US20020033567A1 - Impact pad for a tundish - Google Patents

Impact pad for a tundish Download PDF

Info

Publication number
US20020033567A1
US20020033567A1 US09/986,123 US98612301A US2002033567A1 US 20020033567 A1 US20020033567 A1 US 20020033567A1 US 98612301 A US98612301 A US 98612301A US 2002033567 A1 US2002033567 A1 US 2002033567A1
Authority
US
United States
Prior art keywords
impact
overhang
impact surface
pad according
impact pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
US09/986,123
Other languages
English (en)
Inventor
Rodolfo Morales
Jorge Palafox-Ramos
Simon Lopez-Ramirez
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foseco International Ltd
Original Assignee
Morales Rodolfo Davila
Jorge Palafox-Ramos
Simon Lopez-Ramirez
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Morales Rodolfo Davila, Jorge Palafox-Ramos, Simon Lopez-Ramirez filed Critical Morales Rodolfo Davila
Publication of US20020033567A1 publication Critical patent/US20020033567A1/en
Assigned to FOSECO INTERNATIONAL LIMITED reassignment FOSECO INTERNATIONAL LIMITED ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: LOPEZ-RAMIREZ, SIMON, MORALES, RODOLFO D., PALAFOX-RAMOS, JORGE
Priority to US10/410,597 priority Critical patent/US20040070123A1/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/003Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like with impact pads

Definitions

  • This invention relates to the handling of molten metal, especially steel.
  • the invention relates to a tundish impact pad, i.e. an article formed from refractory material to be placed on the floor of a tundish to receive an incoming stream of molten metal poured into the tundish from a ladle.
  • the invention has particular utility in the continuous casting of steel.
  • WO 96114951 discloses a tundish impact pad comprising a body of refractory material capable of withstanding contact with molten steel in a tundish.
  • the impact pad body comprises a base having an impact surface, an outer sidewall extending upwardly from the impact surface, and a top surface connected to the sidewall and defining an opening therein.
  • the top surface has an inner annular portion substantially parallel to the impact surface, and there is a substantially right angled corner between the sidewall and the impact surface, and also between the sidewall and the inner annular portion of the top surface.
  • This impact pad provides increased residence time of the molten steel in the tundish, which is important to ensure that unwanted inclusions have sufficient time to float to the surface of the steel and to be removed.
  • WO 97/37799 discloses a tundish impact pad comprising a body of refractory material capable of withstanding contact with molten steel in a tundish.
  • the impact pad body comprises a base having an impact surface for molten steel, an outer sidewall extending upwardly from the impact surface and extending around the base to completely enclose it.
  • An annular body portion connected to the sidewall provides a top surface substantially parallel to the impact surface and defines an opening into which molten steel can be poured, the lower surface of the annular body portion and the inner face of the sidewall defining a recess having an undercut portion extending continuously around and above the impact surface.
  • a portion of the top surface is at a lower level than the remainder of the top surface and the recess beneath the portion of the top surface is of smaller cross-section than the remainder of the recess.
  • This impact pad is particularly useful for improving the flow characteristics in elongate tundishes in which the molten steel is poured into the tundish at an end of the tundish and the or each outlet for the steel is at the opposite end of the tundish.
  • the impact pad is oriented such that the lower level portion of the end wall is adjacent to the end wall next to the incoming stream of molten steel, so that the steel rebounding from the pad preferentially flows towards this end wall. This has the effect of markedly reducing the surface turbulence created in the tundish, and generally improving the flow paths, resulting in the production of cleaner steel.
  • the incoming stream of molten metal (the “ladle stream”) to be “off-center”, i.e. not located on the longitudinal axis of the tundish.
  • the ladle shroud the pipe through which in-coming metal flows from the ladle into the tundish
  • the ladle shroud normally moves together with a sliding gate valve which controls the flow of the metal from the ladle, and since the valve is frequently only partially open in order to limit the flow rate, the ladle shroud is frequently off-centre with respect to the tundish.
  • a tundish impact pad formed from refractory material comprising a base having an impact surface which in use faces upwardly to receive molten metal poured onto the impact pad, and a wall extending upwardly from the base around at least part of the periphery of the impact surface, the wall including an overhang projecting over a peripheral region of the impact surface, the overhang including a plurality of protrusions which project further over the impact surface than the remainder of the overhang.
  • the wall preferably extends around the entire periphery of the impact surface, fully enclosing the impact surface.
  • the invention provides a tundish containing an impact pad according to the first aspect of the invention.
  • the tundish is preferably elongate in shape (i.e. in plan view), it preferably has outlets near each longitudinal end, and in use the incoming stream of molten metal, and thus the impact pad, are preferably located substantially in the longitudinal centre of the tundish.
  • the tundish preferably includes at least one dam extending across its width between the impact pad and an outlet.
  • the top surface of the dam preferably has a central portion (i.e. central with respect to the longitudinal axis of the tundish) which is lower than peripheral portions on each side of it. This generally aids in directing the flow of the molten metal towards the longitudinal axis of the tundish.
  • the inventors of the present invention have found that the provision of a plurality of protrusions which project further over the impact surface than the remainder of the overhang of the peripheral wall generally causes the molten metal rebounding from the impact surface to be directed substantially towards the centre of the impact pad. This generally has the effect of causing substantially symmetrical flow of the molten metal out of the impact pad, even if the metal flowing into the pad onto the impact surface is “off-centre”, i.e. spaced a distance from the centre of the pad.
  • Such substantially symmetrical flow out of the impact pad generally causes symmetrical flow throughout the tundish, resulting in the reduction of so-called “dead zones” where the rate of flow of the molten metal is relatively low (causing poor replenishment of fresh metal and the possibility of solidification of the metal) and generally improving the consistency of residence time in the tundish experienced by the molten metal.
  • the impact surface of the pad preferably has at least two corners (e.g. four corners) over which a respective protrusion projects.
  • at least one (and preferably all) of the corners may be formed at the convergence of substantially straight sides of the impact surface.
  • the impact surface may be substantially polygonal, most preferably substantially quadrangular, especially substantially rectangular or square.
  • a protrusion preferably projects over each corner of a polygonal impact surface.
  • at least one protrusion (preferably two protrusions or more) may extend along at least most of the length of a respective side of the impact surface, and may even extend along substantially the entire length of a respective side of the impact surface.
  • the distance by which the overhang extending between two said protrusions projects over the impact surface is substantially uniform along at least most of its length.
  • the overhang extending between two protrusions may advantageously be substantially straight along at least most of its length.
  • the distance by which the overhang projects over the impact surface may be substantially non-uniform along at least most of its length, for example one or more of the overhang(s) extending between two protrusions may be curved in plan view, for example such that the or each overhang projects further over the impact surface at the centre of its length than it does at each end, or alternatively such that it projects further at each end than it does at its centre.
  • the shape and size of each overhang between protrusions, and/or the shape and size of each protrusion may be varied according to each particular circumstance, e.g. depending upon the shape and/or size of the tundish, and/or the amount by which the incoming stream of molten metal is off-centre, or according to any other particular requirements of the user.
  • the maximum distance by which the or each protrusion of the impact pad projects over the impact surface is preferably at least 110%, more preferably at least 120%, even more preferably at least 140%, especially at least 150% of the maximum distance by which the remainder of the overhang projects over the impact surface.
  • the or each protrusion of the impact pad projects over the impact surface by a maximum distance preferably of no more than 600%, more preferably no more than 500%, especially no more than 450% of the maximum distance by which the remainder of the overhang projects over the impact surface.
  • the height of the overhang above the impact surface may be non-uniform along its length.
  • the height of the overhang extending between two of the protrusions is preferably different to that of the overhang extending between one of the two protrusions and another protrusion, or between two other protrusions.
  • at least one portion of the overhang which is lower than that of another portion of the overhang may project a greater distance over the impact surface than does the other, higher, portion of the overhang.
  • the peripheral region of the impact surface comprises a trough extending around at least part of a central region of the impact surface.
  • the trough is preferably wider at the corners than elsewhere.
  • the shape of the trough in plan view may substantially mirror that of the overhang of the wall.
  • FIG. 1 shows, in isometric projection, a tundish impact pad according to the invention
  • FIG. 2 shows, in isometric projection, a longitudinal cross-section of the tundish impact pad shown in FIG. 1;
  • FIG. 3 is a schematic representation of the asymmetric flow of molten metal in an elongate tundish from an off-centre ladle-shroud;
  • FIG. 4 is a schematic representation of the symmetric flow of molten metal in an elongate tundish from an off-centre ladle-shroud using an impact pad and novel dams according to the invention.
  • FIG. 5 shows a dam as shown schematically in FIG. 4.
  • FIG. 1 shows a tundish impact pad 1 according to the invention, comprising a base 3 having an impact surface 5 which in use faces upwardly to receive molten metal poured onto the impact pad, and a wall 7 extending upwardly from the base around the periphery of the impact surface, the wall including an overhang 9 projecting over a peripheral region 11 of the impact surface, the overhang including a plurality of protrusions 13 which project further over the impact surface than the remainder of the overhang.
  • the impact pad 1 is rectangular in plan view, both the base 3 and the impact surface 5 being rectangular in shape.
  • Each of the protrusions 13 is located at one of the four corners of the pad.
  • the overhang 9 a is relatively small, and is substantially straight and uniform.
  • the overhang 9 b is relatively large, and is curved in plan view. Furthermore, the overhangs 9 b are at a lower level above the impact surface than are the overhangs 9 a.
  • the peripheral region 11 of the impact surface comprises a trough, the shape of which substantially mirrors that of the entire overhang ( 9 a, 9 b, 13 ).
  • FIG. 2 shows a longitudinal cross-section of the impact pad of FIG. 1.
  • the extent of the overhangs 9 b is clearly visible, as is the depth of the trough 11 . It is also clear that the shorter walls 7 b are perpendicular to the impact surface 5 , and the overhangs 9 b are perpendicular to the walls 7 b.
  • the longer walls 7 a are, however, inclined to the perpendicular, i.e. they slope outwardly from the impact surface to the overhangs 9 a.
  • FIG. 3 is a schematic representation of the asymmetric flow of molten metal in an elongate tundish from an off-centre ladle-shroud.
  • the tundish is shown in plan view, with the incoming ladle-stream of molten metal represented by a circle in the longitudinal centre of the tundish but off-centre in a transverse direction, i.e. closer to one longitudinal sidewall of the tundish than the other.
  • the tundish also contains a pair of dams 15 (containing holes to permit flow-through of the molten metal) on either longitudinal side of the tundish, and outlets indicated by circles at each end of the tundish.
  • the arrows indicate the flow paths of the molten metal; in part (a), the initial flow paths of metal entering the tundish are shown. (According to normal working practice, the tundish is already full of molten metal flowing through it—the flow paths shown merely indicate the predominant flow paths at various distances from the tundish.) Even at this early stage it can be seen that because the ladle-stream is off-centre, the flow is asymmetric with respect to the longitudinal axis of the tundish. In part (b), the molten metal has begun to flow through the dams, and the asymmetry of the flow paths is even more apparent. In part (c), the molten metal has reached the outlets.
  • dead-zones where there is little or no flow of the molten metal during these steady-state conditions.
  • the presence of dead zones in a tundish is a major problem, since the metal cools in these regions and may start to solidify; they also cause variations in the composition of the metal flowing out of the tundish.
  • FIG. 4 shows how the flow paths of the molten metal are changed by the use of an impact pad 1 according to the invention. Also present in the tundish of FIG. 4 are dams 19 located closer to the outlets than the dams of FIG. 3. These dams have a central portion 21 of their top surface which is lower than the peripheral portions 23 on either side of it.
  • the in-coming ladle-stream of FIG. 4 is once more off-centre, but this time the presence of an impact pad according to the invention causes the flow paths of the molten metal leaving the impact pad to be more symmetrical. By the time that the molten metal has reached the outlets the flow paths are substantially symmetrical, and no dead-zones are present.
  • FIG. 5 shows a front view and a cross-sectional view of a dam 19 (shown only schematically in FIG. 4).
  • the dam has a bottom surface 25 and side surfaces 27 shaped and sized to fit tightly in a tundish across its width. Its top surface has a central portion 21 which is lower than peripheral portions 23 on either side of it. This has the effect of channelling molten metal flowing over the dam along a generally axial flow path in the tundish. It is therefore complementary to the impact pad, in causing symmetrical and/or axial flow of molten metal in the tundish.
  • the dam also has a plurality of holes 29 extending through it, to allow molten metal to flow through the dam in addition to the molten metal which can flow over the dam.
  • the holes 29 are inclined upwards in the direction of flow of the molten metal, so as to impart an upwardly directed flow path to the metal flowing through the holes.
  • the angle of inclination of the holes is preferably greater for the lower holes and preferably decreases on rising up the dam.
  • the lowest holes preferably have an angle of inclination of 40°, reducing to 30° and then 20° respectively for the higher holes.
  • the dimensions shown are in millimeters.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
  • Building Environments (AREA)
  • Finishing Walls (AREA)
  • Road Signs Or Road Markings (AREA)
  • Road Repair (AREA)
  • Laminated Bodies (AREA)
  • Ladders (AREA)
  • Revetment (AREA)
US09/986,123 1999-06-08 2001-11-07 Impact pad for a tundish Abandoned US20020033567A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
US10/410,597 US20040070123A1 (en) 1999-06-08 2003-04-10 Impact pad for a tundish

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
GBGB9913241.7A GB9913241D0 (en) 1999-06-08 1999-06-08 Impact pad for tundish
GB9913241.7 1999-06-08
PCT/GB2000/002070 WO2000074879A1 (en) 1999-06-08 2000-06-07 Impact pad for a tundish

Related Parent Applications (2)

Application Number Title Priority Date Filing Date
PCT/GB2000/002020 Continuation WO2000073260A1 (en) 1999-05-28 2000-05-26 Squaric acid derivatives as cell adhesion molecules
PCT/GB2000/002070 Continuation WO2000074879A1 (en) 1999-06-08 2000-06-07 Impact pad for a tundish

Related Child Applications (1)

Application Number Title Priority Date Filing Date
US10/410,597 Continuation US20040070123A1 (en) 1999-06-08 2003-04-10 Impact pad for a tundish

Publications (1)

Publication Number Publication Date
US20020033567A1 true US20020033567A1 (en) 2002-03-21

Family

ID=10854899

Family Applications (2)

Application Number Title Priority Date Filing Date
US09/986,123 Abandoned US20020033567A1 (en) 1999-06-08 2001-11-07 Impact pad for a tundish
US10/410,597 Abandoned US20040070123A1 (en) 1999-06-08 2003-04-10 Impact pad for a tundish

Family Applications After (1)

Application Number Title Priority Date Filing Date
US10/410,597 Abandoned US20040070123A1 (en) 1999-06-08 2003-04-10 Impact pad for a tundish

Country Status (27)

Country Link
US (2) US20020033567A1 (sh)
EP (1) EP1198315B1 (sh)
JP (1) JP4344107B2 (sh)
KR (1) KR100619318B1 (sh)
CN (1) CN1170647C (sh)
AR (1) AR024294A1 (sh)
AT (1) ATE251000T1 (sh)
AU (1) AU770032B2 (sh)
BG (1) BG64341B1 (sh)
BR (1) BR0011386A (sh)
CA (1) CA2375134A1 (sh)
CZ (1) CZ299614B6 (sh)
DE (1) DE60005674T2 (sh)
DK (1) DK1198315T3 (sh)
ES (1) ES2209900T3 (sh)
GB (1) GB9913241D0 (sh)
HU (1) HU223442B1 (sh)
MX (1) MXPA01012073A (sh)
MY (1) MY125091A (sh)
PL (1) PL193912B1 (sh)
PT (1) PT1198315E (sh)
RS (1) RS49851B (sh)
SK (1) SK286467B6 (sh)
TR (1) TR200103534T2 (sh)
TW (1) TW509601B (sh)
WO (1) WO2000074879A1 (sh)
ZA (1) ZA200109194B (sh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030183362A1 (en) * 2002-03-28 2003-10-02 Zacharias Donald Richard Metallurgical impact pad
US20040041312A1 (en) * 2002-09-04 2004-03-04 Connors Charles W Tundish impact pad
US20040256775A1 (en) * 2002-08-05 2004-12-23 Alexander Retsching Fire resistant ceramic part
WO2012173690A1 (en) * 2011-06-14 2012-12-20 Vesuvius Crucible Company Impact pad
US20130221588A1 (en) * 2010-07-27 2013-08-29 Thiago Augusto Avila Impact pad for use in tundish of continuous casting steel

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7468157B2 (en) * 2005-12-14 2008-12-23 North American Refractories Co. Impact pad for metallurgical vessels
EP2193861A1 (en) 2008-12-02 2010-06-09 Foseco International Limited Tundish Impact pad.
JP5556421B2 (ja) * 2010-06-23 2014-07-23 Jfeスチール株式会社 連続鋳造による高清浄度鋼鋳片の製造方法
JP5556465B2 (ja) * 2010-07-15 2014-07-23 Jfeスチール株式会社 連続鋳造による高清浄度鋼鋳片の製造方法
EP2418032B2 (de) * 2010-07-19 2016-04-06 Refractory Intellectual Property GmbH & Co. KG Feuerfester keramischer Pralltopf
EP2537609A1 (en) * 2011-06-23 2012-12-26 Calderys Ukraine Ltd. Metal-flow impact pad and diffuser for tundish
CN103252465B (zh) * 2013-05-10 2015-07-29 东北大学 一种用于非对称连铸中间包的湍流控制器
DE102016214236A1 (de) * 2016-08-02 2018-02-08 Thyssenkrupp Ag Pralltopf, Vorrichtung zum Vergießen einer metallischen Schmelze sowie Verfahren zum Vergießen einer metallischen Schmelze
TWI739877B (zh) * 2016-08-08 2021-09-21 美商維蘇威美國公司 衝擊墊及減少進入耐火容器的熔融鋼衝擊流之不對準的影響之方法
CN110814330A (zh) * 2019-12-25 2020-02-21 武汉科技大学 一种连铸中间包顶旋型湍流控制器
CN111570777B (zh) * 2020-06-30 2022-01-11 广东韶钢松山股份有限公司 一种中间包稳流器

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59141353A (ja) * 1983-02-02 1984-08-14 Aikoo Kk 鋼鋳造用タンデイツシユ
US4776570A (en) * 1987-07-08 1988-10-11 Sidbec Dosco Inc. Ladle stream breaker
US5169591A (en) * 1992-02-07 1992-12-08 Bethlehem Steel Corporation Impact pad for a continuous caster tundish
US5358551A (en) * 1993-11-16 1994-10-25 Ccpi, Inc. Turbulence inhibiting tundish and impact pad and method of using
WO1996014951A1 (en) * 1994-11-09 1996-05-23 Foseco International Limited Tundish impact pad
US5518153A (en) * 1994-11-09 1996-05-21 Foseco International Limited Tundish impact pad
US5662823A (en) * 1996-01-04 1997-09-02 A. P. Green Industries, Inc. Impact pad
GB9607556D0 (en) * 1996-04-11 1996-06-12 Foseco Int Tundish impact pad
US5861121A (en) * 1996-11-21 1999-01-19 Psc Technologies, Inc. Chamber for reception, Lateral division and redirection of liquid metal flow
US6102260A (en) * 1996-11-21 2000-08-15 Psc Technologies, Inc. Impact pad
FR2756762B1 (fr) * 1996-12-11 1998-12-31 Ugine Savoie Sa Reservoir d'alimentation destine a retenir un metal fondu et notamment un acier

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030183362A1 (en) * 2002-03-28 2003-10-02 Zacharias Donald Richard Metallurgical impact pad
US6997361B2 (en) * 2002-03-28 2006-02-14 Foseco International Limited Metallurgical impact pad
EP1676659A1 (en) * 2002-03-28 2006-07-05 Foseco International Limited Impact pad for a tundish
US20040256775A1 (en) * 2002-08-05 2004-12-23 Alexander Retsching Fire resistant ceramic part
US7128247B2 (en) * 2002-08-05 2006-10-31 Refractory Intellectual Property Gmbh & Co. Kg Fire resistant ceramic part
US20040041312A1 (en) * 2002-09-04 2004-03-04 Connors Charles W Tundish impact pad
US6929775B2 (en) 2002-09-04 2005-08-16 Magneco/Metrel, Inc. Tundish impact pad
US20130221588A1 (en) * 2010-07-27 2013-08-29 Thiago Augusto Avila Impact pad for use in tundish of continuous casting steel
US9511419B2 (en) * 2010-07-27 2016-12-06 Magnesita Refratarios S/A Impact pad for use in tundish of continuous casting steel
WO2012173690A1 (en) * 2011-06-14 2012-12-20 Vesuvius Crucible Company Impact pad
CN103608470A (zh) * 2011-06-14 2014-02-26 维苏威坩埚公司 冲击垫
EP2721184A1 (en) * 2011-06-14 2014-04-23 Vesuvius Crucible Company Impact pad
EP2721184A4 (en) * 2011-06-14 2015-03-11 Vesuvius Crucible Co FLAPPER
US9381572B2 (en) 2011-06-14 2016-07-05 Vesuvius Crucible Company Impact pad
AU2012271229B2 (en) * 2011-06-14 2016-08-11 Vesuvius Usa Corporation Impact pad
TWI568522B (zh) * 2011-06-14 2017-02-01 維蘇威克魯什伯公司 衝擊墊
EA026796B1 (ru) * 2011-06-14 2017-05-31 Везувиус Крусибл Компэни Ударная подушка разливочного устройства

Also Published As

Publication number Publication date
CN1354703A (zh) 2002-06-19
US20040070123A1 (en) 2004-04-15
GB9913241D0 (en) 1999-08-04
DE60005674T2 (de) 2004-07-29
DE60005674D1 (de) 2003-11-06
CZ299614B6 (cs) 2008-09-24
YU86201A (sh) 2003-04-30
PL351868A1 (en) 2003-06-30
ATE251000T1 (de) 2003-10-15
RS49851B (sr) 2008-08-07
BG64341B1 (bg) 2004-10-29
AU5230900A (en) 2000-12-28
KR100619318B1 (ko) 2006-09-05
MXPA01012073A (es) 2002-06-04
TR200103534T2 (tr) 2002-04-22
HU223442B1 (hu) 2004-07-28
EP1198315B1 (en) 2003-10-01
AU770032B2 (en) 2004-02-12
WO2000074879A1 (en) 2000-12-14
HUP0201462A2 (en) 2002-08-28
EP1198315A1 (en) 2002-04-24
BG106187A (en) 2002-08-30
CA2375134A1 (en) 2000-12-14
JP4344107B2 (ja) 2009-10-14
CN1170647C (zh) 2004-10-13
BR0011386A (pt) 2002-03-05
TW509601B (en) 2002-11-11
PL193912B1 (pl) 2007-03-30
ZA200109194B (en) 2003-01-29
KR20010113834A (ko) 2001-12-28
MY125091A (en) 2006-07-31
AR024294A1 (es) 2002-09-25
CZ20014350A3 (cs) 2002-08-14
DK1198315T3 (da) 2004-01-12
SK286467B6 (sk) 2008-11-06
PT1198315E (pt) 2004-01-30
ES2209900T3 (es) 2004-07-01
JP2003501266A (ja) 2003-01-14
SK16832001A3 (sk) 2002-03-05

Similar Documents

Publication Publication Date Title
EP1198315B1 (en) Impact pad for a tundish
US5518153A (en) Tundish impact pad
CA2251561C (en) Tundish impact pad
AU699807B2 (en) Tundish
CA2162551C (en) Tundish impact pad
US6102260A (en) Impact pad
AU2009321773B2 (en) Tundish impact pad
KR100669512B1 (ko) 슬래그 혼입방지장치와 이를 장착한 연속주조장치
CA2243398C (en) Impact pad
WO2000006324A1 (en) Tundish impact pad
MXPA97005546A (en) Artesa refract
MXPA97003352A (en) Artesa shock pad refractor

Legal Events

Date Code Title Description
AS Assignment

Owner name: FOSECO INTERNATIONAL LIMITED, ENGLAND

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:MORALES, RODOLFO D.;PALAFOX-RAMOS, JORGE;LOPEZ-RAMIREZ, SIMON;REEL/FRAME:012986/0964

Effective date: 20020422

STCB Information on status: application discontinuation

Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION