間) その状態が保持される。 ステップ 65では、 作動中のオイルドレン用電磁弁 SV— 7が OFFされる。 かかるシーケンス制御によれば、 均圧用電磁弁 S V— 2が O Nされることで、 図 12に示すように、 フロンタンク 2とシステムオイルセパレ一夕 3とが連通さ れ、 フロンタンク 2内圧力がシステムオイルセパレー夕 3に供給される。 そして、 オイルドレン用電磁弁 SV— 7が ONされることで、 システムオイルセパレー夕 3に供給された圧力により、 ここで分離されたオイルがオイルドレンポルト O T に排出される。
(6) オイル補充シーケンス制御 (図 13)
ステップ 71では、 オイル充填口 24にオイル缶が接続されているか否か力 S確 認される。 そして、 オイル缶が接続されていればステップ 72へと進み (Ye s ) 、 オイル缶が接続されていなければ待機する (No) 。
ステップ 72では、 低圧フィッティング 22がエアコンディショナのフロン充 填口 (低圧側) に接続され、 かつ、 エアコンディショナが作動しているか否かが 確認される。 そして、 両条件が共に成立していればステップ 73へと進み (Ye s) 、 両条件が共に成立していなければ待機する (No) 。
ステップ 73では、 低圧ゲージ 25からの出力が安定しているか否かが確認さ れる。 そして、 出力が安定していればステップ 74へと進み (Ye s) 、 出力が 安定していなければ待機する (No) 。 '
ステップ 74では、 所定時間 (例えば、 30秒間) その状態が保持される。 ステップ 75では、 作動中のエアコンディショナを停止すると共に、 低圧フィ ッティング 22及びオイル缶を取り外す。
かかるシーケンス制御によれば、 低圧フィッティング 22をエアコンディショ ナのフロン充填口 (低圧側) に接続すると共に、 オイル補充口にオイル缶を接続 した後、 エアコンディショナを作動させると、 そのコンプレッサ作動に伴い低圧 側が負圧となり図 14に示すように、 オイル缶からコンプレッサにオイルが補充 される。 なお、 エアコンディショナのコンプレッサに対するオイル補充は、 リサ ィクルフロン回収シーケンス制御と同時に実行するようにしてもよい。 この場合 には、 エアコンディショナを作動させなくとも、 車両側からフロンを回収する回 収圧力を利用して、 オイル補充が実行される。 このため、 フロン回収とオイル補 充とを並行かつ自動で実行することができ、 作業時間の短縮及び作業労力の軽減 を図ることができる。
(7) フロン補給シーケンス制御 (図 15)
ステップ 81では、 入力電磁弁 SV— 1が ONされる。
ステップ 82では、 所定時間 (例えば、 10秒間) その状態が保持される。 ステップ 83では、 コンプレッサ 5が ONされる。
ステップ 84では、 所定時間 (例えば、 60秒間) その状態が保持される。 ステップ 85では、 エアパージ用電磁弁 SV— 3が ONされる。
ステップ 86では、 バキュームスィッチ V— SWからの信号が OFFであるか 否かが判定される。 そして、 信号が OFFであればステップ 87へと進み (OF
F) 、 信号が ONであれば待機する (ON) 。
ステップ 87では、 フロン補給、 即ち、 サ一ビス缶からフロンタンク 2へのフ ロン補給を継続する指示があるか否かが判定される。 そして、 フロン補給を継続 する指示があればステップ 81へと戻り (Ye s) 、 フロン補給を継続する指示 がなければステップ 88へと進む (No) 。
ステップ 88では、 作動中の全ての電磁弁及びコンプレッサ 5が夫々 OFFさ れる。
かかるシーケンス制御によれば、 図 16に示すように、 サービス缶受ロ 20に サービス缶を接続した後、 入力電磁弁 SV— 1及びコンプレッサ 5を夫々 ONす ると、 サービス缶からフロンタンク 2にフロンが補給される。 そして、 フロン補 給がある程度進んだ段階で、 エアパージ用電磁弁 SV— 3が ONされ、 必要に応 じて、 フロンタンク 2の上部に溜まった不凝縮ガスとしてのエア一が大気中に放 出される。
(8) フロン補充シーケンス制御 (図 17)
ステップ 91では、 補充用電磁弁 SV— 8が ONされる。
ステップ 92では、 補充用電磁弁 SV— 8を ONしてから規定補充時間経過し たか否かが判定される。 ここで、 規定補充時間としては、 通常であれば設定重量
(例えば、 50 g) のフロン補充が完了するであろうと考えられる時間に設定す ることが望ましい。 そして、 規定補充時間が経過したならば、 何らかの原因によ りフロンが補充できなかったと判断し、 エラ一処理をすべくステップ 95へと進 み (Ye s) 、 補充用電磁弁 SV— 8が OFFされ、 ステップ 96でエラー表示 が実行される。 一方、 規定補充時間が経過していなければステップ 93へと進む
(No) 。
ステップ 93では、 ロードセル 14からの重量信号に基づいて、 設定重量だけ フロンが補充されたか否かが判定される。 そして、 設定重量だけフロンが補充さ れたならばステップ 94へと進み (Ye s) 、 フロン補充が未完了であればステ ップ 92へと戻る (No) 。
ステップ 94では、 補充用電磁弁 SV— 8が OFFされる。
かかるシーケンス制御によれば、 補充用電磁弁 SV— 8を ONすることで、 図 18に示すようなフロン補充系統が構成される。 そして、 車両のエンジンを始動 させると、 車両側のコンプレッサの負圧を利用し、 低圧フィッティング 22に接 続されたエアコンディショナのフロン充填口 (低圧側) からフロンが設定重量補 充される。 このとき、 フロン補充重量は、 ロードセル 14により計測したタンク 重量の変化に基づいて制御される。
(9) 再生クリーニングシーケンス制御 (図 19)
ステップ 101では、 入力電磁弁 S V— 1及び再生用電磁弁 SV— 4が夫々 O Nされる。
ステップ 102では、 所定時間 (例えば、 10秒間) その状態が保持される。 ステップ 103では、 コンプレッサ 5が ONされる。
ステップ 104では、 所定時間 (例えば、 180〜240秒間) その状態が保 持される。
ステップ 105では、 エアパージ用電磁弁 SV— 3が ONされる。
ステップ 106では、 所定時間 (例えば、 20分間) その状態が保持される。 ステップ 107では、 作動中の全ての電磁弁及びコンプレッサ 5が夫々 OFF される。
かかるシーケンス制御によれば、 入力電磁弁 SV— 1, 再生用電磁弁 SV— 4 及びコンプレッサ 5を夫々 ONすることで、 図 20に示すようなフロン再生系統 が構成される。 そして、 リサイクルフロン再生シーケンス制御と同様な過程を経 て、 フロンタンク 2内のフロンからオイル, 水分及び不純物が除去され、 その再 生が実行される。 フロン再生がある程度進んだ段階で、 エアパージ用電磁弁 SV 一 3が ONされ、 必要に応じて、 フロンタンク 2から不凝縮ガスとしてのエア一 が大気中に放出される。
(10) 再生残ガス回収シーケンス制御 (図 21)
ステップ 111では、 入力電磁弁 SV— 1が ONされる。
ステップ 112では、 所定時間 (例えば、 5秒間) その状態が保持される。 ステップ 1 13では、 コンプレッサ 5が ONされる。
ステップ 114では、 所定時間 (例えば、 60秒間) その状態が保持される。 ステップ 115では、 エアパージ用電磁弁 SV— 3が ONされる。
ステップ 116では、 バキュームスィッチ V—SWからの信号が OFFである か否かが判定される。 そして、 信号が OFFであればステップ 117へと進み (
OFF) 、 信号が ONであれば待機する (ON) 。
ステップ 1 17では、 作動中の全ての電磁弁及びコンプレッサ 5が夫々 OFF される。
かかるシーケンス制御によれば、 図 9及び図 1 0に示すリサイクル残ガス回収 シーケンス制御と同様に、 配管内に残存するフロンがフロンタンク 2へと回収さ れる。
( 1 1 ) 真空引きシーケンス制御 (修理工場モード)
修理工場では、 エアコンディショナを修理, 取り付け又は交換したとき、 その 配管内の水分を除去することが望ましい。 即ち、 エアコンディショナを修理した ときなどには、 その配管内に大気が入り込むので、 空気中の水分も同時に入り込 んでしまう。 そして、 この状態のままフロンを充填すると、 配管内の水分により フ口ンの純度が低下し、 エアコンディ'ショナの能力が低下してしまうおそれがあ る。 そこで、 図 2 2に示すように、 真空ポンプ用電磁弁 S V _ V P, 真空開放用 電磁弁 S V _ P及び真空ポンプ V Pを夫々〇 Nし、 高圧フィッティング 1に接続 されたエアコンディショナのフロン充填口 (高圧側) からその内部のエアーを吸 引する。
( 1 2 ) フロン再生シーケンス制御 (修理工場モード)
エアコンディショナの配管から水分を除去すべく、 前述の真空引きシーケンス 制御を行うと共に、 フロン再生シーケンス制御を並行して連続実行するようにす る。 即ち、 修理工場では、 フロンタンク 2内のフロンをエアコンディショナに充 填する前に、 これを再生する必要がある。 このため、 図 5に示すリサイクルフロ ン再生シーケンス制御と同様な処理により、 図 2 3に示すようなフロン再生系統 を構成し、 フロンタンク 2内のフロンを再生できるようにする。
( 1 3 ) フロン充填シーケンス制御 (修理工場モード)
前記 (1 2 ) のフロン再生シーケンス制御に続いて、 図 7に示すリサイクルフ ロン充填シーケンス制御と同様な処理により、 図 2 4に示すようなフロン充填系 統を構成し、 フロンタンク 2からエアコンディショナにフロンを充填する。
( 1 4 ) フロンリフレツシュ制御モード
エアコンディショナのフロンは、 長年の使用に伴い水分及び不純物などが混入 するため、 その純度が徐々に低下し、 空調能力が徐々に低下する。 このため、 適 切な時期にフロンから水分などを除去し、 空調能力を回復させることが望ましい。 そこで、 エアコンディショナのフロン回収, 再生及び充填を自動で行うべく、 前 述したリサイクルフロン回収シーケンス制御, リサイクルフロン再生シーケンス 制御, リサイクル充填シーケンス制御, リサイクル残ガス回収シーケンス制御及 びオイル排出シーケンス制御を、 順次実行する制御モードを備えるようにする。 なお、 必要に応じて、 リサイクル充填シーケンス制御の後に、 フロン補充シーケ ンス制御を追加実行するようにしてもよい。
( 1 5 ) フロン充填制御モード (修理工場モード)
修理工場では、 エアコンディショナの修理などをした後に、 その配管内から水 分を除去すると共に、 再生したフロンを充填する作業を自動で実行できるように することが望ましい。 このため、 フロン再生シーケンス制御, フロン充填シーケ ンス制御及びオイル排出シーケンス制御を、 順次実行する制御モードを備えるよ うにする。
以上説明したエアコンディショナ用のフロン回収 ·再生 ·充填装置によると、 高圧フィッティング 1及び低圧フィッティング 2 2をエアコンディショナのフロ ン充填口に接続し操作パネルを操作すると、 フロンを大気中に放出させずに、 ェ アコンデイショナのフロンを自動的に回収, 再生及び充填することができる。 こ のため、 作業時間の短縮、 作業者労力の軽減などを図ることができる。
そして、 エアコンディショナの高圧側からフロンを回収するとき、 その低圧側 に接続される低圧フィッティング 2 2直下のオイル補充口 2 4にオイル缶を接続 するようにすれば、 エアコンディショナのコンプレッサにオイルを自動的に補充 することができる。 即ち、 高圧フィッティング 1からフロンを回収すると、 エア コンディショナの低圧側が負圧となることから、 その回収圧力を利用してオイル 缶からコンプレッサにオイルが補充される。 このとき、 オイル補充系統には、 ォ ィル補充方向に所定圧力が作用したときのみ開弁する逆止弁 C V _ 0 i 1が介装 されているため、 オイル補充口 2 4にオイル缶が接続されていないときには、 低 圧フィッティング 2 2に接続された配管 2 3内が大気開放されることが防止され る。
また、 フロンタンク 2上部に溜まったエアーは、 エアパージ用電磁弁 S V— 3 が定期的に開閉されることで、 定期的に大気中に放出される。 このとき、 フロン タンク 2のパージポート 2 Bに接続された配管 1 3には、 フロンタンク内圧力と 基準圧力との圧力差が所定値以上になったときに開弁するオートエアパージ AA Pが介装されているので、 最適な制御によりエアパージが可能となる。 そして、 基準圧力を定めるべくオートエアパージ AA Pに内蔵されるフロンは、 配管 1 2 を介してコンプレッサ 5から供給されるフロンとの間で熱交換が行われるため、 雰囲気温度に応じた温度補償がなされる。 このため、 雰囲気温度が変化しても、 オートエアパージ AA Pが誤動作して開弁することを防止できる。
さらに、 高圧フィッティング 1直下にエアー保護スィッチ C—S Wを接続し、 これが O Nになったときのみエアコンディショナからフロンを回収するようにし たので、 車両側のエアコンディショナにフロンがなかったり、 ホースに弛みや亀 裂があるときには、 フロン回収が行われないようにすることができる。 このため、 車両側から不凝縮ガスとしてのエアーの混入が防止され、 例えば、 フロンタンク 2内圧力が不必要に上昇することを防止できる。
その他、 高圧フィッティング 1直下に高圧ゲージ 7が、 低圧フィッティング 2 2直下に低圧ゲージ 2 5が夫々接続されているため、 各作業を行う前後にホース を接続したままの状態でエアコンディショナを作動させると、 その高圧側及び低 圧側のフロン圧力を計測することができる。 このため、 ホースを繋ぎ直さなくと も、 エアコンディショナの診断が可能となり、 作業時間の短縮及び作業労力の軽 減を図ることができる。
また、 エアコンディショナの種類に対応したフロン充填重量が自動的に充填さ れるので、 規定通り充填されたか否かを目視により確認する必要がなく、 面倒で 手間がかかる作業が不要となり、 熟練者でなくとも容易に作業を行うことができ る。 そして、 フロン充填重量を計測するためにロードセルを採用したことで、 高 精度のフロン充填が可能となり、 フロン充填不足は勿論のこと、 フロン充填過度 も防止でき、 フロン缶からの充填と比較しても経済的である。
このとき、 図 2に示すように、 下面が略水平面上に延びる上部部材 1 5 A及び フロンタンク 2が載置固定される下部部材 1 5 Bを有する架台 1 5を、 上部部材 1 5 Aの下面に配設したスプリング, ゴムなどの弾性体 1 6を介して、 床面や各 種装置の筐体などのフレームに固定されたロードセル 1 4の上面に連結して吊り 下げた構成となっているため、 重量測定精度を確保しつつ、 ロードセル 1 4の耐 衝撃性を向上させることもできる。 即ち、 架台 1 5の上部部材 1 5 Aの下面に弹 性体 1 6が配設されているため、 架台 1 5が傾いても、 その傾きが弾性体 1 6に より吸収され、 重量を計測する口一ドセル 1 4の上面に対して荷重が略垂直に作 用する。 このため、 架台 1 5の傾きにかからわず、 フロンタンク 2の重量が高精 度に測定可能となる。 また、 架台 1 5に振動などの衝撃が発生しても、 上部部材 1 5 Aの下面に配設された弾性体 1 6により衝撃が緩和されるので、 ロードセル 1 4に直接伝達される衝撃が大幅に軽減する。 このため、 衝撃によるロードセル 1 4の重量計測精度の低下が抑制され、 保守点検に要する労力が軽減される。 産業上の利用可能性
以上説明したように、 本発明に係る空調機器用フロンの回収 ·再生 ·充填装置 及び空調機器潤滑用オイルの補充方法は、 空調機器からフロンを回収するときに、 その回収圧力を利用してオイルが自動的に補充されるため、 熟練作業者でなくと もオイル補充を容易かつ迅速に行うことができ、 極めて有用なものである。

Claims

1 . 空調機器のフ口ン充填口の高圧側に対して着脱自由に接続される高圧側コ ネクタとフロンタンクとを繋ぐ第 1の配管に、 システムオイルセパレー夕のオイ ル分離部, フィルタドライ'ャ, コンプレッサ及び該システムオイルセパレ一夕の 熱交換部を少なくとも介装すると共に、 所定部位に配管開閉装置を介装したフロ ン回収系統と、
前記フロンタンクから出て該フロンタンクに戻る第 2の配管に、 前記フ口ン回 収系統と共通の前記システムオイルセパレー夕のオイル分離部, 前記フィルタド ライヤ, 前記コンプレッサ及び該システムオイルセパレー夕の熱交換部を少なく とも介装すると共に、 所定部位に配管開閉装置を介装したフロン再生系統と、 囲
前記フロンタンクと前記高圧側コネクタとを繋ぐ第 3の配管の所定部位に少な くとも配管開閉装置を介装したフロン充填系統と、
前記空調機器のフ口ン充填口の低圧側に対して着脱自由に接続される低圧側コ ネクタと前記フロンタンクとを繋ぐ第 4の配管の所定部位に少なくとも配管開閉 装置を介装したフロン補充系統と、
を備えた空調機器用フロンの回収 ·再生 ·充填装置であって、
前記第 4の配管に、 所定圧力が作用すると開弁する逆止弁を介してオイル補充 口を接続したことを特徴とする空調機器用フロンの回収 ·再生 ·充填装置。
2 . 前記フロンタンクのパージポートに接続された第 5の配管に、 該第 5の配 管を定期的に開閉する第 1の開閉装置、 及び、 該フロンタンク内圧力と基準圧力 との圧力差が所定値以上になったときに開弁する第 2の開閉装置を直列介装した ことを特徴とする請求の範囲第 1項記載の空調機器用フロンの回 ·再生 ·充填 装置。
3 . 前記基準圧力は、 前記フロンタンクに回収されるフロンの温度に応じて温 度補償されることを特徴とする請求の範囲第 2項記載の空調機器用フロンの回収 •再生 ·充填装置。
4. 前記高圧側コネクタ近傍に、 配管内圧力が所定範囲にあるか否かを検出す る圧力検知装置を接続し、 該圧力検知装置により配管内圧力が所定範囲にあるこ とが検出されたときに、 前記フロン回収系統によるフロン回収を実行する制御装 蘆を備えたことを特徴とする請求の範囲第 1項記載の空調機器用フロンの回収 · 再生 ·充填装置。
5 . 前記高圧側コネクタ近傍に、 配管内圧力を検出する第 1の圧力検出装置を 接続すると共に、 前記低圧側コネクタ近傍に、 配管内圧力を検出する第 2の圧力 検出装置を接続したことを特徴とする請求の範囲第 1項記載の空調機器用フロン の回収 ·再生 ·充填装置。
6 . 空調機器の種類に対応したフロン充填重量を設定するフロン充填重量設定 装置と、 前記フロンタンクの重量を測定するスケールからの出力に基づいて実際 のフロン充填重量を検出するフ口ン充填重量検出装置と、 実際のフロン充填重量 が設定されたフ口ン充填重量になつたときに、 前記フロン充填系統によるフロン 充填を停止する停止装置と、 を備えたことを特徴とする請求の範囲第 1項記載の 空調機器用フロンの回収 ·再生 ·充填装置。
7 . 前記スケールは、 下面が略水平面上に延びる上部部材及びフロンタンクが 載置固定される下部部材を有する架台を、 該上部部材の下面に配設した弾性体を 介して、 ロードセルの上面に連結して吊り下げ、 前記フロンタンクの重量を測定 することを特徴とする請求の範囲第 6項記載の空調機器用フロンの回収 ·再生, 充填装置。
8 . 空調機器のフロン充填口の高圧側に対して着脱自由に接続される高圧側コ ネクタとフロンタンクとを繋ぐ配管に、 システムオイルセパレ一夕のオイル分離 部, フィルタドライヤ, コンプレッサ及び該システムオイルセパレー夕の熱交換 部を少なくとも介装すると共に、 所定部位に配管開閉装置を介装したフロン回収 系統により前記空調機器からフロンを回収するときに、 該空調機器のフ口ン充填 口の低圧側に対して着脱自由に接続される低圧側コネクタと前記フロンタンクと を繋ぐ配管に所定圧力が作用すると開弁する逆止弁を介して接続されたオイル補 充口から、 フロン回収圧力を利用して、 前記フロン充填口の低圧側を経て前記空 調機器にオイルを補充することを特徴とする空調機器潤滑用オイルの補充方法。
PCT/JP2004/000057 2003-01-08 2004-01-08 空調機器用フロンの回収・再生・充填装置及び空調機器潤滑用オイルの補充方法 WO2004063645A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005507969A JPWO2004063645A1 (ja) 2003-01-08 2004-01-08 空調機器用フロンの回収・再生・充填装置及び空調機器潤滑用オイルの補充方法

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2003-002580 2003-01-08
JP2003-002578 2003-01-08
JP2003002580 2003-01-08
JP2003002578 2003-01-08

Publications (1)

Publication Number Publication Date
WO2004063645A1 true WO2004063645A1 (ja) 2004-07-29

Family

ID=32716363

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2004/000057 WO2004063645A1 (ja) 2003-01-08 2004-01-08 空調機器用フロンの回収・再生・充填装置及び空調機器潤滑用オイルの補充方法

Country Status (3)

Country Link
JP (1) JPWO2004063645A1 (ja)
KR (1) KR20050091778A (ja)
WO (1) WO2004063645A1 (ja)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012034919A1 (en) * 2010-09-13 2012-03-22 Robert Bosch Gmbh A method and a system for draining oil from an oil accumulator mounted in a service station for performing service and/or for flushing of a/c systems
CN103115458A (zh) * 2013-02-08 2013-05-22 甘小琴 全自动的气体回收充注装置及方法
JP2014085082A (ja) * 2012-10-26 2014-05-12 Mk Seiko Co Ltd 冷媒処理装置
JP2015114018A (ja) * 2013-12-10 2015-06-22 株式会社岡常歯車製作所 流体回収再生充填装置
JP2017026182A (ja) * 2015-07-17 2017-02-02 株式会社岡常歯車製作所 流体回収再生充填装置
KR101878771B1 (ko) * 2017-01-18 2018-07-16 (주)쿨뱅크 냉매 회수 충전 장치 및 이를 이용한 냉매 회수 방법
CN109028671A (zh) * 2018-07-31 2018-12-18 格力电器(武汉)有限公司 一种充氟系统
JP7492529B2 (ja) 2019-03-08 2024-05-29 ザ ケマーズ カンパニー エフシー リミテッド ライアビリティ カンパニー 冷媒を輸送、移送、保管及び使用するための方法及びシステム

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111649509A (zh) * 2020-05-12 2020-09-11 浙江飞越机电有限公司 冷媒智能加注控制系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60235976A (ja) * 1984-05-09 1985-11-22 株式会社日立製作所 空気調和機用の冷媒封入装置
JPH03263565A (ja) * 1990-03-13 1991-11-25 Mitsubishi Heavy Ind Ltd 回収冷媒の移充方法
JPH08136090A (ja) * 1994-11-08 1996-05-31 Nippon Oil Co Ltd 空調機器用フロンの回収・再生・充填装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60235976A (ja) * 1984-05-09 1985-11-22 株式会社日立製作所 空気調和機用の冷媒封入装置
JPH03263565A (ja) * 1990-03-13 1991-11-25 Mitsubishi Heavy Ind Ltd 回収冷媒の移充方法
JPH08136090A (ja) * 1994-11-08 1996-05-31 Nippon Oil Co Ltd 空調機器用フロンの回収・再生・充填装置

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012034919A1 (en) * 2010-09-13 2012-03-22 Robert Bosch Gmbh A method and a system for draining oil from an oil accumulator mounted in a service station for performing service and/or for flushing of a/c systems
JP2014085082A (ja) * 2012-10-26 2014-05-12 Mk Seiko Co Ltd 冷媒処理装置
CN103115458A (zh) * 2013-02-08 2013-05-22 甘小琴 全自动的气体回收充注装置及方法
CN103115458B (zh) * 2013-02-08 2015-09-09 甘小琴 全自动的气体回收充注装置及方法
JP2015114018A (ja) * 2013-12-10 2015-06-22 株式会社岡常歯車製作所 流体回収再生充填装置
JP2017026182A (ja) * 2015-07-17 2017-02-02 株式会社岡常歯車製作所 流体回収再生充填装置
KR101878771B1 (ko) * 2017-01-18 2018-07-16 (주)쿨뱅크 냉매 회수 충전 장치 및 이를 이용한 냉매 회수 방법
CN109028671A (zh) * 2018-07-31 2018-12-18 格力电器(武汉)有限公司 一种充氟系统
JP7492529B2 (ja) 2019-03-08 2024-05-29 ザ ケマーズ カンパニー エフシー リミテッド ライアビリティ カンパニー 冷媒を輸送、移送、保管及び使用するための方法及びシステム

Also Published As

Publication number Publication date
JPWO2004063645A1 (ja) 2006-05-18
KR20050091778A (ko) 2005-09-15

Similar Documents

Publication Publication Date Title
DK2665611T3 (en) Vessel air conditioner service equipment and methods for using it, especially for self cleaning
CN102725155B (zh) 用于维护汽车空调装置的方法和用于该方法的维修设备
US4967567A (en) System and method for diagnosing the operation of air conditioner systems
US8661839B2 (en) Background tank fill based on refrigerant composition
US6134896A (en) Background tank fill
US7854130B2 (en) Internal clearing function for a refrigerant recovery/recharge machine
US4909042A (en) Air conditioner charging station with same refrigerant reclaiming and liquid refrigerant return and method
US5353603A (en) Dual refrigerant recovery apparatus with single vacuum pump and control means
JP4187020B2 (ja) 空気調和装置およびその洗浄方法
JP2001280762A (ja) 自動車空調装置用充填装置
US20090241560A1 (en) Method for recovery and recharge of blend refrigerants with blend sent for reclamation
WO2004063645A1 (ja) 空調機器用フロンの回収・再生・充填装置及び空調機器潤滑用オイルの補充方法
CN105627643B (zh) 具有填充程度监测的制冷系统
JP3442166B2 (ja) 空調機器用フロンの回収・再生・充填装置
JP2006220381A (ja) 冷媒処理装置
KR101999394B1 (ko) 냉매 재생장치 및 이를 이용한 냉매 재생방법
JP2000052754A (ja) 車両用空気調和装置
KR101999391B1 (ko) 냉매배관 세정장치 및 이를 이용한 냉매배관 세정방법
KR20090044614A (ko) 차량에어컨용 냉매의 회수, 재생 및 충전장치
JP3209805U (ja) 冷媒回収充填装置
WO1989005428A2 (en) A method for determining the cause of a malfunction in an air conditioning system
JPH03117862A (ja) フロンガス回収装置
JPH03117865A (ja) フロンガス回収装置
KR20090105983A (ko) 질량충전법과 작동포화압력방식을 응용한 에어컨정밀고장진단 및 회수 충전장치
KR100960558B1 (ko) 냉매회수 재생 충전장치용 고압기준압력표시기 및 이고압기준압력표시기가 적용된 냉매회수 재생 충전장치

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BW BY BZ CA CH CN CO CR CU CZ DE DK DM DZ EC EE EG ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NA NI NO NZ OM PG PH PL PT RO RU SC SD SE SG SK SL SY TJ TM TN TR TT TZ UA UG US UZ VC VN YU ZA ZM ZW

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): BW GH GM KE LS MW MZ SD SL SZ TZ UG ZM ZW AM AZ BY KG KZ MD RU TJ TM AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LU MC NL PT RO SE SI SK TR BF BJ CF CG CI CM GA GN GQ GW ML MR NE SN TD TG

121 Ep: the epo has been informed by wipo that ep was designated in this application
WWE Wipo information: entry into national phase

Ref document number: 2005507969

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 20048019657

Country of ref document: CN

Ref document number: 1020057012855

Country of ref document: KR

WWP Wipo information: published in national office

Ref document number: 1020057012855

Country of ref document: KR

122 Ep: pct application non-entry in european phase