US8504335B2 - Robust optimization-based decision support tool for reservoir development planning - Google Patents

Robust optimization-based decision support tool for reservoir development planning Download PDF

Info

Publication number
US8504335B2
US8504335B2 US12/864,959 US86495909A US8504335B2 US 8504335 B2 US8504335 B2 US 8504335B2 US 86495909 A US86495909 A US 86495909A US 8504335 B2 US8504335 B2 US 8504335B2
Authority
US
United States
Prior art keywords
reservoir
model
uncertainty
data
development planning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active, expires
Application number
US12/864,959
Other versions
US20110022363A1 (en
Inventor
Kevin C. Furman
Vikas Goel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ExxonMobil Upstream Research Co
Original Assignee
ExxonMobil Upstream Research Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ExxonMobil Upstream Research Co filed Critical ExxonMobil Upstream Research Co
Priority to US12/864,959 priority Critical patent/US8504335B2/en
Publication of US20110022363A1 publication Critical patent/US20110022363A1/en
Application granted granted Critical
Publication of US8504335B2 publication Critical patent/US8504335B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/04Constraint-based CAD
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/10Numerical modelling

Definitions

  • This description relates generally to oil and gas production, and more particularly to reservoir development planning that takes uncertainty into consideration.
  • Reservoir development planning may include making decisions regarding size, timing, and location of production platforms as well as subsequent expansions and connections, for example. Key decisions can involve the number, location, allocation to platforms, and timing of wells to be drilled and completed in each field. Post drilling decisions may include determining production rate allocations across multiple wells. Any one decision or action may have system-wide implications, for example, propagating positive or negative impact across a petroleum operation or a reservoir. In view of the aforementioned aspects of reservoir development planning, which are only a representative few of the many decisions facing a manager of petroleum resources, one can appreciate the value and impact of planning.
  • Computer-based modeling holds significant potential for reservoir development planning, particularly when combined with advanced mathematical techniques.
  • Computer-based planning tools support making good decisions.
  • One type of planning tool includes methodology for identifying an optimal solution to a set of decisions based on processing various information inputs.
  • an exemplary optimization model may work towards finding solutions that yield the best outcome from known possibilities with a defined set of constraints.
  • a petroleum operation may achieve great economic benefit via properly applying optimization models for optimizing the development plans and management of petroleum resources, particularly those involving decision-making for multiple oil or gas fields over multiple years.
  • the terms can describe working towards a solution which may be the best available solution, a preferred solution, or a solution that offers a specific benefit within a range of constraints; or continually improving; or refining; or searching for a high point or a maximum for an objective; or processing to reduce a penalty function; etc.
  • an optimization model can be an algebraic system of functions and equations comprising (1) decision variables of either continuous or integer variety which may be limited to specific domain ranges, (2) constraint equations, which are based on input data (parameters) and the decision variables, that restrict activity of the variables within a specified set of conditions that define feasibility of the optimization problem being addressed, and/or (3) an objective function based on input data (parameters) and the decision variables being optimized, either by maximizing the objective function or minimizing the objective function.
  • optimization models may include non-differentiable, black-box and other non-algebraic functions or equations.
  • a typical (deterministic) mathematical optimization problem involves minimization or maximization of some objective function subject to a set of constraints on problem variables. This is commonly known as mathematical programming in the scientific and engineering community. Sub-categories of mathematical programming include linear programming (LP), mixed integer programming (MIP), nonlinear programming (NLP) and mixed-integer nonlinear programming (MINLP).
  • LP linear programming
  • MIP mixed integer programming
  • NLP nonlinear programming
  • MINLP mixed-integer nonlinear programming
  • a deterministic optimization model is typically posed in the following form in which an objective function “f” is optimized subject to an array of constraint functions “g” that must be satisfied by setting the values of decision variable arrays “x” and “y”.
  • the constraint functions generally include a combination of known data parameters and unknown variable values when a mathematical programming model is posed. min f ( x,y ) s.t.g ( x,y ) ⁇ 0
  • Solving the problem to mathematical optimality can comprise finding values for the decision variables such that all constraints are satisfied, wherein it is essentially mathematically impossible to improve upon the value of the objective function by changing variable values while still remaining feasible with respect to all of the constraints.
  • the solution to the deterministic optimization problem may be sub-optimal, or possibly even infeasible, especially if the problem parameters take values that are ultimately different than those values chosen to be used as input into the optimization model that is solved.
  • Uncertainty is ordinarily inherent in the information and factors pertinent to development planning That is, the inputs to the optimization problem (and perhaps the mathematical modeling of the problem) contain uncertainty. Uncertainty can be viewed as characteristics or aspects that are nondeterministic or that otherwise remain unknown, a priori. Conventional approaches for applying computer programming for decision support in developing and managing petroleum resources do not take a sufficiently comprehensive view of such uncertainty.
  • uncertainty in reservoir behavior is typically reduced to a very limited number of cases, for example, represented by a “high-side” case, a “most-likely” case, and a “low-side” case.
  • the uncertainty in reservoir behavior is reduced to a known value, for each of the three cases mentioned above, by typically sampling random points within the uncertainty space.
  • the term “uncertainty space,” as used herein, generally refers to a representation of uncertainty relevant to a problem that is under solution, for example, the collective uncertainties for data input to an optimization routine.
  • a need is apparent in the art for an improved tool that can aid reservoir development planning and/or that can provide decision support in connection with reservoir development and resource management.
  • a need further exists for a tool that can take a broad range of uncertainties into consideration for the plans or decision support.
  • the present invention supports making decisions, plans, strategies, and/or tactics for developing and managing petroleum resources, such as a petroleum reservoir.
  • a computer- or software-based method can provide decision support in connection with developing one or more petroleum reservoirs.
  • the method can produce a reservoir development plan based on input data relevant to the reservoir and/or to the operation.
  • input data can comprise, unknown or ill-defined fluid dynamics, the size of the reservoir, the current state of development, current and projected prices of petroleum, drilling costs, cost per hour of rig time, geological data, the cost of capital, current and projected available resources (human, financial, equipment, etc.), and the regulatory environment, to name a few representative possibilities.
  • the input data can have uncertainty. More specifically, each element of input data can have an associated level, amount, or indication of uncertainty.
  • Some of the input data may be known with a high level of uncertainty, such as the current cost of rig time, while other input data may have various degrees of uncertainty. For example, uncertainty of future rig time cost may increase as the amount of time projected into the future increases. That is, the uncertainty of rig time cost for the fifth year of the development plan would likely be higher than the uncertainty of rig time cost for the second year.
  • the collective uncertainties of the input data can define an uncertainty space.
  • a software routine can produce the reservoir development plan via processing the input data and taking the uncertainty space into consideration, for example via applying a robust optimization routine. Producing the reservoir development plan can comprise outputting some aspect of a plan, making a determination relevant to generating or changing a plan, or making a recommendation about one or more decisions relevant to reservoir development or management, for example.
  • a method for reservoir development planning includes receiving data relevant to reservoir development.
  • a reservoir development plan is generated in response to processing the received data via computer-implemented robust optimization.
  • Implementations of this aspect may include one or more of the following features.
  • the generating step may include generating the reservoir development plan according to an uncertainty space associated with the received data.
  • the computer-implemented robust optimization may include optimizing at least some aspect of the reservoir development plan based on the received data and an uncertainty space.
  • Receiving data may include receiving known data parameters and uncertain data parameters.
  • Processing the received data via computer-implemented robust optimization may include processing the data with a robust optimization model that incorporates the uncertain data parameters.
  • the uncertainty space may be associated with the received data.
  • Processing the received data via computer-implemented robust optimization may include considering the uncertainty space in entirety.
  • a method for reservoir development planning includes receiving data relevant to reservoir development planning, wherein uncertainty is associated with the data. At least some portion of a reservoir development plan is produced in response to processing the received data with a computer-based optimization model that incorporates the uncertainty.
  • Implementations of this aspect may include one or more of the following features.
  • uncertainty parameters may describe the uncertainty
  • the computer-based optimization model may include a robust optimization model that incorporates the uncertainty parameters.
  • Incorporating the uncertainty in the computer-based optimization model may include capturing tradeoffs across a plurality of realizations of the uncertainty.
  • the step of producing at least some portion of the reservoir development plan in response to processing the received data with the computer-based optimization model that incorporates the uncertainty may include forcing feasibility of an optimization problem across an entire uncertainty space.
  • Producing at least some portion of the reservoir development plan in response to processing the received data with the computer-based optimization model that incorporates the uncertainty may include systemically processing uncertain data within the optimization model.
  • a method for decision support regarding development of petroleum resources includes receiving a plurality of data elements regarding a decision about developing a petroleum reservoir, wherein a respective characterization of uncertainty is associated with each of the data elements.
  • a recommendation for the decision is output in response to processing each of the data elements and each of the respective characterizations of uncertainty with a computer-based optimization routine.
  • Implementations of this aspect may include one or more of the following features.
  • the computer-based optimization routine may include a robust optimization model.
  • the robust optimization model may incorporate each of the respective characterizations of uncertainty. Processing each of the data elements and each of the respective characterizations of uncertainty with the computer-based optimization routine may include covering an uncertainty space.
  • a computer-based method of optimizing development planning for a reservoir includes providing input data that comprises uncertainty.
  • a first simulation of the reservoir is generated using a high fidelity model for reservoir or surface facility behavior utilizing the input data, wherein the first simulation generates first high fidelity output data.
  • a low fidelity model for reservoir or surface facility behavior is generated using the input data and the first high fidelity output data, wherein the low fidelity model generates a prediction.
  • a reservoir development planning model is optimized utilizing the input data and the low fidelity model for reservoir or surface facility behavior, wherein the reservoir development planning model generates reservoir development planning output data.
  • a second simulation of the reservoir is performed using the high fidelity model for reservoir or surface facility behavior utilizing the input data and the reservoir development planning output data, wherein the second simulation generates second high fidelity output data.
  • the second high fidelity output data is compared with the prediction of the low fidelity model.
  • the steps comprising generating a low fidelity model for reservoir or surface facility behavior, optimizing a reservoir development planning model, performing a second simulation of the reservoir using the high fidelity model for reservoir or surface facility behavior, and comparing the second high fidelity output data with the prediction of the low fidelity model are repeated until the second high fidelity output data is substantially consistent with the prediction of the low fidelity model.
  • Implementations of this aspect may include one or more of the following features. For example, optimizing a reservoir development planning model may be performed using a robust optimization model. A development plan is generated in response to the second high fidelity output data being consistent with the prediction of the low fidelity model. A solution routine, interfacing with the robust optimization model, may assist the robust optimization model to optimize development planning for the reservoir. The robust optimization model may include a solution routine for assisting with optimizing development planning for the reservoir.
  • a method of producing hydrocarbons from a subterranean reservoir includes generating a reservoir development planning system based on input data.
  • the reservoir development planning system is optimized according to an uncertainty space. Hydrocarbons are produced from the reservoir according to output from the optimized reservoir development planning system.
  • Implementations of this aspect may include one or more of the following features.
  • the input data may include deterministic components and nondeterministic components.
  • Optimizing the reservoir development planning system according to the uncertainty space includes considering each of the nondeterministic components with a robust optimization model.
  • Optimizing the reservoir development planning system according to the uncertainty space may include executing a computer-based robust optimization model that incorporates uncertainty of the input data.
  • the uncertainty space may specify inherent uncertainty of the input data.
  • the reservoir development planning system may include an optimization model comprising a low fidelity reservoir model; and a high fidelity reservoir model.
  • the high fidelity model accepts one or more parameter input data from the optimization model and provides one or more reservoir or surface facility property input data to the optimization model.
  • FIG. 1 is a graphical illustration representing the use of an entire uncertainty space associated with data for a reservoir model in accordance with certain exemplary embodiments of the present invention.
  • FIG. 2 is an illustration of a three-dimensional reservoir model including a grid mesh that defines a plurality of nodes in accordance with certain exemplary embodiments of the present invention.
  • FIG. 3 is a flowchart illustration of a reservoir simulator for simulating the operation of the reservoir model of FIG. 2 in accordance with certain exemplary embodiments of the present invention.
  • FIG. 4 is a schematic illustration of a robust optimization-based reservoir development planning system in accordance with certain exemplary embodiments of the present invention.
  • FIG. 5 is a flowchart illustration of a method for operating the robust optimization-based reservoir development planning system of FIG. 4 in accordance with certain exemplary embodiments of the present invention.
  • Exemplary embodiments of the present invention support making decisions regarding reservoir development planning while details of uncertain parameters remain unknown. Such uncertainties can be considered directly within an optimization model that can be a robust optimization model.
  • the robust optimization model systematically addresses all the uncertain data. Such a paradigm allows for producing flexible or robust optimization solutions that remain feasible covering the uncertainty space, as well as making the trade-off between optimality and the randomness or uncertainty in the input data.
  • robust optimization provides an approach to reservoir development planning and handles uncertainty effectively.
  • the optimization may be analogous to recourse models for stochastic programming.
  • a penalty function in the objective may replace a feasibility for all possible realizations, sometime referred to as “scenarios.”
  • One exemplary embodiment of robust optimization integrates goal programming with scenario-based descriptions of problem data.
  • FIG. 1 is a graphical illustration of using the entire uncertainty space associated with data for a reservoir model in accordance with certain exemplary embodiments of the present invention.
  • the oval shape represents the uncertainty space 100 , which, as discussed above, characterizes uncertainty for information or data that will be considered for planning or decision making.
  • the shading within the oval indicates that the full uncertainty space 100 is being considered, rather than just random data points within the uncertainty space 100 . That is, the robust optimization model allows the entire uncertainty space 100 to be considered for all values 104 deemed possible. With this comprehensive view of uncertainty, the robust optimization model provides solutions that are more optimal.
  • FIG. 2 is an illustration of a three-dimensional reservoir model 200 including a grid mesh 206 that defines a plurality of nodes 204 in accordance with certain exemplary embodiments of the present invention.
  • the reservoir model 200 may be used for simulating operation of an oil and/or gas reservoir with one or more vertical wells 202 .
  • the reservoir model 200 may be broken up into a plurality of nodes 204 by a grid mesh 206 .
  • the grid mesh 206 represents geological formation in cell format to support computer-based processing of reservoir and geological information according to the grid mesh 206 .
  • the nodes 204 of the reservoir model 200 may be of non-uniform size.
  • This three-dimensional reservoir model 200 may provide additional data to be used in conjunction with a reservoir simulator.
  • FIG. 3 is a flowchart illustration of a reservoir simulator 300 for simulating the operation of the reservoir model 200 of FIG. 2 in accordance with certain exemplary embodiments of the present invention.
  • the simulator 300 comprises a set of instructions executing on a computer system. That is, the simulator 300 comprises one or more software programs running on one or more computers. Additionally, the computer may have one or more processors performing the simulation.
  • the reservoir simulator 300 simulates the reservoir model's operation in which well management 302 is performed for the well 202 and surface facility network of the reservoir model 200 .
  • the well management 302 is performed over all wells 202 in the reservoir model 200 and includes an iterative process 304 in which a Jacobian construction and flow calculation 306 is performed, followed by a linear solve 308 and one or more property calculations 310 .
  • the linear solve 308 and/or the one or more property calculations 310 are performed over large arrays of data that represent properties such as, for example, pressure and composition at mesh points in the grid mesh 206 .
  • the data for the well 202 is then generated in a results/checkpoint I/O 312 .
  • the well management 302 may be performed for the remaining wells 202 of the entire reservoir model 200 , wherein the results of each well 202 are generated in the results/checkpoint I/O 312 .
  • the reservoir simulator 300 may be implemented, for example, using one or more general purpose computers, special purpose computers, analog processors, digital processors, central processing units, and/or distributed computing systems. That is, the reservoir simulator 300 can comprise computer executable instructions or code.
  • the output of the reservoir simulator 300 can comprise a result displayed on a graphical user interface (GUI), a data file, data on a medium such as an optical or magnetic disk, a paper report, or signals transmitted to another computer or another software routine (not an exhaustive list).
  • GUI graphical user interface
  • the reservoir model 200 and reservoir simulator 300 may be used to simulate the operation of the reservoir to thereby permit modeling of fluids, energy, and/or gases flowing in the hydrocarbon reservoirs, wells, and related surface facilities.
  • Reservoir simulation 300 is one part of reservoir optimization which also includes constructing the data to accurately represent the reservoir.
  • An exemplary simulation goal comprises understanding formation flow patterns in order to optimize some strategy for producing hydrocarbons from some set of wells 202 and surface facilities.
  • the simulation is usually part of a time-consuming, iterative process to reduce uncertainty about a particular reservoir model description while optimizing a production strategy.
  • Reservoir simulation for example, is one kind of computational fluid dynamics simulation.
  • the reservoir model 200 and the reservoir simulator 300 may further be used to optimize the design and operation of the corresponding reservoir, wells, and related surface facilities.
  • FIG. 4 is a schematic illustration of a robust optimization-based reservoir development planning system 400 in accordance with certain exemplary embodiments of the present invention.
  • the reservoir development planning system 400 is a computer program, a software-based engine, or a computing module.
  • each illustrated block in the diagram of FIG. 4 can comprise a computer program, a software-based engine, or a computing module.
  • the robust optimization-based reservoir development planning system 400 may be implemented, for example, using one or more general purpose computers, special purpose computers, analog processors, digital processors, central processing units, and/or distributed computing systems.
  • the robust optimization-based reservoir development planning system 400 includes one or more robust optimization models for reservoir development planning 402 .
  • the robust optimization model for reservoir development planning 402 is a robust optimization model for optimizing the development plan given some target objective and subject to the constraints of the system.
  • the robust optimization-based reservoir development planning system 400 may include at least one source of input data 404 , a high fidelity model for reservoir and/or surface facility behavior 406 and a solution routine 408 .
  • the high fidelity model for reservoir and/or surface facility behavior 406 is a high fidelity model, or reservoir simulation model, used to update and adjust the robust optimization model for reservoir development planning 402 in subsequent iterations. Such updates and adjustments provide refinement as the robust optimization model for reservoir development planning 402 may contain an approximation of the high fidelity model for reservoir and/or surface facility behavior 406 within its system of constraint equations.
  • a low fidelity model which is included within the robust optimization model for reservoir development planning 402 , provides this approximation of the high fidelity model for reservoir and/or surface facility behavior 406 .
  • the robust optimization model for reservoir development planning 402 may receive input data from a source of input data 404 .
  • the input data can comprise data entries in one or more spreadsheets, one or more databases, information fed over a computer network or the Internet, manual entries, user input from a GUI, etc.
  • the robust optimization model for reservoir development planning 402 may provide output to a high fidelity model for reservoir and/or surface facility behavior 406 of the reservoir under consideration.
  • the high fidelity model for reservoir and/or surface facility behavior 406 may in turn provide its output data back to the robust optimization model for reservoir development planning 402 .
  • the robust optimization model for reservoir development planning 402 may interface with the solution routine 408 .
  • the present exemplary embodiment provides a robust optimization-based reservoir development planning system 400 in which the inherent uncertainty in the data associated with a reservoir is incorporated directly into the robust optimization model for reservoir development planning 402 .
  • the robust optimization model for reservoir development planning 402 By incorporating the uncertainty in the data into the robust optimization model for reservoir development planning 402 , tradeoffs associated with decisions across various realizations of the uncertainty are captured and hence, better information is available when making decisions regarding petroleum and/or natural gas reservoir development planning.
  • the aim of robust optimization is to choose a solution which is able to cope best with various realizations of uncertain data.
  • the uncertain data is assumed to be unknown but bounded, and theoretical results may also assume convexity of the uncertainty space.
  • the optimization problem with uncertain parameters is reformulated into a counterpart robust optimization problem.
  • uncertain data parameters ⁇ (theta) appearing in the constraints.
  • the constraints are reformulated such that they must be satisfied given any possible realization of the uncertain parameters.
  • the decision variable arrays “x” and “y” are now also posed such that they are dependent on the realizations of the uncertain parameters.
  • robust optimization ensures (or alternatively provides or supports) robustness and flexibility in an optimization solution by forcing feasibility of an optimization problem for the entire given uncertainty space, for example, essentially covering the uncertainty space. Solutions avoid violating (or do not violate) any constraint for any data realization. Furthermore, robust optimization allows mitigation of the worst-case scenario given.
  • the robust optimization-based reservoir development planning system 400 provides a decision support tool to optimize a risk averse, risk neutral, or risk seeking measure of the objective function (e.g., net present value—NPV) satisfying all business problem constraints.
  • a risk averse, risk neutral, or risk seeking measure of the objective function e.g., net present value—NPV
  • the robust optimization model for reservoir development planning 402 may be a data independent mathematical abstraction of the reservoir model 200 ( FIG. 2 ).
  • the source of input data 404 may provide reservoir data which may, for example, be stored and retrieved from spreadsheets, databases, manual entry, or otherwise.
  • the high fidelity model for reservoir and/or surface facility behavior 406 may include one or more reservoir or surface facility simulators such as, for example, the reservoir simulator 300 can comprise or be based upon software-based tools, programs, or capabilities; such as those marketed by: Schlumberger Technology Corporation under the registered trademark “ECLIPSE”, Landmark Graphics Corporation under the registered trademark “VIP”, or Landmark Graphics Corporation under the registered trademark “NEXUS”.
  • the solution routine 408 may comprise one or more routines, methods, processes, or algorithms for solving the robust optimization model for reservoir development planning 402 .
  • the design and operation of the robust optimization model for reservoir development planning 402 and the solution routine 408 may be combined in whole or in part. Additionally, the design and operation of the robust optimization-based reservoir development planning system 400 may be implemented, for example, using one or more general purpose programmable computers which may, or may not, be distributed within or between one or more communication networks.
  • FIG. 5 is a flowchart illustration of a method 500 for operating the robust optimization-based reservoir development planning system of FIG. 4 in accordance with an exemplary embodiment.
  • the present invention can include multiple processes that can be implemented with computer and/or manual operation.
  • the present invention can comprise one or more computer programs that embody certain functions described herein and illustrated in the examples, diagrams, figures, and flowcharts.
  • the invention should not be construed as limited to any one set of computer program instructions. Further, a programmer with ordinary skill would be able to write such computer programs without difficulty or undue experimentation based on the disclosure and teaching presented herein.
  • the method of operation 500 begins at step 505 and proceeds to step 510 .
  • the development plan case input data is provided to the robust optimization model for reservoir development planning 402 .
  • the input data may be provided from a combination of manual data entry, spreadsheets, and databases and may include, but is not limited to, specifications of uncertain parameters (e.g., range of uncertain values), decision variables (e.g., time when they will be implemented), risk attitude, objective function, etc. These input data may form a data instance that is used to populate one or more mathematical models within the robust optimization model for reservoir development planning 402 .
  • the initializing reservoir and/or surface facility parameter input data is provided to the high fidelity model for reservoir and/or surface facility behavior 406 .
  • the high fidelity model for reservoir and/or surface facility behavior 406 simulates the reservoir and/or surface facilities.
  • This high fidelity model for reservoir and/or surface facility behavior 406 may include one or more high fidelity models for reservoir and surface facility behavior such as, for example, reservoir and facility simulators as discussed above. Additionally, upon performing the simulation, data relating to the operation of the reservoir and surface facilities are obtained, wherein the data includes, but is not limited to, production estimates, structure, flow properties, etc.
  • the simulation results of the reservoir and/or surface facility property are provided as reservoir and/or surface facility property input data, which may also be referred to as first high fidelity output data, to the robust optimization model for reservoir development planning.
  • the initial low fidelity model components are generated for inclusion in the robust optimization model for reservoir development planning 402 .
  • the initial low fidelity model components are a prediction for the reservoir and/or surface facility behavior. This prediction is generated from using the input data and the first high fidelity output data.
  • the robust optimization model for reservoir development planning 402 includes a low fidelity model that is computationally efficient and provides an approximation of the reservoir and surface facility behavior. In other words, as compared to the high fidelity model, the low fidelity model provides less computational precision to produce relatively rough results and thus executes much faster on a typical computing system.
  • the low fidelity model may be generated from a portion of the software code used in the high fidelity model for reservoir and/or surface facility behavior 406 .
  • the software of high fidelity model can be tuned so as to run fewer iterations.
  • the high fidelity model can be adapted or configured to provide the low fidelity model via running two dimensional cross sections, via reducing the number of parameter inputs, via specifying larger cell sizes, etc.
  • the robust optimization model for reservoir development planning 402 is solved at step 535 , utilizing the input data and the low fidelity model for reservoir and/or surface facility behavior.
  • the robust optimization model for reservoir development planning 402 includes one or more robust optimization models that may, for example, include a MINLP-class model and a MINLP-based solution routine or algorithm.
  • the robust optimization model for reservoir development planning 402 can be solved using one or more fit-for-purpose solution routines that may be provided in the one or more of the robust optimization model for reservoir development planning 402 and the solution routine 408 .
  • the fit-for-purpose solution routines may include a combination of commercial or openly available mathematical programming solver routines and specially designed model-specific techniques.
  • solving the robust optimization model for reservoir development planning 402 can be achieved without probability density functions for the uncertainty representation.
  • the solving of the robust optimization model for reservoir development 403 planning generates a reservoir model solution, wherein a tentative development plan and reservoir and/or surface facility parameter input data, which may also be referred to as reservoir development planning output data, for the high fidelity model for reservoir and/or surface facility behavior 406 may be generated based on this reservoir model solution.
  • the reservoir and/or surface facility parameter input data generated by the solving of the robust optimization model for reservoir development planning 402 , is provided to the high fidelity model for reservoir and/or surface facility behavior 406 .
  • the high fidelity model for reservoir and/or surface facility behavior 406 again simulates the reservoir and/or surface facilities. This simulation generates a corresponding high fidelity output data, which may also be referred to as the reservoir and/or surface facility property input data.
  • step 535 the robust optimization model for reservoir development planning 402 is again solved. This process continues to iterate until the output of the high fidelity model is substantially consistent with the prediction from the low fidelity model at step 550 . For example, when the results of the low fidelity model and the high fidelity model converge, step 550 can make a determination that a sufficient level of processing has been completed. At that point, step 550 deems the iterating complete.
  • the robust optimization model for reservoir development planning 402 is again solved to generate an output which may include a final development plan at step 565 .
  • the output may be used to generate reports, calculations, tables, figures, charts, etc. for the analysis of development planning or reservoir management under data uncertainty.
  • exemplary embodiments of the output comprise, a result displayed on a graphical user interface (GUI), a data file, data on a medium such as an optical or magnetic disk, a paper report, or signals transmitted to another computer or another software routine, or some other tangible output to name a few examples.
  • GUI graphical user interface
  • multiple cases may be tested and optimized so that their results may be compared side-by-side as part of the process.
  • the method of operation 500 then ends at step 570 .
  • the method of operation 500 has been illustrated in steps, some of the steps may be performed in a different order without departing from the scope and spirit of the exemplary embodiment.
  • the method 500 can be implemented using a mathematical programming language or system such as, for example, AIMMS, GAMS, AMPL, OPL, Mosel or using a computer programming language such as, for example, C++ or Java, or some combination of both.
  • the fit-for-purpose solution routines may be developed in either mathematical programming languages or directly with a computer programming language or with support of commercially available software tools. For example, commercial and open source versions of mathematical programming languages and computer programming code compilers are generally available.

Abstract

A robust optimization-based decision support tool for reservoir development planning can comprise a source of input data, an optimization model, a high fidelity model for simulating the reservoir, and one or more solution routines interfacing with the optimization model. The optimization model can consider unknown parameters having uncertainties directly within the optimization model. The model can systematically address uncertain data, for example, comprehensively or even taking all uncertain data into account. Accordingly, the optimization model can provide flexible or robust optimization solutions that remain feasible over an uncertainty space. Once the reservoir model is optimized, final development plans may be generated.

Description

CROSS-REFERENCE TO RELATED APPLICATION
This application is the National Stage of International Application No. PCT/US2009/036540, that published as WO 2009/145960, filed 9 Mar. 2009, which claims the benefit of U.S. Provisional Application No. 61/124,500, filed 17 Apr. 2008, each of which is incorporated herein by reference, in its entirety, for all purposes.
This application is related to the following applications: U.S. Provisional Patent Application 61/124,681 filed Apr. 18, 2008 and PCT Application No. PCT/US09/32736 filed Jan. 30, 2009 titled MARKOV DECISION PROCESS-BASED DECISION SUPPORT TOOL FOR RESERVOIR DEVELOPMENT PLANNING; and U.S. Provisional Patent Application 61/124,929 filed Apr. 21, 2008 titled STOCHASTIC PROGRAMMING-BASED DECISION SUPPORT TOOL FOR RESERVOIR DEVELOPMENT PLANNING. These applications are incorporated by reference herein in their entirety.
TECHNICAL FIELD
This description relates generally to oil and gas production, and more particularly to reservoir development planning that takes uncertainty into consideration.
BACKGROUND
Developing and managing petroleum resources often entails committing large economic investments over many years with an expectation of receiving correspondingly large financial returns. Whether a petroleum reservoir yields profit or loss depends largely upon the strategies and tactics implemented for reservoir development and management. Reservoir development planning involves devising and/or selecting strong strategies and tactics that will yield favorable economic results over the long term.
Reservoir development planning may include making decisions regarding size, timing, and location of production platforms as well as subsequent expansions and connections, for example. Key decisions can involve the number, location, allocation to platforms, and timing of wells to be drilled and completed in each field. Post drilling decisions may include determining production rate allocations across multiple wells. Any one decision or action may have system-wide implications, for example, propagating positive or negative impact across a petroleum operation or a reservoir. In view of the aforementioned aspects of reservoir development planning, which are only a representative few of the many decisions facing a manager of petroleum resources, one can appreciate the value and impact of planning.
Computer-based modeling holds significant potential for reservoir development planning, particularly when combined with advanced mathematical techniques. Computer-based planning tools support making good decisions. One type of planning tool includes methodology for identifying an optimal solution to a set of decisions based on processing various information inputs. For example, an exemplary optimization model may work towards finding solutions that yield the best outcome from known possibilities with a defined set of constraints. Accordingly, a petroleum operation may achieve great economic benefit via properly applying optimization models for optimizing the development plans and management of petroleum resources, particularly those involving decision-making for multiple oil or gas fields over multiple years.
The terms “optimal,” “optimizing,” “optimize,” “optimality,” “optimization” (as well as derivatives and other forms of those terms and linguistically related words and phrases), as used herein, are not intended to be limiting in the sense of requiring the present invention to find the best solution or to make the best decision. Although a mathematically optimal solution may in fact arrive at the best of all mathematically available possibilities, real-world embodiments of optimization routines, methods, models, and processes may work towards such a goal without ever actually achieving perfection. Accordingly, one of ordinary skill in the art having benefit of the present disclosure will appreciate that these terms, in the context of the scope of the present invention, are more general. The terms can describe working towards a solution which may be the best available solution, a preferred solution, or a solution that offers a specific benefit within a range of constraints; or continually improving; or refining; or searching for a high point or a maximum for an objective; or processing to reduce a penalty function; etc.
In certain exemplary embodiments, an optimization model can be an algebraic system of functions and equations comprising (1) decision variables of either continuous or integer variety which may be limited to specific domain ranges, (2) constraint equations, which are based on input data (parameters) and the decision variables, that restrict activity of the variables within a specified set of conditions that define feasibility of the optimization problem being addressed, and/or (3) an objective function based on input data (parameters) and the decision variables being optimized, either by maximizing the objective function or minimizing the objective function. In some variations, optimization models may include non-differentiable, black-box and other non-algebraic functions or equations.
A typical (deterministic) mathematical optimization problem involves minimization or maximization of some objective function subject to a set of constraints on problem variables. This is commonly known as mathematical programming in the scientific and engineering community. Sub-categories of mathematical programming include linear programming (LP), mixed integer programming (MIP), nonlinear programming (NLP) and mixed-integer nonlinear programming (MINLP). A deterministic optimization model is typically posed in the following form in which an objective function “f” is optimized subject to an array of constraint functions “g” that must be satisfied by setting the values of decision variable arrays “x” and “y”. The constraint functions generally include a combination of known data parameters and unknown variable values when a mathematical programming model is posed.
minf(x,y)
s.t.g(x,y)≦0
Solving the problem to mathematical optimality can comprise finding values for the decision variables such that all constraints are satisfied, wherein it is essentially mathematically impossible to improve upon the value of the objective function by changing variable values while still remaining feasible with respect to all of the constraints. When some of the “known” fixed parameters of the problem are actually uncertain in practice, the solution to the deterministic optimization problem may be sub-optimal, or possibly even infeasible, especially if the problem parameters take values that are ultimately different than those values chosen to be used as input into the optimization model that is solved.
The optimization process of reservoir development planning can be challenging, even under the assumption that the economics and behavior of reservoir and surface facilities are fully known. Typically, a large number of soft and hard constraints apply to an even larger number of decision variables. In practice, however, there exists uncertainty in reservoir behavior, economics, and/or other components of the decision process, which complicate the optimization process.
SUMMARY
Conventional reservoir development planning technologies generally fail to consider such uncertainty adequately. Uncertainty is ordinarily inherent in the information and factors pertinent to development planning That is, the inputs to the optimization problem (and perhaps the mathematical modeling of the problem) contain uncertainty. Uncertainty can be viewed as characteristics or aspects that are nondeterministic or that otherwise remain unknown, a priori. Conventional approaches for applying computer programming for decision support in developing and managing petroleum resources do not take a sufficiently comprehensive view of such uncertainty.
Currently, considerations for uncertainty in reservoir behavior, economics, or other components of the decision process are typically reduced to a very limited number of cases, for example, represented by a “high-side” case, a “most-likely” case, and a “low-side” case. For instance, the uncertainty in reservoir behavior is reduced to a known value, for each of the three cases mentioned above, by typically sampling random points within the uncertainty space. The term “uncertainty space,” as used herein, generally refers to a representation of uncertainty relevant to a problem that is under solution, for example, the collective uncertainties for data input to an optimization routine.
Based upon limited sampling of the uncertainty space, a value is assigned to the “high-side” case, the “most-likely” case, and the “low-side” case. Decisions are usually optimized for a specific case, usually the “most-likely” case, and subsequently evaluated for the remaining two cases to provide an acceptable level of risk. This approach, however, grossly underestimates the complexity of the uncertainty and can lead to a solution that is sub-optimal or that is less favorable than some other unidentified solution.
In view of the foregoing discussion, need is apparent in the art for an improved tool that can aid reservoir development planning and/or that can provide decision support in connection with reservoir development and resource management. A need further exists for a tool that can take a broad range of uncertainties into consideration for the plans or decision support. A need further exists for a tool that systematically addresses uncertain data within a model used to produce plans or decision support. A need further exists for a tool that can handle a full uncertainty space in connection with producing reservoir development plans or decision support. A need further exists for a tool in which inherent uncertainty in data is incorporated directly into the decision optimization model, so tradeoffs associated with decisions across various realizations of the uncertainty are captured and hence, better information is available when making decisions regarding petroleum and/or natural gas reservoir development planning. The foregoing discussion of need in the art is intended to be representative rather than exhaustive. A technology addressing one or more such needs, or some other related shortcoming in the field, would benefit reservoir development planning, for example, providing decisions or plans for developing and managing a reservoir more effectively and more profitably.
The present invention supports making decisions, plans, strategies, and/or tactics for developing and managing petroleum resources, such as a petroleum reservoir.
In one aspect of the present invention, a computer- or software-based method can provide decision support in connection with developing one or more petroleum reservoirs. For example, the method can produce a reservoir development plan based on input data relevant to the reservoir and/or to the operation. Such input data can comprise, unknown or ill-defined fluid dynamics, the size of the reservoir, the current state of development, current and projected prices of petroleum, drilling costs, cost per hour of rig time, geological data, the cost of capital, current and projected available resources (human, financial, equipment, etc.), and the regulatory environment, to name a few representative possibilities. The input data can have uncertainty. More specifically, each element of input data can have an associated level, amount, or indication of uncertainty. Some of the input data may be known with a high level of uncertainty, such as the current cost of rig time, while other input data may have various degrees of uncertainty. For example, uncertainty of future rig time cost may increase as the amount of time projected into the future increases. That is, the uncertainty of rig time cost for the fifth year of the development plan would likely be higher than the uncertainty of rig time cost for the second year. The collective uncertainties of the input data can define an uncertainty space. A software routine can produce the reservoir development plan via processing the input data and taking the uncertainty space into consideration, for example via applying a robust optimization routine. Producing the reservoir development plan can comprise outputting some aspect of a plan, making a determination relevant to generating or changing a plan, or making a recommendation about one or more decisions relevant to reservoir development or management, for example.
In one general aspect, a method for reservoir development planning includes receiving data relevant to reservoir development. A reservoir development plan is generated in response to processing the received data via computer-implemented robust optimization.
Implementations of this aspect may include one or more of the following features. For example, the generating step may include generating the reservoir development plan according to an uncertainty space associated with the received data. The computer-implemented robust optimization may include optimizing at least some aspect of the reservoir development plan based on the received data and an uncertainty space. Receiving data may include receiving known data parameters and uncertain data parameters. Processing the received data via computer-implemented robust optimization may include processing the data with a robust optimization model that incorporates the uncertain data parameters. The uncertainty space may be associated with the received data. Processing the received data via computer-implemented robust optimization may include considering the uncertainty space in entirety.
In another general aspect, a method for reservoir development planning includes receiving data relevant to reservoir development planning, wherein uncertainty is associated with the data. At least some portion of a reservoir development plan is produced in response to processing the received data with a computer-based optimization model that incorporates the uncertainty.
Implementations of this aspect may include one or more of the following features. For example, uncertainty parameters may describe the uncertainty, and the computer-based optimization model may include a robust optimization model that incorporates the uncertainty parameters. Incorporating the uncertainty in the computer-based optimization model may include capturing tradeoffs across a plurality of realizations of the uncertainty. The step of producing at least some portion of the reservoir development plan in response to processing the received data with the computer-based optimization model that incorporates the uncertainty may include forcing feasibility of an optimization problem across an entire uncertainty space. Producing at least some portion of the reservoir development plan in response to processing the received data with the computer-based optimization model that incorporates the uncertainty may include systemically processing uncertain data within the optimization model.
In another general aspect, a method for decision support regarding development of petroleum resources includes receiving a plurality of data elements regarding a decision about developing a petroleum reservoir, wherein a respective characterization of uncertainty is associated with each of the data elements. A recommendation for the decision is output in response to processing each of the data elements and each of the respective characterizations of uncertainty with a computer-based optimization routine.
Implementations of this aspect may include one or more of the following features. For example, the computer-based optimization routine may include a robust optimization model. The robust optimization model may incorporate each of the respective characterizations of uncertainty. Processing each of the data elements and each of the respective characterizations of uncertainty with the computer-based optimization routine may include covering an uncertainty space.
In another general aspect, a computer-based method of optimizing development planning for a reservoir includes providing input data that comprises uncertainty. A first simulation of the reservoir is generated using a high fidelity model for reservoir or surface facility behavior utilizing the input data, wherein the first simulation generates first high fidelity output data. A low fidelity model for reservoir or surface facility behavior is generated using the input data and the first high fidelity output data, wherein the low fidelity model generates a prediction. A reservoir development planning model is optimized utilizing the input data and the low fidelity model for reservoir or surface facility behavior, wherein the reservoir development planning model generates reservoir development planning output data. A second simulation of the reservoir is performed using the high fidelity model for reservoir or surface facility behavior utilizing the input data and the reservoir development planning output data, wherein the second simulation generates second high fidelity output data. The second high fidelity output data is compared with the prediction of the low fidelity model. The steps comprising generating a low fidelity model for reservoir or surface facility behavior, optimizing a reservoir development planning model, performing a second simulation of the reservoir using the high fidelity model for reservoir or surface facility behavior, and comparing the second high fidelity output data with the prediction of the low fidelity model are repeated until the second high fidelity output data is substantially consistent with the prediction of the low fidelity model.
Implementations of this aspect may include one or more of the following features. For example, optimizing a reservoir development planning model may be performed using a robust optimization model. A development plan is generated in response to the second high fidelity output data being consistent with the prediction of the low fidelity model. A solution routine, interfacing with the robust optimization model, may assist the robust optimization model to optimize development planning for the reservoir. The robust optimization model may include a solution routine for assisting with optimizing development planning for the reservoir.
In another general aspect, a method of producing hydrocarbons from a subterranean reservoir includes generating a reservoir development planning system based on input data. The reservoir development planning system is optimized according to an uncertainty space. Hydrocarbons are produced from the reservoir according to output from the optimized reservoir development planning system.
Implementations of this aspect may include one or more of the following features. For example, the input data may include deterministic components and nondeterministic components. Optimizing the reservoir development planning system according to the uncertainty space includes considering each of the nondeterministic components with a robust optimization model. Optimizing the reservoir development planning system according to the uncertainty space may include executing a computer-based robust optimization model that incorporates uncertainty of the input data. The uncertainty space may specify inherent uncertainty of the input data. The reservoir development planning system may include an optimization model comprising a low fidelity reservoir model; and a high fidelity reservoir model. The high fidelity model accepts one or more parameter input data from the optimization model and provides one or more reservoir or surface facility property input data to the optimization model.
The discussion of decision support tools for reservoir development presented in this summary is for illustrative purposes only. Various aspects of the present invention may be more clearly understood and appreciated from a review of the following detailed description of the disclosed embodiments and by reference to the drawings and the claims that follow. Moreover, other aspects, systems, methods, features, advantages, and objects of the present invention will become apparent to one with skill in the art upon examination of the following drawings and detailed description. It is intended that all such aspects, systems, methods, features, advantages, and objects are to be included within this description, are to be within the scope of the present invention, and are to be protected by the accompanying claims.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a graphical illustration representing the use of an entire uncertainty space associated with data for a reservoir model in accordance with certain exemplary embodiments of the present invention.
FIG. 2 is an illustration of a three-dimensional reservoir model including a grid mesh that defines a plurality of nodes in accordance with certain exemplary embodiments of the present invention.
FIG. 3 is a flowchart illustration of a reservoir simulator for simulating the operation of the reservoir model of FIG. 2 in accordance with certain exemplary embodiments of the present invention.
FIG. 4 is a schematic illustration of a robust optimization-based reservoir development planning system in accordance with certain exemplary embodiments of the present invention.
FIG. 5 is a flowchart illustration of a method for operating the robust optimization-based reservoir development planning system of FIG. 4 in accordance with certain exemplary embodiments of the present invention.
Many aspects of the present invention can be better understood with reference to the above drawings. The elements and features shown in the drawings are not necessarily to scale, emphasis instead being placed upon clearly illustrating principles of exemplary embodiments of the present invention. Moreover, certain dimensions may be exaggerated to help visually convey such principles. In the drawings, reference numerals designate like or corresponding, but not necessarily identical, elements throughout the several views.
DETAILED DESCRIPTION OF THE EXEMPLARY EMBODIMENTS
Exemplary embodiments of the present invention support making decisions regarding reservoir development planning while details of uncertain parameters remain unknown. Such uncertainties can be considered directly within an optimization model that can be a robust optimization model. In an exemplary embodiment, the robust optimization model systematically addresses all the uncertain data. Such a paradigm allows for producing flexible or robust optimization solutions that remain feasible covering the uncertainty space, as well as making the trade-off between optimality and the randomness or uncertainty in the input data.
In certain exemplary embodiments, robust optimization provides an approach to reservoir development planning and handles uncertainty effectively. In some embodiments, the optimization may be analogous to recourse models for stochastic programming. However, a penalty function in the objective may replace a feasibility for all possible realizations, sometime referred to as “scenarios.” One exemplary embodiment of robust optimization integrates goal programming with scenario-based descriptions of problem data.
The present invention can be embodied in many different forms and should not be construed as limited to the embodiments set forth herein; rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those having ordinary skill in the art. Furthermore, all “examples” or “exemplary embodiments” given herein are intended to be non-limiting, and among others supported by representations of the present invention.
An exemplary embodiment of the present invention will now be described in detail with reference to FIGS. 1-4. FIG. 1 is a graphical illustration of using the entire uncertainty space associated with data for a reservoir model in accordance with certain exemplary embodiments of the present invention. The oval shape represents the uncertainty space 100, which, as discussed above, characterizes uncertainty for information or data that will be considered for planning or decision making. The shading within the oval indicates that the full uncertainty space 100 is being considered, rather than just random data points within the uncertainty space 100. That is, the robust optimization model allows the entire uncertainty space 100 to be considered for all values 104 deemed possible. With this comprehensive view of uncertainty, the robust optimization model provides solutions that are more optimal.
FIG. 2 is an illustration of a three-dimensional reservoir model 200 including a grid mesh 206 that defines a plurality of nodes 204 in accordance with certain exemplary embodiments of the present invention. The reservoir model 200 may be used for simulating operation of an oil and/or gas reservoir with one or more vertical wells 202. As shown, the reservoir model 200 may be broken up into a plurality of nodes 204 by a grid mesh 206. The grid mesh 206 represents geological formation in cell format to support computer-based processing of reservoir and geological information according to the grid mesh 206. The nodes 204 of the reservoir model 200 may be of non-uniform size. This three-dimensional reservoir model 200 may provide additional data to be used in conjunction with a reservoir simulator.
FIG. 3 is a flowchart illustration of a reservoir simulator 300 for simulating the operation of the reservoir model 200 of FIG. 2 in accordance with certain exemplary embodiments of the present invention. In an exemplary embodiment, the simulator 300 comprises a set of instructions executing on a computer system. That is, the simulator 300 comprises one or more software programs running on one or more computers. Additionally, the computer may have one or more processors performing the simulation.
Referring to FIG. 2 and FIG. 3, the reservoir simulator 300 simulates the reservoir model's operation in which well management 302 is performed for the well 202 and surface facility network of the reservoir model 200. The well management 302 is performed over all wells 202 in the reservoir model 200 and includes an iterative process 304 in which a Jacobian construction and flow calculation 306 is performed, followed by a linear solve 308 and one or more property calculations 310. The linear solve 308 and/or the one or more property calculations 310 are performed over large arrays of data that represent properties such as, for example, pressure and composition at mesh points in the grid mesh 206.
Upon the completion and convergence of the iterative process 304 for the well 202 in the reservoir model 200, the data for the well 202 is then generated in a results/checkpoint I/O 312. Upon completion of the well management 302 for the well 202, the well management 302 may be performed for the remaining wells 202 of the entire reservoir model 200, wherein the results of each well 202 are generated in the results/checkpoint I/O 312.
The reservoir simulator 300 may be implemented, for example, using one or more general purpose computers, special purpose computers, analog processors, digital processors, central processing units, and/or distributed computing systems. That is, the reservoir simulator 300 can comprise computer executable instructions or code.
The output of the reservoir simulator 300 can comprise a result displayed on a graphical user interface (GUI), a data file, data on a medium such as an optical or magnetic disk, a paper report, or signals transmitted to another computer or another software routine (not an exhaustive list).
The reservoir model 200 and reservoir simulator 300 may be used to simulate the operation of the reservoir to thereby permit modeling of fluids, energy, and/or gases flowing in the hydrocarbon reservoirs, wells, and related surface facilities. Reservoir simulation 300 is one part of reservoir optimization which also includes constructing the data to accurately represent the reservoir. An exemplary simulation goal comprises understanding formation flow patterns in order to optimize some strategy for producing hydrocarbons from some set of wells 202 and surface facilities. The simulation is usually part of a time-consuming, iterative process to reduce uncertainty about a particular reservoir model description while optimizing a production strategy. Reservoir simulation, for example, is one kind of computational fluid dynamics simulation.
The reservoir model 200 and the reservoir simulator 300 may further be used to optimize the design and operation of the corresponding reservoir, wells, and related surface facilities.
FIG. 4 is a schematic illustration of a robust optimization-based reservoir development planning system 400 in accordance with certain exemplary embodiments of the present invention. In an exemplary embodiment, the reservoir development planning system 400 is a computer program, a software-based engine, or a computing module. Moreover, each illustrated block in the diagram of FIG. 4 can comprise a computer program, a software-based engine, or a computing module. Thus, the robust optimization-based reservoir development planning system 400 may be implemented, for example, using one or more general purpose computers, special purpose computers, analog processors, digital processors, central processing units, and/or distributed computing systems.
The robust optimization-based reservoir development planning system 400 includes one or more robust optimization models for reservoir development planning 402. The robust optimization model for reservoir development planning 402 is a robust optimization model for optimizing the development plan given some target objective and subject to the constraints of the system.
Additionally, the robust optimization-based reservoir development planning system 400 may include at least one source of input data 404, a high fidelity model for reservoir and/or surface facility behavior 406 and a solution routine 408. The high fidelity model for reservoir and/or surface facility behavior 406 is a high fidelity model, or reservoir simulation model, used to update and adjust the robust optimization model for reservoir development planning 402 in subsequent iterations. Such updates and adjustments provide refinement as the robust optimization model for reservoir development planning 402 may contain an approximation of the high fidelity model for reservoir and/or surface facility behavior 406 within its system of constraint equations. A low fidelity model, which is included within the robust optimization model for reservoir development planning 402, provides this approximation of the high fidelity model for reservoir and/or surface facility behavior 406.
The robust optimization model for reservoir development planning 402 may receive input data from a source of input data 404. The input data can comprise data entries in one or more spreadsheets, one or more databases, information fed over a computer network or the Internet, manual entries, user input from a GUI, etc.
After processing the input data, the robust optimization model for reservoir development planning 402 may provide output to a high fidelity model for reservoir and/or surface facility behavior 406 of the reservoir under consideration. The high fidelity model for reservoir and/or surface facility behavior 406 may in turn provide its output data back to the robust optimization model for reservoir development planning 402. Finally, the robust optimization model for reservoir development planning 402 may interface with the solution routine 408.
The present exemplary embodiment provides a robust optimization-based reservoir development planning system 400 in which the inherent uncertainty in the data associated with a reservoir is incorporated directly into the robust optimization model for reservoir development planning 402. By incorporating the uncertainty in the data into the robust optimization model for reservoir development planning 402, tradeoffs associated with decisions across various realizations of the uncertainty are captured and hence, better information is available when making decisions regarding petroleum and/or natural gas reservoir development planning.
The aim of robust optimization is to choose a solution which is able to cope best with various realizations of uncertain data. The uncertain data is assumed to be unknown but bounded, and theoretical results may also assume convexity of the uncertainty space. The optimization problem with uncertain parameters is reformulated into a counterpart robust optimization problem. In this case, in addition to known or certain data parameters, there are also uncertain data parameters θ (theta) appearing in the constraints. The constraints are reformulated such that they must be satisfied given any possible realization of the uncertain parameters. The decision variable arrays “x” and “y” are now also posed such that they are dependent on the realizations of the uncertain parameters.
minf(x,y)
s.t g(x,y;θ)≦0∀θε{uncertainty space}
xεX
y(θ)εY
According to an exemplary embodiment, robust optimization ensures (or alternatively provides or supports) robustness and flexibility in an optimization solution by forcing feasibility of an optimization problem for the entire given uncertainty space, for example, essentially covering the uncertainty space. Solutions avoid violating (or do not violate) any constraint for any data realization. Furthermore, robust optimization allows mitigation of the worst-case scenario given.
In an exemplary embodiment, the robust optimization-based reservoir development planning system 400 provides a decision support tool to optimize a risk averse, risk neutral, or risk seeking measure of the objective function (e.g., net present value—NPV) satisfying all business problem constraints.
In an exemplary embodiment, the robust optimization model for reservoir development planning 402 may be a data independent mathematical abstraction of the reservoir model 200 (FIG. 2). The source of input data 404 may provide reservoir data which may, for example, be stored and retrieved from spreadsheets, databases, manual entry, or otherwise. The high fidelity model for reservoir and/or surface facility behavior 406 may include one or more reservoir or surface facility simulators such as, for example, the reservoir simulator 300 can comprise or be based upon software-based tools, programs, or capabilities; such as those marketed by: Schlumberger Technology Corporation under the registered trademark “ECLIPSE”, Landmark Graphics Corporation under the registered trademark “VIP”, or Landmark Graphics Corporation under the registered trademark “NEXUS”. Also, the solution routine 408 may comprise one or more routines, methods, processes, or algorithms for solving the robust optimization model for reservoir development planning 402.
In an exemplary embodiment, the design and operation of the robust optimization model for reservoir development planning 402 and the solution routine 408 may be combined in whole or in part. Additionally, the design and operation of the robust optimization-based reservoir development planning system 400 may be implemented, for example, using one or more general purpose programmable computers which may, or may not, be distributed within or between one or more communication networks.
FIG. 5 is a flowchart illustration of a method 500 for operating the robust optimization-based reservoir development planning system of FIG. 4 in accordance with an exemplary embodiment.
Certain steps in the methods and processes described herein (with reference to FIG. 5 as well as the other figures) must naturally precede others for the present invention to function as described. However, the present invention is not limited to the order of the steps described if such order or sequence does not adversely alter the functionality of the present invention. That is, it is recognized that some steps may be performed before or after other steps or in parallel with other steps without departing from the scope and spirit of the present invention.
The present invention can include multiple processes that can be implemented with computer and/or manual operation. The present invention can comprise one or more computer programs that embody certain functions described herein and illustrated in the examples, diagrams, figures, and flowcharts. However, it should be apparent that there could be many different ways of implementing aspects of the present invention with computer programming, manually, non-computer-based machines, or in a combination of computer and manual implementation. The invention should not be construed as limited to any one set of computer program instructions. Further, a programmer with ordinary skill would be able to write such computer programs without difficulty or undue experimentation based on the disclosure and teaching presented herein.
Therefore, disclosure of a particular set of program code instructions is not considered necessary for an adequate understanding of how to make and use the present invention. The inventive functionality of any programming aspects of the present invention will be explained in further detail in the following description in conjunction with the figures illustrating the functions and program flow and processes.
Referring to FIG. 5, the method of operation 500, which will be discussed with exemplary reference to FIGS. 1, 2, 3 and 4, begins at step 505 and proceeds to step 510. At step 510 the development plan case input data is provided to the robust optimization model for reservoir development planning 402. The input data may be provided from a combination of manual data entry, spreadsheets, and databases and may include, but is not limited to, specifications of uncertain parameters (e.g., range of uncertain values), decision variables (e.g., time when they will be implemented), risk attitude, objective function, etc. These input data may form a data instance that is used to populate one or more mathematical models within the robust optimization model for reservoir development planning 402.
At step 515, the initializing reservoir and/or surface facility parameter input data is provided to the high fidelity model for reservoir and/or surface facility behavior 406. At step 520, the high fidelity model for reservoir and/or surface facility behavior 406 simulates the reservoir and/or surface facilities. This high fidelity model for reservoir and/or surface facility behavior 406 may include one or more high fidelity models for reservoir and surface facility behavior such as, for example, reservoir and facility simulators as discussed above. Additionally, upon performing the simulation, data relating to the operation of the reservoir and surface facilities are obtained, wherein the data includes, but is not limited to, production estimates, structure, flow properties, etc.
At step 525, the simulation results of the reservoir and/or surface facility property are provided as reservoir and/or surface facility property input data, which may also be referred to as first high fidelity output data, to the robust optimization model for reservoir development planning.
At step 530, the initial low fidelity model components are generated for inclusion in the robust optimization model for reservoir development planning 402. The initial low fidelity model components are a prediction for the reservoir and/or surface facility behavior. This prediction is generated from using the input data and the first high fidelity output data. The robust optimization model for reservoir development planning 402 includes a low fidelity model that is computationally efficient and provides an approximation of the reservoir and surface facility behavior. In other words, as compared to the high fidelity model, the low fidelity model provides less computational precision to produce relatively rough results and thus executes much faster on a typical computing system. The low fidelity model may be generated from a portion of the software code used in the high fidelity model for reservoir and/or surface facility behavior 406. For example, the software of high fidelity model can be tuned so as to run fewer iterations. The high fidelity model can be adapted or configured to provide the low fidelity model via running two dimensional cross sections, via reducing the number of parameter inputs, via specifying larger cell sizes, etc.
Upon completion of steps 505 to 530, the robust optimization model for reservoir development planning 402 is solved at step 535, utilizing the input data and the low fidelity model for reservoir and/or surface facility behavior. The robust optimization model for reservoir development planning 402 includes one or more robust optimization models that may, for example, include a MINLP-class model and a MINLP-based solution routine or algorithm.
The robust optimization model for reservoir development planning 402 can be solved using one or more fit-for-purpose solution routines that may be provided in the one or more of the robust optimization model for reservoir development planning 402 and the solution routine 408. The fit-for-purpose solution routines may include a combination of commercial or openly available mathematical programming solver routines and specially designed model-specific techniques. Thus, solving the robust optimization model for reservoir development planning 402 can be achieved without probability density functions for the uncertainty representation. The solving of the robust optimization model for reservoir development 403 planning generates a reservoir model solution, wherein a tentative development plan and reservoir and/or surface facility parameter input data, which may also be referred to as reservoir development planning output data, for the high fidelity model for reservoir and/or surface facility behavior 406 may be generated based on this reservoir model solution.
At step 540, the reservoir and/or surface facility parameter input data, generated by the solving of the robust optimization model for reservoir development planning 402, is provided to the high fidelity model for reservoir and/or surface facility behavior 406.
At step 545, the high fidelity model for reservoir and/or surface facility behavior 406 again simulates the reservoir and/or surface facilities. This simulation generates a corresponding high fidelity output data, which may also be referred to as the reservoir and/or surface facility property input data.
At step 550, a determination is made as to whether the output of the high fidelity model is substantially consistent with the prediction from the low fidelity model. If the components are not substantially consistent, the reservoir and/or surface facility property input data is again provided to the robust optimization model for reservoir development planning 402 at step 555. At step 560, the low fidelity model components are again generated for inclusion into the robust optimization model for reservoir development planning.
At step 535, the robust optimization model for reservoir development planning 402 is again solved. This process continues to iterate until the output of the high fidelity model is substantially consistent with the prediction from the low fidelity model at step 550. For example, when the results of the low fidelity model and the high fidelity model converge, step 550 can make a determination that a sufficient level of processing has been completed. At that point, step 550 deems the iterating complete.
Once the prediction from the low fidelity model is consistent with the output of the high fidelity model for reservoir and/or surface facility behavior 406, the robust optimization model for reservoir development planning 402 is again solved to generate an output which may include a final development plan at step 565. The output may be used to generate reports, calculations, tables, figures, charts, etc. for the analysis of development planning or reservoir management under data uncertainty. Moreover exemplary embodiments of the output comprise, a result displayed on a graphical user interface (GUI), a data file, data on a medium such as an optical or magnetic disk, a paper report, or signals transmitted to another computer or another software routine, or some other tangible output to name a few examples.
According to some embodiments, multiple cases may be tested and optimized so that their results may be compared side-by-side as part of the process. The method of operation 500 then ends at step 570. Although the method of operation 500 has been illustrated in steps, some of the steps may be performed in a different order without departing from the scope and spirit of the exemplary embodiment.
In various exemplary embodiments, the method 500 can be implemented using a mathematical programming language or system such as, for example, AIMMS, GAMS, AMPL, OPL, Mosel or using a computer programming language such as, for example, C++ or Java, or some combination of both. The fit-for-purpose solution routines may be developed in either mathematical programming languages or directly with a computer programming language or with support of commercially available software tools. For example, commercial and open source versions of mathematical programming languages and computer programming code compilers are generally available.
It is understood that variations may be made in the foregoing without departing from the scope and spirit of the invention. For example, the teachings of the present illustrative embodiments may be used to enhance the computational efficiency of other types of n-dimensional computer models.
Although illustrative embodiments of the present invention have been shown and described, a wide range of modification, changes and substitution is contemplated in the foregoing disclosure. In some instances, some features of the present invention may be employed without a corresponding use of the other features. Accordingly, it is appropriate that the appended claims be construed broadly and in a manner consistent with the scope and spirit of the invention.

Claims (20)

What is claimed is:
1. A method for reservoir development planning, comprising the steps of:
receiving data relevant to reservoir development; and
generating a reservoir development plan in response to processing the received data via computer-implemented robust optimization, wherein the reservoir development plan is generated according to an uncertainty space associated with the received data.
2. The method of claim 1, wherein computer-implemented robust optimization comprises optimizing at least some aspect of the reservoir development plan based on the received data and the uncertainty space.
3. The method of claim 1, wherein the step of receiving data comprises receiving known data parameters and uncertain data parameters, and
wherein processing the received data via computer-implemented robust optimization comprises processing the data with a robust optimization model that incorporates the uncertain data parameters.
4. The method of claim 1,
wherein processing the received data via computer-implemented robust optimization comprises considering the uncertainty space in entirety.
5. A method for reservoir development planning, comprising the steps of:
receiving data relevant to reservoir development planning, wherein uncertainty is associated with the data; and
producing at least some portion of a reservoir development plan in response to processing the received data with a computer-based optimization model that incorporates the uncertainty, wherein uncertainty parameters describe the uncertainty, and wherein the computer-based optimization model comprises a robust optimization model that incorporates the uncertainty parameters.
6. The method of claim 5, wherein incorporating the uncertainty in the computer-based optimization model comprises capturing tradeoffs across a plurality of realizations of the uncertainty.
7. The method of claim 5, wherein the step of producing at least some portion of the reservoir development plan in response to processing the received data with the computer-based optimization model that incorporates the uncertainty comprises forcing feasibility of an optimization problem across an entire uncertainty space.
8. The method of claim 5, wherein the step of producing at least some portion of the reservoir development plan in response to processing the received data with the computer-based optimization model that incorporates the uncertainty comprises systemically processing uncertain data within the optimization model.
9. A method for decision support regarding development of petroleum resources, comprising the steps of:
receiving a plurality of data elements regarding a decision about developing a petroleum reservoir, wherein a respective characterization of uncertainty is associated with each of the data elements; and
outputting a recommendation for the decision in response to processing each of the data elements and each of the respective characterizations of uncertainty with a computer-based optimization routine, wherein the computer-based optimization routine comprises a robust optimization model.
10. The method of claim 9, wherein the robust optimization model incorporates each of the respective characterizations of uncertainty.
11. The method of claim 9, wherein processing each of the data elements and each of the respective characterizations of uncertainty with the computer-based optimization routine comprises covering an uncertainty space.
12. A computer-based method of optimizing development planning for a reservoir, comprising:
providing input data that comprises uncertainty;
generating a first simulation of the reservoir using a high fidelity model for reservoir or surface facility behavior utilizing the input data, wherein the first simulation generates first high fidelity output data;
generating a low fidelity model for reservoir or surface facility behavior using the input data and the first high fidelity output data, wherein the low fidelity model generates a prediction;
optimizing a reservoir development planning model utilizing the input data and the low fidelity model for reservoir or surface facility behavior, wherein the reservoir development planning model generates reservoir development planning output data;
performing a second simulation of the reservoir using the high fidelity model for reservoir or surface facility behavior utilizing the input data and the reservoir development planning output data, wherein the second simulation generates second high fidelity output data;
comparing the second high fidelity output data with the prediction of the low fidelity model;
repeating the steps comprising generating a low fidelity model for reservoir or surface facility behavior, optimizing a reservoir development planning model, performing a second simulation of the reservoir using the high fidelity model for reservoir or surface facility behavior, and comparing the second high fidelity output data with the prediction of the low fidelity model until the second high fidelity output data is substantially consistent with the prediction of the low fidelity model.
13. The method of claim 12, wherein the optimizing a reservoir development planning model is performed using a robust optimization model.
14. The method of claim 13, wherein a solution routine, interfacing with the robust optimization model, assists the robust optimization model to optimize development planning for the reservoir.
15. The method of claim 13, wherein the robust optimization model comprises a solution routine for assisting with optimizing development planning for the reservoir.
16. The method of claim 12, further comprising:
generating a development plan in response to the second high fidelity output data being consistent with the prediction of the low fidelity model.
17. A method of producing hydrocarbons from a subterranean reservoir, comprising:
generating a reservoir development planning system based on input data;
optimizing the reservoir development planning system according to an uncertainty space; and
producing hydrocarbons from the reservoir according to output from the optimized reservoir development planning system, wherein optimizing the reservoir development planning system according to the uncertainty space comprises executing a computer-based robust optimization model that incorporates uncertainty of the input data.
18. The method of claim 17, wherein the input data comprises deterministic components and nondeterministic components, and wherein the step of optimizing the reservoir development planning system according to the uncertainty space comprises considering each of the nondeterministic components with the robust optimization model.
19. The method of claim 17, wherein the uncertainty space specifies inherent uncertainty of the input data.
20. A method of producing hydrocarbons from a subterranean reservoir, comprising:
generating a reservoir development planning system based on input data;
optimizing the reservoir development planning system according to an uncertainty space; and
producing hydrocarbons from the reservoir according to output from the optimized reservoir development planning system,
wherein the reservoir development planning system comprises:
an optimization model comprising a low fidelity reservoir model; and
a high fidelity reservoir model,
wherein the high fidelity model accepts one or more parameter input data from the optimization model and provides one or more reservoir or surface facility property input data to the optimization model.
US12/864,959 2008-04-17 2009-03-09 Robust optimization-based decision support tool for reservoir development planning Active 2030-01-05 US8504335B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US12/864,959 US8504335B2 (en) 2008-04-17 2009-03-09 Robust optimization-based decision support tool for reservoir development planning

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
US12450008P 2008-04-17 2008-04-17
PCT/US2009/036540 WO2009145960A1 (en) 2008-04-17 2009-03-09 Robust optimization-based decision support tool for reservoir development planning
US12/864,959 US8504335B2 (en) 2008-04-17 2009-03-09 Robust optimization-based decision support tool for reservoir development planning

Publications (2)

Publication Number Publication Date
US20110022363A1 US20110022363A1 (en) 2011-01-27
US8504335B2 true US8504335B2 (en) 2013-08-06

Family

ID=41377459

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/864,959 Active 2030-01-05 US8504335B2 (en) 2008-04-17 2009-03-09 Robust optimization-based decision support tool for reservoir development planning

Country Status (6)

Country Link
US (1) US8504335B2 (en)
EP (1) EP2288974A1 (en)
CN (1) CN102007459B (en)
BR (1) BRPI0909440A2 (en)
CA (1) CA2717373A1 (en)
WO (1) WO2009145960A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015138131A1 (en) 2014-03-11 2015-09-17 Exxonmobil Upstream Research Company Risk measure-based decision support tool for reservoir development
WO2017011469A1 (en) * 2015-07-13 2017-01-19 Conocophillips Company Ensemble based decision making
US9946972B2 (en) 2014-05-23 2018-04-17 International Business Machines Corporation Optimization of mixed-criticality systems
US10013663B2 (en) 2011-12-09 2018-07-03 Exxonmobil Upstream Research Company Method for developing a long-term strategy for allocating a supply of liquefied natural gas
US10108762B2 (en) 2014-10-03 2018-10-23 International Business Machines Corporation Tunable miniaturized physical subsurface model for simulation and inversion
US10867261B2 (en) 2014-05-07 2020-12-15 Exxonmobil Upstream Research Company Method of generating an optimized ship schedule to deliver liquefied natural gas

Families Citing this family (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BRPI0820870A2 (en) 2007-12-13 2015-06-16 Exxonmobil Upstream Res Co Method for simulating a reservoir model.
CA2717373A1 (en) 2008-04-17 2009-12-03 Exxonmobil Upstream Research Company Robust optimization-based decision support tool for reservoir development planning
WO2009128972A1 (en) 2008-04-18 2009-10-22 Exxonmobil Upstream Research Company Markov decision process-based decision support tool for reservoir development planning
US8775361B2 (en) 2008-04-21 2014-07-08 Exxonmobil Upstream Research Company Stochastic programming-based decision support tool for reservoir development planning
US9031674B2 (en) * 2010-10-13 2015-05-12 Schlumberger Technology Corporation Lift-gas optimization with choke control
US9465773B2 (en) 2012-08-17 2016-10-11 International Business Machines Corporation Data-driven distributionally robust optimization
EP2819086A1 (en) * 2013-06-28 2014-12-31 Repsol, S.A. Method to generate scenarios of hydrocarbon reservoirs based on limited amount of information on a target hydrocarbon reservoir
US9458713B2 (en) 2012-11-14 2016-10-04 Repsol, S. A. Generating hydrocarbon reservoir scenarios from limited target hydrocarbon reservoir information
US9388682B2 (en) * 2013-01-25 2016-07-12 Schlumberger Technology Corporation Hazard avoidance analysis
EP2811107A1 (en) * 2013-06-06 2014-12-10 Repsol, S.A. Method for selecting and optimizing oil field controls for production plateau
BR112015032537A2 (en) * 2013-06-28 2017-07-25 Ibm method for generating hydrocarbon reservoir scenarios based on limited information in a target hydrocarbon reservoir
RU2640607C1 (en) * 2013-12-06 2018-01-10 Хэллибертон Энерджи Сервисиз, Инк. Control of wellbore drilling complexes
US10808501B2 (en) * 2014-03-17 2020-10-20 Saudi Arabian Oil Company Modeling intersecting faults and complex wellbores in reservoir simulation
CN104806215B (en) * 2015-04-02 2017-04-05 中国石油大学(华东) A kind of recognition methodss that the extraction well performance degree of association is injected for chemical flooding
CN107851230A (en) * 2015-06-05 2018-03-27 雷普索尔有限公司 The method for generating the production strategy for developing hydrocarbon reservoir in natural environment
WO2016204754A1 (en) * 2015-06-17 2016-12-22 Landmark Graphics Corporation Model tuning using boundary flux sector surrogates
WO2017027068A1 (en) * 2015-08-07 2017-02-16 Schlumberger Technology Corporation Well management on cloud computing system
US11762888B2 (en) 2020-12-16 2023-09-19 Landmark Graphics Corporation Geological database management using signatures for hydrocarbon exploration

Citations (71)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5729451A (en) 1995-12-01 1998-03-17 Coleman Research Corporation Apparatus and method for fusing diverse data
US5764515A (en) 1995-05-12 1998-06-09 Institute Francais Du Petrole Method for predicting, by means of an inversion technique, the evolution of the production of an underground reservoir
US5798982A (en) 1996-04-29 1998-08-25 The Trustees Of Columbia University In The City Of New York Method for inverting reflection trace data from 3-D and 4-D seismic surveys and identifying subsurface fluid and pathways in and among hydrocarbon reservoirs based on impedance models
US5878372A (en) 1997-03-04 1999-03-02 Western Atlas International, Inc. Method for simultaneous inversion processing of well log data using a plurality of earth models
US6067340A (en) 1998-07-06 2000-05-23 Eppstein; Margaret J. Three-dimensional stochastic tomography with upscaling
US6128577A (en) 1996-12-19 2000-10-03 Schlumberger Technology Corporation Modeling geological structures and properties
US6216083B1 (en) * 1998-10-22 2001-04-10 Yamaha Motor Co., Ltd. System for intelligent control of an engine based on soft computing
US6230101B1 (en) 1999-06-03 2001-05-08 Schlumberger Technology Corporation Simulation method and apparatus
US6246963B1 (en) 1999-01-29 2001-06-12 Timothy A. Cross Method for predicting stratigraphy
WO2001055939A2 (en) 2000-01-28 2001-08-02 Trajecta, Inc. System and method for robust optimization including uncertainty models
WO2001062603A2 (en) 2000-02-22 2001-08-30 Schlumberger Technology Corporation Integrated reservoir optimization
US20020042702A1 (en) 2000-08-31 2002-04-11 Calvert Craig S. Method for constructing 3-D geologic models by combining multiple frequency passbands
US6381505B1 (en) 1998-09-28 2002-04-30 Aspen Technology, Inc. Robust steady-state target calculation for model predictive control
US6522973B1 (en) 1999-10-29 2003-02-18 Institut Francais Du Petrole Method for 2D or 3D modelling of a heterogeneous medium such as the subsoil described by one or more physical parameters
US20030093392A1 (en) * 1998-10-22 2003-05-15 Ulyanov Sergei V. System for intelligent control based on soft computing
US6618695B1 (en) 1998-07-01 2003-09-09 Institut Francais Du Petrole Method for gradually deforming a stochastic model of a heterogeneous medium such as an underground zone
US20030225606A1 (en) 2002-05-29 2003-12-04 Schlumberger Technology Corporation Tools for decision-making in reservoir risk management
US6662109B2 (en) 2001-04-19 2003-12-09 Institut Francais Du Petrole Method of constraining by dynamic production data a fine model representative of the distribution in the reservoir of a physical quantity characteristic of the subsoil structure
US6674432B2 (en) 2000-06-29 2004-01-06 Object Reservoir, Inc. Method and system for modeling geological structures using an unstructured four-dimensional mesh
US6775578B2 (en) 2000-09-01 2004-08-10 Schlumberger Technology Corporation Optimization of oil well production with deference to reservoir and financial uncertainty
US6813565B1 (en) 1999-07-02 2004-11-02 Institut Francais Du Petrole Method for gradually deforming sequential simulations of a heterogeneous environment such as an underground zone
US20040220790A1 (en) 2003-04-30 2004-11-04 Cullick Alvin Stanley Method and system for scenario and case decision management
US6823297B2 (en) 2003-03-06 2004-11-23 Chevron U.S.A. Inc. Multi-scale finite-volume method for use in subsurface flow simulation
US6826483B1 (en) * 1999-10-13 2004-11-30 The Trustees Of Columbia University In The City Of New York Petroleum reservoir simulation and characterization system and method
US6826486B1 (en) 2000-02-11 2004-11-30 Schlumberger Technology Corporation Methods and apparatus for predicting pore and fracture pressures of a subsurface formation
CA2529339A1 (en) 2003-06-20 2004-12-29 Strategic Capital Network, Llc Improved resource allocation technique
US20050010383A1 (en) 2002-07-11 2005-01-13 Mickaele Le Ravalec-Dupin Method of constraining a heterogeneous permeability field representing an underground reservoir by dynamic data
US20050015226A1 (en) 2003-07-18 2005-01-20 Mickaele Le Ravalec-Dupin Method intended for gradual, deformation of a boolean model simulating a heterogeneous medium, constrained to dynamic data
US20050096893A1 (en) 2003-06-02 2005-05-05 Mathieu Feraille Decision support method for oil reservoir management in the presence of uncertain technical and economic parameters
US20050120195A1 (en) 2003-11-13 2005-06-02 Alok Kumar Allocating memory
US6907392B2 (en) 1999-11-29 2005-06-14 Institut Francais Du Petrole Method of generating a hybrid grid allowing modelling of a heterogeneous formation crossed by one or more wells
US6912491B1 (en) 1999-05-25 2005-06-28 Schlumberger Technology Corp. Method and apparatus for mapping uncertainty and generating a map or a cube based on conditional simulation of random variables
US20050192855A1 (en) 2004-01-13 2005-09-01 Greg Chitty System for evaluating over and underbalanced drilling operations
US20060047489A1 (en) 2004-08-30 2006-03-02 Celine Scheidt Method of modelling the production of an oil reservoir
US7047165B2 (en) 1999-12-10 2006-05-16 Institut Francais Du Petrole Method of generating a grid on a heterogenous formation crossed by one or more geometric discontinuities in order to carry out simulations
US7054752B2 (en) 2003-06-02 2006-05-30 Institut Francais Du Petrole Method for optimizing production of an oil reservoir in the presence of uncertainties
US7096172B2 (en) 2003-01-31 2006-08-22 Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. System and method for automated reservoir targeting
US7096122B2 (en) 2003-07-22 2006-08-22 Dianli Han Method for producing full field radial grid for hydrocarbon reservoir simulation
US20060241925A1 (en) 2003-03-18 2006-10-26 Thomas Schaaf Method for quickly forming a stochastic method representating the distribution of a physical variable in a heterogeneous environment by appropriate selection of a geostatistic realizations
US20060247990A1 (en) 2005-04-29 2006-11-02 Keshav Narayanan Optimization of decisions regarding multiple assets in the presence of various underlying uncertainties
WO2006119099A2 (en) 2005-04-29 2006-11-09 Landmark Graphics Corporation Optimization of decisions regarding multiple assets in the presence of various underlying uncertainties
US20070073527A1 (en) 2005-09-26 2007-03-29 Nicolas Flandrin Method for simulating fluid flows within a medium discretized by a hybrid grid
US7200540B2 (en) 2003-01-31 2007-04-03 Landmark Graphics Corporation System and method for automated platform generation
US7200533B2 (en) 2002-10-30 2007-04-03 Institut Francais Du Petrole Method for rapid formation of a stochastic model representative of a heterogeneous underground reservoir, constrained by dynamic data
US20070094216A1 (en) 2005-08-02 2007-04-26 Northrop Grumman Corporation Uncertainty management in a decision-making system
US20070094187A1 (en) 2003-08-26 2007-04-26 Anderson Roger N Innervated stochastic controller for real time business decision-making support
WO2007058662A1 (en) 2005-11-21 2007-05-24 Chevron U.S.A., Inc. Method for field scale production optimization
US20070179766A1 (en) 2006-01-31 2007-08-02 Landmark Graphics Corporation Methods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator
US7254091B1 (en) 2006-06-08 2007-08-07 Bhp Billiton Innovation Pty Ltd. Method for estimating and/or reducing uncertainty in reservoir models of potential petroleum reservoirs
US7277806B2 (en) 2003-06-26 2007-10-02 Exxonmobil Upstream Research Company Method for removing air wave effect from offshore frequency domain controlled-source electromagnetic data
US20070265815A1 (en) 2006-05-15 2007-11-15 Benoit Couet Method for optimal gridding in reservoir simulation
EP1865340A1 (en) 2006-06-06 2007-12-12 Total S.A. A process and program for characterising evolution of an oil reservoir over time
US7310579B2 (en) 2004-09-16 2007-12-18 Institut Francais Du Petrole Method for generating a reservoir model on flexible grid
US20070294034A1 (en) 2006-06-15 2007-12-20 Tom Bratton Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs
US20080077371A1 (en) 2006-09-01 2008-03-27 Chevron U.S.A. Inc. Method for history matching and uncertainty quantification assisted by global optimization techniques utilizing proxies
US20080091353A1 (en) 2006-10-16 2008-04-17 Krumhansl Peter A Systems and methods for detecting shallow buried objects
US7369973B2 (en) 2000-06-29 2008-05-06 Object Reservoir, Inc. Method and system for representing reservoir systems
US7392166B2 (en) 2003-02-21 2008-06-24 Institut Francais Du Petrole Method for more rapidly producing the representative stochastic model of a heterogeneous underground reservoir defined by uncertain static and dynamic data
US20080167849A1 (en) 2004-06-07 2008-07-10 Brigham Young University Reservoir Simulation
US7426460B2 (en) 2003-01-16 2008-09-16 Institut Francais Du Petrole Method for determining zones in a stratified medium where the interface between a fluid in place in the medium and a flushing fluid moves in a stationary manner
US7451066B2 (en) 1998-05-04 2008-11-11 Edwards David A Near wellbore modeling method and apparatus
US20090006057A1 (en) 2007-06-30 2009-01-01 Yuqiang Niu Simulating fluid flow in reservoir with modified grid
US7496488B2 (en) 2003-03-06 2009-02-24 Schlumberger Technology Company Multi-scale finite-volume method for use in subsurface flow simulation
US7546228B2 (en) 2003-04-30 2009-06-09 Landmark Graphics Corporation Stochastically generating facility and well schedules
US20090164187A1 (en) 2007-12-21 2009-06-25 Tarek Habashy Method for reservoir characterization and monitoring including deep reading quad combo measurements
US20090164188A1 (en) 2007-12-21 2009-06-25 Tarek Habashy Method for upscaling a reservoir model using deep reading measurements
US7584081B2 (en) 2005-11-21 2009-09-01 Chevron U.S.A. Inc. Method, system and apparatus for real-time reservoir model updating using ensemble kalman filter
US20090234625A1 (en) 2008-03-14 2009-09-17 Schlumberger Technology Corporation Providing a simplified subterranean model
WO2009128972A1 (en) 2008-04-18 2009-10-22 Exxonmobil Upstream Research Company Markov decision process-based decision support tool for reservoir development planning
WO2009131761A2 (en) 2008-04-21 2009-10-29 Exxonmobile Upstream Research Company Stochastic programming-based decision support tool for reservoir development planning
WO2009145960A1 (en) 2008-04-17 2009-12-03 Exxonmobil Upstream Research Company Robust optimization-based decision support tool for reservoir development planning

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5858372A (en) * 1997-09-12 1999-01-12 Jacob; George Herbal medication for the treatment of psoriasis
US7263509B2 (en) * 2003-04-09 2007-08-28 Lee Shih-Jong J Intelligent spatial reasoning

Patent Citations (86)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5764515A (en) 1995-05-12 1998-06-09 Institute Francais Du Petrole Method for predicting, by means of an inversion technique, the evolution of the production of an underground reservoir
US5729451A (en) 1995-12-01 1998-03-17 Coleman Research Corporation Apparatus and method for fusing diverse data
US5798982A (en) 1996-04-29 1998-08-25 The Trustees Of Columbia University In The City Of New York Method for inverting reflection trace data from 3-D and 4-D seismic surveys and identifying subsurface fluid and pathways in and among hydrocarbon reservoirs based on impedance models
US6128577A (en) 1996-12-19 2000-10-03 Schlumberger Technology Corporation Modeling geological structures and properties
US5878372A (en) 1997-03-04 1999-03-02 Western Atlas International, Inc. Method for simultaneous inversion processing of well log data using a plurality of earth models
US7451066B2 (en) 1998-05-04 2008-11-11 Edwards David A Near wellbore modeling method and apparatus
US6618695B1 (en) 1998-07-01 2003-09-09 Institut Francais Du Petrole Method for gradually deforming a stochastic model of a heterogeneous medium such as an underground zone
US6067340A (en) 1998-07-06 2000-05-23 Eppstein; Margaret J. Three-dimensional stochastic tomography with upscaling
US6381505B1 (en) 1998-09-28 2002-04-30 Aspen Technology, Inc. Robust steady-state target calculation for model predictive control
US6216083B1 (en) * 1998-10-22 2001-04-10 Yamaha Motor Co., Ltd. System for intelligent control of an engine based on soft computing
US20030093392A1 (en) * 1998-10-22 2003-05-15 Ulyanov Sergei V. System for intelligent control based on soft computing
US6609060B2 (en) * 1998-10-22 2003-08-19 Yamaha Hatsudoki Kabushiki Kaisha System for intelligent control of an engine based on soft computing
US6246963B1 (en) 1999-01-29 2001-06-12 Timothy A. Cross Method for predicting stratigraphy
US6912491B1 (en) 1999-05-25 2005-06-28 Schlumberger Technology Corp. Method and apparatus for mapping uncertainty and generating a map or a cube based on conditional simulation of random variables
US6230101B1 (en) 1999-06-03 2001-05-08 Schlumberger Technology Corporation Simulation method and apparatus
US6813565B1 (en) 1999-07-02 2004-11-02 Institut Francais Du Petrole Method for gradually deforming sequential simulations of a heterogeneous environment such as an underground zone
US6826483B1 (en) * 1999-10-13 2004-11-30 The Trustees Of Columbia University In The City Of New York Petroleum reservoir simulation and characterization system and method
US6522973B1 (en) 1999-10-29 2003-02-18 Institut Francais Du Petrole Method for 2D or 3D modelling of a heterogeneous medium such as the subsoil described by one or more physical parameters
US6907392B2 (en) 1999-11-29 2005-06-14 Institut Francais Du Petrole Method of generating a hybrid grid allowing modelling of a heterogeneous formation crossed by one or more wells
US7047165B2 (en) 1999-12-10 2006-05-16 Institut Francais Du Petrole Method of generating a grid on a heterogenous formation crossed by one or more geometric discontinuities in order to carry out simulations
WO2001055939A2 (en) 2000-01-28 2001-08-02 Trajecta, Inc. System and method for robust optimization including uncertainty models
US6826486B1 (en) 2000-02-11 2004-11-30 Schlumberger Technology Corporation Methods and apparatus for predicting pore and fracture pressures of a subsurface formation
US20080288226A1 (en) 2000-02-22 2008-11-20 Gurpinar Omer M Integrated Resevoir optimization
US20070156377A1 (en) 2000-02-22 2007-07-05 Gurpinar Omer M Integrated reservoir optimization
US6980940B1 (en) 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
US7478024B2 (en) 2000-02-22 2009-01-13 Schlumberger Technology Corporation Integrated reservoir optimization
WO2001062603A2 (en) 2000-02-22 2001-08-30 Schlumberger Technology Corporation Integrated reservoir optimization
US7027964B2 (en) 2000-06-29 2006-04-11 Object Reservoir, Inc. Method and system for solving finite element models using multi-phase physics
US7260508B2 (en) 2000-06-29 2007-08-21 Object Reservoir, Inc. Method and system for high-resolution modeling of a well bore in a hydrocarbon reservoir
US7369973B2 (en) 2000-06-29 2008-05-06 Object Reservoir, Inc. Method and system for representing reservoir systems
US7149671B2 (en) 2000-06-29 2006-12-12 Object Reservoir, Inc. Method and system for coordinate transformation to model radial flow near a singularity
US7043413B2 (en) 2000-06-29 2006-05-09 Object Reservoir, Inc. Method for modeling an arbitrary well path in a hydrocarbon reservoir using adaptive meshing
US6941255B2 (en) 2000-06-29 2005-09-06 Object Reservoir, Inc. Feature modeling in a finite element model
US6674432B2 (en) 2000-06-29 2004-01-06 Object Reservoir, Inc. Method and system for modeling geological structures using an unstructured four-dimensional mesh
US7006951B2 (en) 2000-06-29 2006-02-28 Object Reservoir, Inc. Method for solving finite element models using time slabbing
US20020042702A1 (en) 2000-08-31 2002-04-11 Calvert Craig S. Method for constructing 3-D geologic models by combining multiple frequency passbands
US6775578B2 (en) 2000-09-01 2004-08-10 Schlumberger Technology Corporation Optimization of oil well production with deference to reservoir and financial uncertainty
US6662109B2 (en) 2001-04-19 2003-12-09 Institut Francais Du Petrole Method of constraining by dynamic production data a fine model representative of the distribution in the reservoir of a physical quantity characteristic of the subsoil structure
US20030225606A1 (en) 2002-05-29 2003-12-04 Schlumberger Technology Corporation Tools for decision-making in reservoir risk management
US20050010383A1 (en) 2002-07-11 2005-01-13 Mickaele Le Ravalec-Dupin Method of constraining a heterogeneous permeability field representing an underground reservoir by dynamic data
US7200533B2 (en) 2002-10-30 2007-04-03 Institut Francais Du Petrole Method for rapid formation of a stochastic model representative of a heterogeneous underground reservoir, constrained by dynamic data
US7426460B2 (en) 2003-01-16 2008-09-16 Institut Francais Du Petrole Method for determining zones in a stratified medium where the interface between a fluid in place in the medium and a flushing fluid moves in a stationary manner
US7096172B2 (en) 2003-01-31 2006-08-22 Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. System and method for automated reservoir targeting
US7200540B2 (en) 2003-01-31 2007-04-03 Landmark Graphics Corporation System and method for automated platform generation
US7392166B2 (en) 2003-02-21 2008-06-24 Institut Francais Du Petrole Method for more rapidly producing the representative stochastic model of a heterogeneous underground reservoir defined by uncertain static and dynamic data
US7546229B2 (en) 2003-03-06 2009-06-09 Chevron U.S.A. Inc. Multi-scale finite-volume method for use in subsurface flow simulation
US6823297B2 (en) 2003-03-06 2004-11-23 Chevron U.S.A. Inc. Multi-scale finite-volume method for use in subsurface flow simulation
US7496488B2 (en) 2003-03-06 2009-02-24 Schlumberger Technology Company Multi-scale finite-volume method for use in subsurface flow simulation
US7558715B2 (en) 2003-03-18 2009-07-07 Institut Francais Du Petrole Method for quickly forming a stochastic model representative of the distribution of a physical quantity in a heterogeneous medium by suitable selection of geostatistical realizations
US20060241925A1 (en) 2003-03-18 2006-10-26 Thomas Schaaf Method for quickly forming a stochastic method representating the distribution of a physical variable in a heterogeneous environment by appropriate selection of a geostatistic realizations
US20040220790A1 (en) 2003-04-30 2004-11-04 Cullick Alvin Stanley Method and system for scenario and case decision management
US7546228B2 (en) 2003-04-30 2009-06-09 Landmark Graphics Corporation Stochastically generating facility and well schedules
US7054752B2 (en) 2003-06-02 2006-05-30 Institut Francais Du Petrole Method for optimizing production of an oil reservoir in the presence of uncertainties
US20050096893A1 (en) 2003-06-02 2005-05-05 Mathieu Feraille Decision support method for oil reservoir management in the presence of uncertain technical and economic parameters
US7430501B2 (en) 2003-06-02 2008-09-30 Institut Francais Du Petrole Decision support method for oil reservoir management in the presence of uncertain technical and economic parameters
CA2529339A1 (en) 2003-06-20 2004-12-29 Strategic Capital Network, Llc Improved resource allocation technique
US7277806B2 (en) 2003-06-26 2007-10-02 Exxonmobil Upstream Research Company Method for removing air wave effect from offshore frequency domain controlled-source electromagnetic data
US20050015226A1 (en) 2003-07-18 2005-01-20 Mickaele Le Ravalec-Dupin Method intended for gradual, deformation of a boolean model simulating a heterogeneous medium, constrained to dynamic data
US7096122B2 (en) 2003-07-22 2006-08-22 Dianli Han Method for producing full field radial grid for hydrocarbon reservoir simulation
US20070094187A1 (en) 2003-08-26 2007-04-26 Anderson Roger N Innervated stochastic controller for real time business decision-making support
US20050120195A1 (en) 2003-11-13 2005-06-02 Alok Kumar Allocating memory
US20050192855A1 (en) 2004-01-13 2005-09-01 Greg Chitty System for evaluating over and underbalanced drilling operations
US20080167849A1 (en) 2004-06-07 2008-07-10 Brigham Young University Reservoir Simulation
US20060047489A1 (en) 2004-08-30 2006-03-02 Celine Scheidt Method of modelling the production of an oil reservoir
US7310579B2 (en) 2004-09-16 2007-12-18 Institut Francais Du Petrole Method for generating a reservoir model on flexible grid
WO2006119099A2 (en) 2005-04-29 2006-11-09 Landmark Graphics Corporation Optimization of decisions regarding multiple assets in the presence of various underlying uncertainties
US20060247990A1 (en) 2005-04-29 2006-11-02 Keshav Narayanan Optimization of decisions regarding multiple assets in the presence of various underlying uncertainties
US20070094216A1 (en) 2005-08-02 2007-04-26 Northrop Grumman Corporation Uncertainty management in a decision-making system
US20070073527A1 (en) 2005-09-26 2007-03-29 Nicolas Flandrin Method for simulating fluid flows within a medium discretized by a hybrid grid
US7584081B2 (en) 2005-11-21 2009-09-01 Chevron U.S.A. Inc. Method, system and apparatus for real-time reservoir model updating using ensemble kalman filter
WO2007058662A1 (en) 2005-11-21 2007-05-24 Chevron U.S.A., Inc. Method for field scale production optimization
US20070179766A1 (en) 2006-01-31 2007-08-02 Landmark Graphics Corporation Methods, systems, and computer-readable media for real-time oil and gas field production optimization using a proxy simulator
US20070265815A1 (en) 2006-05-15 2007-11-15 Benoit Couet Method for optimal gridding in reservoir simulation
US7577061B2 (en) 2006-06-06 2009-08-18 Total S.A. Process and program for characterising evolution of an oil reservoir over time
EP1865340A1 (en) 2006-06-06 2007-12-12 Total S.A. A process and program for characterising evolution of an oil reservoir over time
US7254091B1 (en) 2006-06-08 2007-08-07 Bhp Billiton Innovation Pty Ltd. Method for estimating and/or reducing uncertainty in reservoir models of potential petroleum reservoirs
US20070294034A1 (en) 2006-06-15 2007-12-20 Tom Bratton Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs
US20080077371A1 (en) 2006-09-01 2008-03-27 Chevron U.S.A. Inc. Method for history matching and uncertainty quantification assisted by global optimization techniques utilizing proxies
US20080091353A1 (en) 2006-10-16 2008-04-17 Krumhansl Peter A Systems and methods for detecting shallow buried objects
US20090006057A1 (en) 2007-06-30 2009-01-01 Yuqiang Niu Simulating fluid flow in reservoir with modified grid
US20090164187A1 (en) 2007-12-21 2009-06-25 Tarek Habashy Method for reservoir characterization and monitoring including deep reading quad combo measurements
US20090164188A1 (en) 2007-12-21 2009-06-25 Tarek Habashy Method for upscaling a reservoir model using deep reading measurements
US20090234625A1 (en) 2008-03-14 2009-09-17 Schlumberger Technology Corporation Providing a simplified subterranean model
WO2009145960A1 (en) 2008-04-17 2009-12-03 Exxonmobil Upstream Research Company Robust optimization-based decision support tool for reservoir development planning
WO2009128972A1 (en) 2008-04-18 2009-10-22 Exxonmobil Upstream Research Company Markov decision process-based decision support tool for reservoir development planning
WO2009131761A2 (en) 2008-04-21 2009-10-29 Exxonmobile Upstream Research Company Stochastic programming-based decision support tool for reservoir development planning

Non-Patent Citations (23)

* Cited by examiner, † Cited by third party
Title
Atamtürk, A. (2007), "Strong Formulations of Robust Mixed 0-1 Programming", Mathematical Programming, v108, pp. 235-250.
Bellman, R. (1957), "A Markovian Decision Process," Journal of Mathematics and Mechanics 6, pp. 679-684.
Ben-Tal, A. et al. (1998), "Robust Convex Optimization", Mathematics of Operations Research, v23, n4, pp. 769-805.
Ben-Tal, A. et al. (1999), "Robust Solutions to Uncertain Linear Programs", Operations Research Letters, v25, pp. 1-13.
Ben-Tal, A. et al. (2002), "Robust Optimization-Methodology and Applications", Mathematical Programming, v92, pp. 453-480.
Bertsimas, D. et al. (2004), "The Price of Robustness", Oper. Res., v52, n1, pp. 35-53.
European Search Report, dated Dec. 29, 2008, EP Application No. 08159867.4.
Haugen, K.K. (1996), "A stochastic dynamic programming model for scheduling of offshore petroleum fields with resource uncertainty," European Journal of Operational Research 88(1), pp. 88-100.
International Search Report and Written Opinion, dated Apr. 22, 2009, PCT/US2009/036540.
International Search Report and Written Opinion, dated Mar. 23, 2009, PCT/US2009/032736.
International Search Report and Written Opinion, dated May 4, 2009, PCT/US2009/036536.
Mezzomo, C.C. et al., "Field Development Planning Optimization Using Reservoir Simulation", Universidade Estadual de Campinas, 8 pgs.
Ordonez, F. (2004), "Lecture 1: Introduction to Robust Optimization", http://ww-ref.usc/edu/fordon/robopt04/, 9 pgs.
Robust Optimization, http:/en.wikipedia.org/wiki/Robust-optimization, 4 pages.
Sweet, M.L. et al. (2007), Genesis field, Gulf of Mexico: Recognizing reservoir compartments on geologic and production time scales in deep-water reservoirs, AAPG Bulletin 91(12), pp. 1701-1729.
U.S. Appl. No. 61/124,500, filed Apr. 17, 2008, Furman et al.
U.S. Appl. No. 61/124,681, filed Apr. 18, 2008, Goel et al.
U.S. Appl. No. 61/124,929, filed Apr. 21, 2008, Goel et al.
van Essen, G.M. et al. (2006), "Robust Optimization of Oil Reservoir Flooding", Control Applications, 1 pg.
van Essen, G.M. et al. (2006), "Robust Waterflooding Optimization of Multiple Geological Scenarios", SPE 102913, 2006 SPE Annual Tech. Conf. & Exh., San Antonio, TX, Sep. 24-27, 2006, 7 pgs.
White, D.J. (1993), "A Survey of Applications of Markov Decision Processes," Jounral of Operational Research Society 44(11), pp. 1073-1096.
Zandvliet, M. (2004), "Control in reservoir engineering under model uncertainty", Dept. of Geotechnology, Section Petroleum Engineering (Smart Wells group), 2 pgs.
Zhang, Y. (2007), "General Robust-Optimization Formulation for Nonlinear Programming", J. of Optimization Theory and Applns. 132(1), pp. 111-124.

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10013663B2 (en) 2011-12-09 2018-07-03 Exxonmobil Upstream Research Company Method for developing a long-term strategy for allocating a supply of liquefied natural gas
WO2015138131A1 (en) 2014-03-11 2015-09-17 Exxonmobil Upstream Research Company Risk measure-based decision support tool for reservoir development
US10867261B2 (en) 2014-05-07 2020-12-15 Exxonmobil Upstream Research Company Method of generating an optimized ship schedule to deliver liquefied natural gas
US10878349B2 (en) 2014-05-07 2020-12-29 Exxonmobil Upstream Research Company Method of generating an optimized ship schedule to deliver liquefied natural gas
US9946972B2 (en) 2014-05-23 2018-04-17 International Business Machines Corporation Optimization of mixed-criticality systems
US10108762B2 (en) 2014-10-03 2018-10-23 International Business Machines Corporation Tunable miniaturized physical subsurface model for simulation and inversion
WO2017011469A1 (en) * 2015-07-13 2017-01-19 Conocophillips Company Ensemble based decision making
US10262280B2 (en) 2015-07-13 2019-04-16 Conocophillips Company Ensemble based decision making

Also Published As

Publication number Publication date
US20110022363A1 (en) 2011-01-27
BRPI0909440A2 (en) 2015-12-15
WO2009145960A1 (en) 2009-12-03
CA2717373A1 (en) 2009-12-03
CN102007459A (en) 2011-04-06
CN102007459B (en) 2015-01-07
EP2288974A1 (en) 2011-03-02

Similar Documents

Publication Publication Date Title
US8504335B2 (en) Robust optimization-based decision support tool for reservoir development planning
US8775347B2 (en) Markov decision process-based support tool for reservoir development planning
US8775361B2 (en) Stochastic programming-based decision support tool for reservoir development planning
Schiozer et al. Model-based decision analysis applied to petroleum field development and management
US8849623B2 (en) Systems and methods for reservoir development and management optimization
US10435995B2 (en) Oilfield management method and system
US20110307230A1 (en) Optimizing Reservoir Performance Under Uncertainty
US20120130696A1 (en) Optimizing Well Management Policy
CA2813826A1 (en) Iterative method and system to construct robust proxy models for reservoir simulation
CA2992274C (en) Ensemble based decision making
US20210374521A1 (en) Systems and procedures to forecast well production performance for horizontal wells utilizing artificial neural networks
Jahandideh et al. Closed-loop stochastic oilfield optimization for hedging against geologic, development, and operation uncertainty
Kumar et al. Integrated static and dynamic uncertainties modeling big-loop workflow enhances performance prediction and optimization
Schiozer et al. Model-Based Life-Cycle Optimization for Field Development and Management Integrated with Production Facilities
Ettehadtavakkol et al. Stochastic optimization and uncertainty analysis for E&P projects: A case in offshore gas field development
EP3323092B1 (en) Ensemble based decision making
Zhang et al. A framework for design space exploration in oilfield asset development

Legal Events

Date Code Title Description
STCF Information on status: patent grant

Free format text: PATENTED CASE

FPAY Fee payment

Year of fee payment: 4

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 8