BR112016007649A2 - métodos para analisar completações de sistema de poço e projetar uma completação, e, sistema - Google Patents
métodos para analisar completações de sistema de poço e projetar uma completação, e, sistemaInfo
- Publication number
- BR112016007649A2 BR112016007649A2 BR112016007649A BR112016007649A BR112016007649A2 BR 112016007649 A2 BR112016007649 A2 BR 112016007649A2 BR 112016007649 A BR112016007649 A BR 112016007649A BR 112016007649 A BR112016007649 A BR 112016007649A BR 112016007649 A2 BR112016007649 A2 BR 112016007649A2
- Authority
- BR
- Brazil
- Prior art keywords
- completion
- attributes
- completions
- designing
- correlation
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Forestry; Mining
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Human Resources & Organizations (AREA)
- Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- Fluid Mechanics (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Geophysics (AREA)
- Agronomy & Crop Science (AREA)
- Animal Husbandry (AREA)
- Marine Sciences & Fisheries (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- General Engineering & Computer Science (AREA)
Abstract
1 / 1 resumo âmãtodos para analisar completaãães de sistema de poão e projetar uma completaãão, e, sistema â em alguns aspectos, atributos de intervalo de completaã§ã£o sã£o projetados para intervalos de furo de poã§o com base nas posiã§ãµes estratigrã¡ficas dos respectivos intervalos de furo de poã§o. os atributos de intervalo de completaã§ã£o podem ser determinados por um sistema de projeto de completaã§ã£o que associa atributos de produã§ã£o de recursos com combinaã§ãµes distintas de posiã§ãµes estratigrã¡ficas e atributos de intervalo de completaã§ã£o. em alguns aspectos, o sistema de projeto de completaã§ã£o inclui uma base de dados de correlaã§ã£o gerada por uma mã¡quina de correlaã§ã£o. o mecanismo de correlaã§ã£o pode gerar a correlaã§ã£o de dados com base em dados de produã§ã£o e dados de intervalo de poã§o de outro poã§o.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/US2013/069498 WO2015069299A1 (en) | 2013-11-11 | 2013-11-11 | Designing wellbore completion intervals |
Publications (1)
Publication Number | Publication Date |
---|---|
BR112016007649A2 true BR112016007649A2 (pt) | 2017-08-01 |
Family
ID=53041906
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112016007649A BR112016007649A2 (pt) | 2013-11-11 | 2013-11-11 | métodos para analisar completações de sistema de poço e projetar uma completação, e, sistema |
Country Status (10)
Country | Link |
---|---|
US (1) | US20160253767A1 (pt) |
CN (1) | CN105683495A (pt) |
AU (1) | AU2013404930B2 (pt) |
BR (1) | BR112016007649A2 (pt) |
CA (1) | CA2926788C (pt) |
DE (1) | DE112013007583T5 (pt) |
GB (1) | GB2538370B (pt) |
MX (1) | MX2016004534A (pt) |
SG (1) | SG11201602696VA (pt) |
WO (1) | WO2015069299A1 (pt) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2528821B (en) | 2013-08-01 | 2020-03-11 | Landmark Graphics Corp | Algorithm for optimal ICD configuration using a coupled wellbore-reservoir model |
US10345764B2 (en) | 2015-04-27 | 2019-07-09 | Baker Hughes, A Ge Company, Llc | Integrated modeling and monitoring of formation and well performance |
US10370941B2 (en) * | 2015-04-27 | 2019-08-06 | Baker Hughes, A Ge Company, Llc | Well performance index method for evaluating well performance |
WO2017106513A1 (en) | 2015-12-18 | 2017-06-22 | Baker Hughes Incorporated | Integrated modeling and simulation of formation and well performance |
WO2018052438A1 (en) * | 2016-09-16 | 2018-03-22 | Halliburton Energy Services, Inc. | Dynamically optimizing a pumping schedule for stimulating a well |
CN108729911A (zh) * | 2017-04-24 | 2018-11-02 | 通用电气公司 | 用于资源生产系统的优化装置、系统和方法 |
CN107679358B (zh) * | 2017-08-15 | 2020-06-09 | 中国石油天然气股份有限公司 | 一种确定储层渗透率的方法及装置 |
CN107491894B (zh) * | 2017-08-30 | 2021-11-30 | 深圳春沐源控股有限公司 | 一种种植指导方法以及装置 |
WO2020153972A1 (en) * | 2019-01-25 | 2020-07-30 | Halliburton Energy Services, Inc. | Evaluating anisotropic effective permeability in rock formations having natural fracture networks |
WO2020198194A1 (en) * | 2019-03-26 | 2020-10-01 | Drilling Info, Inc. | Determining a landing zone in a subterranean formation |
US11579334B2 (en) | 2021-04-07 | 2023-02-14 | Enverus, Inc. | Determining a wellbore landing zone |
CN113626546B (zh) * | 2021-06-16 | 2023-09-22 | 中国铁路设计集团有限公司 | 一种铁路桥梁地质图形数字化存储及应用的方法 |
US11886400B2 (en) * | 2021-12-14 | 2024-01-30 | Saudi Arabian Oil Company | Achieving and maintaining scalable high quality upstream stratigraphic picks data |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6980940B1 (en) * | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
US7369979B1 (en) * | 2005-09-12 | 2008-05-06 | John Paul Spivey | Method for characterizing and forecasting performance of wells in multilayer reservoirs having commingled production |
US20080091496A1 (en) * | 2006-10-17 | 2008-04-17 | Omer Gurpinar | Method and system for delivering and executing best practices in oilfield development projects |
US20090157361A1 (en) * | 2007-12-12 | 2009-06-18 | Toghi Farid | Method of well placement modeling and geosteering |
CN102282562B (zh) * | 2009-01-13 | 2015-09-23 | 埃克森美孚上游研究公司 | 优化井作业计划 |
US8473212B2 (en) * | 2009-06-04 | 2013-06-25 | Schlumberger Technology Corporation | Log processing in highly deviated wellbores |
WO2011073861A2 (en) * | 2009-12-15 | 2011-06-23 | Schlumberger Canada Limited | Method for modeling a reservoir basin |
US9297924B2 (en) * | 2009-12-28 | 2016-03-29 | Landmark Graphics Corporation | Method and system of displaying data sets indicative of physical parameters associated with a formation penetrated by a wellbore |
US8515720B2 (en) * | 2010-04-06 | 2013-08-20 | Schlumberger Technology Corporation | Determine field fractures using geomechanical forward modeling |
US20120191354A1 (en) * | 2011-01-26 | 2012-07-26 | Francisco Caycedo | Method for determining stratigraphic position of a wellbore during driling using color scale interpretation of strata and its application to wellbore construction operations |
BR112013013692A2 (pt) * | 2011-05-09 | 2019-09-24 | Chevron Usa Inc | sistema e método para determinar propriedades de um reservatório de hidrocarbonetos com base em dados de produção |
FR2992448B1 (fr) * | 2012-06-26 | 2014-06-27 | IFP Energies Nouvelles | Procede d'exploitation d'un reservoir geologique a partir d'un modele de reservoir cale au moyen d'un parametrage multi-echelles |
US9262713B2 (en) * | 2012-09-05 | 2016-02-16 | Carbo Ceramics Inc. | Wellbore completion and hydraulic fracturing optimization methods and associated systems |
-
2013
- 2013-11-11 CA CA2926788A patent/CA2926788C/en active Active
- 2013-11-11 CN CN201380080147.XA patent/CN105683495A/zh active Pending
- 2013-11-11 US US15/028,579 patent/US20160253767A1/en not_active Abandoned
- 2013-11-11 BR BR112016007649A patent/BR112016007649A2/pt not_active IP Right Cessation
- 2013-11-11 MX MX2016004534A patent/MX2016004534A/es unknown
- 2013-11-11 DE DE112013007583.0T patent/DE112013007583T5/de not_active Withdrawn
- 2013-11-11 AU AU2013404930A patent/AU2013404930B2/en not_active Ceased
- 2013-11-11 SG SG11201602696VA patent/SG11201602696VA/en unknown
- 2013-11-11 WO PCT/US2013/069498 patent/WO2015069299A1/en active Application Filing
- 2013-11-11 GB GB1605923.0A patent/GB2538370B/en active Active
Also Published As
Publication number | Publication date |
---|---|
GB2538370A (en) | 2016-11-16 |
DE112013007583T5 (de) | 2016-08-11 |
US20160253767A1 (en) | 2016-09-01 |
MX2016004534A (es) | 2016-10-28 |
AU2013404930A1 (en) | 2016-04-28 |
CA2926788A1 (en) | 2015-05-14 |
AU2013404930B2 (en) | 2017-06-08 |
SG11201602696VA (en) | 2016-05-30 |
GB2538370B (en) | 2020-04-29 |
CN105683495A (zh) | 2016-06-15 |
CA2926788C (en) | 2022-09-13 |
WO2015069299A1 (en) | 2015-05-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112016007649A2 (pt) | métodos para analisar completações de sistema de poço e projetar uma completação, e, sistema | |
BR112017000635A2 (pt) | sistema e método de remoção de ruído para dados de detecção acústica distribuída. | |
BR112017015396A2 (pt) | ?método para classificar a distribuição de forma e tamanho de partícula em fluidos de perfuração, e, meio não transitório legível por computador? | |
MX347822B (es) | Representación geométrica de planos de fractura. | |
BR112015026505A2 (pt) | determinação de parâmetros de poço para otimização de desempenho de poço | |
BR112017008186A2 (pt) | fluidos de estimulação de líquido e gás natural de qualidade y, sistemas e método | |
BR112016028586A2 (pt) | análise de importância de vídeo baseado em regras | |
BR112014007819A2 (pt) | método para produzir hidrocarbonetos | |
BR112015022133A8 (pt) | método, meios legíveis por computador e sistema relacionados a repositórios temáticos para o gerenciamneto de transações | |
BR112018003885A2 (pt) | método e sistema para estimar a porosidade associada à matéria orgânica, método para avaliar o potencial de produção de um poço ou formação, e, meio legível por computador não transitório | |
AR100040A1 (es) | Diseño de pozos horizontales para campos con reservorios fracturados naturalmente | |
BR112012032161A2 (pt) | método de aprimoramento da produção de um campo maduro de gás ou óleo | |
NO20171659A1 (en) | Systems and methods for characterizing materials external of a casing | |
BR112016021678A2 (pt) | método e sistema para determinar uma janela de peso de lama em um poço, e, meio legível por computador. | |
BR112013026513A2 (pt) | método para a caracterização de fratura hidráulica usando dados microssísmicos e dispositivo portador de programa não transitório | |
AR089973A1 (es) | Sistemas y metodos para la estimacion de tiempos de afloramiento de fluidos en sitios de pozos en produccion | |
BR112013026993A2 (pt) | método realizado com um sistema de computação para determinar a integridade do poço | |
BR112013027064A8 (pt) | Sistema e método para obter um endereço estruturado através de geocodificação da informação de endereço não estruturado | |
GB2544012A (en) | Automated fracture planning methods for multi-well fields | |
BR112014019416A8 (pt) | Método, sistema, e meio legível por computador | |
BR112015030537A2 (pt) | método para avaliar planos de estratégia de produção | |
BR112016004403A8 (pt) | sistema, método e meio de armazenamento legível por computador para refinamento inteligente de pesquisa | |
BR112014003509A2 (pt) | método implementado por computador, equipamento e sistema | |
FR3013937B1 (fr) | Circuit d'attaque avec une source lumineuse a base de semi-conducteurs, ainsi que procede de fonctionnement d'un circuit d'attaque | |
BR112015025905A2 (pt) | sistema e método de gerenciamento de espectro, e, mídia legível por computador não transitória |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B08F | Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette] |
Free format text: REFERENTE A 5A ANUIDADE. |
|
B08K | Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette] |
Free format text: REFERENTE AO ARQUIVAMENTO PUBLICADO NA RPI 2488 DE 11/09/2018. |