WO2001062603A2 - Optimisation integree d'exploitation de reservoir - Google Patents
Optimisation integree d'exploitation de reservoir Download PDFInfo
- Publication number
- WO2001062603A2 WO2001062603A2 PCT/US2001/004620 US0104620W WO0162603A2 WO 2001062603 A2 WO2001062603 A2 WO 2001062603A2 US 0104620 W US0104620 W US 0104620W WO 0162603 A2 WO0162603 A2 WO 0162603A2
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- reservoir
- block
- production
- model
- data
- Prior art date
Links
- 238000005457 optimization Methods 0.000 title description 31
- 238000011161 development Methods 0.000 abstract description 369
- 239000012530 fluid Substances 0.000 abstract description 184
- 238000000034 method Methods 0.000 abstract description 179
- 238000004519 manufacturing process Methods 0.000 description 386
- 230000004044 response Effects 0.000 description 131
- 239000007789 gas Substances 0.000 description 113
- 230000007246 mechanism Effects 0.000 description 81
- 238000004458 analytical method Methods 0.000 description 73
- 238000002347 injection Methods 0.000 description 72
- 239000007924 injection Substances 0.000 description 72
- 238000010276 construction Methods 0.000 description 59
- 238000012544 monitoring process Methods 0.000 description 58
- 230000007613 environmental effect Effects 0.000 description 56
- 238000005259 measurement Methods 0.000 description 56
- 238000012502 risk assessment Methods 0.000 description 55
- 230000007423 decrease Effects 0.000 description 49
- 230000008569 process Effects 0.000 description 49
- 230000035945 sensitivity Effects 0.000 description 46
- 238000005553 drilling Methods 0.000 description 40
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 37
- 239000000463 material Substances 0.000 description 32
- 230000015572 biosynthetic process Effects 0.000 description 31
- 238000013461 design Methods 0.000 description 31
- 238000005755 formation reaction Methods 0.000 description 31
- 238000012512 characterization method Methods 0.000 description 29
- 238000012360 testing method Methods 0.000 description 29
- 238000004364 calculation method Methods 0.000 description 25
- 238000009826 distribution Methods 0.000 description 24
- 230000000694 effects Effects 0.000 description 23
- 238000007726 management method Methods 0.000 description 21
- 238000011084 recovery Methods 0.000 description 19
- 238000011156 evaluation Methods 0.000 description 17
- 238000012545 processing Methods 0.000 description 16
- 238000003908 quality control method Methods 0.000 description 16
- 238000010206 sensitivity analysis Methods 0.000 description 15
- 239000011435 rock Substances 0.000 description 14
- 230000009471 action Effects 0.000 description 11
- 238000012552 review Methods 0.000 description 11
- 238000013459 approach Methods 0.000 description 10
- 230000008859 change Effects 0.000 description 10
- 230000006870 function Effects 0.000 description 10
- 230000001276 controlling effect Effects 0.000 description 9
- 238000000605 extraction Methods 0.000 description 9
- 229930195733 hydrocarbon Natural products 0.000 description 8
- 150000002430 hydrocarbons Chemical class 0.000 description 8
- 239000003921 oil Substances 0.000 description 8
- 239000000126 substance Substances 0.000 description 8
- 230000000153 supplemental effect Effects 0.000 description 8
- 230000007774 longterm Effects 0.000 description 7
- 230000001105 regulatory effect Effects 0.000 description 7
- 239000004215 Carbon black (E152) Substances 0.000 description 6
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 6
- 238000012550 audit Methods 0.000 description 6
- 239000006227 byproduct Substances 0.000 description 6
- 238000007906 compression Methods 0.000 description 6
- 230000006835 compression Effects 0.000 description 6
- 230000035699 permeability Effects 0.000 description 6
- 238000007619 statistical method Methods 0.000 description 6
- 238000012384 transportation and delivery Methods 0.000 description 6
- RWSOTUBLDIXVET-UHFFFAOYSA-N Dihydrogen sulfide Chemical compound S RWSOTUBLDIXVET-UHFFFAOYSA-N 0.000 description 5
- NINIDFKCEFEMDL-UHFFFAOYSA-N Sulfur Chemical compound [S] NINIDFKCEFEMDL-UHFFFAOYSA-N 0.000 description 5
- 238000009434 installation Methods 0.000 description 5
- 238000012804 iterative process Methods 0.000 description 5
- 238000013507 mapping Methods 0.000 description 5
- 238000004088 simulation Methods 0.000 description 5
- 230000003068 static effect Effects 0.000 description 5
- 238000011282 treatment Methods 0.000 description 5
- 230000033228 biological regulation Effects 0.000 description 4
- 238000006243 chemical reaction Methods 0.000 description 4
- 238000004891 communication Methods 0.000 description 4
- 238000000892 gravimetry Methods 0.000 description 4
- 238000005272 metallurgy Methods 0.000 description 4
- 229910002092 carbon dioxide Inorganic materials 0.000 description 3
- 239000001569 carbon dioxide Substances 0.000 description 3
- 229910000037 hydrogen sulfide Inorganic materials 0.000 description 3
- 238000009533 lab test Methods 0.000 description 3
- 238000013508 migration Methods 0.000 description 3
- 230000005012 migration Effects 0.000 description 3
- 238000013439 planning Methods 0.000 description 3
- 238000005086 pumping Methods 0.000 description 3
- 238000007670 refining Methods 0.000 description 3
- 238000005067 remediation Methods 0.000 description 3
- 238000005070 sampling Methods 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 239000013589 supplement Substances 0.000 description 3
- 238000012795 verification Methods 0.000 description 3
- 238000012443 analytical study Methods 0.000 description 2
- 238000003491 array Methods 0.000 description 2
- 239000004568 cement Substances 0.000 description 2
- 238000013211 curve analysis Methods 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 239000002920 hazardous waste Substances 0.000 description 2
- 238000003384 imaging method Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 239000000203 mixture Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000003129 oil well Substances 0.000 description 2
- 230000037361 pathway Effects 0.000 description 2
- 239000003208 petroleum Substances 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 239000000047 product Substances 0.000 description 2
- 238000000926 separation method Methods 0.000 description 2
- 229910052717 sulfur Inorganic materials 0.000 description 2
- 239000011593 sulfur Substances 0.000 description 2
- 230000001131 transforming effect Effects 0.000 description 2
- 241001465754 Metazoa Species 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000003466 anti-cipated effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000009530 blood pressure measurement Methods 0.000 description 1
- 230000001427 coherent effect Effects 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000000779 depleting effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 239000008398 formation water Substances 0.000 description 1
- 229920001903 high density polyethylene Polymers 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000000691 measurement method Methods 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- RGCLLPNLLBQHPF-HJWRWDBZSA-N phosphamidon Chemical compound CCN(CC)C(=O)C(\Cl)=C(/C)OP(=O)(OC)OC RGCLLPNLLBQHPF-HJWRWDBZSA-N 0.000 description 1
- 239000000843 powder Substances 0.000 description 1
- 230000000135 prohibitive effect Effects 0.000 description 1
- 238000011002 quantification Methods 0.000 description 1
- 230000002829 reductive effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 230000001502 supplementing effect Effects 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
- 239000011800 void material Substances 0.000 description 1
- 230000003442 weekly effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Forestry; Mining
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/61—Analysis by combining or comparing a seismic data set with other data
- G01V2210/612—Previously recorded data, e.g. time-lapse or 4D
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/84—Greenhouse gas [GHG] management systems
Definitions
- U.S. Patent 5,975,204 to Tubel et al teaches and claims a downhole production well control system for automatically controlling downhole tools in response to sensed selected downhole parameters without an initial control signal from the surface or from some other external source.
- U.S. Patent 5,586,082 to Anderson et al teaches a method for identifying subsurface fluid migration and drainage pathways in and among oil and gas reservoirs using 3-D and 4-D seismic imaging. This method uses both single seismic surveys (3-D) and multiple seismic surveys separated in time (4-D) of a region of interest to determine large scale migration pathways within sedimentary basins, and fine scale drainage structure and oil-water-gas regions within individual petroleum producing reservoirs.
- a feedback loop is installed whereby the new set of data (which has been gathered during the above referenced data gathering step) is accessible to the parties who originally designed the initial development plan for the purpose of: (1) merging the new set of data into previous interpretations, (2) doing any reinterpretations which are necessary, and then (3) modifying the initial development plan in an "ongoing and iterative process" to produce another development plan.
- the initial development plan may be changed or modified based on how the wells are completed, or how many wells are drilled, or where the wells are positioned, etc.
- 'different types of data' are* obtained in response to measurements taken on a reservoir during the lifetime of the reservoir. These 'different types of data' range from a 'first type of data' which are obtained from occasional time-lapse measurements that are taken on an 'infrequent' basis to a 'second type of data' which are obtained from continuous measurements that are taken on a 'frequent' basis by permanently installed systems.
- the performance of reservoirs were monitored solely on an 'infrequent' basis and the results were used to change the reservoir development plan at certain time intervals.
- step (d) which monitors the performance of the reservoir by acquiring high rate monitor data further includes the steps of (dl) acquiring and accumulating and quality checking the high rate monitor data, (d2) using said high rate monitor data to evaluate a single well or a region of several wells and returning to step (c), and (d3) using said high rate monitor data to evaluate a global field or reservoir, returning to step (e) when the reservoir development plan should be updated or when new low rate reservoir monitor data should be acquired, and returning to step (c) when the reservoir development plan should not be updated or when new low rate reservoir monitor data should not be acquired.
- the generating step (b3) for generating facilities requirements from the production and reserves forecast includes: (b3.1) in response to that portion of the third and the fourth output signals from the production and reserves forecasts step (b2) which includes the reservoir fluids production rates and pressures, estimating a first set of facilities that are required for the reservoir fluids production rates and pressures, (b3.2) determining if one or more first set of changes are required to said first set of facilities, (b3.3) if the one or more first set of changes to the first set of facilities is required, making said first set of changes to said first set of facilities, said one or more first set of changes having associated therewith a capital cost and possible incremental operating cost adapted for use by the economics and risk analysis step (b5), (b3.4) in response
- step (b4) for considering environmental issues includes: (b4.1) considering special emergency response plans and provisions, (b4.2) considering pre-construction environmental impact study requirements, (b4.3) considering interrupted or restricted access to wells and facilities, and (b4.4) considering government or regulatory approval and audit provisions.
- the performing step (b5) for performing an economics and risk analysis study includes: (b5.1) in response to the reservoir development plan generated from the production and reserves forecast step (b2), evaluating a set of economics which is associated with said reservoir development plan by generating, responsive to the reservoir development plan, a reservoir production schedule and a reservoir injection schedule and a facility and well schedule, (b5.2) in response to the facilities requirements step (b3) which includes processing and drilling workover plans, generating a capital cost model and an operating cost model associated therewith, (b5.3) in response to the environmental considerations step (b4), generating special project costs, (b5.4) providing, in a plan economic profile, an economic profile and a cash flow summary for the reservoir, development plan in response to the reservoir production schedule, the reservoir injection schedule, the facility and well schedule, the capital cost model, the operating cost model, and the special project costs, (b5.5) determining, in a development and operating risk decision, whether there
- figure 1 illustrates one prior art method for managing a gas or oil reservoir
- figure 2 illustrates a detailed construction of the Developing Plan block 11 of figure 1;
- figure 3 illustrates an alternate construction of block 24 of the Developing Plan block of figure 2;
- figure 4 illustrates a new and novel method, relative to the prior art method of figure 1, for managing a gas or oil reservoir in accordance with the teachings of the present invention
- figure 5 illustrates a detailed construction of the operate/monitor block 44 of figure 4.
- figure 6 illustrates a detailed construction of the Reservoir Monitoring Data Assimilation & Updating block 45 of figure 4;
- FIGS. 9 A and 9B illustrate a detailed construction of the Preliminary Engineering block of figure 7;
- FIGS. 10A and 10B illustrate a detailed construction of the Geological Modeling block in figure 7;
- FIGS. 11 A and 1 IB illustrate a detailed construction of the Numerical Model Studies block in figure 7;
- FIGS. 13 A and 13B illustrate a detailed construction of the Production and Reserves Forecasts block in figure 7;
- Figure 1 shows a sequence of key steps comprising reservoir management. These steps consist of: setting strategy 10, Developing Plan 11, Implementing 12, Monitoring 13, Evaluating 14, Performance matches plan 16, Revising 15, and Completing 17. Each of these steps or block of figure 1 will be discussed in detail below.
- the aforementioned "Development Plan” is implemented.
- This "implementing step” includes designing and drilling new wells, setting well flow rates, or performing workover operations, such as cement squeeze, acidization, fracturing, gel treatments, and tubular repair that are all known in the art. During the “implementing step”, one would go out into the field and take any actions which are necessary to establish the process facilities, wellbores, transportation facility, that will enable your strategy to be met.
- the reservoir is actually producing a second number of barrels per day from the reservoir, which is not equal to the first number of barrels per day.
- the optimized economic information from block 28 is expressed as a development plan to be used for management review and approval, and then for development of the reservoir.
- An approved development plan is then implemented by the field or reservoir asset team. That is, having done the aforementioned risk analysis and economic projections for various depletion alternatives, a series of charts are produced for each development case which present additional considerations that must be taken into account. For example, one such additional consideration might be 'maximizing your net present value by recovering and producing less oil'. Therefore, these additional considerations are overlayed onto the above referenced considerations associated with "Economic Optimization".
- the "Reservoir Development Plan” is complete, and that Development Plan must now be submitted for management approval.
- the day-to-day field operations are managed by a day-to-day operational plan that includes wellbore and surface operations to be conducted, such as well choke settings and intervention and work-over operations.
- the day-to-day operational plan is derived by transforming the longer-term reservoir development plan into a sequence of day- to-day operations that meet a set of key performance indicators.
- constant monitoring of reservoir performance is necessary using high rate monitor data from the 'High Rate Monitor Data' block 62 to determine if the reservoir performance is conforming to the Reservoir Development Plan.
- the 'Preliminary Engineering' block 41d is being performed in parallel with the 'Geological Modeling' 41 e in order to determine a unified interpretation of what the reservoir actually looks like. That is, block 41 d is being performed in parallel with block 41e, using dynamic data (well performance, production and injection rates, reservoir pressure) in an effort to verify the interpretations made by the geoscience group based on static data (i.e., measurements made at a specific point in time from well logs, seismic).
- Block 41dl 1 tries to estimate incremental oil rate and potential oil recoveries associated with the production enhancement opportunities in the 'production enhancement opportunities' block 41d7, after having reconciled the test data with drilling and completion practices. For example, we should recover an extra 100 thousand barrels of oil from the well. Having identified the incremental potential, and verified that it is worthwhile going after with this particular activity from the 'incremental rate and recovery potential' block 41dl 1, the output from block 41dl 1 provides an input to the 'completion workover, and infill guidelines' block 41dl2.
- step (n) selecting a particular development plan from among the one or more alternative development plans evaluated during step (1), the particular development plan selected during the selecting step (n) representing an optimized development plan.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Business, Economics & Management (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Entrepreneurship & Innovation (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Fluid Mechanics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Geophysics (AREA)
- Animal Husbandry (AREA)
- Agronomy & Crop Science (AREA)
- Marine Sciences & Fisheries (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply Devices, Intensifiers, Converters, And Telemotors (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
- Metal-Oxide And Bipolar Metal-Oxide Semiconductor Integrated Circuits (AREA)
- Geophysics And Detection Of Objects (AREA)
- Electrical Discharge Machining, Electrochemical Machining, And Combined Machining (AREA)
- Control Of Vehicles With Linear Motors And Vehicles That Are Magnetically Levitated (AREA)
- Pipeline Systems (AREA)
Abstract
Priority Applications (11)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP01907207A EP1263653B1 (fr) | 2000-02-22 | 2001-02-14 | Optimisation integree d'exploitation de reservoir |
KR1020027011007A KR100756684B1 (ko) | 2000-02-22 | 2001-02-14 | 통합 저류층 최적화 |
BRBR122013023833-6A BR122013023833B1 (pt) | 2000-02-22 | 2001-02-14 | Método de efetuar estudos de modelo numérico |
DE60119087T DE60119087D1 (de) | 2000-02-22 | 2001-02-14 | Integrierte optimierung eines reservoirs |
JP2001561626A JP4593051B2 (ja) | 2000-02-22 | 2001-02-14 | 統合リザーバの最適化 |
KZ20021550A KZ19059A (fr) | 2000-02-22 | 2001-02-14 | |
AU2001235010A AU2001235010A1 (en) | 2000-02-22 | 2001-02-14 | Integrated reservoir optimization |
BRPI0108571A BRPI0108571B1 (pt) | 2000-02-22 | 2001-02-14 | método de gerenciar um reservatório de fluido e/ou gás que assimila diversos dados |
MXPA02008197A MXPA02008197A (es) | 2000-02-22 | 2001-02-14 | Optimizacion de deposito integrada. |
CA002400796A CA2400796A1 (fr) | 2000-02-22 | 2001-02-14 | Optimisation integree d'exploitation de reservoir |
NO20023904A NO333783B1 (no) | 2000-02-22 | 2002-08-16 | Integrert reservoiroptimisering |
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US18383600P | 2000-02-22 | 2000-02-22 | |
US60/183,836 | 2000-02-22 | ||
US09/659,951 | 2000-09-12 | ||
US09/659,951 US6980940B1 (en) | 2000-02-22 | 2000-09-12 | Intergrated reservoir optimization |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2001062603A2 true WO2001062603A2 (fr) | 2001-08-30 |
WO2001062603A3 WO2001062603A3 (fr) | 2002-05-30 |
Family
ID=26879562
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/US2001/004620 WO2001062603A2 (fr) | 2000-02-22 | 2001-02-14 | Optimisation integree d'exploitation de reservoir |
Country Status (16)
Country | Link |
---|---|
US (4) | US6980940B1 (fr) |
EP (6) | EP1701001A1 (fr) |
JP (1) | JP4593051B2 (fr) |
KR (1) | KR100756684B1 (fr) |
CN (2) | CN1419677A (fr) |
AT (1) | ATE324327T1 (fr) |
AU (1) | AU2001235010A1 (fr) |
BR (3) | BR122013023852B1 (fr) |
CA (3) | CA2400796A1 (fr) |
DE (1) | DE60119087D1 (fr) |
KZ (1) | KZ19059A (fr) |
MX (1) | MXPA02008197A (fr) |
NO (1) | NO333783B1 (fr) |
RU (1) | RU2281384C2 (fr) |
SG (1) | SG127743A1 (fr) |
WO (1) | WO2001062603A2 (fr) |
Cited By (37)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004100040A1 (fr) * | 2003-04-30 | 2004-11-18 | Landmark Graphics Corporation | Procede et systeme de gestion de decisions de cas et de scenarios |
WO2006003118A1 (fr) * | 2004-06-25 | 2006-01-12 | Shell Internationale Research Maatschappij B.V. | Systeme de controle en boucle fermee permettant de controler la production d'un flux d'hydrocarbures provenant d'une formation souterraine |
EP1686238A1 (fr) * | 2005-01-11 | 2006-08-02 | Schlumberger Holdings Limited | Système et méthodes de détermination des propriétés des fluides de fond et leur incertitude |
EP1686237A1 (fr) * | 2005-01-11 | 2006-08-02 | Schlumberger Holdings Limited | Système et méthodes de détermination des propriétés des fluides de fond et leur incertitude |
WO2007084348A1 (fr) * | 2006-01-13 | 2007-07-26 | Halliburton Energy Services, Inc. | Surveillance et commande en temps réel des opérations de récupération thermique pour des réservoirs de pétroles bruts lourds |
WO2008106476A1 (fr) * | 2007-02-27 | 2008-09-04 | Schlumberger Technology Corporation | Système et procédé de contrôle de l'efficacité d'injection d'eau |
WO2009030756A3 (fr) * | 2007-09-07 | 2009-06-25 | Abb As | Procédé de prédiction dans un système de production de pétrole/gaz |
EP2118738A2 (fr) * | 2006-12-28 | 2009-11-18 | Chevron U.S.A., Inc. | Procédé, système et dispositif de stockage de programmes destinés à la comparaison d'historiques et la prévision relatives aux roches réservoirs piégeant des hydrocarbures utilisant des approximations pour des fonctions de ressemblances |
WO2009142840A3 (fr) * | 2008-05-22 | 2010-01-14 | Schlumberger Canada Limited | Procédés et appareils de formation de puits |
WO2009020715A3 (fr) * | 2007-08-08 | 2010-03-18 | Schlumberger Canada Limited | Réactualisation d'un modèle souterrain en utilisant au moins des données électromagnétiques |
EP2225632A2 (fr) * | 2007-12-17 | 2010-09-08 | Landmark Graphics Corporation, A Halliburton Company | Systèmes et procédés d'optimisation d'opérations de production en temps réel |
US7813935B2 (en) | 2004-01-13 | 2010-10-12 | Weatherford/Lamb, Inc. | System for evaluating over and underbalanced drilling operations |
US7832482B2 (en) | 2006-10-10 | 2010-11-16 | Halliburton Energy Services, Inc. | Producing resources using steam injection |
GB2471139A (en) * | 2009-06-19 | 2010-12-22 | Kongsberg Maritime As Oil And Gas | Method for providing reconciled estimates of three phase flow for individual wells and at individual locations in a hydrocarbon production process facility |
WO2011019565A3 (fr) * | 2009-08-14 | 2011-05-19 | Bp Corporation North America Inc. | Architecture de réservoir et analyse de connectivité |
GB2486060A (en) * | 2010-12-02 | 2012-06-06 | Logined Bv | Prioritising well drilling proposition |
US8209202B2 (en) | 2005-04-29 | 2012-06-26 | Landmark Graphics Corporation | Analysis of multiple assets in view of uncertainties |
WO2013032444A1 (fr) * | 2011-08-30 | 2013-03-07 | Halliburton Energy Services, Inc. | Procédés et systèmes pour la commande intégrée d'opérations souterraines |
US8504335B2 (en) | 2008-04-17 | 2013-08-06 | Exxonmobil Upstream Research Company | Robust optimization-based decision support tool for reservoir development planning |
US8706541B2 (en) | 2008-10-06 | 2014-04-22 | Schlumberger Technology Corporation | Reservoir management linking |
US8775347B2 (en) | 2008-04-18 | 2014-07-08 | Exxonmobil Upstream Research Company | Markov decision process-based support tool for reservoir development planning |
US8775361B2 (en) | 2008-04-21 | 2014-07-08 | Exxonmobil Upstream Research Company | Stochastic programming-based decision support tool for reservoir development planning |
US20150032377A1 (en) * | 2013-07-29 | 2015-01-29 | Chevron U.S.A. Inc. | System and method for remaining resource mapping |
US9026417B2 (en) | 2007-12-13 | 2015-05-05 | Exxonmobil Upstream Research Company | Iterative reservoir surveillance |
WO2015177653A3 (fr) * | 2014-05-07 | 2016-01-21 | King Abdullah University Of Science And Technology | Cadre de quantification des incertitudes et de mise en correspondance d'historique de réservoir à données multiples |
NO337405B1 (no) * | 2004-10-15 | 2016-04-11 | Saudi Arabian Oil Co | Datamaskin-implementert framgangsmåte for å analysere ytelsen til et produserende gigantisk hydrokarbonreservoar |
EP2984284A4 (fr) * | 2013-04-12 | 2016-12-07 | Services Petroliers Schlumberger | Recuperation assistee de petrole a l'aide d'echantillon de forage numerique |
WO2016193425A1 (fr) * | 2015-06-05 | 2016-12-08 | Repsol, S.A. | Procédé de génération d'une stratégie de production pour le développement d'un réservoir d'hydrocarbures dans un environnement naturel |
CN106295210A (zh) * | 2016-08-16 | 2017-01-04 | 中国石油化工股份有限公司 | 一种开展储量空白带勘探潜力的定量评价方法及系统 |
WO2017023541A1 (fr) * | 2015-07-31 | 2017-02-09 | Schlumberger Technology Corporation | Procédé et appareil de détermination d'un état d'un système |
WO2017143326A1 (fr) * | 2016-02-18 | 2017-08-24 | General Electric Company | Système et procédé pour générer un programme pour extraire une ressource fluide d'un réservoir |
WO2017204689A1 (fr) * | 2016-05-27 | 2017-11-30 | Шлюмберже Текнолоджи Корпорейшн | Procédé de détermination des propriétés mécaniques d'une roche d'une couche productrice |
WO2018178049A3 (fr) * | 2017-03-29 | 2018-11-08 | Repsol, S.A. | Procédé de détermination d'un plan de forage d'une pluralité de nouveaux puits dans un réservoir |
EP3250922A4 (fr) * | 2015-01-28 | 2018-12-26 | Services Petroliers Schlumberger (SPS) | Procédés et systèmes informatiques pour traiter et transformer des données collectées pour améliorer la productivité de forage |
US10352134B2 (en) | 2012-05-30 | 2019-07-16 | Landmark Graphics Corporation | Oil or gas production using computer simulation of oil or gas fields and production facilities |
CN111794743A (zh) * | 2020-08-28 | 2020-10-20 | 四川长宁天然气开发有限责任公司 | 一种页岩气井工程跟踪推演方法 |
US11668165B2 (en) * | 2020-03-04 | 2023-06-06 | Saudi Arabian Oil Company | Method and system for simulating well performance using wellhead measurements |
Families Citing this family (484)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080262737A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Monitoring and Controlling Production from Wells |
US6853921B2 (en) | 1999-07-20 | 2005-02-08 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
JP2002099674A (ja) * | 2000-09-21 | 2002-04-05 | Ricoh Co Ltd | 環境負荷情報システム及び環境負荷情報提供方法 |
US20020049575A1 (en) * | 2000-09-28 | 2002-04-25 | Younes Jalali | Well planning and design |
FR2842321B1 (fr) * | 2002-07-11 | 2008-12-05 | Inst Francais Du Petrole | Methode pour contraindre un champ de permeabilite heterogene representant un reservoir souterrain par des donnees dynamiques |
FR2831917B1 (fr) * | 2001-11-08 | 2004-01-02 | Schlumberger Services Petrol | Procede de determination de la variation de la permeabilite relative a au moins un fluide d'un reservoir contenant des fluides en fonction de la saturation en l'un d'entre eux |
US7512543B2 (en) * | 2002-05-29 | 2009-03-31 | Schlumberger Technology Corporation | Tools for decision-making in reservoir risk management |
US20030229476A1 (en) * | 2002-06-07 | 2003-12-11 | Lohitsa, Inc. | Enhancing dynamic characteristics in an analytical model |
US7725301B2 (en) * | 2002-11-04 | 2010-05-25 | Welldynamics, B.V. | System and method for estimating multi-phase fluid rates in a subterranean well |
US7584165B2 (en) | 2003-01-30 | 2009-09-01 | Landmark Graphics Corporation | Support apparatus, method and system for real time operations and maintenance |
US7200540B2 (en) * | 2003-01-31 | 2007-04-03 | Landmark Graphics Corporation | System and method for automated platform generation |
WO2004095077A1 (fr) * | 2003-04-23 | 2004-11-04 | Commonwealth Scientific And Industrial Research Organisation | Procede permettant de predire la pression interstitielle |
WO2004099917A2 (fr) * | 2003-04-30 | 2004-11-18 | Landmark Graphics Corporation | Procede pour realiser de maniere stochastique des planifications relatives a des installations et a des puits |
FR2855631A1 (fr) * | 2003-06-02 | 2004-12-03 | Inst Francais Du Petrole | Methode pour optimiser la production d'un gisement petrolier en presence d'incertitudes |
NL1024444C2 (nl) * | 2003-10-03 | 2005-04-08 | J O A Beheer B V | Werkwijze, inrichting, computerprogramma en gegevensdrager voor het met een digitale verwerkingseenheid modelleren van een meerdimensionale heterogene structuur. |
US8126689B2 (en) * | 2003-12-04 | 2012-02-28 | Halliburton Energy Services, Inc. | Methods for geomechanical fracture modeling |
US7844430B2 (en) * | 2004-01-30 | 2010-11-30 | Exxonmobil Upstream Research Co. | Reservoir model building methods |
US7783462B2 (en) * | 2004-01-30 | 2010-08-24 | Exxonmobil Upstream Research Co. | Reservoir evaluation methods |
GB2413403B (en) * | 2004-04-19 | 2008-01-09 | Halliburton Energy Serv Inc | Field synthesis system and method for optimizing drilling operations |
US7627461B2 (en) * | 2004-05-25 | 2009-12-01 | Chevron U.S.A. Inc. | Method for field scale production optimization by enhancing the allocation of well flow rates |
US20060045461A1 (en) * | 2004-08-06 | 2006-03-02 | Microsoft Corporation | Methods and apparatus for project management |
US7636671B2 (en) * | 2004-08-30 | 2009-12-22 | Halliburton Energy Services, Inc. | Determining, pricing, and/or providing well servicing treatments and data processing systems therefor |
US7870047B2 (en) * | 2004-09-17 | 2011-01-11 | International Business Machines Corporation | System, method for deploying computing infrastructure, and method for identifying customers at risk of revenue change |
US20060153005A1 (en) * | 2005-01-07 | 2006-07-13 | Herwanger Jorg V | Determination of anisotropic physical characteristics in and around reservoirs |
US7859943B2 (en) * | 2005-01-07 | 2010-12-28 | Westerngeco L.L.C. | Processing a seismic monitor survey |
US7596480B2 (en) * | 2005-04-14 | 2009-09-29 | Saudi Arabian Oil Company | Solution method and apparatus for large-scale simulation of layered formations |
BRPI0611500A2 (pt) | 2005-05-26 | 2011-02-22 | Exxonmobil Upstream Res Co | método para analisar a qualidade conectada de um reservatório de hidrocarbonetos |
US20070016389A1 (en) * | 2005-06-24 | 2007-01-18 | Cetin Ozgen | Method and system for accelerating and improving the history matching of a reservoir simulation model |
EA200800436A1 (ru) * | 2005-07-27 | 2008-08-29 | Эксонмобил Апстрим Рисерч Компани | Моделирование скважины, связанное с добычей углеводородов из подземных формаций |
CN101238465B (zh) | 2005-07-27 | 2010-10-27 | 埃克森美孚上游研究公司 | 与从地下岩层抽取碳氢化合物相关的井建模 |
WO2007018862A2 (fr) * | 2005-07-27 | 2007-02-15 | Exxonmobil Upstream Research Company | Modelisation de puits associee a l'extraction d'hydrocarbures dans des formations souterraines |
US7280918B2 (en) * | 2005-08-08 | 2007-10-09 | Knowledge Systems, Inc. | Method and system for combining seismic data and basin modeling |
US8145463B2 (en) * | 2005-09-15 | 2012-03-27 | Schlumberger Technology Corporation | Gas reservoir evaluation and assessment tool method and apparatus and program storage device |
EP1955253A4 (fr) * | 2005-11-21 | 2016-03-30 | Chevron Usa Inc | Procede d'optimisation de production a pleine echelle |
US7966164B2 (en) * | 2005-12-05 | 2011-06-21 | Shell Oil Company | Method for selecting enhanced oil recovery candidate |
US20070174154A1 (en) * | 2005-12-30 | 2007-07-26 | Halliburton Energy Services, Inc. | Methods and systems for aligning business interests |
BRPI0706580A2 (pt) * | 2006-01-20 | 2011-03-29 | Landmark Graphics Corp | gerenciamento dinámico de sistema de produção |
EP1982046B1 (fr) * | 2006-01-31 | 2011-03-30 | Landmark Graphics Corporation | Procédés, systèmes, et supports lisibles par ordinateur pour optimisation de production de champs de pétrole et de gaz en temps réel à l'aide d'un simulateur mandataire |
US8504341B2 (en) * | 2006-01-31 | 2013-08-06 | Landmark Graphics Corporation | Methods, systems, and computer readable media for fast updating of oil and gas field production models with physical and proxy simulators |
EP1984860B1 (fr) * | 2006-01-31 | 2022-06-15 | Landmark Graphics Corporation | Procédés, systèmes, et supports lisibles par ordinateur pour la mise à jour rapide de modèles de production de champs de pétrole et de gaz à l'aide de simulateurs physiques et mandataires |
US8812334B2 (en) * | 2006-02-27 | 2014-08-19 | Schlumberger Technology Corporation | Well planning system and method |
AU2007225358B2 (en) * | 2006-03-02 | 2012-11-15 | Exxonmobil Upstream Research Company | Method for quantifying reservoir connectivity using fluid travel times |
US7346457B2 (en) * | 2006-03-24 | 2008-03-18 | Schlumberger Technology Corporation | Method for identification of inhibited wells in the mature fields |
US7793718B2 (en) | 2006-03-30 | 2010-09-14 | Schlumberger Technology Corporation | Communicating electrical energy with an electrical device in a well |
US7712524B2 (en) | 2006-03-30 | 2010-05-11 | Schlumberger Technology Corporation | Measuring a characteristic of a well proximate a region to be gravel packed |
US8056619B2 (en) | 2006-03-30 | 2011-11-15 | Schlumberger Technology Corporation | Aligning inductive couplers in a well |
US8050867B2 (en) * | 2006-05-03 | 2011-11-01 | Exxonmobil Upstream Research Co. | Data adaptive vibratory source acquisition method |
WO2007130205A2 (fr) * | 2006-05-04 | 2007-11-15 | Exxonmobil Upstream Research Company | Analyse d'image par image avec des données électromagnétiques |
US7716028B2 (en) * | 2006-05-24 | 2010-05-11 | Schlumberger Technology Corporation | Method for modeling a reservoir using a 3D wettability map generated from a wettability logging tool |
US8620715B2 (en) * | 2006-06-10 | 2013-12-31 | Schlumberger Technology Corporation | Method including a field management framework for optimization of field development and planning and operation |
US8473268B2 (en) * | 2006-06-26 | 2013-06-25 | Exxonmobil Upstream Research Company | Method for comparing and back allocating production |
NO325315B1 (no) * | 2006-08-29 | 2008-03-25 | Abb As | Fremgangsmåte i et system for produksjon av olje og/eller gass |
US9043188B2 (en) * | 2006-09-01 | 2015-05-26 | Chevron U.S.A. Inc. | System and method for forecasting production from a hydrocarbon reservoir |
WO2008028122A2 (fr) * | 2006-09-01 | 2008-03-06 | Chevron U.S.A. Inc. | Procédé de mise en correspondance d'historiques et de quantification d'incertitude assisté par des techniques d'optimisation globale utilisant des proxies |
US20080065362A1 (en) * | 2006-09-08 | 2008-03-13 | Lee Jim H | Well completion modeling and management of well completion |
US7877246B2 (en) * | 2006-09-22 | 2011-01-25 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
US7895241B2 (en) * | 2006-10-16 | 2011-02-22 | Schlumberger Technology Corp. | Method and apparatus for oilfield data repository |
GB2457823B (en) * | 2006-10-30 | 2012-03-21 | Logined Bv | System and method for performing oilfield simulation operations |
US20100318337A1 (en) * | 2006-10-30 | 2010-12-16 | Bailey William J | Method, apparatus and system for modeled carbon sequestration |
BRPI0720188B1 (pt) | 2006-10-31 | 2018-10-16 | Exxonmobil Upstream Res Co | método de modelagem de um sistema de reservatório e meio de armazenamento legível por computador |
US8145464B2 (en) * | 2006-11-02 | 2012-03-27 | Schlumberger Technology Corporation | Oilfield operational system and method |
US20080114630A1 (en) * | 2006-11-15 | 2008-05-15 | Accenture Global Services Gmbh | Aerospace and defense program analysis tool |
US20080126168A1 (en) * | 2006-11-15 | 2008-05-29 | Schlumberger Technology Corporation | Oilfield management system |
US7860593B2 (en) * | 2007-05-10 | 2010-12-28 | Canrig Drilling Technology Ltd. | Well prog execution facilitation system and method |
US8078444B2 (en) | 2006-12-07 | 2011-12-13 | Schlumberger Technology Corporation | Method for performing oilfield production operations |
MX2009005902A (es) * | 2006-12-07 | 2009-06-19 | Logined Bv | Metodo para realizar operaciones de produccion de campo petrolero. |
US7953584B2 (en) * | 2006-12-07 | 2011-05-31 | Schlumberger Technology Corp | Method for optimal lift gas allocation |
US8122965B2 (en) * | 2006-12-08 | 2012-02-28 | Horton Wison Deepwater, Inc. | Methods for development of an offshore oil and gas field |
US8244471B2 (en) * | 2006-12-27 | 2012-08-14 | Schlumberger Technology Corporation | Oilfield analysis system and method |
US8086479B2 (en) * | 2006-12-29 | 2011-12-27 | Schlumberger Technology Corporation | Oilfield management system and method |
US7577527B2 (en) * | 2006-12-29 | 2009-08-18 | Schlumberger Technology Corporation | Bayesian production analysis technique for multistage fracture wells |
US7533725B2 (en) * | 2006-12-29 | 2009-05-19 | Schlumberger Technology Corp. | Method and system for altering pore pressure in a fracturing operation |
US7467044B2 (en) * | 2007-01-15 | 2008-12-16 | Chevron U.S.A. Inc | Method and system for assessing exploration prospect risk and uncertainty |
US7606666B2 (en) * | 2007-01-29 | 2009-10-20 | Schlumberger Technology Corporation | System and method for performing oilfield drilling operations using visualization techniques |
US8412500B2 (en) | 2007-01-29 | 2013-04-02 | Schlumberger Technology Corporation | Simulations for hydraulic fracturing treatments and methods of fracturing naturally fractured formation |
US9135475B2 (en) * | 2007-01-29 | 2015-09-15 | Sclumberger Technology Corporation | System and method for performing downhole stimulation operations |
US8131470B2 (en) * | 2007-02-26 | 2012-03-06 | Bp Exploration Operating Company Limited | Managing flow testing and the results thereof for hydrocarbon wells |
US8170801B2 (en) | 2007-02-26 | 2012-05-01 | Bp Exploration Operating Company Limited | Determining fluid rate and phase information for a hydrocarbon well using predictive models |
US7627430B2 (en) * | 2007-03-13 | 2009-12-01 | Schlumberger Technology Corporation | Method and system for managing information |
US8346695B2 (en) * | 2007-03-29 | 2013-01-01 | Schlumberger Technology Corporation | System and method for multiple volume segmentation |
US8014987B2 (en) * | 2007-04-13 | 2011-09-06 | Schlumberger Technology Corp. | Modeling the transient behavior of BHA/drill string while drilling |
US8688487B2 (en) * | 2007-04-18 | 2014-04-01 | Schlumberger Technology Corporation | Method and system for measuring technology maturity |
US8285531B2 (en) * | 2007-04-19 | 2012-10-09 | Smith International, Inc. | Neural net for use in drilling simulation |
US20080257544A1 (en) * | 2007-04-19 | 2008-10-23 | Baker Hughes Incorporated | System and Method for Crossflow Detection and Intervention in Production Wellbores |
US8117016B2 (en) * | 2007-04-19 | 2012-02-14 | Schlumberger Technology Corporation | System and method for oilfield production operations |
CA2614669C (fr) * | 2007-05-03 | 2008-12-30 | Imperial Oil Resources Limited | Processus ameliore permettant de recuperer un solvant d'asphaltene contenant un refus resultant d'un procede de separation |
BRPI0810840A2 (pt) * | 2007-05-09 | 2014-10-29 | Exxonmobil Upstream Res Co | Métodos para inversão de dados sísmicos de lapso de tempo e para produzir hidrocarbonetos a partir de uma formação em uma região de sub-superfície |
US7814989B2 (en) * | 2007-05-21 | 2010-10-19 | Schlumberger Technology Corporation | System and method for performing a drilling operation in an oilfield |
US8005658B2 (en) * | 2007-05-31 | 2011-08-23 | Schlumberger Technology Corporation | Automated field development planning of well and drainage locations |
US9175547B2 (en) * | 2007-06-05 | 2015-11-03 | Schlumberger Technology Corporation | System and method for performing oilfield production operations |
US20080319726A1 (en) | 2007-06-19 | 2008-12-25 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
CA2592725C (fr) * | 2007-06-26 | 2009-04-14 | Imperial Oil Resources Limited | Methode de decrassage des reservoirs dans le traitement de l'ecume paraffinique |
FR2918178B1 (fr) * | 2007-06-29 | 2009-10-09 | Inst Francais Du Petrole | Methode pour ajuster un modele de vitesse d'ondes sismiques en fonction d'informations relevees aux puits |
CA2691241C (fr) * | 2007-07-02 | 2014-03-25 | Schlumberger Canada Limited | Systeme et procede pour realiser des operations de simulation de champ petrolifere |
US8775141B2 (en) * | 2007-07-02 | 2014-07-08 | Schlumberger Technology Corporation | System and method for performing oilfield simulation operations |
WO2009012454A1 (fr) * | 2007-07-18 | 2009-01-22 | Chevron U.S.A. Inc. | Systèmes et procédés pour augmenter la sécurité et le rendement dans des opérations sur champ de pétrole |
US8214243B2 (en) * | 2007-07-18 | 2012-07-03 | Chevron U.S.A. Inc. | Systems and methods for managing large oil field operations |
CA2594205C (fr) * | 2007-07-20 | 2009-11-24 | Imperial Oil Resources Limited | Polymere au fluorocarbone applicable aux parois d'un reservoir ou d'une canalisation, utilise dans le traitement de l'ecume paraffinique pour reduire l'encrassement |
US8046314B2 (en) * | 2007-07-20 | 2011-10-25 | Schlumberger Technology Corporation | Apparatus, method and system for stochastic workflow in oilfield operations |
US8332194B2 (en) * | 2007-07-30 | 2012-12-11 | Schlumberger Technology Corporation | Method and system to obtain a compositional model of produced fluids using separator discharge data analysis |
CA2595336C (fr) * | 2007-07-31 | 2009-09-15 | Imperial Oil Resources Limited | Reduction de l'entrainement ou de l'etablissement de salissures dans le traitement de l'ecume paraffinique |
US8073800B2 (en) * | 2007-07-31 | 2011-12-06 | Schlumberger Technology Corporation | Valuing future information under uncertainty |
US8244509B2 (en) * | 2007-08-01 | 2012-08-14 | Schlumberger Technology Corporation | Method for managing production from a hydrocarbon producing reservoir in real-time |
US7900700B2 (en) * | 2007-08-02 | 2011-03-08 | Schlumberger Technology Corporation | Method and system for cleat characterization in coal bed methane wells for completion optimization |
FR2919932B1 (fr) * | 2007-08-06 | 2009-12-04 | Inst Francais Du Petrole | Methode pour evaluer un schema de production d'un gissement souterrain en tenant compte des incertitudes |
US20090149981A1 (en) * | 2007-08-14 | 2009-06-11 | Wayne Errol Evans | System and methods for continuous, online monitoring of a chemical plant or refinery |
WO2009024544A2 (fr) * | 2007-08-17 | 2009-02-26 | Shell Internationale Research Maatschappij B.V. | Procédé pour la mesure virtuelle de puits d'injection et l'affectation et la commande de puits d'injection à multiples zones |
US8768672B2 (en) | 2007-08-24 | 2014-07-01 | ExxonMobil. Upstream Research Company | Method for predicting time-lapse seismic timeshifts by computer simulation |
WO2009029133A1 (fr) * | 2007-08-24 | 2009-03-05 | Exxonmobil Upstream Research Company | Procédé d'analyse de modèle géomécanique à plusieurs échelles par simulation informatique |
US8265915B2 (en) * | 2007-08-24 | 2012-09-11 | Exxonmobil Upstream Research Company | Method for predicting well reliability by computer simulation |
US8548782B2 (en) | 2007-08-24 | 2013-10-01 | Exxonmobil Upstream Research Company | Method for modeling deformation in subsurface strata |
US9070172B2 (en) * | 2007-08-27 | 2015-06-30 | Schlumberger Technology Corporation | Method and system for data context service |
US8156131B2 (en) * | 2007-08-27 | 2012-04-10 | Schlumberger Technology Corporation | Quality measure for a data context service |
US20100191516A1 (en) * | 2007-09-07 | 2010-07-29 | Benish Timothy G | Well Performance Modeling In A Collaborative Well Planning Environment |
US8892221B2 (en) * | 2007-09-18 | 2014-11-18 | Groundswell Technologies, Inc. | Integrated resource monitoring system with interactive logic control for well water extraction |
US20090076632A1 (en) * | 2007-09-18 | 2009-03-19 | Groundswell Technologies, Inc. | Integrated resource monitoring system with interactive logic control |
US20090076873A1 (en) * | 2007-09-19 | 2009-03-19 | General Electric Company | Method and system to improve engineered system decisions and transfer risk |
US20110161133A1 (en) * | 2007-09-29 | 2011-06-30 | Schlumberger Technology Corporation | Planning and Performing Drilling Operations |
US8103493B2 (en) * | 2007-09-29 | 2012-01-24 | Schlumberger Technology Corporation | System and method for performing oilfield operations |
RU2486336C2 (ru) | 2007-11-01 | 2013-06-27 | Лоджинд Б.В. | Способы имитации разрыва пласта-коллектора и его оценки и считываемый компьютером носитель |
US8024123B2 (en) * | 2007-11-07 | 2011-09-20 | Schlumberger Technology Corporation | Subterranean formation properties prediction |
BRPI0817402A2 (pt) * | 2007-11-10 | 2019-09-24 | Landmark Graphics Corp A Halliburton Company | dispositivos e métodos para automação de fluxos de trabalho, adaptação e integração |
US8121790B2 (en) * | 2007-11-27 | 2012-02-21 | Schlumberger Technology Corporation | Combining reservoir modeling with downhole sensors and inductive coupling |
WO2009070365A1 (fr) * | 2007-11-27 | 2009-06-04 | Exxonmobil Upstream Research Company | Procédé pour déterminer les propriétés de réservoirs d'hydrocarbure à partir de données géophysiques |
US7668707B2 (en) * | 2007-11-28 | 2010-02-23 | Landmark Graphics Corporation | Systems and methods for the determination of active constraints in a network using slack variables and plurality of slack variable multipliers |
US20090151933A1 (en) * | 2007-12-12 | 2009-06-18 | Conocophillips Company | Lost profit reduction process and system |
CN101896690B (zh) | 2007-12-13 | 2015-02-18 | 埃克森美孚上游研究公司 | 使用非结构化网格的储层模拟上的并行自适应数据分区 |
US7878268B2 (en) * | 2007-12-17 | 2011-02-01 | Schlumberger Technology Corporation | Oilfield well planning and operation |
EP2235500B1 (fr) * | 2007-12-18 | 2018-10-31 | Exxonmobil Upstream Research Company | Détermination d'architecture de connectivité dans des données hétérogènes 2d et 3d |
FR2925726B1 (fr) * | 2007-12-20 | 2010-04-23 | Inst Francais Du Petrole | Methode pour optimiser l'exploitation d'un gisement de fluide par prise en compte d'un terme d'echange geologique et transitoire entre blocs matriciels et fractures |
US8751164B2 (en) * | 2007-12-21 | 2014-06-10 | Schlumberger Technology Corporation | Production by actual loss allocation |
US8738341B2 (en) * | 2007-12-21 | 2014-05-27 | Schlumberger Technology Corporation | Method for reservoir characterization and monitoring including deep reading quad combo measurements |
US8744817B2 (en) * | 2007-12-21 | 2014-06-03 | Schlumberger Technology Corporation | Method for upscaling a reservoir model using deep reading measurements |
CA2705340C (fr) | 2007-12-21 | 2016-09-27 | Exxonmobil Upstream Research Company | Procede et appareil pour analyser des donnees tridimensionnelles |
US20110087471A1 (en) * | 2007-12-31 | 2011-04-14 | Exxonmobil Upstream Research Company | Methods and Systems For Determining Near-Wellbore Characteristics and Reservoir Properties |
US8099267B2 (en) * | 2008-01-11 | 2012-01-17 | Schlumberger Technology Corporation | Input deck migrator for simulators |
US9074454B2 (en) * | 2008-01-15 | 2015-07-07 | Schlumberger Technology Corporation | Dynamic reservoir engineering |
EP2235566A1 (fr) * | 2008-01-22 | 2010-10-06 | Exxonmobil Upstream Research Company | Analyse de connectivité en dynamique |
US9223041B2 (en) | 2008-01-23 | 2015-12-29 | Schlubmerger Technology Corporation | Three-dimensional mechanical earth modeling |
US8255816B2 (en) * | 2008-01-25 | 2012-08-28 | Schlumberger Technology Corporation | Modifying a magnified field model |
US7894991B2 (en) * | 2008-02-01 | 2011-02-22 | Schlumberger Technology Corp. | Statistical determination of historical oilfield data |
WO2009099753A1 (fr) * | 2008-02-05 | 2009-08-13 | Schlumberger Canada Limited | Intégration de données de champ de pétrole |
US20090200210A1 (en) * | 2008-02-11 | 2009-08-13 | Hommema Scott E | Method Of Removing Solids From Bitumen Froth |
US7963327B1 (en) * | 2008-02-25 | 2011-06-21 | QRI Group, LLC | Method for dynamically assessing petroleum reservoir competency and increasing production and recovery through asymmetric analysis of performance metrics |
US8073665B2 (en) * | 2008-03-07 | 2011-12-06 | Schlumberger Technology Corporation | Analyzing an oilfield network for oilfield production |
AU2009223731B2 (en) | 2008-03-10 | 2013-09-05 | Exxonmobil Upstream Research Company | Method for determing distinct alternative paths between two object sets in 2-D and 3-D heterogeneous data |
US8705318B2 (en) | 2008-03-10 | 2014-04-22 | Schlumberger Technology Corporation | Data aggregation for drilling operations |
US20090234623A1 (en) * | 2008-03-12 | 2009-09-17 | Schlumberger Technology Corporation | Validating field data |
US8285532B2 (en) * | 2008-03-14 | 2012-10-09 | Schlumberger Technology Corporation | Providing a simplified subterranean model |
EA018594B1 (ru) * | 2008-03-20 | 2013-09-30 | Бп Корпорейшн Норт Америка Инк. | Способ и система для сбора и обработки данных о скважине |
US8592351B2 (en) * | 2008-03-20 | 2013-11-26 | Exxonmobil Upstream Research Company | Enhancing emulsion stability |
US8803878B2 (en) * | 2008-03-28 | 2014-08-12 | Schlumberger Technology Corporation | Visualizing region growing in three dimensional voxel volumes |
US10552391B2 (en) | 2008-04-04 | 2020-02-04 | Landmark Graphics Corporation | Systems and methods for real time data management in a collaborative environment |
CN101990659B (zh) | 2008-04-04 | 2014-08-20 | 兰德马克绘图国际公司,哈里伯顿公司 | 关联元数据模型表示和资产逻辑模型表示的系统及方法 |
US8793111B2 (en) | 2009-01-20 | 2014-07-29 | Schlumberger Technology Corporation | Automated field development planning |
US8527248B2 (en) | 2008-04-18 | 2013-09-03 | Westerngeco L.L.C. | System and method for performing an adaptive drilling operation |
US7966166B2 (en) * | 2008-04-18 | 2011-06-21 | Schlumberger Technology Corp. | Method for determining a set of net present values to influence the drilling of a wellbore and increase production |
WO2009131762A2 (fr) * | 2008-04-22 | 2009-10-29 | Exxonmobil Upstream Research Company | Analyse de connaissances à base fonctionnelle dans un environnement visuel 2d et 3d |
US8185311B2 (en) * | 2008-04-22 | 2012-05-22 | Schlumberger Technology Corporation | Multiuser oilfield domain analysis and data management |
US8898017B2 (en) * | 2008-05-05 | 2014-11-25 | Bp Corporation North America Inc. | Automated hydrocarbon reservoir pressure estimation |
WO2009137181A1 (fr) | 2008-05-05 | 2009-11-12 | Exxonmobil Upstream Research Company | Systèmes, procédés et produits de programme informatique pour modéliser des systèmes dynamiques en visualisant un espace de paramètres et en réduisant cet espace de paramètres |
US9733388B2 (en) | 2008-05-05 | 2017-08-15 | Exxonmobil Upstream Research Company | Systems and methods for connectivity analysis using functional objects |
EA201071348A1 (ru) * | 2008-05-22 | 2011-06-30 | Эксонмобил Апстрим Рисерч Компани | Способы регулирования притока текучей среды в многозонных интервалах |
US7924001B2 (en) * | 2008-05-23 | 2011-04-12 | Schlumberger Technology Corp. | Determination of oil viscosity and continuous gas oil ratio from nuclear magnetic resonance logs |
US8527203B2 (en) | 2008-05-27 | 2013-09-03 | Schlumberger Technology Corporation | Method for selecting well measurements |
US8095349B2 (en) * | 2008-05-30 | 2012-01-10 | Kelkar And Associates, Inc. | Dynamic updating of simulation models |
US8825408B2 (en) * | 2008-06-13 | 2014-09-02 | Schlumberger Technology Corporation | Using models for equilibrium distributions of asphaltenes in the prescence of GOR gradients to determine sampling procedures |
US9488044B2 (en) | 2008-06-23 | 2016-11-08 | Schlumberger Technology Corporation | Valuing future well test under uncertainty |
US9830563B2 (en) | 2008-06-27 | 2017-11-28 | International Business Machines Corporation | System and method for managing legal obligations for data |
US8252170B2 (en) | 2008-06-27 | 2012-08-28 | Exxonmobil Upstream Research Company | Optimizing feed mixer performance in a paraffinic froth treatment process |
US8515924B2 (en) | 2008-06-30 | 2013-08-20 | International Business Machines Corporation | Method and apparatus for handling edge-cases of event-driven disposition |
US8484069B2 (en) * | 2008-06-30 | 2013-07-09 | International Business Machines Corporation | Forecasting discovery costs based on complex and incomplete facts |
US7873476B2 (en) * | 2008-07-02 | 2011-01-18 | Chevron U.S.A. Inc. | Well log correlation |
WO2010002680A1 (fr) * | 2008-07-03 | 2010-01-07 | Schlumberger Canada Limited | Génération d'estimation de récupération supplémentaire dans le cadre d'un procédé sélectionné de récupération assistée du pétrole (eor) |
US8670966B2 (en) * | 2008-08-04 | 2014-03-11 | Schlumberger Technology Corporation | Methods and systems for performing oilfield production operations |
US8499829B2 (en) * | 2008-08-22 | 2013-08-06 | Schlumberger Technology Corporation | Oilfield application framework |
US8260595B2 (en) * | 2008-09-02 | 2012-09-04 | Schlumberger Technology Corporation | Intelligent completion design for a reservoir |
US20100076740A1 (en) * | 2008-09-08 | 2010-03-25 | Schlumberger Technology Corporation | System and method for well test design and interpretation |
US8533152B2 (en) * | 2008-09-18 | 2013-09-10 | University Of Southern California | System and method for data provenance management |
US8145428B1 (en) | 2008-09-29 | 2012-03-27 | QRI Group, LLC | Assessing petroleum reservoir reserves and potential for increasing ultimate recovery |
US8145427B1 (en) | 2008-09-29 | 2012-03-27 | QRI Group, LLC | Assessing petroleum reservoir production and potential for increasing production rate |
US8892407B2 (en) * | 2008-10-01 | 2014-11-18 | Exxonmobil Upstream Research Company | Robust well trajectory planning |
US8280709B2 (en) * | 2008-10-03 | 2012-10-02 | Schlumberger Technology Corporation | Fully coupled simulation for fluid flow and geomechanical properties in oilfield simulation operations |
US9228415B2 (en) * | 2008-10-06 | 2016-01-05 | Schlumberger Technology Corporation | Multidimensional data repository for modeling oilfield operations |
US8306842B2 (en) * | 2008-10-16 | 2012-11-06 | Schlumberger Technology Corporation | Project planning and management |
AU2009311619B2 (en) * | 2008-11-06 | 2015-10-01 | Exxonmobil Upstream Research Company | System and method for planning a drilling operation |
US8374836B2 (en) * | 2008-11-12 | 2013-02-12 | Geoscape Analytics, Inc. | Methods and systems for constructing and using a subterranean geomechanics model spanning local to zonal scale in complex geological environments |
CA2743479C (fr) | 2008-11-14 | 2016-06-28 | Exxonmobil Upstream Research Company | Formation d'un modele d'une region du sous-sol |
US8301426B2 (en) * | 2008-11-17 | 2012-10-30 | Landmark Graphics Corporation | Systems and methods for dynamically developing wellbore plans with a reservoir simulator |
US8666717B2 (en) * | 2008-11-20 | 2014-03-04 | Exxonmobil Upstream Resarch Company | Sand and fluid production and injection modeling methods |
CN102246060B (zh) * | 2008-12-16 | 2014-07-30 | 埃克森美孚上游研究公司 | 用于优化油气层开发和管理的系统和方法 |
EP2376946A4 (fr) | 2008-12-17 | 2017-02-22 | Exxonmobil Upstream Research Company | Système et procédé de reconstruction de données répétitives |
EP2376944A4 (fr) | 2008-12-17 | 2017-02-22 | Exxonmobil Upstream Research Company | Procédé d'imagerie de réflecteurs visés |
AU2009333602B2 (en) | 2008-12-17 | 2014-07-24 | Exxonmobil Upstream Research Company | System and method for performing time-lapse monitor surveying using sparse monitor data |
US8352228B2 (en) * | 2008-12-23 | 2013-01-08 | Exxonmobil Upstream Research Company | Method for predicting petroleum expulsion |
US9552462B2 (en) * | 2008-12-23 | 2017-01-24 | Exxonmobil Upstream Research Company | Method for predicting composition of petroleum |
BRPI1006862B1 (pt) | 2009-01-13 | 2020-03-17 | Exxonmobil Upstream Research Company | Método e sistema para otimização de tomada de decisão para um poço de hidrocarbonetos, e, sistema associado com a produção de hidrocarbonetos |
CN102341729A (zh) * | 2009-03-05 | 2012-02-01 | 埃克森美孚上游研究公司 | 考虑不确定性优化储层性能 |
AU2009341850A1 (en) | 2009-03-13 | 2011-09-29 | Exxonmobil Upstream Research Company | Method for predicting fluid flow |
US20100243243A1 (en) * | 2009-03-31 | 2010-09-30 | Schlumberger Technology Corporation | Active In-Situ Controlled Permanent Downhole Device |
US20100257004A1 (en) * | 2009-04-01 | 2010-10-07 | Chervon U.S.A. Inc. | Method and system for conducting geologic basin analysis |
US20100256964A1 (en) * | 2009-04-07 | 2010-10-07 | Schlumberger Technology Corporation | System and technique to quantify a fracture system |
ES2792357T3 (es) | 2009-04-20 | 2020-11-11 | Exxonmobil Upstream Res Co | Procedimiento para predecir el flujo de fluido |
US20100299123A1 (en) * | 2009-05-21 | 2010-11-25 | Schlumberger Technology Corporation | Well placement in a volume |
US8463585B2 (en) * | 2009-05-22 | 2013-06-11 | Baker Hughes Incorporated | Apparatus and method for modeling well designs and well performance |
US8332154B2 (en) | 2009-06-02 | 2012-12-11 | Exxonmobil Upstream Research Company | Estimating reservoir properties from 4D seismic data |
US8781747B2 (en) * | 2009-06-09 | 2014-07-15 | Schlumberger Technology Corporation | Method of determining parameters of a layered reservoir |
WO2011002473A1 (fr) * | 2009-07-01 | 2011-01-06 | Halliburton Energy Services | Estimation de la teneur en minéraux à partir de données géochimiques |
CA2672004C (fr) | 2009-07-14 | 2012-03-27 | Imperial Oil Resources Limited | Materiel d'alimentation pour recipient de separation solides- liquides |
US9129256B2 (en) * | 2009-07-24 | 2015-09-08 | Oracle International Corporation | Enabling collaboration on a project plan |
US9043189B2 (en) * | 2009-07-29 | 2015-05-26 | ExxonMobil Upstream Research—Law Department | Space-time surrogate models of subterranean regions |
US8306801B2 (en) * | 2009-08-12 | 2012-11-06 | Schlumberger Technology Corporation | Virtual reservoir sensor |
US8548783B2 (en) | 2009-09-17 | 2013-10-01 | Chevron U.S.A. Inc. | Computer-implemented systems and methods for controlling sand production in a geomechanical reservoir system |
US9482077B2 (en) * | 2009-09-22 | 2016-11-01 | Baker Hughes Incorporated | Method for controlling fluid production from a wellbore by using a script |
US20110067882A1 (en) * | 2009-09-22 | 2011-03-24 | Baker Hughes Incorporated | System and Method for Monitoring and Controlling Wellbore Parameters |
US8756038B2 (en) * | 2009-10-05 | 2014-06-17 | Schlumberger Technology Corporation | Method, system and apparatus for modeling production system network uncertainty |
US8839850B2 (en) | 2009-10-07 | 2014-09-23 | Schlumberger Technology Corporation | Active integrated completion installation system and method |
US9085957B2 (en) | 2009-10-07 | 2015-07-21 | Exxonmobil Upstream Research Company | Discretized physics-based models and simulations of subterranean regions, and methods for creating and using the same |
EP2491431A1 (fr) | 2009-10-20 | 2012-08-29 | Exxonmobil Upstream Research Company | Procédé d'évaluation quantitative de la connectivité pour des paires de puits à des fréquences variables |
EP2499567A4 (fr) | 2009-11-12 | 2017-09-06 | Exxonmobil Upstream Research Company | Procédé et appareil de modélisation et de simulation de réservoirs |
US9176245B2 (en) | 2009-11-25 | 2015-11-03 | Halliburton Energy Services, Inc. | Refining information on subterranean fractures |
US8898044B2 (en) * | 2009-11-25 | 2014-11-25 | Halliburton Energy Services, Inc. | Simulating subterranean fracture propagation |
US20110131201A1 (en) * | 2009-11-30 | 2011-06-02 | Universal Carbon Control Technology Co., Ltd. | Supply Chain Digital Map Management System and Integrating Method Therefor |
BR112012012817A2 (pt) | 2009-11-30 | 2020-08-11 | Exxonmobil Upstream Research Company | método de newton adaptativo para simulação de reservatório |
US8469090B2 (en) * | 2009-12-01 | 2013-06-25 | Schlumberger Technology Corporation | Method for monitoring hydrocarbon production |
WO2011071651A1 (fr) | 2009-12-07 | 2011-06-16 | Exxonmobil Upstream Research Company | Surveillance de solvants dans des processus de récupération de pétrole brut lourd utilisant des solvants |
US8613312B2 (en) | 2009-12-11 | 2013-12-24 | Technological Research Ltd | Method and apparatus for stimulating wells |
US8655856B2 (en) * | 2009-12-22 | 2014-02-18 | International Business Machines Corporation | Method and apparatus for policy distribution |
CA2784910A1 (fr) * | 2010-01-20 | 2011-07-28 | Shell Internationale Research Maatschappij B.V. | Systemes et procedes de production de petrole et/ou de gaz |
EP2531951A2 (fr) * | 2010-02-02 | 2012-12-12 | Conocophillips Company | Résolveur d'agrégation-percolation multi-niveau pour simulations de réservoir de pétrole |
AU2010345083B2 (en) | 2010-02-03 | 2016-03-10 | Exxonmobil Upstream Research Company | Method for using dynamic target region for well path/drill center optimization |
CA2783977C (fr) | 2010-02-12 | 2018-11-20 | Exxonmobil Upstream Research Company | Procede et systeme de partitionnement de modeles de simulation parallele |
EP2534606B1 (fr) | 2010-02-12 | 2019-02-27 | Exxonmobil Upstream Research Company | Procédé et programme d'ordinateur de création de modèles de simulation mis en correspondance avec un historique et procédé correspondant de production d'hydrocarbures d'un champ d'yhdrocarbures |
CA2693640C (fr) | 2010-02-17 | 2013-10-01 | Exxonmobil Upstream Research Company | Separation a l'aide d'un solvant dans un procede d'extraction recourant principalement a l'injection de solvants |
US9367564B2 (en) | 2010-03-12 | 2016-06-14 | Exxonmobil Upstream Research Company | Dynamic grouping of domain objects via smart groups |
CA2696638C (fr) | 2010-03-16 | 2012-08-07 | Exxonmobil Upstream Research Company | Utilisation d'une emulsion dont la phase externe est un solvant pour la recuperation in situ de petrole |
CN102870087B (zh) | 2010-04-30 | 2016-11-09 | 埃克森美孚上游研究公司 | 流体有限体积仿真的方法和系统 |
US8775142B2 (en) | 2010-05-14 | 2014-07-08 | Conocophillips Company | Stochastic downscaling algorithm and applications to geological model downscaling |
US9243476B2 (en) | 2010-05-19 | 2016-01-26 | Schlumberger Technology Corporation | System and method for simulating oilfield operations |
CA2705643C (fr) | 2010-05-26 | 2016-11-01 | Imperial Oil Resources Limited | Optimisation du processus de recuperation domine par un solvant |
BR112012032052A2 (pt) | 2010-06-15 | 2016-11-08 | Exxonmobil Upstream Res Co | método e sistema para estabilizr métodos de formulação. |
US8412501B2 (en) * | 2010-06-16 | 2013-04-02 | Foroil | Production simulator for simulating a mature hydrocarbon field |
US8532968B2 (en) * | 2010-06-16 | 2013-09-10 | Foroil | Method of improving the production of a mature gas or oil field |
US8463586B2 (en) | 2010-06-22 | 2013-06-11 | Saudi Arabian Oil Company | Machine, program product, and computer-implemented method to simulate reservoirs as 2.5D unstructured grids |
US8566903B2 (en) | 2010-06-29 | 2013-10-22 | International Business Machines Corporation | Enterprise evidence repository providing access control to collected artifacts |
US9754056B2 (en) | 2010-06-29 | 2017-09-05 | Exxonmobil Upstream Research Company | Method and system for parallel simulation models |
US8832148B2 (en) | 2010-06-29 | 2014-09-09 | International Business Machines Corporation | Enterprise evidence repository |
WO2012015515A1 (fr) | 2010-07-29 | 2012-02-02 | Exxonmobil Upstream Research Company | Procédés et systèmes pour une simulation de flux par apprentissage automatique |
CA2803068C (fr) | 2010-07-29 | 2016-10-11 | Exxonmobil Upstream Research Company | Procede et systeme de modelisation d'un reservoir |
AU2011283193B2 (en) | 2010-07-29 | 2014-07-17 | Exxonmobil Upstream Research Company | Methods and systems for machine-learning based simulation of flow |
US9665836B2 (en) | 2010-08-10 | 2017-05-30 | X Systems, Llc | System and method for analyzing data |
US9176979B2 (en) | 2010-08-10 | 2015-11-03 | X Systems, Llc | System and method for analyzing data |
US9665916B2 (en) | 2010-08-10 | 2017-05-30 | X Systems, Llc | System and method for analyzing data |
US8849638B2 (en) | 2010-08-10 | 2014-09-30 | X Systems, Llc | System and method for analyzing data |
US9652726B2 (en) | 2010-08-10 | 2017-05-16 | X Systems, Llc | System and method for analyzing data |
CA2808078C (fr) | 2010-08-24 | 2018-10-23 | Exxonmobil Upstream Research Company | Systeme et procede de planification d'une trajectoire de puits |
US8838695B2 (en) * | 2010-08-26 | 2014-09-16 | Bp Corporation North America Inc. | Hydrocarbon well information portal |
US8386227B2 (en) | 2010-09-07 | 2013-02-26 | Saudi Arabian Oil Company | Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation |
US8433551B2 (en) | 2010-11-29 | 2013-04-30 | Saudi Arabian Oil Company | Machine, computer program product and method to carry out parallel reservoir simulation |
EP2614461A4 (fr) * | 2010-09-10 | 2018-05-09 | Exxonmobil Upstream Research Company | Système et procédé pour visualisation simultanée d'un écoulement de fluide dans des complétions de puits et un réservoir |
EP2431767A3 (fr) | 2010-09-17 | 2016-11-30 | Services Pétroliers Schlumberger | Ingénierie sous-marine dynamique |
GB2502432B (en) | 2010-09-20 | 2018-08-01 | Exxonmobil Upstream Res Co | Flexible and adaptive formulations for complex reservoir simulations |
CA2714842C (fr) | 2010-09-22 | 2012-05-29 | Imperial Oil Resources Limited | Methode de surveillance de la qualite du bitume durant son extraction au moyen d'un solvant |
US10428626B2 (en) | 2010-10-18 | 2019-10-01 | Schlumberger Technology Corporation | Production estimation in subterranean formations |
US8788252B2 (en) * | 2010-10-26 | 2014-07-22 | Schlumberger Technology Corporation | Multi-well time-lapse nodal analysis of transient production systems |
US8781879B2 (en) * | 2010-11-04 | 2014-07-15 | Schlumberger Technology Corporation | System and method of facilitating petroleum engineering analysis |
MX343535B (es) * | 2010-11-18 | 2016-11-09 | Suncor Energy Inc | Procedimiento para determinar la saturacion de agua libre en una formacion de deposito. |
US9626466B2 (en) * | 2010-11-23 | 2017-04-18 | Exxonmobil Upstream Research Company | Variable discretization method for flow simulation on complex geological models |
KR101148835B1 (ko) * | 2010-11-29 | 2012-05-29 | 한국지질자원연구원 | 물리검층 자료의 통계분석을 이용한 오일샌드 저류층 암상 예측방법 및 이를 구현하는 시스템 |
MX2013006155A (es) * | 2010-11-30 | 2014-10-24 | Landmark Graphics Corp | Sistemas y metodos para reducir el tiempo de ejecucion de un modelo simulador de deposito. |
WO2012078238A1 (fr) * | 2010-12-09 | 2012-06-14 | Exxonmobil Upstream Company | Système de conception optimale pour la planification d'un développement de ressources d'hydrocarbures |
CA2821003A1 (fr) * | 2010-12-10 | 2012-06-14 | Conocophillips Company | Modele de criblage utilisable en vue de l'amelioration de l'extraction du petrole |
WO2012087864A2 (fr) * | 2010-12-20 | 2012-06-28 | Schlumberger Technology Coproration | Procédé d'utilisation des données relatives aux formations souterraines pour améliorer les opérations de traitement |
US9229603B2 (en) * | 2010-12-28 | 2016-01-05 | Schlumberger Technology Corporation | Methods, systems, apparatuses, and computer-readable mediums for provisioning petrotechnical workflows in a cloud computing environment |
US20130140031A1 (en) * | 2010-12-30 | 2013-06-06 | Schlumberger Technology Corporation | System and method for performing optimized downhole stimulation operations |
GB2500332B (en) * | 2010-12-30 | 2018-10-24 | Schlumberger Holdings | System and method for performing downhole stimulation operations |
AU2011356658B2 (en) | 2011-01-26 | 2017-04-06 | Exxonmobil Upstream Research Company | Method of reservoir compartment analysis using topological structure in 3D earth model |
US8994549B2 (en) * | 2011-01-28 | 2015-03-31 | Schlumberger Technology Corporation | System and method of facilitating oilfield operations utilizing auditory information |
US20120215364A1 (en) * | 2011-02-18 | 2012-08-23 | David John Rossi | Field lift optimization using distributed intelligence and single-variable slope control |
EP2678802A4 (fr) | 2011-02-21 | 2017-12-13 | Exxonmobil Upstream Research Company | Analyse de la connectivité d'un réservoir dans un modèle terrestre 3d |
US8924029B2 (en) * | 2011-02-23 | 2014-12-30 | Honeywell International Inc. | Apparatus and method for increasing the ultimate recovery of natural gas contained in shale and other tight gas reservoirs |
US10534871B2 (en) * | 2011-03-09 | 2020-01-14 | Schlumberger Technology Corporation | Method and systems for reservoir modeling, evaluation and simulation |
CA2734811C (fr) | 2011-03-29 | 2012-11-20 | Imperial Oil Resources Limited | Puits d'alimentation pour recipient de separation |
CN102812203B (zh) * | 2011-04-01 | 2016-04-13 | Qri集团有限责任公司 | 用于通过性能量度的非对称分析来动态地评估石油储集层能力并提高产量和采收率的方法 |
US9488047B2 (en) | 2011-04-04 | 2016-11-08 | Conocophillips Company | Reservoir calibration parameterization method |
US20120278053A1 (en) * | 2011-04-28 | 2012-11-01 | Baker Hughes Incorporated | Method of Providing Flow Control Devices for a Production Wellbore |
US9223594B2 (en) | 2011-07-01 | 2015-12-29 | Exxonmobil Upstream Research Company | Plug-in installer framework |
BR112014000727B1 (pt) * | 2011-07-11 | 2021-01-12 | Valmet Automation Oy | método, sistema e memória legível por computador para monitoramento de um processo industrial |
US20130056201A1 (en) * | 2011-09-02 | 2013-03-07 | William David Chandler, JR. | Method for evaluating hydrocarbon-containing subterrean formations penetrated by a directional wellbore |
WO2013039606A1 (fr) | 2011-09-15 | 2013-03-21 | Exxonmobil Upstream Research Company | Opérations matricielles et vectorielles optimisées dans des algorithmes à instructions limitées qui effectuent des calculs eos |
US9249559B2 (en) | 2011-10-04 | 2016-02-02 | Schlumberger Technology Corporation | Providing equipment in lateral branches of a well |
MX2014003947A (es) | 2011-10-06 | 2014-08-21 | Landmark Graphics Corp | Sistemas y metodo para la optimizacion de recuperacion de petroleo de subsuperficie. |
CN103975341B (zh) * | 2011-10-18 | 2017-03-15 | 沙特阿拉伯石油公司 | 基于4d饱和度模型和仿真模型的储层建模 |
WO2013059224A1 (fr) * | 2011-10-18 | 2013-04-25 | Saudi Arabian Oil Company | Modélisation de saturation 4d |
BR112014009734A2 (pt) * | 2011-10-20 | 2017-04-18 | Prad Res & Dev Ltd | método para controlar equipamentos de recuperação de hidrocarbonetos de um reservatório |
US10508520B2 (en) | 2011-10-26 | 2019-12-17 | QRI Group, LLC | Systems and methods for increasing recovery efficiency of petroleum reservoirs |
US9710766B2 (en) | 2011-10-26 | 2017-07-18 | QRI Group, LLC | Identifying field development opportunities for increasing recovery efficiency of petroleum reservoirs |
US9946986B1 (en) | 2011-10-26 | 2018-04-17 | QRI Group, LLC | Petroleum reservoir operation using geotechnical analysis |
US9767421B2 (en) | 2011-10-26 | 2017-09-19 | QRI Group, LLC | Determining and considering petroleum reservoir reserves and production characteristics when valuing petroleum production capital projects |
US20130110474A1 (en) | 2011-10-26 | 2013-05-02 | Nansen G. Saleri | Determining and considering a premium related to petroleum reserves and production characteristics when valuing petroleum production capital projects |
US20130110483A1 (en) * | 2011-10-31 | 2013-05-02 | Nikita V. Chugunov | Method for measurement screening under reservoir uncertainty |
US20140081613A1 (en) * | 2011-11-01 | 2014-03-20 | Austin Geomodeling, Inc. | Method, system and computer readable medium for scenario mangement of dynamic, three-dimensional geological interpretation and modeling |
US10450860B2 (en) | 2011-11-01 | 2019-10-22 | Schlumberger Technology Corporation | Integrating reservoir modeling with modeling a perturbation |
US20130116994A1 (en) * | 2011-11-03 | 2013-05-09 | International Business Machines Corporation | Water management |
US9644476B2 (en) | 2012-01-23 | 2017-05-09 | Schlumberger Technology Corporation | Structures having cavities containing coupler portions |
US9175560B2 (en) | 2012-01-26 | 2015-11-03 | Schlumberger Technology Corporation | Providing coupler portions along a structure |
US20130204534A1 (en) * | 2012-01-27 | 2013-08-08 | Schlumberger Technology Corporation | Method Of Estimating A Subterranean Formation Property |
US9938823B2 (en) | 2012-02-15 | 2018-04-10 | Schlumberger Technology Corporation | Communicating power and data to a component in a well |
US9753180B2 (en) | 2012-03-28 | 2017-09-05 | Exxonmobil Upstream Research Company | Method for multiphase flow upscaling |
US9595129B2 (en) | 2012-05-08 | 2017-03-14 | Exxonmobil Upstream Research Company | Canvas control for 3D data volume processing |
RU2596692C2 (ru) * | 2012-05-14 | 2016-09-10 | Лэндмарк Графикс Корпорейшн | Способ и система для оценки прогнозной добычи углеводородов |
AU2012381103B2 (en) * | 2012-05-30 | 2016-06-30 | Landmark Graphics Corporation | System and method for reservoir simulation optimization |
US20130325349A1 (en) * | 2012-05-31 | 2013-12-05 | Chevron U.S.A. Inc. | Methods for Generating Depofacies Classifications for Subsurface Oil or Gas Reservoirs or Fields |
US10036234B2 (en) | 2012-06-08 | 2018-07-31 | Schlumberger Technology Corporation | Lateral wellbore completion apparatus and method |
US9619592B2 (en) | 2012-08-31 | 2017-04-11 | Schlumberger Technology Corporation | Analysis of enhanced oil recovery (EOR) processes for naturally-fractured reservoirs |
US9835017B2 (en) * | 2012-09-24 | 2017-12-05 | Schlumberger Technology Corporation | Seismic monitoring system and method |
US20140088878A1 (en) * | 2012-09-27 | 2014-03-27 | Jinhong Chen | Isotherm and gas-in-place estimation considering capillary condensation in shale gas reservoir |
US10036829B2 (en) | 2012-09-28 | 2018-07-31 | Exxonmobil Upstream Research Company | Fault removal in geological models |
US20140129296A1 (en) * | 2012-11-07 | 2014-05-08 | Schlumberger Technology Corporation | Method and system for offering and procuring well services |
FR2997721B1 (fr) * | 2012-11-08 | 2015-05-15 | Storengy | Radonip : nouvelle methodologie de determination des courbes de productivite des puits d'exploitation de stockages et gisements de fluides compressibles |
US20140157172A1 (en) * | 2012-11-30 | 2014-06-05 | Drillmap | Geographic layout of petroleum drilling data and methods for processing data |
US10026133B2 (en) * | 2012-12-11 | 2018-07-17 | Landmark Graphics Corporation | Method and system of analyzing wells of a mature field |
US20150322775A1 (en) * | 2013-01-28 | 2015-11-12 | Halliburton Energy Services, Inc. | Systems and methods for monitoring wellbore fluids using microanalysis of real-time pumping data |
US9798042B2 (en) * | 2013-02-01 | 2017-10-24 | Halliburton Energy Services, Inc. | Simulating an injection treatment of a subterranean zone |
US9229127B2 (en) * | 2013-02-21 | 2016-01-05 | Saudi Arabian Oil Company | Methods program code, computer readable media, and apparatus for predicting matrix permeability by optimization and variance correction of K-nearest neighbors |
WO2014158906A1 (fr) * | 2013-03-14 | 2014-10-02 | Sandia Corporation | Procédés financiers pour conception de fluide injecté en injection d'eau |
EP2811107A1 (fr) * | 2013-06-06 | 2014-12-10 | Repsol, S.A. | Procédé de sélection et d'optimisation de commande de champ de pétrole d'un plateau de production |
BR112015030236B1 (pt) * | 2013-06-06 | 2021-10-05 | Shell Internationale Research Maatschappij B.V. | Método para avaliar um poço de águas profundas |
US10584570B2 (en) | 2013-06-10 | 2020-03-10 | Exxonmobil Upstream Research Company | Interactively planning a well site |
DE112013007213T5 (de) * | 2013-07-02 | 2016-04-28 | Landmark Graphics Corporation | 3D-Stadienalgorithmus für diskrete Gittererzeugung |
EP2823952A1 (fr) * | 2013-07-09 | 2015-01-14 | Siemens Aktiengesellschaft | Procédé d'adaptation et procédé de fabrication pour des composants fabriqués par SLM |
EP3033484B1 (fr) * | 2013-08-13 | 2023-03-15 | Services Pétroliers Schlumberger | Analyse numérique de la sensibilité de carottes |
SG11201600270SA (en) * | 2013-08-16 | 2016-02-26 | Landmark Graphics Corp | Determining and displaying reserve estimates for a reservoir |
US10378329B2 (en) | 2013-08-20 | 2019-08-13 | Nabors Drilling Technologies Usa, Inc. | Rig control system and methods |
US10689965B2 (en) * | 2013-08-26 | 2020-06-23 | Repsol, S.A. | Field development plan selection system, method and program product |
US20150062300A1 (en) * | 2013-08-30 | 2015-03-05 | Halliburton Energy Services, Inc. | Wormhole Structure Digital Characterization and Stimulation |
US9864098B2 (en) | 2013-09-30 | 2018-01-09 | Exxonmobil Upstream Research Company | Method and system of interactive drill center and well planning evaluation and optimization |
CA2923537A1 (fr) * | 2013-10-03 | 2015-04-09 | Landmark Graphics Corporation | Analyse de sensibilite pour modelisation de reservoir d'hydrocarbures |
US9569521B2 (en) | 2013-11-08 | 2017-02-14 | James W. Crafton | System and method for analyzing and validating oil and gas well production data |
BR112016007649A2 (pt) * | 2013-11-11 | 2017-08-01 | Halliburton Energy Services Inc | métodos para analisar completações de sistema de poço e projetar uma completação, e, sistema |
US9958571B2 (en) | 2013-12-30 | 2018-05-01 | Saudi Arabian Oil Company | Machines for reservoir simulation with automated well completions and reservoir grid data quality assurance |
CA2935421A1 (fr) | 2014-01-06 | 2015-07-09 | Schlumberger Canada Limited | Optimisation de conception de champ petrolifere multietapes en situation d'incertitude |
US9283674B2 (en) | 2014-01-07 | 2016-03-15 | Irobot Corporation | Remotely operating a mobile robot |
US10119396B2 (en) | 2014-02-18 | 2018-11-06 | Saudi Arabian Oil Company | Measuring behind casing hydraulic conductivity between reservoir layers |
US9417970B2 (en) * | 2014-02-27 | 2016-08-16 | Halliburton Energy Services, Inc. | Data file processing for a well job data archive |
WO2015138131A1 (fr) * | 2014-03-11 | 2015-09-17 | Exxonmobil Upstream Research Company | Outil de support de décision en se basant sur l'évaluation des risques pour le développement de réservoirs |
BR112016017623A2 (pt) * | 2014-03-12 | 2017-08-08 | Landmark Graphics Corp | Método para selecionar um local de perfuração, dispositivo de armazenamento legível por máquina não transitório, e, sistema |
US9957781B2 (en) * | 2014-03-31 | 2018-05-01 | Hitachi, Ltd. | Oil and gas rig data aggregation and modeling system |
CN103953854B (zh) * | 2014-04-02 | 2017-07-28 | 中国石油大学(北京) | 含蜡原油管道运行参数确定方法及装置 |
CA2943970A1 (fr) * | 2014-04-30 | 2015-11-05 | Landmark Graphics Corporation | Prevision de donnees de production pour puits existants et nouveaux |
US9945703B2 (en) | 2014-05-30 | 2018-04-17 | QRI Group, LLC | Multi-tank material balance model |
US11120371B2 (en) * | 2014-06-23 | 2021-09-14 | Sensia Netherlands B.V. | Systems and methods for cloud-based asset management and analysis regarding well devices |
FR3023316B1 (fr) * | 2014-07-04 | 2016-08-19 | Ifp Energies Now | Procede d'exploitation d'un gisement petrolier a partir d'une technique de positionnement des puits a forer |
US9816366B2 (en) * | 2014-07-14 | 2017-11-14 | Saudi Arabian Oil Company | Methods, systems, and computer medium having computer programs stored thereon to optimize reservoir management decisions |
WO2016018723A1 (fr) | 2014-07-30 | 2016-02-04 | Exxonmobil Upstream Research Company | Procédé de génération de maillage volumétrique dans un domaine ayant des propriétés de matériau hétérogènes |
US10359523B2 (en) | 2014-08-05 | 2019-07-23 | Exxonmobil Upstream Research Company | Exploration and extraction method and system for hydrocarbons |
US9951601B2 (en) | 2014-08-22 | 2018-04-24 | Schlumberger Technology Corporation | Distributed real-time processing for gas lift optimization |
US10443358B2 (en) | 2014-08-22 | 2019-10-15 | Schlumberger Technology Corporation | Oilfield-wide production optimization |
US10508532B1 (en) | 2014-08-27 | 2019-12-17 | QRI Group, LLC | Efficient recovery of petroleum from reservoir and optimized well design and operation through well-based production and automated decline curve analysis |
US10989039B2 (en) * | 2014-09-25 | 2021-04-27 | Total Se | Production of hydrocarbons with test separator |
BR112017006129B1 (pt) * | 2014-09-25 | 2022-05-03 | Total S.A. | Produção de hidrocarbonetos com contador métrico |
WO2016053238A1 (fr) * | 2014-09-29 | 2016-04-07 | Hewlett Packard Enterprise Development Lp | Évacuation de fluide de fracturation sur la base de mesures sismiques |
US10331288B2 (en) * | 2014-10-02 | 2019-06-25 | Schlumberger Technology Corporation | Method and system for generating oilfield objects |
US10221659B2 (en) * | 2014-10-08 | 2019-03-05 | Chevron U.S.A. Inc. | Automated well placement for reservoir evaluation |
US10288766B2 (en) * | 2014-10-09 | 2019-05-14 | Chevron U.S.A. Inc. | Conditioning of object or event based reservior models using local multiple-point statistics simulations |
EP3213125A1 (fr) | 2014-10-31 | 2017-09-06 | Exxonmobil Upstream Research Company Corp-urc-e2. 4A.296 | Procédés de gestion de discontinuité dans la construction d'espace de conception de modèle de subsurface faillée à l'aide de moindres carrés mobiles |
WO2016069171A1 (fr) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Gestion de discontinuité de domaine dans un modèle de grille de sous-surface à l'aide de techniques d'optimisation de grille |
CA2961923A1 (fr) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Gestion des discontinuites dans des modeles geologiques |
WO2016085483A1 (fr) * | 2014-11-26 | 2016-06-02 | Halliburton Energy Services, Inc. | Détermination de profondeur de zones de pertes dans des formations souterraines |
KR101639693B1 (ko) * | 2014-11-28 | 2016-07-14 | 공주대학교 산학협력단 | 탄산염 유전의 회수율 예측방법 및 이를 이용한 탄산염 유전 평가방법 |
RU2597229C2 (ru) * | 2014-12-09 | 2016-09-10 | Общество с ограниченной ответственностью "ТатАСУ" | Система идентификации межскважинных проводимостей |
US10392922B2 (en) | 2015-01-13 | 2019-08-27 | Saudi Arabian Oil Company | Measuring inter-reservoir cross flow rate between adjacent reservoir layers from transient pressure tests |
US10815758B2 (en) * | 2015-01-16 | 2020-10-27 | Schlumberger Technology Corporation | Oilfield service selector |
US10180057B2 (en) | 2015-01-21 | 2019-01-15 | Saudi Arabian Oil Company | Measuring inter-reservoir cross flow rate through unintended leaks in zonal isolation cement sheaths in offset wells |
CA2972391C (fr) * | 2015-01-30 | 2019-08-06 | Landmark Graphics Corporation | Architecture integree de parametres d'incertitude a priori dans la creation d'un modele de simulation |
GB2550820B (en) * | 2015-02-03 | 2020-10-28 | Geoquest Systems Bv | Enhanced oil recovery (EOR) chemical coreflood simulation study workflow |
US10094202B2 (en) | 2015-02-04 | 2018-10-09 | Saudi Arabian Oil Company | Estimating measures of formation flow capacity and phase mobility from pressure transient data under segregated oil and water flow conditions |
KR101647921B1 (ko) * | 2015-03-27 | 2016-08-12 | 서울대학교산학협력단 | 유·가스 저류층의 실제 가스 생산량에 유사한 저류층 모델을 선정하는 방법 및 이를 이용한 생산량 예측 방법 |
US10310136B2 (en) * | 2015-04-24 | 2019-06-04 | W.D. Von Gonten Laboratories Inc. | Lateral placement and completion design for improved well performance of unconventional reservoirs |
KR101658730B1 (ko) * | 2015-05-22 | 2016-09-22 | 동아대학교 산학협력단 | 지하저수지 주입 양수 계통의 최적 설계 방법 |
CN105257252A (zh) * | 2015-06-08 | 2016-01-20 | 中国石油集团川庆钻探工程有限公司 | 利用测井资料优选页岩气水平井分簇射孔井段的方法 |
US10502047B2 (en) * | 2015-06-30 | 2019-12-10 | Magnetic Variation Services LLC | Reservoir recovery simulation process and system |
CN106353804B (zh) * | 2015-07-14 | 2018-11-23 | 中国石油化工股份有限公司 | 河道储层的地震属性的预测方法 |
US10563914B2 (en) * | 2015-08-06 | 2020-02-18 | L'air Liquide Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude | Methods and systems for integration of industrial site efficiency losses to produce LNG and/or LIN |
US11578568B2 (en) * | 2015-08-07 | 2023-02-14 | Schlumberger Technology Corporation | Well management on cloud computing system |
WO2017039660A1 (fr) * | 2015-09-02 | 2017-03-09 | Hitachi, Ltd. | Procédé de calcul de matrice de distance composite à partir d'une multitude d'attributs de données |
CN105372716B (zh) * | 2015-10-28 | 2018-03-23 | 中国石油大学(华东) | 碳酸盐岩表生岩溶储层分布的评价方法 |
US10337315B2 (en) * | 2015-11-25 | 2019-07-02 | International Business Machines Corporation | Methods and apparatus for computing zonal flow rates in reservoir wells |
WO2017106867A1 (fr) * | 2015-12-18 | 2017-06-22 | Schlumberger Technology Corporation | Procédé de réalisation d'une perforation au moyen d'une diagraphie de contraintes sélective |
JP6461779B2 (ja) * | 2015-12-21 | 2019-01-30 | 株式会社日立製作所 | 計画調整システムおよび計画調整方法 |
KR101766917B1 (ko) * | 2015-12-23 | 2017-08-11 | 한국지질자원연구원 | 비투멘의 경제성 평가 장치 및 그 방법 |
WO2017120447A1 (fr) * | 2016-01-08 | 2017-07-13 | Nature Conservancy, The | Techniques de positionnement d'infrastructures énergétiques |
CN105719097A (zh) * | 2016-01-27 | 2016-06-29 | 中国石油化工股份有限公司 | 缝洞型油藏动态分析与注水管理系统 |
CA2958846C (fr) * | 2016-02-23 | 2020-10-27 | Suncor Energy Inc. | Production de produit d'hydrocarbure et rejet selectif d'hydrocarbures de mauvaise qualite provenant de matiere de bitume |
CA3013807C (fr) * | 2016-03-04 | 2021-11-16 | Ali H. Dogru | Modele de puits sequentiel entierement implicite avec structure de matrice tridiagonale pour simulation de reservoir |
WO2017165949A1 (fr) * | 2016-03-30 | 2017-10-05 | Nexen Energy Ulc | Procédés, systèmes et dispositifs permettant de modéliser les propriétés d'un réservoir |
US10713398B2 (en) | 2016-05-23 | 2020-07-14 | Saudi Arabian Oil Company | Iterative and repeatable workflow for comprehensive data and processes integration for petroleum exploration and production assessments |
US10423915B2 (en) * | 2016-06-02 | 2019-09-24 | Ge Oil & Gas Esp, Inc. | System and method for well lifecycle planning visualization |
US10458207B1 (en) | 2016-06-09 | 2019-10-29 | QRI Group, LLC | Reduced-physics, data-driven secondary recovery optimization |
US10590752B2 (en) | 2016-06-13 | 2020-03-17 | Saudi Arabian Oil Company | Automated preventive and predictive maintenance of downhole valves |
US10060227B2 (en) | 2016-08-02 | 2018-08-28 | Saudi Arabian Oil Company | Systems and methods for developing hydrocarbon reservoirs |
US11549355B2 (en) * | 2016-10-19 | 2023-01-10 | Halliburton Energy Services, Inc. | Avoiding geological formation boundaries during drilling operations |
US10678967B2 (en) * | 2016-10-21 | 2020-06-09 | International Business Machines Corporation | Adaptive resource reservoir development |
CA3039470C (fr) | 2016-12-07 | 2022-03-29 | Landmark Graphics Corporation | Reponse intelligente en temps reel a des changements d'equilibre de champ petrolifere |
EP3559401B1 (fr) | 2016-12-23 | 2023-10-18 | ExxonMobil Technology and Engineering Company | Procédé et système de simulation de réservoir stable et efficace à l'aide d'indicateurs de stabilité |
CN106640084B (zh) * | 2017-01-25 | 2018-05-01 | 中国地质大学(武汉) | 一种基于ggd理念的深部智能采矿方法 |
CN108729911A (zh) * | 2017-04-24 | 2018-11-02 | 通用电气公司 | 用于资源生产系统的优化装置、系统和方法 |
EP3625431B1 (fr) * | 2017-05-16 | 2022-12-07 | BP Corporation North America Inc. | Outils pour sélectionner et séquencer des changements de paramètres de fonctionnement pour commander un système de production d'hydrocarbures |
US11041976B2 (en) | 2017-05-30 | 2021-06-22 | Exxonmobil Upstream Research Company | Method and system for creating and using a subsurface model in hydrocarbon operations |
US10612370B2 (en) | 2017-08-01 | 2020-04-07 | Saudi Arabian Oil Company | Open smart completion |
SG11201911682WA (en) * | 2017-08-15 | 2020-02-27 | Exxonmobil Upstream Res Co | Reservoir materiality bounds from seismic inversion |
KR101819957B1 (ko) | 2017-09-15 | 2018-01-19 | 한국지질자원연구원 | 셰일가스 채취장치 및 그 채취방법 |
CN107762461B (zh) * | 2017-09-20 | 2019-09-06 | 中国石油天然气股份有限公司 | 一种聚合物驱采油技术风险评判方法 |
US10597988B2 (en) * | 2017-11-28 | 2020-03-24 | Saudi Arabian Oil Company | Systems and methods for operating downhole inflow control valves |
RU2670801C9 (ru) * | 2017-12-29 | 2018-11-26 | Публичное акционерное общество "Газпром нефть" | Система интегрированного концептуального проектирования месторождения углеводородов |
WO2019147689A1 (fr) | 2018-01-23 | 2019-08-01 | Baker Hughes, A Ge Company, Llc | Procédés d'évaluation de performance de forage, procédés d'amélioration de la performance de forage, et systèmes de forage associés utilisant de tels procédés |
CN110068862B (zh) * | 2018-01-24 | 2021-03-30 | 中国石油天然气股份有限公司 | 盐下超深断背斜油气藏优质储层的预测方法及装置 |
US11126762B2 (en) | 2018-02-28 | 2021-09-21 | Saudi Arabian Oil Company | Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration |
US11466554B2 (en) | 2018-03-20 | 2022-10-11 | QRI Group, LLC | Data-driven methods and systems for improving oil and gas drilling and completion processes |
US10914140B2 (en) | 2018-04-04 | 2021-02-09 | Sim Tech Llc | Systems, methods, and apparatus for discrete fracture simulation of complex subsurface fracture geometries |
US11506052B1 (en) | 2018-06-26 | 2022-11-22 | QRI Group, LLC | Framework and interface for assessing reservoir management competency |
US20200059539A1 (en) * | 2018-08-20 | 2020-02-20 | Landmark Graphics Corporation | Cloud-native reservoir simulation |
WO2020061195A2 (fr) * | 2018-09-19 | 2020-03-26 | Schlumberger Technology Corporation | Visualisation et interprétation d'écarts de plans |
WO2020065374A1 (fr) * | 2018-09-25 | 2020-04-02 | Abu Dhabi National Oil Company | Système de gestion intégrée de réservoirs |
US11321788B2 (en) | 2018-10-22 | 2022-05-03 | Schlumberger Technology Corporation | Systems and methods for rig scheduling with optimal fleet sizing |
CN109268005A (zh) * | 2018-10-30 | 2019-01-25 | 中国石油大学(华东) | 一种基于储层时变性的剩余油预测方法及工业化流程 |
US11506805B2 (en) | 2018-12-07 | 2022-11-22 | Sim Tech Llc | Systems, methods, and apparatus for transient flow simulation in complex subsurface fracture geometries |
WO2020122892A1 (fr) * | 2018-12-12 | 2020-06-18 | Halliburton Energy Services, Inc. | Analyse de gravité de trou de forage pour gestion de réservoir |
US10808517B2 (en) | 2018-12-17 | 2020-10-20 | Baker Hughes Holdings Llc | Earth-boring systems and methods for controlling earth-boring systems |
US11180976B2 (en) | 2018-12-21 | 2021-11-23 | Exxonmobil Upstream Research Company | Method and system for unconventional gas lift optimization |
KR102597540B1 (ko) | 2018-12-21 | 2023-11-03 | 동아대학교 산학협력단 | 인공신경망을 이용한 가스정 생산성을 고려한 플로우라인 네트워크 최적화 방법 |
US20200211127A1 (en) * | 2018-12-31 | 2020-07-02 | Exxonmobil Upstream Research Company | Methods and Systems for Performing Decision Scenario Analysis |
US11441556B2 (en) * | 2019-04-12 | 2022-09-13 | Accenture Global Solutions Limited | Utilizing analytical models to identify wells in which to install plunger lift for improved well production |
US20220178228A1 (en) * | 2019-04-25 | 2022-06-09 | Landmark Graphics Corporation | Systems and methods for determining grid cell count for reservoir simulation |
US11105944B2 (en) * | 2019-04-30 | 2021-08-31 | Chevron U.S.A. Inc. | System and method for lateral statistical estimation of rock and fluid properties in a subsurface formation |
US12012826B2 (en) | 2019-06-21 | 2024-06-18 | Schlumberger Technology Corporation | Field development planning based on deep reinforcement learning |
US11487032B2 (en) * | 2019-07-16 | 2022-11-01 | Saudi Arabian Oil Company | Characterizing low-permeability reservoirs by using numerical models of short-time well test data |
CN110609319B (zh) * | 2019-08-20 | 2021-12-10 | 中国石油大学(华东) | 一种利用沉积正演模拟建立时间域层序地层剖面的方法 |
US11591936B2 (en) | 2019-09-04 | 2023-02-28 | Saudi Arabian Oil Company | Systems and methods for proactive operation of process facilities based on historical operations data |
US11372123B2 (en) | 2019-10-07 | 2022-06-28 | Exxonmobil Upstream Research Company | Method for determining convergence in full wavefield inversion of 4D seismic data |
CN110700821B (zh) * | 2019-10-24 | 2023-03-07 | 中国海洋石油集团有限公司 | 海上储层连通性评价方法及其在储量计算的应用 |
CA3159346A1 (fr) | 2019-10-28 | 2021-05-06 | Schlumberger Canada Limited | Systeme et procede de recommandation d'activite de forage |
US11442974B2 (en) * | 2019-11-01 | 2022-09-13 | Chevron U.S.A. Inc. | Aggregation and presentation of information for well analysis |
CN110821453B (zh) * | 2019-11-07 | 2021-11-23 | 成都北方石油勘探开发技术有限公司 | 基于三维地质数值模型的注气油藏开发方案设计方法 |
EP4065815A4 (fr) | 2019-11-25 | 2023-12-06 | Cold Bore Technology Inc. | Détection automatisée de complétions de bouchon et de perforation, de têtes de puits et d'état de fonctionnement de site de forage |
US11846278B2 (en) * | 2019-12-31 | 2023-12-19 | Schneider Electric Systems Usa, Inc. | Systems and methods for centralized optimization of reservoir production |
US11754746B2 (en) | 2020-02-21 | 2023-09-12 | Saudi Arabian Oil Company | Systems and methods for creating 4D guided history matched models |
US11815650B2 (en) | 2020-04-09 | 2023-11-14 | Saudi Arabian Oil Company | Optimization of well-planning process for identifying hydrocarbon reserves using an integrated multi-dimensional geological model |
US11486230B2 (en) | 2020-04-09 | 2022-11-01 | Saudi Arabian Oil Company | Allocating resources for implementing a well-planning process |
US11693140B2 (en) | 2020-04-09 | 2023-07-04 | Saudi Arabian Oil Company | Identifying hydrocarbon reserves of a subterranean region using a reservoir earth model that models characteristics of the region |
US11180982B2 (en) | 2020-04-21 | 2021-11-23 | Saudi Arabian Oil Company | Systems and methods to safeguard well integrity from hydraulic fracturing |
US11231520B2 (en) | 2020-05-06 | 2022-01-25 | Saudi Arabian Oil Company | Dynamic hydrocarbon well skin modeling and operation |
US11352873B2 (en) | 2020-05-11 | 2022-06-07 | Saudi Arabian Oil Company | System and method to identify water management candidates at asset level |
US11802989B2 (en) * | 2020-05-11 | 2023-10-31 | Saudi Arabian Oil Company | Systems and methods for generating vertical and lateral heterogeneity indices of reservoirs |
US11549359B2 (en) * | 2020-05-11 | 2023-01-10 | Saudi Arabian Oil Company | Systems and methods to identify and quantify field development opportunities through integration of surface and sub-surface data |
US11867054B2 (en) | 2020-05-11 | 2024-01-09 | Saudi Arabian Oil Company | Systems and methods for estimating well parameters and drilling wells |
US11713666B2 (en) | 2020-05-11 | 2023-08-01 | Saudi Arabian Oil Company | Systems and methods for determining fluid saturation associated with reservoir depths |
US11193370B1 (en) | 2020-06-05 | 2021-12-07 | Saudi Arabian Oil Company | Systems and methods for transient testing of hydrocarbon wells |
US11320555B2 (en) | 2020-06-08 | 2022-05-03 | Sim Tech Llc | Systems and methods for calibration of indeterministic subsurface discrete fracture network models |
RU2738558C1 (ru) * | 2020-06-10 | 2020-12-14 | Публичное акционерное общество «Татнефть» имени В.Д. Шашина | Способ разработки низкопроницаемых коллекторов |
US11692415B2 (en) | 2020-06-22 | 2023-07-04 | Saudi Arabian Oil Company | Hydrocarbon well stimulation based on skin profiles |
US11790320B2 (en) * | 2020-06-25 | 2023-10-17 | Schlumberger Technology Corporation | Approaches to creating and evaluating multiple candidate well plans |
US11341830B2 (en) | 2020-08-06 | 2022-05-24 | Saudi Arabian Oil Company | Infrastructure construction digital integrated twin (ICDIT) |
CN111946311B (zh) * | 2020-08-13 | 2022-04-22 | 海默潘多拉数据科技(深圳)有限公司 | 分注分采仿真模拟方法 |
CN111878074A (zh) * | 2020-08-24 | 2020-11-03 | 西南石油大学 | 一种页岩油藏开发方案的优选方法 |
CN112199456B (zh) * | 2020-09-17 | 2022-03-25 | 西南科技大学 | 一种基于供给型水文生态系统服务的流域水资源管理方法 |
RU2758278C1 (ru) * | 2020-12-07 | 2021-10-28 | Общество С Ограниченной Ответственностью "Газпром Добыча Надым" | Способ добычи природного газа на поздней стадии разработки месторождения |
US11668847B2 (en) | 2021-01-04 | 2023-06-06 | Saudi Arabian Oil Company | Generating synthetic geological formation images based on rock fragment images |
CN112727440B (zh) * | 2021-01-11 | 2022-02-01 | 西南石油大学 | 一种基于钻时数据的缝洞性油气藏的储层识别方法 |
US20220228483A1 (en) * | 2021-01-20 | 2022-07-21 | Saudi Arabian Oil Company | Systems and methods for updating reservoir static models |
US11687053B2 (en) | 2021-03-08 | 2023-06-27 | Saudi Arabian Oil Company | Intelligent safety motor control center (ISMCC) |
US11674379B2 (en) | 2021-03-11 | 2023-06-13 | Saudi Arabian Oil Company | Method and system for managing gas supplies |
CN113065705B (zh) * | 2021-04-07 | 2023-12-08 | 中海石油(中国)有限公司 | 海上薄互层砂岩油藏多层合采加密井可采储量预测方法 |
CN112983397B (zh) * | 2021-05-14 | 2021-09-14 | 西南石油大学 | 一种高温高压产水气井结垢离子来源物理模拟装置 |
US11680480B2 (en) | 2021-05-25 | 2023-06-20 | Saudi Arabian Oil Company | Multi-layer gas reservoir field development system and method |
US11905807B2 (en) | 2021-06-30 | 2024-02-20 | Saudi Arabian Oil Company | Workflow to model and condition water distribution in a hydrocarbon reservoir |
US11613957B1 (en) | 2022-01-28 | 2023-03-28 | Saudi Arabian Oil Company | Method and system for high shut-in pressure wells |
US11913333B2 (en) | 2022-02-08 | 2024-02-27 | Saudi Arabian Oil Company | Determination of three-phase fluid saturations from production and pressure measurements from a well |
US12024985B2 (en) | 2022-03-24 | 2024-07-02 | Saudi Arabian Oil Company | Selective inflow control device, system, and method |
WO2023212016A1 (fr) * | 2022-04-28 | 2023-11-02 | Conocophillips Company | Plateforme d'optimisation de développement intégrée pour séquençage de puits et gestion de réservoir non classique |
WO2024006412A1 (fr) * | 2022-06-30 | 2024-01-04 | Schlumberger Technology Corporation | Systèmes et procédés d'optimisation de la fracturation hydraulique |
WO2024103101A1 (fr) * | 2022-11-17 | 2024-05-23 | Deepgreen Engineering Pte. Ltd | Procédé mis en œuvre par ordinateur pour traiter un plan d'extraction et matériel et systèmes associés |
WO2024108062A1 (fr) * | 2022-11-18 | 2024-05-23 | University Of Kansas | Courbes de type sans dimension de composition inspirées de la physique intelligente pour une récupération assistée du pétrole |
CN115759786A (zh) * | 2022-12-09 | 2023-03-07 | 昆仑数智科技有限责任公司 | 油气藏开发方案的确定方法、装置、设备和存储介质 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5148365A (en) * | 1989-08-15 | 1992-09-15 | Dembo Ron S | Scenario optimization |
US5764515A (en) * | 1995-05-12 | 1998-06-09 | Institute Francais Du Petrole | Method for predicting, by means of an inversion technique, the evolution of the production of an underground reservoir |
US6266619B1 (en) * | 1999-07-20 | 2001-07-24 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
Family Cites Families (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4501325A (en) * | 1981-09-25 | 1985-02-26 | Texaco Inc. | Method for predicting workovers and shut-ins from analyzing the annulus effluent of a well |
US4435756A (en) | 1981-12-03 | 1984-03-06 | Burroughs Corporation | Branch predicting computer |
US4633954A (en) | 1983-12-05 | 1987-01-06 | Otis Engineering Corporation | Well production controller system |
FR2582048B1 (fr) | 1985-05-15 | 1988-09-16 | Elf Aquitaine | Dispositif de commande et de surveillance d'une tete de puits immergee dans un liquide |
FR2652180B1 (fr) * | 1989-09-20 | 1991-12-27 | Mallet Jean Laurent | Procede de modelisation d'une surface et dispositif pour sa mise en óoeuvre. |
US4969130A (en) | 1989-09-29 | 1990-11-06 | Scientific Software Intercomp, Inc. | System for monitoring the changes in fluid content of a petroleum reservoir |
US5132904A (en) | 1990-03-07 | 1992-07-21 | Lamp Lawrence R | Remote well head controller with secure communications port |
US5305209A (en) | 1991-01-31 | 1994-04-19 | Amoco Corporation | Method for characterizing subterranean reservoirs |
WO1993012443A1 (fr) * | 1991-12-16 | 1993-06-24 | Istitut Français Du Petrole | Systeme de surveillance active et/ou passive d'un gisement souterrain installe a poste fixe |
US5251286A (en) * | 1992-03-16 | 1993-10-05 | Texaco, Inc. | Method for estimating formation permeability from wireline logs using neural networks |
JPH06167406A (ja) * | 1992-11-27 | 1994-06-14 | Oyo Corp | 差圧式圧力変動測定装置 |
US5444619A (en) * | 1993-09-27 | 1995-08-22 | Schlumberger Technology Corporation | System and method of predicting reservoir properties |
FR2712626B1 (fr) * | 1993-11-17 | 1996-01-05 | Schlumberger Services Petrol | Procédé et dispositif pour la surveillance et le contrôle de formations terrestres constituant un réservoir de fluides . |
FR2712627B1 (fr) * | 1993-11-17 | 1996-01-05 | Schlumberger Services Petrol | Procédé et dispositif pour surveiller et/ou étudier un réservoir d'hydrocarbures traversé par un puits. |
US5905036A (en) | 1995-01-23 | 1999-05-18 | Board Of Regents, The University Of Texas System | Characterization of organic contaminants and assessment of remediation performance in subsurface formations |
US5732776A (en) | 1995-02-09 | 1998-03-31 | Baker Hughes Incorporated | Downhole production well control system and method |
US5730219A (en) * | 1995-02-09 | 1998-03-24 | Baker Hughes Incorporated | Production wells having permanent downhole formation evaluation sensors |
GB2302349B (en) * | 1995-02-09 | 1999-08-18 | Baker Hughes Inc | Subsurface valve position and monitoring system for a production well |
US5706896A (en) | 1995-02-09 | 1998-01-13 | Baker Hughes Incorporated | Method and apparatus for the remote control and monitoring of production wells |
US5829520A (en) * | 1995-02-14 | 1998-11-03 | Baker Hughes Incorporated | Method and apparatus for testing, completion and/or maintaining wellbores using a sensor device |
US5586082A (en) | 1995-03-02 | 1996-12-17 | The Trustees Of Columbia University In The City Of New York | Method for identifying subsurface fluid migration and drainage pathways in and among oil and gas reservoirs using 3-D and 4-D seismic imaging |
JPH0946833A (ja) * | 1995-08-03 | 1997-02-14 | Toshiba Corp | 変電設備 |
US5794210A (en) | 1995-12-11 | 1998-08-11 | Cybergold, Inc. | Attention brokerage |
FR2742794B1 (fr) | 1995-12-22 | 1998-01-30 | Inst Francais Du Petrole | Methode pour modeliser les effets des interactions entre puits sur la fraction aqueuse produite par un gisement souterrain d'hydrocarbures |
US5946662A (en) | 1996-03-29 | 1999-08-31 | International Business Machines Corporation | Method for providing inventory optimization |
US5823262A (en) | 1996-04-10 | 1998-10-20 | Micro Motion, Inc. | Coriolis pump-off controller |
US5798982A (en) | 1996-04-29 | 1998-08-25 | The Trustees Of Columbia University In The City Of New York | Method for inverting reflection trace data from 3-D and 4-D seismic surveys and identifying subsurface fluid and pathways in and among hydrocarbon reservoirs based on impedance models |
US5897620A (en) | 1997-07-08 | 1999-04-27 | Priceline.Com Inc. | Method and apparatus for the sale of airline-specified flight tickets |
CA2252512A1 (fr) | 1997-02-21 | 1998-08-27 | Lynn B. Hales | Systeme logiciel d'optimisation, oriente objet et adaptatif |
US6002985A (en) * | 1997-05-06 | 1999-12-14 | Halliburton Energy Services, Inc. | Method of controlling development of an oil or gas reservoir |
US5841280A (en) * | 1997-06-24 | 1998-11-24 | Western Atlas International, Inc. | Apparatus and method for combined acoustic and seismoelectric logging measurements |
US5992519A (en) | 1997-09-29 | 1999-11-30 | Schlumberger Technology Corporation | Real time monitoring and control of downhole reservoirs |
US6549879B1 (en) * | 1999-09-21 | 2003-04-15 | Mobil Oil Corporation | Determining optimal well locations from a 3D reservoir model |
WO2001098797A2 (fr) * | 2000-06-19 | 2001-12-27 | Halliburton Energy Services, Inc. | Appareil et procedes d'application par intervalle du profil sismique vertical pour la surveillance d'un reservoir |
-
2000
- 2000-09-12 US US09/659,951 patent/US6980940B1/en not_active Expired - Lifetime
-
2001
- 2001-02-14 EP EP06008415A patent/EP1701001A1/fr not_active Withdrawn
- 2001-02-14 BR BRBR122013023852-2A patent/BR122013023852B1/pt not_active IP Right Cessation
- 2001-02-14 AT AT01907207T patent/ATE324327T1/de active
- 2001-02-14 EP EP06008449A patent/EP1679424A3/fr not_active Withdrawn
- 2001-02-14 BR BRPI0108571A patent/BRPI0108571B1/pt not_active IP Right Cessation
- 2001-02-14 WO PCT/US2001/004620 patent/WO2001062603A2/fr active IP Right Grant
- 2001-02-14 EP EP06008431A patent/EP1684096A3/fr not_active Withdrawn
- 2001-02-14 AU AU2001235010A patent/AU2001235010A1/en not_active Abandoned
- 2001-02-14 KZ KZ20021550A patent/KZ19059A/xx unknown
- 2001-02-14 MX MXPA02008197A patent/MXPA02008197A/es active IP Right Grant
- 2001-02-14 CA CA002400796A patent/CA2400796A1/fr not_active Abandoned
- 2001-02-14 KR KR1020027011007A patent/KR100756684B1/ko not_active IP Right Cessation
- 2001-02-14 EP EP06008414A patent/EP1691031A3/fr not_active Withdrawn
- 2001-02-14 CA CA002605860A patent/CA2605860A1/fr not_active Abandoned
- 2001-02-14 EP EP01907207A patent/EP1263653B1/fr not_active Expired - Lifetime
- 2001-02-14 CN CN01807228A patent/CN1419677A/zh active Pending
- 2001-02-14 RU RU2002122397/03A patent/RU2281384C2/ru not_active IP Right Cessation
- 2001-02-14 BR BRBR122013023833-6A patent/BR122013023833B1/pt not_active IP Right Cessation
- 2001-02-14 DE DE60119087T patent/DE60119087D1/de not_active Expired - Lifetime
- 2001-02-14 SG SG200407253A patent/SG127743A1/en unknown
- 2001-02-14 EP EP06008430A patent/EP1691032A3/fr not_active Withdrawn
- 2001-02-14 CN CNA2007101849059A patent/CN101221634A/zh active Pending
- 2001-02-14 CA CA002602280A patent/CA2602280A1/fr not_active Abandoned
- 2001-02-14 JP JP2001561626A patent/JP4593051B2/ja not_active Expired - Fee Related
-
2002
- 2002-08-16 NO NO20023904A patent/NO333783B1/no not_active IP Right Cessation
-
2005
- 2005-03-02 US US11/070,457 patent/US7478024B2/en not_active Expired - Fee Related
-
2007
- 2007-03-05 US US11/714,033 patent/US7953585B2/en not_active Expired - Lifetime
- 2007-10-26 US US11/978,062 patent/US7739089B2/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5148365A (en) * | 1989-08-15 | 1992-09-15 | Dembo Ron S | Scenario optimization |
US5764515A (en) * | 1995-05-12 | 1998-06-09 | Institute Francais Du Petrole | Method for predicting, by means of an inversion technique, the evolution of the production of an underground reservoir |
US6266619B1 (en) * | 1999-07-20 | 2001-07-24 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
Non-Patent Citations (4)
Title |
---|
IVANENKO B. ET AL.: 'Application of neural networks for analysis, imitation modelling and optimal control of oil fields' PROCEEDINGS OF THE 4TH KOREA-RUSSIA INT'L SYMPOSIUM ON SCIENCE AND TECHNOLOGY 2000, pages 17 - 20, XP002908186 * |
OSTEBO R.: 'System-effectiveness assessment in offshore field development using life-cycle performance simulation' RELIABILITY AND MAINTAINABILITY SYMPOSIUM, PROCEEDINGS 1993, pages 375 - 385, XP010110150 * |
See also references of EP1263653A2 * |
ULLO J.: 'Recent developments in siesmic exploration and reservoir characterization' ULTRASONICS SYMPOSIUM, IEEE, PROCEEDINGS vol. 1, 1997, pages 787 - 796, XP010271271 * |
Cited By (60)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8712747B2 (en) | 2003-04-30 | 2014-04-29 | Landmark Graphics Corporation | Decision management system and method |
WO2004100040A1 (fr) * | 2003-04-30 | 2004-11-18 | Landmark Graphics Corporation | Procede et systeme de gestion de decisions de cas et de scenarios |
US7835893B2 (en) | 2003-04-30 | 2010-11-16 | Landmark Graphics Corporation | Method and system for scenario and case decision management |
US7813935B2 (en) | 2004-01-13 | 2010-10-12 | Weatherford/Lamb, Inc. | System for evaluating over and underbalanced drilling operations |
GB2429796B (en) * | 2004-06-25 | 2008-08-06 | Shell Int Research | Closed loop control system for controlling production of hydrocarbon fluid from an underground formation |
GB2429796A (en) * | 2004-06-25 | 2007-03-07 | Shell Int Research | Closed loop control system for controlling production of hydrocarbon fluid from an underground formation |
WO2006003118A1 (fr) * | 2004-06-25 | 2006-01-12 | Shell Internationale Research Maatschappij B.V. | Systeme de controle en boucle fermee permettant de controler la production d'un flux d'hydrocarbures provenant d'une formation souterraine |
US7672825B2 (en) | 2004-06-25 | 2010-03-02 | Shell Oil Company | Closed loop control system for controlling production of hydrocarbon fluid from an underground formation |
NO337405B1 (no) * | 2004-10-15 | 2016-04-11 | Saudi Arabian Oil Co | Datamaskin-implementert framgangsmåte for å analysere ytelsen til et produserende gigantisk hydrokarbonreservoar |
EP1686237A1 (fr) * | 2005-01-11 | 2006-08-02 | Schlumberger Holdings Limited | Système et méthodes de détermination des propriétés des fluides de fond et leur incertitude |
EP1686238A1 (fr) * | 2005-01-11 | 2006-08-02 | Schlumberger Holdings Limited | Système et méthodes de détermination des propriétés des fluides de fond et leur incertitude |
US8458000B2 (en) | 2005-04-29 | 2013-06-04 | Landmark Graphics Corporation | Analysis of multiple assets in view of functionally-related uncertainties |
US8209202B2 (en) | 2005-04-29 | 2012-06-26 | Landmark Graphics Corporation | Analysis of multiple assets in view of uncertainties |
US7809538B2 (en) | 2006-01-13 | 2010-10-05 | Halliburton Energy Services, Inc. | Real time monitoring and control of thermal recovery operations for heavy oil reservoirs |
WO2007084348A1 (fr) * | 2006-01-13 | 2007-07-26 | Halliburton Energy Services, Inc. | Surveillance et commande en temps réel des opérations de récupération thermique pour des réservoirs de pétroles bruts lourds |
US7832482B2 (en) | 2006-10-10 | 2010-11-16 | Halliburton Energy Services, Inc. | Producing resources using steam injection |
EP2118738A4 (fr) * | 2006-12-28 | 2014-07-02 | Chevron Usa Inc | Procédé, système et dispositif de stockage de programmes destinés à la comparaison d'historiques et la prévision relatives aux roches réservoirs piégeant des hydrocarbures utilisant des approximations pour des fonctions de ressemblances |
EP2118738A2 (fr) * | 2006-12-28 | 2009-11-18 | Chevron U.S.A., Inc. | Procédé, système et dispositif de stockage de programmes destinés à la comparaison d'historiques et la prévision relatives aux roches réservoirs piégeant des hydrocarbures utilisant des approximations pour des fonctions de ressemblances |
GB2459404A (en) * | 2007-02-27 | 2009-10-28 | Schlumberger Holdings | System and method for waterflood performance monitoring |
WO2008106476A1 (fr) * | 2007-02-27 | 2008-09-04 | Schlumberger Technology Corporation | Système et procédé de contrôle de l'efficacité d'injection d'eau |
US8612194B2 (en) | 2007-08-08 | 2013-12-17 | Westerngeco L.L.C. | Updating a subterranean model using at least electromagnetic data |
WO2009020715A3 (fr) * | 2007-08-08 | 2010-03-18 | Schlumberger Canada Limited | Réactualisation d'un modèle souterrain en utilisant au moins des données électromagnétiques |
US8380475B2 (en) | 2007-09-07 | 2013-02-19 | Abb As | Method for prediction in an oil/gas production system |
WO2009030756A3 (fr) * | 2007-09-07 | 2009-06-25 | Abb As | Procédé de prédiction dans un système de production de pétrole/gaz |
US9026417B2 (en) | 2007-12-13 | 2015-05-05 | Exxonmobil Upstream Research Company | Iterative reservoir surveillance |
US10354207B2 (en) | 2007-12-17 | 2019-07-16 | Landmark Graphics Corporation | Systems and methods for optimization of real time production operations |
EP2225632A4 (fr) * | 2007-12-17 | 2012-10-24 | Landmark Graphics Corp | Systèmes et procédés d'optimisation d'opérations de production en temps réel |
US8396826B2 (en) | 2007-12-17 | 2013-03-12 | Landmark Graphics Corporation | Systems and methods for optimization of real time production operations |
EP2225632A2 (fr) * | 2007-12-17 | 2010-09-08 | Landmark Graphics Corporation, A Halliburton Company | Systèmes et procédés d'optimisation d'opérations de production en temps réel |
US8504335B2 (en) | 2008-04-17 | 2013-08-06 | Exxonmobil Upstream Research Company | Robust optimization-based decision support tool for reservoir development planning |
US8775347B2 (en) | 2008-04-18 | 2014-07-08 | Exxonmobil Upstream Research Company | Markov decision process-based support tool for reservoir development planning |
US8775361B2 (en) | 2008-04-21 | 2014-07-08 | Exxonmobil Upstream Research Company | Stochastic programming-based decision support tool for reservoir development planning |
WO2009142840A3 (fr) * | 2008-05-22 | 2010-01-14 | Schlumberger Canada Limited | Procédés et appareils de formation de puits |
US8706541B2 (en) | 2008-10-06 | 2014-04-22 | Schlumberger Technology Corporation | Reservoir management linking |
GB2471139A (en) * | 2009-06-19 | 2010-12-22 | Kongsberg Maritime As Oil And Gas | Method for providing reconciled estimates of three phase flow for individual wells and at individual locations in a hydrocarbon production process facility |
US9151868B2 (en) | 2009-08-14 | 2015-10-06 | Bp Corporation North America Inc. | Reservoir architecture and connectivity analysis |
US8793112B2 (en) | 2009-08-14 | 2014-07-29 | Bp Corporation North America Inc. | Reservoir architecture and connectivity analysis |
WO2011019565A3 (fr) * | 2009-08-14 | 2011-05-19 | Bp Corporation North America Inc. | Architecture de réservoir et analyse de connectivité |
EA025620B1 (ru) * | 2009-08-14 | 2017-01-30 | Бп Корпорейшн Норт Америка Инк. | Анализ архитектуры и связности пластового резервуара |
GB2486060A (en) * | 2010-12-02 | 2012-06-06 | Logined Bv | Prioritising well drilling proposition |
WO2013032444A1 (fr) * | 2011-08-30 | 2013-03-07 | Halliburton Energy Services, Inc. | Procédés et systèmes pour la commande intégrée d'opérations souterraines |
US10352134B2 (en) | 2012-05-30 | 2019-07-16 | Landmark Graphics Corporation | Oil or gas production using computer simulation of oil or gas fields and production facilities |
EP2984284A4 (fr) * | 2013-04-12 | 2016-12-07 | Services Petroliers Schlumberger | Recuperation assistee de petrole a l'aide d'echantillon de forage numerique |
WO2015016985A1 (fr) * | 2013-07-29 | 2015-02-05 | Chevron U.S.A. Inc. | Système et procédé de cartographie des ressources restantes |
US20150032377A1 (en) * | 2013-07-29 | 2015-01-29 | Chevron U.S.A. Inc. | System and method for remaining resource mapping |
WO2015177653A3 (fr) * | 2014-05-07 | 2016-01-21 | King Abdullah University Of Science And Technology | Cadre de quantification des incertitudes et de mise en correspondance d'historique de réservoir à données multiples |
US10401808B2 (en) | 2015-01-28 | 2019-09-03 | Schlumberger Technology Corporation | Methods and computing systems for processing and transforming collected data to improve drilling productivity |
EP3250922A4 (fr) * | 2015-01-28 | 2018-12-26 | Services Petroliers Schlumberger (SPS) | Procédés et systèmes informatiques pour traiter et transformer des données collectées pour améliorer la productivité de forage |
WO2016193425A1 (fr) * | 2015-06-05 | 2016-12-08 | Repsol, S.A. | Procédé de génération d'une stratégie de production pour le développement d'un réservoir d'hydrocarbures dans un environnement naturel |
US11009844B2 (en) | 2015-07-31 | 2021-05-18 | Schlumberger Technology Corporation | Method and apparatus of determining a state of a system |
WO2017023541A1 (fr) * | 2015-07-31 | 2017-02-09 | Schlumberger Technology Corporation | Procédé et appareil de détermination d'un état d'un système |
WO2017143326A1 (fr) * | 2016-02-18 | 2017-08-24 | General Electric Company | Système et procédé pour générer un programme pour extraire une ressource fluide d'un réservoir |
US10613488B2 (en) | 2016-02-18 | 2020-04-07 | General Electric Co. | System and method for generating a schedule to extract a resource fluid from a reservoir |
WO2017204689A1 (fr) * | 2016-05-27 | 2017-11-30 | Шлюмберже Текнолоджи Корпорейшн | Procédé de détermination des propriétés mécaniques d'une roche d'une couche productrice |
CN106295210B (zh) * | 2016-08-16 | 2018-10-23 | 中国石油化工股份有限公司 | 一种开展储量空白带勘探潜力的定量评价方法及系统 |
CN106295210A (zh) * | 2016-08-16 | 2017-01-04 | 中国石油化工股份有限公司 | 一种开展储量空白带勘探潜力的定量评价方法及系统 |
WO2018178049A3 (fr) * | 2017-03-29 | 2018-11-08 | Repsol, S.A. | Procédé de détermination d'un plan de forage d'une pluralité de nouveaux puits dans un réservoir |
US11137514B2 (en) | 2017-03-29 | 2021-10-05 | International Business Machines Corporation | Method for determining a drilling plan for a plurality of new wells in a reservoir |
US11668165B2 (en) * | 2020-03-04 | 2023-06-06 | Saudi Arabian Oil Company | Method and system for simulating well performance using wellhead measurements |
CN111794743A (zh) * | 2020-08-28 | 2020-10-20 | 四川长宁天然气开发有限责任公司 | 一种页岩气井工程跟踪推演方法 |
Also Published As
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7953585B2 (en) | Integrated reservoir optimization | |
US8103493B2 (en) | System and method for performing oilfield operations | |
US8352227B2 (en) | System and method for performing oilfield simulation operations | |
US8046314B2 (en) | Apparatus, method and system for stochastic workflow in oilfield operations | |
Ampomah et al. | Co-optimization of CO2-EOR and storage processes under geological uncertainty | |
AU2006235884B2 (en) | Integrated reservoir optimization | |
Rossi et al. | Discussion on integrating monitoring data into the reservoir management process | |
Harrison | In the data room | |
Lorentzen | History Matching a Full Field Reservoir Simulation Model-The Jette Field |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated states |
Kind code of ref document: A2 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A2 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application | ||
AK | Designated states |
Kind code of ref document: A3 Designated state(s): AE AG AL AM AT AU AZ BA BB BG BR BY BZ CA CH CN CR CU CZ DE DK DM DZ EE ES FI GB GD GE GH GM HR HU ID IL IN IS JP KE KG KP KR KZ LC LK LR LS LT LU LV MA MD MG MK MN MW MX MZ NO NZ PL PT RO RU SD SE SG SI SK SL TJ TM TR TT TZ UA UG UZ VN YU ZA ZW |
|
AL | Designated countries for regional patents |
Kind code of ref document: A3 Designated state(s): GH GM KE LS MW MZ SD SL SZ TZ UG ZW AM AZ BY KG KZ MD RU TJ TM AT BE CH CY DE DK ES FI FR GB GR IE IT LU MC NL PT SE TR BF BJ CF CG CI CM GA GN GW ML MR NE SN TD TG |
|
REG | Reference to national code |
Ref country code: DE Ref legal event code: 8642 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2400796 Country of ref document: CA Ref document number: 2001235010 Country of ref document: AU |
|
DFPE | Request for preliminary examination filed prior to expiration of 19th month from priority date (pct application filed before 20040101) | ||
ENP | Entry into the national phase |
Ref document number: 2001 561626 Country of ref document: JP Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: PA/a/2002/008197 Country of ref document: MX Ref document number: 1020027011007 Country of ref document: KR |
|
ENP | Entry into the national phase |
Ref document number: 2002 2002122397 Country of ref document: RU Kind code of ref document: A |
|
WWE | Wipo information: entry into national phase |
Ref document number: 2001907207 Country of ref document: EP |
|
WWE | Wipo information: entry into national phase |
Ref document number: 018072283 Country of ref document: CN |
|
WWP | Wipo information: published in national office |
Ref document number: 2001907207 Country of ref document: EP |
|
WWP | Wipo information: published in national office |
Ref document number: 1020027011007 Country of ref document: KR |
|
WWG | Wipo information: grant in national office |
Ref document number: 2001907207 Country of ref document: EP |