BR112012032052A2 - método e sistema para estabilizr métodos de formulação. - Google Patents

método e sistema para estabilizr métodos de formulação.

Info

Publication number
BR112012032052A2
BR112012032052A2 BR112012032052A BR112012032052A BR112012032052A2 BR 112012032052 A2 BR112012032052 A2 BR 112012032052A2 BR 112012032052 A BR112012032052 A BR 112012032052A BR 112012032052 A BR112012032052 A BR 112012032052A BR 112012032052 A2 BR112012032052 A2 BR 112012032052A2
Authority
BR
Brazil
Prior art keywords
flow rates
masses
phase flow
updated
phase
Prior art date
Application number
BR112012032052A
Other languages
English (en)
Inventor
Xiao-Hui Wu
Yahan Yang
Original Assignee
Exxonmobil Upstream Res Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Exxonmobil Upstream Res Co filed Critical Exxonmobil Upstream Res Co
Publication of BR112012032052A2 publication Critical patent/BR112012032052A2/pt

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V11/00Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Abstract

método e sistema para estabilizar métodos de formulação. um método é aqpresentado para modelar as propriedades de reservatório. o método inclui um procedimento de etapa de tempo auxiliar do reservatório entre um tempo antigo e um tempo novo, e calcular uma pluralidade de massas explicita mente. uma pluralidade de densidades do componente de fase é atualizada linearmente a partir das pluralidade de massas. uma pluralidade de mudanças é calculada com base na pluralidade de massas. uma pluralidade de taxas de fluxo de fase é atualizada com base na pluralidade de mudanças de saturação, uma pluralidade de taxas de fluxo de fase no tempo antigo, e uma pluralidade de derivados de saturação das taxas de fluxo de fase no tempo antigo. uma pluralidade de taxas de fluxo do componente pode ser calculada com base na pluralidade de densidades do componente de fase atualizadas e na pluralidade de taxas de fluxo de fase. o método também inclui um método de formulação com base no procedimento de etapa de tempo auxiliar.
BR112012032052A 2010-06-15 2011-03-03 método e sistema para estabilizr métodos de formulação. BR112012032052A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US35500110P 2010-06-15 2010-06-15
PCT/US2011/026937 WO2011159372A1 (en) 2010-06-15 2011-03-03 Method and system for stabilizing formulation methods

Publications (1)

Publication Number Publication Date
BR112012032052A2 true BR112012032052A2 (pt) 2016-11-08

Family

ID=45348498

Family Applications (1)

Application Number Title Priority Date Filing Date
BR112012032052A BR112012032052A2 (pt) 2010-06-15 2011-03-03 método e sistema para estabilizr métodos de formulação.

Country Status (6)

Country Link
US (1) US10083254B2 (pt)
BR (1) BR112012032052A2 (pt)
CA (1) CA2801386A1 (pt)
GB (1) GB2498255B (pt)
NO (1) NO343811B1 (pt)
WO (1) WO2011159372A1 (pt)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2801386A1 (en) 2010-06-15 2011-12-22 Exxonmobil Upstream Research Company Method and system for stabilizing formulation methods
AU2011283190A1 (en) 2010-07-29 2013-02-07 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
AU2011283192B2 (en) 2010-07-29 2014-07-17 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
AU2011332274B2 (en) 2010-11-23 2017-02-23 Exxonmobil Upstream Research Company Variable discretization method for flow simulation on complex geological models
US9617833B2 (en) * 2012-06-22 2017-04-11 Halliburton Energy Services, Inc. Evaluating fluid flow in a wellbore
CA2883169C (en) 2012-09-28 2021-06-15 Exxonmobil Upstream Research Company Fault removal in geological models
KR101358037B1 (ko) * 2012-11-28 2014-02-05 한국과학기술정보연구원 대용량 cfd 병렬 데이터의 가시화를 위한 데이터 파일 포맷 구조로 데이터가 기록된 기록 매체 및 그 데이터 파일 포맷 구조 생성 방법
JP6561266B2 (ja) * 2013-05-16 2019-08-21 ダッソー システムズ シムリア コーポレイション 相対浸透率シミュレーションのための質量交換の使用
US10119396B2 (en) 2014-02-18 2018-11-06 Saudi Arabian Oil Company Measuring behind casing hydraulic conductivity between reservoir layers
WO2016018723A1 (en) 2014-07-30 2016-02-04 Exxonmobil Upstream Research Company Method for volumetric grid generation in a domain with heterogeneous material properties
US10392922B2 (en) 2015-01-13 2019-08-27 Saudi Arabian Oil Company Measuring inter-reservoir cross flow rate between adjacent reservoir layers from transient pressure tests
US10180057B2 (en) 2015-01-21 2019-01-15 Saudi Arabian Oil Company Measuring inter-reservoir cross flow rate through unintended leaks in zonal isolation cement sheaths in offset wells
US10094202B2 (en) 2015-02-04 2018-10-09 Saudi Arabian Oil Company Estimating measures of formation flow capacity and phase mobility from pressure transient data under segregated oil and water flow conditions
WO2017068382A1 (en) 2015-10-21 2017-04-27 Lemma Method for determining at least one characteristic value of a multiphase flow at each instant, associated system and computer product program
HUE064459T2 (hu) * 2016-12-23 2024-03-28 Exxonmobil Technology & Engineering Company Eljárás és rendszer stabil és hatékony tározó szimulációhoz stabilitási proxyk alkalmazásával
EP3574291B1 (en) 2017-01-26 2023-12-06 Dassault Systemes Simulia Corp. Multi-phase flow visualizations based on fluid occupation time
US11714040B2 (en) 2018-01-10 2023-08-01 Dassault Systemes Simulia Corp. Determining fluid flow characteristics of porous mediums
US11530598B2 (en) 2018-08-21 2022-12-20 Dassault Systemes Simulia Corp. Determination of oil removed by gas via miscible displacement in reservoir rock
EP4073347A1 (en) 2019-12-11 2022-10-19 Exxonmobil Upstream Research Company (EMHC-N1-4A-607) Semi-elimination methodology for simulating high flow features in a reservoir
US11193370B1 (en) 2020-06-05 2021-12-07 Saudi Arabian Oil Company Systems and methods for transient testing of hydrocarbon wells
US11847391B2 (en) 2020-06-29 2023-12-19 Dassault Systemes Simulia Corp. Computer system for simulating physical processes using surface algorithm
US11907625B2 (en) 2020-12-29 2024-02-20 Dassault Systemes Americas Corp. Computer simulation of multi-phase and multi-component fluid flows including physics of under-resolved porous structures

Family Cites Families (59)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2747490B1 (fr) 1996-04-12 1998-05-22 Inst Francais Du Petrole Methode pour generer un maillage 3d respectant la geometrie d'un corps, dans le but de realiser un modele representatif de ce corps
US6018497A (en) 1997-02-27 2000-01-25 Geoquest Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore
US6106561A (en) 1997-06-23 2000-08-22 Schlumberger Technology Corporation Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator
US6052520A (en) 1998-02-10 2000-04-18 Exxon Production Research Company Process for predicting behavior of a subterranean formation
US6101447A (en) 1998-02-12 2000-08-08 Schlumberger Technology Corporation Oil and gas reservoir production analysis apparatus and method
GB2336008B (en) 1998-04-03 2000-11-08 Schlumberger Holdings Simulation system including a simulator and a case manager adapted for organizing data files
GB2352036B (en) 1998-05-04 2002-11-27 Schlumberger Evaluation & Prod Near wellbore modelling method and apparatus
US6662146B1 (en) 1998-11-25 2003-12-09 Landmark Graphics Corporation Methods for performing reservoir simulation
US6230101B1 (en) 1999-06-03 2001-05-08 Schlumberger Technology Corporation Simulation method and apparatus
US6853921B2 (en) 1999-07-20 2005-02-08 Halliburton Energy Services, Inc. System and method for real time reservoir management
US6980940B1 (en) 2000-02-22 2005-12-27 Schlumberger Technology Corp. Intergrated reservoir optimization
US7006951B2 (en) 2000-06-29 2006-02-28 Object Reservoir, Inc. Method for solving finite element models using time slabbing
FR2811430B1 (fr) 2000-07-10 2002-09-06 Inst Francais Du Petrole Methode de modelisation permettant de predire en fonction du temps la composition detaillee de fluides porudits par un gisement souterrain en cours de production
US6585044B2 (en) 2000-09-20 2003-07-01 Halliburton Energy Services, Inc. Method, system and tool for reservoir evaluation and well testing during drilling operations
US7249009B2 (en) 2002-03-19 2007-07-24 Baker Geomark Llc Method and apparatus for simulating PVT parameters
US7523024B2 (en) * 2002-05-17 2009-04-21 Schlumberger Technology Corporation Modeling geologic objects in faulted formations
US8401832B2 (en) 2002-11-23 2013-03-19 Schlumberger Technology Corporation Method and system for integrated reservoir and surface facility networks simulations
US7526953B2 (en) 2002-12-03 2009-05-05 Schlumberger Technology Corporation Methods and apparatus for the downhole characterization of formation fluids
ZA200509840B (en) 2003-05-07 2007-03-28 Saudi Arabian Oil Co Compositional modeling and pyrolysis data analysis methods
FR2869116B1 (fr) 2004-04-14 2006-06-09 Inst Francais Du Petrole Methode pour construire un modele geomecanique d'une zone souterraine destine a etre couple a un modele de reservoir
FR2870621B1 (fr) 2004-05-21 2006-10-27 Inst Francais Du Petrole Methode pour generer un maillage hybride conforme en trois dimensions d'une formation heterogene traversee par une ou plusieurs discontinuites geometriques dans le but de realiser des simulations
WO2006036389A2 (en) 2004-09-10 2006-04-06 Exxonmobil Upstream Research Company Numerical modeling evaluation of basin sedimentation properities
US7809537B2 (en) 2004-10-15 2010-10-05 Saudi Arabian Oil Company Generalized well management in parallel reservoir simulation
US7225078B2 (en) 2004-11-03 2007-05-29 Halliburton Energy Services, Inc. Method and system for predicting production of a well
US7505365B2 (en) 2006-01-10 2009-03-17 Massachusetts Institute Of Technology Lorentz acoustic transmitter for underwater communications
US7809538B2 (en) 2006-01-13 2010-10-05 Halliburton Energy Services, Inc. Real time monitoring and control of thermal recovery operations for heavy oil reservoirs
US8776895B2 (en) 2006-03-02 2014-07-15 Exxonmobil Upstream Research Company Method for quantifying reservoir connectivity using fluid travel times
WO2007149766A2 (en) 2006-06-18 2007-12-27 Chevron U.S.A. Inc. Reservoir simulation using a multi-scale finite volume including black oil modeling
BRPI0714028A2 (pt) 2006-07-07 2012-12-18 Exxonmobil Upstream Res Co métodos para refinar uma propriedade fìsica e para produzir hidrocarbonetos a partir de uma região de subsolo
CA2660444C (en) * 2006-08-14 2017-07-11 Exxonmobil Upstream Research Company Enriched multi-point flux approximation
FR2904982B1 (fr) 2006-08-16 2009-04-17 Inst Francais Du Petrole Methode pour optimiser la recuperation assistee d'un fluide en place dans un milieu poreux par suivi de front.
US7657494B2 (en) 2006-09-20 2010-02-02 Chevron U.S.A. Inc. Method for forecasting the production of a petroleum reservoir utilizing genetic programming
US7877246B2 (en) 2006-09-22 2011-01-25 Schlumberger Technology Corporation System and method for performing oilfield simulation operations
RU2444788C2 (ru) 2007-06-01 2012-03-10 Эксонмобил Апстрим Рисерч Компани Создание ограниченной сетки вороного на плоскости
US20100132450A1 (en) 2007-09-13 2010-06-03 Pomerantz Andrew E Methods for optimizing petroleum reservoir analysis
US7660673B2 (en) 2007-10-12 2010-02-09 Schlumberger Technology Corporation Coarse wellsite analysis for field development planning
US7822554B2 (en) 2008-01-24 2010-10-26 Schlumberger Technology Corporation Methods and apparatus for analysis of downhole compositional gradients and applications thereof
US7920970B2 (en) 2008-01-24 2011-04-05 Schlumberger Technology Corporation Methods and apparatus for characterization of petroleum fluid and applications thereof
US8180578B2 (en) 2008-02-20 2012-05-15 Schlumberger Technology Corporation Multi-component multi-phase fluid analysis using flash method
US9372943B2 (en) 2008-05-05 2016-06-21 Exxonmobil Upstream Research Company Modeling dynamic systems by visualizing and narrowing a parameter space
AU2009314461B2 (en) 2008-11-14 2015-11-05 Exxonmobil Upstream Research Company Forming a model of a subsurface region
US8165986B2 (en) 2008-12-09 2012-04-24 Schlumberger Technology Corporation Method and system for real time production management and reservoir characterization
CN102257377B (zh) 2008-12-18 2014-09-10 埃克森美孚上游研究公司 浊流的重叠多层深度平均流动模型
US8175751B2 (en) 2009-05-27 2012-05-08 Chevron U.S.A. Inc. Computer-implemented systems and methods for screening and predicting the performance of enhanced oil recovery and improved oil recovery methods
US10061060B2 (en) 2009-11-12 2018-08-28 Exxonmobil Upstream Research Company Method and apparatus for generating a three-dimensional simulation grid for a reservoir model
EP2499548A4 (en) 2009-11-12 2017-01-25 Exxonmobil Upstream Research Company Method and system for rapid model evaluation using multilevel surrogates
CA2801386A1 (en) 2010-06-15 2011-12-22 Exxonmobil Upstream Research Company Method and system for stabilizing formulation methods
AU2011283196B2 (en) 2010-07-29 2014-07-31 Exxonmobil Upstream Research Company Method and system for reservoir modeling
CA2803067A1 (en) 2010-07-29 2012-02-02 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
AU2011283193B2 (en) 2010-07-29 2014-07-17 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
AU2011283190A1 (en) 2010-07-29 2013-02-07 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
AU2011283192B2 (en) 2010-07-29 2014-07-17 Exxonmobil Upstream Research Company Methods and systems for machine-learning based simulation of flow
AU2011332274B2 (en) 2010-11-23 2017-02-23 Exxonmobil Upstream Research Company Variable discretization method for flow simulation on complex geological models
AU2011339017B2 (en) 2010-12-08 2016-09-08 Exxonmobil Upstream Research Company Constructing geologic models from geologic concepts
CA2883169C (en) 2012-09-28 2021-06-15 Exxonmobil Upstream Research Company Fault removal in geological models
WO2016018723A1 (en) 2014-07-30 2016-02-04 Exxonmobil Upstream Research Company Method for volumetric grid generation in a domain with heterogeneous material properties
EP3213127A1 (en) 2014-10-31 2017-09-06 Exxonmobil Upstream Research Company Managing discontinuities in geologic models
AU2015339883B2 (en) 2014-10-31 2018-03-29 Exxonmobil Upstream Research Company Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares
US10803534B2 (en) 2014-10-31 2020-10-13 Exxonmobil Upstream Research Company Handling domain discontinuity with the help of grid optimization techniques

Also Published As

Publication number Publication date
GB2498255A (en) 2013-07-10
NO20130073A1 (no) 2013-01-14
GB2498255B (en) 2018-11-14
US20130080128A1 (en) 2013-03-28
GB201222535D0 (en) 2013-01-30
NO343811B1 (no) 2019-06-11
CA2801386A1 (en) 2011-12-22
US10083254B2 (en) 2018-09-25
WO2011159372A1 (en) 2011-12-22

Similar Documents

Publication Publication Date Title
BR112012032052A2 (pt) método e sistema para estabilizr métodos de formulação.
CY1122812T1 (el) Δοσολογικο σχημα για εναν αγωνιστη του υποδοχεα s1p
CY1123208T1 (el) Κυκλικα παραγωγα εστερων βορονικου οξεος, μεθοδος για την παρασκευη και θεραπευτικες χρησεις αυτων
CY1121150T1 (el) Νευροδραστικα 19-αλκοξυ-17-υποκατεστημενα στεροειδη, χρησιμα σε μεθοδους θεραπειας
EA201490533A1 (ru) Способы и композиции для определения статуса в отношении курения
CR20150045A (es) Inhibidores de hepatitis c
EA201790693A1 (ru) Коррекция фигуры
AR086370A1 (es) Nodo de red radial y metodos para habilitar en dicho nodo la medicion de temporizacion de id de celda ampliada para el posicionamiento de un equipo de usuario
BR112015004961A2 (pt) estabelecimento de sessão de comunicação dispositivo a dispositivo
UY34559A (es) Inhibidores de bromodominios
BR112012025057A2 (pt) solicitação de informação de estado de canal aperiódica em comunicação sem fio
BR112014010721A2 (pt) método para recebimento e envio de um canal de controle, equipamento para o usuário e estação base
BR112016006945A2 (pt) métodos e aparelhos para sincronização de tempo e frequência assistida por equipamento de usuário de pequenas células
BR112014012285A2 (pt) método para a produção de hidrocarbonetos usando-se cavernas
GB201217271D0 (en) Traffic sensor management
CA2911567C (en) Implant and method of producing an implant by decellularising an tissue by perfusion under negative pressure
CL2016001211A1 (es) Aparato y método de registro de hoyo.
BR112014029782A2 (pt) defletor parcialmente preenchido
BR112014029464A8 (pt) método e aparelho para determinar um influxo em uma boca de poço
BR112017008845A2 (pt) sistemas e métodos de operação descontínua para dispositivos sem fio
BR112015007843A2 (pt) método para a preparação de um polímero, polímero, artigo e método de preparação de um artigo
BR112013030122A2 (pt) método para simular uma resposta de um instrumento de perfilagem de poço de nêutrons, meio legível por computador não transitório, e método para perfilagem de poço
IN2012DE00401A (pt)
NZ717595A (en) Methods and tools relating to the administration of contrast medium
BR112015004316A2 (pt) método e aparelho para determinação de um valor de uma variável dependente de movimento

Legal Events

Date Code Title Description
B06F Objections, documents and/or translations needed after an examination request according [chapter 6.6 patent gazette]
B06U Preliminary requirement: requests with searches performed by other patent offices: procedure suspended [chapter 6.21 patent gazette]
B09A Decision: intention to grant [chapter 9.1 patent gazette]
B11D Dismissal acc. art. 38, par 2 of ipl - failure to pay fee after grant in time