FR2869116B1 - Methode pour construire un modele geomecanique d'une zone souterraine destine a etre couple a un modele de reservoir - Google Patents
Methode pour construire un modele geomecanique d'une zone souterraine destine a etre couple a un modele de reservoirInfo
- Publication number
- FR2869116B1 FR2869116B1 FR0403889A FR0403889A FR2869116B1 FR 2869116 B1 FR2869116 B1 FR 2869116B1 FR 0403889 A FR0403889 A FR 0403889A FR 0403889 A FR0403889 A FR 0403889A FR 2869116 B1 FR2869116 B1 FR 2869116B1
- Authority
- FR
- France
- Prior art keywords
- model
- constructing
- torque
- subterranean zone
- geomechanical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V1/00—Seismology; Seismic or acoustic prospecting or detecting
- G01V1/28—Processing seismic data, e.g. for interpretation or for event detection
- G01V1/282—Application of seismic models, synthetic seismograms
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/66—Subsurface modeling
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Remote Sensing (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Acoustics & Sound (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Geophysics (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Evolutionary Computation (AREA)
- Geometry (AREA)
- General Engineering & Computer Science (AREA)
- Geophysics And Detection Of Objects (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0403889A FR2869116B1 (fr) | 2004-04-14 | 2004-04-14 | Methode pour construire un modele geomecanique d'une zone souterraine destine a etre couple a un modele de reservoir |
NO20051563A NO335631B1 (no) | 2004-04-14 | 2005-03-23 | Fremgangsmåte for å simulere geomekanisk oppførsel av et undergrunnsreservoar |
NL1028733A NL1028733C2 (nl) | 2004-04-14 | 2005-04-11 | Werkwijze voor het construeren van een geomechanisch model van een ondergronds gebied, bestemd om te worden gekoppeld aan een reservoirmodel. |
GB0507221A GB2413200B (en) | 2004-04-14 | 2005-04-11 | Method of optimizing hydrocarbon recovery from an underground zone by constructing a geomechanical model of the zone by upscaling a geological model |
US11/104,442 US7603265B2 (en) | 2004-04-14 | 2005-04-13 | Method of constructing a geomechanical model of an underground zone intended to be coupled with a reservoir model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0403889A FR2869116B1 (fr) | 2004-04-14 | 2004-04-14 | Methode pour construire un modele geomecanique d'une zone souterraine destine a etre couple a un modele de reservoir |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2869116A1 FR2869116A1 (fr) | 2005-10-21 |
FR2869116B1 true FR2869116B1 (fr) | 2006-06-09 |
Family
ID=34610791
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR0403889A Expired - Fee Related FR2869116B1 (fr) | 2004-04-14 | 2004-04-14 | Methode pour construire un modele geomecanique d'une zone souterraine destine a etre couple a un modele de reservoir |
Country Status (5)
Country | Link |
---|---|
US (1) | US7603265B2 (fr) |
FR (1) | FR2869116B1 (fr) |
GB (1) | GB2413200B (fr) |
NL (1) | NL1028733C2 (fr) |
NO (1) | NO335631B1 (fr) |
Families Citing this family (68)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100489558C (zh) | 2004-06-07 | 2009-05-20 | 埃克森美孚上游研究公司 | 用于求解隐式储层仿真矩阵的方法 |
US20060153005A1 (en) * | 2005-01-07 | 2006-07-13 | Herwanger Jorg V | Determination of anisotropic physical characteristics in and around reservoirs |
US7716029B2 (en) * | 2006-05-15 | 2010-05-11 | Schlumberger Technology Corporation | Method for optimal gridding in reservoir simulation |
GB2439571B (en) * | 2006-06-28 | 2008-11-12 | Schlumberger Holdings | Method for updating a model of the earth using microseismic measurements |
US8078437B2 (en) * | 2006-07-07 | 2011-12-13 | Exxonmobil Upstream Research Company | Upscaling reservoir models by reusing flow solutions from geologic models |
US8548782B2 (en) | 2007-08-24 | 2013-10-01 | Exxonmobil Upstream Research Company | Method for modeling deformation in subsurface strata |
US8768672B2 (en) * | 2007-08-24 | 2014-07-01 | ExxonMobil. Upstream Research Company | Method for predicting time-lapse seismic timeshifts by computer simulation |
CA2702965C (fr) | 2007-12-13 | 2014-04-01 | Exxonmobil Upstream Research Company | Partitionnement parallele adaptatif de donnees sur une simulation de reservoir utilisant une grille non structuree |
EP2235500B1 (fr) * | 2007-12-18 | 2018-10-31 | Exxonmobil Upstream Research Company | Détermination d'architecture de connectivité dans des données hétérogènes 2d et 3d |
AU2008340399B2 (en) | 2007-12-21 | 2013-09-26 | Exxonmobil Upstream Research Company | Method and apparatus for analyzing three-dimensional data |
CN101903805B (zh) * | 2007-12-21 | 2013-09-25 | 埃克森美孚上游研究公司 | 沉积盆地中的建模 |
CA2708967A1 (fr) * | 2008-01-22 | 2009-07-30 | Exxonmobil Upstream Research Company | Analyse de connectivite en dynamique |
AU2009223731B2 (en) | 2008-03-10 | 2013-09-05 | Exxonmobil Upstream Research Company | Method for determing distinct alternative paths between two object sets in 2-D and 3-D heterogeneous data |
US8285532B2 (en) * | 2008-03-14 | 2012-10-09 | Schlumberger Technology Corporation | Providing a simplified subterranean model |
AU2009229194B2 (en) * | 2008-03-28 | 2014-10-02 | Exxonmobil Upstream Research Company | Computing a consistent velocity vector field from a set of fluxes |
US7933750B2 (en) * | 2008-04-02 | 2011-04-26 | Schlumberger Technology Corp | Method for defining regions in reservoir simulation |
EP2283386B1 (fr) | 2008-05-05 | 2019-10-16 | Exxonmobil Upstream Research Company | Systèmes et procédés pour une analyse de connectivité à l'aide d'objets fonctionnels |
US10590762B2 (en) | 2008-09-18 | 2020-03-17 | Geoscale, Inc. | N-phasic finite element method for calculating a fully coupled response of multiphase compositional fluid flow and a system for uncertainty estimation of the calculated reservoir response |
US8255195B2 (en) * | 2008-09-18 | 2012-08-28 | Geoscape Analytics, Inc | N-phasic element method for calculating a fully coupled response of multiphase compositional fluid flow and a system for uncertainty estimation |
CA2737415C (fr) * | 2008-11-06 | 2017-03-28 | Exxonmobil Upstream Research Company | Systeme et procede de planification d'une operation de forage |
US8374836B2 (en) * | 2008-11-12 | 2013-02-12 | Geoscape Analytics, Inc. | Methods and systems for constructing and using a subterranean geomechanics model spanning local to zonal scale in complex geological environments |
US8352228B2 (en) * | 2008-12-23 | 2013-01-08 | Exxonmobil Upstream Research Company | Method for predicting petroleum expulsion |
US8908473B2 (en) * | 2008-12-23 | 2014-12-09 | Schlumberger Technology Corporation | Method of subsurface imaging using microseismic data |
US9552462B2 (en) * | 2008-12-23 | 2017-01-24 | Exxonmobil Upstream Research Company | Method for predicting composition of petroleum |
CA2753131A1 (fr) | 2009-03-13 | 2010-09-16 | Exxonmobil Upstream Research Company | Procede de prediction d'un ecoulement de fluide |
US8548783B2 (en) * | 2009-09-17 | 2013-10-01 | Chevron U.S.A. Inc. | Computer-implemented systems and methods for controlling sand production in a geomechanical reservoir system |
GB2474275B (en) * | 2009-10-09 | 2015-04-01 | Senergy Holdings Ltd | Well simulation |
CA2774181A1 (fr) | 2009-10-20 | 2011-04-28 | Exxonmobil Upstream Research Company | Procede d'evaluation quantitative de la connectivite pour des paires de puits a des frequences variables |
EP2317348B1 (fr) * | 2009-10-30 | 2014-05-21 | Services Pétroliers Schlumberger | Procédé de construction d'un espace sédimentaire correspondant à un domaine géologique |
CN102640163B (zh) | 2009-11-30 | 2016-01-20 | 埃克森美孚上游研究公司 | 用于储层模拟的适应性牛顿法 |
US8931580B2 (en) | 2010-02-03 | 2015-01-13 | Exxonmobil Upstream Research Company | Method for using dynamic target region for well path/drill center optimization |
US9134454B2 (en) | 2010-04-30 | 2015-09-15 | Exxonmobil Upstream Research Company | Method and system for finite volume simulation of flow |
BR112012032052A2 (pt) | 2010-06-15 | 2016-11-08 | Exxonmobil Upstream Res Co | método e sistema para estabilizr métodos de formulação. |
WO2012003007A1 (fr) | 2010-06-29 | 2012-01-05 | Exxonmobil Upstream Research Company | Procédé et système pour modèles de simulation parallèle |
CA2805446C (fr) | 2010-07-29 | 2016-08-16 | Exxonmobil Upstream Research Company | Procedes et systemes de simulation d'ecoulement basee sur un apprentissage machine |
US9058445B2 (en) | 2010-07-29 | 2015-06-16 | Exxonmobil Upstream Research Company | Method and system for reservoir modeling |
US8457940B2 (en) * | 2010-07-29 | 2013-06-04 | Schlumberger Technology Corporation | Model-consistent structural restoration for geomechanical and petroleum systems modeling |
CA2803066A1 (fr) | 2010-07-29 | 2012-02-02 | Exxonmobil Upstream Research Company | Procedes et systemes pour une simulation de flux par apprentissage automatique |
WO2012021292A1 (fr) | 2010-08-09 | 2012-02-16 | Conocophillips Company | Procédé de mise à l'échelle supérieure de réservoir avec une transmissibilité préservée |
WO2012039811A1 (fr) | 2010-09-20 | 2012-03-29 | Exxonmobil Upstream Research Company | Formulations souples et adaptatives pour des simulations de gisements complexes |
EP2622385B1 (fr) * | 2010-09-27 | 2022-05-04 | Total Se | Simulation de karstification |
US10338271B2 (en) * | 2010-12-09 | 2019-07-02 | Schlumberger Technology Corporation | Reservoir grid conversion for scaling strain |
US9747393B2 (en) | 2011-02-09 | 2017-08-29 | Exxonmobil Upstream Research Company | Methods and systems for upscaling mechanical properties of geomaterials |
CA2843929C (fr) | 2011-09-15 | 2018-03-27 | Exxonmobil Upstream Research Company | Operations matricielles et vectorielles optimisees dans des algorithmes a instructions limitees qui effectuent des calculs eos |
AU2013201967B2 (en) | 2012-03-30 | 2017-11-16 | Dassault Systèmes Canada Inc. | System and method for modeling a physical formation |
WO2013169429A1 (fr) | 2012-05-08 | 2013-11-14 | Exxonmobile Upstream Research Company | Commande de toile pour traitement de données volumétriques 3d |
FR2992448B1 (fr) * | 2012-06-26 | 2014-06-27 | IFP Energies Nouvelles | Procede d'exploitation d'un reservoir geologique a partir d'un modele de reservoir cale au moyen d'un parametrage multi-echelles |
NO339744B1 (no) | 2012-08-10 | 2017-01-30 | Schlumberger Technology Bv | Hybrid, lokal ikke-avstemmende metode for flerfasestrømningssimuleringer i heterogent sprukne medier |
US10036829B2 (en) | 2012-09-28 | 2018-07-31 | Exxonmobil Upstream Research Company | Fault removal in geological models |
US10379257B2 (en) * | 2012-10-26 | 2019-08-13 | Landmark Graphics Corporation | Distributing petrofacies using analytical modeling |
US9390555B2 (en) | 2012-11-09 | 2016-07-12 | International Business Machines Corporation | Method to assess the impact of existing fractures and faults for reservoir management |
US9171109B2 (en) | 2012-11-09 | 2015-10-27 | International Business Machines Corporation | Method to couple fluid-flow and geomechanical models for integrated petroleum systems using known triggering events |
GB2512372B (en) * | 2013-03-28 | 2020-07-29 | Total Sa | Method of modelling a subsurface volume |
US10048403B2 (en) | 2013-06-20 | 2018-08-14 | Exxonmobil Upstream Research Company | Method and system for generation of upscaled mechanical stratigraphy from petrophysical measurements |
WO2015030754A1 (fr) | 2013-08-28 | 2015-03-05 | Landmark Graphics Corporation | Procédés et systèmes de mise à l'échelle de cellule de grille de modèle terrestre statique et de rééchantillonnage de propriété |
DE112013007391T5 (de) | 2013-08-29 | 2016-05-19 | Landmark Graphics Corporation | Kalibrierungsverfahren und -systeme für ein statisches Erdmodell |
US9638586B2 (en) * | 2014-03-04 | 2017-05-02 | Underground Systems, Inc. | Dynamic wide-area earth thermal properties and earth ambient temperature determination system |
WO2016018723A1 (fr) | 2014-07-30 | 2016-02-04 | Exxonmobil Upstream Research Company | Procédé de génération de maillage volumétrique dans un domaine ayant des propriétés de matériau hétérogènes |
US10101498B2 (en) * | 2014-09-05 | 2018-10-16 | Schlumberger Technology Corporation | Well survivability in multidimensional geomechanical space |
WO2016067108A1 (fr) * | 2014-10-27 | 2016-05-06 | Cgg Services Sa | Prédiction d'efficacité de traitement de fracture hydraulique et de productivité dans des réservoirs de pétrole et de gaz |
AU2015339883B2 (en) | 2014-10-31 | 2018-03-29 | Exxonmobil Upstream Research Company | Methods to handle discontinuity in constructing design space for faulted subsurface model using moving least squares |
CA2963416A1 (fr) | 2014-10-31 | 2016-05-06 | Exxonmobil Upstream Research Company | Gestion de discontinuite de domaine dans un modele de grille de sous-surface a l'aide de techniques d'optimisation de grille |
CN105095986B (zh) * | 2015-06-23 | 2018-12-25 | 中国石油天然气股份有限公司 | 多层油藏整体产量预测的方法 |
US10248743B2 (en) | 2016-06-13 | 2019-04-02 | Saudi Arabian Oil Company | Determining cumulative water flow on a grid-by-grid basis in a geocellular earth model |
US10839114B2 (en) | 2016-12-23 | 2020-11-17 | Exxonmobil Upstream Research Company | Method and system for stable and efficient reservoir simulation using stability proxies |
US11126762B2 (en) | 2018-02-28 | 2021-09-21 | Saudi Arabian Oil Company | Locating new hydrocarbon fields and predicting reservoir performance from hydrocarbon migration |
US11200093B2 (en) * | 2019-07-15 | 2021-12-14 | Baker Hughes Oilfield Operations Llc | Management of a geomechanical workflow of a geomechanics application in a computer system |
US20220206184A1 (en) * | 2019-08-12 | 2022-06-30 | Landmark Graphics Corporation | Integrated rock mechanics laboratory for predicting stress-strain behavior |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6106561A (en) * | 1997-06-23 | 2000-08-22 | Schlumberger Technology Corporation | Simulation gridding method and apparatus including a structured areal gridder adapted for use by a reservoir simulator |
GB2352036B (en) * | 1998-05-04 | 2002-11-27 | Schlumberger Evaluation & Prod | Near wellbore modelling method and apparatus |
US6826520B1 (en) * | 1999-06-24 | 2004-11-30 | Exxonmobil Upstream Research Company | Method of upscaling permeability for unstructured grids |
US6928399B1 (en) * | 1999-12-03 | 2005-08-09 | Exxonmobil Upstream Research Company | Method and program for simulating a physical system using object-oriented programming |
GB2357097A (en) * | 1999-12-08 | 2001-06-13 | Norske Stats Oljeselskap | Method of assessing positional uncertainty in drilling a well |
GB0017227D0 (en) * | 2000-07-14 | 2000-08-30 | Schlumberger Ind Ltd | Fully coupled geomechanics in a commerical reservoir simulator |
GB0021284D0 (en) * | 2000-08-30 | 2000-10-18 | Schlumberger Evaluation & Prod | Compositional simulation using a new streamline method |
US20020120429A1 (en) * | 2000-12-08 | 2002-08-29 | Peter Ortoleva | Methods for modeling multi-dimensional domains using information theory to resolve gaps in data and in theories |
FR2823877B1 (fr) * | 2001-04-19 | 2004-12-24 | Inst Francais Du Petrole | Methode pour contraindre par des donnees dynamiques de production un modele fin representatif de la repartition dans le gisement d'une grandeur physique caracteristique de la structure du sous-sol |
US7114566B2 (en) * | 2001-10-24 | 2006-10-03 | Shell Oil Company | In situ thermal processing of a hydrocarbon containing formation using a natural distributed combustor |
FR2850187B1 (fr) * | 2003-01-16 | 2005-03-11 | Inst Francais Du Petrole | Methode pour determiner des zones d'un milieu stratifie ou l'interface entre un fluide en place dans le milieu et un fluide de balayage, se deplace de facon stationnaire |
FR2852710B1 (fr) * | 2003-03-18 | 2005-04-29 | Inst Francais Du Petrole | Methode pour former rapidement un modele stochastique representatif de la distribution d'une grandeur physique dans un milieu heterogene par une selection appropriee de realisations geostatistiques |
-
2004
- 2004-04-14 FR FR0403889A patent/FR2869116B1/fr not_active Expired - Fee Related
-
2005
- 2005-03-23 NO NO20051563A patent/NO335631B1/no not_active IP Right Cessation
- 2005-04-11 NL NL1028733A patent/NL1028733C2/nl not_active IP Right Cessation
- 2005-04-11 GB GB0507221A patent/GB2413200B/en not_active Expired - Fee Related
- 2005-04-13 US US11/104,442 patent/US7603265B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
NO20051563D0 (no) | 2005-03-23 |
GB2413200B (en) | 2007-11-07 |
NL1028733C2 (nl) | 2005-10-17 |
US7603265B2 (en) | 2009-10-13 |
US20050234690A1 (en) | 2005-10-20 |
NO20051563L (no) | 2005-10-17 |
NO335631B1 (no) | 2015-01-12 |
GB2413200A (en) | 2005-10-19 |
FR2869116A1 (fr) | 2005-10-21 |
GB0507221D0 (en) | 2005-05-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
FR2869116B1 (fr) | Methode pour construire un modele geomecanique d'une zone souterraine destine a etre couple a un modele de reservoir | |
GB2428719B (en) | Method of Circulating Fluid in a Borehole | |
GB2433527B (en) | Downhole Telemetry system for wired tubing | |
GB0719242D0 (en) | Methods for controlling migration of particulators in a subterranean formation | |
FR2843202B1 (fr) | Methode pour former un modele representatif de la distribution d'une grandeur physique dans une zone souterraine, affranchi de l'effet de bruits correles entachant des donnees d'exploration | |
BRPI0719246A2 (pt) | método para produzir hidrocarbonetos a partir de formações subsuperficiais a diferentes profundidades | |
GB0426945D0 (en) | Method for determining the pressure of earth formations | |
EG26640A (en) | A special method of hydraulic fracturing of an underground formation | |
DK1592401T3 (da) | Fremgangsmåde til ændring af medikamentkrystaldannelsen af mycophenolat-natriumsalt | |
FR2925726B1 (fr) | Methode pour optimiser l'exploitation d'un gisement de fluide par prise en compte d'un terme d'echange geologique et transitoire entre blocs matriciels et fractures | |
FR2837572B1 (fr) | Methode pour modeliser la production d'hydrocarbures par un gisement souterrain soumis a une depletion | |
FR2871897B1 (fr) | Methode pour deformer une image sismique pour interpretation amelioree | |
DK1623078T3 (da) | Fremgangsmåde til sammenføjning af byggesten til dannelse af en byggestenssamling samt byggestenssamling | |
GB2440084B (en) | Method of drilling a stable borehole | |
FR2852710B1 (fr) | Methode pour former rapidement un modele stochastique representatif de la distribution d'une grandeur physique dans un milieu heterogene par une selection appropriee de realisations geostatistiques | |
FR2868167B1 (fr) | Methode pour imager dans une formation souterraine des interfaces geologiques fortement pentees, donnant lieu a des reflexions prismatiques | |
NO20041150L (no) | Fremgangsmate for a danne en sammenfoyning. | |
AP2006003681A0 (en) | Drill column for deep wells | |
FR2888251B1 (fr) | Methode pour evaluer la biodegradation d'hydrocarbures pieges dans une structure geologique | |
GB2411679B (en) | Inhibiting breakthrough of driving fluid via a permeable geological layer into an oil production well | |
FR2882763B1 (fr) | Procede pour le pronostic d'une reponse a un traitement | |
EP2096257A4 (fr) | Procédé pour augmenter de rendement d'une formation pétrolière productrice | |
FR2882382B1 (fr) | Montant pour paroi de piscine ou similaire a section trapezoidale, et piscine comportant de tels montants | |
FR2842858B1 (fr) | Procede pour realiser un logement de volet roulant dans la partie superieure d'une baie | |
GB0422934D0 (en) | Method to speed up the response of a bent liquid curtain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
CD | Change of name or company name | ||
PLFP | Fee payment |
Year of fee payment: 13 |
|
PLFP | Fee payment |
Year of fee payment: 14 |
|
PLFP | Fee payment |
Year of fee payment: 15 |
|
PLFP | Fee payment |
Year of fee payment: 16 |
|
PLFP | Fee payment |
Year of fee payment: 17 |
|
ST | Notification of lapse |
Effective date: 20211205 |