US3807310A - Movable apparatus for replacing an old track by a new track - Google Patents

Movable apparatus for replacing an old track by a new track Download PDF

Info

Publication number
US3807310A
US3807310A US00350735A US35073573A US3807310A US 3807310 A US3807310 A US 3807310A US 00350735 A US00350735 A US 00350735A US 35073573 A US35073573 A US 35073573A US 3807310 A US3807310 A US 3807310A
Authority
US
United States
Prior art keywords
track
section
train
old
way
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US00350735A
Other languages
English (en)
Inventor
E Plasser
J Theurer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US3807310A publication Critical patent/US3807310A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/05Transporting, laying, removing, or renewing both rails and sleepers

Definitions

  • tent 1 AN OLD CK BY A NEW TRACK [76] Inventors: Plasser Erna; Theurer Josef,
  • An apparatus for the continuous replacement of an old track by a new track comprises a train assembly continuously moving along a right of way during the replacement, the right of way consisting of an old track section, a new track section and an intermediate right of way section wherein the old track is renewed, suitable track removal and laying tools being provided on the train assembly.
  • This assembly consists of a first train section moving on the old track, a second train assembly moving on the new track and, linking the two train sections, an intermediate train section bridging the intermediate right of way section, the intermediate train section having two undercarriages which respectively run on the old and new track sections.
  • the present invention relates to improvements in apparatus for the continuous replacement of an old track by a new track consisting of track parts including two rails and ties supporting the rails on ballast, which comprises a train assembly continuously moving along a right of way during the replacement, the right of way consisting of a section of old track, a section of new track and an intermediate right of way section wherein the old track is replaced by the new track.
  • the replacement may include only the two track rails or the track rails and ties.
  • the train assembly consists of a first train section moving on the old track rails, a second train section moving on the new track rails and an intermediate train section bridging the intermediate right of way section, means being provided to link the intermediate train section respectively to the first and second train sections to interconnect the same for common movement along the right of way.
  • This apparatus comprises, on the train assembly, means for transporting and supporting at least one of the track parts of the old and new track, means for respectively receiving at least one of the track parts of the old track and laying at least one of the track parts of the new track, the track part receiving and laying means including tools movable in respect of the right of way in a lateral and- /or vertical direction, and means for guiding the track rails bridging the intermediate right of way section without substantial friction.
  • Such an apparatus has made it possible to proceed with track renewal in the manner of a moving assembly line, taking into full consideration the flexing moments to which the rails are subjected under'varying operating conditions, particularly in track curves.
  • Apparatus of this type also permits accurate and automatic centering of the track part receiving and laying means in respect of the track axis in tangent as well as curved track sections.
  • ballast plow and grader In track renewal operations using apparatus of the above type, a ballast plow and grader has conventionally been used in the intermediate right of way section, sometimes supplemented by a ballast cleaning machine, so as to renew the ballast bed at the same time the track is renewed. This, of course, considerably increases the length of the train assembly, making the apparatus uneconomical in some instances.
  • the intermediate train section is a single rigid frame and the frame is mounted pivotally on the undercarriages near the respective ends of the frame. Couplings connect the respective frame ends to rail transport cars of the first and second train sections respectively. In this manner, the ends of the intermediate train section is doubly pivotally arranged in the train assembly, which further improves the adaptability of the assembly for use in track curves and the centering of the track receiving and laying tools.
  • each undercarriage is a swivel truck with three axles, and hydraulically operated means is mounted in the region of the undercarriages for laterally moving the intermediate train section as a unit in respect of the right of way.
  • the intermediate train section may be a selfpropellable vehicle having drive and drive control means enabling the vehicle to operate independently of the train assembly. In this way, it may be readily exchanged in the train assembly for adaptation to different operating conditions and may be used independently, being moved from place to place on its own power. This, of course, further increases the economy of the apparatus.
  • FIG. 1 is a schematic side view of an apparatus according to the present invention and FIG. 2 is a plan view of the apparatus.
  • new track and track parts refers only to the fact that these track parts from part of a newly laid track and that such replacement rails and/or ties may, in fact, be used parts.
  • the intermediate train section 1 is illustrated as a rigid frame 2 whose one end is mounted on undercarriage 4 constituted by a swivel truck while its other end is mounted on undercarriage 4' also constituted by a swivel truck.
  • Undercarriage 4 runs on rails 3 of the old track section and undercarriage 4' runs on rails 3 of the new track section, the track renewal operation proceeding in the direction of arrow 10.
  • the swivel trucks 4, 4' have three axles, which assures a good load distribution of the entire weight of the frame 2 pressing on the rails 3, 3' so that neither the old or the new track are subjected to undue loads. It is, of course, possible to use singleor doubleaxle undercarriages.
  • a pivotal pin, ball-and-socket joint or like pivot connection 5, 5' mounts the intermediate train section 1 on its undercarriages, the intermediate section of the right of way, wherein the track is renewed, i.e. the old rail 3 and/or old ties 6 are received and the new rail 3' and/or new ties 6' are laid, extending between the undercarriages 4, 4'.
  • means for respectively receiving at least one of the track parts of the old track and laying at least one of the track parts of the new track are mounted on the intermediate track section. These means include tools 7, 7' which are movable laterally and/or vertically in respect of the right of way for receiving the old rails 3 and laying the new rails 3',
  • the track replacement tools are only schematically shown and include means 8, such as guide rollers, for guiding the track rails without substantial friction, the guide rollers being divergently arranged so that the rails are spread apart beyond the track gage in the intermediate section of the right of way to enable the old ties to be taken up and the new ties to be laid without hindrance.
  • means 9, 9, also well known, are mounted on train sec tion 1 for receiving the old ties 6 and laying new ties 6'.
  • the track renewal operating cycle proceeds as follows:
  • the new rails 3' which may be transported on cars forming part of the first train section or which may be placed next to the old rails, i.e., adjacent the tie ends, are similarly spread in the region of the intermediate right of way section, the new rails being shown in full lines while the old rails are shown in chain-dotted lines.
  • the lose old ties 6 in the intermediate section of the right of way are lifted and removed by tools 9 arranged to take up pairs of adjacent ties and to pivot them 90 in the region of the spread rails so that the old ties are positioned parallel to the right of way.
  • the old ties After the old ties have been turned, they are lifted above the level of the pair of conveyor bands 11, 11.
  • the conveyor bands are then inwardly moved in a transverse direction until they are aligned with the old ties, whereupon tools 9 are opened and deposit the ties on the conveyors.
  • a like apparatus 9- lays new ties 6' brought to the intermediate section of the right of way by elongated con veyors 12 which move the new ties into laterally adjustable conveyor bands 11 which bring them into the reach of tools 9' turning the new ties to lay them at desired crib spacings.
  • the two elongated tie conveyors 12, 12 are pivotally mounted about a vertical axis in the region of the pivots 5, 5' for the undercarriages, 4, 4 to assure an accurate transfer of the ties from conveyor bands 11, 11' to conveyors 12, 12' in track curves.
  • the new rails 3 are laid thereon by means of tools 7' and the newly laid rails are fastened at the desired gage on the new ties in any suitable manner (not shown).
  • conventional couplings 13, 13' link the ends of the intermediate train section 1 to adjacent cars 14 and 15 of the first and second train sections so that all three train sections are interconnected for common movement along the right of way.
  • the cars 14, 15 may take various forms. Thus, car 14 may be used to transport old ties and new rails, and car 15 may be used to transport new ties and the old rails. It is also possible, however, to use the car 15 only for the old rails while succeeding cars are used to transport the old and the new ties while the car 14 is used to house the dirve and drive control for the intermediate train section 1.
  • the train section 1 is self-propellable to make it universally useful, carrying its own drive 17 and drive control 18.
  • the train section 1 may be used independently, for instance if only the rails are to be replaced, and/or it may be inserted into a variety of train assemblies for track renewal. Therefore, it is useful to equip the intermediate train section 1 with its own operating stand 19 which houses the drive 17 and controls 18.
  • control lines 20 lead from the operating stand to the track renewal tools 7, 7', 9, 9' and to the hydraulic motors l6, 16.
  • the intermediate train section may be used advantageously for the replacement of rails as well as for the simultaneous replacement of the ties and rails in all cases where the ballast bed has been previously prepared, i.e., leveled and, if desired, cleaned, any ballast required to fill the cribs after the track renewal being stored on the shoulders.
  • the universal adaptability of the intermediate train section is enhanced by the two pivotal connections between this section and the two other sections of the train assembly.
  • An apparatus for the continuous replacement of an old track by a new track consisting of track parts in cluding two rails and ties supporting the rails on ballast, comprising a train assembly continuously moving along a right of way during the replacement, the right of way consisting of a section of old track, a section of new track and an intermediate right of way section wherein the old track is replaced by the new track, the train assembly consisting of l. a first train section moving on the old track rails,
  • the track part receiving and laying means including tools movable in respect of the right of way
  • intermediate train section is a single rigid frame, the frame being mounted pivotally on the undercarriages near the respective ends of the frame, and the linking means being couplings connecting the respective frame ends to rail transport cars of the first and second train sections respectively.
  • each of the undercarriages has three axles.
  • intermediate train section is a self-propellable vehicle having drive and drive control means enabling the vehicle to operate independently of the train assembly.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
US00350735A 1972-05-02 1973-04-13 Movable apparatus for replacing an old track by a new track Expired - Lifetime US3807310A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT381872A AT321971B (de) 1972-05-02 1972-05-02 Fahrbare einrichtung zum auswechseln bzw. erneuern eines aus schienen und querschwellen bestehenden gleises

Publications (1)

Publication Number Publication Date
US3807310A true US3807310A (en) 1974-04-30

Family

ID=3555836

Family Applications (1)

Application Number Title Priority Date Filing Date
US00350735A Expired - Lifetime US3807310A (en) 1972-05-02 1973-04-13 Movable apparatus for replacing an old track by a new track

Country Status (8)

Country Link
US (1) US3807310A (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
AT (1) AT321971B (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
CA (1) CA981978A (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
CH (1) CH562919A5 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
DE (1) DE2301592C2 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
FR (1) FR2183096B1 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
GB (1) GB1433045A (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)
ZA (1) ZA732456B (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4152989A (en) * 1977-02-23 1979-05-08 Franz Plasser Bahnbaumaschinen-Industriegesellschaft, M.B.H. Mobile apparatus for continuously laying ties
US4160418A (en) * 1976-10-15 1979-07-10 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile apparatus for continuous track renewal
US4184431A (en) * 1976-07-27 1980-01-22 Canron, Inc. Track laying train
US4211170A (en) * 1977-09-02 1980-07-08 Franz Plasser Bahnbaumaschinen-Industriegesellschaft Mbh Mobile apparatus for the continuous replacement of an old track by a new track
US4236452A (en) * 1978-06-28 1980-12-02 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile apparatus for continuously renewing track
US4301738A (en) * 1978-12-12 1981-11-24 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Apparatus for the replacement of rails of a track
US5222435A (en) * 1991-09-10 1993-06-29 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track renewal
WO1999016977A1 (en) * 1997-09-26 1999-04-08 A. Rosenqvist Förvaltnings Ab Gripping arrangement
US6415720B2 (en) * 2000-06-09 2002-07-09 Franz Plasser Bahnbaumaschinen Industrigesellschaft M.B.H. Machine for renewing a railroad track
US20060102042A1 (en) * 2004-08-20 2006-05-18 Martin Green Long rail pick-up and delivery system
US20060219123A1 (en) * 2005-03-30 2006-10-05 Franz Plasser Bahnbaumaschinen Industriegesellschaft Gmbh Method and machine for replacing damaged rail sections of a track
CN107974881A (zh) * 2017-11-20 2018-05-01 中国神华能源股份有限公司 位于曲线桥梁上的铁路线路的拨道方法和清筛方法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT404040B (de) * 1995-07-25 1998-07-27 Plasser Bahnbaumasch Franz Maschine zum auswechseln von schienen eines gleises
AT3878U3 (de) * 2000-06-09 2001-02-26 Plasser Bahnbaumasch Franz Maschine und verfahren zum entfernen eines altgleises und zur verlegung eines neugleises

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3286648A (en) * 1963-08-30 1966-11-22 Brosnan Dennis William Rail renewal process
US3330219A (en) * 1963-09-23 1967-07-11 Plasser Franz Method and apparatus for replacing an old track by a new track
US3465687A (en) * 1966-11-18 1969-09-09 New York Central Railroad Co T Rail positioning system
US3548750A (en) * 1968-10-01 1970-12-22 Lloyd Oscar Hostland Mobile mechanized track layer

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR700512A (fr) * 1929-11-25 1931-03-02 Installation pour la réfection des voies ferrées
AT313341B (de) * 1969-10-07 1974-02-11 Plasser Bahnbaumasch Franz Fahrbare Einrichtung zum kontinuierlichen Auswechseln bzw. Erneuern eines Gleises

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3286648A (en) * 1963-08-30 1966-11-22 Brosnan Dennis William Rail renewal process
US3330219A (en) * 1963-09-23 1967-07-11 Plasser Franz Method and apparatus for replacing an old track by a new track
US3465687A (en) * 1966-11-18 1969-09-09 New York Central Railroad Co T Rail positioning system
US3548750A (en) * 1968-10-01 1970-12-22 Lloyd Oscar Hostland Mobile mechanized track layer

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4184431A (en) * 1976-07-27 1980-01-22 Canron, Inc. Track laying train
US4160418A (en) * 1976-10-15 1979-07-10 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile apparatus for continuous track renewal
US4152989A (en) * 1977-02-23 1979-05-08 Franz Plasser Bahnbaumaschinen-Industriegesellschaft, M.B.H. Mobile apparatus for continuously laying ties
US4211170A (en) * 1977-09-02 1980-07-08 Franz Plasser Bahnbaumaschinen-Industriegesellschaft Mbh Mobile apparatus for the continuous replacement of an old track by a new track
US4236452A (en) * 1978-06-28 1980-12-02 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile apparatus for continuously renewing track
US4301738A (en) * 1978-12-12 1981-11-24 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Apparatus for the replacement of rails of a track
US5222435A (en) * 1991-09-10 1993-06-29 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track renewal
WO1999016977A1 (en) * 1997-09-26 1999-04-08 A. Rosenqvist Förvaltnings Ab Gripping arrangement
US6415720B2 (en) * 2000-06-09 2002-07-09 Franz Plasser Bahnbaumaschinen Industrigesellschaft M.B.H. Machine for renewing a railroad track
US20060102042A1 (en) * 2004-08-20 2006-05-18 Martin Green Long rail pick-up and delivery system
US7350467B2 (en) 2004-08-20 2008-04-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
US20080163781A1 (en) * 2004-08-20 2008-07-10 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
US7895950B2 (en) 2004-08-20 2011-03-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
US20060219123A1 (en) * 2005-03-30 2006-10-05 Franz Plasser Bahnbaumaschinen Industriegesellschaft Gmbh Method and machine for replacing damaged rail sections of a track
US7478596B2 (en) * 2005-03-30 2009-01-20 Franz Plasser Bahnbaumaschinen - Industriegesellschaft Gmbh Method and machine for replacing damaged rail sections of a track
CN107974881A (zh) * 2017-11-20 2018-05-01 中国神华能源股份有限公司 位于曲线桥梁上的铁路线路的拨道方法和清筛方法

Also Published As

Publication number Publication date
AU5276373A (en) 1974-09-05
FR2183096A1 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html) 1973-12-14
DE2301592A1 (de) 1973-11-22
AT321971B (de) 1975-04-25
DE2301592C2 (de) 1985-12-05
GB1433045A (en) 1976-04-22
CH562919A5 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html) 1975-06-13
CA981978A (en) 1976-01-20
ZA732456B (en) 1974-04-24
FR2183096B1 (GUID-C5D7CC26-194C-43D0-91A1-9AE8C70A9BFF.html) 1977-04-29

Similar Documents

Publication Publication Date Title
US3699894A (en) Movable apparatus for replacing an old track by a new track
CA1130653A (en) Mobile apparatus for continuously renewing track
US4160418A (en) Mobile apparatus for continuous track renewal
US3807310A (en) Movable apparatus for replacing an old track by a new track
US4307667A (en) Railroad track relaying train
AU661157B2 (en) A machine for renewing or laying a railway track
CA1138257A (en) Mobile apparatus for the continuous replacement of ties
US3685456A (en) Method and apparatus for the continuous replacement of an old track by a new track
AU654383B2 (en) A method for renewing a track and a machine arrangement
US4211170A (en) Mobile apparatus for the continuous replacement of an old track by a new track
SU884578A3 (ru) Устройство дл замены рельсов и шпал железнодорожного пути
GB2036141A (en) Travelling machine for taking-up and/or laying track switches of crossings
PL176661B1 (pl) Wagon do transportu przęseł torowych
CA1206809A (en) Track tamping, leveling and lining operating unit
RU2013483C1 (ru) Передвижная шпалоподбивочная и выправочная машина
CZ285348B6 (cs) Kolejnicový nákladní vůz
GB1587802A (en) Travelling machine for laying sleepers
RU2048629C1 (ru) Передвижная шпалоподбивочная машина
CZ296557B6 (cs) Stroj pro odstranování staré koleje a soucasné pokládání nové koleje
US4261264A (en) Mobile track tie transport apparatus with traveling gantry
CZ285437B6 (cs) Stroj pro demontáž staré koleje a pokládání nové koleje
AU709022B2 (en) A machine for laying a track
CA2103613C (en) Continuously mobile track tamping machine
US4152990A (en) Mobile track tie transport apparatus
RU2070950C1 (ru) Устройство для подбивки шпал рельсового пути и разравнивания его щебня