AR100040A1 - Diseño de pozos horizontales para campos con reservorios fracturados naturalmente - Google Patents
Diseño de pozos horizontales para campos con reservorios fracturados naturalmenteInfo
- Publication number
- AR100040A1 AR100040A1 ARP150100758A ARP150100758A AR100040A1 AR 100040 A1 AR100040 A1 AR 100040A1 AR P150100758 A ARP150100758 A AR P150100758A AR P150100758 A ARP150100758 A AR P150100758A AR 100040 A1 AR100040 A1 AR 100040A1
- Authority
- AR
- Argentina
- Prior art keywords
- design
- fields
- reserves
- naturally fractured
- horizontal wells
- Prior art date
Links
- 239000004215 Carbon black (E152) Substances 0.000 abstract 1
- 238000004590 computer program Methods 0.000 abstract 1
- 229930195733 hydrocarbon Natural products 0.000 abstract 1
- 150000002430 hydrocarbons Chemical class 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
- E21B43/305—Specific pattern of wells, e.g. optimising the spacing of wells comprising at least one inclined or horizontal well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/44—Arrangements for executing specific programs
- G06F9/455—Emulation; Interpretation; Software simulation, e.g. virtualisation or emulation of application or operating system execution engines
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Software Systems (AREA)
- Geochemistry & Mineralogy (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- General Engineering & Computer Science (AREA)
- Geometry (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Computational Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Peptides Or Proteins (AREA)
- Operations Research (AREA)
- Earth Drilling (AREA)
Abstract
Métodos, sistemas y productos de programas de computación para diseñar un pozo horizontal en un campo de hidrocarburos que tiene reservorios fracturados naturalmente que integran los flujos de trabajo de múltiples disciplinas relacionadas con los campos petroleros, incluyendo un flujo de trabajo geofísico, un flujo de trabajo geomecánico y un flujo de trabajo de completación y producción para obtener una solución dinámica e integrada.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201461951623P | 2014-03-12 | 2014-03-12 |
Publications (1)
Publication Number | Publication Date |
---|---|
AR100040A1 true AR100040A1 (es) | 2016-09-07 |
Family
ID=54072401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ARP150100758A AR100040A1 (es) | 2014-03-12 | 2015-03-12 | Diseño de pozos horizontales para campos con reservorios fracturados naturalmente |
Country Status (10)
Country | Link |
---|---|
US (2) | US9890616B2 (es) |
EP (1) | EP3077908A4 (es) |
CN (1) | CN106462436A (es) |
AR (1) | AR100040A1 (es) |
AU (2) | AU2015229284A1 (es) |
CA (1) | CA2936555A1 (es) |
MX (1) | MX2016010894A (es) |
RU (1) | RU2016127688A (es) |
SG (1) | SG11201605226VA (es) |
WO (1) | WO2015138724A1 (es) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2533847B (en) * | 2014-11-06 | 2017-04-05 | Logined Bv | Local layer geometry engine with work zone generated from buffer defined relative to a wellbore trajectory |
BR112017019151B1 (pt) * | 2015-03-06 | 2023-01-31 | Hartford Steam Boiler Inspection And Insurance Company | Método para avaliação de risco para completação de poço, aparelho para estimativa de tempos parados reais para operações de perfuração e sistema |
US10370941B2 (en) | 2015-04-27 | 2019-08-06 | Baker Hughes, A Ge Company, Llc | Well performance index method for evaluating well performance |
US10345764B2 (en) | 2015-04-27 | 2019-07-09 | Baker Hughes, A Ge Company, Llc | Integrated modeling and monitoring of formation and well performance |
US9836449B2 (en) * | 2015-09-16 | 2017-12-05 | Hitachi, Ltd. | Information analysis system |
WO2017106513A1 (en) | 2015-12-18 | 2017-06-22 | Baker Hughes Incorporated | Integrated modeling and simulation of formation and well performance |
US10605054B2 (en) | 2017-02-15 | 2020-03-31 | General Electric Co. | System and method for generating a schedule to extract a resource from a reservoir |
US20200057569A1 (en) * | 2018-08-17 | 2020-02-20 | Schlumberger Technology Corporation | System and method for secure data replication on drilling management systems |
US11099640B2 (en) | 2018-11-20 | 2021-08-24 | Express Scripts Strategie Development, Inc. | System and method for enhancing a user interface using eye tracking data |
US10747655B2 (en) | 2018-11-20 | 2020-08-18 | Express Scripts Strategic Development, Inc. | Method and system for programmatically testing a user interface |
US11639646B2 (en) | 2019-02-13 | 2023-05-02 | Landmark Graphics Corporation | Planning a well configuration using geomechanical parameters |
WO2020172106A1 (en) * | 2019-02-18 | 2020-08-27 | Schlumberger Technology Corporation | Engineering completion and selective fracturing of lateral wellbores |
CN111396021B (zh) * | 2020-03-04 | 2022-03-29 | 中国石油天然气股份有限公司 | 一种注水开发老油田新钻加密井的布井优化方法 |
CN112523744A (zh) * | 2020-11-30 | 2021-03-19 | 大庆油田有限责任公司 | 一种薄差层水平井井位设计及实时跟踪导向方法 |
CN115126469B (zh) * | 2022-06-22 | 2023-03-28 | 中国地质大学(武汉) | 一种煤层气井网部署优化的方法及计算机设备 |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
MXPA06000064A (es) * | 2003-06-25 | 2006-04-07 | Schlumberger Technology Corp | Metodo y aparato y dispositivo para almacenar un programa que incluye un sistema integrado de control de flujo de trabajo de planeacion de pozo con dependencias de proceso. |
US7743826B2 (en) * | 2006-01-20 | 2010-06-29 | American Shale Oil, Llc | In situ method and system for extraction of oil from shale |
US20090159277A1 (en) * | 2006-02-27 | 2009-06-25 | Grant Hocking | Enhanced Hydrocarbon Recovery by in Situ Combustion of Oil Sand Formations |
US7953587B2 (en) * | 2006-06-15 | 2011-05-31 | Schlumberger Technology Corp | Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs |
US20080017372A1 (en) | 2006-07-21 | 2008-01-24 | Paramount Resources Ltd. | In situ process to recover heavy oil and bitumen |
US9074454B2 (en) * | 2008-01-15 | 2015-07-07 | Schlumberger Technology Corporation | Dynamic reservoir engineering |
GB0918051D0 (en) * | 2009-10-15 | 2009-12-02 | Oilflow Solutions Holdings Ltd | Hydrocarbons |
US20130311147A1 (en) * | 2011-02-01 | 2013-11-21 | Halliburton Energy Services, Inc. | Drilling optimization |
US10352145B2 (en) * | 2011-03-11 | 2019-07-16 | Schlumberger Technology Corporation | Method of calibrating fracture geometry to microseismic events |
US9835746B2 (en) * | 2013-08-24 | 2017-12-05 | Schlumberger Technology Corporation | Formation stability modeling |
US10101498B2 (en) * | 2014-09-05 | 2018-10-16 | Schlumberger Technology Corporation | Well survivability in multidimensional geomechanical space |
US10001769B2 (en) * | 2014-11-18 | 2018-06-19 | Weatherford Technology Holdings, Llc | Systems and methods for optimizing formation fracturing operations |
-
2015
- 2015-03-12 AU AU2015229284A patent/AU2015229284A1/en not_active Abandoned
- 2015-03-12 MX MX2016010894A patent/MX2016010894A/es unknown
- 2015-03-12 WO PCT/US2015/020176 patent/WO2015138724A1/en active Application Filing
- 2015-03-12 US US15/118,854 patent/US9890616B2/en not_active Expired - Fee Related
- 2015-03-12 CA CA2936555A patent/CA2936555A1/en not_active Abandoned
- 2015-03-12 SG SG11201605226VA patent/SG11201605226VA/en unknown
- 2015-03-12 EP EP15762021.2A patent/EP3077908A4/en not_active Withdrawn
- 2015-03-12 CN CN201580008248.5A patent/CN106462436A/zh active Pending
- 2015-03-12 AR ARP150100758A patent/AR100040A1/es unknown
- 2015-03-12 RU RU2016127688A patent/RU2016127688A/ru unknown
-
2018
- 2018-02-12 US US15/894,396 patent/US20180171762A1/en not_active Abandoned
- 2018-07-25 AU AU2018208671A patent/AU2018208671A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
AU2015229284A1 (en) | 2016-07-21 |
RU2016127688A (ru) | 2018-04-12 |
US20170051582A1 (en) | 2017-02-23 |
AU2018208671A1 (en) | 2018-08-09 |
US9890616B2 (en) | 2018-02-13 |
MX2016010894A (es) | 2016-10-26 |
CA2936555A1 (en) | 2015-09-17 |
EP3077908A4 (en) | 2017-08-23 |
WO2015138724A1 (en) | 2015-09-17 |
EP3077908A1 (en) | 2016-10-12 |
SG11201605226VA (en) | 2016-07-28 |
US20180171762A1 (en) | 2018-06-21 |
CN106462436A (zh) | 2017-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AR100040A1 (es) | Diseño de pozos horizontales para campos con reservorios fracturados naturalmente | |
CO2019006837A2 (es) | Estado de tensión especialmente diseñado con terminaciones de múltiples pozos | |
MX2017006357A (es) | Sistemas y metodos para optimizar las operaciones de fracturacion del yacimiento. | |
AR093475A1 (es) | Sistema, metodo y producto de programa de computacion para un grafico de interpolacion en aplicaciones de geonavegacion | |
BR112017008186A2 (pt) | fluidos de estimulação de líquido e gás natural de qualidade y, sistemas e método | |
AR091020A1 (es) | Modelado de esfuerzo alrededor de un pozo de perforacion | |
CL2016000500A1 (es) | Producto ensamblado con tres elementos en tres planos diferentes, el primero conectado perpendicular a un segundo y un tercero esta conectado perpendicular al segundo; el producto tiene dispositivos de bloqueo, cada uno con lengueta flexible en una ranura de insercion, para bloquear el elemento y un elemento adyacente | |
CL2015002728A1 (es) | Un método para proporcionar un entorno de aprendizaje de idiomas | |
AR084654A1 (es) | Modelado de fracturas hidraulicas | |
GB2538370A (en) | Designing wellbore completion intervals | |
PE20141811A1 (es) | Un metodo para ayudar en la exploracion, diseno de mina, evaluacion y/o extraccion de depositos de mineral metalifero y/o diamante | |
GB2544012A (en) | Automated fracture planning methods for multi-well fields | |
BR112013026513A2 (pt) | método para a caracterização de fratura hidráulica usando dados microssísmicos e dispositivo portador de programa não transitório | |
MX2015009684A (es) | Sistema y metodo para la provision de un registro continuo de pozos. | |
AR089973A1 (es) | Sistemas y metodos para la estimacion de tiempos de afloramiento de fluidos en sitios de pozos en produccion | |
AR093936A1 (es) | Sistema, metodo y producto de programa informatico para determinar la ubicacion de intervalos de perforacion utilizando facies, limites de fluidos, geocuerpos y propiedades dinamicas de los fluidos | |
AR104654A1 (es) | Método para insertar sensores en un espacio anular formado entre la tubería de revestimiento y una formación en la que penetra un pozo para adquirir datos del fluido | |
AR096590A1 (es) | Inhibidores de arcilla para perforación, fracturación, y otros procedimientos | |
AR094359A1 (es) | Sistema de exploración de rendimiento de insumos agrícolas | |
MX2015014246A (es) | Modelado de cuencas para yacimientos. | |
CL2018000236A1 (es) | Nmr en cinética de generación de hidrocarburos | |
BR112015032435A2 (pt) | método implementado por computador, sistema, produto de programa de computador, método para completar um poço e método para desenvolver um campo de hidrocarboneto | |
AR098410A1 (es) | Optimización de las propiedades de dispositivos de control de flujo tanto en pozos productores como inyectores en sistemas de inundación de líquidos de inyector y productor conectados | |
AR091091A1 (es) | Modelado estratigrafico utilizando perfiles de densidad de datos de produccion | |
AR097725A1 (es) | Operaciones de perforaciones de pozos que involucran métodos computacionales que producen perfiles de depresión |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
FB | Suspension of granting procedure |