BR112014019416A8 - Método, sistema, e meio legível por computador - Google Patents
Método, sistema, e meio legível por computadorInfo
- Publication number
- BR112014019416A8 BR112014019416A8 BR112014019416A BR112014019416A BR112014019416A8 BR 112014019416 A8 BR112014019416 A8 BR 112014019416A8 BR 112014019416 A BR112014019416 A BR 112014019416A BR 112014019416 A BR112014019416 A BR 112014019416A BR 112014019416 A8 BR112014019416 A8 BR 112014019416A8
- Authority
- BR
- Brazil
- Prior art keywords
- formation
- computer readable
- readable medium
- control operation
- simulation
- Prior art date
Links
- 238000000034 method Methods 0.000 title abstract 3
- 230000015572 biosynthetic process Effects 0.000 abstract 4
- 238000004088 simulation Methods 0.000 abstract 2
- 239000012530 fluid Substances 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Abstract
MÉTODO, SISTEMA, E MEIO LEGÍVEL EM COMPUTADOR. Um método de projetar uma operação de controle de poço inclui obter dados de subsuperfície relacionados a uma formação circundando um poço, construir um modelo geomecânico da formação com base nos dados de subsuperfície, obter dados operacionais relacionados à operação de controle de poço, executar, em um processador, uma simulação de fratura hidráulica da formação, em que a simulação se baseia nos dados operacionais e modelo geomecânico, e determinar um volume estimado de fluido exigido para uma fratura quebrar uma superfície superior da formação.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201261595478P | 2012-02-06 | 2012-02-06 | |
PCT/US2013/024959 WO2013119685A1 (en) | 2012-02-06 | 2013-02-06 | Modeling and analysis of hydraulic fracture propagation to surface from a casing shoe |
Publications (2)
Publication Number | Publication Date |
---|---|
BR112014019416A2 BR112014019416A2 (pt) | 2017-06-20 |
BR112014019416A8 true BR112014019416A8 (pt) | 2017-07-11 |
Family
ID=48947968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
BR112014019416A BR112014019416A8 (pt) | 2012-02-06 | 2013-02-06 | Método, sistema, e meio legível por computador |
Country Status (9)
Country | Link |
---|---|
US (1) | US10240444B2 (pt) |
EP (1) | EP2812531A4 (pt) |
AU (2) | AU2013217086A1 (pt) |
BR (1) | BR112014019416A8 (pt) |
CA (1) | CA2863796C (pt) |
CO (1) | CO7131395A2 (pt) |
EA (1) | EA201491485A1 (pt) |
EC (1) | ECSP14017629A (pt) |
WO (1) | WO2013119685A1 (pt) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015057242A1 (en) * | 2013-10-18 | 2015-04-23 | Halliburton Energy Services, Inc. | Managing a wellsite operation with a proxy model |
US9803475B2 (en) * | 2014-04-09 | 2017-10-31 | Weatherford Technology Holdings, Llc | System and method for integrated wellbore stress, stability and strengthening analyses |
WO2015163858A1 (en) * | 2014-04-22 | 2015-10-29 | Landmark Graphics Corporation | Integrated 3d method for prediction of mud weight window for complex well sections |
WO2017007940A1 (en) * | 2015-07-09 | 2017-01-12 | Conocophillips Company | Rock strength and in-situ stresses from drilling response |
CA2995448A1 (en) * | 2015-09-25 | 2017-03-30 | Halliburton Energy Services, Inc. | Multi-oriented hydraulic fracturing models and methods |
WO2018185099A1 (en) * | 2017-04-03 | 2018-10-11 | Repsol, S.A. | Drilling method suitable for wells for the injection or production of a gas or oil reservoir |
US11085289B2 (en) * | 2017-05-19 | 2021-08-10 | Baker Hughes Holdings Llc | Distributed remote logging |
CN113330184B (zh) | 2018-12-06 | 2023-10-17 | 斯伦贝谢技术有限公司 | 用于具有实时调节的多层水力压裂处理的方法 |
CN109975177B (zh) * | 2019-04-30 | 2023-11-10 | 中南大学 | 一种水平注浆口注浆扩散形态的模拟试验装置及方法 |
WO2020242615A1 (en) | 2019-05-31 | 2020-12-03 | Exxonmobil Upstream Research Company | Modeling fluid flow in a wellbore for hydraulic fracturing pressure determination |
CN113605885A (zh) * | 2021-08-20 | 2021-11-05 | 中海石油(中国)有限公司海南分公司 | 钻井液在裂缝性地层微量吞吐的模拟装置及模拟方法 |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3165569A (en) | 1960-04-18 | 1965-01-12 | Air Logisties Corp | Method and apparatus for thermal expansion molding |
US5250250A (en) | 1991-09-19 | 1993-10-05 | Dennis Gorski | Process for forming artificial rocks |
US6876959B1 (en) * | 1999-04-29 | 2005-04-05 | Schlumberger Technology Corporation | Method and apparatus for hydraulic fractioning analysis and design |
US6904366B2 (en) | 2001-04-03 | 2005-06-07 | The Regents Of The University Of California | Waterflood control system for maximizing total oil recovery |
CA2491942C (en) * | 2002-07-08 | 2011-02-22 | Gilman A. Hill | Method for upward growth of a hydraulic fracture along a well bore sandpacked annulus |
US20070272407A1 (en) * | 2006-05-25 | 2007-11-29 | Halliburton Energy Services, Inc. | Method and system for development of naturally fractured formations |
US8444901B2 (en) | 2007-12-31 | 2013-05-21 | Schlumberger Technology Corporation | Method of fabricating a high temperature progressive cavity motor or pump component |
WO2010111398A2 (en) * | 2009-03-24 | 2010-09-30 | Chevron U.S.A. Inc. | A system and method for characterizing fractures in a subsurface reservoir |
EP2261459A1 (en) * | 2009-06-03 | 2010-12-15 | BP Exploration Operating Company Limited | Method and system for configuring crude oil displacement system |
US8898044B2 (en) | 2009-11-25 | 2014-11-25 | Halliburton Energy Services, Inc. | Simulating subterranean fracture propagation |
US8392165B2 (en) | 2009-11-25 | 2013-03-05 | Halliburton Energy Services, Inc. | Probabilistic earth model for subterranean fracture simulation |
US8731889B2 (en) * | 2010-03-05 | 2014-05-20 | Schlumberger Technology Corporation | Modeling hydraulic fracturing induced fracture networks as a dual porosity system |
US8515720B2 (en) * | 2010-04-06 | 2013-08-20 | Schlumberger Technology Corporation | Determine field fractures using geomechanical forward modeling |
WO2012003027A1 (en) * | 2010-06-28 | 2012-01-05 | Exxonmobil Upstream Research Company | Method and system for modeling fractures in ductile rock |
CN101899972A (zh) | 2010-06-30 | 2010-12-01 | 中国石油大学(北京) | 砂岩油藏注水开发可预测物理模型建立方法 |
CN102041995B (zh) | 2010-12-02 | 2013-06-19 | 中国海洋石油总公司 | 复杂油藏水淹状况监测系统 |
US9121272B2 (en) * | 2011-08-05 | 2015-09-01 | Schlumberger Technology Corporation | Method of fracturing multiple zones within a well |
-
2013
- 2013-02-06 WO PCT/US2013/024959 patent/WO2013119685A1/en active Application Filing
- 2013-02-06 BR BR112014019416A patent/BR112014019416A8/pt not_active Application Discontinuation
- 2013-02-06 CA CA2863796A patent/CA2863796C/en not_active Expired - Fee Related
- 2013-02-06 EA EA201491485A patent/EA201491485A1/ru unknown
- 2013-02-06 US US14/376,809 patent/US10240444B2/en not_active Expired - Fee Related
- 2013-02-06 AU AU2013217086A patent/AU2013217086A1/en not_active Abandoned
- 2013-02-06 EP EP13747207.2A patent/EP2812531A4/en not_active Withdrawn
-
2014
- 2014-08-29 CO CO14190804A patent/CO7131395A2/es unknown
- 2014-09-05 EC ECIEPI201417629A patent/ECSP14017629A/es unknown
-
2016
- 2016-10-05 AU AU2016238868A patent/AU2016238868A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
CA2863796A1 (en) | 2013-08-15 |
EA201491485A1 (ru) | 2015-01-30 |
BR112014019416A2 (pt) | 2017-06-20 |
CN104204407A (zh) | 2014-12-10 |
US20150041120A1 (en) | 2015-02-12 |
AU2016238868A1 (en) | 2016-10-27 |
ECSP14017629A (es) | 2018-11-30 |
EP2812531A1 (en) | 2014-12-17 |
CO7131395A2 (es) | 2014-12-01 |
EP2812531A4 (en) | 2016-01-13 |
US10240444B2 (en) | 2019-03-26 |
CA2863796C (en) | 2016-09-27 |
WO2013119685A1 (en) | 2013-08-15 |
AU2013217086A1 (en) | 2014-08-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
BR112014019416A8 (pt) | Método, sistema, e meio legível por computador | |
BR112014027507A2 (pt) | métodos e sistemas para monitoramento em tempo real e processamento de dados de furo de poço | |
BR112016011902A2 (pt) | Método e sistema de controle de equipamento de perfuração de fundo de poço, e, meio de armazenamento legível por computador | |
BR112019000587A2 (pt) | método, meio de armazenamento não transitório legível por computador por computador e sistema | |
BR112015031567A2 (pt) | método e sistema para predizer propriedades de fluido, e, método para manutenção de um furo de poço | |
BR112016014653A8 (pt) | Método implementado por computador para prever preferências de compartilhamento de privacidade, meio legível por computador não transitório e pelo menos um dispositivo de computação | |
BR112014010082A2 (pt) | método, sistema de computador e meio não transitório lido por computador armazenando um programa | |
BR112016028422A2 (pt) | método para a fratura hidráulica de uma formação subterrânea atravessada por um poço de exploração | |
BR112015009680A2 (pt) | método e sistema para geo-orientar um conjunto de fundo de poço, e, produto de programa de computador | |
EP2848964A3 (en) | Combining downhole fluid analysis and petroleum systems modeling | |
BR112012019720A2 (pt) | método e sistema para predizer o efeito da injeção de micróbios em um reservatório petrolífero. | |
BR112012017182A2 (pt) | método e sistema para utilizar simulação estatística multiponto para modelar tendências de propriedade de reservatório | |
GB201311436D0 (en) | System and method for performing reservoir simulation using preconditioning | |
BR112017019578A2 (pt) | método de controle de fundo de poço e aparelho de completação de fundo de poço | |
BR112016021678A2 (pt) | método e sistema para determinar uma janela de peso de lama em um poço, e, meio legível por computador. | |
BR112016001807A2 (pt) | compartimentos de atualização dinâmica que representam uma ou mais estruturas geológicas | |
BR112014001495A2 (pt) | método para mapear dados geológicos, aparelho compreendendo uma mídia não transitória e tangível lida por computador e sistema de computação | |
BR112015032435A2 (pt) | método implementado por computador, sistema, produto de programa de computador, método para completar um poço e método para desenvolver um campo de hidrocarboneto | |
BR112013016699A2 (pt) | método, sistema de computador, e, meio legível por computador | |
BR112016007649A2 (pt) | métodos para analisar completações de sistema de poço e projetar uma completação, e, sistema | |
BR112014026014A2 (pt) | sistema e método para calibrar permeabilidade para uso em modelagem de reservatório | |
BR112013026993A2 (pt) | método realizado com um sistema de computação para determinar a integridade do poço | |
BR112012024690A2 (pt) | métodos para estimar ima velocidade de uma camada geológica e para formar um modelo de velocidade de uma região de subsuperfície | |
BR112017007415A2 (pt) | método, sistema de computador, artigo de fabricação e meio legível por computador não volátil | |
GB2518546A (en) | Prediction and diagnosis of lost circulation in wells |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
B06F | Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette] | ||
B06U | Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette] | ||
B06A | Patent application procedure suspended [chapter 6.1 patent gazette] | ||
B11B | Dismissal acc. art. 36, par 1 of ipl - no reply within 90 days to fullfil the necessary requirements |