CO2019006837A2 - Estado de tensión especialmente diseñado con terminaciones de múltiples pozos - Google Patents
Estado de tensión especialmente diseñado con terminaciones de múltiples pozosInfo
- Publication number
- CO2019006837A2 CO2019006837A2 CONC2019/0006837A CO2019006837A CO2019006837A2 CO 2019006837 A2 CO2019006837 A2 CO 2019006837A2 CO 2019006837 A CO2019006837 A CO 2019006837A CO 2019006837 A2 CO2019006837 A2 CO 2019006837A2
- Authority
- CO
- Colombia
- Prior art keywords
- well
- terminations
- specially designed
- tension state
- designed tension
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B41/00—Equipment or details not covered by groups E21B15/00 - E21B40/00
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B49/00—Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Adornments (AREA)
- General Engineering & Computer Science (AREA)
- Operations Research (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
La divulgación describe un método para realizar la fracturación de un pozo para mejorar la productividad, mediante la simulación de fracturación en cremallera de manera tal de generar estructuras de tensión, mediante lo cual se minimiza la anisotropía en una zona donde se desea complejidad de fractura.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201662427262P | 2016-11-29 | 2016-11-29 | |
US201662427280P | 2016-11-29 | 2016-11-29 | |
PCT/US2017/063360 WO2018102274A1 (en) | 2016-11-29 | 2017-11-28 | Engineered stress state with multi-well completions |
Publications (1)
Publication Number | Publication Date |
---|---|
CO2019006837A2 true CO2019006837A2 (es) | 2019-07-10 |
Family
ID=62190001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CONC2019/0006837A CO2019006837A2 (es) | 2016-11-29 | 2019-06-26 | Estado de tensión especialmente diseñado con terminaciones de múltiples pozos |
Country Status (5)
Country | Link |
---|---|
US (1) | US10801307B2 (es) |
CA (1) | CA3045297C (es) |
CL (1) | CL2019001429A1 (es) |
CO (1) | CO2019006837A2 (es) |
WO (1) | WO2018102274A1 (es) |
Families Citing this family (24)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9988895B2 (en) | 2013-12-18 | 2018-06-05 | Conocophillips Company | Method for determining hydraulic fracture orientation and dimension |
CA3045295A1 (en) | 2016-11-29 | 2018-06-07 | Nicolas P. Roussel | Methods for shut-in pressure escalation analysis |
WO2019217762A1 (en) | 2018-05-09 | 2019-11-14 | Conocophillips Company | Measurement of poroelastic pressure response |
US10753203B2 (en) * | 2018-07-10 | 2020-08-25 | Saudi Arabian Oil Company | Systems and methods to identify and inhibit spider web borehole failure in hydrocarbon wells |
CA3100391C (en) * | 2018-09-21 | 2023-02-14 | Landmark Graphics Corporation | Well operations involving synthetic fracture injection test |
CN110094196B (zh) * | 2019-04-19 | 2022-04-15 | 西南石油大学 | 一种碳酸盐岩裸眼水平井分段酸压效果评价方法 |
US11149532B2 (en) | 2019-07-12 | 2021-10-19 | Halliburton Energy Services, Inc. | Multiple wellbore hydraulic fracturing through a single pumping system |
US11466557B2 (en) | 2019-11-04 | 2022-10-11 | Chevron U.S.A. Inc. | Determining proppant distribution for a plurality of clusters within a fracture stage |
CN110714746B (zh) * | 2019-11-28 | 2021-08-17 | 中国华能集团清洁能源技术研究院有限公司 | 一种地热系统的锯齿状压裂装置及方法 |
WO2021125998A1 (en) * | 2019-12-19 | 2021-06-24 | Schlumberger Canada Limited | Method to improve hydraulic fracturing in the near wellbore region |
CN111042809B (zh) * | 2019-12-27 | 2022-04-08 | 中国石油集团川庆钻探工程有限公司 | 一种井下地层复杂裂缝状态及砂堵模拟装置、方法 |
US20210230992A1 (en) * | 2020-01-24 | 2021-07-29 | Halliburton Energy Services, Inc. | Fracturing control |
CN111236910A (zh) * | 2020-03-16 | 2020-06-05 | 中国石油天然气集团有限公司 | 一种大井组平台丛式井高效压裂方法 |
US11066915B1 (en) | 2020-06-09 | 2021-07-20 | Bj Energy Solutions, Llc | Methods for detection and mitigation of well screen out |
CN113803041B (zh) * | 2020-06-12 | 2023-06-20 | 中国石油化工股份有限公司 | 一种体积压裂设计方法及系统 |
US11028677B1 (en) | 2020-06-22 | 2021-06-08 | Bj Energy Solutions, Llc | Stage profiles for operations of hydraulic systems and associated methods |
US11933153B2 (en) | 2020-06-22 | 2024-03-19 | Bj Energy Solutions, Llc | Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control |
US11939853B2 (en) | 2020-06-22 | 2024-03-26 | Bj Energy Solutions, Llc | Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units |
US11466680B2 (en) | 2020-06-23 | 2022-10-11 | Bj Energy Solutions, Llc | Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units |
WO2022155594A1 (en) | 2021-01-15 | 2022-07-21 | Conocophillips Company | Hydraulic integrity analysis |
CN112814669B (zh) * | 2021-04-02 | 2023-06-27 | 中国石油天然气股份有限公司 | 一种页岩油藏全生命周期采收率预测方法和系统 |
CN113107363B (zh) * | 2021-05-31 | 2023-09-01 | 中国矿业大学 | 一种促进裂隙错动提升自支撑能力的水平井施工方法 |
CN114329346B (zh) * | 2021-12-31 | 2024-06-14 | 中国石油大学(北京) | 一种立体开发井网的合理井距计算及布井方法 |
CN116927740B (zh) * | 2023-05-31 | 2024-06-18 | 中国石油天然气股份有限公司 | 一种立体式开发整体压裂顺序优化设计方法 |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3933205A (en) | 1973-10-09 | 1976-01-20 | Othar Meade Kiel | Hydraulic fracturing process using reverse flow |
US8439116B2 (en) | 2009-07-24 | 2013-05-14 | Halliburton Energy Services, Inc. | Method for inducing fracture complexity in hydraulically fractured horizontal well completions |
US8210257B2 (en) | 2010-03-01 | 2012-07-03 | Halliburton Energy Services Inc. | Fracturing a stress-altered subterranean formation |
CA2852881A1 (en) | 2011-06-24 | 2012-12-27 | Board Of Regents, The University Of Texas System | Method for determining spacing of hydraulic fractures in a rock formation |
US8899349B2 (en) | 2011-07-22 | 2014-12-02 | Schlumberger Technology Corporation | Methods for determining formation strength of a wellbore |
WO2014031607A1 (en) | 2012-08-20 | 2014-02-27 | Texas Tech University System | Methods and devices for hydraulic fracturing design and optimization: a modification to zipper frac |
US9262713B2 (en) | 2012-09-05 | 2016-02-16 | Carbo Ceramics Inc. | Wellbore completion and hydraulic fracturing optimization methods and associated systems |
WO2014121270A2 (en) * | 2013-02-04 | 2014-08-07 | Board Of Regents, The University Of Texas System | Methods for time-delayed fracturing in hydrocarbon formations |
US9988895B2 (en) | 2013-12-18 | 2018-06-05 | Conocophillips Company | Method for determining hydraulic fracture orientation and dimension |
US10846443B2 (en) | 2014-07-15 | 2020-11-24 | Petroleum Fractured Reservoir Solutions, Llc | Discrete irregular cellular models for simulating the development of fractured reservoirs |
GB2554194A (en) * | 2015-04-30 | 2018-03-28 | Landmark Graphics Corp | Shale geomechanics for multi-stage hydraulic fracturing optimization in resource shale and tight plays |
-
2017
- 2017-11-28 US US15/823,801 patent/US10801307B2/en active Active
- 2017-11-28 WO PCT/US2017/063360 patent/WO2018102274A1/en active Application Filing
- 2017-11-28 CA CA3045297A patent/CA3045297C/en active Active
-
2019
- 2019-05-27 CL CL2019001429A patent/CL2019001429A1/es unknown
- 2019-06-26 CO CONC2019/0006837A patent/CO2019006837A2/es unknown
Also Published As
Publication number | Publication date |
---|---|
US10801307B2 (en) | 2020-10-13 |
CA3045297C (en) | 2023-08-15 |
CA3045297A1 (en) | 2018-06-07 |
CL2019001429A1 (es) | 2019-10-18 |
WO2018102274A1 (en) | 2018-06-07 |
US20180149000A1 (en) | 2018-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CO2019006837A2 (es) | Estado de tensión especialmente diseñado con terminaciones de múltiples pozos | |
AR110650A1 (es) | Estado de tensión especialmente diseñado con terminaciones de múltiples pozos | |
AR099591A1 (es) | Acelerador de cemento pasivado | |
CL2019002824A1 (es) | Anticuerpos anti-lag3. | |
CL2015003750A1 (es) | Metodo para producir una pared decorada o panel de suelo | |
EA201990344A1 (ru) | Способ получения геополимера или геополимерного композита | |
MX367456B (es) | Composiciones para el mantenimiento de pozos y metodos para su realizacion y uso. | |
GB2528800A (en) | Syntactic foam frac ball and methods of using same | |
MX2018007081A (es) | Actualizacion de modelo de velocidad con un gradiente de inversion. | |
MX2018004831A (es) | Metodos para confeccionar formas fucosiladas y afucosiladas de una proteina. | |
AR097533A1 (es) | Tratamiento de pozos | |
AR101086A1 (es) | Sistema y método de modelización y diseño de redes de fracturación por pulsos | |
AR103563A1 (es) | Apuntalantes de baja energía para operaciones en fondo de pozo | |
SA115370152B1 (ar) | تركيبة أسمنت مسامية لدعم الصدوع لتظل مفتوحة | |
BR112015018599A2 (pt) | Micro-organismos com produtividade de putrescina e processo para produzir putrescina que utiliza os mesmos | |
GB2538370A (en) | Designing wellbore completion intervals | |
BR112018010605A2 (pt) | nanoemulsões de bebidas produzidas por processamento de alto cisalhamento | |
AR083560A1 (es) | Metodo y sistema para la estimulacion de fracturas mediante desplazamiento de formacion | |
AR097725A1 (es) | Operaciones de perforaciones de pozos que involucran métodos computacionales que producen perfiles de depresión | |
GB2545583A (en) | Stage tool | |
BR112016025024A2 (pt) | ?processo para preparar compostos ceto, e, uso de farnesil acetona? | |
BR112015020373A2 (pt) | processo para produção de um poliuretano, poliuretano e uso de um poliuretano. | |
AR113695A1 (es) | Una d-psicosa 3-epimerasa y el uso de un método para producir d-psicosa | |
BR112017005018A2 (pt) | processo para modificar pelo menos parte da superfície de um material, produto mineral, e, uso de um produto mineral. | |
ITUB20152564A1 (it) | Motocompressore e metodo per migliorare l’efficienza di un motocompressore |