US5347449A - Method for eliminating malfunctions, in particular in spinning machines - Google Patents

Method for eliminating malfunctions, in particular in spinning machines Download PDF

Info

Publication number
US5347449A
US5347449A US07/778,813 US77881391A US5347449A US 5347449 A US5347449 A US 5347449A US 77881391 A US77881391 A US 77881391A US 5347449 A US5347449 A US 5347449A
Authority
US
United States
Prior art keywords
control computer
malfunctions
machine
malfunction
process control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
US07/778,813
Other languages
English (en)
Inventor
Urs Meyer
Roland Beringer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maschinenfabrik Rieter AG
Original Assignee
Maschinenfabrik Rieter AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from DE19904012930 external-priority patent/DE4012930A1/de
Priority claimed from CH1025/91A external-priority patent/CH684952A5/de
Application filed by Maschinenfabrik Rieter AG filed Critical Maschinenfabrik Rieter AG
Assigned to MASCHINENFABRIK RIETER AG A SWISS CORP. reassignment MASCHINENFABRIK RIETER AG A SWISS CORP. ASSIGNMENT OF ASSIGNORS INTEREST. Assignors: BERINGER, ROLAND, MEYER, URS
Application granted granted Critical
Publication of US5347449A publication Critical patent/US5347449A/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • D—TEXTILES; PAPER
    • D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01H—SPINNING OR TWISTING
    • D01H13/00—Other common constructional features, details or accessories
    • D01H13/14—Warning or safety devices, e.g. automatic fault detectors, stop motions ; Monitoring the entanglement of slivers in drafting arrangements
    • D—TEXTILES; PAPER
    • D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01H—SPINNING OR TWISTING
    • D01H13/00—Other common constructional features, details or accessories
    • D01H13/32—Counting, measuring, recording or registering devices

Definitions

  • the invention relates to a method for eliminating malfunctions in machines, in particular in spinning machines, whereby fault signals are transmitted from the machine to the process control computer controlling the elimination of the malfunction.
  • Alarm systems comprise, for example, blinkers or pertinent acoustic signals in a spinning room or in an individual machine. These alarms are, however, unspecific and unnecessarily stress the operating personnel and in addition give no indication as to the type, place, and priority of the malfunction.
  • Optical alarm systems must be visible from all sides, whereas acoustic signals are difficult to hear due to the background noise caused by the machines.
  • Monitor supervising systems for whole groups of machines are known. These systems, however, requires a person who continuously monitors the screen or who, in the event of am alarm, first has to proceed to said screen.
  • the solution to this problem consists in a system with a transmitter for emitting an alarm controlled by the process control computer that calls the desired specialist to a certain machine for eliminating the malfunction.
  • Classical maintenance planning of maintenance specialists distinguishes between planned maintenance, such as lubricating, cleaning, regular checking, preventive replacement or overhauling of components, and the elimination of inadvertent malfunctions.
  • planned maintenance such as lubricating, cleaning, regular checking, preventive replacement or overhauling of components, and the elimination of inadvertent malfunctions.
  • the maintenance work is carried out by unskilled personnel trained on the respective machine.
  • the organization is equivalent to a normal, productive work session.
  • the supervision and control is performed by a qualified specialist, who also trains the personnel.
  • the present method as provided by the invention optimizes the use of such specialists.
  • a principal job (“occupancy work”) consists of high-quality maintenance work not subject to any kind of work schedule or of supervising the maintenance team.
  • the decisive point is that the specialist must be able to fully concentrate on the respective task. Particularly when said specialist carries out his principal work, it can be quite disturbing for him if his attention is diverted by continuously supervising his background. This is the case, for example, in alarm systems that work with optical or acoustic signals.
  • the malfunction is to be classified in the machine itself, in particular in the machine controls.
  • This means that the malfunction is allocated to a certain specialist, i.e. a foreman or a maintenance specialist, and provided with a certain priority.
  • This information is then supplied from the machine to the process control computer that supervises a plurality of machines and collects the respective signals.
  • the process control computer sorts the signals according to machine and priority, and calls upon the desired specialist via the alarm transmitter.
  • the process control computer is also given the task of storing the status and the tasks performed on each machine in a log file, so that any malfunction that has occurred is recorded consistently and reliably without encumbering the staff with administrative work.
  • the alarm call of the alarm transmitter should include the place and the type of malfunction to enable the specialist to refer to the correct machine and take with him the tools required for eliminating a certain malfunction.
  • the maintenance specialist can then read in the display means on the machine the place where the malfunction has occurred.
  • a principal idea behind the invention is to create an alarm system that collects reports on malfunctions in a plurality of machines and conveying systems, evaluates these in accordance with process-dependent priorities, alarms the competent personnel and informs them of the place and type of malfunction.
  • the elimination of the malfunction is also supervised, because the specialist only issues the respective message when the malfunction has been eliminated.
  • an error protocol is kept for the whole plant and for each machine.
  • the respective alarm system for carrying out the method in accordance with the invention consists of various components.
  • the process control computer needs to be mentioned.
  • this computer receives the respective signals from the individual machine.
  • the signals are emitted by the machine control unit, whereby the signal preferably contains information on the urgency for eliminating the malfunction, the type thereof, and the personnel to be called in (operator, technician, foreman).
  • the central evaluation of the malfunction signals takes place in the process control computer that evaluates the individual malfunctions, inserts them into the priority queue, and stores the status of the individual machines in a kind of log file. This function is preferably taken over by an already existing process control computer that is also used for other functions.
  • the process control computer is also responsible for centrally supervising the individual specialists, whereby the computer also continuously knows the availability of the individual person, knows and also takes into account the tasks he can perform, and stores the tasks performed by means of a log file. This function, too, is taken over by an already existing process control computer that is also used for other functions.
  • the process control computer is provided with an alarm transmitter that comprises a selective call for individual receivers.
  • This alarm transmitter is connected via a radio link with the receivers carried by the specialists.
  • This personal call receiver preferably comprises an alphanumerical display for short texts, so that the specialist can be informed about the place and the type of the malfunction. In this way the specialist is able to bring the required tools along with him.
  • a communications network connects the machine with the process control computer and, in addition, both the machine and the process control computer are provided with the respective programs.
  • FIG. 1 shows a block diagram display of components of the alarm system in accordance with the invention and the connection of said components;
  • FIG. 2 shows a block diagram display of software modules of the alarm system in accordance with FIG. 1;
  • FIG. 3 shows a perspective view of a receiver according to the invention
  • FIG. 4 shows a schematical display of a spinning mill for manufacturing combed yarn made from cotton or a cotton/chemical fibre mixture
  • FIG. 5 shows a schematical distribution of the spinning mill of FIG. 4 in processing stages
  • FIG. 6 shows a possible allocation of such processing stages depicted in FIG. 5 to "areas", each with its own process control computer;
  • FIG. 7 shows an "area" in accordance with FIG. 6, whereby further details of the communications links within the area are explained, and
  • FIG. 8 provides further details of a system in accordance with FIG. 7.
  • the five machines or conveying systems 1a-1e are connected ro a process control computer 3 via a communications network 2.
  • Every machine 1 comprises a machine control unit 4, various sensors 5, in particular for detecting malfunctions, and a display plus keyboard 6.
  • the respective machine issues a signal via network 2 to the control computer 3.
  • the issuance of the signal takes place through machine control unit 4, whereby the signal contains details on the type of the malfunction, the urgency for eliminating said malfunction, and the group of personnel required (operator, technician, foreman).
  • the process control computer receives the malfunction signals, evaluates the individual malfunctions itself and inserts them into a priority queue. In addition, the process control computer also stores the status of the individual machine 1a-1e in a log file.
  • the process control computer 3 preferably carries out the central monitoring of the individual groups of personnel. For this purpose it is necessary to know the availability of every single person and the tasks he can perform and to save all tasks in a log file.
  • An alarm transmitter 7 can be controlled by the process control computer 3.
  • This alarm transmitter comprises a selective call function for individual receivers, in particular for pocket receivers that are characterized by the reference sign 8 and displayed by way of example in FIG. 3.
  • the respective radio links are outlined in broken lines.
  • receivers 8 which usually are pocket receivers and which emit a sound signal or comprise a short message display 8a (FIG. 3) the foreman M, a maintenance specialist W, or an operator B is informed. The person thus alarmed can now proceed to the respective machine 1a-1e where the display means 6 will provide comprehensive information on the place, type, and urgency of the malfunction.
  • These ways covered by the operator and the maintenance specialists are outlined in broken lines and marked by reference signs 10 and 11.
  • a terminal 13 should be provided to the foreman on the way 12, from which he can either obtain or enter new information. This terminal is usually located at his work place.
  • process control computer 3 is linked to the plant control computer 14, whereby the information transmitted by the process control computer to the plant control computer 14 may be retrieved by the plant manager from terminal 15.
  • the present combination of components in accordance with FIG. 1 more or less uses devices that are required in any case for controlling the production process.
  • the only essential additional parts required are the alarm call device and the programs for the additional functions of the process control computer or the machine. These additional programs are schematically shown in FIG. 2.
  • Additional programs in the machine 1a-1e are the alarm evaluation 16 and an alarm dialogue 17.
  • the process control computer 3 is provided with the following programs: priority determination 18, disposition of personnel 19, alarm evaluation 20 (similar to alarm evaluation 16) and the alarm statistics 21.
  • the plant control computer 14 is also provided with a process simulation 22.
  • This program will give a preview of the consequences on the process stages and the production caused by the malfunctions that have occurred. This preview has an influence on the priority rating of the individual interventions 18. It is accessible to the foreman M via the dialogue 17.
  • the alarm system in accordance with the invention works as follows:
  • a malfunction is recognized in machine 1 or the conveying system.
  • a classification of the malfunction according to type and urgency of the intervention takes place in the machine.
  • a classification is provided below by way of example. The following malfunctions may be established:
  • the classification by the machine control unit 4 results in the following:
  • control unit transmits the following signals to the process control computer 3, whereby the abbreviations have the following meanings:
  • the process control computer 3 which receives the respective signals from a plurality of machines 1, classifies said signals and sorts them according to their priority. Then it emits pertinent signals to the alarm transmitter 7 through whose radio call the respective maintenance specialists or operators may be reached. This person then proceeds to the designated machine that displays the place of the malfunction and the expected intervention. Thereafter the person acknowledges the alarm, eliminates the malfunction and then reports the success or the result of the work.
  • the main task of the plant manager L is the disposition of personnel and the adjustment of process parameters. The latter applies primarily to the alteration of priorities.
  • the exemplary spinning mill shown in FIG. 4 may comprise a bale opener 120, a coarse cleaning machine 122, a mixing machine 124, two fine cleaning machines 126, twelve carding machines 128, two drawing frames 130 (first drawing passage), two combing preparation machines 132, ten combing machines 136, four drawing frames 138 (second drawing passage), five fliers 140 and forty ring spinning machines 142.
  • This is a present conventional arrangement for manufacturing so-called ring-spun yarn.
  • the ring spinning process can be replaced by a more modern spinning process (e.g. rotor spinning), whereby the fliers can then be dropped.
  • the spinning mill in accordance with FIG. 4 is again shown schematically in FIG. 5, whereby in the latter case the machines are grouped into "processing stages".
  • the bale opener 120, the coarse cleaning machine 122, the mixing machine 124 and the fine cleaning machine 126 form a so-called blow room 42 that supplies the carding room 44 with more of less fully opened and cleaned fibrous material.
  • the fibrous material is conveyed from machine to machine by means of a pneumatic conveying system (stream of air), whereby the system ends in the carding room.
  • the carding machines 128 each supply, as an intermediate product, a sliver that is placed in a suitable container (a so-called "can) that has to be further conveyed.
  • the first drawing passage (through the drawing frames 130) and the second drawing passage (through the drawing frames 136) each form a processing stage 46 or 52, respectively.
  • the combing preparation machines 132 form the processing stage 48 and the combing machines 134 a processing stage 50.
  • the fliers 138 form a spinning preparation stage 54 and the ring spinning machines 140 a final spinning stage 56.
  • the final results of the schematically displayed spinning process are influenced by a large number of factors, which are not discussed herein in detail.
  • One important factor is the raw material to be processed, which can be displayed as a group of fibre qualities that can be ascertained individually (e.g. fibre fineness, fibre type, fibre hardness).
  • fibre qualities e.g. fibre fineness, fibre type, fibre hardness.
  • There are three processing stages that particularly influence the staple diagram of the material to be spun i.e.:
  • FIG. 4 shows the complexity of this task. One ought to bear in mind the number of possible "paths" between the bale storehouse (for raw cotton) and the final spinning stage. This problems was solved in the past by the plant manager and his workers.
  • FIG. 6 One example for such a plant is schematically shown in FIG. 6, whereby the plant comprises three areas B1, B2 and B3. Each area is allocated to its own process control computer R1, R2, R3. Each computer R1, R2, R3 is linked up with one another for exchanging signals (schematically outlined in FIG. 6 by links 86).
  • FIG. 6 One skilled in the art will quickly realize that the display in FIG. 6 is purely schematical. Naturally, it is possible to provide only a single process control computer connected to all areas of the spinning plant for performing the desired exchange of signals between these areas.
  • the arrangement shown with one process control computer R per area B is sensible and will be used for the following explanation.
  • Area B1 comprises the blow room 42 and the carding room 44 (FIG. 5) .
  • Area B2 comprises both the two drafting passages 46, 52 (FIG. 5) and the combing preparation stage 48 and the combing room 50.
  • the area B3 comprises the flyer 54 and the final spinning stage 56 (FIG. 5), possibly also a winding department.
  • a spinning mill with a limited number of workers can naturally also be achieved by automating functions formerly carried out by the staff. These functions in particular comprise the transport of the material between the processing stages and the insertion of the material in the machine used for the further processing of said material. In addition, the personnel is responsible for supervising the plant and eliminating malfunctions.
  • the part of this task that is taken over by automation and the control system is outlined below in closer detail by reference to FIG. 7. Area 3 (FIG. 6) shall serve here as an example.
  • FIG. 7 A practical embodiment of area B3 for an automated plant is shown in FIG. 7, but only schematically in order to outline the computerized side of the system.
  • the shown part of the plant comprises (according to the sequence of the processing stages, i.e. the "concatenation" of the machines):
  • a roving yarn conveying system 310 for carrying speed frame bobbins from the flyer stage 300 to the final spinning stage 320 and empty bobbins back from the final spinnings stage 320 back to the flyer stage 300;
  • a rewinding stage 330 to transform the cops formed on the ring spinning machine to larger (cylindrical or conical) packages.
  • Each processing stage 300, 320, 330 comprises a plurality of main work units (machines) that are each provided with a control unit. Said control units are not shown in FIG. 7, but are explained below. Robot controlled units (automatic operating devices) directly allocated to these machines are connected to the respective machine control units.
  • a doffer is provided for each flyer of stage 300; the function "flyer doffing" is indicated in FIG. 7 by box 302.
  • a possible embodiment is shown, for example, in EP 360 149 or DE-OS 3 702 265.
  • FIG. 7 one automatic operating device per row of spinning places for operating said spinning place and a creeling operating device for the supply of roving yarn are provided for each ring spinning machine of stage 320.
  • the function of "operating the spinning place” is indicated by box 322, 324 (one box per row of spinning places) and that of "supply of roving yarn” by box 326.
  • a possible embodiment is shown, for example, in EP 394 708 and 392 482.
  • the roving yarn conveying system 310 is also provided with its own control unit, which will not be explained in closer detail.
  • the system 310 comprises a unit for cleaning roving bobbins before they are given back to the flyer stage 300.
  • the function "roving bobbin cleaner" is indicated by box 312.
  • a possible embodiment of this part of the plant is partly shown in EP 392 482.
  • the ring spinning machines of stage 320 and the winding machines of stage 330 together .form an "interlinked group of machines", thus ensuring the transport of the cops to the winding machines.
  • This interlinked group of machines is controlled by the winding machines.
  • a network 350 is provided for connecting all machines of stages 300, 320, 330 and the system 310 for the exchange of signals (data transfer) with a process control computer 340.
  • Computer 340 directly operates an alarm system 342 and a terminal 344 at the control station or the foreman's office.
  • a very important function concerning the rewinding of ring spinning yarn is the so-called yarn cleaning, indicated by box 360.
  • the yarn cleaner is connected to the process control computer 340 via the network 350. This device ensures that defects in the yarn are eliminated and, simultaneously, information (data) is collected that allows deductions on the preceding processing stages.
  • the yarn cleaning function is carried out by the winding machine.
  • Each machine is also provided with a so-called “user interface” that is connected to the respective control unit and that allows man-machine (or even robot-machine) communication.
  • the "user interface” may also be termed an "operator console”.
  • An example of such a user interface is shown in the DE-OS 37 34 277. It does not apply to a ring spinning machine, but to a drafting frame. The principle is the same for all such operating means.
  • the plat is programmed and designed in such a way that the control computer 340 can provide operator support via the user interface of the respective machine, i.e. the control computer can send control commands via the network 350 and the machine control units can receive and act upon such control commands, so that the condition of the user interface is determined by the control computer 340 via the respective control units.
  • the machine can be provided with more than a "user interface".
  • the important aspect is, however, that the user interface (or each user interface) is connected to the machine control unit, so that signals can be exchanged between the user interface and the machine control unit. If an auxiliary device is provided, for example, with a user interface in a machine and said device is subordinate to the machine control unit, the user interface of said device has to be allocated to the machine.
  • FIG. 8 shows a possible variation in the architecture of process controls in accordance with FIG. 7.
  • FIG. 8 again shows the control computer 340 and the network 350 together with a computer 390 of a machine control unit of the plant (e.g. the roving yarn conveying system 310 that can be regarded as equivalent for the purpose of explaining the computer side of a "machine").
  • Each computer 340, 390 comprises memory 343, 345 or 391 allocated to it and drivers 347, 349 or 393, 394, 395, 396.
  • Drivers 349 or 394 determine the necessary interfaces for the communication of the computers 340, 390 with their user interfaces, indicated here as display, operation and printer.
  • Driver 347 determines the interface between the control computer 340 and the network 350
  • driver 393 determines the interface between the network 350 and the machine control unit 390.
  • Driver 395 determines the interfaces between the machine control unit 390 and the drive controlled by it (actuator).
  • Driver 396 determines the interface between the machine control unit 390 and the sensors allocated to it.
  • Important actuator elements in a spinning machine are those that serve for "stopping” a spinning place, whereby “stopping” is to be understood as “stopping an effectively producing spinning place”. In most cases not all working elements of this spinning place are stopped when an individual spinning place is brought to a standstill, but the spinning there is interrupted. This can take place, for example, by interrupting the supply of material and/or by bringing about a sliver breakage.
  • a central machine control unit in either the one way or the other.
  • the drive to the feed roller can be interrupted in order to interrupt the supply of material to the opening cylinder or the rotor of the spinning place.
  • a so-called quality cut within the quality control can also be carried out to interrupt the course of the thread.
  • a slubbing clip for interrupting the supply of material is important in all types of machines that supply the material to be fed via a drafting frame to the spinning elements, because it is usually impossible to turn off one single position of a drafting frame.
  • the slubbing clips of the individual spinning places can naturally each be provided with one activating means. They may then also be activated from a central machine control unit. Examples of such slubbing clips are to be found in EP 322 636 and EP 353 575.
  • the invention is realized in a plant in accordance with FIGS. 7 and 8, i.e. a plant in which at least one machine control unit comprises a user interface, and in which the process control computer can use said user interface for communicating with a man at this machine.
  • a certain signal is provided with a specific meaning.
  • This arrangement can be compared with another system in which the operator support takes place via a system that is independent of the machine control units, e.g. in accordance with the U.S. Pat. No. 4,194,349.
  • the advantages of the combination according to this invention are particularly striking in the event that a process control computer influences both the operator support as well as the control of the machines, e.g. in a doffer management system for ring spinning machines, similar to a system in accordance with U.S. Pat. No. 4,665,686.
  • the operator support provided by the user interface on the respective machine clearly ensures that help is offered wherever it is required. This also allows facilitating the alarm/call system, because in principle the operator only has be guided to the affected machine without providing beforehand the precise information on the action to be taken.
  • the alarm/call system must clearly ensure that the operator is informed on the urgency or priority of the call for hte operator or that the correct help is provided or person called to the affected machine (doffer help, maintenance, elimination of sliver breakage).
  • an instruction can be passed on to the operator, so that he carries out an action that cannot be performed by the machine control unit itself, e.g. because the required actuating means is not included in the respective machine or because the machine is not controlled by the machine control unit.
  • an action would be the stopping of a badly functioning spinning place where the machine cannot intervene directly in said spinning place.
  • the operator is preferably in the position (or is even "forced") to bring about the generation of a signal that represents the execution of an instruction, and informs the machine control unit or the process control computer thereof.
  • the operator support therefore preferably comprises the following aspects:
  • said person shall receive near or at the place of his task additional information on the required task (e.g. localization of a defect within a machine or a group of components, or details concerning the necessary alterations to the machine in the event of a change in the batch).
  • the process control computer requires information from a person concerning the success or failure of his work, in particular when this success or failure has an effect on the efficiency of the plant.
  • a call transmitter/receiver system personnel can selectively be notified of a necessary task, whereby only a minimal amount of information needs to be forwarded over the call system;
  • the additional information is available (if required) on the user interface of the affected machine or auxiliary device;
  • acknowledge messages from man to the machine are preferably transmitted by the machine itself e.g. the user interface comprises signal generation means for transmitting a suitable response via the network to the computer.
  • a further option consists of the call system only indicating to the receiver that his intervention is required (e.g. by a "beep").
  • the required information on the place of work is given separately via the telephone line or a central display.
  • the detailed operating support (with details on the task) is, however, preferably supplied on site. This option therefore requires a "distribution" of the system:
  • the call, urgency and the disclosure of the place of the task is combined in one receiver.
  • a process control computer (with or without a plant control computer) is also in the position (if programmed respectively), to provide further support, i.e. by simulating the task to be performed through a forthcoming work period.
  • the controlled plant (or the controlled part thereof) is "copied” by equations. These equations represent the connections between the essential performance data of the plant (or the part thereof).
  • “scenarios” can be calculated by the program, whereby “optimum” and “difficult” scenarios can be provided for the task to be undertaken. The operator support can then be adjusted to follow the best possible scenarios or to avoid the worst possible ones.
  • the work period to be simulated depends on a number of factors. In any case, one must consider the computer computing capacity. The simulation must not use up so much processing capacity that the other tasks of the process control computer are delayed. Therefore it might be sensible to pass on this task to a plant control computer, if there is such a computer and it has some free capacity left. If there is sufficient capacity available in the process control computer, the simulation can also be performed at the "process control level".
  • the type of the plant also has an influence.
  • the "simulated work period" should comprise more than a single operating shift, so that the "second" or next shift not only has to solve the problems of the "optimized” shift.
  • a spinning mill is adjusted to "flexible manufacturing” (with frequent changes in batches and assortments), it does not make sense to simulate many operating shifts, as the whole organization has to adapt to short-term adjustments and a quickly changing situation.
  • a malfunction signal is sent from the machine control unit to the process control computer, it is possible to have the machine provide at least a part of the user support on its own user interface, e.g. the precise place of the malfunction, possible also the time at which the malfunction occurred.
  • This has the advantage that at least a part of the support is independent of the process control computer and that it can still be provided even if said computer has broken down.
  • the user is normally not able to correctly assess the priority in repairing the malfunction.
  • the computer accepts the messages on the operating condition of the individual machines. This is a general function of any process control system.
  • the alarm thus generated is assessed by the computer by way of a priority list.
  • the priority is established by way of set rules.
  • the computer keeps track of the work schedule of the individual operators. It compares the priority of the current task with the priority list and generates an alarm call to the operator with a task of a lower priority as soon as an alarm of a higher priority occurs.
  • the work schedule of the operator team is shown in the display of the process control system and may be adjusted by the supervisor (foreman, plant manager).
  • a particular advantage of this method consists of the fact that no difference is made between service works and the elimination of the malfunctions.
  • the limits in day-to-day operations are very narrow between these. In a plant with a limited number of personnel it is essential to get in control of planned maintenance work and unplanned eliminations of malfunctions. Systems that concentrate only on the one or the other task will encounter problems in day-to-day operations.
  • the generally known method consists of a user confirming the alarm. The malfunction continues to exist until it is eliminated, while the alarm is "silenced” and limited to a malfunction indication. This indication will disappear as soon as the malfunction is removed.
  • the computer has found a new task for the operator. It transmits this task via a call transmitter to the receiver of this specific operator.
  • the receiver alarms the operator by a conspicuous signal and, simultaneously, displays the new site and task (catch word).
  • the operator acknowledges recognition of the new task on the receiver.
  • the operator concludes his present task and proceeds to the new site and gains the details of his new task from the user interface on the respective machine.
  • the operator carries out the task. If the control unit of the machine recognizes the repair, the defective condition will disappear and the instructions for the next task will automatically be displayed. If the respective control unit cannot recognize the elimination of the malfunction through its sensing means, the operator confirms the termination of the work via the local user interface.
  • the user enters his conclusions/call for help/alarm on site via the user interface on the machine.
  • This alarm is further treated like any other alarm raised by the machine control unit and automatically leads to calling up further operators with altered priorities.
  • the operator's superior should not only know the work schedule, but should also stay in touch with the individual operators.
  • One essential element is the protection of the personnel: in the extreme case of a fire he must advise all people to leave the plant or call them up for duty in the plant fire brigade. It is also possible that he wants to gather a larger number of operators for an important job to be carried out jointly.
  • the signals conveyed by common call receivers are usually not sufficient for such a broad selection of such differentiated alarms. Receivers with a larger display obstruct the carrier and are regarded as bothersome by these.
  • the alarm system should support the transmission of messages to the individual operator or user without them having to leave their place of work.
  • the receivers should make do without large text displays to prevent them from obstructing the user by their size and weight.
  • the process control computer ascertains the machines on which every operator is working by the alarm list provided.
  • the individual tasks are taken into account with a minimum time required for carrying it out under normal conditions. During this time competing alarms with the same priority are suppressed totally.
  • the number of alarms per shift is evaluated by the computer and calculated in a "stress factor" in accordance with the special qualifications of the individual operator.
  • the computer takes into account this stress factor in accordance with the respective qualification of the operator.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)
  • Preliminary Treatment Of Fibers (AREA)
US07/778,813 1990-04-24 1991-04-23 Method for eliminating malfunctions, in particular in spinning machines Expired - Fee Related US5347449A (en)

Applications Claiming Priority (7)

Application Number Priority Date Filing Date Title
DE19904012930 DE4012930A1 (de) 1990-04-24 1990-04-24 Verfahren zum beheben von stoerungen, insbesondere an spinnmaschinen
DE4012930 1990-04-24
CH0189/91-5 1991-01-23
CH18991 1991-01-23
CH1025/91-2 1991-04-05
CH1025/91A CH684952A5 (de) 1991-04-05 1991-04-05 Längsteilmaschine zur Verwendung in einer Maschinengruppe mit einem Prozessleitrechner.
PCT/CH1991/000097 WO1991016481A1 (de) 1990-04-24 1991-04-23 Verfahren zum beheben von störungen, insbesondere an spinnmaschinen

Publications (1)

Publication Number Publication Date
US5347449A true US5347449A (en) 1994-09-13

Family

ID=27171891

Family Applications (1)

Application Number Title Priority Date Filing Date
US07/778,813 Expired - Fee Related US5347449A (en) 1990-04-24 1991-04-23 Method for eliminating malfunctions, in particular in spinning machines

Country Status (4)

Country Link
US (1) US5347449A (enExample)
EP (1) EP0481033A1 (enExample)
JP (1) JPH05500838A (enExample)
WO (1) WO1991016481A1 (enExample)

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5555712A (en) * 1993-11-10 1996-09-17 Murata Kikai Kabushiki Kaisha Method for judging the quality of sliver in textile machine
US5650940A (en) * 1991-10-25 1997-07-22 Kabushiki Kaisha Toshiba Process monitoring system with remote supervision
US5799476A (en) * 1993-10-18 1998-09-01 Rieter Ingolstadt Spinnereimaschinenbau Ag Spinning station error signalling and qualifying device
US6381508B1 (en) * 1997-04-15 2002-04-30 MARRIE STéPHANE Process and equipment for optimizing production
US20030036816A1 (en) * 2001-07-28 2003-02-20 Rieter Ingolstadt Spinnereimaschinenbau Ag Control of the travel movement of at least one service unit at a textile machine
US20030056487A1 (en) * 2001-07-28 2003-03-27 Rieter Ingolstadt Spinnereimaschinenbau Ag Textile machine with at least one service unit
US20030056486A1 (en) * 2001-07-28 2003-03-27 Rieter Ingolstadt Spinnereimaschinenbau Ag Method for the maintenance of a textile machine
US6556885B2 (en) * 2000-11-07 2003-04-29 TRüTZSCHLER GMBH & CO. KG System and method for controlling a group of fiber processing machines
US6650949B1 (en) * 1999-12-30 2003-11-18 General Electric Company Method and system for sorting incident log data from a plurality of machines
US20040072478A1 (en) * 2000-12-29 2004-04-15 Walter Sticht Production management device for a manufacturing and/or assembling device
US6965806B2 (en) 2001-03-01 2005-11-15 Fisher-Rosemount Systems Inc. Automatic work order/parts order generation and tracking
US7206646B2 (en) 1999-02-22 2007-04-17 Fisher-Rosemount Systems, Inc. Method and apparatus for performing a function in a plant using process performance monitoring with process equipment monitoring and control
US7272531B2 (en) 2005-09-20 2007-09-18 Fisher-Rosemount Systems, Inc. Aggregation of asset use indices within a process plant
US7346404B2 (en) 2001-03-01 2008-03-18 Fisher-Rosemount Systems, Inc. Data sharing in a process plant
US7557702B2 (en) 1999-02-22 2009-07-07 Evren Eryurek Integrated alert generation in a process plant
US7562135B2 (en) 2000-05-23 2009-07-14 Fisher-Rosemount Systems, Inc. Enhanced fieldbus device alerts in a process control system
US7702401B2 (en) 2007-09-05 2010-04-20 Fisher-Rosemount Systems, Inc. System for preserving and displaying process control data associated with an abnormal situation
US8005647B2 (en) 2005-04-08 2011-08-23 Rosemount, Inc. Method and apparatus for monitoring and performing corrective measures in a process plant using monitoring data with corrective measures data
US8055479B2 (en) 2007-10-10 2011-11-08 Fisher-Rosemount Systems, Inc. Simplified algorithm for abnormal situation prevention in load following applications including plugged line diagnostics in a dynamic process
US8073967B2 (en) 2002-04-15 2011-12-06 Fisher-Rosemount Systems, Inc. Web services-based communications for use with process control systems
CN101463514B (zh) * 2007-12-22 2012-02-15 欧瑞康纺织有限及两合公司 操作纺织机的方法及执行该方法的纺织机
US8301676B2 (en) 2007-08-23 2012-10-30 Fisher-Rosemount Systems, Inc. Field device with capability of calculating digital filter coefficients
US8417595B2 (en) 2001-03-01 2013-04-09 Fisher-Rosemount Systems, Inc. Economic calculations in a process control system
CN103703422A (zh) * 2011-07-20 2014-04-02 飞思卡尔半导体公司 安全关键装备和用于控制安全关键装备操作者涣散的方法
US9201420B2 (en) 2005-04-08 2015-12-01 Rosemount, Inc. Method and apparatus for performing a function in a process plant using monitoring data with criticality evaluation data
US20150350748A1 (en) * 2014-05-27 2015-12-03 International Business Machines Corporation Cooperative task execution in instrumented roadway systems
US20160168764A1 (en) * 2014-12-13 2016-06-16 Saurer Germany Gmbh & Co. Kg Multipoint textile machine
US9927788B2 (en) 2011-05-19 2018-03-27 Fisher-Rosemount Systems, Inc. Software lockout coordination between a process control system and an asset management system
CN107963515A (zh) * 2016-10-20 2018-04-27 村田机械株式会社 纺织机械的维护顺序调整系统
US20190384267A1 (en) * 2018-06-15 2019-12-19 Honeywell International Inc. System and method for accurate automatic determination of "alarm-operator action" linkage for operator assessment and alarm guidance using custom graphics and control charts
US11174105B2 (en) * 2019-04-18 2021-11-16 Saurer Spinning Solutions Gmbh & Co. Kg Tube storage and transport device for a textile machine producing cross-wound packages
WO2024246185A1 (en) 2023-05-31 2024-12-05 Rieter Ag An attending device for a ring spinning machine for producing yarn, a ring spinning machine with an attending device, and a method of using the attending device to detect the working state at a workstation of the ring spinning machine
US20260093242A1 (en) * 2024-09-29 2026-04-02 Zhejiang Hengyi Petrochemical Co., Ltd. Method for controlling transit of yarn spindle, electronic device and storage medium

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5509179A (en) * 1990-06-25 1996-04-23 Mondini; Giancarlo Autoleveller draw frame having process feed back control system
CH685125A5 (de) * 1991-11-08 1995-03-31 Rieter Ag Maschf Spinnereianlage mit einem Prozessleitrechner.
DE19547068B4 (de) * 1995-12-16 2005-08-04 Saurer Gmbh & Co. Kg Serviceeinrichtung an einer Spinnmaschine
DE19930714C5 (de) * 1999-07-02 2015-04-09 Rieter Ingolstadt Gmbh Textilmaschine mit einer Vielzahl gleichartiger Arbeitsstellen
EP2719803A3 (en) * 2008-09-17 2017-12-13 Murata Machinery, Ltd. Textile machine
DE102015106470A1 (de) * 2015-04-27 2016-10-27 Maschinenfabrik Rieter Ag Verfahren zur Bedienung einer Arbeitsstelle einer Textilmaschine sowie Bedienungseinrichtung
DE102023114850A1 (de) * 2023-06-06 2024-12-12 Temafa Maschinenfabrik Gmbh Textilmaschine mit Anzeigeeinheit und Verfahren zum Betreiben der Textilmaschine

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1907990A1 (de) * 1968-02-19 1969-11-06 Parks Cramer Co Verfahren und Vorrichtung zum Feststellen und Melden von unerwuenschten AEnderungen des Betriebszustandes einer Vielzahl von Garnherstellungseinrichtungen,insbesondere zum Feststellen und Melden von Fadenbruechen bei Textilmaschinen
DE1800434A1 (de) * 1968-10-01 1970-05-14 Parks Cramer Co Einrichtung zur UEberwachung von Fadenbruch oder -ausfall in Spinnereien
FR2098414A3 (enExample) * 1970-07-15 1972-03-10 Stahlecker Gmbh Wilhelm
US4005392A (en) * 1974-08-02 1977-01-25 Toray Industries, Inc. Method and apparatus for detecting and recording abnormal conditions in the operation of spinning machines
US4167041A (en) * 1977-04-05 1979-09-04 International Business Machines Corporation Status reporting
EP0026111A1 (en) * 1979-09-24 1981-04-01 Parks Cramer Company Method and apparatus for facilitating maintenance of spinning machine information system
DE3135333A1 (de) * 1981-09-07 1983-03-24 Zinser Textilmaschinen Gmbh, 7333 Ebersbach Verfahren und vorrichtung zum einsatzsteuern einer bedienperson oder einer mobilen wartungsvorrichtung in einer spinnereianlage
US4408447A (en) * 1978-09-06 1983-10-11 Vyzkumny Ustav Bavlnarsky Method of and system for controlling the operation of open-end spinning machines
US4534042A (en) * 1981-10-24 1985-08-06 Vyzkumny Ustav Bavlnarsky Method of and apparatus for the continuous monitoring and analysis of the operation of spinning units in an open-end spinning machine
US4563873A (en) * 1982-10-21 1986-01-14 Kabushiki Kaisha Toyoda Jidoshokki Seisakusho Apparatus for controlling production in a spinning machine
US4656465A (en) * 1984-03-22 1987-04-07 Maschinenfabrik Rieter Ag Method and arrangement for evaluating the performance of a yarn processing machine
CH661913A5 (de) * 1983-08-19 1987-08-31 Zellweger Uster Ag Verfahren und vorrichtung zur gleichzeitigen ueberwachung der garnqualitaet an einer vielzahl gleichartiger ueberwachungsstellen einer textilmaschine.
DE3701796A1 (de) * 1987-01-22 1988-08-04 Zinser Textilmaschinen Gmbh Verfahren und vorrichtung zum einsatzsteuern von bedienorganen an einer spinnereianlage
US4835699A (en) * 1987-03-23 1989-05-30 Burlington Industries, Inc. Automated distributed control system for a weaving mill
DE3841464A1 (de) * 1988-12-09 1990-06-13 Schlafhorst & Co W Textilmaschine mit aggregaten zur wartung und/oder bedienung der arbeitseinheiten
US4965567A (en) * 1987-12-24 1990-10-23 Rieter Machine Works Limited Method of, and apparatus for, transmitting data in a manufacturing machine comprising a plurality of production stations
US5224047A (en) * 1989-10-03 1993-06-29 Murata Kikai Kabushiki Kaisha Maintenance monitoring apparatus for automatic winder

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1907990A1 (de) * 1968-02-19 1969-11-06 Parks Cramer Co Verfahren und Vorrichtung zum Feststellen und Melden von unerwuenschten AEnderungen des Betriebszustandes einer Vielzahl von Garnherstellungseinrichtungen,insbesondere zum Feststellen und Melden von Fadenbruechen bei Textilmaschinen
DE1800434A1 (de) * 1968-10-01 1970-05-14 Parks Cramer Co Einrichtung zur UEberwachung von Fadenbruch oder -ausfall in Spinnereien
FR2098414A3 (enExample) * 1970-07-15 1972-03-10 Stahlecker Gmbh Wilhelm
US4005392A (en) * 1974-08-02 1977-01-25 Toray Industries, Inc. Method and apparatus for detecting and recording abnormal conditions in the operation of spinning machines
US4167041A (en) * 1977-04-05 1979-09-04 International Business Machines Corporation Status reporting
US4294065A (en) * 1978-04-26 1981-10-13 Parks-Cramer Company Method and apparatus for facilitating maintenance of spinning machine information system
US4408447A (en) * 1978-09-06 1983-10-11 Vyzkumny Ustav Bavlnarsky Method of and system for controlling the operation of open-end spinning machines
EP0026111A1 (en) * 1979-09-24 1981-04-01 Parks Cramer Company Method and apparatus for facilitating maintenance of spinning machine information system
DE3135333A1 (de) * 1981-09-07 1983-03-24 Zinser Textilmaschinen Gmbh, 7333 Ebersbach Verfahren und vorrichtung zum einsatzsteuern einer bedienperson oder einer mobilen wartungsvorrichtung in einer spinnereianlage
US4534042A (en) * 1981-10-24 1985-08-06 Vyzkumny Ustav Bavlnarsky Method of and apparatus for the continuous monitoring and analysis of the operation of spinning units in an open-end spinning machine
US4563873A (en) * 1982-10-21 1986-01-14 Kabushiki Kaisha Toyoda Jidoshokki Seisakusho Apparatus for controlling production in a spinning machine
CH661913A5 (de) * 1983-08-19 1987-08-31 Zellweger Uster Ag Verfahren und vorrichtung zur gleichzeitigen ueberwachung der garnqualitaet an einer vielzahl gleichartiger ueberwachungsstellen einer textilmaschine.
US4656465A (en) * 1984-03-22 1987-04-07 Maschinenfabrik Rieter Ag Method and arrangement for evaluating the performance of a yarn processing machine
DE3701796A1 (de) * 1987-01-22 1988-08-04 Zinser Textilmaschinen Gmbh Verfahren und vorrichtung zum einsatzsteuern von bedienorganen an einer spinnereianlage
US4823544A (en) * 1987-01-22 1989-04-25 Zinser Textilmaschinen Gmbh Process and apparatus for job control of servicing elements at a textile spinning installation
US4835699A (en) * 1987-03-23 1989-05-30 Burlington Industries, Inc. Automated distributed control system for a weaving mill
US4965567A (en) * 1987-12-24 1990-10-23 Rieter Machine Works Limited Method of, and apparatus for, transmitting data in a manufacturing machine comprising a plurality of production stations
DE3841464A1 (de) * 1988-12-09 1990-06-13 Schlafhorst & Co W Textilmaschine mit aggregaten zur wartung und/oder bedienung der arbeitseinheiten
US5224047A (en) * 1989-10-03 1993-06-29 Murata Kikai Kabushiki Kaisha Maintenance monitoring apparatus for automatic winder

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
Melliand Textilberichte Apr. 1973 (Article) pp. 331 334. *
Melliand Textilberichte Apr. 1973 (Article) pp. 331-334.
Melliand Textilberichte Apr. 1988 (Article) pp. 548 553. *
Melliand Textilberichte Apr. 1988 (Article) pp. 548-553.

Cited By (51)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5650940A (en) * 1991-10-25 1997-07-22 Kabushiki Kaisha Toshiba Process monitoring system with remote supervision
US5799476A (en) * 1993-10-18 1998-09-01 Rieter Ingolstadt Spinnereimaschinenbau Ag Spinning station error signalling and qualifying device
US5555712A (en) * 1993-11-10 1996-09-17 Murata Kikai Kabushiki Kaisha Method for judging the quality of sliver in textile machine
US6381508B1 (en) * 1997-04-15 2002-04-30 MARRIE STéPHANE Process and equipment for optimizing production
US7557702B2 (en) 1999-02-22 2009-07-07 Evren Eryurek Integrated alert generation in a process plant
US7206646B2 (en) 1999-02-22 2007-04-17 Fisher-Rosemount Systems, Inc. Method and apparatus for performing a function in a plant using process performance monitoring with process equipment monitoring and control
US6650949B1 (en) * 1999-12-30 2003-11-18 General Electric Company Method and system for sorting incident log data from a plurality of machines
US7562135B2 (en) 2000-05-23 2009-07-14 Fisher-Rosemount Systems, Inc. Enhanced fieldbus device alerts in a process control system
US6556885B2 (en) * 2000-11-07 2003-04-29 TRüTZSCHLER GMBH & CO. KG System and method for controlling a group of fiber processing machines
US20040072478A1 (en) * 2000-12-29 2004-04-15 Walter Sticht Production management device for a manufacturing and/or assembling device
AT505204B1 (de) * 2000-12-29 2009-03-15 Sticht Fertigungstech Stiwa Betriebsleiteinrichtung für eine fertigungs- und/oder montageeinrichtung und verfahren zu deren betrieb
US8044793B2 (en) 2001-03-01 2011-10-25 Fisher-Rosemount Systems, Inc. Integrated device alerts in a process control system
US8417595B2 (en) 2001-03-01 2013-04-09 Fisher-Rosemount Systems, Inc. Economic calculations in a process control system
US6965806B2 (en) 2001-03-01 2005-11-15 Fisher-Rosemount Systems Inc. Automatic work order/parts order generation and tracking
US7346404B2 (en) 2001-03-01 2008-03-18 Fisher-Rosemount Systems, Inc. Data sharing in a process plant
US7221988B2 (en) 2001-03-01 2007-05-22 Rosemount, Inc. Creation and display of indices within a process plant
US8620779B2 (en) 2001-03-01 2013-12-31 Fisher-Rosemount Systems, Inc. Economic calculations in a process control system
US20030056487A1 (en) * 2001-07-28 2003-03-27 Rieter Ingolstadt Spinnereimaschinenbau Ag Textile machine with at least one service unit
US7113843B2 (en) * 2001-07-28 2006-09-26 Rieter Ingolstadt Spinnermaschbau Ag Method for the maintenance of a textile machine
US7010383B2 (en) 2001-07-28 2006-03-07 Rieter Ingolstadt Spinnermaschbau Ag Method for control of the travel movement of at least one service unit at a textile machine
US6907309B2 (en) 2001-07-28 2005-06-14 Rieter Ingolstadt Spinnermaschau Ag Textile machine with at least one service unit
US20030056486A1 (en) * 2001-07-28 2003-03-27 Rieter Ingolstadt Spinnereimaschinenbau Ag Method for the maintenance of a textile machine
US20030036816A1 (en) * 2001-07-28 2003-02-20 Rieter Ingolstadt Spinnereimaschinenbau Ag Control of the travel movement of at least one service unit at a textile machine
US8073967B2 (en) 2002-04-15 2011-12-06 Fisher-Rosemount Systems, Inc. Web services-based communications for use with process control systems
US9760651B2 (en) 2002-04-15 2017-09-12 Fisher-Rosemount Systems, Inc. Web services-based communications for use with process control systems
US9094470B2 (en) 2002-04-15 2015-07-28 Fisher-Rosemount Systems, Inc. Web services-based communications for use with process control systems
US8005647B2 (en) 2005-04-08 2011-08-23 Rosemount, Inc. Method and apparatus for monitoring and performing corrective measures in a process plant using monitoring data with corrective measures data
US9201420B2 (en) 2005-04-08 2015-12-01 Rosemount, Inc. Method and apparatus for performing a function in a process plant using monitoring data with criticality evaluation data
US7272531B2 (en) 2005-09-20 2007-09-18 Fisher-Rosemount Systems, Inc. Aggregation of asset use indices within a process plant
US8301676B2 (en) 2007-08-23 2012-10-30 Fisher-Rosemount Systems, Inc. Field device with capability of calculating digital filter coefficients
US7702401B2 (en) 2007-09-05 2010-04-20 Fisher-Rosemount Systems, Inc. System for preserving and displaying process control data associated with an abnormal situation
US8712731B2 (en) 2007-10-10 2014-04-29 Fisher-Rosemount Systems, Inc. Simplified algorithm for abnormal situation prevention in load following applications including plugged line diagnostics in a dynamic process
US8055479B2 (en) 2007-10-10 2011-11-08 Fisher-Rosemount Systems, Inc. Simplified algorithm for abnormal situation prevention in load following applications including plugged line diagnostics in a dynamic process
CN101463514B (zh) * 2007-12-22 2012-02-15 欧瑞康纺织有限及两合公司 操作纺织机的方法及执行该方法的纺织机
US9927788B2 (en) 2011-05-19 2018-03-27 Fisher-Rosemount Systems, Inc. Software lockout coordination between a process control system and an asset management system
CN103703422A (zh) * 2011-07-20 2014-04-02 飞思卡尔半导体公司 安全关键装备和用于控制安全关键装备操作者涣散的方法
CN103703422B (zh) * 2011-07-20 2016-03-23 飞思卡尔半导体公司 安全关键装备和用于控制安全关键装备操作者涣散的方法
US20150350748A1 (en) * 2014-05-27 2015-12-03 International Business Machines Corporation Cooperative task execution in instrumented roadway systems
US9877088B2 (en) * 2014-05-27 2018-01-23 International Business Machines Corporation Cooperative task execution in instrumented roadway systems
US20160168764A1 (en) * 2014-12-13 2016-06-16 Saurer Germany Gmbh & Co. Kg Multipoint textile machine
US20190194835A1 (en) * 2014-12-13 2019-06-27 Saurer Germany Gmbh & Co. Kg Multipoint textile machine
US10337127B2 (en) * 2014-12-13 2019-07-02 Saurer Spinning Solutions Gmbh & Co. Kg Multipoint textile machine
US11198956B2 (en) 2014-12-13 2021-12-14 Saurer Spinning Solutions Gmbh & Co. Kg Multipoint textile machine
CN107963515A (zh) * 2016-10-20 2018-04-27 村田机械株式会社 纺织机械的维护顺序调整系统
CN107963515B (zh) * 2016-10-20 2020-11-17 村田机械株式会社 纺织机械的维护顺序调整系统
US20190384267A1 (en) * 2018-06-15 2019-12-19 Honeywell International Inc. System and method for accurate automatic determination of "alarm-operator action" linkage for operator assessment and alarm guidance using custom graphics and control charts
US10747207B2 (en) * 2018-06-15 2020-08-18 Honeywell International Inc. System and method for accurate automatic determination of “alarm-operator action” linkage for operator assessment and alarm guidance using custom graphics and control charts
US11174105B2 (en) * 2019-04-18 2021-11-16 Saurer Spinning Solutions Gmbh & Co. Kg Tube storage and transport device for a textile machine producing cross-wound packages
WO2024246185A1 (en) 2023-05-31 2024-12-05 Rieter Ag An attending device for a ring spinning machine for producing yarn, a ring spinning machine with an attending device, and a method of using the attending device to detect the working state at a workstation of the ring spinning machine
US20260093242A1 (en) * 2024-09-29 2026-04-02 Zhejiang Hengyi Petrochemical Co., Ltd. Method for controlling transit of yarn spindle, electronic device and storage medium
US12669809B2 (en) * 2024-09-29 2026-06-30 Zhejiang Hengyi Petrochemical Co., Ltd. Method for controlling transit of yarn spindle, electronic device and storage medium

Also Published As

Publication number Publication date
EP0481033A1 (de) 1992-04-22
WO1991016481A1 (de) 1991-10-31
JPH05500838A (ja) 1993-02-18

Similar Documents

Publication Publication Date Title
JPH05500838A (ja) 特に紡績機械におけるトラブルの除去法
US5517404A (en) Process control in the textile plant
EP0712949B1 (de) Prozess-Steuerung im Textilbetrieb
EP3928172B1 (en) Textile machine management system and method
JPH03167324A (ja) 紡績工場の生産ラインの作動法および装置
JPS6314096B2 (enExample)
JPS60218265A (ja) 糸品質モニタシステム
EP3170778A1 (en) Textile-machine management system
EP3409626B1 (en) Productivity display control device, method thereof, and automatic winder
EP0026111B1 (en) Method and apparatus for facilitating maintenance of spinning machine information system
US11459676B2 (en) Automatic ring spinning system and method for automatically operating same
US5799476A (en) Spinning station error signalling and qualifying device
US12398491B2 (en) Device and method for enabling displaying on a user display an operational readiness index related to a spinning mill
DE4334472A1 (de) Maschinenüberwachungssystem
WO2023066544A1 (en) An electronic device for adjusting operational parameters of a winding machine of a spinning mill and a method for adjusting the same
DE10160861A1 (de) Verfahren und System zum Beheben von Störungen an Spinnmaschinen
CN113396252B (zh) 针对异物优化纺纱过程
DE4012930A1 (de) Verfahren zum beheben von stoerungen, insbesondere an spinnmaschinen
CN112789563A (zh) 用于操作多个长丝生产位置的方法和设备
JPH0748738A (ja) 紡機のモニタシステム
CN117580983B (zh) 确定用于至少部分地改进纺纱厂的操作的信息的装置和方法
JPH04202816A (ja) 紡績工場の操業管理装置
Khairunnisa et al. Manufacturing Losses Analysis of Ring Spinning Machine Based on Overall
JPH05282369A (ja) 紡績工場のデータベース構築装置
JPH0747437B2 (ja) 自動ワインダーの保全方法

Legal Events

Date Code Title Description
AS Assignment

Owner name: MASCHINENFABRIK RIETER AG A SWISS CORP., SWITZERL

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST.;ASSIGNORS:MEYER, URS;BERINGER, ROLAND;REEL/FRAME:006063/0185

Effective date: 19911125

FEPP Fee payment procedure

Free format text: PAYOR NUMBER ASSIGNED (ORIGINAL EVENT CODE: ASPN); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

FPAY Fee payment

Year of fee payment: 4

REMI Maintenance fee reminder mailed
LAPS Lapse for failure to pay maintenance fees
STCH Information on status: patent discontinuation

Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362

FP Lapsed due to failure to pay maintenance fee

Effective date: 20020913