US20200208063A1 - Gaseous tracer leak detection - Google Patents
Gaseous tracer leak detection Download PDFInfo
- Publication number
- US20200208063A1 US20200208063A1 US16/729,201 US201916729201A US2020208063A1 US 20200208063 A1 US20200208063 A1 US 20200208063A1 US 201916729201 A US201916729201 A US 201916729201A US 2020208063 A1 US2020208063 A1 US 2020208063A1
- Authority
- US
- United States
- Prior art keywords
- gaseous tracer
- amount
- leak
- gaseous
- pressure system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 239000000700 radioactive tracer Substances 0.000 title claims abstract description 326
- 238000001514 detection method Methods 0.000 title description 9
- 238000000034 method Methods 0.000 claims abstract description 210
- 239000000571 coke Substances 0.000 claims abstract description 144
- 238000007599 discharging Methods 0.000 claims abstract description 36
- 239000007789 gas Substances 0.000 claims description 68
- 238000004939 coking Methods 0.000 claims description 65
- 239000003245 coal Substances 0.000 claims description 60
- 239000000523 sample Substances 0.000 claims description 56
- 238000011084 recovery Methods 0.000 claims description 54
- 239000001307 helium Substances 0.000 claims description 45
- 229910052734 helium Inorganic materials 0.000 claims description 45
- SWQJXJOGLNCZEY-UHFFFAOYSA-N helium atom Chemical group [He] SWQJXJOGLNCZEY-UHFFFAOYSA-N 0.000 claims description 45
- 238000012360 testing method Methods 0.000 claims description 44
- 239000006227 byproduct Substances 0.000 claims description 31
- 238000005507 spraying Methods 0.000 claims description 15
- 239000000779 smoke Substances 0.000 claims description 10
- 239000007921 spray Substances 0.000 claims description 10
- 238000011144 upstream manufacturing Methods 0.000 claims description 9
- 230000008439 repair process Effects 0.000 claims description 7
- 238000009413 insulation Methods 0.000 claims description 5
- 230000002045 lasting effect Effects 0.000 claims description 3
- 229910052756 noble gas Inorganic materials 0.000 claims description 3
- 150000001875 compounds Chemical class 0.000 claims description 2
- 230000008878 coupling Effects 0.000 claims 1
- 238000010168 coupling process Methods 0.000 claims 1
- 238000005859 coupling reaction Methods 0.000 claims 1
- 239000004509 smoke generator Substances 0.000 claims 1
- 238000005516 engineering process Methods 0.000 abstract description 66
- 238000005259 measurement Methods 0.000 description 25
- QGZKDVFQNNGYKY-UHFFFAOYSA-N Ammonia Chemical compound N QGZKDVFQNNGYKY-UHFFFAOYSA-N 0.000 description 12
- 238000012544 monitoring process Methods 0.000 description 10
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 description 8
- 239000003546 flue gas Substances 0.000 description 7
- UFWIBTONFRDIAS-UHFFFAOYSA-N Naphthalene Chemical compound C1=CC=CC2=CC=CC=C21 UFWIBTONFRDIAS-UHFFFAOYSA-N 0.000 description 6
- 230000008569 process Effects 0.000 description 6
- 229910021529 ammonia Inorganic materials 0.000 description 5
- 230000008901 benefit Effects 0.000 description 5
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 4
- 239000000446 fuel Substances 0.000 description 4
- 239000001301 oxygen Substances 0.000 description 4
- 229910052760 oxygen Inorganic materials 0.000 description 4
- 239000000126 substance Substances 0.000 description 4
- 239000002912 waste gas Substances 0.000 description 4
- UHOVQNZJYSORNB-UHFFFAOYSA-N Benzene Chemical compound C1=CC=CC=C1 UHOVQNZJYSORNB-UHFFFAOYSA-N 0.000 description 3
- 238000003763 carbonization Methods 0.000 description 3
- 238000006477 desulfuration reaction Methods 0.000 description 3
- 230000023556 desulfurization Effects 0.000 description 3
- 230000007613 environmental effect Effects 0.000 description 3
- 238000010438 heat treatment Methods 0.000 description 3
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 239000002245 particle Substances 0.000 description 3
- 239000012716 precipitator Substances 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- 230000032258 transport Effects 0.000 description 3
- 239000003039 volatile agent Substances 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Chemical compound O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- XKRFYHLGVUSROY-UHFFFAOYSA-N Argon Chemical compound [Ar] XKRFYHLGVUSROY-UHFFFAOYSA-N 0.000 description 2
- IJGRMHOSHXDMSA-UHFFFAOYSA-N Atomic nitrogen Chemical compound N#N IJGRMHOSHXDMSA-UHFFFAOYSA-N 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 2
- CURLTUGMZLYLDI-UHFFFAOYSA-N Carbon dioxide Chemical compound O=C=O CURLTUGMZLYLDI-UHFFFAOYSA-N 0.000 description 2
- RWSOTUBLDIXVET-UHFFFAOYSA-N Dihydrogen sulfide Chemical compound S RWSOTUBLDIXVET-UHFFFAOYSA-N 0.000 description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 2
- 229910052799 carbon Inorganic materials 0.000 description 2
- 238000009833 condensation Methods 0.000 description 2
- 230000005494 condensation Effects 0.000 description 2
- 239000012530 fluid Substances 0.000 description 2
- 229910052731 fluorine Inorganic materials 0.000 description 2
- 238000009472 formulation Methods 0.000 description 2
- LELOWRISYMNNSU-UHFFFAOYSA-N hydrogen cyanide Chemical compound N#C LELOWRISYMNNSU-UHFFFAOYSA-N 0.000 description 2
- 206010022000 influenza Diseases 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 150000002835 noble gases Chemical class 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000003908 quality control method Methods 0.000 description 2
- 230000009467 reduction Effects 0.000 description 2
- 239000000243 solution Substances 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 239000013076 target substance Substances 0.000 description 2
- YCKRFDGAMUMZLT-UHFFFAOYSA-N Fluorine atom Chemical compound [F] YCKRFDGAMUMZLT-UHFFFAOYSA-N 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- QAOWNCQODCNURD-UHFFFAOYSA-N Sulfuric acid Chemical compound OS(O)(=O)=O QAOWNCQODCNURD-UHFFFAOYSA-N 0.000 description 1
- YZCKVEUIGOORGS-NJFSPNSNSA-N Tritium Chemical compound [3H] YZCKVEUIGOORGS-NJFSPNSNSA-N 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- LFVGISIMTYGQHF-UHFFFAOYSA-N ammonium dihydrogen phosphate Chemical compound [NH4+].OP(O)([O-])=O LFVGISIMTYGQHF-UHFFFAOYSA-N 0.000 description 1
- 229910000387 ammonium dihydrogen phosphate Inorganic materials 0.000 description 1
- BFNBIHQBYMNNAN-UHFFFAOYSA-N ammonium sulfate Chemical compound N.N.OS(O)(=O)=O BFNBIHQBYMNNAN-UHFFFAOYSA-N 0.000 description 1
- 229910052921 ammonium sulfate Inorganic materials 0.000 description 1
- 239000001166 ammonium sulphate Substances 0.000 description 1
- 235000011130 ammonium sulphate Nutrition 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 229910052786 argon Inorganic materials 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 239000001569 carbon dioxide Substances 0.000 description 1
- 229910002092 carbon dioxide Inorganic materials 0.000 description 1
- 229910002091 carbon monoxide Inorganic materials 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000004821 distillation Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 239000003344 environmental pollutant Substances 0.000 description 1
- 230000003090 exacerbative effect Effects 0.000 description 1
- 239000011737 fluorine Substances 0.000 description 1
- 239000002737 fuel gas Substances 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 229930195733 hydrocarbon Natural products 0.000 description 1
- 150000002430 hydrocarbons Chemical class 0.000 description 1
- 239000001257 hydrogen Substances 0.000 description 1
- 229910052739 hydrogen Inorganic materials 0.000 description 1
- 150000002431 hydrogen Chemical class 0.000 description 1
- 229910000037 hydrogen sulfide Inorganic materials 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000011068 loading method Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 235000019837 monoammonium phosphate Nutrition 0.000 description 1
- 239000006012 monoammonium phosphate Substances 0.000 description 1
- 229910052754 neon Inorganic materials 0.000 description 1
- GKAOGPIIYCISHV-UHFFFAOYSA-N neon atom Chemical compound [Ne] GKAOGPIIYCISHV-UHFFFAOYSA-N 0.000 description 1
- 229910052757 nitrogen Inorganic materials 0.000 description 1
- 230000001590 oxidative effect Effects 0.000 description 1
- 231100000719 pollutant Toxicity 0.000 description 1
- 238000004445 quantitative analysis Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000001117 sulphuric acid Substances 0.000 description 1
- 235000011149 sulphuric acid Nutrition 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 229910052722 tritium Inorganic materials 0.000 description 1
- -1 vapor Chemical compound 0.000 description 1
- 229910052724 xenon Inorganic materials 0.000 description 1
- FHNFHKCVQCLJFQ-UHFFFAOYSA-N xenon atom Chemical compound [Xe] FHNFHKCVQCLJFQ-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B29/00—Other details of coke ovens
- C10B29/06—Preventing or repairing leakages of the brickwork
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P6/00—Restoring or reconditioning objects
- B23P6/04—Repairing fractures or cracked metal parts or products, e.g. castings
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C73/00—Repairing of articles made from plastics or substances in a plastic state, e.g. of articles shaped or produced by using techniques covered by this subclass or subclass B29D
- B29C73/02—Repairing of articles made from plastics or substances in a plastic state, e.g. of articles shaped or produced by using techniques covered by this subclass or subclass B29D using liquid or paste-like material
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
- B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
- B29C73/00—Repairing of articles made from plastics or substances in a plastic state, e.g. of articles shaped or produced by using techniques covered by this subclass or subclass B29D
- B29C73/04—Repairing of articles made from plastics or substances in a plastic state, e.g. of articles shaped or produced by using techniques covered by this subclass or subclass B29D using preformed elements
- B29C73/10—Repairing of articles made from plastics or substances in a plastic state, e.g. of articles shaped or produced by using techniques covered by this subclass or subclass B29D using preformed elements using patches sealing on the surface of the article
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B15/00—Other coke ovens
- C10B15/02—Other coke ovens with floor heating
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B25/00—Doors or closures for coke ovens
- C10B25/02—Doors; Door frames
- C10B25/16—Sealing; Means for sealing
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B29/00—Other details of coke ovens
- C10B29/02—Brickwork, e.g. casings, linings, walls
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B41/00—Safety devices, e.g. signalling or controlling devices for use in the discharge of coke
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B45/00—Other details
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B5/00—Coke ovens with horizontal chambers
- C10B5/02—Coke ovens with horizontal chambers with vertical heating flues
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23D—ENAMELLING OF, OR APPLYING A VITREOUS LAYER TO, METALS
- C23D5/00—Coating with enamels or vitreous layers
- C23D5/08—Applying enamels non-uniformly over the surface
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M3/00—Investigating fluid-tightness of structures
- G01M3/02—Investigating fluid-tightness of structures by using fluid or vacuum
- G01M3/04—Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point
- G01M3/20—Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point using special tracer materials, e.g. dye, fluorescent material, radioactive material
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M3/00—Investigating fluid-tightness of structures
- G01M3/02—Investigating fluid-tightness of structures by using fluid or vacuum
- G01M3/04—Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point
- G01M3/20—Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point using special tracer materials, e.g. dye, fluorescent material, radioactive material
- G01M3/202—Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point using special tracer materials, e.g. dye, fluorescent material, radioactive material using mass spectrometer detection systems
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M3/00—Investigating fluid-tightness of structures
- G01M3/02—Investigating fluid-tightness of structures by using fluid or vacuum
- G01M3/04—Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point
- G01M3/20—Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point using special tracer materials, e.g. dye, fluorescent material, radioactive material
- G01M3/207—Investigating fluid-tightness of structures by using fluid or vacuum by detecting the presence of fluid at the leakage point using special tracer materials, e.g. dye, fluorescent material, radioactive material calibration arrangements
-
- C—CHEMISTRY; METALLURGY
- C10—PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
- C10B—DESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
- C10B31/00—Charging devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D19/00—Arrangements of controlling devices
- F27D2019/0006—Monitoring the characteristics (composition, quantities, temperature, pressure) of at least one of the gases of the kiln atmosphere and using it as a controlling value
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D21/00—Arrangement of monitoring devices; Arrangement of safety devices
- F27D2021/0057—Security or safety devices, e.g. for protection against heat, noise, pollution or too much duress; Ergonomic aspects
- F27D2021/0078—Security or safety devices, e.g. for protection against heat, noise, pollution or too much duress; Ergonomic aspects against the presence of an undesirable element in the atmosphere of the furnace
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P20/00—Technologies relating to chemical industry
- Y02P20/10—Process efficiency
- Y02P20/129—Energy recovery, e.g. by cogeneration, H2recovery or pressure recovery turbines
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
Definitions
- the present technology generally relates to systems for coking coal, and in particular to systems and methods for detecting a leak in a system for coking coal.
- Coke is a solid carbon fuel and carbon source used to melt and reduce iron ore in the production of steel.
- Coking ovens have been used for many years to convert coal into metallurgical coke.
- coke is produced by batch feeding pulverized coal to an oven that is sealed and heated to very high temperatures for 24 to 48 hours under closely-controlled atmospheric conditions.
- the finely crushed coal devolatilizes and forms a fused mass of coke having a predetermined porosity and strength. Because the production of coke is a batch process, multiple coke ovens are operated simultaneously.
- HHR ovens which have a unique environmental advantage over chemical byproduct ovens based upon a relative operating atmospheric pressure condition inside the oven.
- HHR ovens operate under negative pressure
- chemical byproduct ovens operate at a slightly positive atmospheric pressure.
- Both oven types are typically constructed of refractory bricks and other materials in which creating a generally airtight environment can be a challenge because small cracks can form in these structures, thereby allowing air to leak in or out of the oven. Cracks may also form in structures fluidly coupled to the ovens, exacerbating the challenge of creating an airtight environment.
- cracks may permit uncontrolled air to leak into the system, thereby affecting the overall functionality of the coke plant.
- cracks may permit gases to escape from the plant before being treated, thereby making it more difficult to control the coking conditions and increasing the environmental footprint of the coke plant.
- identifying leaks so they can be repaired is an important step in maintaining a functioning coke plant.
- Current leak detection methods are suboptimal for a variety of reasons. For example, current leak detection methods do not allow a user to quantitatively analyze the size of leaks, and therefore do not allow users to prioritize repair of troublesome leaks. Furthermore, leaks in certain locations (e.g., in an insulated chamber, in the sole flue, etc.) may be difficult and/or not possible to locate with current methods.
- FIG. 1 is an isometric, partial cut-away view of a portion of a horizontal heat recovery coke plant configured in accordance with select embodiments of the present technology.
- FIG. 2A is an isometric, partial cut-away view of a portion of a byproduct coke oven battery configured in accordance with select embodiments of the present technology.
- FIG. 2B is a schematic illustration of a byproduct coke plant, including the byproduct coke oven battery illustrated in FIG. 2A , configured in accordance with select embodiments of the present technology.
- FIG. 3 is a schematic illustration of a heat recovery coke plant configured in accordance with select embodiments of the present technology.
- FIG. 4 is a schematic illustration of a gaseous tracer spray probe configured in accordance with one embodiment of the present technology.
- FIG. 5 is a schematic illustration of another gaseous tracer spray probe configured in accordance with another embodiment of the present technology.
- FIG. 6 is a flowchart of a method 600 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology.
- FIG. 7 is a flowchart of a method 700 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology.
- FIG. 8 is a flowchart of a method 800 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology.
- FIG. 9 is a flowchart of a method 900 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology.
- FIG. 10 is a flowchart of a method 1000 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology.
- FIG. 11 is a flowchart of a method 1100 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology.
- FIG. 12 is a flowchart of a method 1200 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology.
- FIG. 13 is a flowchart of a method 1300 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology.
- FIG. 14 is a flowchart of a method 1400 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology.
- FIG. 15 is a flowchart of a method 1500 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology.
- FIG. 16 is a flowchart of a method 1600 of detecting a leak between a high-pressure system and a low-pressure system.
- FIG. 17 is a flowchart of a method 1700 of detecting a leak between a high-pressure system and a low-pressure system.
- FIG. 18 is a graphical illustration of the results of a first gaseous tracer leak detection test performed in accordance with embodiments of the present technology.
- FIG. 19 is a graphical illustration of the results of a second gaseous tracer leak detection test performed in accordance with embodiments of the present technology.
- the present technology provides systems and methods for detecting leaks in a system for coking coal (e.g., a coke plant).
- the system and methods can include discharging a gaseous tracer at a first location adjacent to a potential leak site (e.g., a “test” location) in the coke plant, and, after discharging the gaseous tracer at the test location, measuring an amount of the gaseous tracer at a location downstream of the test location (e.g., at a second location with a lower pressure than the first location).
- the downstream location can be at least partially fluidly isolated from the test location under normal, non-leaking, operating conditions.
- Measuring a spike in the concentration of the gaseous tracer at the location downstream of the potential leak site can therefore indicate that there is a leak at the test location.
- the present technology be used to detect leaks in a number of different coke plant systems, including chemical byproduct coke plants (“byproduct system”), heat recovery coke plants (“heat recovery system”), beehive/non-recovery coke plants (“non-recovery system”), and other types of coke plants known in the art.
- Coke plants have a number of different structures that may be susceptible to forming leaks.
- coke system(s) generally have a plurality of coke ovens for heating coal to produce coke.
- coke systems may also include one or more flue gas chambers, a plurality of heat recovery steam generators, a common tunnel fluidly coupled to the plurality of coke ovens and/or the plurality of heat recovery steam generators, and/or other features common to coke plants known in the art. Due to a variety of reasons, various structures and/or surfaces in the coke plant may be susceptible to cracking or other wear that permits an airflow between the external environment and the interior of the system, or vice versa.
- the present technology provides systems and methods for detecting leaks that permits air to enter or leave the coking system in an uncontrolled and/or undesired manner, or otherwise affects the performance of the coke plant. More specifically, as will be described in detail herein, select embodiments of the present technology can, among other things, (1) identify whether a leak exists, (2) identify a location of a leak, and/or (3) at least semi-quantitatively analyze the size of the leak.
- Identifying cracks enables the cracks to be repaired, patched, or otherwise treated to mitigate and/or eliminate the foregoing problems, among other things.
- the present technology enables leaks to be detected without reducing the temperature of the coking plant or taking the coking plant “offline” (i.e., the test can be performed without interrupting the operation of the coke plant).
- the tests described herein can be performed in systems having temperatures of 100 degrees Celsius or higher, 500 degrees Celsius or higher, 1,000 degrees Celsius or higher, and/or 1,500 degrees Celsius or higher, thereby allowing the tests to be performed without interrupting the coking cycle.
- the present technology can be applied to any number of coke plants, including, for example, heat recovery coking systems and byproduct coking systems.
- heat recovery systems several embodiments of the present technology include discharging a gaseous tracer adjacent to an external facing surface of the coke plant. If there is a leak between the external facing surface and the interior of the coke plant, the negative pressure of the heat recovery system will draw the gaseous tracer into the coke plant. Accordingly, the amount of gaseous tracer inside the heat recovery system may be measured at a location downstream of the tested external facing surface to determine if gaseous tracer discharged at the potential leak site entered the heat recovery system.
- a spike in gaseous tracer is observed at the downstream location inside the heat recovery system, there is likely a leak on the tested surface. This process may be repeated at any number of potential leak sites.
- several embodiments of the present technology include discharging a gaseous tracer into a high-pressure environment adjacent a low-pressure environment. If there is a leak between the high-pressure environment and the low-pressure environment, the gaseous tracer will be detected in the low-pressure environment.
- the present system is beneficial because, among other things, it can at least partially quantitatively characterize leaks and locate leaks in locations where traditional methods cannot.
- the present technology allows coke plant operators to prioritize repair of more troublesome leaks based on the provided quantitative analysis.
- the present technology enables identification of leaks in locations that were previously difficult to test, such as insulated regions of the system or in the sole flue.
- the present technology is capable of identifying regions that do not have a direct leak into the interior of the system, but instead allow air into a region between an outer surface and insulation. This air may be problematic because it can migrate beneath the insulation and enter the system at a different location.
- coke plants As used herein, the terms “coke plants”, “coking plants”, “coke systems,” “coking systems,” “systems for coking coal,” and their variants collectively refer to any type of coke plant, including byproduct coke plants, heat recovery coke plants, horizontal heat recovery coke plants, non-recovery coke plants, and horizontal non-recovery coke plants. Moreover, certain aspects of the present disclosure are described in the context of a specific oven type. However, as one skilled in the art will appreciate, such aspects may be readily adapted for use with any type of coke plant. Accordingly, aspects of the present disclosure is not limited to a specific type of coke plant, unless explicitly noted otherwise.
- the terms “high-pressure system” and “low-pressure system” are used in a relative manner. Neither the “high-pressure system” nor the “low-pressure system” require a pressure above or below a specific magnitude. Rather, the term “high-pressure system” is used to mean that the system has a pressure that is greater than a pressure in another adjacent system (e.g., a low-pressure system). Likewise, the term “low-pressure system” is used to mean that the system has a pressure that is less than a pressure in another adjacent system (e.g., a high-pressure system).
- upstream and downstream refer to the expected direction of gas flow in a coke plant.
- gas is expected to flow in a direction from an upstream structure to a downstream structure.
- the term “residence time” refers to the duration of time that it takes for a gas to travel between two locations.
- the first location can be any test location and the second location can be any location where measurements are taken.
- the coke plant 100 which produces coke from coal in a reducing environment.
- the coke plant 100 comprises at least one oven 101 , along with heat recovery steam generators and an air quality control system (e.g. an exhaust or flue gas desulfurization system) both of which are positioned fluidly downstream from the ovens and both of which are fluidly connected to the ovens by suitable ducts.
- the coke plant can include a heat recovery or a non-heat recovery coke oven, or a horizontal heat recovery or horizontal non-recovery coke oven.
- the coke plant 100 preferably includes a plurality of ovens 101 and a common tunnel 102 that is fluidly connected to each of the ovens 101 with uptake ducts 103 .
- a cooled gas duct transports the cooled gas from the heat recovery steam generators to the flue gas desulfurization system.
- Fluidly connected and further downstream are a baghouse for collecting particulates, at least one draft fan for controlling air pressure within the system, and a main gas stack for exhausting cooled, treated exhaust to the environment.
- Steam lines interconnect the heat recovery steam generators and a cogeneration plant so that the recovered heat can be utilized.
- the coke plant 100 can also be fluidly connected to a bypass exhaust stack 104 that can be used to vent hot exhaust gasses to the atmosphere in emergency situations.
- FIG. 1 illustrates four ovens 101 with sections cut away for clarity.
- Each oven 101 comprises an oven chamber 110 preferably defined by a floor 111 , a front door 114 , a rear door 115 preferably opposite the front door 114 , two sidewalls 112 extending upwardly from the floor 111 intermediate the front 114 and rear 115 doors, and a crown 113 which forms the top surface of the oven chamber 110 .
- Controlling air flow and pressure inside the oven 101 can be critical to the efficient operation of the coking cycle and therefore the oven 101 includes one or more air inlets 119 that allow air into the oven 101 .
- Each air inlet 119 includes an air damper which can be positioned at any number of positions between fully open and fully closed to vary the amount of primary air flow into the oven 101 .
- the oven 101 includes an air inlet 119 coupled to the front door 114 , which is configured to control air flow into the oven chamber 110 , and an air inlet 119 coupled to a sole flue 118 positioned beneath the floor 111 of the oven 101 .
- the one or more air inlets 119 are formed through the crown 113 and/or in the uptake ducts 103 .
- volatile gases emitted from the coal positioned inside the oven chamber 110 collect in the crown 113 and are drawn downstream in the overall system into downcomer channels 117 formed in one or both sidewalls 112 .
- the downcomer channels 117 fluidly connect the oven chamber 110 with the sole flue 118 .
- the sole flue 118 forms a circuitous path beneath the floor 111 and volatile gases emitted from the coal can be com busted in the sole flue 118 , thereby generating heat to support the reduction of coal into coke.
- the downcomer channels 117 are fluidly connected to uptake channels 116 formed in one or both sidewalls 112 .
- the air inlet 119 coupled to the sole flue 118 can fluidly connect the sole flue 118 to the atmosphere and can be used to control combustion within the sole flue 118 .
- the oven 101 can also include a platform 105 adjacent to the front door 114 that a worker can stand and walk on to access the front door and the oven chamber 110 .
- coke is produced in the ovens 101 by first loading coal into the oven chamber 110 , heating the coal in an oxygen depleted environment, driving off the volatile fraction of coal and then oxidizing the volatiles within the oven 101 to capture and utilize the heat given off.
- the coal volatiles are oxidized within the ovens over a 48-hour coking cycle and release heat to regeneratively drive the carbonization of the coal to coke.
- the coking cycle begins when the front door 114 is opened and coal is charged onto the floor 111 .
- the coal on the floor 111 is known as the coal bed.
- Heat from the oven starts the carbonization cycle.
- no additional fuel other than that produced by the coking process is used.
- Leaks may form, for example, in the sole flue 118 , in the front door 114 , in the air inlet 119 , in the uptake ducts 103 , and/or in the common tunnel 102 .
- Other locations not explicitly mentioned herein may also be susceptible to leaks.
- Leaks may form, for example, if one or more cracks extend between an external facing surface and an internal facing surface of the coking system. Leaks may also occur at connective joints.
- a probe 120 is provided to test for leaks at potential leak sites.
- the probe 120 is configured to detect leaks in the coke plant 100 by dispensing a gaseous tracer adjacent to a potential leak site.
- FIG. 2A illustrates a coke oven battery 200 of a byproduct coke plant.
- the coke oven battery 200 includes a plurality of narrow, vertically oriented coke ovens 202 .
- coal is loaded into the ovens 202 and heated in a reducing atmosphere to vaporize the volatiles into a raw coke gas.
- the raw coke gas is transported to a by-product plant for treatment, as will be described in greater detail below.
- the remaining coke mass is pushed from the oven and can be wet or dry quenched prior to its shipment to a blast furnace for further processing, as known in the art.
- the coke ovens 202 are heated via burning gaseous fuel and allowing the heated gases to occupy flue chambers 204 positioned around the ovens 202 .
- each oven 202 can share a common heating flue chamber 204 with an adjacent oven 202 .
- the plant 200 can further include a waste gas tunnel 206 and a plurality of ducts 208 fluidly connecting the flue chambers 204 and the waste gas tunnel 206 .
- the gaseous fuel can be combusted adjacent the flue chambers 204 to generate hot flue gas that can enter the flue chambers 204 and heat the coke ovens 202 .
- the flue gas can then enter the waste gas tunnel 206 via the plurality of ducts 208 and be transported to an exhaust stack (not shown).
- the coke oven battery 200 also includes a plurality of raw coke gas vents 210 fluidly connected to the oven chambers 202 . After raw coke gas is vaporized from the heated coal in the oven chambers 202 , the raw coke gas vents transport the raw gas from the oven chambers 202 to a main collector channel 212 .
- the main collector channel 212 delivers the raw coke gas vents to a byproduct treatment plant, as described in detail with respect to FIG. 2B .
- the raw coke oven gas can include a mixture of water vapor, hydrogen methane, nitrogen, carbon monoxide, carbon dioxide, and/or various hydrocarbons.
- Raw coke oven gas can also include tar vapors, light oil vapors, naphthalene, vapor, ammonia gas, hydrogen sulfide gas, hydrogen cyanide gas, and/or other contaminates in various amounts.
- the raw coke gas is treated in a byproduct treatment plant to transform the raw gas into environmentally friendly fuel gases.
- FIG. 2B is a schematic illustration of the coke oven battery 200 operably coupled to the byproduct coke plant 250 for processing the raw coke oven gas.
- the byproduct coke plant 250 receives raw coke gas via the main collector channel 212 .
- the primary gas cooler cools the raw gas to remove water vapor.
- Suitable primary gas coolers include spray type coolers and horizontal tube type coolers. As the raw gas is cooled, the water, tar, and naphthalene condense out, leaving behind a condensate in the gas condensation chamber 252 .
- the gas next flows through a tar precipitator chamber 254 .
- Tar precipitators can use high voltage electrodes to charge the tar particles in the gas and subsequently capture the tar particles through electrostatic attraction.
- the gas flows through an ammonia removal chamber 256 .
- Ammonia is removed from the gas in the ammonia removal chamber 256 .
- ammonia can be removed from the gas through contacting the gas with a solution of sulphuric acid to form ammonium sulphate.
- the ammonia is removed from the gas using a solution of mono ammonium phosphate to produce anhydrous ammonia.
- the gas then flows through a naphthalene collection chamber 258 , a benzene collection chamber 260 , and a hydrogen sulphide removal chamber (not shown).
- the cleaned gas can then be stored in a gas holder (not shown).
- the design of the byproduct coke plant 250 can be altered to include additional or fewer chambers than expressly illustrated and described herein.
- the various treatment chambers can be arranged such that the raw gases flow through the chambers in any sequence. Such alterations are within the scope of the present technology.
- byproduct coke plant 200 may be susceptible to leaks that can allow air to enter the system and/or gases to uncontrollably flow from a high-pressure location to a low-pressure location.
- the high-pressure location can be internal or external to the coke plant 200
- the low-pressure location can be internal or external to the coke plant 200 , depending on the configuration of the plant 200 .
- Leaks may form, for example, in the oven doors, the flue chambers 204 , the waste gas tunnel 206 , the ducts 208 , the raw coke gas vents 210 , and/or the main collector channel 212 . Leaks may also form under insulation in, for example the flue chambers 204 .
- Leaks may form, for example, if one or more cracks extend between an external facing surface and an internal facing surface of the coking system. Leaks may also occur at connective joints and under/through insulation.
- a leak may allow raw coke oven gas or other pollutants to flow out of the system and into the surrounding environment. Accordingly, there is a need to test for and identify leaks in the coke plant 200 .
- a probe 220 is configured to detect leaks in the coke plant 200 by dispensing a gaseous tracer adjacent to potential leak sites.
- the probe 220 is configured to detect leaks in the coke plant by dispensing a gaseous tracer adjacent to a potential leak site.
- the probe 220 may be moved to any location adjacent to a potential leak site.
- the probe 220 can be a hand-held probe that a user can carry between potential leak sites. Accordingly, the probe 220 can enable a user to relatively quickly check multiple locations for leaks.
- the present technology further includes a detector configured to detect the gaseous tracer. The detector can be positioned at any location downstream of the probe 220 .
- FIG. 3 is a schematic illustration of a heat recovery coke plant configured to operate under a negative pressure.
- a plurality of heat recovery coke ovens 302 are provided for coking coal.
- the coke ovens 302 are fluidly connected to a plurality of heat recovery steam generators 304 by a common tunnel 306 .
- a cooled gas duct 308 transports cooled gas from the heat recovery steam generators 204 to an air quality control system 310 (e.g., a flue gas desulfurization system).
- a baghouse 312 for collecting particulates
- at least one draft fan 314 for controlling flue gas pressure within the system
- a main gas stack 316 e.g., an exhaust stack
- a probe 320 for dispensing a gaseous tracer is illustrated as being positioned adjacent to the plurality of ovens 302 .
- the probe is configured to detect leaks in the coke plant by dispensing a gaseous tracer adjacent to a potential leak site.
- the probe 320 may be moved to any location adjacent to a potential leak site.
- the probe 320 can be a hand-held probe that a user can carry between potential leak sites. Accordingly, the probe 320 can enable a user to relatively quickly check multiple locations for leaks.
- the present technology includes a detector 322 configured to detect the gaseous tracer inside the coke plant 320 .
- the detector is positioned adjacent to the main gas stack 316 .
- the detector 322 may be positioned at any location downstream of the probe 320 .
- the probes 220 , 320 may be any device configured to dispense a gaseous tracer.
- the probes 220 , 320 may include a valve configured to control the release of the gaseous tracer.
- the probes 220 , 320 may discharge a known volume of the gaseous tracer, a constant volume of the gaseous tracer, or a known and constant volume of the gaseous tracer.
- the detector 322 may be any device configured to measure an amount of the gaseous tracer.
- the detector 322 may be a mass spectrometer or other suitable device.
- the detector 322 is operably coupled to a vacuum pump or other mechanism configured to draw air into the sample.
- the detector can be moveable or fixed.
- the detector 322 is a hand-held or other moveable detector and can be carried between multiple locations.
- the detector 322 is secured or otherwise affixed to a structure of the coke plant 320 .
- the detector 322 can be temporarily affixed to a structure of the coke pant 320 while a test is performed, or can be affixed to a structure of the coke plant 320 for a longer period (e.g., semi-permanently, permanently, etc.).
- the detectors can be moveable to ensure an accurate reading can be taken.
- FIG. 4 illustrates one embodiment of a probe 400 .
- probes 220 , 320 are generally similar to probe 400 .
- the probe 400 includes a proximal end region 402 configured to receive a gaseous tracer from a gaseous tracer supply 420 (e.g., a gas storage canister).
- the probe 400 can include a hose 403 fluidly coupled to the gaseous tracer supply 420 .
- the probe also includes a distal end region 404 , configured to discharge the gaseous tracer.
- the distal end region 404 can include a spray nozzle 415 .
- the probe 400 may include a pressure regulator 406 , a gauge 408 , a hand valve 410 , and a two-way spring valve 412 .
- the pressure regulator 406 may be attached to a gaseous tracer supply 420 and may regulate the amount of gaseous tracer 420 flowing through the probe 400 .
- the gauge may visually depict the pressure in the probe 400 .
- the two-way spring valve 412 can control the discharge of the gaseous tracer through the spray nozzle 415 .
- the two-way spring valve is a two-way manually operated spring valve.
- FIG. 5 illustrates an embodiment of a known-volume spray probe 500 .
- probes 220 , 320 are generally similar to probe 500 .
- the probe 500 includes a proximal end region 502 configured to receive gaseous tracer from a gaseous tracer supply 520 (e.g., a gas storage canister).
- the probe 500 can include a hose 503 fluidly coupled to the gaseous tracer supply 420 .
- the probe also includes a distal end region 504 configured to discharge the gaseous tracer.
- the distal end region 404 can include a spray nozzle 515 .
- the probe 500 may include a pressure regulator 506 , a first gauge 508 , a first hand valve 510 , a known volume canister 518 , a second gauge 516 , a second hand valve 514 , and a two-way spring valve 512 .
- the known volume canister 518 may be filled to a constant pressure and sealed off from the gaseous tracer supply 520 .
- the contents of the known volume canister 518 can be discharged through the two-way spring valve so a known and constant amount of volume is released via the spray nozzle 515 .
- the known volume canister 518 may then be refilled to the same constant pressure, thereby ensuring the volume of gaseous tracer dispensed by the probe 500 remains constant.
- other probes suitable for discharging a gaseous substance can be used without deviating from the scope of the present technology.
- gaseous tracers may be suitable for use with the present technology.
- the gaseous tracer may be any compound that is not otherwise present in the system and is detectable at a location within the system.
- the gaseous tracer may already be present in the system and/or the environment. As will be described below, such tracers can be used because a baseline measurement of the gaseous tracer already present in the system can be taken and adjusted for.
- the gaseous tracer is a non-combustible tracer (e.g., it is at least partially stable and is not fully degraded in the system).
- the non-combustible gaseous tracer can comprise any non-reactive molecule or element.
- suitable non-reactive gaseous tracers include the noble gases, including but not limited to helium, neon, argon, xenon, and their isotopes.
- suitable gaseous tracers include non-noble gases such as fluorine gas.
- suitable gaseous tracers are nuclear tracers, such as tritium.
- the gaseous tracer may exhibit certain flow characteristics once mixed with other gases inside the system.
- the gaseous tracer may flow through some or generally all of the system with a generally turbulent flow.
- the flow of the gaseous tracer may be generally turbulent in at least one region of the system.
- the flow of the gaseous tracer through the system may further be characterized by its Reynolds number.
- the gaseous tracer may exhibit a Reynolds number of about 4,000 or more, about 10,000 or more, about 25,000 or more, about 50,000 or more, or about 100,000 or more in at least one region of the system.
- the gaseous tracer may also move through the system in a relatively short residence time.
- the residence time may be 120 seconds or less, 90 seconds or less, 60 seconds or less, 45 seconds or less, 30 seconds or less, and/or 15 seconds or less.
- the flow characteristics depend on, among other things, the conditions adjacent to and within the coking system.
- the present technology provides gaseous tracer tests that work in coking systems that exhibit a wide range of flow characteristics, including in systems having flow characteristics such as turbulent flow, high Reynolds numbers, and/or relatively short residence times.
- FIGS. 6-17 are flowcharts of methods of detecting leaks in accordance with the present technology. To better describe the present technology, certain aspects of the methods are highlighted while discussing specific figures. However, one skilled in the art will recognize that the present technology can include some embodiments with additional elements and/or without several of the elements described below with reference to FIGS. 6-17 . Therefore, any step discussed with respect to a method below may be included in any other method unless explicitly stated otherwise. Moreover, descriptions of certain steps previously described in detail may be shortened to avoid unnecessary repetition. One skilled in the art will recognize that many of the methods below include similar steps, and that the description of one step may be equally applicable to another similar step.
- FIG. 6 is a flowchart of a method 600 of detecting an air leak in a system configured to coke coal under a negative pressure.
- the method 600 begins by discharging a gaseous tracer adjacent to a potential leak site (e.g., any structure at least partially dividing a high-pressure system and a low pressure system) in the system (process step 602 ).
- a potential leak site e.g., any structure at least partially dividing a high-pressure system and a low pressure system
- the potential leak site can be any site in the system that may allow external air to enter into the system in an uncontrolled manner.
- potential leak sites include, but are not limited to, the sole flues, the oven chambers, the front doors of the ovens, the back doors of the ovens, the air inlets, the uptake ducts, and/or the common tunnel, as well as any connecting joints or ducts between said sites.
- the potential leak site includes a leak, the pressure differential between the inside of the system and the external environment will suck gaseous tracer into the system. Once inside the system, the gaseous tracer will move in a downstream direction away from the leak and towards a downstream location (e.g., an exhaust stack).
- the method 600 continues by measuring the amount of gaseous tracer at a location inside the system and downstream from the potential leak site (process step 604 ). Measurements may be made by any device suitable to continuously monitor a volume or amount of gaseous tracer (e.g., a mass spectrometer, etc.). Measurements may be made at any location downstream from the potential leak site (e.g., an exhaust stack, a distillation column, etc.). By measuring gaseous tracer at a location downstream from the potential leak site, any gaseous tracer that entered at the potential leak site during step 602 may be detected. Accordingly, detecting a spike in gaseous tracer during step 604 indicates there is likely a leak at the potential leak site. If no spike in gaseous tracer is detected, no gaseous tracer entered the system during step 602 , and therefore there likely is not a leak at the potential leak site.
- any device suitable to continuously monitor a volume or amount of gaseous tracer e.g., a mass spectrometer, etc
- FIG. 7 is a flowchart of a method 700 of detecting an air leak in a system configured to coke coal under a negative pressure after accounting for any gaseous tracer already present in the system.
- the method begins by measuring a baseline amount of gaseous tracer at a first location in a system for coking coal (process step 702 ).
- the baseline measurement can be made anywhere in the system.
- the baseline measurement may be taken at a location upstream from the surface to be tested. In other embodiments, the baseline measurement may be taken at a location downstream from or adjacent the surface to be tested.
- the operator can account for any gaseous tracer that may already be present in the system from previous tests and/or from another source, thereby enabling the operator to determine that a subsequent measurement of gaseous tracer is due to a leak allowing gaseous tracer into the system and not previously present gaseous tracer.
- the operator may optionally zero the gaseous tracer measuring device such that the baseline amount of gaseous tracer measures as zero on the device. As a consequence, detecting any gaseous tracer in the system during a subsequent gaseous tracer leak test will indicate there is a leak.
- the ambient gaseous tracer can be adjusted for after the test.
- Method 700 continues by discharging gaseous tracer adjacent to a potential leak site in the system that is upstream from the first location (process step 704 ).
- the potential leak site can be any site in the system that may allow external air to enter into the system in an uncontrolled manner.
- potential leak sites include, but are not limited to, the sole flues, the oven chambers, the front doors of the ovens, the back doors of the ovens, the air inlets, the uptake ducts, and/or the common tunnel, as well as any connecting joints or ducts between said sites. If the potential leak site includes a leak, the pressure differential between the inside of the system and the external environment will suck gaseous tracer into the system. Once inside the system, the gaseous tracer will move in a downstream direction away from the potential leak site and towards a downstream location.
- the method 700 continues by continuously measuring the amount of gaseous tracer at the first location for a period beginning when the gaseous tracer is discharged at the potential leak site (process step 706 ).
- any gaseous tracer that entered at the potential leak site during step 704 may be detected.
- the period may be any period of time approximately equal to the time it takes the gaseous tracer to travel from the potential leak site to the first location.
- the period may be determined by dividing the distance between the first location and the potential leak site by the average velocity of the gaseous tracer between the first location and the potential leak site. In some embodiments, this time may be 120 seconds or less, 90 seconds or less, 60 seconds or less, 45 seconds or less, 30 seconds or less, and/or 15 seconds or less.
- the method 700 continues by comparing the baseline amount of gaseous tracer with the amount of gaseous tracer observed during the period to determine if there is a leak at the potential leak site (process step 708 ). If the measuring device has been zeroed out in step 702 such that the baseline reading of gaseous tracer is zero, any gaseous tracer detected during the period likely entered the system through a leak at the potential leak site. If the measuring device was not zeroed out, a spike in the amount of gaseous tracer during the period likely indicates that gaseous tracer entered the system through a leak at the potential leak site. The method 700 may be optionally repeated by discharging a gaseous tracer at a second potential leak location upstream from the first location, and repeating steps 704 , 706 , and 708 .
- FIG. 8 is a flowchart of a method 800 of detecting an air leak in a system configured to coke coal under a negative pressure.
- the method 800 includes measuring a baseline amount of gaseous tracer at an exhaust stack (process step 802 ). As previously described in detail with respect to FIG. 7 , measuring a baseline amount of gaseous tracer can help account for any amount of gaseous tracer already present in the system.
- Method 800 further includes discharging a volume of the gaseous tracer adjacent to a potential leak site (process step 804 ). Similar to method 700 , the potential leak site should be located upstream of where the baseline amount of the gaseous tracer was measured. In this case, the potential leak site should be upstream from the exhaust stack.
- the method 800 continues by monitoring the amount of gaseous tracer at the exhaust stack for a period beginning when the gaseous tracer is discharged at the potential leak site (process step 806 ). Because the exhaust stack is downstream from the potential leak site, any gaseous tracer that enters the system at the leak site may be detected at the exhaust stack. Thus, the method 800 continues by comparing the baseline amount of gaseous tracer with the amount of gaseous tracer observed during the period to determine if there is a leak at the potential leak site (process step 808 ). If the measuring device has been zeroed out in step 802 such that the baseline reading of gaseous tracer is zero, any gaseous tracer detected during the period likely entered the system through a leak at the potential leak site. If the measuring device was not zeroed out, a spike in the amount of gaseous tracer during the period likely indicates that gaseous tracer entered the system through a leak at the potential leak site.
- FIG. 9 is a flowchart of a method 900 of detecting an air leak in a system configured to coke coal under a negative pressure.
- the method 900 includes measuring a baseline amount of gaseous tracer at a downstream location (process step 902 ).
- a downstream location is any location downstream of the sites to be tested for leaks.
- measuring a baseline amount of gaseous tracer can help account for any amount of the gaseous tracer already present in the system.
- the method 900 further includes injecting a first amount of a gaseous tracer into the system at a first location, wherein the first location is adjacent to a known leak site or another site that allows air to enter into the system (process step 904 ). Injecting the gaseous tracer into the system enables an operator to determine how the gaseous tracer will behave once inside the system. For example, the presence of the gaseous tracer will be monitored at the downstream location so a residence time can be determined for the first amount of gaseous tracer to travel from the first location to the downstream location (process step 906 ). It may be useful to determine the residence time because it can define the period of time to measure for the gaseous tracer when it has been sprayed on a potential leak site.
- the method 900 continues similarly to method 700 .
- the method 900 includes discharging a second amount of the gaseous tracer adjacent to a potential leak site (process step 908 ), continuously monitoring the amount of the gaseous tracer at the downstream location beginning when the gaseous tracer is discharged at the potential leak site and lasting for a period equal to the residence time (process step 910 ), and comparing the baseline amount of the gaseous tracer with the amount of the gaseous tracer observed during the period equal to the residence time to determine if there is a leak at the potential leak site (process step 912 ).
- any gaseous tracer detected during the period likely entered the system through a leak at the potential leak site. If the measuring device was not zeroed out, a spike in the amount of gaseous tracer during the period likely indicates that gaseous tracer entered the system through a leak at the potential leak site.
- FIG. 10 illustrates a method for detecting a leak and semi-quantitatively estimating the size of the leak.
- method 1000 begins similarly to method 900 : measuring a baseline amount of the gaseous tracer at a downstream location (process step 1002 ).
- the method 1000 continues by injecting a first known amount of the gaseous tracer into the system at a first location, wherein the first location is adjacent to a known leak site or another site that allows air to enter into the system (process step 1004 ).
- injecting a known amount of gaseous tracer can assist in quantitatively defining leaks.
- an operator may use a probe configured to dispense a known and constant amount of the gaseous tracer.
- probe 400 or probe 500 described above with respect to FIGS. 4 and 5 , may be utilized to discharge a known amount of gaseous tracer.
- injecting the gaseous tracer into the system enables an operator to determine how the gaseous tracer will behave once inside the system. For example, the presence of the gaseous tracer will be monitored at the downstream location so a residence time can be determined for the first amount of gaseous tracer to travel from the first location to the downstream location (process step 706 ).
- the method 1000 continues by discharging a second known amount of gaseous tracer adjacent to a potential leak site (process step 1008 ), continuously monitoring the amount of gaseous tracer beginning when the gaseous tracer is discharged at the potential leak site and lasting for at least a period equal to the residence time (process step 1010 ), and comparing the baseline amount of the gaseous tracer with the amount of the gaseous tracer observed during the period equal to the residence time to determine (i) if there is a leak at the potential leak site, and (ii) the size of the leak (process step 1012 ).
- method 1000 operates in a generally similar fashion as the methods described above: if the measuring device has been zeroed out in step 1002 such that the baseline reading of gaseous tracer is zero, any gaseous tracer detected during the period likely entered the system through a leak at the potential leak site, and if the measuring device was not zeroed out, a spike in the amount of gaseous tracer during the period likely indicates that the gaseous tracer entered the system through a leak at the potential leak site.
- the amount of gaseous tracer injected in step 1004 and discharged in step 1008 are known, the relative size of the leak can also be determined. For example, the amount discharged in steps 1004 and 1008 can be equal.
- the amount measured at the downstream location following this injection can represent an expected upper limit on the amount of gaseous tracer that could be observed in step 1010 .
- the amount of the gaseous tracer observed in step 1010 can be compared to the amount of the gaseous tracer observed following step 1004 to get a semi-quantitative estimate of the size of the leak.
- FIG. 11 illustrates one exemplary method for determining which of two potential leaks is larger.
- method 1100 begins with measuring a baseline amount of a gaseous tracer at a downstream location (process step 1102 ), discharging a first known amount of the gaseous tracer adjacent to a first leak site (process step 1104 ), and continuously monitoring a first amount of the gaseous tracer for a first period beginning when the gaseous tracer is discharged adjacent to the first potential leak site (process step 1106 ). The method 1100 continues by comparing the baseline amount of the gaseous tracer with the first amount of gaseous tracer observed during the first period to determine if there is a first leak at the first potential leak site (process step 1108 ).
- the method 1100 further includes discharging a second known amount of gaseous tracer adjacent to a second potential leak site (process step 1110 ).
- the second known amount of gaseous tracer should be approximately equal and/or equal to the first known amount.
- an operator may use a probe configured to dispense a known and constant amount of gaseous tracer.
- probe 400 or probe 500 described above with respect to FIGS. 4 and 5 , may be utilized to discharge a known and constant amount of gaseous tracer.
- the method 1100 next includes continuously monitoring the second amount of gaseous tracer at the downstream location for a second period beginning when the gaseous tracer is discharged at the second potential leak site (process step 1112 ).
- the second period should be approximately equal and/or equal to the first period.
- Method 1100 continues by comparing the baseline amount of the gaseous tracer with the second amount of the gaseous tracer to determine if there is a second leak at the second potential leak site (process step 1114 ). If a spike in the amount of gaseous tracer above the baseline amount is observed during the second period, there is likely a leak at the second potential leak site.
- Method 1100 continues by determining whether the first leak or the second leak is larger. To do so, the first amount of the gaseous tracer observed during the first period is compared with the second amount of the gaseous tracer observed during the second period (process step 1116 ). Since the first known amount and second known amount of gaseous tracer discharged adjacent to the first and second potential leak sites are the same amount, the amount of gaseous tracer observed during the first and second period can indicate whether the first or second leak is larger. For example, if more gaseous tracer is detected during the first period than during the second period, the first leak is likely larger than the second leak. Likewise, if more gaseous tracer is detected during the second period than during the first period, the second leak is likely larger than the first leak. This information can be useful, for example, in prioritizing which leak to fix first.
- FIG. 12 illustrates another exemplary method for detecting leaks and for identifying which of two potential leaks are larger.
- Method 1200 in FIG. 12 is similar to method 1100 , except that it includes determining a residence time to precisely define the period to monitor for the gaseous tracer following application of the gaseous tracer to a potential leak site.
- Method 1200 begins by measuring a baseline amount of gaseous tracer at a downstream location, which comprises a first measurement (process step 1202 ).
- the method 1200 continues by injecting a first known volume of the gaseous tracer into the system at a first location that is adjacent to a known leak site or another site that allows air to enter into the system (process step 1204 ).
- Method 1200 continues by discharging a second known amount of the gaseous tracer adjacent to a first leak site (process step 1208 ), and continuously measuring a second amount of the gaseous tracer for a period equal to the residence time, which comprises a second measurement (process step 1210 ). The method 1200 continues by comparing the first measurement with the second measurement to determine if there is a first leak at the first potential leak site (process step 1212 ). If a spike in the amount of gaseous tracer above the baseline amount is observed during the first measurement, there is likely a leak at the first potential leak site.
- the method 1100 further includes discharging a third known amount of gaseous tracer adjacent to a second potential leak site (process step 1114 ).
- the second known amount of gaseous tracer should be approximately equal and/or equal to the first known amount.
- an operator may use a probe configured to dispense a known and constant amount of gaseous tracer.
- probe 400 or probe 500 described above with respect to FIGS. 4 and 5 , may be utilized to inject a known and constant amount of gaseous tracer.
- the method 1100 next includes continuously measuring the third amount of gaseous tracer at the downstream location for at least a period equal to the residence time, which comprises a third measurement (process step 1116 ). Method 1100 continues by comparing the first measurement with the second measurement to determine if there is a second leak at the second potential leak site (process step 1118 ). If a spike in the amount of gaseous tracer above the baseline amount is observed during the second period, there is likely a leak at the second potential leak site.
- Method 1100 continues by determining whether the first leak or the second leak is larger. To do so, the second measurement is compared with the first measurement (process step 1016 ). Since the first known amount and second known amount of gaseous tracer discharged adjacent to the first and second potential leak sites are the same amount, the relative amount of gaseous tracer in the second and third measurements can indicate whether the first or second leak is larger. For example, if more gaseous tracer is detected during the second measurement, the first leak is likely larger than the second leak. Likewise, if more gaseous tracer is detected during the third measurement, the second leak is likely larger than the first leak. This information can be useful, for example, in prioritizing which leak to fix first.
- FIG. 13 is an exemplary method of quantitatively defining and comparing leaks.
- method 1300 includes injecting a first known amount of a gaseous tracer into the system at a first location adjacent to a known leak site or another site that allows air to enter into the system (process step 1302 ).
- the first location should allow a substantial amount of the gaseous tracer to enter into the system.
- the first known amount of the gaseous tracer is discharged directly into the system.
- Method 1300 continues by measuring a first amount of the gaseous tracer at a location downstream of the first location (process step 1304 ).
- a first volume versus time graph of the first amount of the gaseous tracer is generated (process step 1306 ). For example, continuous measurements taken with a mass spectrometer may be plotted on a volume versus time graph.
- a residence time for the gaseous tracer to move through the system may optionally be determined as described in detail above. However, in some embodiments, a period may equal 240 seconds or less, 120 seconds or less, 90 seconds or less, 60 seconds or less, 45 seconds or less, 30 seconds or less, and/or 15 seconds or less.
- Resultant graphs may include, for example, a slope, one or more inflection points, and a magnitude (e.g., area under the curve).
- the slope and magnitude of the graph may constitute quantitative parameters of the volume of the gaseous tracer detected. For example, a larger magnitude (e.g., area under the curve) indicates more gaseous tracer entered the system.
- the inflection points and/or the number of spikes in concentration may, for example, indicate whether the gaseous tracer entered the system at a single location, or whether it entered at one or more locations.
- Method 1300 continues by discharging a second known amount of the gaseous tracer adjacent to a first potential leak site (process step 1308 ).
- the second amount of the gaseous tracer should be approximately equal to the first known amount.
- Method 1300 further includes measuring a second amount of the gaseous tracer at the location downstream of the first location, wherein the downstream location is also downstream of the second potential leak site (process step 1310 ), and generating a second volume versus time graph of the second amount of the gaseous tracer, wherein the graph includes a slope, inflection points, and a magnitude (process step 1312 ). This can be done in a similar fashion as described above with respect to step 1306 .
- the first volume versus time graph and the second volume versus time graph may be compared to determine (i) if there is a leak at the potential leak site, and (ii) the size of the leak.
- the second volume versus time graph can be analyzed. If there is a spike in the amount of gaseous tracer observed, there is likely a leak.
- the first and second volume versus time graphs may be compared. Since the first volume versus time graph resulted from injecting the gaseous tracer into the system, it quantifies the behavior of the gaseous tracer if approximately all of the gaseous tracer entered the system.
- the second volume versus time graph can be compared against the first volume versus time graph to quantitatively determine certain characteristics of the leak. For example, if the magnitude under the curve of the second graph approaches the magnitude under the curve of the first graph, the leak is relatively large (e.g., more gaseous tracer was able to enter the system through the leak). If the magnitude under the curve of the second graph is much smaller than the first graph, the leak is relatively small (e.g., less gaseous tracer was able to enter the system through the leak). Likewise, the distance between inflection points can indicate whether the gaseous tracer entered through a single leak or through two or more leaks.
- the gaseous tracer may have entered through multiple leaks, with each inflection point indicating a separate leak.
- the data collected from one or more of the tests described herein can be analyzed using an algorithm or other computational modeling software.
- the data is analyzed to determine an estimated leak rate (e.g., in lbs/hr and/or O2%). Such modeling may also predict the reduction of the leak rate following repair of one or more specific leaks and may help a user prioritize which leak(s) to repair first.
- method 1300 is described above with respect to measuring a volume of the gaseous tracer and generating a volume versus time graph, one skilled in the art will recognize that other measurements corresponding to an amount of the gaseous tracer (e.g., mass, moles, etc.) could be utilized.
- an amount of the gaseous tracer e.g., mass, moles, etc.
- FIG. 14 is an exemplary method in accordance with the present technology that enables a user to test for leaks across a first region of a coking system, and, if a leak is found, test smaller regions within the first region to determine where the leak is.
- method 1400 includes spraying a first external facing region of a system for coking coal with a gaseous tracer (process step 1402 ).
- the first external facing region of the system may be any region of the system that may be susceptible to leaks.
- the size of the first region may be variable: for example, in some embodiments, the first region may be between about 5 square feet and about 50 square feet.
- the method continues by measuring the gaseous tracer in the system at a location downstream of the first external facing region (process step 1404 ).
- a second external facing region positioned within the first external facing region and having a smaller surface area than the first external facing region may be sprayed with gaseous tracer (process step 1406 ).
- the gaseous tracer will be measured for at a location downstream of the second external facing region (process step 1408 ). If gaseous tracer is detected, there is likely a leak within the second region. If no gaseous tracer is detected, there is likely no leak in the second region. Steps 1306 and 1308 may be repeated in other sub-regions of the first external facing region to determine if there are other leaks in other regions of the first external facing region.
- FIG. 15 illustrates an exemplary method of combining a gaseous tracer leak detection test with a visually based smoke or colored gas test.
- method 1500 begins by spraying an external facing region of a system for coking coal with a gaseous tracer (process step 1502 ), and measuring the amount of the gaseous tracer in the system at a location downstream of the first external facing region (process step 1504 ). If a spike in the amount of gaseous tracer is detected, there is likely a leak within the external facing region. To better determine where the leak is within the first external facing region, a device configured to dispense smoke or colored gas may be dispensed adjacent to the external facing region (process step 1506 ). An example of such device is a smoke bomb.
- any device configured to dispense smoke and/or colored gas may be suitable. After the device has dispensed the smoke or colored gas, a user will observe the smoke or colored gas to detect a sub-region of the external facing region that has one or more cracks (process step 1508 ). The cracks may be detected, for example, by observing smoke or colored gas being sucked into the system in a sub-region, thereby indicating there is a leak in the sub-region.
- FIG. 16 illustrates another exemplary method of detecting a leak between a high-pressure system and a low-pressure system.
- method 1600 includes injecting a gaseous tracer into a high-pressure system at a first location adjacent to a low-pressure system (process step 1602 ).
- the gaseous tracer may be injected adjacent to a structure configured to at least partially divide the high-pressure system and the low-pressure system.
- the high-pressure system and low-pressure system are designed to be fluidly isolated.
- the high-pressure system and low-pressure system might in complete fluid isolation, or the high-pressure system and low-pressure system might be designed such that they are not uncontrollably fluidly connected (e.g., a fluid connection includes a controllable damper to fluidly isolate the high-pressure system and the low-pressure system).
- a fluid connection includes a controllable damper to fluidly isolate the high-pressure system and the low-pressure system.
- the high-pressure system is a byproduct coking system
- the low-pressure system is external to the byproduct coking system.
- the high-pressure system is a first aspect of a byproduct coking system (e.g., an oven), and the low-pressure system is a second aspect of the byproduct coking system (e.g., a flue chamber surrounding the oven).
- the high-pressure system is the external environment and the low-pressure system is a heat recovery coking system.
- FIG. 17 illustrates another exemplary method of detecting a leak between a high-pressure system and a low-pressure system.
- method 1700 includes injecting a gaseous tracer into a high-pressure system at a first location adjacent to a low-pressure system (process step 1702 ), and measuring the amount of gaseous tracer at a second location inside the low-pressure system (process step 1704 ).
- the high-pressure system and/or the low-pressure system can be one or more regions within a byproduct coke plant (e.g., ovens, flue chambers, etc.).
- gas within the high-pressure system may eventually reach the low-pressure system through one or more connecting ducts, regardless of whether a leak between the high-pressure system and low-pressure system exists.
- gas or air in the high-pressure system may enter the low-pressure system, even if there is no leak between the high-pressure and low-pressure systems. Accordingly, in some embodiments, a single spike in the amount of gaseous tracer measured does not necessarily indicate that there is a leak.
- detecting multiple, temporally spaced apart spikes in the amount of gaseous tracer at the second location indicate the potential presence of a leak between the high-pressure system and the low-pressure system (process step 1706 ).
- the first spike may occur within a first period of time beginning when the gaseous tracer is injected (e.g., less than 5 seconds, less than 10 seconds, less than 15 seconds, less than 20 seconds etc.), and the second spike may occur during a second period of time beginning when the gaseous tracer is injected (e.g., more than 5 seconds, more than 10 seconds, more than 15 seconds, more than 20 seconds, etc.).
- the first spike may represent gaseous tracer entering the low-pressure system through a leak
- the second spike may represent gaseous tracer entering the low-pressure system through the one or more connection ducts.
- the high-pressure system is a first aspect of a byproduct coking system
- the low-pressure system is a second aspect of a byproduct coking system.
- the coke plants described herein can include various sensors (e.g., oxygen sensors) that continuously or at least semi-continuously detect the presence of a target substance or molecule (e.g., oxygen). If an unexplained change in concentration of the target substance or molecule is sensed by the sensor (e.g., if the concentration of measured oxygen unexpectedly increases), the monitoring system can send an alert to a user.
- the alert can state that an abnormality was sensed, and/or can include more detailed information such as a suspected location of a problem (e.g., leak) causing the abnormality.
- the alert can direct the user to said location to perform a gaseous tracer test as described herein to more accurately identify the leak, identify the precise location of the leak, and/or semi-quantitatively analyze a size of the leak.
- the monitoring system may also include a gaseous tracer detector (e.g., a Helium detector, etc.) such that a user does not need to deploy a gaseous tracer detector after receiving the alert and before conducting the gaseous tracer test.
- a gaseous tracer detector e.g., a Helium detector, etc.
- a gaseous tracer test representative of some embodiments of the present technology was performed to detect leaks in or around a heat recovery steam generator in a heat recovery coking system.
- a helium detector was placed downstream from the heat recovery steam generator adjacent the main stack at the outlet of the induced draft fans, although in other examples other locations downstream from the tested surface can be used, as described in detail above. The detector was positioned to measure helium concentration inside of the heat recovery coking system. Before testing for leaks, a known volume of helium was injected into an open oven uptake while the detector was recording helium concentration. The time between the injection of helium into the open oven uptake and the detection of the helium at the downstream detector defined a residence time for the helium.
- helium was discharged using a probe generally similar to probe 400 . More specifically, the helium was sprayed on various external facing surfaces of the heat recovery steam generators. As discussed above, the present technology enables a user to sequentially test multiple surfaces for leaks. Accordingly, the probe was used to spray various surfaces of the heat recovery steam generator while the helium detector was continuously recording the concentration of helium within the system. The results of the tests are illustrated in FIG. 18 .
- the x-axis represents time (in seconds), and the y-axis represents the concentration of helium detected by the mass spectrometer (e.g., the leak rate LR). As illustrated in FIG.
- the helium detector measured two primary spikes in helium concentration (labeled A and B, respectively). Based on the residence time that it takes for the helium to flow from the leak to the helium detector, the location of a leak associated with the first spike can be calculated. For example, the first spike A was measured approximately 30 seconds after spraying a first external surface of the heat recovery steam generator, and the second spike B was measured approximately 30 seconds after spraying a second external surface of the heat recovery steam generator. Accordingly, the graph indicates there is a first leak at the first external surface and a second leak at the second external surface.
- the first leak was associated with a cross-over portion of the heat recovery steam generator (e.g., a cross-over duct), and the second leak was associated with an elbow of the heat recovery steam generator.
- the area under the first spike A and the area of under the second spike B can be calculated to semi-quantitatively assess the magnitude of the leak. For example, assuming other variables are approximately equal, such as the amount of helium discharged at each test location, if the area under the curve at the first spike A is greater than the area under the curve at the second spike B, the leak indicated by the first spike A is likely larger (i.e., allowing greater airflow into the system) than the leak indicated by the second spike B.
- a gaseous tracer test representative of some embodiments of the present technology was performed to detect leaks in or around a heat recovery steam generator in a heat recovery coking system.
- a helium detector was placed downstream from the heat recovery steam generator adjacent the main stack at the outlet of the induced draft fans, although in other examples other locations downstream from the tested surface can be used, as described in detail above. The detector was positioned to measure helium concentration inside of the heat recovery coking system. Before testing for leaks, a known volume of helium was injected into an open oven uptake while the detector was recording helium concentration. The time between the injection of helium into the open oven uptake and the detection of the helium at the downstream detector defined a residence time for the helium.
- helium was discharged using a probe generally similar to probe 400 . More specifically, the helium was sprayed on various external facing surfaces of the ovens that are designed to be fluidly isolated from an interior of the system. The results of the tests are illustrated in FIG. 19 .
- the x-axis represents time (in seconds), and the y-axis represents the concentration of helium detected by the helium detector.
- the dashed line represents the helium concentration, and the solid gray shaded area beneath the dashed line represents the detected helium minus the control amount of helium (e.g., an ambient amount of helium not introduced via a test).
- Each measurement A-H represents a different tested structure (e.g., a first oven door, a first oven side wall, a second oven door, a second oven side wall, etc.).
- Table 1 reports the numerical results of the test:
- the concentration of detected helium spiked after spraying surfaces B and F For example, the concentration of detected helium spiked from around 3.40E 7 Atm ⁇ cc/s after spraying surface A to about 1.6E 6 Atm ⁇ cc/s after spraying surface B. This indicates that more helium entered the system after spraying surface B than after spraying surface A. Likewise, the concentration of detected helium spiked from around 3.6E 7 Atm ⁇ cc/s after spraying surface E to about 1.0E 6 Atm ⁇ cc/s after spraying surface F. Accordingly, this indicates that more helium entered the system after spraying surface F than after spraying surface E. Any of the above values can be compared to determine which surfaces are allowing the most air to enter the system.
- references herein to “one embodiment,” “an embodiment,” or similar formulations means that a particular feature, structure, operation, or characteristic described in connection with the embodiment can be included in at least one embodiment of the present technology. Thus, the appearances of such phrases or formulations herein are not necessarily all referring to the same embodiment. Furthermore, various particular features, structures, operations, or characteristics may be combined in any suitable manner in one or more embodiments.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Metallurgy (AREA)
- Coke Industry (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
- Examining Or Testing Airtightness (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
- Treating Waste Gases (AREA)
Abstract
Description
- The present application claims priority to U.S. Provisional Patent Application No. 62/785,728, titled “GASEOUS TRACER LEAK DETECTION,” filed Dec. 28, 2018; U.S. Provisional Patent Application No. 62/786,096, titled “SYSTEMS AND METHODS FOR TREATING A SURFACE OF A COKE PLANT,” filed Dec. 28, 2018; U.S. Provisional Patent Application No. 62/786,157, titled “COKE PLANT TUNNEL REPAIR AND FLEXIBLE JOINTS,” filed Dec. 28, 2018; and U.S. Provisional Patent Application No. 62/786,194, titled “COKE PLANT TUNNEL REPAIR AND ANCHOR DISTRIBUTION,” filed Dec. 28, 2018; the disclosures of which are hereby incorporated by reference in their entireties.
- The present technology generally relates to systems for coking coal, and in particular to systems and methods for detecting a leak in a system for coking coal.
- Coke is a solid carbon fuel and carbon source used to melt and reduce iron ore in the production of steel. Coking ovens have been used for many years to convert coal into metallurgical coke. In one process, coke is produced by batch feeding pulverized coal to an oven that is sealed and heated to very high temperatures for 24 to 48 hours under closely-controlled atmospheric conditions. During the coking process, the finely crushed coal devolatilizes and forms a fused mass of coke having a predetermined porosity and strength. Because the production of coke is a batch process, multiple coke ovens are operated simultaneously.
- One style of coke plants includes Horizontal Heat Recovery (HHR) ovens, which have a unique environmental advantage over chemical byproduct ovens based upon a relative operating atmospheric pressure condition inside the oven. HHR ovens operate under negative pressure, whereas chemical byproduct ovens operate at a slightly positive atmospheric pressure. Both oven types are typically constructed of refractory bricks and other materials in which creating a generally airtight environment can be a challenge because small cracks can form in these structures, thereby allowing air to leak in or out of the oven. Cracks may also form in structures fluidly coupled to the ovens, exacerbating the challenge of creating an airtight environment. In coke plants operating under a negative pressure, such cracks may permit uncontrolled air to leak into the system, thereby affecting the overall functionality of the coke plant. And in coke plants operating under a positive pressure, such cracks may permit gases to escape from the plant before being treated, thereby making it more difficult to control the coking conditions and increasing the environmental footprint of the coke plant.
- Accordingly, identifying leaks so they can be repaired is an important step in maintaining a functioning coke plant. Current leak detection methods are suboptimal for a variety of reasons. For example, current leak detection methods do not allow a user to quantitatively analyze the size of leaks, and therefore do not allow users to prioritize repair of troublesome leaks. Furthermore, leaks in certain locations (e.g., in an insulated chamber, in the sole flue, etc.) may be difficult and/or not possible to locate with current methods.
-
FIG. 1 is an isometric, partial cut-away view of a portion of a horizontal heat recovery coke plant configured in accordance with select embodiments of the present technology. -
FIG. 2A is an isometric, partial cut-away view of a portion of a byproduct coke oven battery configured in accordance with select embodiments of the present technology. -
FIG. 2B is a schematic illustration of a byproduct coke plant, including the byproduct coke oven battery illustrated inFIG. 2A , configured in accordance with select embodiments of the present technology. -
FIG. 3 is a schematic illustration of a heat recovery coke plant configured in accordance with select embodiments of the present technology. -
FIG. 4 is a schematic illustration of a gaseous tracer spray probe configured in accordance with one embodiment of the present technology. -
FIG. 5 is a schematic illustration of another gaseous tracer spray probe configured in accordance with another embodiment of the present technology. -
FIG. 6 is a flowchart of amethod 600 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology. -
FIG. 7 is a flowchart of amethod 700 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology. -
FIG. 8 is a flowchart of amethod 800 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology. -
FIG. 9 is a flowchart of amethod 900 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology. -
FIG. 10 is a flowchart of amethod 1000 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology. -
FIG. 11 is a flowchart of amethod 1100 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology. -
FIG. 12 is a flowchart of amethod 1200 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology. -
FIG. 13 is a flowchart of amethod 1300 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology. -
FIG. 14 is a flowchart of amethod 1400 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology. -
FIG. 15 is a flowchart of amethod 1500 of detecting an air leak in a system for coking coal and in accordance with select embodiments of the present technology. -
FIG. 16 is a flowchart of amethod 1600 of detecting a leak between a high-pressure system and a low-pressure system. -
FIG. 17 is a flowchart of amethod 1700 of detecting a leak between a high-pressure system and a low-pressure system. -
FIG. 18 is a graphical illustration of the results of a first gaseous tracer leak detection test performed in accordance with embodiments of the present technology. -
FIG. 19 is a graphical illustration of the results of a second gaseous tracer leak detection test performed in accordance with embodiments of the present technology. - The present technology provides systems and methods for detecting leaks in a system for coking coal (e.g., a coke plant). The system and methods can include discharging a gaseous tracer at a first location adjacent to a potential leak site (e.g., a “test” location) in the coke plant, and, after discharging the gaseous tracer at the test location, measuring an amount of the gaseous tracer at a location downstream of the test location (e.g., at a second location with a lower pressure than the first location). The downstream location can be at least partially fluidly isolated from the test location under normal, non-leaking, operating conditions. Measuring a spike in the concentration of the gaseous tracer at the location downstream of the potential leak site can therefore indicate that there is a leak at the test location. As discussed in greater detail below, the present technology be used to detect leaks in a number of different coke plant systems, including chemical byproduct coke plants (“byproduct system”), heat recovery coke plants (“heat recovery system”), beehive/non-recovery coke plants (“non-recovery system”), and other types of coke plants known in the art.
- Coke plants have a number of different structures that may be susceptible to forming leaks. For example, coke system(s) generally have a plurality of coke ovens for heating coal to produce coke. In some embodiments, coke systems may also include one or more flue gas chambers, a plurality of heat recovery steam generators, a common tunnel fluidly coupled to the plurality of coke ovens and/or the plurality of heat recovery steam generators, and/or other features common to coke plants known in the art. Due to a variety of reasons, various structures and/or surfaces in the coke plant may be susceptible to cracking or other wear that permits an airflow between the external environment and the interior of the system, or vice versa. Such airflow may be problematic, for example, because it can make it challenging to maintain a desired pressure inside the system, can make it challenging to maintain a suitable temperature for coking coal, and can adversely affect the quality of coke produced by the system. The uncontrolled airflow may also increase the environmental footprint of certain coke plants. Accordingly, the present technology provides systems and methods for detecting leaks that permits air to enter or leave the coking system in an uncontrolled and/or undesired manner, or otherwise affects the performance of the coke plant. More specifically, as will be described in detail herein, select embodiments of the present technology can, among other things, (1) identify whether a leak exists, (2) identify a location of a leak, and/or (3) at least semi-quantitatively analyze the size of the leak. Identifying cracks enables the cracks to be repaired, patched, or otherwise treated to mitigate and/or eliminate the foregoing problems, among other things. In some embodiments, the present technology enables leaks to be detected without reducing the temperature of the coking plant or taking the coking plant “offline” (i.e., the test can be performed without interrupting the operation of the coke plant). For example, in some embodiments the tests described herein can be performed in systems having temperatures of 100 degrees Celsius or higher, 500 degrees Celsius or higher, 1,000 degrees Celsius or higher, and/or 1,500 degrees Celsius or higher, thereby allowing the tests to be performed without interrupting the coking cycle.
- As will be described in greater detail below, the present technology can be applied to any number of coke plants, including, for example, heat recovery coking systems and byproduct coking systems. For example, for heat recovery systems, several embodiments of the present technology include discharging a gaseous tracer adjacent to an external facing surface of the coke plant. If there is a leak between the external facing surface and the interior of the coke plant, the negative pressure of the heat recovery system will draw the gaseous tracer into the coke plant. Accordingly, the amount of gaseous tracer inside the heat recovery system may be measured at a location downstream of the tested external facing surface to determine if gaseous tracer discharged at the potential leak site entered the heat recovery system. If a spike in gaseous tracer is observed at the downstream location inside the heat recovery system, there is likely a leak on the tested surface. This process may be repeated at any number of potential leak sites. Likewise, in byproduct coking systems, several embodiments of the present technology include discharging a gaseous tracer into a high-pressure environment adjacent a low-pressure environment. If there is a leak between the high-pressure environment and the low-pressure environment, the gaseous tracer will be detected in the low-pressure environment.
- As will be discussed in detail herein, the present system is beneficial because, among other things, it can at least partially quantitatively characterize leaks and locate leaks in locations where traditional methods cannot. For example, the present technology allows coke plant operators to prioritize repair of more troublesome leaks based on the provided quantitative analysis. Furthermore, the present technology enables identification of leaks in locations that were previously difficult to test, such as insulated regions of the system or in the sole flue. The present technology, for example, is capable of identifying regions that do not have a direct leak into the interior of the system, but instead allow air into a region between an outer surface and insulation. This air may be problematic because it can migrate beneath the insulation and enter the system at a different location.
- Specific details of several embodiments of the disclosed technology are described below with reference to particular, representative configurations. The disclosed technology can be practiced in accordance with coke making systems having other suitable configurations. Specific details describing structures or processes that are well-known and often associated with coke making systems but that can unnecessarily obscure some significant aspects of the present technology are not set forth in the following description for clarity. Moreover, although the following disclosure sets forth some embodiments of the different aspects of the disclosed technology, some embodiments of the technology can have configurations and/or components different than those described in this section. As such, the present technology can include some embodiments with additional elements and/or without several of the elements described below with reference to
FIGS. 1-17 . - As used herein, the terms “coke plants”, “coking plants”, “coke systems,” “coking systems,” “systems for coking coal,” and their variants collectively refer to any type of coke plant, including byproduct coke plants, heat recovery coke plants, horizontal heat recovery coke plants, non-recovery coke plants, and horizontal non-recovery coke plants. Moreover, certain aspects of the present disclosure are described in the context of a specific oven type. However, as one skilled in the art will appreciate, such aspects may be readily adapted for use with any type of coke plant. Accordingly, aspects of the present disclosure is not limited to a specific type of coke plant, unless explicitly noted otherwise.
- As used herein, the terms “high-pressure system” and “low-pressure system” are used in a relative manner. Neither the “high-pressure system” nor the “low-pressure system” require a pressure above or below a specific magnitude. Rather, the term “high-pressure system” is used to mean that the system has a pressure that is greater than a pressure in another adjacent system (e.g., a low-pressure system). Likewise, the term “low-pressure system” is used to mean that the system has a pressure that is less than a pressure in another adjacent system (e.g., a high-pressure system).
- As used herein, the terms “upstream” and “downstream” refer to the expected direction of gas flow in a coke plant. For example, gas is expected to flow in a direction from an upstream structure to a downstream structure.
- As used herein, the term “residence time” refers to the duration of time that it takes for a gas to travel between two locations. For example, the first location can be any test location and the second location can be any location where measurements are taken.
- Reference throughout this specification to relative terms such as, for example, “generally,” “approximately,” and “about” are used herein to mean the stated value plus or minus 10%. For example, the term “about 100” refers to a range from 90 to 110, inclusive.
- Referring to
FIG. 1 , acoke plant 100 is illustrated which produces coke from coal in a reducing environment. In general, thecoke plant 100 comprises at least one oven 101, along with heat recovery steam generators and an air quality control system (e.g. an exhaust or flue gas desulfurization system) both of which are positioned fluidly downstream from the ovens and both of which are fluidly connected to the ovens by suitable ducts. According to aspects of the disclosure, the coke plant can include a heat recovery or a non-heat recovery coke oven, or a horizontal heat recovery or horizontal non-recovery coke oven. Thecoke plant 100 preferably includes a plurality of ovens 101 and acommon tunnel 102 that is fluidly connected to each of the ovens 101 withuptake ducts 103. A cooled gas duct transports the cooled gas from the heat recovery steam generators to the flue gas desulfurization system. Fluidly connected and further downstream are a baghouse for collecting particulates, at least one draft fan for controlling air pressure within the system, and a main gas stack for exhausting cooled, treated exhaust to the environment. Steam lines interconnect the heat recovery steam generators and a cogeneration plant so that the recovered heat can be utilized. Thecoke plant 100 can also be fluidly connected to abypass exhaust stack 104 that can be used to vent hot exhaust gasses to the atmosphere in emergency situations. -
FIG. 1 illustrates four ovens 101 with sections cut away for clarity. Each oven 101 comprises anoven chamber 110 preferably defined by afloor 111, afront door 114, arear door 115 preferably opposite thefront door 114, twosidewalls 112 extending upwardly from thefloor 111 intermediate the front 114 and rear 115 doors, and acrown 113 which forms the top surface of theoven chamber 110. Controlling air flow and pressure inside the oven 101 can be critical to the efficient operation of the coking cycle and therefore the oven 101 includes one ormore air inlets 119 that allow air into the oven 101. Eachair inlet 119 includes an air damper which can be positioned at any number of positions between fully open and fully closed to vary the amount of primary air flow into the oven 101. In the illustrated embodiment, the oven 101 includes anair inlet 119 coupled to thefront door 114, which is configured to control air flow into theoven chamber 110, and anair inlet 119 coupled to asole flue 118 positioned beneath thefloor 111 of the oven 101. Alternatively, the one ormore air inlets 119 are formed through thecrown 113 and/or in theuptake ducts 103. In operation, volatile gases emitted from the coal positioned inside theoven chamber 110 collect in thecrown 113 and are drawn downstream in the overall system intodowncomer channels 117 formed in one or bothsidewalls 112. Thedowncomer channels 117 fluidly connect theoven chamber 110 with thesole flue 118. Thesole flue 118 forms a circuitous path beneath thefloor 111 and volatile gases emitted from the coal can be com busted in thesole flue 118, thereby generating heat to support the reduction of coal into coke. Thedowncomer channels 117 are fluidly connected touptake channels 116 formed in one or bothsidewalls 112. Theair inlet 119 coupled to thesole flue 118 can fluidly connect thesole flue 118 to the atmosphere and can be used to control combustion within thesole flue 118. The oven 101 can also include aplatform 105 adjacent to thefront door 114 that a worker can stand and walk on to access the front door and theoven chamber 110. - In operation, coke is produced in the ovens 101 by first loading coal into the
oven chamber 110, heating the coal in an oxygen depleted environment, driving off the volatile fraction of coal and then oxidizing the volatiles within the oven 101 to capture and utilize the heat given off. The coal volatiles are oxidized within the ovens over a 48-hour coking cycle and release heat to regeneratively drive the carbonization of the coal to coke. The coking cycle begins when thefront door 114 is opened and coal is charged onto thefloor 111. The coal on thefloor 111 is known as the coal bed. Heat from the oven (due to the previous coking cycle) starts the carbonization cycle. Preferably, no additional fuel other than that produced by the coking process is used. Roughly half of the total heat transfer to the coal bed is radiated down onto the top surface of the coal bed from the luminous flame andradiant oven crown 113. The remaining half of the heat is transferred to the coal bed by conduction from thefloor 111, which is convectively heated from the volatilization of gases in thesole flue 118. In this way, a carbonization process “wave” of plastic flow of the coal particles and formation of high strength cohesive coke proceeds from both the top and bottom boundaries of the coal bed at the same rate, preferably meeting at the center of the coal bed after about 45-48 hours. - Any of a number of structures, locations, connections, and/or surfaces within the
coke plant 100 may be susceptible to leaks. Leaks may form, for example, in thesole flue 118, in thefront door 114, in theair inlet 119, in theuptake ducts 103, and/or in thecommon tunnel 102. Other locations not explicitly mentioned herein may also be susceptible to leaks. Leaks may form, for example, if one or more cracks extend between an external facing surface and an internal facing surface of the coking system. Leaks may also occur at connective joints. When thecoke plant 100 is operating under a negative pressure, such as in a heat recovery system, a leak will allow uncontrolled air to enter into thecoke plant 100, thereby affecting the functionality of thecoke plant 100. Accordingly, there is a need to test for and identify leaks in thecoke plant 100. Thus, aprobe 120 is provided to test for leaks at potential leak sites. As will be described in detail herein, theprobe 120 is configured to detect leaks in thecoke plant 100 by dispensing a gaseous tracer adjacent to a potential leak site. -
FIG. 2A illustrates acoke oven battery 200 of a byproduct coke plant. Thecoke oven battery 200 includes a plurality of narrow, vertically orientedcoke ovens 202. During operation, coal is loaded into theovens 202 and heated in a reducing atmosphere to vaporize the volatiles into a raw coke gas. The raw coke gas is transported to a by-product plant for treatment, as will be described in greater detail below. The remaining coke mass is pushed from the oven and can be wet or dry quenched prior to its shipment to a blast furnace for further processing, as known in the art. - The
coke ovens 202 are heated via burning gaseous fuel and allowing the heated gases to occupyflue chambers 204 positioned around theovens 202. In some embodiments, eachoven 202 can share a commonheating flue chamber 204 with anadjacent oven 202. Theplant 200 can further include awaste gas tunnel 206 and a plurality ofducts 208 fluidly connecting theflue chambers 204 and thewaste gas tunnel 206. The gaseous fuel can be combusted adjacent theflue chambers 204 to generate hot flue gas that can enter theflue chambers 204 and heat thecoke ovens 202. The flue gas can then enter thewaste gas tunnel 206 via the plurality ofducts 208 and be transported to an exhaust stack (not shown). - The
coke oven battery 200 also includes a plurality of rawcoke gas vents 210 fluidly connected to theoven chambers 202. After raw coke gas is vaporized from the heated coal in theoven chambers 202, the raw coke gas vents transport the raw gas from theoven chambers 202 to amain collector channel 212. Themain collector channel 212 delivers the raw coke gas vents to a byproduct treatment plant, as described in detail with respect toFIG. 2B . The raw coke oven gas can include a mixture of water vapor, hydrogen methane, nitrogen, carbon monoxide, carbon dioxide, and/or various hydrocarbons. Raw coke oven gas can also include tar vapors, light oil vapors, naphthalene, vapor, ammonia gas, hydrogen sulfide gas, hydrogen cyanide gas, and/or other contaminates in various amounts. Typically, the raw coke gas is treated in a byproduct treatment plant to transform the raw gas into environmentally friendly fuel gases. -
FIG. 2B is a schematic illustration of thecoke oven battery 200 operably coupled to thebyproduct coke plant 250 for processing the raw coke oven gas. As illustrated, thebyproduct coke plant 250 receives raw coke gas via themain collector channel 212. As raw coke gas exits thebyproduct coke plant 202, it is cooled by a primary gas cooler (not shown) and passes through agas condensation chamber 252. The primary gas cooler cools the raw gas to remove water vapor. Suitable primary gas coolers include spray type coolers and horizontal tube type coolers. As the raw gas is cooled, the water, tar, and naphthalene condense out, leaving behind a condensate in thegas condensation chamber 252. The gas next flows through atar precipitator chamber 254. Tar precipitators can use high voltage electrodes to charge the tar particles in the gas and subsequently capture the tar particles through electrostatic attraction. After flowing through thetar precipitator chamber 254, the gas flows through anammonia removal chamber 256. Ammonia is removed from the gas in theammonia removal chamber 256. For example, ammonia can be removed from the gas through contacting the gas with a solution of sulphuric acid to form ammonium sulphate. In another example, the ammonia is removed from the gas using a solution of mono ammonium phosphate to produce anhydrous ammonia. The gas then flows through anaphthalene collection chamber 258, abenzene collection chamber 260, and a hydrogen sulphide removal chamber (not shown). The cleaned gas can then be stored in a gas holder (not shown). As one skilled in the art will appreciate, however, the design of thebyproduct coke plant 250 can be altered to include additional or fewer chambers than expressly illustrated and described herein. Likewise, the various treatment chambers can be arranged such that the raw gases flow through the chambers in any sequence. Such alterations are within the scope of the present technology. - As with
coke plant 100,byproduct coke plant 200 may be susceptible to leaks that can allow air to enter the system and/or gases to uncontrollably flow from a high-pressure location to a low-pressure location. As one skilled in the art will appreciate, the high-pressure location can be internal or external to thecoke plant 200, and the low-pressure location can be internal or external to thecoke plant 200, depending on the configuration of theplant 200. Leaks may form, for example, in the oven doors, theflue chambers 204, thewaste gas tunnel 206, theducts 208, the rawcoke gas vents 210, and/or themain collector channel 212. Leaks may also form under insulation in, for example theflue chambers 204. Other locations not explicitly mentioned herein may also be susceptible to leaks (e.g., in an air space beam area, in a cold duct, by fans, etc.). Leaks may form, for example, if one or more cracks extend between an external facing surface and an internal facing surface of the coking system. Leaks may also occur at connective joints and under/through insulation. When thecoke plant 200 is operating under a positive pressure, a leak may allow raw coke oven gas or other pollutants to flow out of the system and into the surrounding environment. Accordingly, there is a need to test for and identify leaks in thecoke plant 200. Thus, as illustrated inFIG. 2A , aprobe 220 is configured to detect leaks in thecoke plant 200 by dispensing a gaseous tracer adjacent to potential leak sites. Theprobe 220 is configured to detect leaks in the coke plant by dispensing a gaseous tracer adjacent to a potential leak site. Thus, theprobe 220 may be moved to any location adjacent to a potential leak site. For example, theprobe 220 can be a hand-held probe that a user can carry between potential leak sites. Accordingly, theprobe 220 can enable a user to relatively quickly check multiple locations for leaks. As will be described in greater detail below, the present technology further includes a detector configured to detect the gaseous tracer. The detector can be positioned at any location downstream of theprobe 220. -
FIG. 3 is a schematic illustration of a heat recovery coke plant configured to operate under a negative pressure. As illustrated inFIG. 3 , a plurality of heatrecovery coke ovens 302 are provided for coking coal. Thecoke ovens 302 are fluidly connected to a plurality of heatrecovery steam generators 304 by acommon tunnel 306. A cooledgas duct 308 transports cooled gas from the heatrecovery steam generators 204 to an air quality control system 310 (e.g., a flue gas desulfurization system). Fluidly connected and further downstream are abaghouse 312 for collecting particulates, at least onedraft fan 314 for controlling flue gas pressure within the system, and a main gas stack 316 (e.g., an exhaust stack) for exhausting cooled, treated exhaust to the environment. - A
probe 320 for dispensing a gaseous tracer is illustrated as being positioned adjacent to the plurality ofovens 302. As described herein, the probe is configured to detect leaks in the coke plant by dispensing a gaseous tracer adjacent to a potential leak site. Thus, theprobe 320 may be moved to any location adjacent to a potential leak site. For example, theprobe 320 can be a hand-held probe that a user can carry between potential leak sites. Accordingly, theprobe 320 can enable a user to relatively quickly check multiple locations for leaks. As further illustrated inFIG. 3 , the present technology includes adetector 322 configured to detect the gaseous tracer inside thecoke plant 320. InFIG. 3 , the detector is positioned adjacent to themain gas stack 316. However, in other embodiments, thedetector 322 may be positioned at any location downstream of theprobe 320. - Referring to
FIG. 2A andFIG. 3 , the 220, 320 may be any device configured to dispense a gaseous tracer. For example, theprobes 220, 320 may include a valve configured to control the release of the gaseous tracer. In some embodiments, theprobes 220, 320 may discharge a known volume of the gaseous tracer, a constant volume of the gaseous tracer, or a known and constant volume of the gaseous tracer. Theprobes detector 322 may be any device configured to measure an amount of the gaseous tracer. For example, thedetector 322 may be a mass spectrometer or other suitable device. In some embodiments, thedetector 322 is operably coupled to a vacuum pump or other mechanism configured to draw air into the sample. The detector can be moveable or fixed. For example, in some embodiments, thedetector 322 is a hand-held or other moveable detector and can be carried between multiple locations. In other embodiments, thedetector 322 is secured or otherwise affixed to a structure of thecoke plant 320. For example, thedetector 322 can be temporarily affixed to a structure of thecoke pant 320 while a test is performed, or can be affixed to a structure of thecoke plant 320 for a longer period (e.g., semi-permanently, permanently, etc.). In some embodiments, the detectors can be moveable to ensure an accurate reading can be taken. -
FIG. 4 illustrates one embodiment of aprobe 400. In some embodiments, probes 220, 320 are generally similar toprobe 400. Theprobe 400 includes aproximal end region 402 configured to receive a gaseous tracer from a gaseous tracer supply 420 (e.g., a gas storage canister). For example, theprobe 400 can include ahose 403 fluidly coupled to thegaseous tracer supply 420. The probe also includes a distal end region 404, configured to discharge the gaseous tracer. For example, the distal end region 404 can include aspray nozzle 415. Moving in a proximal to distal direction, theprobe 400 may include apressure regulator 406, agauge 408, ahand valve 410, and a two-way spring valve 412. Thepressure regulator 406 may be attached to agaseous tracer supply 420 and may regulate the amount ofgaseous tracer 420 flowing through theprobe 400. The gauge may visually depict the pressure in theprobe 400. The two-way spring valve 412 can control the discharge of the gaseous tracer through thespray nozzle 415. In some embodiments, the two-way spring valve is a two-way manually operated spring valve. -
FIG. 5 illustrates an embodiment of a known-volume spray probe 500. In some embodiments, probes 220, 320 are generally similar toprobe 500. Theprobe 500 includes aproximal end region 502 configured to receive gaseous tracer from a gaseous tracer supply 520 (e.g., a gas storage canister). For example, theprobe 500 can include ahose 503 fluidly coupled to thegaseous tracer supply 420. The probe also includes adistal end region 504 configured to discharge the gaseous tracer. For example, the distal end region 404 can include aspray nozzle 515. Moving in a proximal to distal direction, theprobe 500 may include apressure regulator 506, afirst gauge 508, afirst hand valve 510, a knownvolume canister 518, asecond gauge 516, asecond hand valve 514, and a two-way spring valve 512. Utilizing thepressure regulator 506, the knownvolume canister 518 may be filled to a constant pressure and sealed off from thegaseous tracer supply 520. The contents of the knownvolume canister 518 can be discharged through the two-way spring valve so a known and constant amount of volume is released via thespray nozzle 515. The knownvolume canister 518 may then be refilled to the same constant pressure, thereby ensuring the volume of gaseous tracer dispensed by theprobe 500 remains constant. As one skilled in the art will appreciate from the disclosure herein, other probes suitable for discharging a gaseous substance can be used without deviating from the scope of the present technology. - A number of gaseous tracers may be suitable for use with the present technology. For example, in some embodiments, the gaseous tracer may be any compound that is not otherwise present in the system and is detectable at a location within the system. In some embodiments, the gaseous tracer may already be present in the system and/or the environment. As will be described below, such tracers can be used because a baseline measurement of the gaseous tracer already present in the system can be taken and adjusted for.
- In some embodiments, the gaseous tracer is a non-combustible tracer (e.g., it is at least partially stable and is not fully degraded in the system). For example, the non-combustible gaseous tracer can comprise any non-reactive molecule or element. Examples of suitable non-reactive gaseous tracers include the noble gases, including but not limited to helium, neon, argon, xenon, and their isotopes. Other examples of suitable gaseous tracers include non-noble gases such as fluorine gas. Yet another example of suitable gaseous tracers are nuclear tracers, such as tritium.
- The gaseous tracer may exhibit certain flow characteristics once mixed with other gases inside the system. For example, in some embodiments, the gaseous tracer may flow through some or generally all of the system with a generally turbulent flow. In other embodiments, the flow of the gaseous tracer may be generally turbulent in at least one region of the system. In some embodiments, the flow of the gaseous tracer through the system may further be characterized by its Reynolds number. For example, in some embodiments, the gaseous tracer may exhibit a Reynolds number of about 4,000 or more, about 10,000 or more, about 25,000 or more, about 50,000 or more, or about 100,000 or more in at least one region of the system. Further, in some embodiments, the gaseous tracer may also move through the system in a relatively short residence time. For example, depending on the size of the system, the residence time may be 120 seconds or less, 90 seconds or less, 60 seconds or less, 45 seconds or less, 30 seconds or less, and/or 15 seconds or less. As one skilled in the art will appreciate, the flow characteristics depend on, among other things, the conditions adjacent to and within the coking system. However, the present technology provides gaseous tracer tests that work in coking systems that exhibit a wide range of flow characteristics, including in systems having flow characteristics such as turbulent flow, high Reynolds numbers, and/or relatively short residence times.
-
FIGS. 6-17 are flowcharts of methods of detecting leaks in accordance with the present technology. To better describe the present technology, certain aspects of the methods are highlighted while discussing specific figures. However, one skilled in the art will recognize that the present technology can include some embodiments with additional elements and/or without several of the elements described below with reference toFIGS. 6-17 . Therefore, any step discussed with respect to a method below may be included in any other method unless explicitly stated otherwise. Moreover, descriptions of certain steps previously described in detail may be shortened to avoid unnecessary repetition. One skilled in the art will recognize that many of the methods below include similar steps, and that the description of one step may be equally applicable to another similar step. -
FIG. 6 is a flowchart of amethod 600 of detecting an air leak in a system configured to coke coal under a negative pressure. Themethod 600 begins by discharging a gaseous tracer adjacent to a potential leak site (e.g., any structure at least partially dividing a high-pressure system and a low pressure system) in the system (process step 602). As discussed previously, the potential leak site can be any site in the system that may allow external air to enter into the system in an uncontrolled manner. For example, potential leak sites include, but are not limited to, the sole flues, the oven chambers, the front doors of the ovens, the back doors of the ovens, the air inlets, the uptake ducts, and/or the common tunnel, as well as any connecting joints or ducts between said sites. If the potential leak site includes a leak, the pressure differential between the inside of the system and the external environment will suck gaseous tracer into the system. Once inside the system, the gaseous tracer will move in a downstream direction away from the leak and towards a downstream location (e.g., an exhaust stack). - The
method 600 continues by measuring the amount of gaseous tracer at a location inside the system and downstream from the potential leak site (process step 604). Measurements may be made by any device suitable to continuously monitor a volume or amount of gaseous tracer (e.g., a mass spectrometer, etc.). Measurements may be made at any location downstream from the potential leak site (e.g., an exhaust stack, a distillation column, etc.). By measuring gaseous tracer at a location downstream from the potential leak site, any gaseous tracer that entered at the potential leak site duringstep 602 may be detected. Accordingly, detecting a spike in gaseous tracer duringstep 604 indicates there is likely a leak at the potential leak site. If no spike in gaseous tracer is detected, no gaseous tracer entered the system duringstep 602, and therefore there likely is not a leak at the potential leak site. -
FIG. 7 is a flowchart of amethod 700 of detecting an air leak in a system configured to coke coal under a negative pressure after accounting for any gaseous tracer already present in the system. The method begins by measuring a baseline amount of gaseous tracer at a first location in a system for coking coal (process step 702). The baseline measurement can be made anywhere in the system. For example, the baseline measurement may be taken at a location upstream from the surface to be tested. In other embodiments, the baseline measurement may be taken at a location downstream from or adjacent the surface to be tested. By taking a baseline measurement of the amount of gaseous tracer in the system prior to any testing, the operator can account for any gaseous tracer that may already be present in the system from previous tests and/or from another source, thereby enabling the operator to determine that a subsequent measurement of gaseous tracer is due to a leak allowing gaseous tracer into the system and not previously present gaseous tracer. In some embodiments, the operator may optionally zero the gaseous tracer measuring device such that the baseline amount of gaseous tracer measures as zero on the device. As a consequence, detecting any gaseous tracer in the system during a subsequent gaseous tracer leak test will indicate there is a leak. In other embodiments, the ambient gaseous tracer can be adjusted for after the test. -
Method 700 continues by discharging gaseous tracer adjacent to a potential leak site in the system that is upstream from the first location (process step 704). As discussed previously, the potential leak site can be any site in the system that may allow external air to enter into the system in an uncontrolled manner. For example, potential leak sites include, but are not limited to, the sole flues, the oven chambers, the front doors of the ovens, the back doors of the ovens, the air inlets, the uptake ducts, and/or the common tunnel, as well as any connecting joints or ducts between said sites. If the potential leak site includes a leak, the pressure differential between the inside of the system and the external environment will suck gaseous tracer into the system. Once inside the system, the gaseous tracer will move in a downstream direction away from the potential leak site and towards a downstream location. - The
method 700 continues by continuously measuring the amount of gaseous tracer at the first location for a period beginning when the gaseous tracer is discharged at the potential leak site (process step 706). By measuring gaseous tracer at the first location, any gaseous tracer that entered at the potential leak site duringstep 704 may be detected. The period may be any period of time approximately equal to the time it takes the gaseous tracer to travel from the potential leak site to the first location. For example, the period may be determined by dividing the distance between the first location and the potential leak site by the average velocity of the gaseous tracer between the first location and the potential leak site. In some embodiments, this time may be 120 seconds or less, 90 seconds or less, 60 seconds or less, 45 seconds or less, 30 seconds or less, and/or 15 seconds or less. - The
method 700 continues by comparing the baseline amount of gaseous tracer with the amount of gaseous tracer observed during the period to determine if there is a leak at the potential leak site (process step 708). If the measuring device has been zeroed out instep 702 such that the baseline reading of gaseous tracer is zero, any gaseous tracer detected during the period likely entered the system through a leak at the potential leak site. If the measuring device was not zeroed out, a spike in the amount of gaseous tracer during the period likely indicates that gaseous tracer entered the system through a leak at the potential leak site. Themethod 700 may be optionally repeated by discharging a gaseous tracer at a second potential leak location upstream from the first location, and repeating 704, 706, and 708.steps -
FIG. 8 is a flowchart of amethod 800 of detecting an air leak in a system configured to coke coal under a negative pressure. Themethod 800 includes measuring a baseline amount of gaseous tracer at an exhaust stack (process step 802). As previously described in detail with respect toFIG. 7 , measuring a baseline amount of gaseous tracer can help account for any amount of gaseous tracer already present in the system.Method 800 further includes discharging a volume of the gaseous tracer adjacent to a potential leak site (process step 804). Similar tomethod 700, the potential leak site should be located upstream of where the baseline amount of the gaseous tracer was measured. In this case, the potential leak site should be upstream from the exhaust stack. Themethod 800 continues by monitoring the amount of gaseous tracer at the exhaust stack for a period beginning when the gaseous tracer is discharged at the potential leak site (process step 806). Because the exhaust stack is downstream from the potential leak site, any gaseous tracer that enters the system at the leak site may be detected at the exhaust stack. Thus, themethod 800 continues by comparing the baseline amount of gaseous tracer with the amount of gaseous tracer observed during the period to determine if there is a leak at the potential leak site (process step 808). If the measuring device has been zeroed out instep 802 such that the baseline reading of gaseous tracer is zero, any gaseous tracer detected during the period likely entered the system through a leak at the potential leak site. If the measuring device was not zeroed out, a spike in the amount of gaseous tracer during the period likely indicates that gaseous tracer entered the system through a leak at the potential leak site. -
FIG. 9 is a flowchart of amethod 900 of detecting an air leak in a system configured to coke coal under a negative pressure. Themethod 900 includes measuring a baseline amount of gaseous tracer at a downstream location (process step 902). As can be appreciated from the foregoing, a downstream location is any location downstream of the sites to be tested for leaks. And as previously discussed above, measuring a baseline amount of gaseous tracer can help account for any amount of the gaseous tracer already present in the system. - The
method 900 further includes injecting a first amount of a gaseous tracer into the system at a first location, wherein the first location is adjacent to a known leak site or another site that allows air to enter into the system (process step 904). Injecting the gaseous tracer into the system enables an operator to determine how the gaseous tracer will behave once inside the system. For example, the presence of the gaseous tracer will be monitored at the downstream location so a residence time can be determined for the first amount of gaseous tracer to travel from the first location to the downstream location (process step 906). It may be useful to determine the residence time because it can define the period of time to measure for the gaseous tracer when it has been sprayed on a potential leak site. - The
method 900 continues similarly tomethod 700. For example, themethod 900 includes discharging a second amount of the gaseous tracer adjacent to a potential leak site (process step 908), continuously monitoring the amount of the gaseous tracer at the downstream location beginning when the gaseous tracer is discharged at the potential leak site and lasting for a period equal to the residence time (process step 910), and comparing the baseline amount of the gaseous tracer with the amount of the gaseous tracer observed during the period equal to the residence time to determine if there is a leak at the potential leak site (process step 912). If the measuring device has been zeroed out instep 902 such that the baseline reading of gaseous tracer is zero, any gaseous tracer detected during the period likely entered the system through a leak at the potential leak site. If the measuring device was not zeroed out, a spike in the amount of gaseous tracer during the period likely indicates that gaseous tracer entered the system through a leak at the potential leak site. -
FIG. 10 illustrates a method for detecting a leak and semi-quantitatively estimating the size of the leak. InFIG. 10 ,method 1000 begins similarly to method 900: measuring a baseline amount of the gaseous tracer at a downstream location (process step 1002). Themethod 1000 continues by injecting a first known amount of the gaseous tracer into the system at a first location, wherein the first location is adjacent to a known leak site or another site that allows air to enter into the system (process step 1004). As will be described in detail below, injecting a known amount of gaseous tracer can assist in quantitatively defining leaks. To inject a known amount of gaseous tracer, an operator may use a probe configured to dispense a known and constant amount of the gaseous tracer. For example, probe 400 or probe 500, described above with respect toFIGS. 4 and 5 , may be utilized to discharge a known amount of gaseous tracer. As described above with respect tomethod 900, injecting the gaseous tracer into the system enables an operator to determine how the gaseous tracer will behave once inside the system. For example, the presence of the gaseous tracer will be monitored at the downstream location so a residence time can be determined for the first amount of gaseous tracer to travel from the first location to the downstream location (process step 706). - The
method 1000 continues by discharging a second known amount of gaseous tracer adjacent to a potential leak site (process step 1008), continuously monitoring the amount of gaseous tracer beginning when the gaseous tracer is discharged at the potential leak site and lasting for at least a period equal to the residence time (process step 1010), and comparing the baseline amount of the gaseous tracer with the amount of the gaseous tracer observed during the period equal to the residence time to determine (i) if there is a leak at the potential leak site, and (ii) the size of the leak (process step 1012). With respect to determining whether there is a leak,method 1000 operates in a generally similar fashion as the methods described above: if the measuring device has been zeroed out instep 1002 such that the baseline reading of gaseous tracer is zero, any gaseous tracer detected during the period likely entered the system through a leak at the potential leak site, and if the measuring device was not zeroed out, a spike in the amount of gaseous tracer during the period likely indicates that the gaseous tracer entered the system through a leak at the potential leak site. However, because the amount of gaseous tracer injected instep 1004 and discharged instep 1008 are known, the relative size of the leak can also be determined. For example, the amount discharged in 1004 and 1008 can be equal. Since the first known amount of the gaseous tracer is injected into the system, the amount measured at the downstream location following this injection can represent an expected upper limit on the amount of gaseous tracer that could be observed insteps step 1010. Thus, the amount of the gaseous tracer observed instep 1010 can be compared to the amount of the gaseous tracer observed followingstep 1004 to get a semi-quantitative estimate of the size of the leak. -
FIG. 11 illustrates one exemplary method for determining which of two potential leaks is larger. InFIG. 11 ,method 1100 begins with measuring a baseline amount of a gaseous tracer at a downstream location (process step 1102), discharging a first known amount of the gaseous tracer adjacent to a first leak site (process step 1104), and continuously monitoring a first amount of the gaseous tracer for a first period beginning when the gaseous tracer is discharged adjacent to the first potential leak site (process step 1106). Themethod 1100 continues by comparing the baseline amount of the gaseous tracer with the first amount of gaseous tracer observed during the first period to determine if there is a first leak at the first potential leak site (process step 1108). If a spike in the amount of gaseous tracer above the baseline amount is observed during the first period, there is likely a leak at the first potential leak site. Themethod 1100 further includes discharging a second known amount of gaseous tracer adjacent to a second potential leak site (process step 1110). In order to semi-quantitatively measure the relative size of a potential leak, the second known amount of gaseous tracer should be approximately equal and/or equal to the first known amount. To do this, an operator may use a probe configured to dispense a known and constant amount of gaseous tracer. For example, probe 400 or probe 500, described above with respect toFIGS. 4 and 5 , may be utilized to discharge a known and constant amount of gaseous tracer. Themethod 1100 next includes continuously monitoring the second amount of gaseous tracer at the downstream location for a second period beginning when the gaseous tracer is discharged at the second potential leak site (process step 1112). The second period should be approximately equal and/or equal to the first period.Method 1100 continues by comparing the baseline amount of the gaseous tracer with the second amount of the gaseous tracer to determine if there is a second leak at the second potential leak site (process step 1114). If a spike in the amount of gaseous tracer above the baseline amount is observed during the second period, there is likely a leak at the second potential leak site. -
Method 1100 continues by determining whether the first leak or the second leak is larger. To do so, the first amount of the gaseous tracer observed during the first period is compared with the second amount of the gaseous tracer observed during the second period (process step 1116). Since the first known amount and second known amount of gaseous tracer discharged adjacent to the first and second potential leak sites are the same amount, the amount of gaseous tracer observed during the first and second period can indicate whether the first or second leak is larger. For example, if more gaseous tracer is detected during the first period than during the second period, the first leak is likely larger than the second leak. Likewise, if more gaseous tracer is detected during the second period than during the first period, the second leak is likely larger than the first leak. This information can be useful, for example, in prioritizing which leak to fix first. -
FIG. 12 illustrates another exemplary method for detecting leaks and for identifying which of two potential leaks are larger.Method 1200 inFIG. 12 is similar tomethod 1100, except that it includes determining a residence time to precisely define the period to monitor for the gaseous tracer following application of the gaseous tracer to a potential leak site.Method 1200 begins by measuring a baseline amount of gaseous tracer at a downstream location, which comprises a first measurement (process step 1202). Themethod 1200 continues by injecting a first known volume of the gaseous tracer into the system at a first location that is adjacent to a known leak site or another site that allows air to enter into the system (process step 1204). From this, a residence time for the first known amount of the gaseous tracer to travel from the first location to the downstream location is determined (process step 1206).Method 1200 continues by discharging a second known amount of the gaseous tracer adjacent to a first leak site (process step 1208), and continuously measuring a second amount of the gaseous tracer for a period equal to the residence time, which comprises a second measurement (process step 1210). Themethod 1200 continues by comparing the first measurement with the second measurement to determine if there is a first leak at the first potential leak site (process step 1212). If a spike in the amount of gaseous tracer above the baseline amount is observed during the first measurement, there is likely a leak at the first potential leak site. - Similar to
FIG. 11 , themethod 1100 further includes discharging a third known amount of gaseous tracer adjacent to a second potential leak site (process step 1114). In order to semi-quantitatively measure the relative size of a potential leak, the second known amount of gaseous tracer should be approximately equal and/or equal to the first known amount. To do this, an operator may use a probe configured to dispense a known and constant amount of gaseous tracer. For example, probe 400 or probe 500, described above with respect toFIGS. 4 and 5 , may be utilized to inject a known and constant amount of gaseous tracer. Themethod 1100 next includes continuously measuring the third amount of gaseous tracer at the downstream location for at least a period equal to the residence time, which comprises a third measurement (process step 1116).Method 1100 continues by comparing the first measurement with the second measurement to determine if there is a second leak at the second potential leak site (process step 1118). If a spike in the amount of gaseous tracer above the baseline amount is observed during the second period, there is likely a leak at the second potential leak site. -
Method 1100 continues by determining whether the first leak or the second leak is larger. To do so, the second measurement is compared with the first measurement (process step 1016). Since the first known amount and second known amount of gaseous tracer discharged adjacent to the first and second potential leak sites are the same amount, the relative amount of gaseous tracer in the second and third measurements can indicate whether the first or second leak is larger. For example, if more gaseous tracer is detected during the second measurement, the first leak is likely larger than the second leak. Likewise, if more gaseous tracer is detected during the third measurement, the second leak is likely larger than the first leak. This information can be useful, for example, in prioritizing which leak to fix first. -
FIG. 13 is an exemplary method of quantitatively defining and comparing leaks. InFIG. 13 ,method 1300 includes injecting a first known amount of a gaseous tracer into the system at a first location adjacent to a known leak site or another site that allows air to enter into the system (process step 1302). In some embodiments, the first location should allow a substantial amount of the gaseous tracer to enter into the system. For example, in one embodiment, the first known amount of the gaseous tracer is discharged directly into the system.Method 1300 continues by measuring a first amount of the gaseous tracer at a location downstream of the first location (process step 1304). Next, a first volume versus time graph of the first amount of the gaseous tracer is generated (process step 1306). For example, continuous measurements taken with a mass spectrometer may be plotted on a volume versus time graph. To define the period to graph, a residence time for the gaseous tracer to move through the system may optionally be determined as described in detail above. However, in some embodiments, a period may equal 240 seconds or less, 120 seconds or less, 90 seconds or less, 60 seconds or less, 45 seconds or less, 30 seconds or less, and/or 15 seconds or less. Resultant graphs may include, for example, a slope, one or more inflection points, and a magnitude (e.g., area under the curve). The slope and magnitude of the graph may constitute quantitative parameters of the volume of the gaseous tracer detected. For example, a larger magnitude (e.g., area under the curve) indicates more gaseous tracer entered the system. The inflection points and/or the number of spikes in concentration may, for example, indicate whether the gaseous tracer entered the system at a single location, or whether it entered at one or more locations. -
Method 1300 continues by discharging a second known amount of the gaseous tracer adjacent to a first potential leak site (process step 1308). The second amount of the gaseous tracer should be approximately equal to the first known amount.Method 1300 further includes measuring a second amount of the gaseous tracer at the location downstream of the first location, wherein the downstream location is also downstream of the second potential leak site (process step 1310), and generating a second volume versus time graph of the second amount of the gaseous tracer, wherein the graph includes a slope, inflection points, and a magnitude (process step 1312). This can be done in a similar fashion as described above with respect to step 1306. - The first volume versus time graph and the second volume versus time graph may be compared to determine (i) if there is a leak at the potential leak site, and (ii) the size of the leak. To determine whether there is a leak, the second volume versus time graph can be analyzed. If there is a spike in the amount of gaseous tracer observed, there is likely a leak. To determine the size of the leak, the first and second volume versus time graphs may be compared. Since the first volume versus time graph resulted from injecting the gaseous tracer into the system, it quantifies the behavior of the gaseous tracer if approximately all of the gaseous tracer entered the system. Thus, the second volume versus time graph can be compared against the first volume versus time graph to quantitatively determine certain characteristics of the leak. For example, if the magnitude under the curve of the second graph approaches the magnitude under the curve of the first graph, the leak is relatively large (e.g., more gaseous tracer was able to enter the system through the leak). If the magnitude under the curve of the second graph is much smaller than the first graph, the leak is relatively small (e.g., less gaseous tracer was able to enter the system through the leak). Likewise, the distance between inflection points can indicate whether the gaseous tracer entered through a single leak or through two or more leaks. If there are multiple inflection points spaced apart from each other, the gaseous tracer may have entered through multiple leaks, with each inflection point indicating a separate leak. In some embodiments, the data collected from one or more of the tests described herein can be analyzed using an algorithm or other computational modeling software. In some embodiments, the data is analyzed to determine an estimated leak rate (e.g., in lbs/hr and/or O2%). Such modeling may also predict the reduction of the leak rate following repair of one or more specific leaks and may help a user prioritize which leak(s) to repair first. Moreover, although
method 1300 is described above with respect to measuring a volume of the gaseous tracer and generating a volume versus time graph, one skilled in the art will recognize that other measurements corresponding to an amount of the gaseous tracer (e.g., mass, moles, etc.) could be utilized. -
FIG. 14 is an exemplary method in accordance with the present technology that enables a user to test for leaks across a first region of a coking system, and, if a leak is found, test smaller regions within the first region to determine where the leak is. InFIG. 14 ,method 1400 includes spraying a first external facing region of a system for coking coal with a gaseous tracer (process step 1402). The first external facing region of the system may be any region of the system that may be susceptible to leaks. The size of the first region may be variable: for example, in some embodiments, the first region may be between about 5 square feet and about 50 square feet. The method continues by measuring the gaseous tracer in the system at a location downstream of the first external facing region (process step 1404). If a spike in the gaseous tracer is detected, there is a leak within the first external facing region. Accordingly, to determine a more precise location of the leak within the first region, a second external facing region positioned within the first external facing region and having a smaller surface area than the first external facing region may be sprayed with gaseous tracer (process step 1406). The gaseous tracer will be measured for at a location downstream of the second external facing region (process step 1408). If gaseous tracer is detected, there is likely a leak within the second region. If no gaseous tracer is detected, there is likely no leak in the second region. 1306 and 1308 may be repeated in other sub-regions of the first external facing region to determine if there are other leaks in other regions of the first external facing region.Steps -
FIG. 15 illustrates an exemplary method of combining a gaseous tracer leak detection test with a visually based smoke or colored gas test. InFIG. 15 ,method 1500 begins by spraying an external facing region of a system for coking coal with a gaseous tracer (process step 1502), and measuring the amount of the gaseous tracer in the system at a location downstream of the first external facing region (process step 1504). If a spike in the amount of gaseous tracer is detected, there is likely a leak within the external facing region. To better determine where the leak is within the first external facing region, a device configured to dispense smoke or colored gas may be dispensed adjacent to the external facing region (process step 1506). An example of such device is a smoke bomb. However, any device configured to dispense smoke and/or colored gas may be suitable. After the device has dispensed the smoke or colored gas, a user will observe the smoke or colored gas to detect a sub-region of the external facing region that has one or more cracks (process step 1508). The cracks may be detected, for example, by observing smoke or colored gas being sucked into the system in a sub-region, thereby indicating there is a leak in the sub-region. -
FIG. 16 illustrates another exemplary method of detecting a leak between a high-pressure system and a low-pressure system. InFIG. 16 ,method 1600 includes injecting a gaseous tracer into a high-pressure system at a first location adjacent to a low-pressure system (process step 1602). For example, the gaseous tracer may be injected adjacent to a structure configured to at least partially divide the high-pressure system and the low-pressure system. In some embodiments, the high-pressure system and low-pressure system are designed to be fluidly isolated. For example, the high-pressure system and low-pressure system might in complete fluid isolation, or the high-pressure system and low-pressure system might be designed such that they are not uncontrollably fluidly connected (e.g., a fluid connection includes a controllable damper to fluidly isolate the high-pressure system and the low-pressure system). Once the gaseous tracer has been injected in the high-pressure system, the amount of gaseous tracer is measured at a second location within (or downstream from) the low-pressure system (process step 1604). Because the high-pressure system and low-pressure system are designed to be fluidly isolated, detecting a spike in the amount of gaseous tracer in the low-pressure system indicates there is a leak between the high-pressure system and low-pressure system. In some embodiments, the high-pressure system is a byproduct coking system, and the low-pressure system is external to the byproduct coking system. In some embodiments, the high-pressure system is a first aspect of a byproduct coking system (e.g., an oven), and the low-pressure system is a second aspect of the byproduct coking system (e.g., a flue chamber surrounding the oven). In yet other embodiments, the high-pressure system is the external environment and the low-pressure system is a heat recovery coking system. -
FIG. 17 illustrates another exemplary method of detecting a leak between a high-pressure system and a low-pressure system. InFIG. 17 ,method 1700 includes injecting a gaseous tracer into a high-pressure system at a first location adjacent to a low-pressure system (process step 1702), and measuring the amount of gaseous tracer at a second location inside the low-pressure system (process step 1704). The high-pressure system and/or the low-pressure system can be one or more regions within a byproduct coke plant (e.g., ovens, flue chambers, etc.). In some embodiments, gas within the high-pressure system may eventually reach the low-pressure system through one or more connecting ducts, regardless of whether a leak between the high-pressure system and low-pressure system exists. Thus, in some embodiments, gas or air in the high-pressure system may enter the low-pressure system, even if there is no leak between the high-pressure and low-pressure systems. Accordingly, in some embodiments, a single spike in the amount of gaseous tracer measured does not necessarily indicate that there is a leak. Instead, detecting multiple, temporally spaced apart spikes (e.g., a first spike and a second spike) in the amount of gaseous tracer at the second location indicate the potential presence of a leak between the high-pressure system and the low-pressure system (process step 1706). The first spike may occur within a first period of time beginning when the gaseous tracer is injected (e.g., less than 5 seconds, less than 10 seconds, less than 15 seconds, less than 20 seconds etc.), and the second spike may occur during a second period of time beginning when the gaseous tracer is injected (e.g., more than 5 seconds, more than 10 seconds, more than 15 seconds, more than 20 seconds, etc.). The first spike may represent gaseous tracer entering the low-pressure system through a leak, and the second spike may represent gaseous tracer entering the low-pressure system through the one or more connection ducts. In some embodiments, the high-pressure system is a first aspect of a byproduct coking system, and the low-pressure system is a second aspect of a byproduct coking system. - Other embodiments of the present technology integrate aspects of the gaseous tracer tests described herein with a coke plant monitoring system. For example, the coke plants described herein can include various sensors (e.g., oxygen sensors) that continuously or at least semi-continuously detect the presence of a target substance or molecule (e.g., oxygen). If an unexplained change in concentration of the target substance or molecule is sensed by the sensor (e.g., if the concentration of measured oxygen unexpectedly increases), the monitoring system can send an alert to a user. The alert can state that an abnormality was sensed, and/or can include more detailed information such as a suspected location of a problem (e.g., leak) causing the abnormality. The alert can direct the user to said location to perform a gaseous tracer test as described herein to more accurately identify the leak, identify the precise location of the leak, and/or semi-quantitatively analyze a size of the leak. In some embodiments, the monitoring system may also include a gaseous tracer detector (e.g., a Helium detector, etc.) such that a user does not need to deploy a gaseous tracer detector after receiving the alert and before conducting the gaseous tracer test.
- The following examples are provided to further illustrate embodiments of the present technology and are not to be interpreted as limiting the scope of the present technology. To the extent that certain embodiments or features thereof are mentioned, it is merely for purposes of illustration and, unless otherwise specified, is not intended to limit the present technology. It will be understood that many variations can be made in the procedures herein described while still remaining within the bounds of the present technology. Such variations are intended to be included within the scope of the presently disclosed technology.
- A gaseous tracer test representative of some embodiments of the present technology was performed to detect leaks in or around a heat recovery steam generator in a heat recovery coking system. A helium detector was placed downstream from the heat recovery steam generator adjacent the main stack at the outlet of the induced draft fans, although in other examples other locations downstream from the tested surface can be used, as described in detail above. The detector was positioned to measure helium concentration inside of the heat recovery coking system. Before testing for leaks, a known volume of helium was injected into an open oven uptake while the detector was recording helium concentration. The time between the injection of helium into the open oven uptake and the detection of the helium at the downstream detector defined a residence time for the helium. Once the residence time was determined, and with the helium detector continuously monitoring helium levels, helium was discharged using a probe generally similar to
probe 400. More specifically, the helium was sprayed on various external facing surfaces of the heat recovery steam generators. As discussed above, the present technology enables a user to sequentially test multiple surfaces for leaks. Accordingly, the probe was used to spray various surfaces of the heat recovery steam generator while the helium detector was continuously recording the concentration of helium within the system. The results of the tests are illustrated inFIG. 18 . The x-axis represents time (in seconds), and the y-axis represents the concentration of helium detected by the mass spectrometer (e.g., the leak rate LR). As illustrated inFIG. 18 , the helium detector measured two primary spikes in helium concentration (labeled A and B, respectively). Based on the residence time that it takes for the helium to flow from the leak to the helium detector, the location of a leak associated with the first spike can be calculated. For example, the first spike A was measured approximately 30 seconds after spraying a first external surface of the heat recovery steam generator, and the second spike B was measured approximately 30 seconds after spraying a second external surface of the heat recovery steam generator. Accordingly, the graph indicates there is a first leak at the first external surface and a second leak at the second external surface. In the present example, the first leak was associated with a cross-over portion of the heat recovery steam generator (e.g., a cross-over duct), and the second leak was associated with an elbow of the heat recovery steam generator. The area under the first spike A and the area of under the second spike B can be calculated to semi-quantitatively assess the magnitude of the leak. For example, assuming other variables are approximately equal, such as the amount of helium discharged at each test location, if the area under the curve at the first spike A is greater than the area under the curve at the second spike B, the leak indicated by the first spike A is likely larger (i.e., allowing greater airflow into the system) than the leak indicated by the second spike B. - A gaseous tracer test representative of some embodiments of the present technology was performed to detect leaks in or around a heat recovery steam generator in a heat recovery coking system. A helium detector was placed downstream from the heat recovery steam generator adjacent the main stack at the outlet of the induced draft fans, although in other examples other locations downstream from the tested surface can be used, as described in detail above. The detector was positioned to measure helium concentration inside of the heat recovery coking system. Before testing for leaks, a known volume of helium was injected into an open oven uptake while the detector was recording helium concentration. The time between the injection of helium into the open oven uptake and the detection of the helium at the downstream detector defined a residence time for the helium. Once the residence time was determined, and with the helium detector continuously monitoring helium levels, helium was discharged using a probe generally similar to
probe 400. More specifically, the helium was sprayed on various external facing surfaces of the ovens that are designed to be fluidly isolated from an interior of the system. The results of the tests are illustrated inFIG. 19 . The x-axis represents time (in seconds), and the y-axis represents the concentration of helium detected by the helium detector. The dashed line represents the helium concentration, and the solid gray shaded area beneath the dashed line represents the detected helium minus the control amount of helium (e.g., an ambient amount of helium not introduced via a test). Accordingly, spikes in the solid gray shaded area reflect helium entering the system in an uncontrolled manner, such as via a leak. Each measurement A-H represents a different tested structure (e.g., a first oven door, a first oven side wall, a second oven door, a second oven side wall, etc.). Table 1 reports the numerical results of the test: -
Surface time LR(Atm · cc/s) A 9:50 3.40E−07 B 9:52 1.60E−06 C 9:53 4.70E−07 D 10:05 4.70E−07 E 10:08 3.60E−07 F 10:14 1.00E−06 G 10:15 4.50E−07 H 10:17 4.10E−07 - The concentration of detected helium spiked after spraying surfaces B and F. For example, the concentration of detected helium spiked from around 3.40E7 Atm·cc/s after spraying surface A to about 1.6E6 Atm·cc/s after spraying surface B. This indicates that more helium entered the system after spraying surface B than after spraying surface A. Likewise, the concentration of detected helium spiked from around 3.6E7 Atm·cc/s after spraying surface E to about 1.0E6 Atm·cc/s after spraying surface F. Accordingly, this indicates that more helium entered the system after spraying surface F than after spraying surface E. Any of the above values can be compared to determine which surfaces are allowing the most air to enter the system.
- As can be appreciated from the foregoing disclosure, the representative systems and methods described above may be combined in various manners to achieve desired results. Accordingly, this disclosure is not intended to be exhaustive or to limit the present technology to the precise forms disclosed herein. Although specific embodiments are disclosed herein for illustrative purposes, various equivalent modifications are possible without deviating from the present technology, as those of ordinary skill in the art will recognize. In some cases, well-known structures and functions have not been shown or described in detail to avoid unnecessarily obscuring the description of the embodiments of the present technology. Although steps of methods may be presented herein in a particular order, alternative embodiments may perform the steps in a different order. Similarly, certain aspects of the present technology disclosed in the context of particular embodiments can be combined or eliminated in other embodiments. Furthermore, while advantages associated with certain embodiments of the present technology may have been disclosed in the context of those embodiments, other embodiments of the present technology may have been disclosed in the context of those embodiments, other embodiments can also exhibit such advantages, and not all embodiments need necessarily exhibit such advantages or other advantages disclosed herein to fall within the scope of the technology. Accordingly, the disclosure and associated technology can encompass other embodiments not expressly shown or described herein.
- Throughout this disclosure, the singular terms “a,”, “an,” and “the” include plural referents unless the context clearly indicates otherwise. Similarly, unless the word “or” is expressly limited to mean only a single item exclusive from the other items in reference to a list of two or more items, then the use of “or” in such a list is to be interpreted as including (a) any single item in the list, (b) all of the items in the list, or (c) any combination of items in the list. Additionally, the term “comprising” is used throughout to mean including at least the recited feature(s) such that any greater number of the same feature and/or additional types of other features are not precluded. Reference herein to “one embodiment,” “an embodiment,” or similar formulations means that a particular feature, structure, operation, or characteristic described in connection with the embodiment can be included in at least one embodiment of the present technology. Thus, the appearances of such phrases or formulations herein are not necessarily all referring to the same embodiment. Furthermore, various particular features, structures, operations, or characteristics may be combined in any suitable manner in one or more embodiments.
Claims (48)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US16/729,201 US20200208063A1 (en) | 2018-12-28 | 2019-12-27 | Gaseous tracer leak detection |
Applications Claiming Priority (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201862786194P | 2018-12-28 | 2018-12-28 | |
| US201862786096P | 2018-12-28 | 2018-12-28 | |
| US201862786157P | 2018-12-28 | 2018-12-28 | |
| US201862785728P | 2018-12-28 | 2018-12-28 | |
| US16/729,201 US20200208063A1 (en) | 2018-12-28 | 2019-12-27 | Gaseous tracer leak detection |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20200208063A1 true US20200208063A1 (en) | 2020-07-02 |
Family
ID=71121590
Family Applications (7)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US16/729,170 Active 2040-06-23 US11193069B2 (en) | 2018-12-28 | 2019-12-27 | Coke plant tunnel repair and anchor distribution |
| US16/729,036 Active US11365355B2 (en) | 2018-12-28 | 2019-12-27 | Systems and methods for treating a surface of a coke plant |
| US16/729,129 Active US11008518B2 (en) | 2018-12-28 | 2019-12-27 | Coke plant tunnel repair and flexible joints |
| US16/729,201 Abandoned US20200208063A1 (en) | 2018-12-28 | 2019-12-27 | Gaseous tracer leak detection |
| US17/320,343 Active US11597881B2 (en) | 2018-12-28 | 2021-05-14 | Coke plant tunnel repair and flexible joints |
| US17/532,058 Active US11505747B2 (en) | 2018-12-28 | 2021-11-22 | Coke plant tunnel repair and anchor distribution |
| US17/747,708 Active US12060525B2 (en) | 2018-12-28 | 2022-05-18 | Systems for treating a surface of a coke plant sole flue |
Family Applications Before (3)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US16/729,170 Active 2040-06-23 US11193069B2 (en) | 2018-12-28 | 2019-12-27 | Coke plant tunnel repair and anchor distribution |
| US16/729,036 Active US11365355B2 (en) | 2018-12-28 | 2019-12-27 | Systems and methods for treating a surface of a coke plant |
| US16/729,129 Active US11008518B2 (en) | 2018-12-28 | 2019-12-27 | Coke plant tunnel repair and flexible joints |
Family Applications After (3)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US17/320,343 Active US11597881B2 (en) | 2018-12-28 | 2021-05-14 | Coke plant tunnel repair and flexible joints |
| US17/532,058 Active US11505747B2 (en) | 2018-12-28 | 2021-11-22 | Coke plant tunnel repair and anchor distribution |
| US17/747,708 Active US12060525B2 (en) | 2018-12-28 | 2022-05-18 | Systems for treating a surface of a coke plant sole flue |
Country Status (4)
| Country | Link |
|---|---|
| US (7) | US11193069B2 (en) |
| BR (4) | BR112021012653B1 (en) |
| CA (4) | CA3124563C (en) |
| WO (4) | WO2020140091A1 (en) |
Cited By (27)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US10968393B2 (en) | 2014-09-15 | 2021-04-06 | Suncoke Technology And Development Llc | Coke ovens having monolith component construction |
| US20220055455A1 (en) * | 2020-08-20 | 2022-02-24 | Denso International America, Inc. | Binding agent and olfaction sensor |
| US11359145B2 (en) | 2012-12-28 | 2022-06-14 | Suncoke Technology And Development Llc | Systems and methods for maintaining a hot car in a coke plant |
| US11365355B2 (en) * | 2018-12-28 | 2022-06-21 | Suncoke Technology And Development Llc | Systems and methods for treating a surface of a coke plant |
| CN114874792A (en) * | 2022-04-23 | 2022-08-09 | 中国五冶集团有限公司 | Error control method for front surface line of heat recovery coke oven |
| US11441077B2 (en) | 2012-08-17 | 2022-09-13 | Suncoke Technology And Development Llc | Coke plant including exhaust gas sharing |
| US11508230B2 (en) | 2016-06-03 | 2022-11-22 | Suncoke Technology And Development Llc | Methods and systems for automatically generating a remedial action in an industrial facility |
| US11643602B2 (en) | 2018-12-28 | 2023-05-09 | Suncoke Technology And Development Llc | Decarbonization of coke ovens, and associated systems and methods |
| US11680208B2 (en) | 2018-12-28 | 2023-06-20 | Suncoke Technology And Development Llc | Spring-loaded heat recovery oven system and method |
| US11692138B2 (en) | 2012-08-17 | 2023-07-04 | Suncoke Technology And Development Llc | Automatic draft control system for coke plants |
| US11746296B2 (en) | 2013-03-15 | 2023-09-05 | Suncoke Technology And Development Llc | Methods and systems for improved quench tower design |
| US11767482B2 (en) | 2020-05-03 | 2023-09-26 | Suncoke Technology And Development Llc | High-quality coke products |
| US11788012B2 (en) | 2015-01-02 | 2023-10-17 | Suncoke Technology And Development Llc | Integrated coke plant automation and optimization using advanced control and optimization techniques |
| US11807812B2 (en) | 2012-12-28 | 2023-11-07 | Suncoke Technology And Development Llc | Methods and systems for improved coke quenching |
| US11819802B2 (en) | 2018-12-31 | 2023-11-21 | Suncoke Technology And Development Llc | Methods and systems for providing corrosion resistant surfaces in contaminant treatment systems |
| US11845898B2 (en) | 2017-05-23 | 2023-12-19 | Suncoke Technology And Development Llc | System and method for repairing a coke oven |
| US11845897B2 (en) | 2018-12-28 | 2023-12-19 | Suncoke Technology And Development Llc | Heat recovery oven foundation |
| US11845037B2 (en) | 2012-12-28 | 2023-12-19 | Suncoke Technology And Development Llc | Systems and methods for removing mercury from emissions |
| US11851724B2 (en) | 2021-11-04 | 2023-12-26 | Suncoke Technology And Development Llc. | Foundry coke products, and associated systems, devices, and methods |
| US11939526B2 (en) | 2012-12-28 | 2024-03-26 | Suncoke Technology And Development Llc | Vent stack lids and associated systems and methods |
| US11946108B2 (en) | 2021-11-04 | 2024-04-02 | Suncoke Technology And Development Llc | Foundry coke products and associated processing methods via cupolas |
| US12110458B2 (en) | 2022-11-04 | 2024-10-08 | Suncoke Technology And Development Llc | Coal blends, foundry coke products, and associated systems, devices, and methods |
| US12227699B2 (en) | 2019-12-26 | 2025-02-18 | Suncoke Technology And Development Llc | Oven health optimization systems and methods |
| WO2025101430A1 (en) * | 2023-11-06 | 2025-05-15 | Graphyte, Inc. | The use of tracers to monitor the condition of stored materials |
| US12325828B2 (en) | 2012-12-28 | 2025-06-10 | Suncoke Technology And Development Llc | Exhaust flow modifier, duct intersection incorporating the same, and methods therefor |
| US12338394B2 (en) | 2014-12-31 | 2025-06-24 | Suncoke Technology And Development Llc | Multi-modal beds of coking material |
| US12410369B2 (en) | 2023-11-21 | 2025-09-09 | Suncoke Technology And Development Llc | Flat push hot car for foundry coke and associated systems and methods |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA3125279A1 (en) | 2018-12-28 | 2020-07-02 | Suncoke Technology And Development Llc | Improved oven uptakes |
| CN112480940A (en) * | 2020-11-30 | 2021-03-12 | 新疆元瑞圣湖能源有限公司 | Semicoke indirect heat exchange coke quenching device and method capable of automatically adjusting cold medium circulation speed |
| CN119552670B (en) * | 2025-01-22 | 2025-04-22 | 太原四联重工股份有限公司 | Coke cake dust fall forming device in coking workshop |
Family Cites Families (660)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1486401A (en) | 1924-03-11 | van ackeren | ||
| US2340283A (en) | 1944-01-25 | Flue control device | ||
| US1848818A (en) | 1932-03-08 | becker | ||
| US469868A (en) | 1892-03-01 | Apparatus for quenching coke | ||
| US1895202A (en) | 1933-01-24 | Damper control | ||
| US425797A (en) | 1890-04-15 | Charles w | ||
| US845719A (en) | 1899-08-01 | 1907-02-26 | United Coke & Gas Company | Apparatus for charging coke-ovens. |
| US705926A (en) | 1901-10-21 | 1902-07-29 | Curtis Joel Rothermel | Continuous process of coking coal. |
| US760372A (en) | 1903-08-20 | 1904-05-17 | Beam Coke Oven Steam Boiler Power Company | Coke-oven. |
| US875989A (en) | 1906-11-10 | 1908-01-07 | Covington Machine Company | Coke-extracting machine. |
| DE212176C (en) | 1908-04-10 | 1909-07-26 | ||
| US976580A (en) | 1909-07-08 | 1910-11-22 | Stettiner Chamotte Fabrik Actien Ges | Apparatus for quenching incandescent materials. |
| US1140798A (en) | 1915-01-02 | 1915-05-25 | Riterconley Mfg Company | Coal-gas-generating apparatus. |
| US1424777A (en) | 1915-08-21 | 1922-08-08 | Schondeling Wilhelm | Process of and device for quenching coke in narrow containers |
| US1378782A (en) | 1918-07-12 | 1921-05-17 | Griffin Eddie Floyd | Coke-shovel |
| US1430027A (en) | 1920-05-01 | 1922-09-26 | Plantinga Pierre | Oven-wall structure |
| US1429346A (en) | 1921-09-01 | 1922-09-19 | Horn Elisabeth | Retort for gas furnaces |
| US1530995A (en) | 1922-09-11 | 1925-03-24 | Geiger Joseph | Coke-oven construction |
| US1572391A (en) | 1923-09-12 | 1926-02-09 | Koppers Co Inc | Container for testing coal and method of testing |
| US1818994A (en) | 1924-10-11 | 1931-08-18 | Combustion Eng Corp | Dust collector |
| US1677973A (en) | 1925-08-08 | 1928-07-24 | Frank F Marquard | Method of quenching coke |
| BE336997A (en) | 1926-03-04 | |||
| US1705039A (en) | 1926-11-01 | 1929-03-12 | Thornhill Anderson Company | Furnace for treatment of materials |
| US1830951A (en) | 1927-04-12 | 1931-11-10 | Koppers Co Inc | Pusher ram for coke ovens |
| US1757682A (en) | 1928-05-18 | 1930-05-06 | Palm Robert | Furnace-arch support |
| US1818370A (en) | 1929-04-27 | 1931-08-11 | William E Wine | Cross bearer |
| GB364236A (en) | 1929-11-25 | 1932-01-07 | Stettiner Chamotte Fabrik Ag | Improvements in processes and apparatus for extinguishing coke |
| US1947499A (en) | 1930-08-12 | 1934-02-20 | Semet Solvay Eng Corp | By-product coke oven |
| GB368649A (en) | 1930-10-04 | 1932-03-10 | Ig Farbenindustrie Ag | Process for the treatment of welded structural members, of light metal, with closed, hollow cross section |
| US1979507A (en) | 1932-04-02 | 1934-11-06 | Bethlehem Steel Corp | Coke oven machine |
| US1955962A (en) | 1933-07-18 | 1934-04-24 | Carter Coal Company | Coal testing apparatus |
| GB441784A (en) | 1934-08-16 | 1936-01-27 | Carves Simon Ltd | Process for improvement of quality of coke in coke ovens |
| US2141035A (en) | 1935-01-24 | 1938-12-20 | Koppers Co Inc | Coking retort oven heating wall of brickwork |
| US2075337A (en) | 1936-04-03 | 1937-03-30 | Harold F Burnaugh | Ash and soot trap |
| US2195466A (en) | 1936-07-28 | 1940-04-02 | Otto Wilputte Ovenbouw Mij N V | Operating coke ovens |
| US2235970A (en) | 1940-06-19 | 1941-03-25 | Wilputte Coke Oven Corp | Underfired coke oven |
| US2340981A (en) | 1941-05-03 | 1944-02-08 | Fuel Refining Corp | Coke oven construction |
| BE464279A (en) | 1942-07-07 | |||
| US2394173A (en) | 1943-07-26 | 1946-02-05 | Albert B Harris | Locomotive draft arrangement |
| GB606340A (en) | 1944-02-28 | 1948-08-12 | Waldemar Amalius Endter | Latch devices |
| GB611524A (en) | 1945-07-21 | 1948-11-01 | Koppers Co Inc | Improvements in or relating to coke oven door handling apparatus |
| US2486199A (en) | 1945-09-10 | 1949-10-25 | Univ Minnesota | Method and apparatus for determining leaks |
| US2641575A (en) | 1949-01-21 | 1953-06-09 | Otto Carl | Coke oven buckstay structure |
| US2609948A (en) | 1949-08-12 | 1952-09-09 | Koppers Co Inc | Pusher machine with articulated pusher bar |
| US2667185A (en) | 1950-02-13 | 1954-01-26 | James L Beavers | Fluid diverter |
| US2649978A (en) | 1950-10-07 | 1953-08-25 | Smith Henry Such | Belt charging apparatus |
| US2907698A (en) | 1950-10-07 | 1959-10-06 | Schulz Erich | Process of producing coke from mixture of coke breeze and coal |
| US2813708A (en) | 1951-10-08 | 1957-11-19 | Frey Kurt Paul Hermann | Devices to improve flow pattern and heat transfer in heat exchange zones of brick-lined furnaces |
| GB725865A (en) | 1952-04-29 | 1955-03-09 | Koppers Gmbh Heinrich | Coke-quenching car |
| US2827424A (en) | 1953-03-09 | 1958-03-18 | Koppers Co Inc | Quenching station |
| US2723725A (en) | 1954-05-18 | 1955-11-15 | Charles J Keiffer | Dust separating and recovering apparatus |
| US2756842A (en) | 1954-08-27 | 1956-07-31 | Research Corp | Electrostatic gas cleaning method |
| US2873816A (en) | 1954-09-27 | 1959-02-17 | Ajem Lab Inc | Gas washing apparatus |
| DE201729C (en) | 1956-08-25 | 1908-09-19 | Franz Meguin & Co Ag | DEVICE FOR SCRAPING GRAPHITE APPROACHES AND THE DIGITAL VOCES OF KOKS CHAMBERS |
| US2968083A (en) * | 1956-09-21 | 1961-01-17 | George F Lentz | Hot patching of refractory structures |
| US2902991A (en) | 1957-08-15 | 1959-09-08 | Howard E Whitman | Smoke generator |
| US3033764A (en) | 1958-06-10 | 1962-05-08 | Koppers Co Inc | Coke quenching tower |
| GB923205A (en) | 1959-02-06 | 1963-04-10 | Stanley Pearson Winn | Roller blind for curved windows |
| GB871094A (en) | 1959-04-29 | 1961-06-21 | Didier Werke Ag | Coke cooling towers |
| US3015893A (en) | 1960-03-14 | 1962-01-09 | Mccreary John | Fluid flow control device for tenter machines utilizing super-heated steam |
| US3026715A (en) | 1961-01-03 | 1962-03-27 | Gen Electric | Leak detector test table |
| US3259551A (en) | 1961-10-03 | 1966-07-05 | Allied Chem | Regenerative coke oven batteries |
| US3175961A (en) | 1962-05-28 | 1965-03-30 | Allied Chem | Adjusting device for springs associated with the buckstays of coke oven batteries |
| AT251607B (en) | 1963-08-09 | 1967-01-10 | Kohlenscheidungs Gmbh | Bracket for horizontal pipes of heat exchangers on vertical support pipes |
| DE1212037B (en) | 1963-08-28 | 1966-03-10 | Still Fa Carl | Sealing of the extinguishing area of coke extinguishing devices |
| US3199135A (en) | 1964-01-29 | 1965-08-10 | Koppers Co Inc | Combined coke oven door jamb cleaning apparatus and pusher |
| US3224805A (en) | 1964-01-30 | 1965-12-21 | Glen W Clyatt | Truck top carrier |
| US3265044A (en) | 1964-04-03 | 1966-08-09 | Combustion Eng | Heat exchanger tube support |
| GB1047204A (en) | 1964-05-26 | 1900-01-01 | ||
| US3327521A (en) | 1964-10-26 | 1967-06-27 | Nat Res Corp | Leak detector and vacuum pumping station |
| US3444046A (en) | 1965-02-04 | 1969-05-13 | Koppers Co Inc | Method for producing coke |
| FR1579485A (en) | 1966-12-17 | 1969-08-29 | ||
| US3448012A (en) | 1967-02-01 | 1969-06-03 | Marathon Oil Co | Rotary concentric partition in a coke oven hearth |
| CA860719A (en) | 1967-02-06 | 1971-01-12 | Research-Cottrell | Method and apparatus for electrostatically cleaning highly compressed gases |
| US3462345A (en) | 1967-05-10 | 1969-08-19 | Babcock & Wilcox Co | Nuclear reactor rod controller |
| US3545470A (en) | 1967-07-24 | 1970-12-08 | Hamilton Neil King Paton | Differential-pressure flow-controlling valve mechanism |
| US3453839A (en) | 1967-10-26 | 1969-07-08 | Alfred B Sabin | Cargo transport system and container therefor |
| US3591827A (en) | 1967-11-29 | 1971-07-06 | Andar Iti Inc | Ion-pumped mass spectrometer leak detector apparatus and method and ion pump therefor |
| US3444047A (en) | 1968-03-04 | 1969-05-13 | Thomas J Wilde | Method for making metallurgical coke |
| US3616408A (en) | 1968-05-29 | 1971-10-26 | Westinghouse Electric Corp | Oxygen sensor |
| DE1771855A1 (en) | 1968-07-20 | 1972-02-03 | Still Fa Carl | Device for emission-free coke expression and coke extinguishing in horizontal coking furnace batteries |
| US3652403A (en) | 1968-12-03 | 1972-03-28 | Still Fa Carl | Method and apparatus for the evacuation of coke from a furnace chamber |
| DE1812897B2 (en) | 1968-12-05 | 1973-04-12 | Heinrich Koppers Gmbh, 4300 Essen | DEVICE FOR REMOVING THE DUST ARISING FROM COOKING CHAMBER STOVES |
| US3587198A (en) | 1969-04-14 | 1971-06-28 | Universal Oil Prod Co | Heat protected metal wall |
| US3592742A (en) | 1970-02-06 | 1971-07-13 | Buster R Thompson | Foundation cooling system for sole flue coking ovens |
| US3623511A (en) | 1970-02-16 | 1971-11-30 | Bvs | Tubular conduits having a bent portion and carrying a fluid |
| US3811572A (en) | 1970-04-13 | 1974-05-21 | Koppers Co Inc | Pollution control system |
| US3722182A (en) | 1970-05-14 | 1973-03-27 | J Gilbertson | Air purifying and deodorizing device for automobiles |
| US3710551A (en) | 1970-06-18 | 1973-01-16 | Pollution Rectifiers Corp | Gas scrubber |
| US3875016A (en) | 1970-10-13 | 1975-04-01 | Otto & Co Gmbh Dr C | Method and apparatus for controlling the operation of regeneratively heated coke ovens |
| US3711025A (en) | 1971-03-15 | 1973-01-16 | Du Pont | Centrifugal atomizing device |
| US3933443A (en) | 1971-05-18 | 1976-01-20 | Hugo Lohrmann | Coking component |
| US3748235A (en) | 1971-06-10 | 1973-07-24 | Otto & Co Gmbh Dr C | Pollution free discharging and quenching system |
| US3709794A (en) | 1971-06-24 | 1973-01-09 | Koppers Co Inc | Coke oven machinery door extractor shroud |
| DE2154306A1 (en) | 1971-11-02 | 1973-05-10 | Otto & Co Gmbh Dr C | KOKSLOESCHTURM |
| BE790985A (en) | 1971-12-11 | 1973-03-01 | Koppers Gmbh Heinrich | PROCEDURE FOR THE UNIFORMIZATION OF THE HEATING OF HORIZONTAL CHAMBER COKE OVENS AND INSTALLATION FOR THE PRACTICE OF |
| US3894302A (en) | 1972-03-08 | 1975-07-15 | Tyler Pipe Ind Inc | Self-venting fitting |
| US3784034A (en) | 1972-04-04 | 1974-01-08 | B Thompson | Coke oven pushing and charging machine and method |
| US3912091A (en) | 1972-04-04 | 1975-10-14 | Buster Ray Thompson | Coke oven pushing and charging machine and method |
| US3917458A (en) | 1972-07-21 | 1975-11-04 | Nicoll Jr Frank S | Gas filtration system employing a filtration screen of particulate solids |
| US3857758A (en) | 1972-07-21 | 1974-12-31 | Block A | Method and apparatus for emission free operation of by-product coke ovens |
| DE2245567C3 (en) | 1972-09-16 | 1981-12-03 | G. Wolff Jun. Kg, 4630 Bochum | Coking oven door with circumferential sealing edge |
| US4143104A (en) | 1972-10-09 | 1979-03-06 | Hoogovens Ijmuiden, B.V. | Repairing damaged refractory walls by gunning |
| DE2250636C3 (en) | 1972-10-16 | 1978-08-24 | Hartung, Kuhn & Co Maschinenfabrik Gmbh, 4000 Duesseldorf | Movable device consisting of a coke cake guide carriage and a support frame for a suction hood |
| US3836161A (en) | 1973-01-08 | 1974-09-17 | Midland Ross Corp | Leveling system for vehicles with optional manual or automatic control |
| DE2312907C2 (en) | 1973-03-15 | 1974-09-12 | Dr. C. Otto & Co Gmbh, 4630 Bochum | Process for extinguishing the coke fire in coking ovens arranged in batteries |
| DE2326825A1 (en) | 1973-05-25 | 1975-01-02 | Hartung Kuhn & Co Maschf | DEVICE FOR EXTRACTION AND CLEANING OF GAS VAPOR LEAKING FROM THE DOORS OF THE HORIZONTAL CHAMBER COOKING OVEN BATTERIES |
| DE2327983B2 (en) | 1973-06-01 | 1976-08-19 | HORIZONTAL COOKING FURNACE WITH TRANSVERSAL GENERATORS | |
| US3878053A (en) | 1973-09-04 | 1975-04-15 | Koppers Co Inc | Refractory shapes and jamb structure of coke oven battery heating wall |
| US4067462A (en) | 1974-01-08 | 1978-01-10 | Buster Ray Thompson | Coke oven pushing and charging machine and method |
| US3897312A (en) | 1974-01-17 | 1975-07-29 | Interlake Inc | Coke oven charging system |
| US4025395A (en) | 1974-02-15 | 1977-05-24 | United States Steel Corporation | Method for quenching coke |
| JPS5347497Y2 (en) | 1974-02-19 | 1978-11-14 | ||
| US3912597A (en) | 1974-03-08 | 1975-10-14 | James E Macdonald | Smokeless non-recovery type coke oven |
| DE2416434A1 (en) | 1974-04-04 | 1975-10-16 | Otto & Co Gmbh Dr C | COOKING OVEN |
| US3930961A (en) | 1974-04-08 | 1976-01-06 | Koppers Company, Inc. | Hooded quenching wharf for coke side emission control |
| JPS536964B2 (en) | 1974-05-18 | 1978-03-13 | ||
| US3906992A (en) | 1974-07-02 | 1975-09-23 | John Meredith Leach | Sealed, easily cleanable gate valve |
| US3984289A (en) | 1974-07-12 | 1976-10-05 | Koppers Company, Inc. | Coke quencher car apparatus |
| US3928144A (en) | 1974-07-17 | 1975-12-23 | Nat Steel Corp | Pollutants collection system for coke oven discharge operation |
| US4100033A (en) | 1974-08-21 | 1978-07-11 | Hoelter H | Extraction of charge gases from coke ovens |
| US3959084A (en) | 1974-09-25 | 1976-05-25 | Dravo Corporation | Process for cooling of coke |
| JPS5314242B2 (en) | 1974-10-31 | 1978-05-16 | ||
| US3963582A (en) | 1974-11-26 | 1976-06-15 | Koppers Company, Inc. | Method and apparatus for suppressing the deposition of carbonaceous material in a coke oven battery |
| US3979870A (en) | 1975-01-24 | 1976-09-14 | Moore Alvin E | Light-weight, insulated construction element and wall |
| US3990948A (en) | 1975-02-11 | 1976-11-09 | Koppers Company, Inc. | Apparatus for cleaning the bottom surface of a coke oven door plug |
| US4059885A (en) | 1975-03-19 | 1977-11-29 | Dr. C. Otto & Comp. G.M.B.H. | Process for partial restoration of a coke oven battery |
| US4004702A (en) | 1975-04-21 | 1977-01-25 | Bethlehem Steel Corporation | Coke oven larry car coal restricting insert |
| DE2524462A1 (en) | 1975-06-03 | 1976-12-16 | Still Fa Carl | COOKING OVEN FILLING TROLLEY |
| US4045056A (en) * | 1975-10-14 | 1977-08-30 | Gennady Petrovich Kandakov | Expansion compensator for pipelines |
| US4045299A (en) | 1975-11-24 | 1977-08-30 | Pennsylvania Coke Technology, Inc. | Smokeless non-recovery type coke oven |
| DE2603678C2 (en) | 1976-01-31 | 1984-02-23 | Saarbergwerke AG, 6600 Saarbrücken | Device for locking a movable ram, which closes the rammed form of a rammed coking plant on its side facing away from the furnace chambers, in its position on the furnace chamber head |
| US4083753A (en) | 1976-05-04 | 1978-04-11 | Koppers Company, Inc. | One-spot coke quencher car |
| US4145195A (en) | 1976-06-28 | 1979-03-20 | Firma Carl Still | Adjustable device for removing pollutants from gases and vapors evolved during coke quenching operations |
| JPS5319301A (en) | 1976-08-09 | 1978-02-22 | Takenaka Komuten Co | Lower structure of coke oven |
| US4065059A (en) * | 1976-09-07 | 1977-12-27 | Richard Jablin | Repair gun for coke ovens |
| JPS5352502A (en) | 1976-10-22 | 1978-05-13 | Otto & Co Gmbh Dr C | Supporting structure for base plate of bottom heat coke oven |
| US4077848A (en) | 1976-12-10 | 1978-03-07 | United States Steel Corporation | Method and apparatus for applying patching or sealing compositions to coke oven side walls and roof |
| DE2657227C2 (en) | 1976-12-17 | 1978-11-30 | Krupp-Koppers Gmbh, 4300 Essen | Device for cleaning the oven sole of coke oven chambers |
| US4100491A (en) | 1977-02-28 | 1978-07-11 | Southwest Research Institute | Automatic self-cleaning ferromagnetic metal detector |
| DE2712111A1 (en) | 1977-03-19 | 1978-09-28 | Otto & Co Gmbh Dr C | FOR TAKING A COOKING FIRE SERVANT, CARRIAGE OF CARRIAGE ALONG A BATTERY OF CARBON OVENS |
| US4100889A (en) | 1977-04-07 | 1978-07-18 | Combustion Engineering, Inc. | Band type tube support |
| DE2715536C2 (en) | 1977-04-07 | 1982-07-15 | Bergwerksverband Gmbh | Method and device for recovering waste heat from coke ovens |
| US4271814A (en) | 1977-04-29 | 1981-06-09 | Lister Paul M | Heat extracting apparatus for fireplaces |
| DE2720688A1 (en) | 1977-05-07 | 1978-11-09 | Alois Steimer | Automatically operated flap for flue gas channel - has pivoting shaft ensuring unstable equilibrium in any flap open position |
| US4111757A (en) | 1977-05-25 | 1978-09-05 | Pennsylvania Coke Technology, Inc. | Smokeless and non-recovery type coke oven battery |
| US4093245A (en) | 1977-06-02 | 1978-06-06 | Mosser Industries, Inc. | Mechanical sealing means |
| US4213828A (en) | 1977-06-07 | 1980-07-22 | Albert Calderon | Method and apparatus for quenching coke |
| US4141796A (en) | 1977-08-08 | 1979-02-27 | Bethlehem Steel Corporation | Coke oven emission control method and apparatus |
| US4284478A (en) | 1977-08-19 | 1981-08-18 | Didier Engineering Gmbh | Apparatus for quenching hot coke |
| US4211608A (en) | 1977-09-28 | 1980-07-08 | Bethlehem Steel Corporation | Coke pushing emission control system |
| JPS5453103A (en) | 1977-10-04 | 1979-04-26 | Nippon Kokan Kk <Nkk> | Production of metallurgical coke |
| US4196053A (en) | 1977-10-04 | 1980-04-01 | Hartung, Kuhn & Co. Maschinenfabrik Gmbh | Equipment for operating coke oven service machines |
| JPS5454101A (en) | 1977-10-07 | 1979-04-28 | Nippon Kokan Kk <Nkk> | Charging of raw coal for sintered coke |
| US4162546A (en) | 1977-10-31 | 1979-07-31 | Carrcraft Manufacturing Company | Branch tail piece |
| DE2755108B2 (en) | 1977-12-10 | 1980-06-19 | Gewerkschaft Schalker Eisenhuette, 4650 Gelsenkirchen | Door lifting device |
| US4176013A (en) * | 1978-01-23 | 1979-11-27 | Interlake, Inc. | Coke oven door seal assembly |
| DE2804935C2 (en) | 1978-02-06 | 1984-04-05 | Carl Still Gmbh & Co Kg, 4350 Recklinghausen | Device for the emission-free filling of coking coal into the furnace chambers of coking batteries |
| DE2808213C2 (en) | 1978-02-25 | 1979-10-11 | 4300 Essen | Recuperative coke oven and method for operating the same |
| US4189272A (en) | 1978-02-27 | 1980-02-19 | Gewerkschaft Schalker Eisenhutte | Method of and apparatus for charging coal into a coke oven chamber |
| US4181459A (en) | 1978-03-01 | 1980-01-01 | United States Steel Corporation | Conveyor protection system |
| US4222748A (en) | 1979-02-22 | 1980-09-16 | Monsanto Company | Electrostatically augmented fiber bed and method of using |
| US4147230A (en) | 1978-04-14 | 1979-04-03 | Nelson Industries, Inc. | Combination spark arrestor and aspirating muffler |
| US4287024A (en) | 1978-06-22 | 1981-09-01 | Thompson Buster R | High-speed smokeless coke oven battery |
| US4230498A (en) * | 1978-08-02 | 1980-10-28 | United States Steel Corporation | Coke oven patching and sealing material |
| US4353189A (en) | 1978-08-15 | 1982-10-12 | Firma Carl Still Gmbh & Co. Kg | Earthquake-proof foundation for coke oven batteries |
| US4235830A (en) | 1978-09-05 | 1980-11-25 | Aluminum Company Of America | Flue pressure control for tunnel kilns |
| US4249997A (en) | 1978-12-18 | 1981-02-10 | Bethlehem Steel Corporation | Low differential coke oven heating system |
| US4213489A (en) | 1979-01-10 | 1980-07-22 | Koppers Company, Inc. | One-spot coke quench car coke distribution system |
| US4285772A (en) | 1979-02-06 | 1981-08-25 | Kress Edward S | Method and apparatus for handlng and dry quenching coke |
| US4289584A (en) | 1979-03-15 | 1981-09-15 | Bethlehem Steel Corporation | Coke quenching practice for one-spot cars |
| US4248671A (en) | 1979-04-04 | 1981-02-03 | Envirotech Corporation | Dry coke quenching and pollution control |
| DE2914387C2 (en) | 1979-04-10 | 1982-07-01 | Carl Still Gmbh & Co Kg, 4350 Recklinghausen | Formation of heating walls for horizontal chamber coking ovens |
| US4226113A (en) | 1979-04-11 | 1980-10-07 | Electric Power Research Institute, Inc. | Leak detecting arrangement especially suitable for a steam condenser and method |
| DE2915330C2 (en) | 1979-04-14 | 1983-01-27 | Didier Engineering Gmbh, 4300 Essen | Process and plant for wet quenching of coke |
| DE7914320U1 (en) | 1979-05-17 | 1979-08-09 | Fa. Carl Still Gmbh & Co Kg, 4350 Recklinghausen | SUBMERSIBLE LOCKING DEVICE FOR ELEVATOR LID |
| US4263099A (en) | 1979-05-17 | 1981-04-21 | Bethlehem Steel Corporation | Wet quenching of incandescent coke |
| DE2921171C2 (en) | 1979-05-25 | 1986-04-03 | Dr. C. Otto & Co Gmbh, 4630 Bochum | Procedure for renovating the masonry of coking ovens |
| DE2922571C2 (en) | 1979-06-02 | 1985-08-01 | Dr. C. Otto & Co Gmbh, 4630 Bochum | Charging trolleys for coking ovens |
| US4307673A (en) | 1979-07-23 | 1981-12-29 | Forest Fuels, Inc. | Spark arresting module |
| US4239602A (en) | 1979-07-23 | 1980-12-16 | Insul Company, Inc. | Ascension pipe elbow lid for coke ovens |
| US4334963A (en) | 1979-09-26 | 1982-06-15 | Wsw Planungs-Gmbh | Exhaust hood for unloading assembly of coke-oven battery |
| US4336843A (en) | 1979-10-19 | 1982-06-29 | Odeco Engineers, Inc. | Emergency well-control vessel |
| BR8006807A (en) | 1979-10-23 | 1981-04-28 | Nippon Steel Corp | PROCESS AND APPLIANCE FOR FILLING THE CARBONIZATION CHAMBER OF A COOK OVEN WITH COAL IN PO |
| JPS5918436B2 (en) | 1980-09-11 | 1984-04-27 | 新日本製鐵株式会社 | Pulverized coal pressurization and vibration filling equipment in coke ovens |
| JPS5918437B2 (en) | 1980-09-11 | 1984-04-27 | 新日本製鐵株式会社 | Pressure/vibration filling device for pulverized coal in a coke oven |
| US4344822A (en) | 1979-10-31 | 1982-08-17 | Bethlehem Steel Corporation | One-spot car coke quenching method |
| US4396461A (en) | 1979-10-31 | 1983-08-02 | Bethlehem Steel Corporation | One-spot car coke quenching process |
| US4298497A (en) | 1980-01-21 | 1981-11-03 | Nalco Chemical Company | Composition for preventing cold end corrosion in boilers |
| US4302935A (en) | 1980-01-31 | 1981-12-01 | Cousimano Robert D | Adjustable (D)-port insert header for internal combustion engines |
| US4316435A (en) | 1980-02-27 | 1982-02-23 | General Electric Company | Boiler tube silencer |
| US4268360A (en) | 1980-03-03 | 1981-05-19 | Koritsu Machine Industrial Limited | Temporary heat-proof apparatus for use in repairing coke ovens |
| DE3011781C2 (en) | 1980-03-27 | 1984-02-23 | Gewerkschaft Schalker Eisenhütte, 4650 Gelsenkirchen | Equipment for the coke oven operation |
| US4446018A (en) | 1980-05-01 | 1984-05-01 | Armco Inc. | Waste treatment system having integral intrachannel clarifier |
| US4303615A (en) | 1980-06-02 | 1981-12-01 | Fisher Scientific Company | Crucible with lid |
| DE3022604A1 (en) | 1980-06-16 | 1982-01-14 | Ruhrkohle Ag, 4300 Essen | METHOD FOR PRODUCING CARBIDE MIXTURES FOR COOKERIES |
| US4289479A (en) | 1980-06-19 | 1981-09-15 | Johnson Jr Allen S | Thermally insulated rotary kiln and method of making same |
| US4324568A (en) | 1980-08-11 | 1982-04-13 | Flanders Filters, Inc. | Method and apparatus for the leak testing of filters |
| US4342195A (en) | 1980-08-15 | 1982-08-03 | Lo Ching P | Motorcycle exhaust system |
| DE3037950C2 (en) | 1980-10-08 | 1985-09-12 | Dr. C. Otto & Co Gmbh, 4630 Bochum | Device for improving the flow course in the transfer channels, which are arranged between the regenerators or recuperators and the combustion chambers of technical gas firing systems, in particular of coke ovens |
| JPS5783585A (en) | 1980-11-12 | 1982-05-25 | Ishikawajima Harima Heavy Ind Co Ltd | Method for charging stock coal into coke oven |
| DE3043239C2 (en) | 1980-11-15 | 1985-11-28 | Balcke-Dürr AG, 4030 Ratingen | Method and device for mixing at least two fluid partial flows |
| JPS5790092A (en) | 1980-11-27 | 1982-06-04 | Ishikawajima Harima Heavy Ind Co Ltd | Method for compacting coking coal |
| DE3044897A1 (en) | 1980-11-28 | 1982-07-08 | Krupp-Koppers Gmbh, 4300 Essen | CLAMPING SYSTEM TO AVOID HARMFUL TENSION AND SHEARING TENSIONS IN ANY MULTI-LAYER WALLWORK DISKS |
| US4340445A (en) | 1981-01-09 | 1982-07-20 | Kucher Valery N | Car for receiving incandescent coke |
| US4391674A (en) | 1981-02-17 | 1983-07-05 | Republic Steel Corporation | Coke delivery apparatus and method |
| US4407237A (en) | 1981-02-18 | 1983-10-04 | Applied Engineering Co., Inc. | Economizer with soot blower |
| NL8101060A (en) | 1981-03-05 | 1982-10-01 | Estel Hoogovens Bv | HORIZONTAL COOKING OVEN BATTERY. |
| US4474344A (en) | 1981-03-25 | 1984-10-02 | The Boeing Company | Compression-sealed nacelle inlet door assembly |
| US4406619A (en) * | 1981-03-30 | 1983-09-27 | Hans Oldengott | Sealing lid means for coke oven chamber |
| JPS57172978A (en) | 1981-04-17 | 1982-10-25 | Kawatetsu Kagaku Kk | Apparatus for feeding pressure molded briquette into oven chamber |
| DE3119973C2 (en) | 1981-05-20 | 1983-11-03 | Carl Still Gmbh & Co Kg, 4350 Recklinghausen | Heating device for regenerative coking furnace batteries |
| US4330372A (en) | 1981-05-29 | 1982-05-18 | National Steel Corporation | Coke oven emission control method and apparatus |
| GB2102830B (en) | 1981-08-01 | 1985-08-21 | Kurt Dix | Coke-oven door |
| CA1172895A (en) | 1981-08-27 | 1984-08-21 | James Ross | Energy saving chimney cap assembly |
| US4366029A (en) | 1981-08-31 | 1982-12-28 | Koppers Company, Inc. | Pivoting back one-spot coke car |
| US4336107A (en) | 1981-09-02 | 1982-06-22 | Koppers Company, Inc. | Aligning device |
| US4395269B1 (en) | 1981-09-30 | 1994-08-30 | Donaldson Co Inc | Compact dust filter assembly |
| JPS5891788A (en) | 1981-11-27 | 1983-05-31 | Ishikawajima Harima Heavy Ind Co Ltd | Coal compaction block charging equipment into coke oven |
| FR2517802A1 (en) | 1981-12-04 | 1983-06-10 | Gaz Transport | Leak detector for liquefied gas storage vessel - has gas sampling pipes, at known points in vessel isolating barriers, connected to analyser |
| US4396394A (en) | 1981-12-21 | 1983-08-02 | Atlantic Richfield Company | Method for producing a dried coal fuel having a reduced tendency to spontaneously ignite from a low rank coal |
| JPS58152095A (en) | 1982-03-04 | 1983-09-09 | Idemitsu Kosan Co Ltd | Modification of low-grade coal |
| US4459103A (en) | 1982-03-10 | 1984-07-10 | Hazen Research, Inc. | Automatic volatile matter content analyzer |
| DE3210372A1 (en) | 1982-03-20 | 1983-09-29 | Krupp-Koppers Gmbh, 4300 Essen | BASE FOR A BATTERY HEAD-HEATED COOKING OVEN |
| DE3315738C2 (en) | 1982-05-03 | 1984-03-22 | WSW Planungsgesellschaft mbH, 4355 Waltrop | Process and device for dedusting coke oven emissions |
| US4469446A (en) | 1982-06-24 | 1984-09-04 | Joy Manufacturing Company | Fluid handling |
| US4421070A (en) | 1982-06-25 | 1983-12-20 | Combustion Engineering, Inc. | Steam cooled hanger tube for horizontal superheaters and reheaters |
| DE3231697C1 (en) | 1982-08-26 | 1984-01-26 | Didier Engineering Gmbh, 4300 Essen | Extinguishing tower |
| US4452749A (en) | 1982-09-14 | 1984-06-05 | Modern Refractories Service Corp. | Method of repairing hot refractory brick walls |
| JPS5951978A (en) | 1982-09-16 | 1984-03-26 | Kawasaki Heavy Ind Ltd | Self-supporting carrier case for compression-molded coal |
| US4448541A (en) | 1982-09-22 | 1984-05-15 | Mediminder Development Limited Partnership | Medical timer apparatus |
| JPS5953589A (en) | 1982-09-22 | 1984-03-28 | Kawasaki Steel Corp | Manufacture of compression-formed coal |
| JPS5971388A (en) | 1982-10-15 | 1984-04-23 | Kawatetsu Kagaku Kk | Operating station for compression molded coal case in coke oven |
| AU552638B2 (en) | 1982-10-20 | 1986-06-12 | Idemitsu Kosan Co. Ltd | Process for modification of coal |
| DE3245551C1 (en) | 1982-12-09 | 1984-02-09 | Dr. C. Otto & Co Gmbh, 4630 Bochum | Coke oven battery |
| US4440098A (en) | 1982-12-10 | 1984-04-03 | Energy Recovery Group, Inc. | Waste material incineration system and method |
| JPS59108083A (en) | 1982-12-13 | 1984-06-22 | Kawasaki Heavy Ind Ltd | Transportation of compression molded coal and its device |
| US4487137A (en) | 1983-01-21 | 1984-12-11 | Horvat George T | Auxiliary exhaust system |
| JPS59145281A (en) | 1983-02-08 | 1984-08-20 | Ishikawajima Harima Heavy Ind Co Ltd | Powdered coal compaction cake manufacturing equipment |
| US4568426A (en) | 1983-02-09 | 1986-02-04 | Alcor, Inc. | Controlled atmosphere oven |
| US4680167A (en) | 1983-02-09 | 1987-07-14 | Alcor, Inc. | Controlled atmosphere oven |
| US4445977A (en) | 1983-02-28 | 1984-05-01 | Furnco Construction Corporation | Coke oven having an offset expansion joint and method of installation thereof |
| US4690689A (en) * | 1983-03-02 | 1987-09-01 | Columbia Gas System Service Corp. | Gas tracer composition and method |
| US4527488A (en) | 1983-04-26 | 1985-07-09 | Koppers Company, Inc. | Coke oven charging car |
| DE3317378A1 (en) | 1983-05-13 | 1984-11-15 | Wilhelm Fritz 4006 Erkrath Morschheuser | FLOW CHANNEL SHORT LENGTH |
| JPS604588A (en) | 1983-06-22 | 1985-01-11 | Nippon Steel Corp | Horizontal chamber coke oven and method for controlling heating of said oven |
| DE3328702A1 (en) | 1983-08-09 | 1985-02-28 | FS-Verfahrenstechnik für Industrieanlagen GmbH, 5110 Alsorf | Process and equipment for quenching red-hot coke |
| DE3329367C1 (en) | 1983-08-13 | 1984-11-29 | Gewerkschaft Schalker Eisenhütte, 4650 Gelsenkirchen | Coking furnace |
| DE3339160C2 (en) | 1983-10-28 | 1986-03-20 | Carl Still Gmbh & Co Kg, 4350 Recklinghausen | Methods and devices for detecting embers and extinguishing the coke lying on the coke ramp |
| DE3407487C1 (en) | 1984-02-27 | 1985-06-05 | Mannesmann AG, 4000 Düsseldorf | Coke-quenching tower |
| US4506025A (en) | 1984-03-22 | 1985-03-19 | Dresser Industries, Inc. | Silica castables |
| US4570670A (en) | 1984-05-21 | 1986-02-18 | Johnson Charles D | Valve |
| US4655193A (en) | 1984-06-05 | 1987-04-07 | Blacket Arnold M | Incinerator |
| DE3436687A1 (en) | 1984-10-05 | 1986-04-10 | Krupp Polysius Ag, 4720 Beckum | DEVICE FOR HEAT TREATMENT OF FINE GOODS |
| JPS61106690A (en) | 1984-10-30 | 1986-05-24 | Kawasaki Heavy Ind Ltd | Conveying device for compacted coal for coke ovens |
| DE3443976A1 (en) | 1984-12-01 | 1986-06-12 | Krupp Koppers GmbH, 4300 Essen | METHOD FOR REDUCING THE NO (ARROW DOWN) X (ARROW DOWN) CONTENT IN THE FLUE GAS IN THE HEATING OF COCING FURNACES AND FURNISHING OVEN FOR CARRYING OUT THE PROCEDURE |
| DE3521540A1 (en) | 1985-06-15 | 1986-12-18 | Dr. C. Otto & Co Gmbh, 4630 Bochum | EXTINGUISHER TROLLEY FOR COCING OVENS |
| DK298485A (en) | 1985-07-01 | 1987-01-02 | Niro Atomizer As | PROCEDURE FOR THE REMOVAL OF MERCURY VAPOR AND Vapor-shaped CHLORDIBENZODIOXINES AND FURANES FROM A STREAM OF HOT RAGGAS |
| JPS6211794A (en) | 1985-07-10 | 1987-01-20 | Nippon Steel Corp | Coal charging vibration consolidation device in coke oven |
| US4666675A (en) | 1985-11-12 | 1987-05-19 | Shell Oil Company | Mechanical implant to reduce back pressure in a riser reactor equipped with a horizontal tee joint connection |
| US4655804A (en) | 1985-12-11 | 1987-04-07 | Environmental Elements Corp. | Hopper gas distribution system |
| US4921483A (en) | 1985-12-19 | 1990-05-01 | Leocor, Inc. | Angioplasty catheter |
| US4643327A (en) | 1986-03-25 | 1987-02-17 | Campbell William P | Insulated container hinge seal |
| JPS62285980A (en) | 1986-06-05 | 1987-12-11 | Ishikawajima Harima Heavy Ind Co Ltd | Charging method and device for charging coal in a coke oven |
| DK158376C (en) | 1986-07-16 | 1990-10-08 | Niro Atomizer As | METHOD OF REDUCING THE CONTENT OF MERCURY Vapor AND / OR VAPORS OF Harmful Organic Compounds And / Or Nitrogen Oxides In Combustion Plant |
| US4793981A (en) | 1986-11-19 | 1988-12-27 | The Babcock & Wilcox Company | Integrated injection and bag filter house system for SOx -NOx -particulate control with reagent/catalyst regeneration |
| US4724976A (en) | 1987-01-12 | 1988-02-16 | Lee Alfredo A | Collapsible container |
| EP0285864B1 (en) | 1987-03-31 | 1992-04-22 | Leybold Aktiengesellschaft | Method and device for detecting leakage in liquid systems |
| US4824614A (en) | 1987-04-09 | 1989-04-25 | Santa Fe Energy Company | Device for uniformly distributing a two-phase fluid |
| US4997527A (en) | 1988-04-22 | 1991-03-05 | Kress Corporation | Coke handling and dry quenching method |
| DE3816396A1 (en) | 1987-05-21 | 1989-03-02 | Ruhrkohle Ag | Coke oven roof |
| US4821473A (en) | 1987-06-08 | 1989-04-18 | Cowell Ernest E | Chimney by-pass |
| JPH0768523B2 (en) | 1987-07-21 | 1995-07-26 | 住友金属工業株式会社 | Coke oven charging material consolidation method and apparatus |
| DE3726492C1 (en) | 1987-08-08 | 1988-11-10 | Flachglas Ag | Flow channel for the flue gases of a flue gas cleaning system |
| CN87212113U (en) | 1987-08-22 | 1988-06-29 | 戴春亭 | Coking still |
| JPH01249886A (en) | 1988-03-31 | 1989-10-05 | Nkk Corp | Coke oven bulk density control method |
| SU1535880A1 (en) | 1988-04-12 | 1990-01-15 | Донецкий политехнический институт | Installation for wet quenching of coke |
| GB2220255B (en) | 1988-05-13 | 1992-01-02 | Heinz Hoelter | A method of,and apparatus for cooling and keeping clean the roof of a coke oven |
| US4898021A (en) | 1988-11-30 | 1990-02-06 | Westinghouse Electric Corp. | Quantitative air inleakage detection system and method for turbine-condenser systems |
| DE3841630A1 (en) | 1988-12-10 | 1990-06-13 | Krupp Koppers Gmbh | METHOD FOR REDUCING THE NO (ARROW DOWN) X (ARROW DOWN) CONTENT IN THE EXHAUST GAS IN THE HEATING OF STRENGTH GAS OR MIXED COOKED OVENS AND COOKING OVEN BATTERY FOR CARRYING OUT THE PROCESS |
| JPH0319127A (en) | 1989-06-16 | 1991-01-28 | Fuji Photo Film Co Ltd | Magnetic recording medium |
| NL8901620A (en) | 1989-06-27 | 1991-01-16 | Hoogovens Groep Bv | CERAMIC BURNER AND A FORMAT SUITABLE FOR IT. |
| CN2064363U (en) | 1989-07-10 | 1990-10-24 | 介休县第二机械厂 | Cover of coke-oven |
| AT394053B (en) | 1989-09-07 | 1992-01-27 | Voest Alpine Stahl Linz | GAS TRANSFER DEVICE FOR A COOKING OVEN |
| US5078822A (en) | 1989-11-14 | 1992-01-07 | Hodges Michael F | Method for making refractory lined duct and duct formed thereby |
| JPH07119418B2 (en) | 1989-12-26 | 1995-12-20 | 住友金属工業株式会社 | Extraction method and equipment for coke oven charging |
| US5227106A (en) | 1990-02-09 | 1993-07-13 | Tonawanda Coke Corporation | Process for making large size cast monolithic refractory repair modules suitable for use in a coke oven repair |
| US5114542A (en) | 1990-09-25 | 1992-05-19 | Jewell Coal And Coke Company | Nonrecovery coke oven battery and method of operation |
| JPH07100794B2 (en) | 1990-10-22 | 1995-11-01 | 住友金属工業株式会社 | Extraction method and equipment for coke oven charging |
| JPH04178494A (en) | 1990-11-09 | 1992-06-25 | Sumitomo Metal Ind Ltd | How to prevent dust leakage from coke fire tower |
| GB9110796D0 (en) | 1991-05-18 | 1991-07-10 | Atomic Energy Authority Uk | Double lid system |
| US5213138A (en) | 1992-03-09 | 1993-05-25 | United Technologies Corporation | Mechanism to reduce turning losses in conduits |
| US5228955A (en) * | 1992-05-22 | 1993-07-20 | Sun Coal Company | High strength coke oven wall having gas flues therein |
| JPH06264062A (en) | 1992-05-28 | 1994-09-20 | Kawasaki Steel Corp | Operation of coke oven dry quencher |
| JPH0674855A (en) | 1992-07-08 | 1994-03-18 | Hitachi Bill Shisetsu Eng Kk | Vacuum leak detection method and device |
| JPH0649450A (en) | 1992-07-28 | 1994-02-22 | Nippon Steel Corp | Fire wall during heating in hot repairing work of coke oven |
| US5597452A (en) | 1992-09-24 | 1997-01-28 | Robert Bosch Gmbh | Method of restoring heating walls of coke oven battery |
| US5234601A (en) | 1992-09-28 | 1993-08-10 | Autotrol Corporation | Apparatus and method for controlling regeneration of a water treatment system |
| CN2139121Y (en) | 1992-11-26 | 1993-07-28 | 吴在奋 | Scraper for cleaning graphite from carbide chamber of coke oven |
| JP2594737Y2 (en) | 1993-01-08 | 1999-05-10 | 日本鋼管株式会社 | Insulation box for coke oven repair |
| JPH06299156A (en) | 1993-04-13 | 1994-10-25 | Nippon Steel Corp | Method for removing adhered carbon in coke oven carbonization chamber |
| US5447606A (en) * | 1993-05-12 | 1995-09-05 | Sun Coal Company | Method of and apparatus for capturing coke oven charging emissions |
| KR960008754Y1 (en) | 1993-09-10 | 1996-10-09 | 포항종합제철 주식회사 | Carbon Scraper of Coke Oven Extruder |
| US5370218A (en) | 1993-09-17 | 1994-12-06 | Johnson Industries, Inc. | Apparatus for hauling coal through a mine |
| WO1995011950A1 (en) | 1993-10-29 | 1995-05-04 | Sumitomo Heavy Industries, Ltd. | Method and apparatus for repairing a coke oven |
| JPH07188668A (en) | 1993-12-27 | 1995-07-25 | Nkk Corp | Dust collection method when charging coke oven coal |
| JPH07204432A (en) | 1994-01-14 | 1995-08-08 | Mitsubishi Heavy Ind Ltd | Exhaust gas treatment method |
| US5752993A (en) | 1994-01-21 | 1998-05-19 | Covol Technologies, Inc. | Blast furnace fuel from reclaimed carbonaceous materials and related methods |
| JPH07216357A (en) | 1994-01-27 | 1995-08-15 | Nippon Steel Corp | Method and apparatus for compacting coal charged into coke oven |
| KR960008754B1 (en) | 1994-02-02 | 1996-06-29 | Lg Semicon Co Ltd | On screen display circuit |
| DE4403244A1 (en) | 1994-02-03 | 1995-08-10 | Metallgesellschaft Ag | Processes for cleaning combustion exhaust gases |
| CN1092457A (en) | 1994-02-04 | 1994-09-21 | 张胜 | Contiuum type coke furnace and coking process thereof |
| BE1008047A3 (en) | 1994-02-25 | 1996-01-03 | Fib Services Sa | Repair method and / or partial construction of industrial facilities hot including structure and refractory materials prefabricated element used. |
| JPH0843314A (en) | 1994-07-27 | 1996-02-16 | Nkk Corp | Coke oven furnace body diagnosis method |
| KR960008754U (en) | 1994-08-31 | 1996-03-16 | Suction device of air conditioner indoor unit | |
| US5480594A (en) | 1994-09-02 | 1996-01-02 | Wilkerson; H. Joe | Method and apparatus for distributing air through a cooling tower |
| JPH08104875A (en) | 1994-10-04 | 1996-04-23 | Takamichi Iida | Device for inserting heat insulating box for hot repairing construction for coke oven into coke oven |
| JP2914198B2 (en) | 1994-10-28 | 1999-06-28 | 住友金属工業株式会社 | Coking furnace coal charging method and apparatus |
| DE4445713C1 (en) * | 1994-12-21 | 1996-07-11 | Krupp Koppers Gmbh | Method and device for reducing the CO content in the exhaust gas from lean gas coke oven batteries |
| US5542650A (en) | 1995-02-10 | 1996-08-06 | Anthony-Ross Company | Apparatus for automatically cleaning smelt spouts of a chemical recovery furnace |
| JP3042758B2 (en) | 1995-02-17 | 2000-05-22 | 川崎製鉄株式会社 | Method and apparatus for diagnosing furnace wall in coke oven carbonization chamber |
| US5603810A (en) * | 1995-03-07 | 1997-02-18 | Minnotte Corporations | Coke-oven door seal |
| US5810032A (en) | 1995-03-22 | 1998-09-22 | Chevron U.S.A. Inc. | Method and apparatus for controlling the distribution of two-phase fluids flowing through impacting pipe tees |
| RU2083532C1 (en) | 1995-05-06 | 1997-07-10 | Акционерное общество открытого типа "Восточный институт огнеупоров" | Process for manufacturing dinas products |
| US5622280A (en) | 1995-07-06 | 1997-04-22 | North American Packaging Company | Method and apparatus for sealing an open head drum |
| US5670025A (en) | 1995-08-24 | 1997-09-23 | Saturn Machine & Welding Co., Inc. | Coke oven door with multi-latch sealing system |
| JP3194031B2 (en) | 1995-10-06 | 2001-07-30 | 株式会社ベンカン | Single pipe type drain pipe fitting |
| US5715962A (en) | 1995-11-16 | 1998-02-10 | Mcdonnell; Sandra J. | Expandable ice chest |
| DE19545736A1 (en) | 1995-12-08 | 1997-06-12 | Thyssen Still Otto Gmbh | Method of charging coke oven with coal |
| US5687768A (en) | 1996-01-18 | 1997-11-18 | The Babcock & Wilcox Company | Corner foils for hydraulic measurement |
| US5826518A (en) | 1996-02-13 | 1998-10-27 | The Babcock & Wilcox Company | High velocity integrated flue gas treatment scrubbing system |
| US6002993A (en) | 1996-04-04 | 1999-12-14 | Nippon Steel Corporation | Apparatus for monitoring wall surface |
| US5720855A (en) | 1996-05-14 | 1998-02-24 | Saturn Machine & Welding Co. Inc. | Coke oven door |
| FR2749390B1 (en) | 1996-05-30 | 1998-07-31 | Pyrolyse De Marienau Centre | ENDOSCOPIC INSPECTION PROBE FOR COKE OVEN BATTERIES |
| JPH10110650A (en) | 1996-10-03 | 1998-04-28 | Nissan Diesel Motor Co Ltd | Exhaust port structure for internal combustion engine |
| US5968320A (en) | 1997-02-07 | 1999-10-19 | Stelco, Inc. | Non-recovery coke oven gas combustion system |
| TW409142B (en) | 1997-03-25 | 2000-10-21 | Kawasaki Steel Co | Method of operating coke and apparatus for implementing the method |
| JPH10273672A (en) | 1997-03-27 | 1998-10-13 | Kawasaki Steel Corp | Charcoal charging method for coke ovens capable of producing large grain coke |
| FR2764978B1 (en) | 1997-06-18 | 1999-09-24 | Provencale D Automation Et De | IMPROVEMENT IN AUTOMATED METHODS AND DEVICES FOR DETECTING LEAKS FROM GAS BOTTLES |
| DE59803290D1 (en) | 1997-06-30 | 2002-04-11 | Siemens Ag | heat recovery steam generator |
| US5913448A (en) | 1997-07-08 | 1999-06-22 | Rubbermaid Incorporated | Collapsible container |
| US5928476A (en) | 1997-08-19 | 1999-07-27 | Sun Coal Company | Nonrecovery coke oven door |
| US5881551A (en) | 1997-09-22 | 1999-03-16 | Combustion Engineering, Inc. | Heat recovery steam generator |
| PT903393E (en) | 1997-09-23 | 2002-05-31 | Thyssen Krupp Encoke Gmbh | CARBON LOAD WAGON FOR FILLING THE COKE OVEN CHAMBER OF A COKE OVEN BATTERY |
| US6126910A (en) | 1997-10-14 | 2000-10-03 | Wilhelm; James H. | Method for removing acid gases from flue gas |
| JPH11131074A (en) | 1997-10-31 | 1999-05-18 | Kawasaki Steel Corp | Operating method of coke oven |
| KR19990017156U (en) | 1997-10-31 | 1999-05-25 | 이구택 | Hot Air Valve Leakage Measuring Device |
| DE69804577T2 (en) * | 1997-12-05 | 2002-10-17 | Kawasaki Refractories Co., Ltd. | Material and process for repairing coke oven chambers |
| KR100317962B1 (en) | 1997-12-26 | 2002-03-08 | 이구택 | Coke Swarm's automatic coke fire extinguishing system |
| DE19803455C1 (en) | 1998-01-30 | 1999-08-26 | Saarberg Interplan Gmbh | Method and device for producing a coking coal cake for coking in an oven chamber |
| CN1298437A (en) | 1998-03-04 | 2001-06-06 | 克雷斯公司 | Method and apparatus for handling and indirectly cooling coke |
| JP3924064B2 (en) | 1998-03-16 | 2007-06-06 | 新日本製鐵株式会社 | Coke oven furnace diagnosis method |
| WO2000006669A1 (en) | 1998-07-29 | 2000-02-10 | Kawasaki Steel Corporation | Method for producing metallurgical coke |
| US6003706A (en) | 1998-09-17 | 1999-12-21 | Polyfoam Packers Corporation | Adjustable depth insulated container |
| US6059932A (en) | 1998-10-05 | 2000-05-09 | Pennsylvania Coke Technology, Inc. | Coal bed vibration compactor for non-recovery coke oven |
| US6017214A (en) | 1998-10-05 | 2000-01-25 | Pennsylvania Coke Technology, Inc. | Interlocking floor brick for non-recovery coke oven |
| KR100296700B1 (en) | 1998-12-24 | 2001-10-26 | 손재익 | Composite cyclone filter for solids collection at high temperature |
| JP2000204373A (en) | 1999-01-18 | 2000-07-25 | Sumitomo Metal Ind Ltd | Sealing method for charging lid of coke oven |
| JP2000219883A (en) | 1999-02-02 | 2000-08-08 | Nippon Steel Corp | Method for suppressing adhesion of attached carbon in coke oven and method for removing attached carbon |
| US6187148B1 (en) | 1999-03-01 | 2001-02-13 | Pennsylvania Coke Technology, Inc. | Downcomer valve for non-recovery coke oven |
| US6189819B1 (en) | 1999-05-20 | 2001-02-20 | Wisconsin Electric Power Company (Wepco) | Mill door in coal-burning utility electrical power generation plant |
| EP1067167A3 (en) | 1999-07-05 | 2003-02-05 | Kawasaki Steel Corporation | Method of repairing coke oven and apparatus for taking-in bricks for repair |
| US6412221B1 (en) | 1999-08-02 | 2002-07-02 | Thermal Engineering International | Catalyst door system |
| JP3514177B2 (en) * | 1999-08-20 | 2004-03-31 | 住友金属工業株式会社 | Repair method of coke oven dry main |
| CN1104484C (en) | 1999-10-13 | 2003-04-02 | 太原重型机械(集团)有限公司 | Coal feeding method and equipment for horizontal coke furnace |
| US6626984B1 (en) | 1999-10-26 | 2003-09-30 | Fsx, Inc. | High volume dust and fume collector |
| CN1084782C (en) | 1999-12-09 | 2002-05-15 | 山西三佳煤化有限公司 | Integrative cokery and its coking process |
| JP2001200258A (en) | 2000-01-14 | 2001-07-24 | Kawasaki Steel Corp | Method and apparatus for removing carbon from coke oven |
| US6729248B2 (en) | 2000-06-26 | 2004-05-04 | Ada Environmental Solutions, Llc | Low sulfur coal additive for improved furnace operation |
| US6786941B2 (en) | 2000-06-30 | 2004-09-07 | Hazen Research, Inc. | Methods of controlling the density and thermal properties of bulk materials |
| DE10046487C2 (en) | 2000-09-20 | 2003-02-20 | Thyssen Krupp Encoke Gmbh | Method and device for leveling coal in a coke oven |
| JP2002098285A (en) | 2000-09-22 | 2002-04-05 | Mitsubishi Heavy Ind Ltd | Piping structure for branch pipe line |
| JP4166428B2 (en) | 2000-09-26 | 2008-10-15 | Jfeスチール株式会社 | Apparatus and method for repairing furnace wall in coke oven carbonization chamber |
| US6495268B1 (en) | 2000-09-28 | 2002-12-17 | The Babcock & Wilcox Company | Tapered corrosion protection of tubes at mud drum location |
| JP2002106941A (en) | 2000-09-29 | 2002-04-10 | Kajima Corp | Branch / merge header duct unit |
| US6290494B1 (en) | 2000-10-05 | 2001-09-18 | Sun Coke Company | Method and apparatus for coal coking |
| ITGE20010011A1 (en) | 2001-02-07 | 2002-08-07 | Sms Demag S P A Italimpianti D | COOKING OVEN. |
| US6596128B2 (en) | 2001-02-14 | 2003-07-22 | Sun Coke Company | Coke oven flue gas sharing |
| US7611609B1 (en) | 2001-05-01 | 2009-11-03 | ArcelorMittal Investigacion y Desarrollo, S. L. | Method for producing blast furnace coke through coal compaction in a non-recovery or heat recovery type oven |
| US6807973B2 (en) | 2001-05-04 | 2004-10-26 | Mark Vii Equipment Llc | Vehicle wash apparatus with an adjustable boom |
| DE10122531A1 (en) | 2001-05-09 | 2002-11-21 | Thyssenkrupp Stahl Ag | Quenching tower, used for quenching coke, comprises quenching chamber, shaft into which vapor produced by quenching coke rises, removal devices in shaft in rising direction of vapor, and scrubbing devices |
| EP1399784B1 (en) | 2001-05-25 | 2007-10-31 | Parametric Optimization Solutions Ltd. | Improved process control |
| CA2699670C (en) | 2001-07-17 | 2011-03-08 | Direct Contact, Llc | Fluidized spray tower |
| US6589306B2 (en) | 2001-07-18 | 2003-07-08 | Ronning Engineering Co., Inc. | Centrifugal separator apparatus for removing particulate material from an air stream |
| JP4757408B2 (en) | 2001-07-27 | 2011-08-24 | 新日本製鐵株式会社 | Coke furnace bottom irregularity measuring device, furnace bottom repair method and repair device |
| KR100776035B1 (en) | 2001-08-01 | 2007-11-16 | 주식회사 포스코 | Stave pipe gas automatic detection device of stave blast furnace |
| JP2003051082A (en) | 2001-08-07 | 2003-02-21 | Omron Corp | Movable monitoring robot |
| JP2003071313A (en) | 2001-09-05 | 2003-03-11 | Asahi Glass Co Ltd | Glass crusher |
| US6699035B2 (en) | 2001-09-06 | 2004-03-02 | Enardo, Inc. | Detonation flame arrestor including a spiral wound wedge wire screen for gases having a low MESG |
| US20030057083A1 (en) | 2001-09-17 | 2003-03-27 | Eatough Craig N. | Clean production of coke |
| US6712576B2 (en) | 2001-09-18 | 2004-03-30 | Ottawa Fibre Inc | Batch charger for cold top electric furnace |
| US6907895B2 (en) | 2001-09-19 | 2005-06-21 | The United States Of America As Represented By The Secretary Of Commerce | Method for microfluidic flow manipulation |
| DE10154785B4 (en) | 2001-11-07 | 2010-09-23 | Flsmidth Koch Gmbh | Door lock for a coking oven |
| CN1358822A (en) | 2001-11-08 | 2002-07-17 | 李天瑞 | Clean type heat recovery tamping type coke oven |
| CN2509188Y (en) | 2001-11-08 | 2002-09-04 | 李天瑞 | Cleaning heat recovery tamping coke oven |
| US6758875B2 (en) | 2001-11-13 | 2004-07-06 | Great Lakes Air Systems, Inc. | Air cleaning system for a robotic welding chamber |
| CN2521473Y (en) | 2001-12-27 | 2002-11-20 | 杨正德 | Induced flow tee |
| US7035877B2 (en) | 2001-12-28 | 2006-04-25 | Kimberly-Clark Worldwide, Inc. | Quality management and intelligent manufacturing with labels and smart tags in event-based product manufacturing |
| CN2528771Y (en) | 2002-02-02 | 2003-01-01 | 李天瑞 | Coal charging device of tamping type heat recovery cleaning coke oven |
| UA50580A1 (en) | 2002-02-14 | 2002-10-15 | Відкрите Акціонерне Товариство "Запорожкокс" | A method for diagnostics of hydraulic state and coke oven heating gas combustion conditions |
| JP4003509B2 (en) | 2002-04-02 | 2007-11-07 | Jfeスチール株式会社 | Reuse method of fine coke generated in coke production process |
| JP3948347B2 (en) | 2002-05-24 | 2007-07-25 | Jfeスチール株式会社 | Coke oven gas combustion control method and apparatus |
| JP2004169016A (en) | 2002-11-01 | 2004-06-17 | Jfe Steel Kk | Equipment for charging coke ovens, such as insulation boxes for hot repair work of coke ovens and insulation boxes |
| US7198062B2 (en) | 2002-11-21 | 2007-04-03 | The Boeing Company | Fluid control valve |
| US6946011B2 (en) | 2003-03-18 | 2005-09-20 | The Babcock & Wilcox Company | Intermittent mixer with low pressure drop |
| US7813945B2 (en) | 2003-04-30 | 2010-10-12 | Genworth Financial, Inc. | System and process for multivariate adaptive regression splines classification for insurance underwriting suitable for use by an automated system |
| US6848374B2 (en) | 2003-06-03 | 2005-02-01 | Alstom Technology Ltd | Control of mercury emissions from solid fuel combustion |
| KR100957916B1 (en) | 2003-06-13 | 2010-05-13 | 주식회사 포스코 | Box stay thermostat and strain relief of coke oven |
| ITRM20030451A1 (en) | 2003-09-30 | 2005-04-01 | Xsemisys Di Fabio La Spina & C S N C | METHOD AND DEVICE FOR THE REVELATION AND THE |
| US7422910B2 (en) | 2003-10-27 | 2008-09-09 | Velocys | Manifold designs, and flow control in multichannel microchannel devices |
| US20050096759A1 (en) | 2003-10-31 | 2005-05-05 | General Electric Company | Distributed power generation plant automated event assessment and mitigation plan determination process |
| JP2005154597A (en) * | 2003-11-26 | 2005-06-16 | Jfe Steel Kk | Coke oven hot repair method |
| US7077892B2 (en) | 2003-11-26 | 2006-07-18 | Lee David B | Air purification system and method |
| KR100961347B1 (en) | 2003-12-03 | 2010-06-04 | 주식회사 포스코 | Coke dry state detection and combustion control device |
| WO2005084321A2 (en) | 2004-03-01 | 2005-09-15 | Novinium, Inc. | Method for treating electrical cable at sustained elevated pressure |
| JP2005263983A (en) | 2004-03-18 | 2005-09-29 | Jfe Holdings Inc | Recycling method of organic waste using coke oven |
| CN2668641Y (en) | 2004-05-19 | 2005-01-05 | 山西森特煤焦化工程集团有限公司 | Level coke-receiving coke-quenching vehicle |
| SE527104C2 (en) | 2004-05-21 | 2005-12-20 | Alstom Technology Ltd | Method and apparatus for separating dust particles |
| NO20042196L (en) | 2004-05-27 | 2005-11-28 | Aker Kvaerner Subsea As | Device for filtering solids suspended in fluids |
| JP4374284B2 (en) | 2004-06-07 | 2009-12-02 | 関西熱化学株式会社 | Coke oven leveler |
| US7288233B2 (en) | 2004-08-03 | 2007-10-30 | Breen Energy Solutions | Dry adsorption of oxidized mercury in flue gas |
| DE102004040625B3 (en) | 2004-08-21 | 2006-04-20 | Friatec Aktiengesellschaft | Shut-off device for gaseous media of high temperature |
| US7331298B2 (en) | 2004-09-03 | 2008-02-19 | Suncoke Energy, Inc. | Coke oven rotary wedge door latch |
| CA2839738C (en) | 2004-09-10 | 2015-07-21 | M-I L.L.C. | Apparatus and method for homogenizing two or more fluids of different densities |
| JP4101226B2 (en) | 2004-10-22 | 2008-06-18 | 伊藤鉄工株式会社 | Pipe fitting device for pressure drainage |
| DE102004054966A1 (en) | 2004-11-13 | 2006-05-18 | Andreas Stihl Ag & Co. Kg | exhaust silencer |
| JP4379335B2 (en) | 2005-01-06 | 2009-12-09 | 住友金属工業株式会社 | Coke oven flue interior repair method and work insulation box, and coke oven operation method during repair |
| WO2006090663A1 (en) | 2005-02-22 | 2006-08-31 | Yamasaki Industries Co., Ltd. | Temperature raising furnace door for coke carbonization furnace |
| EP1803790B1 (en) * | 2005-02-28 | 2013-09-04 | The Kansai Coke and Chemicals Co., Ltd. | Repair apparatus for coke oven |
| DE102005015301A1 (en) | 2005-04-01 | 2006-10-05 | Uhde Gmbh | Process and apparatus for the coking of high volatility coal |
| US7314060B2 (en) | 2005-04-23 | 2008-01-01 | Industrial Technology Research Institute | Fluid flow conducting module |
| DE102005025955B3 (en) | 2005-06-03 | 2007-03-15 | Uhde Gmbh | Supply of combustion air for coking ovens |
| US8398935B2 (en) | 2005-06-09 | 2013-03-19 | The United States Of America, As Represented By The Secretary Of The Navy | Sheath flow device and method |
| KR100714189B1 (en) | 2005-06-17 | 2007-05-02 | 고려특수화학주식회사 | Coke oven door |
| JP5116669B2 (en) | 2005-06-23 | 2013-01-09 | ビーピー オイル インターナショナル リミテッド | Evaluation method for coke and bitumen quality of raw materials |
| US7644711B2 (en) | 2005-08-05 | 2010-01-12 | The Big Green Egg, Inc. | Spark arrestor and airflow control assembly for a portable cooking or heating device |
| JP2007063420A (en) | 2005-08-31 | 2007-03-15 | Kurita Water Ind Ltd | Bulk density improver and bulk density improving method for coking raw material coal, and coke manufacturing method |
| US7565829B2 (en) | 2005-10-18 | 2009-07-28 | E.F. Products | System, methods, and compositions for detecting and inhibiting leaks in steering systems |
| US7374733B2 (en) | 2005-11-18 | 2008-05-20 | General Electric Company | Method and system for removing mercury from combustion gas |
| DE102005055483A1 (en) | 2005-11-18 | 2007-05-31 | Uhde Gmbh | Centrally controlled coke oven ventilation system for primary and secondary air |
| ITRE20050134A1 (en) | 2005-11-29 | 2007-05-30 | Ufi Filters Spa | AIR FILTRATION SYSTEM DIRECTED TO THE ASPIRATION OF AN INTERNAL COMBUSTION ENGINE |
| DE102006004669A1 (en) | 2006-01-31 | 2007-08-09 | Uhde Gmbh | Coke oven with optimized control and method of control |
| DE102006005189A1 (en) | 2006-02-02 | 2007-08-09 | Uhde Gmbh | Method for producing coke with high volatile content in coking chamber of non recovery or heat recovery type coke oven, involves filling coking chamber with layer of coal, where cooling water vapor is introduced in coke oven |
| JP4807103B2 (en) | 2006-02-28 | 2011-11-02 | Jfeスチール株式会社 | Blast furnace operation method |
| US8152970B2 (en) | 2006-03-03 | 2012-04-10 | Suncoke Technology And Development Llc | Method and apparatus for producing coke |
| US9863917B2 (en) | 2006-03-20 | 2018-01-09 | Clarkson University | Method and system for real-time vibroacoustic condition monitoring and fault diagnostics in solid dosage compaction presses |
| US7282074B1 (en) | 2006-04-28 | 2007-10-16 | Witter Robert M | Auxiliary dust collection system |
| DE102006024651B4 (en) | 2006-05-22 | 2008-03-06 | Thermohauser Gmbh | Wall for insulated containers and insulated containers |
| DE102006026521A1 (en) | 2006-06-06 | 2007-12-13 | Uhde Gmbh | Horizontal oven for the production of coke, comprises a coke oven chamber, and a coke oven base that is arranged in vertical direction between the oven chamber and horizontally running flue gas channels and that has cover- and lower layer |
| DE202006009985U1 (en) | 2006-06-06 | 2006-10-12 | Uhde Gmbh | Horizontal coke oven has a flat firebrick upper layer aver a domed lower layer incorporating channels open to ambient air |
| US7497930B2 (en) | 2006-06-16 | 2009-03-03 | Suncoke Energy, Inc. | Method and apparatus for compacting coal for a coal coking process |
| US7641876B2 (en) | 2006-07-13 | 2010-01-05 | Alstom Technology Ltd | Reduced liquid discharge in wet flue gas desulfurization |
| KR100737393B1 (en) | 2006-08-30 | 2007-07-09 | 주식회사 포스코 | Dust Collector of Coke Digestion Tower |
| EP2059329B1 (en) | 2006-09-05 | 2015-06-03 | Clue As | Flue gas desulfurization process |
| MD3917C2 (en) | 2006-09-20 | 2009-12-31 | Dinano Ecotechnology Llc | Process for thermochemical processing of carboniferous raw material |
| JP4779928B2 (en) | 2006-10-27 | 2011-09-28 | 株式会社デンソー | Ejector refrigeration cycle |
| US7722843B1 (en) | 2006-11-24 | 2010-05-25 | Srivats Srinivasachar | System and method for sequestration and separation of mercury in combustion exhaust gas aqueous scrubber systems |
| KR100797852B1 (en) | 2006-12-28 | 2008-01-24 | 주식회사 포스코 | How to control the flow rate of exhaust gas |
| CN101211495B (en) | 2006-12-31 | 2010-12-01 | 财团法人工业技术研究院 | Distributed security system |
| US7827689B2 (en) | 2007-01-16 | 2010-11-09 | Vanocur Refractories, L.L.C. | Coke oven reconstruction |
| US7736470B2 (en) | 2007-01-25 | 2010-06-15 | Exxonmobil Research And Engineering Company | Coker feed method and apparatus |
| CA2666059C (en) | 2007-02-22 | 2013-09-24 | Nippon Steel Corporation | Coke oven wall surface evaluation and repair supporting apparatus and method |
| JP5094468B2 (en) | 2007-03-01 | 2012-12-12 | 日本エンバイロケミカルズ株式会社 | Method for removing mercury vapor from gas |
| US20110083314A1 (en) | 2007-03-02 | 2011-04-14 | Saturn Machine & Welding Co., Inc. | Method and apparatus for replacing coke oven wall |
| US8080088B1 (en) | 2007-03-05 | 2011-12-20 | Srivats Srinivasachar | Flue gas mercury control |
| JP5117084B2 (en) | 2007-03-22 | 2013-01-09 | Jfeケミカル株式会社 | Method for treating tar cake and charging method for tar cake in coke oven |
| US8833174B2 (en) | 2007-04-12 | 2014-09-16 | Colorado School Of Mines | Piezoelectric sensor based smart-die structure for predicting the onset of failure during die casting operations |
| US20080257236A1 (en) | 2007-04-17 | 2008-10-23 | Green E Laurence | Smokeless furnace |
| CN101037603B (en) | 2007-04-20 | 2010-10-06 | 中冶焦耐(大连)工程技术有限公司 | High-efficient dust removal quenching tower |
| CN100569908C (en) | 2007-05-24 | 2009-12-16 | 中冶焦耐工程技术有限公司 | Dome type dust removing coke quenching machine |
| WO2008146773A1 (en) | 2007-05-29 | 2008-12-04 | Kuraray Chemical Co., Ltd. | Mercury adsorbent and process for production thereof |
| EP2167894A4 (en) * | 2007-06-15 | 2014-10-08 | Palmer Linings Pty Ltd | Anchor system for refractory lining |
| BE1017674A3 (en) | 2007-07-05 | 2009-03-03 | Fib Services Internat | REFRACTORY WALL CHAMBER TREATING COMPOSITION AND METHOD FOR CARRYING OUT THE SAME. |
| JP5050694B2 (en) | 2007-07-11 | 2012-10-17 | 住友金属工業株式会社 | Heat insulation box for repairing coke oven carbonization chamber and method for repairing coke oven |
| CN100500619C (en) | 2007-07-18 | 2009-06-17 | 山西盂县西小坪耐火材料有限公司 | 7.63m silica brick for coke oven |
| US20090032385A1 (en) | 2007-07-31 | 2009-02-05 | Engle Bradley G | Damper baffle for a coke oven ventilation system |
| ATE495812T1 (en) | 2007-09-04 | 2011-02-15 | Evonik Energy Services Gmbh | METHOD FOR REMOVING MERCURY FROM COMBUSTION FUSES |
| DE102007042502B4 (en) | 2007-09-07 | 2012-12-06 | Uhde Gmbh | Device for supplying combustion air or coke-influencing gases to the upper part of coke ovens |
| JP2009073865A (en) | 2007-09-18 | 2009-04-09 | Shinagawa Furness Kk | Heat insulating box for hot repair work of coke oven |
| JP5220370B2 (en) | 2007-09-18 | 2013-06-26 | 品川フアーネス株式会社 | Heat insulation box for hot repair work of coke oven |
| US8362403B2 (en) | 2007-09-27 | 2013-01-29 | Baking Acquisition, Llc | Oven drive load monitoring system |
| EP2048553B1 (en) | 2007-10-12 | 2010-10-27 | Powitec Intelligent Technologies GmbH | Control circuit for regulating a process, in particular a combustion process |
| CN201121178Y (en) | 2007-10-31 | 2008-09-24 | 北京弘泰汇明能源技术有限责任公司 | Coke quenching tower vapor recovery unit |
| CN101157874A (en) | 2007-11-20 | 2008-04-09 | 济南钢铁股份有限公司 | Coking coal dust shaping technique |
| DE102007057348A1 (en) | 2007-11-28 | 2009-06-04 | Uhde Gmbh | Method for filling a furnace chamber of a coke oven battery |
| JP2009135276A (en) | 2007-11-30 | 2009-06-18 | Panasonic Corp | Substrate transfer device |
| US7886580B2 (en) | 2007-12-06 | 2011-02-15 | Apv North America, Inc. | Heat exchanger leak testing method and apparatus |
| DE102007061502B4 (en) | 2007-12-18 | 2012-06-06 | Uhde Gmbh | Adjustable air ducts for supplying additional combustion air into the region of the exhaust ducts of coke oven ovens |
| JP2009144121A (en) | 2007-12-18 | 2009-07-02 | Nippon Steel Corp | Coke oven coke extruder and extrusion method |
| US20090173037A1 (en) | 2008-01-08 | 2009-07-09 | Ano Leo | Prefabricated Building Components and Assembly Equipments |
| US8146376B1 (en) | 2008-01-14 | 2012-04-03 | Research Products Corporation | System and methods for actively controlling an HVAC system based on air cleaning requirements |
| JP2009166012A (en) | 2008-01-21 | 2009-07-30 | Mitsubishi Heavy Ind Ltd | Exhaust gas treatment system and its operation method of coal fired boiler |
| US7707818B2 (en) | 2008-02-11 | 2010-05-04 | General Electric Company | Exhaust stacks and power generation systems for increasing gas turbine power output |
| DE102008011552B4 (en) | 2008-02-28 | 2012-08-30 | Thyssenkrupp Uhde Gmbh | Method and device for positioning control units of a coal filling car at filling openings of a coke oven |
| DE102008025437B4 (en) | 2008-05-27 | 2014-03-20 | Uhde Gmbh | Apparatus and method for the directional introduction of primary combustion air into the gas space of a coke oven battery |
| CN101302445A (en) | 2008-05-27 | 2008-11-12 | 综合能源有限公司 | Exhaust-heat boiler for fluidized bed coal gasification |
| JP5315341B2 (en) | 2008-06-04 | 2013-10-16 | 新日鐵住金株式会社 | Thermal spray repair device and thermal spray repair method for coke oven |
| US8748008B2 (en) | 2008-06-12 | 2014-06-10 | Exxonmobil Research And Engineering Company | High performance coatings and surfaces to mitigate corrosion and fouling in fired heater tubes |
| JP5638746B2 (en) | 2008-08-20 | 2014-12-10 | 堺化学工業株式会社 | Catalyst and method for pyrolyzing organic matter and method for producing such a catalyst |
| CN201264981Y (en) | 2008-09-01 | 2009-07-01 | 鞍钢股份有限公司 | Coke shield cover of coke quenching car |
| DE102008049316B3 (en) | 2008-09-29 | 2010-07-01 | Uhde Gmbh | Air dosing system for secondary air in coke ovens and method for dosing secondary air in a coke oven |
| DE102008050599B3 (en) | 2008-10-09 | 2010-07-29 | Uhde Gmbh | Apparatus and method for distributing primary air in coke ovens |
| US20100106310A1 (en) | 2008-10-27 | 2010-04-29 | Lennox Industries Inc. | Alarm and diagnostics system and method for a distributed- architecture heating, ventilation and air conditioning network |
| US20100115912A1 (en) | 2008-11-07 | 2010-05-13 | General Electric Company | Parallel turbine arrangement and method |
| US8840042B2 (en) | 2008-12-12 | 2014-09-23 | Alstom Technology Ltd | Dry flue gas desulfurization system with dual feed atomizer liquid distributor |
| DE102008064209B4 (en) | 2008-12-22 | 2010-11-18 | Uhde Gmbh | Method and apparatus for the cyclical operation of coke oven benches from "heat recovery" coke oven chambers |
| CN101486017B (en) | 2009-01-12 | 2011-09-28 | 北京航空航天大学 | Wet coke-quenching aerial fog processing method and device based on non-thermal plasma injection |
| WO2010103992A1 (en) | 2009-03-11 | 2010-09-16 | 新日本製鐵株式会社 | Coke oven body inspection/repair management system and method |
| DE102009012264A1 (en) | 2009-03-11 | 2010-09-16 | Uhde Gmbh | Apparatus and method for metering or blocking primary combustion air into the primary heating space of horizontal coke oven chambers |
| US8172930B2 (en) * | 2009-03-13 | 2012-05-08 | Suncoke Technology And Development Llc | Cleanable in situ spark arrestor |
| CN101497835B (en) | 2009-03-13 | 2012-05-23 | 唐山金强恒业压力型焦有限公司 | Method for preparing formed coke from coal powder by using microwave energy |
| US7998316B2 (en) | 2009-03-17 | 2011-08-16 | Suncoke Technology And Development Corp. | Flat push coke wet quenching apparatus and process |
| JP5321187B2 (en) | 2009-03-26 | 2013-10-23 | 新日鐵住金株式会社 | Heat insulation box for hot repair of coke oven carbonization chamber and hot repair method for carbonization chamber |
| JP5333990B2 (en) | 2009-04-16 | 2013-11-06 | 新日鐵住金株式会社 | Side heat insulating device and method for installing side heat insulating plate during hot transfer in coke oven carbonization chamber |
| US8266853B2 (en) | 2009-05-12 | 2012-09-18 | Vanocur Refractories Llc | Corbel repairs of coke ovens |
| AU2010255496B2 (en) | 2009-06-05 | 2015-01-29 | Garrett Thermal Systems Limited | Gas detector apparatus |
| DE102009031436A1 (en) | 2009-07-01 | 2011-01-05 | Uhde Gmbh | Method and device for keeping warm coke oven chambers during standstill of a waste heat boiler |
| US20110014406A1 (en) | 2009-07-15 | 2011-01-20 | James Clyde Coleman | Sheet material exhibiting insulating and cushioning properties |
| KR20110010452A (en) | 2009-07-24 | 2011-02-01 | 현대제철 주식회사 | Dust collector |
| JP2011068733A (en) | 2009-09-25 | 2011-04-07 | Shinagawa Refractories Co Ltd | Repairing material for oven wall of coke oven carbonization chamber and method of repairing the wall |
| JP5093205B2 (en) | 2009-09-30 | 2012-12-12 | 株式会社日立製作所 | Carbon dioxide recovery type power generation system |
| US8268233B2 (en) | 2009-10-16 | 2012-09-18 | Macrae Allan J | Eddy-free high velocity cooler |
| DE102009052282B4 (en) | 2009-11-09 | 2012-11-29 | Thyssenkrupp Uhde Gmbh | Method for compensating exhaust enthalpy losses of heat recovery coke ovens |
| DE102009052502A1 (en) | 2009-11-11 | 2011-05-12 | Uhde Gmbh | Method for generating a negative pressure in a coke oven chamber during the Ausdrück- and loading process |
| JP5531568B2 (en) | 2009-11-11 | 2014-06-25 | Jfeスチール株式会社 | Dust collection duct lid closing detection method |
| CN102117527A (en) | 2009-12-30 | 2011-07-06 | 捷达世软件(深圳)有限公司 | System and method for monitoring and alarming for abnormal condition |
| US8087491B2 (en) | 2010-01-08 | 2012-01-03 | General Electric Company | Vane type silencers in elbow for gas turbine |
| CA2728545C (en) | 2010-01-20 | 2014-04-08 | Carrier Corporation | Primary heat exchanger design for condensing gas furnace |
| UA50580U (en) | 2010-01-21 | 2010-06-10 | Андрей Георгиевич Лисицкий | pharmaceutical composition for treatment of acute and chronic pain |
| CN102859277A (en) | 2010-02-01 | 2013-01-02 | 努特埃里克森公司 | Process and apparatus for heating feedwater in a heat recovery steam generator |
| CN101775299A (en) | 2010-02-23 | 2010-07-14 | 山西工霄商社有限公司 | Limited-oxygen self-heated pyrolysis equipment for making charcoal quickly by using crop straws |
| US8999278B2 (en) | 2010-03-11 | 2015-04-07 | The Board Of Trustees Of The University Of Illinois | Method and apparatus for on-site production of lime and sorbents for use in removal of gaseous pollutants |
| MA34168B1 (en) | 2010-03-23 | 2013-04-03 | Todd C Dana | SYSTEMS, APPARATUS, AND METHODS RELATED TO A DOME-SHAPED CORNUE |
| KR101011106B1 (en) | 2010-03-26 | 2011-01-25 | 황형근 | Ice box |
| CN102844407B (en) | 2010-04-06 | 2014-04-16 | 新日铁住金株式会社 | Method for repairing inside of gas flue of coke oven, and device for repairing inside of gas flue |
| WO2011132355A1 (en) | 2010-04-20 | 2011-10-27 | Panasonic Corporation | A method for measuring a concentration of a biogenic substance contained in a living body |
| US8236142B2 (en) | 2010-05-19 | 2012-08-07 | Westbrook Thermal Technology, Llc | Process for transporting and quenching coke |
| CN101886466B (en) | 2010-07-09 | 2011-09-14 | 中国二十二冶集团有限公司 | Construction method for support structure of coal tower template for tamping type coke oven |
| US9200225B2 (en) | 2010-08-03 | 2015-12-01 | Suncoke Technology And Development Llc. | Method and apparatus for compacting coal for a coal coking process |
| DE102010039020A1 (en) | 2010-08-06 | 2012-02-09 | Robert Bosch Gmbh | Method and apparatus for regeneration of a particulate filter |
| JP5229362B2 (en) | 2010-09-01 | 2013-07-03 | Jfeスチール株式会社 | Method for producing metallurgical coke |
| DE102010048982B4 (en) | 2010-09-03 | 2022-06-09 | Inficon Gmbh | leak detector |
| WO2012031726A1 (en) | 2010-09-10 | 2012-03-15 | Michael Schneider | Modular system for conveyor engineering |
| DE102010044938B4 (en) | 2010-09-10 | 2012-06-28 | Thyssenkrupp Uhde Gmbh | Method and apparatus for the automatic removal of carbon deposits from the flow channels of non-recovery and heat-recovery coke ovens |
| KR101149142B1 (en) | 2010-09-29 | 2012-05-25 | 현대제철 주식회사 | Apparatus and method for removing carbon |
| JP5742650B2 (en) | 2010-10-15 | 2015-07-01 | 新日鐵住金株式会社 | Molded coke manufacturing method and molded coke manufactured by the method |
| CN102072829B (en) | 2010-11-04 | 2013-09-04 | 同济大学 | Iron and steel continuous casting equipment oriented method and device for forecasting faults |
| JP2012102302A (en) | 2010-11-15 | 2012-05-31 | Jfe Steel Corp | Kiln mouth structure of coke oven |
| US12061468B2 (en) | 2010-12-07 | 2024-08-13 | Gautam Dasgupta | Emergency response management apparatuses, methods and systems |
| EP2468837A1 (en) | 2010-12-21 | 2012-06-27 | Tata Steel UK Limited | Method and device for assessing through-wall leakage of a heating wall of a coke oven |
| US9296124B2 (en) | 2010-12-30 | 2016-03-29 | United States Gypsum Company | Slurry distributor with a wiping mechanism, system, and method for using same |
| WO2012093481A1 (en) | 2011-01-06 | 2012-07-12 | イビデン株式会社 | Exhaust gas treatment apparatus |
| US8621637B2 (en) | 2011-01-10 | 2013-12-31 | Saudi Arabian Oil Company | Systems, program product and methods for performing a risk assessment workflow process for plant networks and systems |
| DE102011009176A1 (en) | 2011-01-21 | 2012-07-26 | Thyssenkrupp Uhde Gmbh | Apparatus and method for increasing the internal surface of a compact coke load in a receptacle |
| DE102011009175B4 (en) | 2011-01-21 | 2016-12-29 | Thyssenkrupp Industrial Solutions Ag | Method and apparatus for breaking up a fresh and warm coke charge in a receptacle |
| CA2839338C (en) | 2011-02-01 | 2017-05-16 | Shaw Environmental & Infrastructure, Inc. | Emission control system |
| JP5199410B2 (en) | 2011-02-17 | 2013-05-15 | シャープ株式会社 | Air conditioner |
| KR101314288B1 (en) | 2011-04-11 | 2013-10-02 | 김언주 | Leveling apparatus for a coking chamber of coke oven |
| LT2697185T (en) | 2011-04-15 | 2020-09-10 | Carbon Technology Holdings, LLC | MANUFACTURE OF HIGH CARBON BIOGENIC REAGENTS |
| RU2478176C2 (en) | 2011-06-15 | 2013-03-27 | Закрытое Акционерное Общество "Пиккерама" | Resistance box furnace from phosphate blocks |
| JP5741246B2 (en) | 2011-06-24 | 2015-07-01 | 新日鐵住金株式会社 | Coke oven charging method and coke manufacturing method |
| US8884751B2 (en) | 2011-07-01 | 2014-11-11 | Albert S. Baldocchi | Portable monitor for elderly/infirm individuals |
| JP5631273B2 (en) | 2011-07-19 | 2014-11-26 | 本田技研工業株式会社 | Saddle-ride type vehicle and method of manufacturing body frame of saddle-ride type vehicle |
| CN103648636B (en) | 2011-08-15 | 2016-04-13 | 英派尔科技开发有限公司 | Mercury is removed with oxalates (ester) sorbent |
| DE102011052785B3 (en) | 2011-08-17 | 2012-12-06 | Thyssenkrupp Uhde Gmbh | Wet extinguishing tower for the extinguishment of hot coke |
| CN202226816U (en) | 2011-08-31 | 2012-05-23 | 武汉钢铁(集团)公司 | Graphite scrapping pusher ram for coke oven carbonization chamber |
| CN103987812B (en) | 2011-10-14 | 2015-09-09 | 杰富意钢铁株式会社 | How to make coke |
| CN202265541U (en) | 2011-10-24 | 2012-06-06 | 大连华宇冶金设备有限公司 | Cleaning device for coal adhered to coal wall |
| KR101318388B1 (en) | 2011-11-08 | 2013-10-15 | 주식회사 포스코 | Removing apparatus of carbon in carbonizing chamber of coke oven |
| CN202415446U (en) | 2012-01-06 | 2012-09-05 | 山东潍焦集团有限公司 | Coke shielding cover of quenching tower |
| JP5763569B2 (en) | 2012-02-13 | 2015-08-12 | 日本特殊炉材株式会社 | Silica castable refractories and siliceous precast block refractories |
| CN102584294B (en) | 2012-02-28 | 2013-06-05 | 贵阳东吉博宇耐火材料有限公司 | Composite fire-proof material with high refractoriness under load for coke ovens as well as furnace-building process and products thereof |
| DE102012004667A1 (en) | 2012-03-12 | 2013-09-12 | Thyssenkrupp Uhde Gmbh | Process and apparatus for producing metallurgical coke from petroleum coals produced in petroleum refineries by coking in non-recovery or heat-recovery coke ovens |
| WO2013145679A1 (en) | 2012-03-27 | 2013-10-03 | Jfeスチール株式会社 | Coal blending method for coke production, production method for coke |
| WO2013153555A1 (en) | 2012-04-12 | 2013-10-17 | Jsw Steel Limited | A devolatalization catalyst for devolatalization of coals and a process for the manufacture of coke with improved cri and csr values using such catalyst. |
| US20150226499A1 (en) | 2012-05-16 | 2015-08-13 | Babcock & Wilcox Vølund A/S | Heat Exchanger Having Enhanced Corrosion Resistance |
| JP2015529619A (en) | 2012-07-19 | 2015-10-08 | インヴィスタ テクノロジーズ エスアエルエル | Corrosion control in ammonia extraction by air sparging |
| EP3531018B1 (en) | 2012-07-31 | 2024-03-20 | SunCoke Technology and Development LLC | System for handling coal processing emissions |
| US9405291B2 (en) | 2012-07-31 | 2016-08-02 | Fisher-Rosemount Systems, Inc. | Systems and methods to monitor an asset in an operating process unit |
| CN102786941B (en) | 2012-08-06 | 2014-10-08 | 山西鑫立能源科技有限公司 | Heat cycle continuous automatic coal pyrolyzing furnace |
| US9359554B2 (en) * | 2012-08-17 | 2016-06-07 | Suncoke Technology And Development Llc | Automatic draft control system for coke plants |
| US9243186B2 (en) * | 2012-08-17 | 2016-01-26 | Suncoke Technology And Development Llc. | Coke plant including exhaust gas sharing |
| US9249357B2 (en) * | 2012-08-17 | 2016-02-02 | Suncoke Technology And Development Llc. | Method and apparatus for volatile matter sharing in stamp-charged coke ovens |
| JP6071324B2 (en) | 2012-08-21 | 2017-02-01 | 関西熱化学株式会社 | Coke oven wall repair method |
| US9169439B2 (en) | 2012-08-29 | 2015-10-27 | Suncoke Technology And Development Llc | Method and apparatus for testing coal coking properties |
| EP2895927A1 (en) | 2012-09-17 | 2015-07-22 | Siemens Corporation | Logic based approach for system behavior diagnosis |
| CN110283604A (en) | 2012-09-21 | 2019-09-27 | 太阳焦炭科技和发展有限责任公司 | Extend the shared coking technique for reducing output rating of gas of process cycle through providing |
| KR101421805B1 (en) | 2012-09-28 | 2014-07-22 | 주식회사 포스코 | Formation apparatus of refractory for coke oven ascension pipe |
| US9076106B2 (en) | 2012-11-30 | 2015-07-07 | General Electric Company | Systems and methods for management of risk in industrial plants |
| CN104902984B (en) * | 2012-12-28 | 2019-05-31 | 太阳焦炭科技和发展有限责任公司 | System and method for removing the mercury in emission |
| US10760002B2 (en) * | 2012-12-28 | 2020-09-01 | Suncoke Technology And Development Llc | Systems and methods for maintaining a hot car in a coke plant |
| CN104884578B (en) | 2012-12-28 | 2016-06-22 | 太阳焦炭科技和发展有限责任公司 | Vent riser cover and associated systems and methods |
| US9238778B2 (en) | 2012-12-28 | 2016-01-19 | Suncoke Technology And Development Llc. | Systems and methods for improving quenched coke recovery |
| US9476547B2 (en) * | 2012-12-28 | 2016-10-25 | Suncoke Technology And Development Llc | Exhaust flow modifier, duct intersection incorporating the same, and methods therefor |
| CN103913193A (en) | 2012-12-28 | 2014-07-09 | 中国科学院沈阳自动化研究所 | Device fault pre-maintenance method based on industrial wireless technology |
| US10047295B2 (en) | 2012-12-28 | 2018-08-14 | Suncoke Technology And Development Llc | Non-perpendicular connections between coke oven uptakes and a hot common tunnel, and associated systems and methods |
| CA2896477C (en) | 2012-12-28 | 2017-03-28 | Suncoke Technology And Development Llc. | Systems and methods for controlling air distribution in a coke oven |
| US9273249B2 (en) * | 2012-12-28 | 2016-03-01 | Suncoke Technology And Development Llc. | Systems and methods for controlling air distribution in a coke oven |
| US10883051B2 (en) | 2012-12-28 | 2021-01-05 | Suncoke Technology And Development Llc | Methods and systems for improved coke quenching |
| US9108136B2 (en) | 2013-02-13 | 2015-08-18 | Camfil Usa, Inc. | Dust collector with spark arrester |
| US9193915B2 (en) * | 2013-03-14 | 2015-11-24 | Suncoke Technology And Development Llc. | Horizontal heat recovery coke ovens having monolith crowns |
| US9273250B2 (en) * | 2013-03-15 | 2016-03-01 | Suncoke Technology And Development Llc. | Methods and systems for improved quench tower design |
| WO2014143725A1 (en) | 2013-03-15 | 2014-09-18 | Lantheus Medical Imaging, Inc. | Control system for radiopharmaceuticals |
| US20160048139A1 (en) | 2013-04-25 | 2016-02-18 | Dow Global Technologies Llc | Real-Time Chemical Process Monitoring, Assessment and Decision-Making Assistance Method |
| CN103399536A (en) | 2013-07-15 | 2013-11-20 | 冶金自动化研究设计院 | Monitoring system and method of CO2 emission load of long-running iron and steel enterprise |
| KR101495436B1 (en) | 2013-07-22 | 2015-02-24 | 주식회사 포스코 | Apparatus of damper for collectiong duct |
| CN103468289B (en) | 2013-09-27 | 2014-12-31 | 武汉科技大学 | Iron coke for blast furnace and preparing method thereof |
| JP5559413B1 (en) | 2013-11-11 | 2014-07-23 | 鹿島建設株式会社 | Fireproof structure of flexible joints for underground structures |
| US9797023B2 (en) | 2013-12-20 | 2017-10-24 | Grede Llc | Shaft furnace and method of operating same |
| US20150219530A1 (en) | 2013-12-23 | 2015-08-06 | Exxonmobil Research And Engineering Company | Systems and methods for event detection and diagnosis |
| CN112251246B (en) | 2013-12-31 | 2022-05-17 | 太阳焦炭科技和发展有限责任公司 | Method for decarbonizing coke ovens and associated system and device |
| CN103756699B (en) | 2014-01-07 | 2016-01-20 | 神华集团有限责任公司 | Produce the mixed coal of foundry coke and the production method of foundry coke |
| FR3017937B1 (en) | 2014-02-24 | 2016-02-12 | Olivo | ISOTHERMIC CONTAINER FOR THE CONSERVATION OF MISCELLANEOUS PRODUCTS |
| US9672499B2 (en) | 2014-04-02 | 2017-06-06 | Modernity Financial Holdings, Ltd. | Data analytic and security mechanism for implementing a hot wallet service |
| US10435042B1 (en) | 2014-04-16 | 2019-10-08 | Ronald T. Weymouth | Modular cargo containment systems, assemblies, components, and methods |
| UA123141C2 (en) | 2014-06-30 | 2021-02-24 | Санкоук Текнолоджі Енд Дівелепмент Ллк | Horizontal heat recovery coke ovens having monolith crowns |
| US10877007B2 (en) | 2014-07-08 | 2020-12-29 | Picarro, Inc. | Gas leak detection and event selection based on spatial concentration variability and other event properties |
| CN203981700U (en) | 2014-07-21 | 2014-12-03 | 乌鲁木齐市恒信瑞丰机械科技有限公司 | Dust through-current capacity pick-up unit |
| CA2959367C (en) | 2014-08-28 | 2018-02-20 | John Francis Quanci | Coke oven charging system |
| JP2016052629A (en) | 2014-09-04 | 2016-04-14 | 株式会社Ihi | Desulfurization apparatus |
| US10968393B2 (en) | 2014-09-15 | 2021-04-06 | Suncoke Technology And Development Llc | Coke ovens having monolith component construction |
| DE102014221150B3 (en) | 2014-10-17 | 2016-03-17 | Thyssenkrupp Ag | Coke oven with improved exhaust system in the secondary heating chambers and a method for coking coal and the use of the coke oven |
| CN104498059B (en) | 2014-11-15 | 2017-05-31 | 马钢(集团)控股有限公司 | Coke furnace carbonization chamber repairing protection device, its manufacture method and carbonization chamber method for repairing and mending |
| EP3023852B1 (en) | 2014-11-21 | 2017-05-03 | ABB Schweiz AG | Method for intrusion detection in industrial automation and control system |
| JP2016103404A (en) | 2014-11-28 | 2016-06-02 | 株式会社東芝 | Illuminating device |
| CH710497B1 (en) | 2014-12-01 | 2018-08-31 | Mokesys Ag | Fireproof wall, in particular for a combustion furnace. |
| BR112017014186A2 (en) | 2014-12-31 | 2018-01-09 | Suncoke Tech & Development Llc | coke material multimodal beds |
| US11060032B2 (en) | 2015-01-02 | 2021-07-13 | Suncoke Technology And Development Llc | Integrated coke plant automation and optimization using advanced control and optimization techniques |
| BR112017014428B1 (en) | 2015-01-02 | 2022-04-12 | Suncoke Technology And Development Llc | Method for optimizing the operation of a coke plant and coke oven |
| JP6245202B2 (en) * | 2015-03-12 | 2017-12-13 | Jfeスチール株式会社 | Brick structure repair method and coke oven flue repair method |
| CN105467949A (en) | 2015-05-19 | 2016-04-06 | 上海谷德软件工程有限公司 | Crane remote monitoring and intelligent maintenance system based on IOT and DSP |
| US10118119B2 (en) | 2015-06-08 | 2018-11-06 | Cts Corporation | Radio frequency process sensing, control, and diagnostics network and system |
| CN105001914B (en) | 2015-07-06 | 2017-08-01 | 开滦(集团)有限责任公司 | Co-gasification method of coking dust removal ash mixed with coal |
| CN105137947A (en) | 2015-09-15 | 2015-12-09 | 湖南千盟智能信息技术有限公司 | Intelligent control and management system for coke oven |
| KR20170058808A (en) | 2015-11-19 | 2017-05-29 | 주식회사 진흥기공 | Damper having perpendicular system blade for high pressure and high temperature |
| CN108463536B (en) | 2015-12-28 | 2021-06-01 | 太阳焦炭科技和发展有限责任公司 | Method and system for a dynamic charging coke oven |
| US10078043B2 (en) | 2016-03-08 | 2018-09-18 | Ford Global Technologies, Llc | Method and system for exhaust particulate matter sensing |
| BR102016009636B1 (en) | 2016-04-29 | 2021-06-01 | Paul Wurth Do Brasil Tecnologia E Solucoes Industriais Ltda. | METHOD FOR REPAIRING COKE OVENS |
| US11507064B2 (en) | 2016-05-09 | 2022-11-22 | Strong Force Iot Portfolio 2016, Llc | Methods and systems for industrial internet of things data collection in downstream oil and gas environment |
| EP3465369A4 (en) | 2016-06-03 | 2020-01-15 | Suncoke Technology and Development LLC | METHODS AND SYSTEMS FOR AUTOMATICALLY GENERATING A REMEDIAL MEASURE IN AN INDUSTRIAL PLANT |
| KR101862491B1 (en) | 2016-12-14 | 2018-05-29 | 주식회사 포스코 | Level control apparatus for dust catcher in cokes dry quenchingfacilities |
| CN107022359B (en) | 2017-04-28 | 2024-10-25 | 河南中鸿集团煤化有限公司 | Temperature control and nitrate control method and system for coke oven combustion chamber |
| US10578521B1 (en) | 2017-05-10 | 2020-03-03 | American Air Filter Company, Inc. | Sealed automatic filter scanning system |
| CA3064430C (en) | 2017-05-23 | 2022-04-26 | Suncoke Technology And Development Llc | System and method for repairing a coke oven |
| US12007133B2 (en) | 2017-06-29 | 2024-06-11 | American Air Filter Company, Inc. | Sensor array environment for an air handling unit |
| CN107445633B (en) | 2017-08-21 | 2020-10-09 | 上海应用技术大学 | Liquid grouting material for thermal-state repair of cracks on coke oven wall, and preparation method and application method thereof |
| US11585882B2 (en) | 2018-04-11 | 2023-02-21 | Mars Sciences Limited | Superparamagnetic particle imaging and its applications in quantitative multiplex stationary phase diagnostic assays |
| US11498852B2 (en) | 2018-09-05 | 2022-11-15 | Elemental Scientific, Inc. | Ultrapure water generation and verification system |
| CN113226513A (en) | 2018-10-24 | 2021-08-06 | 珀金埃尔默健康科学加拿大股份有限公司 | Particulate filter and system including the same |
| CA3124563C (en) | 2018-12-28 | 2023-06-27 | Suncoke Technology And Development Llc | Coke plant tunnel repair and anchor distribution |
| US11071935B2 (en) | 2018-12-28 | 2021-07-27 | Suncoke Technology And Development Llc | Particulate detection for industrial facilities, and associated systems and methods |
| BR112021012511B1 (en) | 2018-12-28 | 2023-05-02 | Suncoke Technology And Development Llc | SPRING LOADED HEAT RECOVERY FURNACE SYSTEM AND METHOD |
| CA3125279A1 (en) | 2018-12-28 | 2020-07-02 | Suncoke Technology And Development Llc | Improved oven uptakes |
| BR112021012455B1 (en) | 2018-12-28 | 2023-10-24 | Suncoke Technology And Development Llc | COKE OVEN |
| BR112021012766B1 (en) | 2018-12-28 | 2023-10-31 | Suncoke Technology And Development Llc | DECARBONIZATION OF COKE OVENS AND ASSOCIATED SYSTEMS AND METHODS |
| BR112021012412A2 (en) | 2018-12-31 | 2021-09-08 | Suncoke Technology And Development Llc | IMPROVED SYSTEMS AND METHODS TO USE COMBUSTION GAS |
| CA3125589A1 (en) | 2018-12-31 | 2020-07-09 | Suncoke Technology And Development Llc | Methods and systems for providing corrosion resistant surfaces in contaminant treatment systems |
| US12227699B2 (en) | 2019-12-26 | 2025-02-18 | Suncoke Technology And Development Llc | Oven health optimization systems and methods |
| MX2022013769A (en) | 2020-05-03 | 2023-01-04 | Suncoke Tech & Development Llc | High-quality coke products. |
| AU2022270111A1 (en) | 2021-05-04 | 2023-11-23 | Suncoke Technology And Development Llc | Foundry coke products, and associated systems and methods |
-
2019
- 2019-12-27 CA CA3124563A patent/CA3124563C/en active Active
- 2019-12-27 WO PCT/US2019/068827 patent/WO2020140091A1/en not_active Ceased
- 2019-12-27 CA CA3125187A patent/CA3125187C/en active Active
- 2019-12-27 CA CA3124590A patent/CA3124590C/en active Active
- 2019-12-27 US US16/729,170 patent/US11193069B2/en active Active
- 2019-12-27 WO PCT/US2019/068817 patent/WO2020140081A1/en not_active Ceased
- 2019-12-27 US US16/729,036 patent/US11365355B2/en active Active
- 2019-12-27 WO PCT/US2019/068819 patent/WO2020140083A2/en not_active Ceased
- 2019-12-27 CA CA3124960A patent/CA3124960C/en active Active
- 2019-12-27 US US16/729,129 patent/US11008518B2/en active Active
- 2019-12-27 BR BR112021012653-8A patent/BR112021012653B1/en active IP Right Grant
- 2019-12-27 US US16/729,201 patent/US20200208063A1/en not_active Abandoned
- 2019-12-27 WO PCT/US2019/068823 patent/WO2020140087A1/en not_active Ceased
- 2019-12-27 BR BR112021012725-9A patent/BR112021012725B1/en active IP Right Grant
- 2019-12-27 BR BR112021012459-4A patent/BR112021012459B1/en active IP Right Grant
- 2019-12-27 BR BR112021012598-1A patent/BR112021012598B1/en active IP Right Grant
-
2021
- 2021-05-14 US US17/320,343 patent/US11597881B2/en active Active
- 2021-11-22 US US17/532,058 patent/US11505747B2/en active Active
-
2022
- 2022-05-18 US US17/747,708 patent/US12060525B2/en active Active
Cited By (39)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US12195671B2 (en) | 2012-08-17 | 2025-01-14 | Suncoke Technology And Development Llc | Automatic draft control system for coke plants |
| US11692138B2 (en) | 2012-08-17 | 2023-07-04 | Suncoke Technology And Development Llc | Automatic draft control system for coke plants |
| US11441077B2 (en) | 2012-08-17 | 2022-09-13 | Suncoke Technology And Development Llc | Coke plant including exhaust gas sharing |
| US11939526B2 (en) | 2012-12-28 | 2024-03-26 | Suncoke Technology And Development Llc | Vent stack lids and associated systems and methods |
| US12325828B2 (en) | 2012-12-28 | 2025-06-10 | Suncoke Technology And Development Llc | Exhaust flow modifier, duct intersection incorporating the same, and methods therefor |
| US11359145B2 (en) | 2012-12-28 | 2022-06-14 | Suncoke Technology And Development Llc | Systems and methods for maintaining a hot car in a coke plant |
| US11807812B2 (en) | 2012-12-28 | 2023-11-07 | Suncoke Technology And Development Llc | Methods and systems for improved coke quenching |
| US11845037B2 (en) | 2012-12-28 | 2023-12-19 | Suncoke Technology And Development Llc | Systems and methods for removing mercury from emissions |
| US11746296B2 (en) | 2013-03-15 | 2023-09-05 | Suncoke Technology And Development Llc | Methods and systems for improved quench tower design |
| US10968393B2 (en) | 2014-09-15 | 2021-04-06 | Suncoke Technology And Development Llc | Coke ovens having monolith component construction |
| US11795400B2 (en) | 2014-09-15 | 2023-10-24 | Suncoke Technology And Development Llc | Coke ovens having monolith component construction |
| US12338394B2 (en) | 2014-12-31 | 2025-06-24 | Suncoke Technology And Development Llc | Multi-modal beds of coking material |
| US11788012B2 (en) | 2015-01-02 | 2023-10-17 | Suncoke Technology And Development Llc | Integrated coke plant automation and optimization using advanced control and optimization techniques |
| US11508230B2 (en) | 2016-06-03 | 2022-11-22 | Suncoke Technology And Development Llc | Methods and systems for automatically generating a remedial action in an industrial facility |
| US12190701B2 (en) | 2016-06-03 | 2025-01-07 | Suncoke Technology And Development Llc | Methods and systems for automatically generating a remedial action in an industrial facility |
| US11845898B2 (en) | 2017-05-23 | 2023-12-19 | Suncoke Technology And Development Llc | System and method for repairing a coke oven |
| US11643602B2 (en) | 2018-12-28 | 2023-05-09 | Suncoke Technology And Development Llc | Decarbonization of coke ovens, and associated systems and methods |
| US11597881B2 (en) | 2018-12-28 | 2023-03-07 | Suncoke Technology And Development Llc | Coke plant tunnel repair and flexible joints |
| US12305119B2 (en) | 2018-12-28 | 2025-05-20 | Suncoke Technology And Development Llc | Decarbonization of coke ovens and associated systems and methods |
| US11505747B2 (en) | 2018-12-28 | 2022-11-22 | Suncoke Technology And Development Llc | Coke plant tunnel repair and anchor distribution |
| US11845897B2 (en) | 2018-12-28 | 2023-12-19 | Suncoke Technology And Development Llc | Heat recovery oven foundation |
| US11680208B2 (en) | 2018-12-28 | 2023-06-20 | Suncoke Technology And Development Llc | Spring-loaded heat recovery oven system and method |
| US11365355B2 (en) * | 2018-12-28 | 2022-06-21 | Suncoke Technology And Development Llc | Systems and methods for treating a surface of a coke plant |
| US12060525B2 (en) | 2018-12-28 | 2024-08-13 | Suncoke Technology And Development Llc | Systems for treating a surface of a coke plant sole flue |
| US11819802B2 (en) | 2018-12-31 | 2023-11-21 | Suncoke Technology And Development Llc | Methods and systems for providing corrosion resistant surfaces in contaminant treatment systems |
| US12227699B2 (en) | 2019-12-26 | 2025-02-18 | Suncoke Technology And Development Llc | Oven health optimization systems and methods |
| US11767482B2 (en) | 2020-05-03 | 2023-09-26 | Suncoke Technology And Development Llc | High-quality coke products |
| US12215289B2 (en) | 2020-05-03 | 2025-02-04 | Suncoke Technology And Development Llc | High-quality coke products |
| US20220055455A1 (en) * | 2020-08-20 | 2022-02-24 | Denso International America, Inc. | Binding agent and olfaction sensor |
| US11813926B2 (en) * | 2020-08-20 | 2023-11-14 | Denso International America, Inc. | Binding agent and olfaction sensor |
| US11851724B2 (en) | 2021-11-04 | 2023-12-26 | Suncoke Technology And Development Llc. | Foundry coke products, and associated systems, devices, and methods |
| US12319976B2 (en) | 2021-11-04 | 2025-06-03 | Suncoke Technology And Development Llc | Foundry coke products, and associated systems, devices, and methods |
| US12331367B2 (en) | 2021-11-04 | 2025-06-17 | Suncoke Technology And Development Llc | Foundry coke products, and associated systems, devices, and methods |
| US11946108B2 (en) | 2021-11-04 | 2024-04-02 | Suncoke Technology And Development Llc | Foundry coke products and associated processing methods via cupolas |
| CN114874792A (en) * | 2022-04-23 | 2022-08-09 | 中国五冶集团有限公司 | Error control method for front surface line of heat recovery coke oven |
| US12286591B2 (en) | 2022-11-04 | 2025-04-29 | Suncoke Technology And Development Llc | Coal blends, foundry coke products, and associated systems, devices, and methods |
| US12110458B2 (en) | 2022-11-04 | 2024-10-08 | Suncoke Technology And Development Llc | Coal blends, foundry coke products, and associated systems, devices, and methods |
| WO2025101430A1 (en) * | 2023-11-06 | 2025-05-15 | Graphyte, Inc. | The use of tracers to monitor the condition of stored materials |
| US12410369B2 (en) | 2023-11-21 | 2025-09-09 | Suncoke Technology And Development Llc | Flat push hot car for foundry coke and associated systems and methods |
Also Published As
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA3125187C (en) | Gaseous tracer leak detection | |
| CN101821575B (en) | Method for monitoring smoke duct connecting carbonated block baking furnace to smoke processing centre | |
| EP2468837A1 (en) | Method and device for assessing through-wall leakage of a heating wall of a coke oven | |
| CN102967541B (en) | Device and method suitable for on-line detection of particulate matters in high-temperature gas pipeline | |
| CN110003923B (en) | Device and method for measuring coke burning loss in dry quenching furnace | |
| Pisupati et al. | An investigation on polycyclic aromatic hydrocarbon emissions from pulverized coal combustion systems | |
| CN103439364A (en) | Testing device for harmful gas generated by combustion of high molecular material, and testing method | |
| RU2524293C2 (en) | Method and system for control over operation of unit for drying of carbon block | |
| Bryant et al. | The NIST 3 megawatt quantitative heat release rate facility-description and procedures | |
| EP3772649A1 (en) | Method for controlling furnace, and analyzing device for carrying out this method | |
| US8603831B2 (en) | Method of determining a composition of fuel in a power station | |
| JP6604658B2 (en) | Blast furnace injection reducing material combustion rate estimation method, blast furnace operation method and blower tuyere | |
| CN109580297B (en) | Coke oven smoke detection device and detection method | |
| CN106546695A (en) | Dry dust collection method tests coal combustion rate device and method | |
| Einbu et al. | Demonstration of a novel instrument for online monitoring of absorber emissions to air | |
| TWI759113B (en) | High temperature gas sampling equipment | |
| Danilin | Improving the performance of dry-quenching units by minimizing coke losses | |
| Illerup et al. | Characterization of a full-scale, single-burner pulverized coal boiler: temperatures, gas concentrations and nitrogen oxides | |
| KR100770575B1 (en) | Combustion chamber gas pressure detector of coke oven | |
| JP2821985B2 (en) | Combustible gas combustion control method for coke dry fire extinguishing equipment | |
| JP2004203966A (en) | Evaluation method of coke oven wall condition | |
| KR102256774B1 (en) | Temperature controllable combustion chamber for investigating the photochemical properties of combustion generated particles | |
| Nowak et al. | Methodology development of a time-resolved in-cylinder fuel oxidation analysis: Homogeneous charge compression ignition combustion study application | |
| Wisman et al. | Importance of Electrode Location on Flames Modfied by Low Applied Electric Fields | |
| Perrin et al. | Thermal characterization of downward ventilation flows through a smoke layer |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: SUNCOKE TECHNOLOGY AND DEVELOPMENT LLC, ILLINOIS Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:QUANCI, JOHN FRANCIS;CHARLES, DANIEL C.;KAPLAREVIC, MILOS;AND OTHERS;SIGNING DATES FROM 20190205 TO 20190211;REEL/FRAME:051676/0635 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: DOCKETED NEW CASE - READY FOR EXAMINATION |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| AS | Assignment |
Owner name: BANK OF AMERICA, N.A., AS ADMINISTRATIVE AGENT, TEXAS Free format text: NOTICE OF GRANT OF SECURITY INTEREST IN PATENTS;ASSIGNOR:SUNCOKE TECHNOLOGY AND DEVELOPMENT LLC;REEL/FRAME:056713/0889 Effective date: 20190805 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| AS | Assignment |
Owner name: THE BANK OF NEW YORK MELLON TRUST COMPANY, N.A., AS COLLATERAL AGENT, PENNSYLVANIA Free format text: SECURITY INTEREST;ASSIGNOR:SUNCOKE TECHNOLOGY AND DEVELOPMENT LLC;REEL/FRAME:056846/0548 Effective date: 20210622 |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: NON FINAL ACTION MAILED |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: RESPONSE TO NON-FINAL OFFICE ACTION ENTERED AND FORWARDED TO EXAMINER |
|
| STPP | Information on status: patent application and granting procedure in general |
Free format text: FINAL REJECTION MAILED |
|
| STCV | Information on status: appeal procedure |
Free format text: NOTICE OF APPEAL FILED |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |