US20220106791A1 - Reinforced structural insulation panel with corner blocks - Google Patents

Reinforced structural insulation panel with corner blocks Download PDF

Info

Publication number
US20220106791A1
US20220106791A1 US17/551,045 US202117551045A US2022106791A1 US 20220106791 A1 US20220106791 A1 US 20220106791A1 US 202117551045 A US202117551045 A US 202117551045A US 2022106791 A1 US2022106791 A1 US 2022106791A1
Authority
US
United States
Prior art keywords
sip
core
corner block
corner
cementitious material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
US17/551,045
Inventor
Michael Anthony Dombowsky
Benedict John Dombowsky
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nexii Building Solutions Inc
Original Assignee
Nexii Building Solutions Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nexii Building Solutions Inc filed Critical Nexii Building Solutions Inc
Priority to US17/551,045 priority Critical patent/US20220106791A1/en
Publication of US20220106791A1 publication Critical patent/US20220106791A1/en
Assigned to HORIZON TECHNOLOGY FINANCE CORPORATION reassignment HORIZON TECHNOLOGY FINANCE CORPORATION SECURITY INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: NEXII BUILDING SOLUTIONS INC.
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/26Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
    • E04C2/284Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating
    • E04C2/296Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and non-metallic or unspecified sheet-material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/78Heat insulating elements
    • E04B1/80Heat insulating elements slab-shaped
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/26Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
    • E04C2/284Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating
    • E04C2/288Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and concrete, stone or stone-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/26Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups
    • E04C2/284Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating
    • E04C2/288Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and concrete, stone or stone-like material
    • E04C2/2885Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials composed of materials covered by two or more of groups E04C2/04, E04C2/08, E04C2/10 or of materials covered by one of these groups with a material not specified in one of the groups at least one of the materials being insulating composed of insulating material and concrete, stone or stone-like material with the insulating material being completely surrounded by, or embedded in, a stone-like material, e.g. the insulating material being discontinuous
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • E04C2/38Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels
    • E04C2/382Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure with attached ribs, flanges, or the like, e.g. framed panels with a frame of concrete or other stone-like substance
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • E04C2/42Gratings; Grid-like panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/44Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
    • E04C2/46Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose specially adapted for making walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/44Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
    • E04C2/52Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits
    • E04C2/526Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits with adaptations not otherwise provided for, for connecting, transport; for making impervious or hermetic, e.g. sealings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B2001/742Use of special materials; Materials having special structures or shape
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2002/001Mechanical features of panels
    • E04C2002/002Panels with integrated lifting means, e.g. with hoisting lugs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2002/001Mechanical features of panels
    • E04C2002/004Panels with profiled edges, e.g. stepped, serrated

Definitions

  • the present invention is related to a reinforced structural insulation panel (SIP). More specifically, it relates to a SIP with corner blocks that are enclosed in the SIP in order to improve the reinforcement, maneuverability and the modularity of the panel.
  • SIP reinforced structural insulation panel
  • the prefabrication of the structural insulation panel or SIP is a major improvement in the construction field.
  • the SIP is usually prepared and assembled off-site.
  • One type of SIP is usually made of several components, among them a central insulation core or block core made of expanded polystyrene foam (EPS), extruded polystyrene foam (XPS), polyisocyanurate foam, polyurethane foam or composite honeycomb (HSC) and two layers of structural skin or structural board that can be made of sheet metal, plywood, cement, magnesium oxide board or oriented strand board (OSB).
  • EPS expanded polystyrene foam
  • XPS extruded polystyrene foam
  • HSC polyurethane foam
  • HSC composite honeycomb
  • the composition of a SIP is chosen in order to impart to the SIP a light weight, good fire resistance, water resistance and strength.
  • the present invention is related to a SIP that has features for improving the reinforcement, maneuverability and the modularity of a basic SIP.
  • the SIP has a series of reinforcement components at each of its corners.
  • the SIP is reinforced with corner blocks placed at each corner and integrated with the SIP.
  • the corner blocks reinforce the corners while being embedded in the structure of the SIP.
  • the corners of SIPs are the parts of the SIP that are more susceptible to experience failure or weakening when the SIP is lifted or carried for transportation or around a construction site.
  • the corner blocks also act as a point of fixation where a hook can be mounted in order to lift the SIP.
  • the corner blocks enable the attachment of several reinforced SIPs to each other to form a modular wall.
  • the corner blocks may also facilitate the alignment of the SIPs in the wall.
  • the SIPs disclosed herein provide at least one of the advantages described in relation thereto.
  • a structural insulated panel comprising: a core made with one or blocks of insulation material, the core defined by two opposing faces connected by stepped edges; a layer of cementitious material bonded to each face of the core; a peripheral wall of cementitious material extending from one of said layers into a step of the stepped edges; rebar embedded in the peripheral wall; a corner block in a corner of the SIP, the corner block defining a hole that is accessible by a tool that lifts the SIP; and two reinforcement pins connected to and projecting from different adjacent faces of the corner block into different straight sections of the peripheral wall, wherein each reinforcement pin has a head with a diameter that is larger than a diameter of a shank of the reinforcement pin, each head being distal from the corner block.
  • a method of fabricating a structural insulated panel comprising: forming a core with one or more blocks of insulation material, the core defined by two opposing faces connected by stepped edges; connecting two reinforcement pins to a corner block so that they project from different adjacent faces of the corner block, wherein each reinforcement pin has a head with a diameter that is larger than a diameter of a shank of the reinforcement pin, each head being distal from the corner block, wherein the corner block defines a hole that is accessible by a tool that lifts the SIP; pouring a first layer of cementitious material into a form; placing the core on the first layer of cementitious material; positioning rebar in a step of the stepped edges; positioning the corner block with the connected reinforcement pins at a corner of the SIP; pouring cementitious material around the stepped edges, to form a peripheral wall of cementitious material extending from the first layer into a step of the stepped edges and to embed the rebar in different straight sections of the peripheral wall; pouring
  • FIG. 1 is a drawing representing an arrangement of a reinforced SIP from a perspective view, where a portion of the SIP is cutaway so as to view various layers of the SIP, according to an embodiment of the present invention.
  • FIG. 2 is a schematic drawing representing a reinforced SIP as seen from above, according to an embodiment of the present invention.
  • FIG. 3 is a schematic drawing representing a reinforced SIP as seen from the left side, according to an embodiment of the present invention.
  • FIG. 4 is a schematic drawing representing an insulating core as seen from above, according to an embodiment of the present invention.
  • FIG. 5 is a schematic drawing representing components of the SIP as seen from above, according to an embodiment of the present invention.
  • FIG. 6 is a schematic drawing representing an insulating core seen from underneath, according to an embodiment of the present invention.
  • FIG. 7 is a schematic view of a corner of the SIP connected to a hook, according to an embodiment of the present invention.
  • FIG. 8 is a schematic drawing representing a horizontal cross-section taken on line A-A of FIG. 1 , according to an embodiment of the present invention.
  • FIG. 9 is a flowchart describing the preparation of an insulating core and fiber mesh sheets, according to an embodiment of the present invention.
  • FIG. 10 is a flowchart describing the fabrication of a SIP, according to an embodiment of the present invention.
  • the SIP 10 is made of a central insulating block core 14 .
  • the insulating core 14 may be made of a thermally insulating material such as expanded polystyrene (EPS) or mineral fiber and covered on its upper surface by an upper cured cementitious layer 18 and underneath by a lower cured cementitious layer 22 .
  • the cured cementitious layers 18 , 22 may be concrete, for example.
  • the SIP 10 has a rectangular shape. In some embodiments, the SIP 10 has a different shape.
  • the SIP 10 has a corner block located at each corner, such as the corner block 26 located at the corner between the bottom side and right side of the upper level of the SIP 10 .
  • the corner block 26 has a cube shape with 4 closed faces and 2 open faces or apertures. Each closed face has a circular opening or hole 30 at the center of the face.
  • the number of holes in the corner block varies, the sizes of the holes vary, the positions of the holes vary, and the shapes of the holes vary.
  • the reference to, for example, the sides as left and right and the surfaces as top, bottom, upper or lower, interior or exterior is non-limiting and simply for convenient reference, as the SIP 10 can be oriented in a variety of ways depending on how it is used in the construction of a building. It is worth noting that the actual rectangular shape, the proportions and the dimensions of the SIP are simply an embodiment of the present invention and can be subjected to modification depending on the specificity of the SIP 10 .
  • the insulating core 14 has two levels: an upper level 34 and a lower level 38 .
  • the overall size of the upper level 34 is smaller than the overall size of the lower level 38 .
  • the two levels 34 and 38 are joined using glue, unless the levels are made from a single contiguous piece.
  • the difference in overall sizes between the two levels 34 and 38 defines a ledge 42 around the central part of the insulating core 14 .
  • the presence of the ledge 42 results in the insulating core 14 having stepped edges around its perimeter.
  • a rebar 46 is positioned over the ledge 42 on the bottom side of the SIP 10 .
  • the rebar is made of a carbon steel, stainless steel, glass fiber or carbon fiber in order to reinforce the cured cementitious 18 enclosing the rebar.
  • the position of the rebar 46 is maintained on the ledge 42 using a rebar holder 50 fixed onto the ledge.
  • Other rebar 54 is positioned in a channel 58 located in the middle, between the left and right ends of the insulating core 10 .
  • one or more rebar lengths are positioned inside the channel 58 .
  • the channel 58 extends from the top side to the opposing bottom side of the SIP 10 .
  • the channel 58 is located in the upper level 34 of the insulating core 14 .
  • the concrete layer 18 covers and fills the channel 58 , embedding the rebar 54 .
  • the SIP 10 is not reinforced in its middle section.
  • a fiber mesh sheet 62 such as fiberglass scrim or carbon fiber mesh is used to reinforce the upper concrete layer 18 .
  • a grid of grooves 70 is present on the exterior surface 66 of the insulating core 14 .
  • the exterior surface faces towards the outside of the building in which the SIP 10 is to be installed.
  • the lower cured cementitious layer 22 on the underneath of the SIP 10 is also reinforced by a fiber mesh sheet 74 .
  • the lower cured cementitious layer 22 partially enters into each groove 70 in order to define empty channels 78 between the exterior surface 66 of the insulating core 14 and the lower cured cementitious layer 22 .
  • This type of empty channel 78 facilitates moisture release from the cured cementitious material when the SIP 10 is in a humid environment.
  • the channels 78 act as a way of equalizing the pressure when the atmospheric pressure changes. As a result, the bonding between the cured cementitious layer 22 and the exterior surface 66 of the insulating core 14 is more resilient.
  • the SIP 10 is rectangular with a left side 94 , a right side 98 , a bottom side 102 and a top side 106 .
  • the interior surface 108 of the SIP is that of the upper cured cementitious layer 18 .
  • the interior surface 108 faces towards the inside of the building in which the SIP 10 is to be installed.
  • the SIP 10 has corner blocks positioned at each corner such as the corner block 26 located at the bottom right part of the SIP.
  • FIG. 3 there is shown the left side 94 of the SIP 10 .
  • the upper cured cementitious layer 18 of the SIP is in contact with the lower level 38 of the insulating core 14 .
  • the exterior surface 152 of the lower level 38 of the insulating core has a series of grooves 70 that are partially filled with the lower cured cementitious layer 22 underneath.
  • the lower cured cementitious layer 22 partially enters the grooves 70 to form empty channels 78 .
  • a corner block 168 with a circular hole 172 is disposed at each corner on the left side 94 of the SIP 10 .
  • the upper level 180 of the insulating core has a shape that has smaller dimensions than the lower level 184 .
  • the shape of the upper level 180 can be approximated to a truncated rectangle or an irregular octagon.
  • the corner face 188 located at one of the corners of the upper level 180 forms an angle ⁇ of 45° to the faces 192 , 196 adjacent to the top, right corner of the upper level. The same applies to the other corners.
  • two notches are positioned at the extremities of each corner face, for example, two notches 200 , 204 are present in the corner face 188 .
  • the geometry of the corners of the upper level 180 is different.
  • each corner block 224 has two reinforcement pins 228 , 236 (e.g. bolts with a hexagonal head), each fixed at one end to an inner-facing side face of the corner block.
  • the corner block 224 has a reinforcement pin 228 that is parallel to the edge of the right side 232 of the insulating core and oriented inward into the SIP away from the corner, and a second reinforcement pin 236 that is parallel to the top side 240 of the insulating core and oriented inward into the SIP away from the corner.
  • the role of the hexagonal heads 244 , 248 mounted at the other end of the reinforcement pins 228 , 236 is to maintain and reinforce the position of the corner block 224 when the cured cementitious layer covers the insulating core 220 and embeds the reinforcement pins.
  • the hexagonal heads 244 , 248 are replaced by other, differently shaped components that are used to provide a tensile mechanical joint with the cured cementitious material at the inner extremity of the reinforcement pins 228 , 236 .
  • the shank of the reinforcement pins 228 , 236 may be shaped to increase the surface area of the pins in contact with the cementitious material.
  • the heads 244 , 248 of the pins 228 , 236 are positioned inside, or partially inside, the two notches 249 , 250 of the corner face 252 .
  • the distance D between the corner block 224 and the corner face 252 of the upper level of the insulating core 220 should be sufficient to decrease the risk of cracking of the cured cementitious material when the corner block is subjected to normal loads or stress, subject to any required safety margins.
  • the distance D is greater than the thickness of the cured cementitious layers on the faces of the insulating core 14 .
  • the method of fixing the reinforcement pins 228 , 236 to the corner blocks 224 is different, for example, the reinforcement pins can be directly welded to the corner blocks.
  • the reinforcement pins and the corner blocks separately to the fabrication site are that they can be more closely packed for shipping.
  • the management of sheer forces in a bolted (“lock and key”) connection configuration rather than a welded configuration provides a greater allowance for seismic protection.
  • the overall composite structure and configuration of the SIP also contributes to seismic protection.
  • the rebar 272 , 273 , 274 , 275 located on the side ledges 260 , 264 , 266 , 268 of the insulating core 220 is held in position using rebar holders.
  • rebar 272 is held in place by two rebar holders 276 and 280 fixed on the ledge 260 close to the left side 232 of the insulating core 220 .
  • Rebar 272 is locked by means of two arms 284 located, for example, on the rebar holder 276 .
  • These rebar holders 276 , 280 raise the rebar 272 above the ledge 260 and thus eliminate the contact area between the rebar and the ledge 260 .
  • the rebar 272 becomes fully enclosed or embedded in the cured cementitious material. This optimizes the action of the rebar 272 on the reinforcement of the cementitious material, specifically the reinforcement of the side edges of the SIP.
  • the cementitious material that encloses the rebar is also reinforced with fibre mesh strips placed on the side ledges, either parallel to the upper surface of the ledges or parallel to the side face of the upper level 296 of the insulating core 220 .
  • This SIP 220 is also reinforced in its middle section by rebar 288 placed in a channel 292 .
  • a channel 292 is cut in the upper level 296 in order to host one or more lengths of rebar 288 .
  • the channel 292 connects the top-side ledge 268 to the bottom-side ledge 264 .
  • the depth of the channel 292 is chosen in such a way that the bottom surface of the channel is at the same level as the surface of the side ledges 264 and 268 .
  • the rebar 288 positioned in the central channel 292 is held in place using rebar holders in the same fashion as for the side rebar, 272 , 273 , 274 , 275 .
  • the corner block is made from a 4 inch (10 cm) length of hollow structural steel with a 4 inch (10 cm) square cross-section and 3 ⁇ 8 inch (9 mm) wall thickness.
  • an insulating core 300 as seen from underneath, presenting the grid of grooves 304 present on the exterior surface of the lower level 308 of the insulating core.
  • the upper level 312 of the insulating core does not have a grid of grooves 304 .
  • the pattern for the grid of grooves 304 differs in regards to the application of the SIP.
  • the depth of grooves 304 is less than about half of the thickness of the lower level 308 of the insulating core.
  • the grooves 304 are 0.75 inches (19 mm) deep and 0.5 inches (13 mm) wide, while the thickness of the lower level 308 is 1.5 inches (38 mm).
  • the depth of the grooves 304 that are parallel to the right and left side edges of the SIP and the depth of the grooves perpendicular to the top and bottom side edges of the insulating core are the same. In some embodiments, the depth of the grooves is different in regards to the SIP's specific application. Standoff devices such as standoff 316 are placed on the surface of the lower level 308 of the insulating core.
  • FIG. 7 there is shown an embodiment of a corner of a SIP 340 as shown from the side.
  • a hook 350 is mounted on the corner block 354 using a set screw 358 and a hex nut 362 .
  • the hook 350 is used to lift and move the SIP 340 .
  • the SIP 340 can be carried using a crane on a construction site.
  • FIG. 8 there is shown a cross section of an embodiment of the SIP 10 .
  • An upper cured cementitious layer 18 encloses a fiber mesh sheet 408 that covers and is spaced above the interior surface 412 of the upper level 34 of the insulating core and the ledges 416 and 420 formed by the interior surface 424 of the lower level 38 of insulating core.
  • the fiber mesh sheet 408 reinforces the upper cured cementitious layer 18 .
  • Standoffs 432 , 436 , 440 are positioned under the exterior surface 444 of the lower level 38 of the insulating core, and serve to maintain a uniform thickness of cementitious mix below the insulating core during its fabrication.
  • the standoffs 432 , 436 , 440 positioned on the insulating core also maintain the position of the fiber mesh sheet 448 so that it becomes embedded in the lower cured cementitious layer 22 during fabrication.
  • the fiber mesh sheet 448 reinforces the lower cured cementitious layer 22 .
  • the fiber mesh sheets 408 and 448 should not be in contact with the insulating core surface.
  • the fiber mesh sheets 408 , 448 are in contact with the surface of the insulating core, the upper and lower cured cementitious layers 18 and 22 will not be reinforced optimally. Moreover, the fiber mesh sheets 408 , 448 may hinder the adhesive bonds between the cured cementitious layers 18 , 22 and the surfaces 412 , 444 of the insulating core.
  • the rebar 456 , 460 is embedded in the thickened edges of cured cementitious layer 18 to the sides of the upper level 34 of the insulating core and above the ledges 416 , 420 formed by the side edges of the lower level 38 of the insulating core.
  • the thickened edges of cured cementitious material form a peripheral wall that extends from the upper cured cementitious layer 18 into the step formed by the ledges 416 , 420 , i.e. part way down the stepped edges of the block core.
  • the exterior surface 444 of the lower level of the insulating core has grooves such as the groove 70 .
  • Standoffs 432 , 436 , 440 are positioned on the exterior surface 444 of the insulating core between the grooves 70 .
  • the standoffs 432 , 436 , 440 keep the fiber mesh sheet 448 enclosed by the lower cementitious layer 38 during pouring of the cementitious mix.
  • step 500 a first EPS billet of the prescribed length and width is placed onto a hotwire machine table or hot wire CNC foam cutter in order to be sliced to a prescribed thickness.
  • a second EPS billet of the same length and width is then obtained and processed with a hot machine square to carve a grid of grooves on one of its surfaces in step 504 .
  • the two modified EPS billets are placed on an assembly table and glued together using a set of clamps in step 508 .
  • the glue is applied on each surface of the modified EPS billets to be joined.
  • the two modified EPS billets are allowed to sit with the glue for 2 minutes before being joined together to result in an EPS block core.
  • a weighted bar is used on the top of the EPS block core to apply pressure to the joint area.
  • a set of clamps is used to keep both EPS billets aligned with each other. The clamps are closed for a duration of 2 minutes.
  • the measurement of the fiber mesh sheet is made by superimposing the fiber mesh sheets over each surface of the EPS block core (interior and exterior surfaces).
  • the fiber mesh dimensions should correspond to the dimensions of the surface of the EPS block core.
  • the fiber mesh sheets are then cut to match the length and width of the EPS core in step 514 .
  • the EPS block core is then positioned flat, with the grooves underneath.
  • the upper level of the EPS block core is trimmed using a hot-knife tool to create surfaces for laying the rebar and the corner blocks.
  • step 550 the casting bed and the casting form are prepared in regards to the desired SIP dimensions.
  • the casting bed and the casting form are held in place using magnets.
  • supplementary frames for windows, doors or others elements that have to be incorporated in the SIP are placed inside the casting form.
  • the positioning of the supplementary frame inside the casting form is set and secured using a set of right angled blocks.
  • the casting bed is cleaned using a cleanser, a release agent or a mold release spray and a microfiber pad.
  • the release agent facilitates the detachment of the SIP from the casting form.
  • the release agent is sprayed using a handheld airless spray.
  • the bottom surface of the casting bed is wiped down using a microfiber pad on an extension pole or manually for the more confined areas of the surface.
  • the microfiber pad is used to provide a thorough cleaning process.
  • the internal edges of the casting form are sealed to each other and to the floor with caulking and left to cure for 20 minutes.
  • the first mix of cementitious slurry is prepared in a continuous mixer.
  • the cementitious slurry is mixed and poured into a rolling cart.
  • the cementitious slurry is left for 13 seconds in the rolling cart to achieve the desired consistency.
  • a compression test is made for testing the consistency of the cured cementitious material using three samples of cementitious material in a mold containing three cavities.
  • the slurry of cementitious material is then poured into a slurry pump in order to be poured later into the casting bed.
  • a slurry of cementitious material is poured via the slurry pump into the casting bed to create the exterior surface of the SIP in step 562 .
  • a gauge rake is used to spread the slurry of cementitious material on the bottom face of the casting bed to obtain an even distribution.
  • a leveling screed is passed over the casting form from end to end using the top of the form as a guide to confirm the correct thickness of the slurry of concrete.
  • the first fiber mesh sheet with standoffs fixed on the fiber mesh sheet, is placed over the cementitious slurry in the casting bed in step 566 .
  • the bases of the standoffs are oriented upwards to support the EPS block core.
  • the fiber mesh sheet is gently raked in using a porcupine rake.
  • the EPS block core is placed into the casting bed over the slurry of cementitious material in step 570 .
  • the EPS block core is gently pressed into the cementitious slurry with evenly applied pressure on each area of the EPS block core.
  • rebar is fixed on the side ledges of the EPS block core using rebar holders, and corner blocks are placed at each corner of the EPS block core in step 574 .
  • a dam is taped over each corner block in order to prevent any slurry from filling the interior of the corner blocks during the subsequent concrete pours.
  • a joint sealant and fire rated silicone is applied to the upper side edges of the EPS block core adjacent to the walls of the casting bed in step 578 .
  • a second slurry of cementitious material is then poured around the edges of the EPS block core in order to cover the rebar placed on the side ledges of the EPS block core in step 582 .
  • the second slurry is prepared specifically for thickening the edge of the SIP.
  • the slurry is then left to cure until it reaches the temperature of 24° C. or less.
  • a third slurry of cementitious material is poured over the EPS block core in order to create the interior surface of the SIP.
  • the slurry is spread evenly across the EPS block core and the thickened edges using a gauge rake.
  • the level of the third slurry comes up to a level a little above (e.g. 0.5 inches or 13 mm) the tops of the corner blocks.
  • the second fiber mesh sheet with corners cut out to match the corner blocks, is placed onto the slurry in step 590 .
  • the fiber mesh sheet is rolled into the slurry until the fiber mesh sheet is no longer visible and fully immersed in the slurry.
  • a leveling screed is used to ensure an even and smooth surface.
  • the SIP is then left to cure. Once a thin film has developed on the surface of the SIP, a mist of water is sprayed on the surface of the cementitious material. The surface is kept wet for at least 3 hours after the final pouring step.
  • the SIP is then lifted from the casting bed using lifting brackets fixed to the corner blocks and a crane.
  • the SIP is placed on a rolling cart in order to be moved to a finishing area where the SIP is ground and polished.
  • the SIP is ground in step 594 .
  • the SIP edges are first ground using a low speed grinder to remove the curled-up edge created during the casting process. The edges have to be flat and as even as the rest of the SIP. Any sharp corners are rounded off until they are smooth using a hand pad. Then, the entire surface of the SIP is spread with water to dampen it but not to soak it. Immediately after, GM3000TM solution is applied and spread with a fine bristle broom. The surface of the SIP with GM3000TM solution is then ground using an 18′′ grinding machine with 7′′ metal/diamond segments to create a slurry that fills any surface pinholes. Once the entire surface has been ground with the slurry, it is left to cure for a minimum of 1 hour.
  • step 598 the SIP is polished in step 598 .
  • a HEPA (high-efficiency particle air) vacuum is used to polish the entire surface of the SIP using a grinder with an intermediate 100-grit pad T63 until the surface has a smooth polished finish.
  • a 200-grit resin FP44TM diamond pad mounted on the grinder is used to remove any swirl marks created by the previous treatment, to reveal a lightly matte finish that is ready for paint or any other preferred coating.
  • the insulating core or EPS block core is replaced by a mineral fiber block core.
  • the mineral fiber block core is cut to size a similar way to the EPS block core.
  • the inner layer of the mineral fiber block core is in two pieces so that rebar can be included between the two pieces.
  • the fiber mesh sheet is pre-cut to cover the mineral fiber block core when placed inside the casting form.
  • the first slurry of cementitious material is poured and the fiber mesh sheet is placed in the slurry.
  • the lower mineral fiber block core is then placed over the first slurry in the casting form.
  • the two pieces of upper mineral fiber block are then placed on the lower block forming a central channel to receive rebar and rebar holders.
  • pre-cut wooden blocks are placed alongside the block core to maintain the space between the walls of the casting form and the block core. This space is further used to reinforce the edges of the SIP by means of rebar embedded in the cementitious material, held in position with rebar holders.
  • Strips of fiber mesh sheet are placed around the edges of the block core to be embedded by the thickened peripheral wall formed by the second slurry of cementitious material.
  • a grid of grooves may be cut in the mineral fiber block.
  • the hook on the corner block can be replaced by a device that facilitates the attachment of adjacent SIPs to form the wall of a building.

Abstract

A structural insulation panel (SIP) is made of a central insulation material or block core covered with cementitious material. The layers of cementitious material are reinforced with fiber mesh sheets, rebar and corner blocks. The corner blocks are held in thickened cementitious material edges by reinforcement pins that are fixed to the corner blocks. The corner blocks are accessible for lifting the panel and for assembling multiple panels to build a wall.

Description

    CROSS-REFERENCE TO RELATED APPLICATIONS
  • This application is a continuation of U.S. patent application Ser. No. 16/442,292 filed 14 Jun. 2019 and titled REINFORCED STRUCTURAL INSULATION PANEL WITH CORNER BLOCKS which is hereby incorporated by reference in its entirety for all purposes.
  • TECHNICAL FIELD
  • The present invention is related to a reinforced structural insulation panel (SIP). More specifically, it relates to a SIP with corner blocks that are enclosed in the SIP in order to improve the reinforcement, maneuverability and the modularity of the panel.
  • BACKGROUND
  • The prefabrication of the structural insulation panel or SIP is a major improvement in the construction field. The SIP is usually prepared and assembled off-site. One type of SIP is usually made of several components, among them a central insulation core or block core made of expanded polystyrene foam (EPS), extruded polystyrene foam (XPS), polyisocyanurate foam, polyurethane foam or composite honeycomb (HSC) and two layers of structural skin or structural board that can be made of sheet metal, plywood, cement, magnesium oxide board or oriented strand board (OSB). The composition of a SIP is chosen in order to impart to the SIP a light weight, good fire resistance, water resistance and strength.
  • Preparing the SIP in a factory instead of on-site minimizes the cost of production of the SIP. In the meantime, the quality control of each produced SIP is improved because the influence of external parameters, such as the construction site, the weather and the construction workers, is minimized.
  • This background is not intended, nor should be construed, to constitute prior art against the present invention.
  • SUMMARY OF INVENTION
  • The present invention is related to a SIP that has features for improving the reinforcement, maneuverability and the modularity of a basic SIP. The SIP has a series of reinforcement components at each of its corners. In particular, the SIP is reinforced with corner blocks placed at each corner and integrated with the SIP. The corner blocks reinforce the corners while being embedded in the structure of the SIP.
  • The corners of SIPs, in general, are the parts of the SIP that are more susceptible to experience failure or weakening when the SIP is lifted or carried for transportation or around a construction site. The corner blocks also act as a point of fixation where a hook can be mounted in order to lift the SIP. In addition to their reinforcement role, the corner blocks enable the attachment of several reinforced SIPs to each other to form a modular wall. The corner blocks may also facilitate the alignment of the SIPs in the wall. Depending on the embodiment, the SIPs disclosed herein provide at least one of the advantages described in relation thereto.
  • Disclosed herein is a structural insulated panel (SIP) comprising: a core made with one or blocks of insulation material, the core defined by two opposing faces connected by stepped edges; a layer of cementitious material bonded to each face of the core; a peripheral wall of cementitious material extending from one of said layers into a step of the stepped edges; rebar embedded in the peripheral wall; a corner block in a corner of the SIP, the corner block defining a hole that is accessible by a tool that lifts the SIP; and two reinforcement pins connected to and projecting from different adjacent faces of the corner block into different straight sections of the peripheral wall, wherein each reinforcement pin has a head with a diameter that is larger than a diameter of a shank of the reinforcement pin, each head being distal from the corner block.
  • Also disclosed is a method of fabricating a structural insulated panel (SIP) comprising: forming a core with one or more blocks of insulation material, the core defined by two opposing faces connected by stepped edges; connecting two reinforcement pins to a corner block so that they project from different adjacent faces of the corner block, wherein each reinforcement pin has a head with a diameter that is larger than a diameter of a shank of the reinforcement pin, each head being distal from the corner block, wherein the corner block defines a hole that is accessible by a tool that lifts the SIP; pouring a first layer of cementitious material into a form; placing the core on the first layer of cementitious material; positioning rebar in a step of the stepped edges; positioning the corner block with the connected reinforcement pins at a corner of the SIP; pouring cementitious material around the stepped edges, to form a peripheral wall of cementitious material extending from the first layer into a step of the stepped edges and to embed the rebar in different straight sections of the peripheral wall; pouring a second layer of cementitious material over the core; and allowing the cementitious material to cure and bond to the faces of the core.
  • BRIEF DESCRIPTION OF THE DRAWINGS
  • The following drawings illustrate embodiments of the invention, which should not be construed as restricting the scope of the invention in any way.
  • FIG. 1 is a drawing representing an arrangement of a reinforced SIP from a perspective view, where a portion of the SIP is cutaway so as to view various layers of the SIP, according to an embodiment of the present invention.
  • FIG. 2 is a schematic drawing representing a reinforced SIP as seen from above, according to an embodiment of the present invention.
  • FIG. 3 is a schematic drawing representing a reinforced SIP as seen from the left side, according to an embodiment of the present invention.
  • FIG. 4 is a schematic drawing representing an insulating core as seen from above, according to an embodiment of the present invention.
  • FIG. 5 is a schematic drawing representing components of the SIP as seen from above, according to an embodiment of the present invention.
  • FIG. 6 is a schematic drawing representing an insulating core seen from underneath, according to an embodiment of the present invention.
  • FIG. 7 is a schematic view of a corner of the SIP connected to a hook, according to an embodiment of the present invention.
  • FIG. 8 is a schematic drawing representing a horizontal cross-section taken on line A-A of FIG. 1, according to an embodiment of the present invention.
  • FIG. 9 is a flowchart describing the preparation of an insulating core and fiber mesh sheets, according to an embodiment of the present invention.
  • FIG. 10 is a flowchart describing the fabrication of a SIP, according to an embodiment of the present invention.
  • DESCRIPTION A. Glossary
  • EPS—Expanded polystyrene.
  • SIP—Structural insulation panel.
  • B. Exemplary Apparatus
  • Referring to FIG. 1, there is shown an embodiment of a reinforced SIP 10. The SIP 10 is made of a central insulating block core 14. The insulating core 14 may be made of a thermally insulating material such as expanded polystyrene (EPS) or mineral fiber and covered on its upper surface by an upper cured cementitious layer 18 and underneath by a lower cured cementitious layer 22. The cured cementitious layers 18, 22 may be concrete, for example. The SIP 10 has a rectangular shape. In some embodiments, the SIP 10 has a different shape. The SIP 10 has a corner block located at each corner, such as the corner block 26 located at the corner between the bottom side and right side of the upper level of the SIP 10. The corner block 26 has a cube shape with 4 closed faces and 2 open faces or apertures. Each closed face has a circular opening or hole 30 at the center of the face. In other embodiments, the number of holes in the corner block varies, the sizes of the holes vary, the positions of the holes vary, and the shapes of the holes vary.
  • The reference to, for example, the sides as left and right and the surfaces as top, bottom, upper or lower, interior or exterior is non-limiting and simply for convenient reference, as the SIP 10 can be oriented in a variety of ways depending on how it is used in the construction of a building. It is worth noting that the actual rectangular shape, the proportions and the dimensions of the SIP are simply an embodiment of the present invention and can be subjected to modification depending on the specificity of the SIP 10.
  • The insulating core 14 has two levels: an upper level 34 and a lower level 38. The overall size of the upper level 34 is smaller than the overall size of the lower level 38. The two levels 34 and 38 are joined using glue, unless the levels are made from a single contiguous piece. The difference in overall sizes between the two levels 34 and 38 defines a ledge 42 around the central part of the insulating core 14. The presence of the ledge 42 results in the insulating core 14 having stepped edges around its perimeter. A rebar 46 is positioned over the ledge 42 on the bottom side of the SIP 10. In some embodiments, the rebar is made of a carbon steel, stainless steel, glass fiber or carbon fiber in order to reinforce the cured cementitious 18 enclosing the rebar. The position of the rebar 46 is maintained on the ledge 42 using a rebar holder 50 fixed onto the ledge.
  • Other rebar 54 is positioned in a channel 58 located in the middle, between the left and right ends of the insulating core 10. In some embodiments, one or more rebar lengths are positioned inside the channel 58. The channel 58 extends from the top side to the opposing bottom side of the SIP 10. The channel 58 is located in the upper level 34 of the insulating core 14. The concrete layer 18 covers and fills the channel 58, embedding the rebar 54. In some embodiments, the SIP 10 is not reinforced in its middle section.
  • A fiber mesh sheet 62 such as fiberglass scrim or carbon fiber mesh is used to reinforce the upper concrete layer 18.
  • Underneath, on the exterior surface 66 of the insulating core 14, a grid of grooves 70 is present. The exterior surface faces towards the outside of the building in which the SIP 10 is to be installed. The lower cured cementitious layer 22 on the underneath of the SIP 10 is also reinforced by a fiber mesh sheet 74. The lower cured cementitious layer 22 partially enters into each groove 70 in order to define empty channels 78 between the exterior surface 66 of the insulating core 14 and the lower cured cementitious layer 22. This type of empty channel 78 facilitates moisture release from the cured cementitious material when the SIP 10 is in a humid environment. In addition, the channels 78 act as a way of equalizing the pressure when the atmospheric pressure changes. As a result, the bonding between the cured cementitious layer 22 and the exterior surface 66 of the insulating core 14 is more resilient.
  • Referring to FIG. 2, there is shown the SIP 10 as seen from above. The SIP 10 is rectangular with a left side 94, a right side 98, a bottom side 102 and a top side 106. The interior surface 108 of the SIP is that of the upper cured cementitious layer 18. The interior surface 108 faces towards the inside of the building in which the SIP 10 is to be installed. The SIP 10 has corner blocks positioned at each corner such as the corner block 26 located at the bottom right part of the SIP.
  • Referring to FIG. 3, there is shown the left side 94 of the SIP 10. The upper cured cementitious layer 18 of the SIP is in contact with the lower level 38 of the insulating core 14. The exterior surface 152 of the lower level 38 of the insulating core has a series of grooves 70 that are partially filled with the lower cured cementitious layer 22 underneath. The lower cured cementitious layer 22 partially enters the grooves 70 to form empty channels 78. A corner block 168 with a circular hole 172 is disposed at each corner on the left side 94 of the SIP 10.
  • Referring to FIG. 4, there is shown an exemplary embodiment of the insulating core 175 as seen from above. The upper level 180 of the insulating core has a shape that has smaller dimensions than the lower level 184. The shape of the upper level 180 can be approximated to a truncated rectangle or an irregular octagon. The corner face 188 located at one of the corners of the upper level 180 forms an angle α of 45° to the faces 192, 196 adjacent to the top, right corner of the upper level. The same applies to the other corners. In addition, two notches are positioned at the extremities of each corner face, for example, two notches 200, 204 are present in the corner face 188. In some embodiments, the geometry of the corners of the upper level 180 is different.
  • Referring to FIG. 5, there is shown another exemplary embodiment of the insulating core 220 with corner blocks 224 disposed at each corner of the insulating core and rebar (e.g. 272) disposed along the side ledges (e.g. 260) of the block core. The rebar 272 can be considered to be in the step of the stepped edges of the block core. Each corner block 224 has two reinforcement pins 228, 236 (e.g. bolts with a hexagonal head), each fixed at one end to an inner-facing side face of the corner block. As an example, the corner block 224 has a reinforcement pin 228 that is parallel to the edge of the right side 232 of the insulating core and oriented inward into the SIP away from the corner, and a second reinforcement pin 236 that is parallel to the top side 240 of the insulating core and oriented inward into the SIP away from the corner.
  • The role of the hexagonal heads 244, 248 mounted at the other end of the reinforcement pins 228, 236 is to maintain and reinforce the position of the corner block 224 when the cured cementitious layer covers the insulating core 220 and embeds the reinforcement pins. In some embodiments, the hexagonal heads 244, 248 are replaced by other, differently shaped components that are used to provide a tensile mechanical joint with the cured cementitious material at the inner extremity of the reinforcement pins 228, 236. Also, the shank of the reinforcement pins 228, 236 may be shaped to increase the surface area of the pins in contact with the cementitious material. The heads 244, 248 of the pins 228, 236 are positioned inside, or partially inside, the two notches 249, 250 of the corner face 252. The distance D between the corner block 224 and the corner face 252 of the upper level of the insulating core 220 should be sufficient to decrease the risk of cracking of the cured cementitious material when the corner block is subjected to normal loads or stress, subject to any required safety margins. For example the distance D is greater than the thickness of the cured cementitious layers on the faces of the insulating core 14.
  • In some embodiments, the method of fixing the reinforcement pins 228, 236 to the corner blocks 224 is different, for example, the reinforcement pins can be directly welded to the corner blocks. However, one advantage of providing the reinforcement pins and the corner blocks separately to the fabrication site is that they can be more closely packed for shipping. Furthermore, the management of sheer forces in a bolted (“lock and key”) connection configuration rather than a welded configuration provides a greater allowance for seismic protection. The overall composite structure and configuration of the SIP also contributes to seismic protection.
  • The rebar 272, 273, 274, 275 located on the side ledges 260, 264, 266, 268 of the insulating core 220 is held in position using rebar holders. For example, rebar 272 is held in place by two rebar holders 276 and 280 fixed on the ledge 260 close to the left side 232 of the insulating core 220. Rebar 272 is locked by means of two arms 284 located, for example, on the rebar holder 276. These rebar holders 276, 280 raise the rebar 272 above the ledge 260 and thus eliminate the contact area between the rebar and the ledge 260. Therefore, when the cementitious mix is poured over the ledge 260 of the left side 232, the rebar 272 becomes fully enclosed or embedded in the cured cementitious material. This optimizes the action of the rebar 272 on the reinforcement of the cementitious material, specifically the reinforcement of the side edges of the SIP. In addition, the cementitious material that encloses the rebar is also reinforced with fibre mesh strips placed on the side ledges, either parallel to the upper surface of the ledges or parallel to the side face of the upper level 296 of the insulating core 220.
  • This SIP 220 is also reinforced in its middle section by rebar 288 placed in a channel 292. For this reason, a channel 292 is cut in the upper level 296 in order to host one or more lengths of rebar 288. The channel 292 connects the top-side ledge 268 to the bottom-side ledge 264. The depth of the channel 292 is chosen in such a way that the bottom surface of the channel is at the same level as the surface of the side ledges 264 and 268. The rebar 288 positioned in the central channel 292 is held in place using rebar holders in the same fashion as for the side rebar, 272, 273, 274, 275.
  • As an example only, the corner block is made from a 4 inch (10 cm) length of hollow structural steel with a 4 inch (10 cm) square cross-section and ⅜ inch (9 mm) wall thickness.
  • Referring to FIG. 6, there is shown an insulating core 300 as seen from underneath, presenting the grid of grooves 304 present on the exterior surface of the lower level 308 of the insulating core. The upper level 312 of the insulating core does not have a grid of grooves 304. In some embodiments, the pattern for the grid of grooves 304 differs in regards to the application of the SIP. The depth of grooves 304 is less than about half of the thickness of the lower level 308 of the insulating core. For example, the grooves 304 are 0.75 inches (19 mm) deep and 0.5 inches (13 mm) wide, while the thickness of the lower level 308 is 1.5 inches (38 mm). The depth of the grooves 304 that are parallel to the right and left side edges of the SIP and the depth of the grooves perpendicular to the top and bottom side edges of the insulating core are the same. In some embodiments, the depth of the grooves is different in regards to the SIP's specific application. Standoff devices such as standoff 316 are placed on the surface of the lower level 308 of the insulating core.
  • Referring to FIG. 7, there is shown an embodiment of a corner of a SIP 340 as shown from the side. In this embodiment, a hook 350 is mounted on the corner block 354 using a set screw 358 and a hex nut 362. The hook 350 is used to lift and move the SIP 340. For example, the SIP 340 can be carried using a crane on a construction site.
  • Referring to FIG. 8, there is shown a cross section of an embodiment of the SIP 10. An upper cured cementitious layer 18 encloses a fiber mesh sheet 408 that covers and is spaced above the interior surface 412 of the upper level 34 of the insulating core and the ledges 416 and 420 formed by the interior surface 424 of the lower level 38 of insulating core. The fiber mesh sheet 408 reinforces the upper cured cementitious layer 18.
  • Standoffs 432, 436, 440 are positioned under the exterior surface 444 of the lower level 38 of the insulating core, and serve to maintain a uniform thickness of cementitious mix below the insulating core during its fabrication. The standoffs 432, 436, 440 positioned on the insulating core also maintain the position of the fiber mesh sheet 448 so that it becomes embedded in the lower cured cementitious layer 22 during fabrication. The fiber mesh sheet 448 reinforces the lower cured cementitious layer 22. The fiber mesh sheets 408 and 448 should not be in contact with the insulating core surface. If the fiber mesh sheets 408, 448 are in contact with the surface of the insulating core, the upper and lower cured cementitious layers 18 and 22 will not be reinforced optimally. Moreover, the fiber mesh sheets 408, 448 may hinder the adhesive bonds between the cured cementitious layers 18, 22 and the surfaces 412, 444 of the insulating core.
  • The rebar 456, 460 is embedded in the thickened edges of cured cementitious layer 18 to the sides of the upper level 34 of the insulating core and above the ledges 416, 420 formed by the side edges of the lower level 38 of the insulating core. The thickened edges of cured cementitious material form a peripheral wall that extends from the upper cured cementitious layer 18 into the step formed by the ledges 416, 420, i.e. part way down the stepped edges of the block core.
  • The exterior surface 444 of the lower level of the insulating core has grooves such as the groove 70. Standoffs 432, 436, 440 are positioned on the exterior surface 444 of the insulating core between the grooves 70. The standoffs 432, 436, 440 keep the fiber mesh sheet 448 enclosed by the lower cementitious layer 38 during pouring of the cementitious mix. When the insulating core is placed on the freshly poured lower cementitious layer 22, the cementitious material enters partway into the grooves 70 of the exterior surface of the insulating core in order to form empty channels 78.
  • C. Exemplary Method
  • Referring to FIG. 9, there is shown an exemplary method for the preparation of an insulating core and fiber mesh sheets. In step 500, a first EPS billet of the prescribed length and width is placed onto a hotwire machine table or hot wire CNC foam cutter in order to be sliced to a prescribed thickness. A second EPS billet of the same length and width is then obtained and processed with a hot machine square to carve a grid of grooves on one of its surfaces in step 504.
  • After that, the two modified EPS billets are placed on an assembly table and glued together using a set of clamps in step 508. First, the glue is applied on each surface of the modified EPS billets to be joined. Then, the two modified EPS billets are allowed to sit with the glue for 2 minutes before being joined together to result in an EPS block core. A weighted bar is used on the top of the EPS block core to apply pressure to the joint area. In addition, a set of clamps is used to keep both EPS billets aligned with each other. The clamps are closed for a duration of 2 minutes.
  • Then in step 512, the measurement of the fiber mesh sheet is made by superimposing the fiber mesh sheets over each surface of the EPS block core (interior and exterior surfaces). The fiber mesh dimensions should correspond to the dimensions of the surface of the EPS block core.
  • The fiber mesh sheets are then cut to match the length and width of the EPS core in step 514.
  • The EPS block core is then positioned flat, with the grooves underneath. In step 516, the upper level of the EPS block core is trimmed using a hot-knife tool to create surfaces for laying the rebar and the corner blocks.
  • After that, the EPS block core is inverted so that the grooves are on top. The standoffs are placed onto the grooved surface of the EPS block core in step 520. The standoffs are more specifically placed at the center of squares defined by four interconnected grooves. Placement of the standoffs on the EPS block core is for positioning purposes. The outer fiber mesh is then aligned with the EPS block core while being placed onto the standoffs, at which point the mesh is then attached to the standoffs. The mesh, with attached standoffs is then removed.
  • Referring to FIG. 10, there is shown an embodiment of the preparation of a SIP. In step 550, the casting bed and the casting form are prepared in regards to the desired SIP dimensions. The casting bed and the casting form are held in place using magnets. Optionally, supplementary frames for windows, doors or others elements that have to be incorporated in the SIP are placed inside the casting form. The positioning of the supplementary frame inside the casting form is set and secured using a set of right angled blocks.
  • After that, in step 554, the casting bed is cleaned using a cleanser, a release agent or a mold release spray and a microfiber pad. The release agent facilitates the detachment of the SIP from the casting form. The release agent is sprayed using a handheld airless spray. The bottom surface of the casting bed is wiped down using a microfiber pad on an extension pole or manually for the more confined areas of the surface. The microfiber pad is used to provide a thorough cleaning process. In addition to the cleaning step, the internal edges of the casting form are sealed to each other and to the floor with caulking and left to cure for 20 minutes.
  • During the cleaning step, the first mix of cementitious slurry is prepared in a continuous mixer. The cementitious slurry is mixed and poured into a rolling cart. The cementitious slurry is left for 13 seconds in the rolling cart to achieve the desired consistency. A compression test is made for testing the consistency of the cured cementitious material using three samples of cementitious material in a mold containing three cavities. The slurry of cementitious material is then poured into a slurry pump in order to be poured later into the casting bed.
  • In the meantime, in step 556, an EPS block core is prepared as explained in relation to FIG. 9.
  • After that, a slurry of cementitious material is poured via the slurry pump into the casting bed to create the exterior surface of the SIP in step 562. A gauge rake is used to spread the slurry of cementitious material on the bottom face of the casting bed to obtain an even distribution. A leveling screed is passed over the casting form from end to end using the top of the form as a guide to confirm the correct thickness of the slurry of concrete.
  • The first fiber mesh sheet, with standoffs fixed on the fiber mesh sheet, is placed over the cementitious slurry in the casting bed in step 566. The bases of the standoffs are oriented upwards to support the EPS block core. The fiber mesh sheet is gently raked in using a porcupine rake.
  • Then the EPS block core is placed into the casting bed over the slurry of cementitious material in step 570. The EPS block core is gently pressed into the cementitious slurry with evenly applied pressure on each area of the EPS block core. When the EPS block core is in position, rebar is fixed on the side ledges of the EPS block core using rebar holders, and corner blocks are placed at each corner of the EPS block core in step 574. A dam is taped over each corner block in order to prevent any slurry from filling the interior of the corner blocks during the subsequent concrete pours. If necessary, a joint sealant and fire rated silicone is applied to the upper side edges of the EPS block core adjacent to the walls of the casting bed in step 578.
  • A second slurry of cementitious material is then poured around the edges of the EPS block core in order to cover the rebar placed on the side ledges of the EPS block core in step 582. The second slurry is prepared specifically for thickening the edge of the SIP. The slurry is then left to cure until it reaches the temperature of 24° C. or less.
  • Then in step 586, a third slurry of cementitious material is poured over the EPS block core in order to create the interior surface of the SIP. The slurry is spread evenly across the EPS block core and the thickened edges using a gauge rake. The level of the third slurry comes up to a level a little above (e.g. 0.5 inches or 13 mm) the tops of the corner blocks. After that, the second fiber mesh sheet, with corners cut out to match the corner blocks, is placed onto the slurry in step 590. The fiber mesh sheet is rolled into the slurry until the fiber mesh sheet is no longer visible and fully immersed in the slurry. A leveling screed is used to ensure an even and smooth surface. Then the SIP is then left to cure. Once a thin film has developed on the surface of the SIP, a mist of water is sprayed on the surface of the cementitious material. The surface is kept wet for at least 3 hours after the final pouring step.
  • The SIP is then lifted from the casting bed using lifting brackets fixed to the corner blocks and a crane. The SIP is placed on a rolling cart in order to be moved to a finishing area where the SIP is ground and polished.
  • The SIP is ground in step 594. The SIP edges are first ground using a low speed grinder to remove the curled-up edge created during the casting process. The edges have to be flat and as even as the rest of the SIP. Any sharp corners are rounded off until they are smooth using a hand pad. Then, the entire surface of the SIP is spread with water to dampen it but not to soak it. Immediately after, GM3000™ solution is applied and spread with a fine bristle broom. The surface of the SIP with GM3000™ solution is then ground using an 18″ grinding machine with 7″ metal/diamond segments to create a slurry that fills any surface pinholes. Once the entire surface has been ground with the slurry, it is left to cure for a minimum of 1 hour.
  • Then the SIP is polished in step 598. A HEPA (high-efficiency particle air) vacuum is used to polish the entire surface of the SIP using a grinder with an intermediate 100-grit pad T63 until the surface has a smooth polished finish. After that, a 200-grit resin FP44™ diamond pad mounted on the grinder is used to remove any swirl marks created by the previous treatment, to reveal a lightly matte finish that is ready for paint or any other preferred coating.
  • D. Variations
  • In some embodiments, the insulating core or EPS block core is replaced by a mineral fiber block core. The mineral fiber block core is cut to size a similar way to the EPS block core. However, in this example, the inner layer of the mineral fiber block core is in two pieces so that rebar can be included between the two pieces. The fiber mesh sheet is pre-cut to cover the mineral fiber block core when placed inside the casting form.
  • After the preparation of the casting form, the first slurry of cementitious material is poured and the fiber mesh sheet is placed in the slurry. The lower mineral fiber block core is then placed over the first slurry in the casting form. The two pieces of upper mineral fiber block are then placed on the lower block forming a central channel to receive rebar and rebar holders. When the upper mineral fiber block cores are placed inside the casting form, pre-cut wooden blocks are placed alongside the block core to maintain the space between the walls of the casting form and the block core. This space is further used to reinforce the edges of the SIP by means of rebar embedded in the cementitious material, held in position with rebar holders.
  • Strips of fiber mesh sheet are placed around the edges of the block core to be embedded by the thickened peripheral wall formed by the second slurry of cementitious material.
  • In some embodiments, a grid of grooves may be cut in the mineral fiber block.
  • The hook on the corner block can be replaced by a device that facilitates the attachment of adjacent SIPs to form the wall of a building.
  • In general, unless otherwise indicated, singular elements may be in the plural and vice versa with no loss of generality.
  • Throughout the description, specific details have been set forth in order to provide a more thorough understanding of the invention. However, the invention may be practiced without these particulars. In other instances, well known elements have not been shown or described in detail and repetitions of steps and features have been omitted to avoid unnecessarily obscuring the invention. Accordingly, the specification is to be regarded in an illustrative, rather than a restrictive, sense.
  • It will be clear to one having skill in the art that further variations to the specific details disclosed herein can be made, resulting in other embodiments that are within the scope of the invention disclosed. Two or more steps in the flowcharts may be performed in a different order, other steps may be added, or one or more may be removed without altering the main function of the invention. Flowcharts from different figures may be combined in different ways. All parameters, dimensions, materials, and configurations described herein are examples only and actual ones of such depend on the specific embodiment. Accordingly, the scope of the invention is to be construed in accordance with the substance defined by the following claims.

Claims (19)

1. A structural insulated panel (SIP) comprising:
a core made with one or more blocks of insulation material, the core defined by two opposing faces connected by stepped edges;
a layer of cementitious material bonded to each face of the core;
a peripheral wall of cementitious material extending from one of said layers into a step of the stepped edges;
rebar embedded in the peripheral wall;
a corner block in a corner of the SIP, the corner block defining a hole that is accessible by a tool that lifts the SIP; and
two reinforcement pins connected to and projecting from different adjacent faces of the corner block into different straight sections of the peripheral wall, wherein each reinforcement pin has a head with a diameter that is larger than a diameter of a shank of the reinforcement pin, each head being distal from the corner block.
2. The SIP of claim 1, wherein the reinforcement pins are hex bolts that are screwed into further, threaded holes in the corner block.
3. The SIP of claim 1, wherein the core is made of expanded polystyrene.
4. The SIP of claim 1, wherein the core is made of mineral fiber block.
5. The SIP of claim 1, wherein the layers of cementitious material are reinforced with fiber mesh sheets.
6. The SIP of claim 1, wherein the rebar is positioned in the step via rebar holders.
7. The SIP of claim 1, wherein the core has an upper level and a lower level wherein the upper level has a smaller surface area than a surface area of the lower level.
8. The SIP of claim 7, wherein the upper level of the core is a truncated rectangular prism, the truncated rectangular cross-section thereof having had its rectangular corners each truncated to form a corner face with two notches.
9. The SIP of claim 8, wherein the corner faces form a 45° angle with adjoining sides of the upper level of the core.
10. The SIP of claim 8, wherein a thickness of the cementitious material between the corner block and the nearest corner face of the upper level of the core is greater than a thickness of each layer of cementitious material bonded to the faces of the core.
11. The SIP of claim 8, wherein the heads extend at least part way into the notches.
12. The SIP of claim 7, wherein:
the upper level of the core has a channel extending from one of the stepped edges to an opposing stepped edge;
the layer of cementitious material bonded to the upper level of the core extends into the channel; and
rebar is embedded in the cementitious material that extends into the channel.
13. The SIP of claim 1, wherein:
each corner block has a hollow, cube shape open at opposing ends;
the hole is defined by a closed face of the corner block;
a further hole is defined by another closed face of the corner block adjacent to the closed face; and
one of the open ends of the corner block is accessible from outside the SIP.
14. The SIP of claim 1, wherein a hook is bolted to the corner block via the hole.
15. The SIP of claim 1, wherein the reinforcement pins are welded to the corner block.
16. A method of fabricating a structural insulated panel (SIP) comprising:
forming a core with one or more blocks of insulation material, the core defined by two opposing faces connected by stepped edges;
connecting two reinforcement pins to a corner block so that they project from different adjacent faces of the corner block, wherein each reinforcement pin has a head with a diameter that is larger than a diameter of a shank of the reinforcement pin, each head being distal from the corner block, wherein the corner block defines a hole that is accessible by a tool that lifts the SIP;
pouring a first layer of cementitious material into a form;
placing the core on the first layer of cementitious material;
positioning rebar in a step of the stepped edges;
positioning the corner block with the connected reinforcement pins at a corner of the SIP;
pouring cementitious material around the stepped edges, to form a peripheral wall of cementitious material extending from the first layer into a step of the stepped edges and to embed the rebar in different straight sections of the peripheral wall;
pouring a second layer of cementitious material over the core; and
allowing the cementitious material to cure and bond to the faces of the core.
17. The method of claim 16 comprising:
threading further holes in the corner block, wherein connecting the reinforcement pins to the corner block comprises screwing the reinforcement pins into the further holes;
reinforcing the first and second layers of cementitious material with fiber mesh sheets.
18. The method of claim 16, wherein forming the core comprises:
forming the core with an upper level and a lower level, wherein:
the upper level has a smaller surface area than a surface area of the lower level;
the upper level of the core is a truncated rectangular prism, the truncated rectangular cross-section thereof having had its rectangular corners each truncated to form a corner face with two notches; and
the corner faces form a 45° angle with adjoining sides of the upper level of the core; and
positioning the heads to extend at least part way into the notches.
19. The method of claim 16, wherein:
each corner block has a hollow, cube shape open at opposing ends;
the hole is defined by a closed face of the corner block;
a further hole is defined by another closed face of the corner block adjacent to the closed face; and
one of the open ends of the corner block is accessible from outside the SIP.
US17/551,045 2019-06-14 2021-12-14 Reinforced structural insulation panel with corner blocks Pending US20220106791A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US17/551,045 US20220106791A1 (en) 2019-06-14 2021-12-14 Reinforced structural insulation panel with corner blocks

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US16/442,292 US11214964B2 (en) 2019-06-14 2019-06-14 Reinforced structural insulation panel with corner blocks
US17/551,045 US20220106791A1 (en) 2019-06-14 2021-12-14 Reinforced structural insulation panel with corner blocks

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
US16/442,292 Continuation US11214964B2 (en) 2019-06-14 2019-06-14 Reinforced structural insulation panel with corner blocks

Publications (1)

Publication Number Publication Date
US20220106791A1 true US20220106791A1 (en) 2022-04-07

Family

ID=73744933

Family Applications (2)

Application Number Title Priority Date Filing Date
US16/442,292 Active US11214964B2 (en) 2019-06-14 2019-06-14 Reinforced structural insulation panel with corner blocks
US17/551,045 Pending US20220106791A1 (en) 2019-06-14 2021-12-14 Reinforced structural insulation panel with corner blocks

Family Applications Before (1)

Application Number Title Priority Date Filing Date
US16/442,292 Active US11214964B2 (en) 2019-06-14 2019-06-14 Reinforced structural insulation panel with corner blocks

Country Status (7)

Country Link
US (2) US11214964B2 (en)
EP (1) EP3983621A4 (en)
JP (1) JP2022538796A (en)
CN (1) CN114269999A (en)
AU (1) AU2020293300A1 (en)
CA (1) CA3143358A1 (en)
WO (1) WO2020248081A1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20210040738A1 (en) * 2019-08-06 2021-02-11 Kim D. Blackburn Tilt-Up and Precast Construction Panels
US11015345B1 (en) * 2020-01-18 2021-05-25 Walter Smith Concrete wall section
CA3177189A1 (en) * 2020-04-01 2021-10-07 Nexii Building Solutions Inc. Systems and methods for coupling prefabricated panels together and reinforcing frame structure
WO2022032389A1 (en) * 2020-08-13 2022-02-17 Nexii Building Solutions Inc. Systems and methods for sealing a prefabricated panel
CA3194799A1 (en) * 2020-09-21 2022-03-24 Nexii Building Solutions Inc. Encapsulated prefabricated panel
GB2606863B (en) 2021-05-20 2023-06-07 Sano Development Ltd Hybrid residential building construction method
US20230304284A1 (en) * 2022-03-23 2023-09-28 Changda Construction Technology Co., Ltd. Structural energy-saving, heat-insulated and decorative integrated plate and manufacturing method therefor

Citations (52)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US581142A (en) * 1897-04-20 Composition building block and column
US3435580A (en) * 1966-03-17 1969-04-01 Otto Buehner & Co Insulated,reinforced concrete,panel-type building unit
US3693308A (en) * 1969-02-18 1972-09-26 B C T I Bureau De Coordination Building construction
US3709161A (en) * 1971-04-06 1973-01-09 Narad Inc Honeycomb pallet
US3721052A (en) * 1970-05-04 1973-03-20 Houilleres Bassin Du Nord Multi-storey building comprising unit compartments
US3800489A (en) * 1972-01-03 1974-04-02 Structural Syst Inc Modular wall construction
US3922413A (en) * 1974-06-03 1975-11-25 Richard G Reineman Lightweight, high strength, reinforced concrete constructions
US4142338A (en) * 1975-11-24 1979-03-06 Becker Otto A Construction unit
US4181286A (en) * 1977-03-28 1980-01-01 Doren David A Van Reinforced plastic mold for concrete panels
US4512126A (en) * 1981-12-28 1985-04-23 Beaver Products, Inc. Panel module means
US4542613A (en) * 1983-05-26 1985-09-24 Leyte Vidal Marco A Precast concrete building panel and method of producing the same
US4561225A (en) * 1982-08-10 1985-12-31 Yoshida Kogyo K.K. Curtain wall units in a unit type curtain wall
US4606165A (en) * 1983-10-20 1986-08-19 Ron Allan Industries (Australia) Pty. Ltd. Building panels
US4811536A (en) * 1982-08-09 1989-03-14 Hardt William G Outer wall structure for buildings
US4905334A (en) * 1989-06-23 1990-03-06 Oppenhuizen Donald E Refurbishing panel system for space divider partition walls
US5217000A (en) * 1988-02-23 1993-06-08 Pierce Bjorklund Patricia Compound solar collector building construction
US5471804A (en) * 1988-11-21 1995-12-05 Winter, Iv; Amos G. Building system using prefabricated building panels and fastening components used therewith
US5540524A (en) * 1994-06-07 1996-07-30 Gonsalves & Santucci, Inc. Concrete slab foundation and method of construction
US5579620A (en) * 1994-03-03 1996-12-03 Kuo; Ching-Liang Wall system
US5608991A (en) * 1993-05-18 1997-03-11 Yamashita; Senji Flexible form member and method of forming through hole by means of the form member
US5771645A (en) * 1996-04-12 1998-06-30 Porter; William H. Electrical access in structural insulated foam core panels
US6223485B1 (en) * 1996-06-07 2001-05-01 Herman Miller, Inc. Wall panel system
US20020043045A1 (en) * 2000-10-18 2002-04-18 Schnell House S.P.A. Modular panels for building construction
US6568136B2 (en) * 1999-05-24 2003-05-27 Yashima Inc. Method for building a floor designated to utilize the heat stored in the earth, and the construction of a floor built using such method
US6658799B1 (en) * 1998-10-20 2003-12-09 William Richard Charles Stoodley Volumetric modular building system
US6729085B2 (en) * 2001-02-09 2004-05-04 Herman Miller, Inc. Wall panel system
US6857377B2 (en) * 2001-10-16 2005-02-22 Conrad C. Herring Load bearing structure for a shipping pallet
US7493738B2 (en) * 2002-08-29 2009-02-24 Bui Thuan H Lightweight modular cementitious panel/tile for use in construction
US7530204B2 (en) * 2001-10-26 2009-05-12 Celestia Climate controlled housing unit
US7627997B2 (en) * 2002-03-06 2009-12-08 Oldcastle Precast, Inc. Concrete foundation wall with a low density core and carbon fiber and steel reinforcement
US20110023410A1 (en) * 2008-04-15 2011-02-03 Carlos Hernandez Gallardo Integral panel for walls and floors
US20110265399A1 (en) * 2010-05-03 2011-11-03 Kevin Hahn Universal block with recessed knock-out panels
US8601758B2 (en) * 2011-09-08 2013-12-10 Samobi Industries, Llc Interlocking construction blocks
US8607522B2 (en) * 2008-01-30 2013-12-17 Keystone Retaining Wall Systems Llc Block system with corner block and method of manufacturing a block
US8844227B1 (en) * 2013-03-15 2014-09-30 Romeo Ilarian Ciuperca High performance, reinforced insulated precast concrete and tilt-up concrete structures and methods of making same
US8881480B1 (en) * 2012-05-25 2014-11-11 Phase Change Energy Solutions, Inc. Construction assembly and method
US9038343B2 (en) * 2011-02-23 2015-05-26 Elmere Device for connecting two prefabricated construction elements together
US9175470B2 (en) * 2010-11-25 2015-11-03 Owens Corning Intellectual Capital, Llc Prefabricated thermal insulating composite panel, assembly thereof, moulded panel and concrete slab comprising same, method and mould profile for prefabricating same
US9376804B2 (en) * 2013-04-08 2016-06-28 Applied Minds, Llc Mirrored insulating panels structures, systems and associated processes
US9376815B1 (en) * 2015-07-31 2016-06-28 Patrick J. Santini Structural concrete panel
US9399867B2 (en) * 2009-04-07 2016-07-26 Millwick Acquisition Corp. Concrete panel corner connection
US9598891B2 (en) * 2015-03-23 2017-03-21 Jk Worldwide Enterprises Inc. Thermal break for use in construction
US9617724B2 (en) * 2012-10-17 2017-04-11 Matthew John Lubberts Building systems and methods
US10077553B2 (en) * 2010-10-11 2018-09-18 Michael Neumayr Modular wall system with integrated channels
US10087643B2 (en) * 2012-10-17 2018-10-02 Matthew John Lubberts Building systems and methods
US10422141B1 (en) * 2012-09-14 2019-09-24 Daniel J. Harkins Conversion of solar energy into other forms of useful energy
US20200299960A1 (en) * 2019-03-20 2020-09-24 Kps Global Llc Structurally reinforced insulated panel
US10947716B2 (en) * 2014-04-30 2021-03-16 Z-Modular Holding, Inc. Structural modular building connector
US11109519B2 (en) * 2019-01-15 2021-08-31 Hdt Expeditionary Systems, Inc. Mission configurable shelter
US11130625B2 (en) * 2016-11-01 2021-09-28 Storage Ip Llc Self-storage facility, fabrication, and methodology
US11236505B2 (en) * 2019-05-15 2022-02-01 Cover Technologies, Inc. Panelized structural building system
USRE49073E1 (en) * 2013-09-27 2022-05-17 Covestro Llc Foam wall structure

Family Cites Families (55)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2235001A (en) * 1938-08-24 1941-03-18 Charles T Allen Method for the production of composite sectional building units
US2219962A (en) * 1939-09-18 1940-10-29 Reynolds Edward Bert Gasket
US2303837A (en) * 1941-04-30 1942-12-01 Gurber Samuel Building construction
US2373409A (en) * 1942-02-27 1945-04-10 Wilbur V Myer Building construction
US2825221A (en) * 1952-12-18 1958-03-04 Brouk Joseph John Wall embodying masonry panels
US3077149A (en) * 1961-08-08 1963-02-12 Oliver C Eckel Cable floor structure with offset connectors
BE794529Q (en) * 1966-01-24 1973-05-16 Architectural Res Corp DECORATIVE FOAM CORE PANEL AND PROCESS FOR MAKING IT
US3500595A (en) * 1967-10-27 1970-03-17 Flehr Hohbach Modular building construction unit and column
US3703058A (en) * 1970-09-14 1972-11-21 Building Block Modules Inc Modular building construction and erection system utilizing selectively oriented modules
BE787370A (en) * 1971-08-10 1973-02-09 Saint Gobain PROCESS FOR THE MANUFACTURING OF PLATES, PANELS OR SHAPED PARTS, USABLE IN PARTICULAR AS CONSTRUCTION ELEMENTS
US4031682A (en) * 1975-04-14 1977-06-28 Metropolitan Industries Prefabricated building panel and method of making
US3965635A (en) * 1975-04-14 1976-06-29 Metropolitan Industries, Inc. Prefabricated building panel and method of making
US4226071A (en) * 1979-07-20 1980-10-07 The Dow Chemical Company Method for the preparation of low temperature structure
US4329827A (en) * 1980-05-06 1982-05-18 Masonite Ab Roofing elements
US4531338A (en) * 1983-06-15 1985-07-30 Olympian Stone Company Building wall panel
SE455711B (en) * 1987-01-15 1988-08-01 Straengbetong Ab THREE-DIMENSIONAL FRAMEWORK FOR BEARING FRONT WALLS
US5104715A (en) * 1987-07-06 1992-04-14 Cruz Francisco A Tile formed of composite sheet with insulating board
US4841702A (en) * 1988-02-22 1989-06-27 Huettemann Erik W Insulated concrete building panels and method of making the same
US5095674A (en) * 1988-02-22 1992-03-17 Huettemann Erik W Concrete building panel with intermeshed interior insulating slab and method of preparing the same
SE9103042D0 (en) * 1991-10-18 1991-10-18 Ew Element Foersaeljnings Ab SET TO MANUFACTURE WALL ELEMENTS, AND WALL PARTS MANUFACTURED AS SET
TW350894B (en) * 1994-08-02 1999-01-21 Stylite Kogyo Co Ltd Refractory coating components, building siding panels and the siding structure
AUPN516795A0 (en) * 1995-09-01 1995-09-28 Armacel Pty Limited Layered structural article
US5950386A (en) * 1995-12-26 1999-09-14 Steelcase Inc. Partition construction having frame and misaligned covers
US6230409B1 (en) * 1998-03-31 2001-05-15 Earth Products Limited Molded building panel and method of construction
US6205729B1 (en) * 1998-11-18 2001-03-27 William H. Porter Asymmetric structural insulated panel
US20040035071A1 (en) * 2002-08-26 2004-02-26 Jim Jian Ho Molded grating provided with reinforcement and attaching arrangement
WO2004042163A2 (en) * 2002-10-30 2004-05-21 Blastcrete Equipment Company Wire mesh screed
WO2004094739A2 (en) * 2003-04-17 2004-11-04 Frank Mcdonald Modular building panels, method of assembly of building panels and method of making building panels
US7168216B2 (en) * 2003-06-06 2007-01-30 Hans T. Hagen, Jr. Insulated stud panel and method of making such
US7028440B2 (en) * 2003-09-29 2006-04-18 Dale Brisson Modular homes
US8857123B2 (en) * 2004-08-12 2014-10-14 Progressive Foam Technologies, Inc. Foam insulation board
EP1884352A3 (en) * 2006-08-04 2008-03-05 Roxbury Limited Building panel
US7810293B2 (en) * 2006-08-15 2010-10-12 Gibbar James H Multiple layer polymer foam and concrete system for forming concrete walls, panels, floors, and decks
US8256173B2 (en) * 2008-11-17 2012-09-04 Skidmore, Owings & Merrill Llp Environmentally sustainable form-inclusion system
US8904737B2 (en) * 2008-12-18 2014-12-09 Composite Panel Systems, Llc Building panel assemblies and methods of use in wall structures
US9493938B2 (en) * 2008-12-18 2016-11-15 Composite Panel Systems, Llc Building panel assemblies and methods of use in wall structures
US10066393B1 (en) * 2009-08-21 2018-09-04 SafetyStep TD Fiber reinforced surface covering
WO2012126040A1 (en) * 2011-03-18 2012-09-27 Neil Peter Mervyn Composite wall panel, wall system and components thereof, and a method of construction thereof
US8567153B1 (en) * 2011-04-21 2013-10-29 Spray Rock Llc Composite concrete and framing system and method for building construction
GB201113574D0 (en) * 2011-08-05 2011-09-21 Keystone Lintels Ltd A panel and a method for building panels
CA2800414C (en) * 2011-12-28 2016-08-16 Dirtt Environmental Solutions, Ltd. Modular walls incorporating recessed, extendable furniture
CN104204373B (en) * 2012-01-23 2017-08-04 威斯廷酒店服务有限公司 The Prefabricated block of building
US9649662B2 (en) 2012-11-21 2017-05-16 Zks, Llc Seamless reinforced concrete structural insulated panel
US9169643B2 (en) * 2013-04-16 2015-10-27 Richard J. Dryburgh Concrete slab forming apparatus
DE202014010772U1 (en) * 2014-05-02 2016-08-09 Veit Dennert Kg Baustoffbetriebe Mobile building element, in particular building room cell or wall or ceiling part thereof
US10865562B2 (en) * 2014-06-28 2020-12-15 Kenneth R. Kreizinger Foam backed panel with cantilever
AU2015306073A1 (en) * 2014-08-19 2017-03-30 Bfre Pty Ltd Insulated and prefinished wall panel and wall cladding assembly
CN105625631A (en) * 2014-11-02 2016-06-01 黑龙江傲立辅龙科技开发有限公司 Special plate for erecting electric power distribution electrical house
US9890531B2 (en) * 2015-04-08 2018-02-13 Barnet L. Liberman Modular building system with adhesive-joined spline connections between wall sections
US10370845B2 (en) * 2017-03-08 2019-08-06 Maestro International, Llc Rotating pin locking connector
CN107190905A (en) * 2017-07-14 2017-09-22 北京善筑科技股份有限公司 Light gauge cold-formed steel shape integration beam slab and preparation method thereof
CA3033991A1 (en) 2018-02-13 2018-04-26 Michael A. Dombowsky Prefabricated insulated building panel with opposite cured cementitious layers bonded to insulation
US10900222B2 (en) * 2018-02-17 2021-01-26 Kyler Smith Special lightweight, durable mounting system for sound foam panel and quick installation process
US10550565B2 (en) * 2018-02-21 2020-02-04 Scott Edward Heatly Precast modular structural building system and method
US11105110B2 (en) * 2018-12-31 2021-08-31 Katerra Inc. Closed shear wall hold down system

Patent Citations (53)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US581142A (en) * 1897-04-20 Composition building block and column
US3435580A (en) * 1966-03-17 1969-04-01 Otto Buehner & Co Insulated,reinforced concrete,panel-type building unit
US3693308A (en) * 1969-02-18 1972-09-26 B C T I Bureau De Coordination Building construction
US3721052A (en) * 1970-05-04 1973-03-20 Houilleres Bassin Du Nord Multi-storey building comprising unit compartments
US3709161A (en) * 1971-04-06 1973-01-09 Narad Inc Honeycomb pallet
US3800489A (en) * 1972-01-03 1974-04-02 Structural Syst Inc Modular wall construction
US3922413A (en) * 1974-06-03 1975-11-25 Richard G Reineman Lightweight, high strength, reinforced concrete constructions
US4142338A (en) * 1975-11-24 1979-03-06 Becker Otto A Construction unit
US4181286A (en) * 1977-03-28 1980-01-01 Doren David A Van Reinforced plastic mold for concrete panels
US4512126A (en) * 1981-12-28 1985-04-23 Beaver Products, Inc. Panel module means
US4811536A (en) * 1982-08-09 1989-03-14 Hardt William G Outer wall structure for buildings
US4561225A (en) * 1982-08-10 1985-12-31 Yoshida Kogyo K.K. Curtain wall units in a unit type curtain wall
US4542613A (en) * 1983-05-26 1985-09-24 Leyte Vidal Marco A Precast concrete building panel and method of producing the same
US4606165A (en) * 1983-10-20 1986-08-19 Ron Allan Industries (Australia) Pty. Ltd. Building panels
US5217000A (en) * 1988-02-23 1993-06-08 Pierce Bjorklund Patricia Compound solar collector building construction
US5471804A (en) * 1988-11-21 1995-12-05 Winter, Iv; Amos G. Building system using prefabricated building panels and fastening components used therewith
US4905334A (en) * 1989-06-23 1990-03-06 Oppenhuizen Donald E Refurbishing panel system for space divider partition walls
US5608991A (en) * 1993-05-18 1997-03-11 Yamashita; Senji Flexible form member and method of forming through hole by means of the form member
US5579620A (en) * 1994-03-03 1996-12-03 Kuo; Ching-Liang Wall system
US5540524A (en) * 1994-06-07 1996-07-30 Gonsalves & Santucci, Inc. Concrete slab foundation and method of construction
US5771645A (en) * 1996-04-12 1998-06-30 Porter; William H. Electrical access in structural insulated foam core panels
US6223485B1 (en) * 1996-06-07 2001-05-01 Herman Miller, Inc. Wall panel system
US6658799B1 (en) * 1998-10-20 2003-12-09 William Richard Charles Stoodley Volumetric modular building system
US6568136B2 (en) * 1999-05-24 2003-05-27 Yashima Inc. Method for building a floor designated to utilize the heat stored in the earth, and the construction of a floor built using such method
US20020043045A1 (en) * 2000-10-18 2002-04-18 Schnell House S.P.A. Modular panels for building construction
US6820388B2 (en) * 2001-02-09 2004-11-23 Herman Miller, Inc. Stackable wall panel assembly and connector therefor
US6729085B2 (en) * 2001-02-09 2004-05-04 Herman Miller, Inc. Wall panel system
US6857377B2 (en) * 2001-10-16 2005-02-22 Conrad C. Herring Load bearing structure for a shipping pallet
US7530204B2 (en) * 2001-10-26 2009-05-12 Celestia Climate controlled housing unit
US7627997B2 (en) * 2002-03-06 2009-12-08 Oldcastle Precast, Inc. Concrete foundation wall with a low density core and carbon fiber and steel reinforcement
US7493738B2 (en) * 2002-08-29 2009-02-24 Bui Thuan H Lightweight modular cementitious panel/tile for use in construction
US8607522B2 (en) * 2008-01-30 2013-12-17 Keystone Retaining Wall Systems Llc Block system with corner block and method of manufacturing a block
US20110023410A1 (en) * 2008-04-15 2011-02-03 Carlos Hernandez Gallardo Integral panel for walls and floors
US9399867B2 (en) * 2009-04-07 2016-07-26 Millwick Acquisition Corp. Concrete panel corner connection
US20110265399A1 (en) * 2010-05-03 2011-11-03 Kevin Hahn Universal block with recessed knock-out panels
US10077553B2 (en) * 2010-10-11 2018-09-18 Michael Neumayr Modular wall system with integrated channels
US9175470B2 (en) * 2010-11-25 2015-11-03 Owens Corning Intellectual Capital, Llc Prefabricated thermal insulating composite panel, assembly thereof, moulded panel and concrete slab comprising same, method and mould profile for prefabricating same
US9038343B2 (en) * 2011-02-23 2015-05-26 Elmere Device for connecting two prefabricated construction elements together
US8601758B2 (en) * 2011-09-08 2013-12-10 Samobi Industries, Llc Interlocking construction blocks
US8881480B1 (en) * 2012-05-25 2014-11-11 Phase Change Energy Solutions, Inc. Construction assembly and method
US10422141B1 (en) * 2012-09-14 2019-09-24 Daniel J. Harkins Conversion of solar energy into other forms of useful energy
US9617724B2 (en) * 2012-10-17 2017-04-11 Matthew John Lubberts Building systems and methods
US10087643B2 (en) * 2012-10-17 2018-10-02 Matthew John Lubberts Building systems and methods
US8844227B1 (en) * 2013-03-15 2014-09-30 Romeo Ilarian Ciuperca High performance, reinforced insulated precast concrete and tilt-up concrete structures and methods of making same
US9376804B2 (en) * 2013-04-08 2016-06-28 Applied Minds, Llc Mirrored insulating panels structures, systems and associated processes
USRE49073E1 (en) * 2013-09-27 2022-05-17 Covestro Llc Foam wall structure
US10947716B2 (en) * 2014-04-30 2021-03-16 Z-Modular Holding, Inc. Structural modular building connector
US9598891B2 (en) * 2015-03-23 2017-03-21 Jk Worldwide Enterprises Inc. Thermal break for use in construction
US9376815B1 (en) * 2015-07-31 2016-06-28 Patrick J. Santini Structural concrete panel
US11130625B2 (en) * 2016-11-01 2021-09-28 Storage Ip Llc Self-storage facility, fabrication, and methodology
US11109519B2 (en) * 2019-01-15 2021-08-31 Hdt Expeditionary Systems, Inc. Mission configurable shelter
US20200299960A1 (en) * 2019-03-20 2020-09-24 Kps Global Llc Structurally reinforced insulated panel
US11236505B2 (en) * 2019-05-15 2022-02-01 Cover Technologies, Inc. Panelized structural building system

Also Published As

Publication number Publication date
AU2020293300A1 (en) 2022-01-27
US11214964B2 (en) 2022-01-04
WO2020248081A1 (en) 2020-12-17
JP2022538796A (en) 2022-09-06
CA3143358A1 (en) 2020-12-17
US20200392731A1 (en) 2020-12-17
CN114269999A (en) 2022-04-01
EP3983621A4 (en) 2023-07-05
EP3983621A1 (en) 2022-04-20

Similar Documents

Publication Publication Date Title
US20220106791A1 (en) Reinforced structural insulation panel with corner blocks
US3145502A (en) Structural element and method of making
US20200247001A1 (en) Integral Composite Shuttering Panel and Monolithic Wall Building System
RU2465415C1 (en) Wall unit (versions), material for manufacturing of wall units, mould to manufacture wall units (versions), method to make wall units and flow line to manufacture wall units
CN101831963A (en) Novel multipurpose composite insulation board and construction method and processing device thereof
JPS62256607A (en) Manufacture of transportable brick wall
JP2695023B2 (en) Method of manufacturing reinforced panels from building material blocks such as stone
CN201486105U (en) Floating cast concrete ground structure
WO2013184043A2 (en) System and method for light steel frame construction
CN113386255A (en) Construction and production process of building decoration heat preservation and sound insulation structure integrated plate
US20070062134A1 (en) Cellularcrete wall system
CN114000646A (en) Reverse-beating integrated wallboard of precast concrete composite heat-insulation template and preparation method
US20150158229A1 (en) Pool coping and method for fabricating
CN100453755C (en) Polyurethane composite board and its application
DE19542133A1 (en) Plate for prodn. of walls, esp. interior walls
CN113550460A (en) Prefabricated heat-preservation superposed shear wall and manufacturing method thereof
CN115898029A (en) Construction method of multi-curved-surface fair-faced concrete structure
CN110725532B (en) Supporting system for small formwork of bare concrete decorative wall and construction process
JPS5945495B2 (en) Method of manufacturing architectural panels
JPH10237985A (en) Building-frame wall and retaining wall by hollow block for construction, hollow block used for constructing building-frame wall and retaining wall thereof, and method and equipment for building-frame wall and retaining wall
CZ508388A3 (en) Process for preparing planking elements and a planking element
JPH08193409A (en) Fiber-reinforced plastic panel, its joint body, and incombustible, composite, fiber-reinforced plastic panel
CN220681176U (en) Prefabricated coincide bottom plate
FR2515567A1 (en) Method of forming precast concrete wall panel - has polygonal rubble face using soaked elastic foam to mount stones on bed with sand forming recessed joints
JPH0633530A (en) Form used as interior material in common

Legal Events

Date Code Title Description
STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: NON FINAL ACTION MAILED

STPP Information on status: patent application and granting procedure in general

Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER

STPP Information on status: patent application and granting procedure in general

Free format text: NOTICE OF ALLOWANCE MAILED -- APPLICATION RECEIVED IN OFFICE OF PUBLICATIONS

AS Assignment

Owner name: HORIZON TECHNOLOGY FINANCE CORPORATION, CONNECTICUT

Free format text: SECURITY INTEREST;ASSIGNOR:NEXII BUILDING SOLUTIONS INC.;REEL/FRAME:066070/0640

Effective date: 20220608

STPP Information on status: patent application and granting procedure in general

Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION

STPP Information on status: patent application and granting procedure in general