EA201491485A1 - Моделирование и анализ распространения трещины гидравлического разрыва к поверхности от башмака обсадной колонны - Google Patents
Моделирование и анализ распространения трещины гидравлического разрыва к поверхности от башмака обсадной колонныInfo
- Publication number
- EA201491485A1 EA201491485A1 EA201491485A EA201491485A EA201491485A1 EA 201491485 A1 EA201491485 A1 EA 201491485A1 EA 201491485 A EA201491485 A EA 201491485A EA 201491485 A EA201491485 A EA 201491485A EA 201491485 A1 EA201491485 A1 EA 201491485A1
- Authority
- EA
- Eurasian Patent Office
- Prior art keywords
- modeling
- bashmack
- showcard
- splash
- crushing
- Prior art date
Links
- 230000015572 biosynthetic process Effects 0.000 abstract 3
- 239000012530 fluid Substances 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- 238000004088 simulation Methods 0.000 abstract 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Abstract
Способ планирования операции по регулированию скважины включает в себя получение данных о геологической среде, относящихся к пласту, окружающему скважину, построение геомеханической модели пласта на основании данных о геологической среде, получение рабочих данных, относящихся к операции по регулированию скважины, выполнение на процессоре моделирования трещины гидравлического разрыва пласта, при этом моделирование основано на рабочих данных и геомеханической модели, и определение расчетного объема флюида, необходимого для прорыва трещиной верхней поверхности пласта.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201261595478P | 2012-02-06 | 2012-02-06 | |
PCT/US2013/024959 WO2013119685A1 (en) | 2012-02-06 | 2013-02-06 | Modeling and analysis of hydraulic fracture propagation to surface from a casing shoe |
Publications (1)
Publication Number | Publication Date |
---|---|
EA201491485A1 true EA201491485A1 (ru) | 2015-01-30 |
Family
ID=48947968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EA201491485A EA201491485A1 (ru) | 2012-02-06 | 2013-02-06 | Моделирование и анализ распространения трещины гидравлического разрыва к поверхности от башмака обсадной колонны |
Country Status (9)
Country | Link |
---|---|
US (1) | US10240444B2 (ru) |
EP (1) | EP2812531A4 (ru) |
AU (2) | AU2013217086A1 (ru) |
BR (1) | BR112014019416A8 (ru) |
CA (1) | CA2863796C (ru) |
CO (1) | CO7131395A2 (ru) |
EA (1) | EA201491485A1 (ru) |
EC (1) | ECSP14017629A (ru) |
WO (1) | WO2013119685A1 (ru) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2015057242A1 (en) * | 2013-10-18 | 2015-04-23 | Halliburton Energy Services, Inc. | Managing a wellsite operation with a proxy model |
US9803475B2 (en) * | 2014-04-09 | 2017-10-31 | Weatherford Technology Holdings, Llc | System and method for integrated wellbore stress, stability and strengthening analyses |
WO2015163858A1 (en) * | 2014-04-22 | 2015-10-29 | Landmark Graphics Corporation | Integrated 3d method for prediction of mud weight window for complex well sections |
EP3320177B1 (en) | 2015-07-09 | 2022-11-02 | ConocoPhillips Company | Rock strength and in-situ stresses from drilling response |
CA2995448A1 (en) * | 2015-09-25 | 2017-03-30 | Halliburton Energy Services, Inc. | Multi-oriented hydraulic fracturing models and methods |
WO2018185099A1 (en) * | 2017-04-03 | 2018-10-11 | Repsol, S.A. | Drilling method suitable for wells for the injection or production of a gas or oil reservoir |
US11085289B2 (en) * | 2017-05-19 | 2021-08-10 | Baker Hughes Holdings Llc | Distributed remote logging |
CN113330184B (zh) | 2018-12-06 | 2023-10-17 | 斯伦贝谢技术有限公司 | 用于具有实时调节的多层水力压裂处理的方法 |
CN109975177B (zh) * | 2019-04-30 | 2023-11-10 | 中南大学 | 一种水平注浆口注浆扩散形态的模拟试验装置及方法 |
WO2020242615A1 (en) | 2019-05-31 | 2020-12-03 | Exxonmobil Upstream Research Company | Modeling fluid flow in a wellbore for hydraulic fracturing pressure determination |
CN113605885A (zh) * | 2021-08-20 | 2021-11-05 | 中海石油(中国)有限公司海南分公司 | 钻井液在裂缝性地层微量吞吐的模拟装置及模拟方法 |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3165569A (en) | 1960-04-18 | 1965-01-12 | Air Logisties Corp | Method and apparatus for thermal expansion molding |
US5250250A (en) | 1991-09-19 | 1993-10-05 | Dennis Gorski | Process for forming artificial rocks |
US6876959B1 (en) | 1999-04-29 | 2005-04-05 | Schlumberger Technology Corporation | Method and apparatus for hydraulic fractioning analysis and design |
US6904366B2 (en) | 2001-04-03 | 2005-06-07 | The Regents Of The University Of California | Waterflood control system for maximizing total oil recovery |
CA2491942C (en) * | 2002-07-08 | 2011-02-22 | Gilman A. Hill | Method for upward growth of a hydraulic fracture along a well bore sandpacked annulus |
US20070272407A1 (en) | 2006-05-25 | 2007-11-29 | Halliburton Energy Services, Inc. | Method and system for development of naturally fractured formations |
US8444901B2 (en) | 2007-12-31 | 2013-05-21 | Schlumberger Technology Corporation | Method of fabricating a high temperature progressive cavity motor or pump component |
WO2010111398A2 (en) * | 2009-03-24 | 2010-09-30 | Chevron U.S.A. Inc. | A system and method for characterizing fractures in a subsurface reservoir |
EP2261459A1 (en) * | 2009-06-03 | 2010-12-15 | BP Exploration Operating Company Limited | Method and system for configuring crude oil displacement system |
US8898044B2 (en) | 2009-11-25 | 2014-11-25 | Halliburton Energy Services, Inc. | Simulating subterranean fracture propagation |
US8392165B2 (en) | 2009-11-25 | 2013-03-05 | Halliburton Energy Services, Inc. | Probabilistic earth model for subterranean fracture simulation |
US8731889B2 (en) * | 2010-03-05 | 2014-05-20 | Schlumberger Technology Corporation | Modeling hydraulic fracturing induced fracture networks as a dual porosity system |
US8515720B2 (en) * | 2010-04-06 | 2013-08-20 | Schlumberger Technology Corporation | Determine field fractures using geomechanical forward modeling |
WO2012003027A1 (en) | 2010-06-28 | 2012-01-05 | Exxonmobil Upstream Research Company | Method and system for modeling fractures in ductile rock |
CN101899972A (zh) | 2010-06-30 | 2010-12-01 | 中国石油大学(北京) | 砂岩油藏注水开发可预测物理模型建立方法 |
CN102041995B (zh) | 2010-12-02 | 2013-06-19 | 中国海洋石油总公司 | 复杂油藏水淹状况监测系统 |
US9121272B2 (en) * | 2011-08-05 | 2015-09-01 | Schlumberger Technology Corporation | Method of fracturing multiple zones within a well |
-
2013
- 2013-02-06 BR BR112014019416A patent/BR112014019416A8/pt not_active Application Discontinuation
- 2013-02-06 US US14/376,809 patent/US10240444B2/en not_active Expired - Fee Related
- 2013-02-06 CA CA2863796A patent/CA2863796C/en not_active Expired - Fee Related
- 2013-02-06 EA EA201491485A patent/EA201491485A1/ru unknown
- 2013-02-06 AU AU2013217086A patent/AU2013217086A1/en not_active Abandoned
- 2013-02-06 WO PCT/US2013/024959 patent/WO2013119685A1/en active Application Filing
- 2013-02-06 EP EP13747207.2A patent/EP2812531A4/en not_active Withdrawn
-
2014
- 2014-08-29 CO CO14190804A patent/CO7131395A2/es unknown
- 2014-09-05 EC ECIEPI201417629A patent/ECSP14017629A/es unknown
-
2016
- 2016-10-05 AU AU2016238868A patent/AU2016238868A1/en not_active Abandoned
Also Published As
Publication number | Publication date |
---|---|
CA2863796A1 (en) | 2013-08-15 |
BR112014019416A8 (pt) | 2017-07-11 |
AU2016238868A1 (en) | 2016-10-27 |
CA2863796C (en) | 2016-09-27 |
CO7131395A2 (es) | 2014-12-01 |
BR112014019416A2 (ru) | 2017-06-20 |
US20150041120A1 (en) | 2015-02-12 |
EP2812531A1 (en) | 2014-12-17 |
CN104204407A (zh) | 2014-12-10 |
AU2013217086A1 (en) | 2014-08-28 |
WO2013119685A1 (en) | 2013-08-15 |
ECSP14017629A (es) | 2018-11-30 |
US10240444B2 (en) | 2019-03-26 |
EP2812531A4 (en) | 2016-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA201491485A1 (ru) | Моделирование и анализ распространения трещины гидравлического разрыва к поверхности от башмака обсадной колонны | |
WO2014160464A3 (en) | A computer-implemented method, a device, and a computer-readable medium for data-driven modeling of oil, gas, and water | |
MX367584B (es) | Método de calibración de la geometría de fractura a los eventos microsísmicos. | |
EA201170749A1 (ru) | Система и способ формирования сетки для дискретного моделирования трещин | |
EA201890925A2 (ru) | Способы и аппараты для прогнозирования риска рака предстательной железы и объема предстательной железы | |
EA201170472A1 (ru) | Реализованные посредством компьютера системы и способы для использования при моделировании геомеханической системы коллектора | |
BR112016006470A2 (pt) | método para predizer um risco durante operações de perfuração de um poço, e, dispositivo portador de programa não transitório | |
WO2012148688A3 (en) | A method of providing flow control devices for a production wellbore | |
MX349526B (es) | Analisis de datos microsismicos de un tratamiento de fractura. | |
WO2013192516A3 (en) | Evaluating fluid flow in a wellbore | |
BRPI1007187A2 (pt) | método e sistema de inversão estocástica implementado por meio de computador para estimar os parâmetros do modelo de um modelo de terra de um volume geológico de subsuperfície de interesse. | |
EA201490172A1 (ru) | Система и способ для формирования геостатистической модели интересующего геологического объема, ограниченной процесс-ориентированной моделью интересующего геологического объема | |
GB2503136A (en) | Method of minimizing wellbore instability | |
GB2528821A (en) | Algorithm for optimal ICD configuration using a coupled wellbore-reservoir model | |
MX2015005629A (es) | Sistema, metodo y producto de programa informatico para el moldeado de eventos de pozos que utilizan datos de rimlier. | |
EA201270525A1 (ru) | Способ и устройство для бурения, использующие вероятностный подход | |
GB2534729A (en) | Real-time risk prediction during drilling operations | |
GB201217271D0 (en) | Traffic sensor management | |
GB201317827D0 (en) | Computer-Based method for real-time three-dimensional geological model calculation and reservoir navigation | |
GB2518546A (en) | Prediction and diagnosis of lost circulation in wells | |
GB2535362A (en) | Drilling engineering analysis roadmap builder | |
BR112015032435A2 (pt) | método implementado por computador, sistema, produto de programa de computador, método para completar um poço e método para desenvolver um campo de hidrocarboneto | |
WO2014209879A3 (en) | Characterizing porosity distribution from a borehole image | |
GB2569900A (en) | Geostatistical analysis of microseismic data in fracture modelling | |
GB2536123A (en) | Integrated oilfield asset modeling using multiple resolutions of reservoir detail |