US20130340874A1 - Method to repair compromised inlet outlet piping - Google Patents
Method to repair compromised inlet outlet piping Download PDFInfo
- Publication number
- US20130340874A1 US20130340874A1 US13/707,213 US201213707213A US2013340874A1 US 20130340874 A1 US20130340874 A1 US 20130340874A1 US 201213707213 A US201213707213 A US 201213707213A US 2013340874 A1 US2013340874 A1 US 2013340874A1
- Authority
- US
- United States
- Prior art keywords
- stave
- pipe
- annulus
- cooling
- uncured epoxy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/16—Devices for covering leaks in pipes or hoses, e.g. hose-menders
- F16L55/162—Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe
- F16L55/165—Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a pipe or flexible liner being inserted in the damaged section
- F16L55/1657—Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a pipe or flexible liner being inserted in the damaged section lengths of rigid pipe being inserted
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/10—Cooling; Devices therefor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/16—Devices for covering leaks in pipes or hoses, e.g. hose-menders
- F16L55/168—Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
- F16L55/175—Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe by using materials which fill a space around the pipe before hardening
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/16—Devices for covering leaks in pipes or hoses, e.g. hose-menders
- F16L55/179—Devices for covering leaks in pipes or hoses, e.g. hose-menders specially adapted for bends, branch units, branching pipes or the like
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D1/00—Casings; Linings; Walls; Roofs
- F27D1/12—Casings; Linings; Walls; Roofs incorporating cooling arrangements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D9/00—Cooling of furnaces or of charges therein
Definitions
- the cooling stave of the blast furnace body is used to protect the furnace shell, provide cooling, support brick lining refractory material and maintain a proper furnace shape.
- the heat of refractory material is transferred to the cooling stave base, and the base transfers heat to a pipe carrying cooling water.
- the cooling water takes heat out of the furnace.
- One failure mode occurs when the pipeline fractures in the heat load.
- a first aspect of the application describes a repair method for a cooling stave utilized in a blast furnace, the cooling stave having a stave inlet outlet pipe attached to the cooling pipe in the cooling stave, the method comprising of the steps of: inserting a rigid pipe into the compromised stave inlet outlet pipe to form a first annulus; inflating a bladder disposed inside the inner pipe and cooling stave; injecting a first uncured epoxy material into the first annulus; permitting the first uncured epoxy to cure; and removing the bladder.
- a first end of the inner tube distal to the stave further comprises a means for introduction of the first uncured epoxy to the first annulus
- a second end of the inner tube proximal to the stave further comprises means for venting air displaced during injecting of a first uncured epoxy into the first annulus.
- the repair method further comprises the steps of: applying an outer pipe external to the compromised stave inlet outlet pipe to form a second annulus; injecting a second uncured epoxy material into the second annulus; and permitting the second uncured epoxy material to cure.
- the first and second uncured epoxies are cured concurrently.
- the first uncured epoxy is cured before the second uncured epoxy is cured.
- a first end of the outer tube distal to the stave further comprises a means for introduction of the second uncured epoxy to the second annulus
- a second end of the outer tube proximal to the stave further comprises a boot adapted to form seals with the outer tube and the stave, and the second end having an aperture in open communication with the second annulus
- a second aspect of the application describes a repair method for a cooling stave utilized in a blast furnace, the method comprised of the steps of: rethreading an aperture in the cooling stave formed after removal of a compromised stave inlet outlet pipe; installing a new inlet outlet pipe; inserting an inner rigid pipe into the new stave inlet outlet pipe to form an annulus; inflating a bladder inside the inner rigid pipe and the cooling stave; injecting an uncured epoxy material into the annulus; permitting the uncured epoxy to cure; and removing the bladder.
- a third aspect of the application describes a repair system kit for a cooling stave utilized in a blast furnace, the cooling stave having a stave inlet outlet pipe comprised of: an inflatable bladder; an inner rigid pipe; a grout inlet; and a vent tube.
- the repair system further comprises a concentric outer pipe; and a flexible rubber seal.
- FIG. 1 illustrates embodiments of elements of one aspect of the application.
- FIG. 2 illustrates further embodiments of elements of the application.
- FIG. 3 illustrates another aspect of the application.
- FIG. 4 illustrates existing stave failure mechanisms.
- FIG. 5 illustrates existing stave failure mechanisms.
- FIG. 6 illustrates existing stave failure mechanisms.
- the repair system utilizes an inflatable bladder 20 , a concentric inner rigid pipe 1 , a custom machined grout inlet 7 , vent tube 8 , and compression fitting 3 .
- inner rigid pipe 1 is inserted into the compromised stave pipe 27 .
- Inflatable bladder 20 is inserted into the inner rigid pipe 1 as far as stave 30 .
- the bladder 20 is inflated to a specified pressure and epoxy 15 is injected into the compromised stave inlet outlet pipe 27 and around the inner rigid pipe 1 via the grout inlet 7 in fitting 2 .
- the epoxy 15 is injected until the entire first annular gap 28 between the compromised stave inlet outlet pipe 27 and the inner rigid pipe 1 is filled.
- An optional vent tube 10 is positioned in the first annular gap 28 extending beyond the length of the first annular gap 28 allows for displaced air to escape.
- the epoxy 15 is injected it is cured.
- the bladder 20 is deflated and removed.
- the inner rigid pipe 1 is an epoxy pipe.
- an outer rigid pipe 5 may be positioned around the compromised stave pipe 27 .
- a grout inlet 7 is formed or attached through the outer rigid pipe 5 .
- a flexible seal 6 is fitted to an end of the outer rigid pipe 5 .
- the flexible seal 6 has an optional aperture 31 to allow for escape of displaced air.
- Epoxy 15 is injected until the entire second annular gap 29 between the compromised stave inlet outlet pipe 27 and the outer rigid pipe 5 is filled. After the epoxy 15 is injected it is cured.
- the outer rigid pipe 5 is an epoxy pipe.
- the compromised stave inlet outlet pipe 27 may first be removed from the stave 30 to give a resulting aperture.
- the resulting aperture is rethreaded and a new inlet outlet pipe is installed in the resulting aperture.
- the method steps of the first and second embodiments may then follow.
- stave inlet hoses may be reattached to the epoxy pipe 1 , in a preferred embodiment through an attached connector 4 and elbow 11 and the water circuit tested per plant procedures.
- a dowel rod 23 and pull rod 25 are used to assist in the insertion and removal of the bladder 20 .
- a repair system kit for a cooling stave utilized in a blast furnace having a compromised stave inlet outlet pipe comprised of an inflatable bladder 20 , a rigid inner pipe 1 ; a grout inlet 7 ; and a vent tube 8 .
- the repair system kit may further comprise rigid outer pipe 5 and flexible seal 6 .
- FIGS. 4-6 illustrate example staves 30 and stave inlet/outlet pipes 27 that may be repaired with the repair system and repair kit of the present application.
- FIG. 4 illustrates a weld or pipe fracture 50 caused by heating and cooling cycles
- FIG. 5 illustrates a pipe or weld fracture 50 caused by flow disruptions
- FIG. 6 illustrates a pipe or weld fracture 50 caused by plug washing.
- This method of repair allows the customer to reestablish water to a compromised water pipe without losing the cooling effects of the water in contact with the stave.
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Blast Furnaces (AREA)
- Pipe Accessories (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/707,213 US20130340874A1 (en) | 2011-12-06 | 2012-12-06 | Method to repair compromised inlet outlet piping |
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US201161567395P | 2011-12-06 | 2011-12-06 | |
| US13/707,213 US20130340874A1 (en) | 2011-12-06 | 2012-12-06 | Method to repair compromised inlet outlet piping |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20130340874A1 true US20130340874A1 (en) | 2013-12-26 |
Family
ID=47505309
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/707,213 Abandoned US20130340874A1 (en) | 2011-12-06 | 2012-12-06 | Method to repair compromised inlet outlet piping |
Country Status (12)
| Country | Link |
|---|---|
| US (1) | US20130340874A1 (enExample) |
| EP (1) | EP2788649A1 (enExample) |
| KR (1) | KR20140097448A (enExample) |
| CN (1) | CN103998847A (enExample) |
| AR (1) | AR089188A1 (enExample) |
| AU (1) | AU2012347750A1 (enExample) |
| BR (1) | BR112014033170A2 (enExample) |
| CA (1) | CA2858567A1 (enExample) |
| IN (1) | IN2014CN04504A (enExample) |
| MX (1) | MX2014006887A (enExample) |
| RU (1) | RU2014127181A (enExample) |
| WO (1) | WO2013086192A1 (enExample) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015187288A (ja) * | 2014-03-26 | 2015-10-29 | 新日鐵住金株式会社 | ステーブクーラの管路の補修器具および補修方法 |
| KR101569616B1 (ko) | 2014-04-15 | 2015-11-17 | 주식회사 포스코 | 스테이브 냉각수 관로 보수장치 및 그 방법 |
| KR101569612B1 (ko) | 2014-04-14 | 2015-11-17 | 주식회사 포스코 | 하이드로포밍 공법을 이용한 스테이브 냉각수 관로 보수장치 및 그 방법 |
| JP2020505578A (ja) * | 2017-02-09 | 2020-02-20 | ポール ヴルス エス.エイ.Paul Wurth S.A. | 冶金炉用冷却板 |
| CN114854913A (zh) * | 2022-05-19 | 2022-08-05 | 宝武集团鄂城钢铁有限公司 | 高炉中修冷却立管跳接的方法 |
| CN114891940A (zh) * | 2022-04-18 | 2022-08-12 | 大连科萌工程材料有限公司 | 一种高炉碳砖热面压浆的方法 |
| CN114908205A (zh) * | 2022-04-22 | 2022-08-16 | 北京科技大学 | 一种高炉微型冷却器 |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR101870708B1 (ko) | 2016-12-05 | 2018-07-19 | 주식회사 포스코 | 블록 구조체, 용기 및 블록 구조체의 시공 방법 |
| KR101842579B1 (ko) * | 2017-03-17 | 2018-03-27 | 포항공과대학교 산학협력단 | 스테이브 |
| CN108087660B (zh) * | 2017-12-05 | 2019-09-10 | 浙江景迈环境工程有限公司 | 地下管道非开挖修复缺陷点的定位方法 |
| CN110263466B (zh) * | 2019-06-26 | 2023-04-18 | 四川亚大塑料制品有限公司 | 一种基于管道三维定位的管网电子地图生成方法及系统 |
| CN111365559B (zh) * | 2020-04-15 | 2021-08-27 | 福光环境工程(上海)有限公司 | 一种fipp法管道修复用管材及其管道修复方法 |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1838686A (en) * | 1927-04-04 | 1931-12-29 | Mare Thomas De La | Device for repairing structures confining fluid under pressure |
| US3496963A (en) * | 1968-08-12 | 1970-02-24 | Exxon Production Research Co | Pressurized repair clamp for pipeline |
| US4428204A (en) * | 1981-12-08 | 1984-01-31 | Brister Beryle D | Method for forming a temporary plug in a fluid conduit |
| US4907911A (en) * | 1987-04-27 | 1990-03-13 | Angus Fire Armour Limited | Pipeline renovation system |
| US4995761A (en) * | 1989-08-23 | 1991-02-26 | Barton Kenneth S | Method and apparatus for repairing ruptures in underground conduits |
| US5033512A (en) * | 1989-02-14 | 1991-07-23 | Tuboscope Inc. | Replacement pipe section for a defective pipeline |
| US5322653A (en) * | 1992-06-05 | 1994-06-21 | Mueller Hans | Method of repairing buried sewage pipes |
| US6240965B1 (en) * | 1998-04-24 | 2001-06-05 | Link-Pipe (H.K.), Ltd. | Apparatus for repair of high temperature and pressure conduits, method for repairing high temperature and pressure conduits, and a sealing device for repairing high temperature and pressure conduits |
| US20040156682A1 (en) * | 2001-02-02 | 2004-08-12 | Richard Blackmore | Apparatus and method for the repair and stabilization of underground pipes |
| US7000643B2 (en) * | 2003-06-13 | 2006-02-21 | Underground Solutions Technologies Group, Inc. | Bladder system for conduit expansion |
| US20060118191A1 (en) * | 2004-12-03 | 2006-06-08 | Rice Brian L | System and method for pipe repair |
| US7472722B2 (en) * | 2002-09-17 | 2009-01-06 | Petronas Research & Scientific Services Sdn. Bhd. | Method of permanently repairing a pipeline section using a combination wrap and sleeve structure |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2210134B (en) * | 1987-09-21 | 1990-11-14 | British Gas Plc | Method of repairing a pipe |
| DE4430426C2 (de) * | 1994-08-26 | 1999-12-02 | Lemberger Ind Und Staedtereini | Verfahren zum Abdichten von Undichtigkeiten in unterirdischen Rohrleitungen und dergleichen |
| RO121235B1 (ro) * | 2001-05-10 | 2007-01-30 | S.C. Foraj Sonde S.A. Videle | Procedeu pentru protejarea interioară, anticorosivă şi antierozivă, a conductelor şi conductele realizate prin aplicarea procedeului |
| DE202008016407U1 (de) * | 2008-12-12 | 2009-03-19 | Franz Schuck Gmbh | Vorrichtung und System zum Erneuern eines Gasanschlusses in einem Gebäude, welcher eine bestehende gasführende Leitung aus Polyethylen aufweist |
| WO2011123579A1 (en) * | 2010-03-30 | 2011-10-06 | Berry Metal Company | Plate cooler stave apparatus and methods for ferrous or non-ferrous metal making furnace |
| DE102009039865B3 (de) * | 2009-09-03 | 2011-03-17 | Franz Schuck Gmbh | Vorrichtung zur Sanierung einer Hausanschlussleitung |
| CN101701269B (zh) * | 2009-09-23 | 2011-01-05 | 新兴铸管股份有限公司 | 高炉冷却壁进出水管的连接方法 |
| CN201530834U (zh) * | 2009-11-05 | 2010-07-21 | 南京钢铁股份有限公司 | 高炉破损冷却壁孔道冷却装置 |
-
2012
- 2012-12-06 IN IN4504CHN2014 patent/IN2014CN04504A/en unknown
- 2012-12-06 US US13/707,213 patent/US20130340874A1/en not_active Abandoned
- 2012-12-06 MX MX2014006887A patent/MX2014006887A/es unknown
- 2012-12-06 CA CA2858567A patent/CA2858567A1/en not_active Abandoned
- 2012-12-06 RU RU2014127181A patent/RU2014127181A/ru not_active Application Discontinuation
- 2012-12-06 KR KR1020147017324A patent/KR20140097448A/ko not_active Withdrawn
- 2012-12-06 WO PCT/US2012/068246 patent/WO2013086192A1/en not_active Ceased
- 2012-12-06 BR BR112014033170A patent/BR112014033170A2/pt not_active IP Right Cessation
- 2012-12-06 AU AU2012347750A patent/AU2012347750A1/en not_active Abandoned
- 2012-12-06 CN CN201280062376.4A patent/CN103998847A/zh active Pending
- 2012-12-06 EP EP12810461.9A patent/EP2788649A1/en not_active Withdrawn
- 2012-12-07 AR ARP120104592A patent/AR089188A1/es unknown
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1838686A (en) * | 1927-04-04 | 1931-12-29 | Mare Thomas De La | Device for repairing structures confining fluid under pressure |
| US3496963A (en) * | 1968-08-12 | 1970-02-24 | Exxon Production Research Co | Pressurized repair clamp for pipeline |
| US4428204A (en) * | 1981-12-08 | 1984-01-31 | Brister Beryle D | Method for forming a temporary plug in a fluid conduit |
| US4907911A (en) * | 1987-04-27 | 1990-03-13 | Angus Fire Armour Limited | Pipeline renovation system |
| US5033512A (en) * | 1989-02-14 | 1991-07-23 | Tuboscope Inc. | Replacement pipe section for a defective pipeline |
| US4995761A (en) * | 1989-08-23 | 1991-02-26 | Barton Kenneth S | Method and apparatus for repairing ruptures in underground conduits |
| US5322653A (en) * | 1992-06-05 | 1994-06-21 | Mueller Hans | Method of repairing buried sewage pipes |
| US6240965B1 (en) * | 1998-04-24 | 2001-06-05 | Link-Pipe (H.K.), Ltd. | Apparatus for repair of high temperature and pressure conduits, method for repairing high temperature and pressure conduits, and a sealing device for repairing high temperature and pressure conduits |
| US20040156682A1 (en) * | 2001-02-02 | 2004-08-12 | Richard Blackmore | Apparatus and method for the repair and stabilization of underground pipes |
| US7472722B2 (en) * | 2002-09-17 | 2009-01-06 | Petronas Research & Scientific Services Sdn. Bhd. | Method of permanently repairing a pipeline section using a combination wrap and sleeve structure |
| US7000643B2 (en) * | 2003-06-13 | 2006-02-21 | Underground Solutions Technologies Group, Inc. | Bladder system for conduit expansion |
| US20060118191A1 (en) * | 2004-12-03 | 2006-06-08 | Rice Brian L | System and method for pipe repair |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2015187288A (ja) * | 2014-03-26 | 2015-10-29 | 新日鐵住金株式会社 | ステーブクーラの管路の補修器具および補修方法 |
| KR101569612B1 (ko) | 2014-04-14 | 2015-11-17 | 주식회사 포스코 | 하이드로포밍 공법을 이용한 스테이브 냉각수 관로 보수장치 및 그 방법 |
| KR101569616B1 (ko) | 2014-04-15 | 2015-11-17 | 주식회사 포스코 | 스테이브 냉각수 관로 보수장치 및 그 방법 |
| JP2020505578A (ja) * | 2017-02-09 | 2020-02-20 | ポール ヴルス エス.エイ.Paul Wurth S.A. | 冶金炉用冷却板 |
| CN114891940A (zh) * | 2022-04-18 | 2022-08-12 | 大连科萌工程材料有限公司 | 一种高炉碳砖热面压浆的方法 |
| CN114908205A (zh) * | 2022-04-22 | 2022-08-16 | 北京科技大学 | 一种高炉微型冷却器 |
| CN114854913A (zh) * | 2022-05-19 | 2022-08-05 | 宝武集团鄂城钢铁有限公司 | 高炉中修冷却立管跳接的方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| CA2858567A1 (en) | 2013-06-13 |
| AR089188A1 (es) | 2014-08-06 |
| BR112014033170A2 (pt) | 2017-06-27 |
| AU2012347750A1 (en) | 2014-07-03 |
| RU2014127181A (ru) | 2016-02-10 |
| MX2014006887A (es) | 2015-04-09 |
| IN2014CN04504A (enExample) | 2015-09-11 |
| KR20140097448A (ko) | 2014-08-06 |
| WO2013086192A1 (en) | 2013-06-13 |
| CN103998847A (zh) | 2014-08-20 |
| EP2788649A1 (en) | 2014-10-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2858567A1 (en) | Method to repair compromised inlet outlet piping | |
| CN104633377B (zh) | 一种高压玻璃纤维管线安装及管破损维修装置及工艺方法 | |
| CA2682634A1 (en) | Bladderless pipeliner and method for using same | |
| CN104272005B (zh) | 用于修复管道的设备和方法 | |
| US9261219B2 (en) | Method of installing and curing a liner in a sewer pipe | |
| US12516766B2 (en) | Device and method for sealing or repairing a leaking and/or damaged location on an inner wall of a pipe | |
| KR101393690B1 (ko) | 튜브 종점부 경화온도 제어기능을 구비한 관로 보수장치 및 이를 이용한 관로 비굴착 내면 전체 보수공법 | |
| US20020083990A1 (en) | Method and apparatus for repairing a pipeline | |
| KR101861488B1 (ko) | 비굴착 상하수도 부분 보수장치 및 보수공법 | |
| KR100934194B1 (ko) | 부압을 이용한 라이너 튜브 보수장치 및 방법 | |
| CN203628139U (zh) | 一种高压玻璃纤维管线安装及管破损维修装置 | |
| CA2863479C (en) | Apparatus and method for heat curing of pipe liners | |
| CN117189991A (zh) | 油气管道腐蚀穿孔缺陷快速堵漏方法 | |
| KR20230012283A (ko) | 하수관로 부분보수장치 및 그를 이용한 보수방법 | |
| KR200365487Y1 (ko) | 관로보수용 튜브 공기압 연속반전장치 | |
| US20230295914A1 (en) | System and method for sealing an annular space of a sewer connection line | |
| US9074719B2 (en) | Apparatus and method for heat curing of pipe liners | |
| KR19980076513A (ko) | 노후관 보수용 라이너 및 라이너 피복방법 | |
| CN203892796U (zh) | 一种检查井内衬修复用支撑装置 | |
| CN207031466U (zh) | 一种炼铁高炉冷却壁打压检漏装置 | |
| KR100719436B1 (ko) | 배관 보수장치 및 그에 따른 보수공법 | |
| CN115199855A (zh) | 地面管道非开挖修复方法 | |
| JP2006110826A (ja) | 管路の分岐管路部のライニング施工方法及び該ライニング施工方法に使用される分岐ライニング管 | |
| JP2016017626A (ja) | 管路補修方法 | |
| JPH0550288U (ja) | 既設管ライニング用樹脂管の管端密封装置 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| AS | Assignment |
Owner name: UNITED STATES STEEL CORPORATION, PENNSYLVANIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:BAKER, DALE W.;REEL/FRAME:034083/0520 Effective date: 20141024 |
|
| AS | Assignment |
Owner name: UNITED STATES STEEL CORPORATION, PENNSYLVANIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:WING, KENNETH B;REEL/FRAME:035177/0960 Effective date: 20150210 |
|
| AS | Assignment |
Owner name: U.S. BANK NATIONAL ASSOCIATION, AS COLLATERAL AGEN Free format text: SECURITY INTEREST;ASSIGNOR:UNITED STATES STEEL CORPORATION;REEL/FRAME:039177/0544 Effective date: 20160510 |
|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |
|
| AS | Assignment |
Owner name: UNITED STATES STEEL CORPORATION, PENNSYLVANIA Free format text: RELEASE BY SECURED PARTY;ASSIGNOR:U.S. BANK NATIONAL ASSOCIATION;REEL/FRAME:046102/0085 Effective date: 20180612 |
|
| AS | Assignment |
Owner name: BERRY METAL COMPANY, PENNSYLVANIA Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:SMITH, TODD G.;REEL/FRAME:064835/0113 Effective date: 20230816 |