US3699894A - Movable apparatus for replacing an old track by a new track - Google Patents

Movable apparatus for replacing an old track by a new track Download PDF

Info

Publication number
US3699894A
US3699894A US74710A US3699894DA US3699894A US 3699894 A US3699894 A US 3699894A US 74710 A US74710 A US 74710A US 3699894D A US3699894D A US 3699894DA US 3699894 A US3699894 A US 3699894A
Authority
US
United States
Prior art keywords
track
section
train
pair
rails
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
US74710A
Inventor
Franz Plasser
Josef Theurer
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Franz Plasser Bahnbaumaschinen Industrie GmbH
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of US3699894A publication Critical patent/US3699894A/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/11Renewing or cleaning the ballast in situ, with or without concurrent work on the track combined with concurrent renewal of track components
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/05Transporting, laying, removing, or renewing both rails and sleepers

Definitions

  • ABSTRACT PP 74,710 A train assembly is moved continuously along a right of way during a track renewal or replacement opera- [30] Foreign Application Priority Data tion, with a first train section of cars moving on the old track rails and a second train section of cars mov- 1969 Ausma "9452/69 ing on the new track rails. in an intermediate trackless section, the old track is replaced by the new track,
  • Track replacement apparatus of this general type has been described, for instance, in our US. Pat. No. 3,330,219, dated July ll, 1967, and US. Pat. No. 3,521,565, dated July 21, 1970.
  • Such apparatus includes a first train section of cars moving on the old track rails and a second train section of cars moving on the new track rails.
  • various means are arranged for movement in the trackless intermediate section of the right of way independently of the movement of the train sections, which sections also move independently of the each other.
  • the independently movable means include implements for receiving and/or laying track parts, and for working on the ballast.
  • the accuracy and quality of the track replacement also suffer because of varying distance between the point where the old track parts are received and the point where the new track parts are laid correspondingly varies the conditions for the guidance and fixing of the rails.
  • the rails are subjected to flexing as they are lowered from the transport cars to the intermediate section where they are laid or where they are lifted to enable work to be done on the ballast, the flexing load depending on the curvature of flexing which is a function of the distance between the transport cars and the point where the rails are laid.
  • an intermediate train section bridges the trackless intermediate section of the right of way.
  • the intermediate train section is respectively linked, for instance by pivotal couplings, to the first and second train sections to interconnect the same for common movement, and means is provided for maintaining the respective linking means at a predetermined, preferably adjustable, distance in the direction of the right of way.
  • the desired operation of these implements is further facilitated and simplified by selectively operable vehicles arranged to move on the track and to move on the trackless intermediate section of the right of way, preferably including full-track vehicles capable of moving on the ballast in the intermediate section.
  • This feature enables the intermediate train section to start or stop its track renewal work without any change in the structure, and thus to change from a forward movement during renewal to a forward movement from one renewal site to the next.
  • FIG. 1 is a side view of the central portion of a train assembly according to the invention
  • FIGS. la and 1b show the respective left and right end portions of the train assembly of FIG. 1;
  • FIG. 2 is a top view of the central portion of the train assembly in the direction of arrow II of FIG. 1;
  • FIG. 3 is a side view similar to FIG. 1 but showing a modified embodiment of the intermediate train section
  • FIGS. 4 and 5 schematically illustrate a track laying procedure with another embodiment of the train assembly
  • FIG. 6 is a side view similar to FIG. 1 and showing yet another embodiment of the train assembly
  • FIG. 7 is a transverse section of the train assembly of FIG. 6, along line VII-VII;
  • FIGS. 8 and 9 are side views illustrating modifications of running gears or vehicles forming part of the intermediate train section.
  • new track and track parts refer only to the fact that they form part of a newly laid track and that such replacement rails or ties may, in fact, be used parts.
  • FIGS. 1, 1a and 117 show the inner ends of the first and second train sections of cars used to transport and support the old and new track parts, respectively. These inner ends face each other and are adjacent an intermediate trackless section of the right of way, the first train section shown in the left portion of FIG. 1 and in FIG. 1a moving on the old track and transporting the old ties and new rails, as indicated by a first of a series of transport cars 1, while the second train section shown in the right portion of FIG. 1 and in FIG.
  • the working direction of the train assembly is indicated by a horizontal arrow, the first train section forming the forward section of the train assembly in this working direction while the second train section forms the rear section of the train assembly in this direction.
  • a flat car 3 forms the rear end of the forward train section and carries a schematically illustrated device, such as a trolley, for transporting the old ties 5 to the cars 1 and to place them on respective ones of these cars as the trolley runs over the flat platforms of these cars.
  • Car 3 also carries a schematically illustrated implement 6 for loosening the rail spikes of old rails 7 which are shown in full lines.
  • a suitable rail gripping and guiding implement 9 for receiving the old track 7, after the rail spikes have been loosened, is mounted at the rear end of flat car 3.
  • a universal. pivot 11' vertically above the running gear 8 of car 3 pivotaily supports a support arm 11 extending towards the intermediate trackless section of the right of way and carrying a device 12 for receiving the old ties 5.
  • the device 12 is only schematically shown because they may take any desired form.
  • a support 14 is pivotally connected to the support arm 1 1 and a vehicle or running gear 15 with wheels arranged to move on the track is vertically adjustably mounted on a guide column 14 of the support 14 for selectively lifting and lowering the vehicle 15 out of and into an operable position on the track.
  • An intermediate train section is shown to comprise a frame 16 which is a connecting part between the first and second train sections, and whose respective ends carry full-track vehicles 17, 17 which are selectively operable for moving on the ballast in the intermediate section of the right of way, an end bracket of the support extending over and being supported on the frame 16.
  • the frame 16 carries a ballast working machine.
  • the frame is pivotally connected to the supports 14, 14 to provide the connecting train section intermediate the first and second train sections.
  • the supports 14 are vertically adjustably mounted on the frame 16 by means of a hydraulic drive 18 to control the relative vertical position of these train portions.
  • ballast working machine Any suitable ballast working machine may be used, the illustrated machine being a ballast cleaning machine which comprises an endless bucket conveyor continuously moved by drive 19' through a triangular path, one stringer of which extending transversely of the right of way and clearing excess ballast from ballast bed 20 while another stringer moves the excess ballast upwardly to a chute 21'.
  • a transversely moving conveyor receives the cleaned ballast from the chute and moves it to the lateral edges of the ballast bed or, by means of an elongated conveyor 24 to a rearwardly positioned chute 25.
  • the machine is operated from stand 28.
  • Ballast cleaning machines of this and similar types are known and may include ballast storage containers to supply controlled quantities of ballast to selected portions of the ballast bed.
  • the chute 25 is mounted on a first car 26 of the rear train section.
  • car 26 carries a trolley 4 for transporting the new ties 27 from the cars 2 and to place them in position for laying as the trolleys run forwardly over the flat platforms of these cars.
  • All the cars of the second train sections have running gears 8 moving on the new track rails 10.
  • the pivotal connection of the second train section to the intermediate train section is a mirror image of the above-described connection thereof to the first train section, thus including the support 14 with the vertically adjustable vehicle 15 and a support arm 11.
  • This support arm carries a suitable device 32 for laying new ties 27, the structure of this device forming no part of this invention and being, therefore, only schematically shown.
  • FIG. 3 shows the modified embodiment of FIG. 3, parts of the intermediate train section are shown in such a position that the train assembly may be moved from one track renewal site to another.
  • FIG. 1 shows the running gears 15, 15 of the intermediate train section lifted into an inoperative position while the full-track vehicles 17, 17 move the intermediate train section on the ballast
  • the frame 16 with vehicles 17, 17 are lifted into an inoperative position in FIG. 3 while the running gears move on the track so that the entire train assembly is supported on the track for movement thereover.
  • the rail guiding implements 9, 9 are lifted out of rail gripping position.
  • Hydraulic drive means 19" is connected to the bucket conveyor 19 of the ballast cleaning machine so that, as shown in broken lines in FIG.
  • the conveyor may be moved into an operating position in engagement with the ballast even in the lifted position of frame 16.
  • the conveyor may scoop up ballast and move it upwardly to a vibratory screen 21 where it is cleaned, and the cleaned ballast is moved by a chute 23 to elongated conveyor 24.
  • a second conveyor 22 moves the waste ballast laterally away from the ballast bed.
  • a third conveyor 30 moves cleaned ballast towards the input side of the bucket conveyor 19.
  • the distance between the last car 3 of the first train section and the first car 26 of the second train section may be adjustable. This distance is selected in dependence on the working conditions and, more particularly, the flexing load to which the new rails to be laid and the old rails to be taken up is subjected, these loads varying with changing levels of the rails. Excessive loads must be avoided to prevent stresses in the rails which lead to permanent deformations thereof. In this respect, it is also important to note that the rails must be guided and spread without undue friction.
  • the train assembly of the present invention need not include a ballast cleaning machine in the intermediate trackless section of the right of way but have other devices for working on or treating the ballast in this trackless section, as will become evident from the following description of other embodiments of the intermediate train section holding the first and second train sections at a predetermined, preferably adjustable distance.
  • the intermediate train section may consist merely of a spacing rod 16' whose ends are linked respectively to the last car 3 of the first train section and the first car 26 of the second train section.
  • the spacing rod is a telescoped structure enabling the length of the rod, and thus the distance between the first and second train sections, to be adjusted to a selected length.
  • rods may be detachably connected and selectively exchanged.
  • a frame such as 16
  • it may be detachably connected in the train assembly and/or it may carry other track maintenance implements rather than a ballast cleaning machine.
  • the possible variations in the nature of the intermediate train section can be adapted to any track maintenance need, the only requirement being that this section is linked to the first and second train sections so as to maintain a selected distance therebetween and to form a train assembly moving together along the right of way.
  • the spacing rod 16 is linked directly to the first and second train sections and has no running gear support of its own.
  • This embodiment provides only for the replacement of old rails 7 for new rails 10, the nature of this replacement being more fully disclosed and claimed in our above-mentioned U. S. patents.
  • a spacing frame 16 functionally similar to spacing rod 16', is used in a structure which is otherwise like that of FIGS. 1 and 2, i.e. the spacing frame forming the intermediate train section is supported on selectively operable vehicles and 17 arranged, respectively, to
  • the support 14 carries a fulltrack vehicle 17 instead of a wheeled running gear arranged to move on tracks.
  • the intermediate train section with its ballast cleaning machine is quite similar to that of FIGS. 1 and 2 but the frame 16 is slightly different, being supported at one end by a full-track vehicle 17" and at the other end by a running gear comprising a series of rubber rollers 40 (see FIG. 7).
  • the vehicles 17" and 40 serve to move the intermediate train section on the ballast 20 of the intermediate trackless section of the right of way.
  • the frame 16 carries wheeled vehicles 15", these vehicles as well as vehicles 17" and 40 being selectively operable by lifting or lowering them respectively off and into contact with the track rails or the ballast.
  • intermediate train section frame 16 carry auxiliary running gears 41, 41 which may be lifted and lowered into operable positions by pressure fluid drives 41' at the end of a track renewal operation so that the intermediate train section is supported on the track rails until the main running gears 15" move onto the track for movement of the train assembly to another track renewal site.
  • the rubber rollers 40 serve the following purpose:
  • Operation of the bucket conveyor 19 produces a concavely curved ballast bed, as shown in FIG. 7.
  • the outer rollers 40, 40 exert a heavier load or pressure on the ballast than the central rollers 40' so as to produce proper ballast supports for the tie ends while the central portion of the ballast bed 20 remains concave.
  • the ties are securely fixed in position.
  • the laterally extending mounds of ballast seen in FIG. 7 are produced by the ballast moved to the sides of the track by conveyor 24, and this excess ballast may be used to fill the cribs.
  • FIGS. 8 and 9 Additional modifications of the intermediate train section are shown in FIGS. 8 and 9. These embodiments are designed solely for replacement of the old ties 5 by new ties 27 while the rails are merely lifted at the intermediate trackless section of the right of way, whereupon they are lowered again and fastened to the newly laid ties.
  • the supports 14 carry full-track vehicles 17 as in the embodiment of FIG. 6.
  • the frame 16a may be selectively supported on wheeled running gears 15a mounted at the ends of the frame.
  • a ballast leveling implement 29 is mounted on the frame for vertical movement into and out of engagement with the ballast, a drive 29' being provided for the vertical movement of implement 29.
  • the frame 16b of FIG. 9, on the other hand, carries selectively operable fulltrack vehicles 17a as well as rail-engaging running gears 15b, which are retractable so that the frame may run either on the trackless section of the right of way or on the track.
  • An apparatus for the continuous replacement of an old track by a new track consisting of track parts in cluding two rails and ties supporting the rails on ballast comprising a train assembly continuously moving along a right of way during the replacement; the right of way consisting of a section of old track, a section of new track and a trackless intermediate section wherein the old track is replaced by the new track; the train assembly consisting of a first train section moving on the old track rails, an intermediate train section bridging the trackless intermediate section of the right of way, a second train section moving on the new track rails, and means linking the intermediate train section respectively to the first and second train sections to interconnect the same for common movement, the linking means being at a predetermined distance in the direction of the right of way; and means on the train assembly for transporting and supporting at least one of the track parts of the old and new tracks, for respectively receiving at least one of the track parts of the old track and laying at least one of the track parts of the new track, and for guiding without substantial friction the track rails
  • linking means comprises pivotal couplings between the intermediate train section and the first and second train sections, respectively.
  • the intermediate train section includes vehicles selectively operable to move on the track and to move on the trackless intermediate section of the right of way.
  • the adjustable distancing means is arranged to select a maximum distance limited by the permissible deformation of the new track rails being lowered from a respective one of said cars to the intermediate trackless section of the right of way or of the old track rails being raised in the of frame parts and extending therebetween, and the means for respectively receiving and laying the track parts being mounted on the pair of frame parts.
  • each frame part of the pair comprises a running gear vertically movably mounted in the frame for selective operative engagement with the track
  • the connecting frame part comprises full tracks for operative engagement with the trackless intermediate section.
  • each frame part of the pair has a pivotal support arm having an end extending towards a respective one of the first and second train sections and being supported thereon.
  • each of the first and second train sections has a running gear moving on the respective tracks, the supported arm ends being in vertical alignment with the running gears of the train sections.
  • each frame part of the pair has an end portion respectively supported on the ends of the connecting frame part in substantially vertical alignment with respective ones of the full tracks thereof.
  • the intermediate train section means includes a pair of frame parts respectively linked to the first and second train sections and a connecting frame part linked to the pair of frame parts and extending therebetween, a pair of running gears being vertically movably mounted in the connecting frame part for selective operative engagement with the track, and a pair of full tracks being mounted on the connecting frame part for selective operative engagement with the trackless intermediate section, the running gears being arranged between the full tracks on the connecting frame part in the direction of track elongation.
  • each frame part of the pair has an end portion pivotally coupled to be connecting frame part at a point in substantially vertical alignment with a respective one of the full tracks.
  • the intermediate train section means includes a pair of frame parts respectively linked to the first and second train sections and a connecting frame part linked .to the pair of frame parts and extending therebetween, a running gear and a full track being mounted in each of the frame parts of the pair, each running gear being vertically movable for selective operative engagement with the track and the full tracks being mounted for operative engagement with the trackless intermediate section.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)
  • Platform Screen Doors And Railroad Systems (AREA)

Abstract

A train assembly is moved continuously along a right of way during a track renewal or replacement operation, with a first train section of cars moving on the old track rails and a second train section of cars moving on the new track rails. In an intermediate trackless section, the old track is replaced by the new track, and an intermediate train section bridges the trackless section of the right of way. The intermediate train section is pivotally coupled to the first and second train sections, the latter being held at a predetermined distance. Track renewal means operable in a timed sequence during the continuous movement of the train assembly are mounted on the cars.

Description

United States Patent Plasser et al.
[ 1 Oct. 24, 1972 [54] MOVABLE APPARATUS FOR 2,997,001 8/ 1961 Scheuchzer ..l04/2 REPLACING AN OLD TRACK BY A 3,286,648 HI 1966 Brosman ..l04/2 NEW TRACK [72] Inventors: Franz Plasser; Josef Theurer, both 5? gmmt{ler of Johannesgasse 3, Vienna, 1, Aussslsmm xammer ar ensc ma AttorneyKurt Kelman [22] Filed: Sept. 23, 1970 57] ABSTRACT PP 74,710 A train assembly is moved continuously along a right of way during a track renewal or replacement opera- [30] Foreign Application Priority Data tion, with a first train section of cars moving on the old track rails and a second train section of cars mov- 1969 Ausma "9452/69 ing on the new track rails. in an intermediate trackless section, the old track is replaced by the new track,
g 81 and an intermediate train Section bridges the trackless section of the right of way. The intermediate tram sec- Fleld of Search 2, 3, 4, 5, 6 tion is coupled to the and Second, train sections, the latter being held at a predetermined [56] References cued distance. Track renewal means operable in a timed UNITED STATES PATENTS sequence during the continuous movement of the train assembly are mounted on the cars.
3,330,219 7/1967 Plasser et al ..,.....l04/2 3,465,687 9/1969 Kerns ..104/2 18 Claims, 11 Drawing Figures PATENTEDUBI 24 I972 SHEET 2 OF 2 1 N VENTOR. KANZ Ppasseg SEF' YHeuuua KMLKMW AGENT MOVABLE APPARATUS FOR REPLACING AN OLD TRACK BY A NEW TRACK The present invention relates to the continuously progressing replacement of old track by new track by means of a train moving along a right of way consisting of a section of old track, a section of new track and a trackless intermediate section wherein the old track is replaced by the new track. The replacement preferably includes not only the two track rails but also the ties whereon the rails are supported on ballast.
Track replacement apparatus of this general type has been described, for instance, in our US. Pat. No. 3,330,219, dated July ll, 1967, and US. Pat. No. 3,521,565, dated July 21, 1970. Such apparatus includes a first train section of cars moving on the old track rails and a second train section of cars moving on the new track rails. Means on respective cars, including vertically and/or laterally moving implements, transport and support the rails and/or the ties of the old and new track, respectively receive and lay the rails and/or the ties of the old and new tracks, and guide without friction the track rails bridging the intermediate trackless section of the right of way. All these implements are controlled and operated in timed sequence during the continuous movement of the train assembly.
In known apparatus of this type, various means are arranged for movement in the trackless intermediate section of the right of way independently of the movement of the train sections, which sections also move independently of the each other. The independently movable means include implements for receiving and/or laying track parts, and for working on the ballast.
This combination of three independently moving sections results in delays in putting together the entire apparatus, as well as difficulties and delays in the operation of the assembled apparatus. The efficiency of such an apparatus is further reduced because each independently moving section requires an independent drive and it is difficult to synchronize these drives during the continuous forward movement of the apparatus If the movement of only a single section or vehicle is out of step, the work of the entire apparatus is affected thereby.
In addition to these difficulties, the accuracy and quality of the track replacement also suffer because of varying distance between the point where the old track parts are received and the point where the new track parts are laid correspondingly varies the conditions for the guidance and fixing of the rails. In this respect, it may be noted, for instance, that the rails are subjected to flexing as they are lowered from the transport cars to the intermediate section where they are laid or where they are lifted to enable work to be done on the ballast, the flexing load depending on the curvature of flexing which is a function of the distance between the transport cars and the point where the rails are laid.
It is the primary object of this invention to avoid the above difficulties and disadvantages in track replacement apparatus of the indicated type.
It is a concomitant object of the invention to structure such an apparatus so that it assures a continuously uniform and accordingly highly efficient, automated cooperation of all the operating portions of the apparatus.
The above and other objects are accomplished by maintaining the respective cars of the first and second train sections which are adjacent the intermediate trackless section of the right of way at a constant distance. Accordingly, an intermediate train section bridges the trackless intermediate section of the right of way. The intermediate train section is respectively linked, for instance by pivotal couplings, to the first and second train sections to interconnect the same for common movement, and means is provided for maintaining the respective linking means at a predetermined, preferably adjustable, distance in the direction of the right of way.
With an apparatus of such structure, it is possible to renew a track truly continuously and under constant operating conditions in a timed sequence of operating steps in the manner of a mass producing conveyor. This structure makes it further possible to arrange in the intermediate section of the right of way all the implements required to lay the track and/or treat the ballast, these implements being combined with the train cars which transport the rails and ties in a single unit, rather than being assembled on the track renewal site.
In accordance with an important feature of the present invention, the desired operation of these implements is further facilitated and simplified by selectively operable vehicles arranged to move on the track and to move on the trackless intermediate section of the right of way, preferably including full-track vehicles capable of moving on the ballast in the intermediate section.
This feature enables the intermediate train section to start or stop its track renewal work without any change in the structure, and thus to change from a forward movement during renewal to a forward movement from one renewal site to the next.
The above and other objects, advantages and features of this invention will become more apparent from the following detailed description of certain now preferred embodiments thereof, taken in conjunction with the accompanying schematic drawing of track replacement apparatus, wherein FIG. 1 is a side view of the central portion of a train assembly according to the invention;
FIGS. la and 1b show the respective left and right end portions of the train assembly of FIG. 1;
FIG. 2 is a top view of the central portion of the train assembly in the direction of arrow II of FIG. 1;
FIG. 3 is a side view similar to FIG. 1 but showing a modified embodiment of the intermediate train section;
FIGS. 4 and 5 schematically illustrate a track laying procedure with another embodiment of the train assembly;
FIG. 6 is a side view similar to FIG. 1 and showing yet another embodiment of the train assembly;
FIG. 7 is a transverse section of the train assembly of FIG. 6, along line VII-VII; and
FIGS. 8 and 9 are side views illustrating modifications of running gears or vehicles forming part of the intermediate train section.
It will be understood that, throughout the specification and claims, the terms new track and track parts refer only to the fact that they form part of a newly laid track and that such replacement rails or ties may, in fact, be used parts.
Referring now to the drawing, wherein like reference numerals in all figures refer to like parts functioning in a like manner to avoid redundancy in the description, FIGS. 1, 1a and 117 show the inner ends of the first and second train sections of cars used to transport and support the old and new track parts, respectively. These inner ends face each other and are adjacent an intermediate trackless section of the right of way, the first train section shown in the left portion of FIG. 1 and in FIG. 1a moving on the old track and transporting the old ties and new rails, as indicated by a first of a series of transport cars 1, while the second train section shown in the right portion of FIG. 1 and in FIG. 1b moves on the new track and transports the new ties and old rails, as indicated by a first of a series of transport cars 2. The working direction of the train assembly is indicated by a horizontal arrow, the first train section forming the forward section of the train assembly in this working direction while the second train section forms the rear section of the train assembly in this direction.
A flat car 3 forms the rear end of the forward train section and carries a schematically illustrated device, such as a trolley, for transporting the old ties 5 to the cars 1 and to place them on respective ones of these cars as the trolley runs over the flat platforms of these cars. Car 3 also carries a schematically illustrated implement 6 for loosening the rail spikes of old rails 7 which are shown in full lines.
All the cars of the first train section have running gears 8 moving on the old tracks 7.
A suitable rail gripping and guiding implement 9 for receiving the old track 7, after the rail spikes have been loosened, is mounted at the rear end of flat car 3.
A universal. pivot 11' vertically above the running gear 8 of car 3 pivotaily supports a support arm 11 extending towards the intermediate trackless section of the right of way and carrying a device 12 for receiving the old ties 5. Like the implement 9, the device 12 is only schematically shown because they may take any desired form. As more fully disclosed in our abovementioned U. S. Pat. No. 3,52l ,565, means is provided for guiding without friction the old track rails 7 and the new rails (shown in chain-dotted lines) which bridge the intermediate trackless section of the right of way, the schematically illustrated frictionless rail guiding means including preferably adjustably mounted guide rollers 13 on support arm 11, the guide rollers being divergently arranged so that the rails are spread apart beyond the track gage in the trackless section of the right of way whereby the track laying implements as well as any ballast working apparatus in the trackless section may operate without hindrance. A support 14 is pivotally connected to the support arm 1 1 and a vehicle or running gear 15 with wheels arranged to move on the track is vertically adjustably mounted on a guide column 14 of the support 14 for selectively lifting and lowering the vehicle 15 out of and into an operable position on the track.
An intermediate train section is shown to comprise a frame 16 which is a connecting part between the first and second train sections, and whose respective ends carry full- track vehicles 17, 17 which are selectively operable for moving on the ballast in the intermediate section of the right of way, an end bracket of the support extending over and being supported on the frame 16. In the illustrated embodiment, the frame 16 carries a ballast working machine. The frame is pivotally connected to the supports 14, 14 to provide the connecting train section intermediate the first and second train sections. The supports 14 are vertically adjustably mounted on the frame 16 by means of a hydraulic drive 18 to control the relative vertical position of these train portions.
Any suitable ballast working machine may be used, the illustrated machine being a ballast cleaning machine which comprises an endless bucket conveyor continuously moved by drive 19' through a triangular path, one stringer of which extending transversely of the right of way and clearing excess ballast from ballast bed 20 while another stringer moves the excess ballast upwardly to a chute 21'. A transversely moving conveyor receives the cleaned ballast from the chute and moves it to the lateral edges of the ballast bed or, by means of an elongated conveyor 24 to a rearwardly positioned chute 25. The machine is operated from stand 28. Ballast cleaning machines of this and similar types are known and may include ballast storage containers to supply controlled quantities of ballast to selected portions of the ballast bed.
In the illustrated embodiment, the chute 25 is mounted on a first car 26 of the rear train section. Similarly to flat car 3, car 26 carries a trolley 4 for transporting the new ties 27 from the cars 2 and to place them in position for laying as the trolleys run forwardly over the flat platforms of these cars. All the cars of the second train sections have running gears 8 moving on the new track rails 10.
The pivotal connection of the second train section to the intermediate train section is a mirror image of the above-described connection thereof to the first train section, thus including the support 14 with the vertically adjustable vehicle 15 and a support arm 11. This support arm, however, carries a suitable device 32 for laying new ties 27, the structure of this device forming no part of this invention and being, therefore, only schematically shown.
In the modified embodiment of FIG. 3, parts of the intermediate train section are shown in such a position that the train assembly may be moved from one track renewal site to another. Thus, while FIG. 1 shows the running gears 15, 15 of the intermediate train section lifted into an inoperative position while the full- track vehicles 17, 17 move the intermediate train section on the ballast, the frame 16 with vehicles 17, 17 are lifted into an inoperative position in FIG. 3 while the running gears move on the track so that the entire train assembly is supported on the track for movement thereover. In this position, the rail guiding implements 9, 9 are lifted out of rail gripping position. Hydraulic drive means 19" is connected to the bucket conveyor 19 of the ballast cleaning machine so that, as shown in broken lines in FIG. 3, the conveyor may be moved into an operating position in engagement with the ballast even in the lifted position of frame 16. The conveyor may scoop up ballast and move it upwardly to a vibratory screen 21 where it is cleaned, and the cleaned ballast is moved by a chute 23 to elongated conveyor 24. A second conveyor 22 moves the waste ballast laterally away from the ballast bed. A third conveyor 30 moves cleaned ballast towards the input side of the bucket conveyor 19.
When the train assembly is moved from one renewal site to another, it is desirable to limit the length of this assembly. Therefore, the cars for transporting the track rails are uncoupled so that they do not travel with the train assembly. Instead, the new rails are stored on wheeled stands laterally adjacent the track of the renewal site and the old rails are placed on the wheeled stands after they have been replaced.
In accordance with the invention, the distance between the last car 3 of the first train section and the first car 26 of the second train section may be adjustable. This distance is selected in dependence on the working conditions and, more particularly, the flexing load to which the new rails to be laid and the old rails to be taken up is subjected, these loads varying with changing levels of the rails. Excessive loads must be avoided to prevent stresses in the rails which lead to permanent deformations thereof. In this respect, it is also important to note that the rails must be guided and spread without undue friction.
The train assembly of the present invention need not include a ballast cleaning machine in the intermediate trackless section of the right of way but have other devices for working on or treating the ballast in this trackless section, as will become evident from the following description of other embodiments of the intermediate train section holding the first and second train sections at a predetermined, preferably adjustable distance.
As shown in FIG. 4, for instance, the intermediate train section may consist merely of a spacing rod 16' whose ends are linked respectively to the last car 3 of the first train section and the first car 26 of the second train section. In the illustrated embodiment, the spacing rod is a telescoped structure enabling the length of the rod, and thus the distance between the first and second train sections, to be adjusted to a selected length. Obviously, it would also be possible to provide a series of rods of different lengths which may be detachably connected and selectively exchanged. Also, if a frame such as 16 is used, it may be detachably connected in the train assembly and/or it may carry other track maintenance implements rather than a ballast cleaning machine. Thus, the possible variations in the nature of the intermediate train section can be adapted to any track maintenance need, the only requirement being that this section is linked to the first and second train sections so as to maintain a selected distance therebetween and to form a train assembly moving together along the right of way.
In the embodiment of FIG. 4, the spacing rod 16 is linked directly to the first and second train sections and has no running gear support of its own. This embodiment provides only for the replacement of old rails 7 for new rails 10, the nature of this replacement being more fully disclosed and claimed in our above-mentioned U. S. patents.
In the embodiment of FIG. 5, on the other hand, a spacing frame 16", functionally similar to spacing rod 16', is used in a structure which is otherwise like that of FIGS. 1 and 2, i.e. the spacing frame forming the intermediate train section is supported on selectively operable vehicles and 17 arranged, respectively, to
In this embodiment, the support 14 carries a fulltrack vehicle 17 instead of a wheeled running gear arranged to move on tracks. The intermediate train section with its ballast cleaning machine is quite similar to that of FIGS. 1 and 2 but the frame 16 is slightly different, being supported at one end by a full-track vehicle 17" and at the other end by a running gear comprising a series of rubber rollers 40 (see FIG. 7). The vehicles 17" and 40 serve to move the intermediate train section on the ballast 20 of the intermediate trackless section of the right of way. In addition, the frame 16 carries wheeled vehicles 15", these vehicles as well as vehicles 17" and 40 being selectively operable by lifting or lowering them respectively off and into contact with the track rails or the ballast.
The ends of intermediate train section frame 16 carry auxiliary running gears 41, 41 which may be lifted and lowered into operable positions by pressure fluid drives 41' at the end of a track renewal operation so that the intermediate train section is supported on the track rails until the main running gears 15" move onto the track for movement of the train assembly to another track renewal site.
The rubber rollers 40 serve the following purpose:
Operation of the bucket conveyor 19 produces a concavely curved ballast bed, as shown in FIG. 7. To obtain a proper support for the ends of ties 27, the outer rollers 40, 40 exert a heavier load or pressure on the ballast than the central rollers 40' so as to produce proper ballast supports for the tie ends while the central portion of the ballast bed 20 remains concave. In this manner, the ties are securely fixed in position. The laterally extending mounds of ballast seen in FIG. 7 are produced by the ballast moved to the sides of the track by conveyor 24, and this excess ballast may be used to fill the cribs.
Additional modifications of the intermediate train section are shown in FIGS. 8 and 9. These embodiments are designed solely for replacement of the old ties 5 by new ties 27 while the rails are merely lifted at the intermediate trackless section of the right of way, whereupon they are lowered again and fastened to the newly laid ties.
In the embodiment of FIG. 8, the supports 14 carry full-track vehicles 17 as in the embodiment of FIG. 6. The frame 16a, on the other hand, may be selectively supported on wheeled running gears 15a mounted at the ends of the frame. A ballast leveling implement 29 is mounted on the frame for vertical movement into and out of engagement with the ballast, a drive 29' being provided for the vertical movement of implement 29.
The frame 16b of FIG. 9, on the other hand, carries selectively operable fulltrack vehicles 17a as well as rail-engaging running gears 15b, which are retractable so that the frame may run either on the trackless section of the right of way or on the track.
It will be obvious from the above description that a great many variations and modifications of the intermediate train section are possible to adapt the train assembly to various operating conditions without departing from the spirit and scope of the present invention as defined in the appended claims.
We claim:
1. An apparatus for the continuous replacement of an old track by a new track consisting of track parts in cluding two rails and ties supporting the rails on ballast, comprising a train assembly continuously moving along a right of way during the replacement; the right of way consisting of a section of old track, a section of new track and a trackless intermediate section wherein the old track is replaced by the new track; the train assembly consisting of a first train section moving on the old track rails, an intermediate train section bridging the trackless intermediate section of the right of way, a second train section moving on the new track rails, and means linking the intermediate train section respectively to the first and second train sections to interconnect the same for common movement, the linking means being at a predetermined distance in the direction of the right of way; and means on the train assembly for transporting and supporting at least one of the track parts of the old and new tracks, for respectively receiving at least one of the track parts of the old track and laying at least one of the track parts of the new track, and for guiding without substantial friction the track rails briding the intermediate trackless section of the right of way.
2. The apparatus of claim 1, wherein said last-mentioned means are arranged for supporting and transporting, receiving and laying the rails and the ties.
3. The apparatus of claim 1, wherein the linking means comprises pivotal couplings between the intermediate train section and the first and second train sections, respectively.
4. The apparatus of claim 1, wherein the intermediate train section includes vehicles selectively operable to move on the track and to move on the trackless intermediate section of the right of way.
5. The apparatus of claim 4, wherein the intermediate train section includes full-track vehicles.
6. The apparatus of claim 1, wherein the intermediate train section means comprises a ballast conditioning apparatus.
7. The apparatus of claim 1, wherein the intermediate train section includes means for maintaining the respective linking means at said predetermined distance.
8. The apparatus of claim 7, wherein the means for maintaining the respective linking means at a predetermined distance is adjustable for selecting said distance.
9. The apparatus of claim 8, wherein the adjustable distancing means is arranged to select a maximum distance limited by the permissible deformation of the new track rails being lowered from a respective one of said cars to the intermediate trackless section of the right of way or of the old track rails being raised in the of frame parts and extending therebetween, and the means for respectively receiving and laying the track parts being mounted on the pair of frame parts.
1 1. The apparatus of claim 10, wherein each frame part of the pair comprises a running gear vertically movably mounted in the frame for selective operative engagement with the track, and the connecting frame part comprises full tracks for operative engagement with the trackless intermediate section.
12. The apparatus of claim 11, wherein each frame part of the pair has a pivotal support arm having an end extending towards a respective one of the first and second train sections and being supported thereon.
13. The apparatus of claim 12, wherein each of the first and second train sections has a running gear moving on the respective tracks, the supported arm ends being in vertical alignment with the running gears of the train sections.
14. The apparatus of claim 11, wherein each frame part of the pair has an end portion respectively supported on the ends of the connecting frame part in substantially vertical alignment with respective ones of the full tracks thereof.
15. The apparatus of claim 14, wherein the end portions of the frame parts are vertically adjustably supported on the connecting frame part ends.
16. The apparatus of claim 7, wherein the intermediate train section means includes a pair of frame parts respectively linked to the first and second train sections and a connecting frame part linked to the pair of frame parts and extending therebetween, a pair of running gears being vertically movably mounted in the connecting frame part for selective operative engagement with the track, and a pair of full tracks being mounted on the connecting frame part for selective operative engagement with the trackless intermediate section, the running gears being arranged between the full tracks on the connecting frame part in the direction of track elongation.
17. The apparatus of claim 16, wherein each frame part of the pair has an end portion pivotally coupled to be connecting frame part at a point in substantially vertical alignment with a respective one of the full tracks.
18. The apparatus of claim 7, wherein the intermediate train section means includes a pair of frame parts respectively linked to the first and second train sections and a connecting frame part linked .to the pair of frame parts and extending therebetween, a running gear and a full track being mounted in each of the frame parts of the pair, each running gear being vertically movable for selective operative engagement with the track and the full tracks being mounted for operative engagement with the trackless intermediate section.

Claims (18)

1. An apparatus for the continuous replacement of an old track by a new track consisting of track parts including two rails and ties supporting the rails on ballast, comprising a train assembly continuously moving along a right of way during the replacement; the right of way consisting of a section of old track, a section of new track and a trackless intermediate section wherein the old track is replaced by the new track; the train assembly consisting of a first train section moving on the old track rails, an intermediate train section bridging the trackless intermediate section of the right of way, a second train section moving on the new track rails, and means linking the intermediate train section respectively to the first and second train sections to interconnect the same for common movement, the linking means being at a predetermined distance in the direction of the right of way; and means on the train assembly for transporting and supporting at least one of the track parts of the old and new tracks, for respectively receiving at least one of the track parts of the old track and laying at least one of the track parts of the new track, and for guiding without substantial friction the track rails briding the intermediate trackless section of the right of way.
2. The apparatus of claim 1, wherein said last-mentioned means are arranged for supporting and transporting, receiving and laying the rails and the ties.
3. The apparatus of claim 1, wherein the linking means comprises pivotal couplings between the intermediate train section and the first and second train sections, respectively.
4. The apparatus of claim 1, wherein the intermediate train section includes vehicles selectively operable to move on the track and to move on the trackless intermediate section of the right of way.
5. The apparatus of claim 4, wherein the intermediate train section includes full-track vehicles.
6. The apparatus of claim 1, wherein the intermediate train section means comprises a ballast conditioning apparatus.
7. The apparatus of claim 1, wherein The intermediate train section includes means for maintaining the respective linking means at said predetermined distance.
8. The apparatus of claim 7, wherein the means for maintaining the respective linking means at a predetermined distance is adjustable for selecting said distance.
9. The apparatus of claim 8, wherein the adjustable distancing means is arranged to select a maximum distance limited by the permissible deformation of the new track rails being lowered from a respective one of said cars to the intermediate trackless section of the right of way or of the old track rails being raised in the latter section.
10. The apparatus of claim 7, wherein the intermediate train section means includes a pair of frame parts respectively linked to the first and second train sections and a connecting frame part linked to the pair of frame parts and extending therebetween, and the means for respectively receiving and laying the track parts being mounted on the pair of frame parts.
11. The apparatus of claim 10, wherein each frame part of the pair comprises a running gear vertically movably mounted in the frame for selective operative engagement with the track, and the connecting frame part comprises full tracks for operative engagement with the trackless intermediate section.
12. The apparatus of claim 11, wherein each frame part of the pair has a pivotal support arm having an end extending towards a respective one of the first and second train sections and being supported thereon.
13. The apparatus of claim 12, wherein each of the first and second train sections has a running gear moving on the respective tracks, the supported arm ends being in vertical alignment with the running gears of the train sections.
14. The apparatus of claim 11, wherein each frame part of the pair has an end portion respectively supported on the ends of the connecting frame part in substantially vertical alignment with respective ones of the full tracks thereof.
15. The apparatus of claim 14, wherein the end portions of the frame parts are vertically adjustably supported on the connecting frame part ends.
16. The apparatus of claim 7, wherein the intermediate train section means includes a pair of frame parts respectively linked to the first and second train sections and a connecting frame part linked to the pair of frame parts and extending therebetween, a pair of running gears being vertically movably mounted in the connecting frame part for selective operative engagement with the track, and a pair of full tracks being mounted on the connecting frame part for selective operative engagement with the trackless intermediate section, the running gears being arranged between the full tracks on the connecting frame part in the direction of track elongation.
17. The apparatus of claim 16, wherein each frame part of the pair has an end portion pivotally coupled to be connecting frame part at a point in substantially vertical alignment with a respective one of the full tracks.
18. The apparatus of claim 7, wherein the intermediate train section means includes a pair of frame parts respectively linked to the first and second train sections and a connecting frame part linked to the pair of frame parts and extending therebetween, a running gear and a full track being mounted in each of the frame parts of the pair, each running gear being vertically movable for selective operative engagement with the track and the full tracks being mounted for operative engagement with the trackless intermediate section.
US74710A 1969-10-07 1970-09-23 Movable apparatus for replacing an old track by a new track Expired - Lifetime US3699894A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
AT945269A AT313341B (en) 1969-10-07 1969-10-07 Mobile device for the continuous replacement or renewal of a track

Publications (1)

Publication Number Publication Date
US3699894A true US3699894A (en) 1972-10-24

Family

ID=3614261

Family Applications (1)

Application Number Title Priority Date Filing Date
US74710A Expired - Lifetime US3699894A (en) 1969-10-07 1970-09-23 Movable apparatus for replacing an old track by a new track

Country Status (13)

Country Link
US (1) US3699894A (en)
JP (1) JPS557482B1 (en)
AT (1) AT313341B (en)
CA (1) CA919994A (en)
CH (1) CH525334A (en)
DE (2) DE2023931C2 (en)
ES (1) ES384306A1 (en)
FR (1) FR2061354A5 (en)
GB (1) GB1322544A (en)
SE (1) SE365563B (en)
SU (1) SU503542A3 (en)
YU (1) YU34597B (en)
ZA (1) ZA706192B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4000699A (en) * 1974-01-29 1977-01-04 Les Fils D'auguste Scheuchzer S.A. Apparatus for replacement of rail tracks
US4004524A (en) * 1974-07-11 1977-01-25 Les Fils D'auguste Scheuchzer S.A. Method of renewal of a railroad track and train therefor
US4046077A (en) * 1975-07-11 1977-09-06 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track renewal method and apparatus
US4094249A (en) * 1976-02-02 1978-06-13 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Apparatus for laying track
US4108076A (en) * 1975-11-10 1978-08-22 Fritz Knape Method for removing ballast from railroad tracks
US4152989A (en) * 1977-02-23 1979-05-08 Franz Plasser Bahnbaumaschinen-Industriegesellschaft, M.B.H. Mobile apparatus for continuously laying ties
US4160418A (en) * 1976-10-15 1979-07-10 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile apparatus for continuous track renewal
US4184431A (en) * 1976-07-27 1980-01-22 Canron, Inc. Track laying train
US4204476A (en) * 1977-04-22 1980-05-27 Matisa Materiel Industriel S.A. Mobile device for renewal of railway tracks
US4207820A (en) * 1977-04-22 1980-06-17 Matisa Materiel Industriel S.A. Mobile apparatus for the renewal and for the construction of railway tracks
US4236452A (en) * 1978-06-28 1980-12-02 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile apparatus for continuously renewing track
US4250812A (en) * 1979-10-11 1981-02-17 Loram Maintenance Of Way Undertrack fabric applicator
US4307667A (en) * 1978-04-19 1981-12-29 Les Fils D'auguste Scheuchzer, S.A. Railroad track relaying train
US4316416A (en) * 1978-09-13 1982-02-23 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile apparatus for replacing old track ties by new track ties
US4534296A (en) * 1983-04-29 1985-08-13 Southern Railway Company Rail gauger
US4611541A (en) * 1984-01-31 1986-09-16 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Ballast cleaning method and machine
US5528991A (en) * 1995-06-30 1996-06-25 Huber; Friedrich Apparatus and associated methods of laying track
US7350467B2 (en) 2004-08-20 2008-04-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
US20080163780A1 (en) * 2005-08-11 2008-07-10 Franz Plasser Bahnbaumaschinen -Industriegesellschaft M.B.H. Track renewal machine
US20090305925A1 (en) * 2008-06-04 2009-12-10 Williams Duncan E Utilization of an anhydride as a demulsifier and a solvent for demulsifier formulations
US20090306232A1 (en) * 2008-06-04 2009-12-10 Williams Duncan E Anhydride demulsifier formulations for resolving emulsions of water and oil
US20160194836A1 (en) * 2013-08-20 2016-07-07 Joerg Machine for renewal of sleepers and ballast under raised railway track

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT321971B (en) * 1972-05-02 1975-04-25 Plasser Bahnbaumasch Franz MOBILE DEVICE FOR REPLACEMENT OR RENEWING A TRACK CONSISTING OF RAILS AND SLEEPERS
AT353306B (en) * 1976-09-13 1979-11-12 Plasser Bahnbaumasch Franz SELF-PROPELLED BALL BED CLEANING MACHINE, IN PARTICULAR FOR THE AREA OF SWITCHES
AT351069B (en) * 1977-09-02 1979-07-10 Plasser Bahnbaumasch Franz MOBILE DEVICE FOR CONTINUOUS REPLACEMENT OR RENEWING A TRACK COMPOSED OF RAILS AND SLEEPERS
EP0056497A1 (en) * 1981-01-15 1982-07-28 Les Fils D'auguste Scheuchzer S.A. Frame wagon in a train for the subsoil stabilization of railway tracks
AT503118B1 (en) * 2006-06-27 2007-08-15 Plasser Bahnbaumasch Franz Track construction machine for track renewal, has machine frame supported on rail-mounted travel units, and two frame sections, between which sub-frame is arranged
AT505403B1 (en) * 2007-06-19 2009-01-15 Plasser Bahnbaumasch Franz MACHINE FOR RECEIVING AND STORING SMALL IRONS OF A TRACK AND PROCESS
DE102011111026A1 (en) * 2011-08-19 2013-02-21 K&K Maschinenentwicklungs GmbH & Co. KG Railway work vehicle has transport path that is provided below and/or above and/or adjacent to operating units, on which transport unit for objects or objects forming transport units is driven along vehicle in form of parceled goods
CA2836389C (en) 2011-05-16 2021-01-26 K & K Maschinenentwicklungs Gmbh & Co. Kg System, method and railway carriage for the rail-bound transportation of articles
AU2012257707B2 (en) 2011-05-16 2017-03-23 K & K Maschinenentwicklungs Gmbh & Co. Kg Railway work vehicle

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2997001A (en) * 1956-03-03 1961-08-22 Andre Scheuchzer Method of repairing railway tracks and an installation for carrying out the same
US3286648A (en) * 1963-08-30 1966-11-22 Brosnan Dennis William Rail renewal process
US3330219A (en) * 1963-09-23 1967-07-11 Plasser Franz Method and apparatus for replacing an old track by a new track
US3465687A (en) * 1966-11-18 1969-09-09 New York Central Railroad Co T Rail positioning system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1303502A (en) * 1961-07-07 1962-09-14 S E C O Improved machine for repairing railway tracks
AT273201B (en) * 1963-09-23 1969-08-11 Plasser Bahnbaumasch Franz Process and device for the renewal of a railway superstructure consisting of rails and cross-ties

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2997001A (en) * 1956-03-03 1961-08-22 Andre Scheuchzer Method of repairing railway tracks and an installation for carrying out the same
US3286648A (en) * 1963-08-30 1966-11-22 Brosnan Dennis William Rail renewal process
US3330219A (en) * 1963-09-23 1967-07-11 Plasser Franz Method and apparatus for replacing an old track by a new track
US3465687A (en) * 1966-11-18 1969-09-09 New York Central Railroad Co T Rail positioning system

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4000699A (en) * 1974-01-29 1977-01-04 Les Fils D'auguste Scheuchzer S.A. Apparatus for replacement of rail tracks
US4004524A (en) * 1974-07-11 1977-01-25 Les Fils D'auguste Scheuchzer S.A. Method of renewal of a railroad track and train therefor
US4046077A (en) * 1975-07-11 1977-09-06 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track renewal method and apparatus
US4108076A (en) * 1975-11-10 1978-08-22 Fritz Knape Method for removing ballast from railroad tracks
US4094249A (en) * 1976-02-02 1978-06-13 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Apparatus for laying track
US4184431A (en) * 1976-07-27 1980-01-22 Canron, Inc. Track laying train
US4160418A (en) * 1976-10-15 1979-07-10 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile apparatus for continuous track renewal
US4152989A (en) * 1977-02-23 1979-05-08 Franz Plasser Bahnbaumaschinen-Industriegesellschaft, M.B.H. Mobile apparatus for continuously laying ties
US4204476A (en) * 1977-04-22 1980-05-27 Matisa Materiel Industriel S.A. Mobile device for renewal of railway tracks
US4207820A (en) * 1977-04-22 1980-06-17 Matisa Materiel Industriel S.A. Mobile apparatus for the renewal and for the construction of railway tracks
US4307667A (en) * 1978-04-19 1981-12-29 Les Fils D'auguste Scheuchzer, S.A. Railroad track relaying train
US4236452A (en) * 1978-06-28 1980-12-02 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile apparatus for continuously renewing track
US4316416A (en) * 1978-09-13 1982-02-23 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Mobile apparatus for replacing old track ties by new track ties
US4250812A (en) * 1979-10-11 1981-02-17 Loram Maintenance Of Way Undertrack fabric applicator
US4534296A (en) * 1983-04-29 1985-08-13 Southern Railway Company Rail gauger
US4611541A (en) * 1984-01-31 1986-09-16 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Ballast cleaning method and machine
EP0751258A1 (en) * 1995-06-30 1997-01-02 Friedrich Huber Apparatus and associated methods of laying track
US5528991A (en) * 1995-06-30 1996-06-25 Huber; Friedrich Apparatus and associated methods of laying track
US7350467B2 (en) 2004-08-20 2008-04-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
US7895950B2 (en) 2004-08-20 2011-03-01 Loram Maintenance Of Way, Inc. Long rail pick-up and delivery system
US20080163780A1 (en) * 2005-08-11 2008-07-10 Franz Plasser Bahnbaumaschinen -Industriegesellschaft M.B.H. Track renewal machine
US7516702B2 (en) * 2005-08-11 2009-04-14 Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. Track renewal machine
US20090305925A1 (en) * 2008-06-04 2009-12-10 Williams Duncan E Utilization of an anhydride as a demulsifier and a solvent for demulsifier formulations
US20090306232A1 (en) * 2008-06-04 2009-12-10 Williams Duncan E Anhydride demulsifier formulations for resolving emulsions of water and oil
US20160194836A1 (en) * 2013-08-20 2016-07-07 Joerg Machine for renewal of sleepers and ballast under raised railway track
US9945079B2 (en) * 2013-08-20 2018-04-17 MATIS Material Industrial SA Machine for renewal of sleepers and ballast under raised railway track

Also Published As

Publication number Publication date
DE2023931A1 (en) 1971-04-22
DE2065989A1 (en) 1977-09-08
FR2061354A5 (en) 1971-06-18
ZA706192B (en) 1971-05-27
AT313341B (en) 1974-02-11
CH525334A (en) 1972-07-15
CA919994A (en) 1973-01-30
DE2023931C2 (en) 1983-06-01
ES384306A1 (en) 1973-03-01
GB1322544A (en) 1973-07-04
SE365563B (en) 1974-03-25
DE2065989B2 (en) 1978-11-02
JPS557482B1 (en) 1980-02-26
DE2065989C3 (en) 1979-06-28
YU195470A (en) 1979-04-30
YU34597B (en) 1979-10-31
SU503542A3 (en) 1976-02-15

Similar Documents

Publication Publication Date Title
US3699894A (en) Movable apparatus for replacing an old track by a new track
US3685456A (en) Method and apparatus for the continuous replacement of an old track by a new track
US4160418A (en) Mobile apparatus for continuous track renewal
CA2098351C (en) Machine for renewing or laying a railway track
US4236452A (en) Mobile apparatus for continuously renewing track
AU654383B2 (en) A method for renewing a track and a machine arrangement
US4534295A (en) Track tamping, leveling and lining operating unit
US4211170A (en) Mobile apparatus for the continuous replacement of an old track by a new track
AU643894B2 (en) Method and tamping machine for consolidating the ballast of a track
AU663238B2 (en) A tamping machine
US4207820A (en) Mobile apparatus for the renewal and for the construction of railway tracks
RU2013483C1 (en) Sleeper tamping and nipping machine
US3469534A (en) Mobile track liner and tamper
US3807310A (en) Movable apparatus for replacing an old track by a new track
JP3732289B2 (en) Machine that removes old tracks and lays new tracks
JPS6078002A (en) Runnable track correcting machine
JP2653701B2 (en) Track maintenance machine with track stabilization device
US6705232B2 (en) Machine for tamping ties of a track
RU2082847C1 (en) Sleeper padding machine and method of rail track padding
AU709022B2 (en) A machine for laying a track
CZ279245B6 (en) Machine for side shift of track and method of side shift of the track
JPS6168903A (en) Railroad train for renewing railroad track
US3722423A (en) Mobile ballast treating and rail fastening element engaging tool unit
US3472173A (en) Method and apparatus for the lateral alignment of railroad track
US4204476A (en) Mobile device for renewal of railway tracks