US20010025583A1 - Center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split - Google Patents
Center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split Download PDFInfo
- Publication number
- US20010025583A1 US20010025583A1 US09/750,842 US75084200A US2001025583A1 US 20010025583 A1 US20010025583 A1 US 20010025583A1 US 75084200 A US75084200 A US 75084200A US 2001025583 A1 US2001025583 A1 US 2001025583A1
- Authority
- US
- United States
- Prior art keywords
- cut
- center
- holes
- blasting
- auxiliary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005422 blasting Methods 0.000 title claims abstract description 194
- 238000000034 method Methods 0.000 title claims abstract description 71
- 238000009412 basement excavation Methods 0.000 title claims abstract description 24
- 238000005553 drilling Methods 0.000 claims abstract description 62
- 230000009977 dual effect Effects 0.000 claims abstract description 33
- 239000002360 explosive Substances 0.000 claims abstract description 28
- 239000000463 material Substances 0.000 claims abstract description 3
- 239000011435 rock Substances 0.000 description 44
- 239000012634 fragment Substances 0.000 description 16
- 230000000694 effects Effects 0.000 description 11
- 238000010586 diagram Methods 0.000 description 6
- 238000005474 detonation Methods 0.000 description 5
- 230000001934 delay Effects 0.000 description 4
- 108010010803 Gelatin Proteins 0.000 description 3
- 230000005611 electricity Effects 0.000 description 3
- 229920000159 gelatin Polymers 0.000 description 3
- 239000008273 gelatin Substances 0.000 description 3
- 235000019322 gelatine Nutrition 0.000 description 3
- 235000011852 gelatine desserts Nutrition 0.000 description 3
- 230000002250 progressing effect Effects 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 238000004904 shortening Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000003313 weakening effect Effects 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 230000002301 combined effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
Definitions
- the present invention relates generally to tunnel excavating methods, and more particularly to a center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split, which employs a pre-splitting technique that blasts loaded auxiliary holes alternately arranged along with large unloaded auxiliary holes in a circle and a sub-drilling technique of rooting away blast holes, thereby facilitating a center-cut operation by weakening the binding force of an original rock and easily achieving dual free surfaces, and shortening the period of execution and reducing execution costs.
- a first stage of the tunnel blasting is the stage of drilling center-cut holes 1 , cut spreader holes 2 , floor holes 3 and roof holes 4 to predetermined depths
- a second stage is the stage of loading the drilled holes 1 , 2 , 3 and 4 with detonators and explosives
- a third stage is the stage of detonating the detonators using a triggering device.
- the detonators are detonated from the center-cut holes 1 to the outer holes 2 , 3 and 4 .
- the center-cut holes 1 are loaded with delay detonators in such a way that the detonators are bilaterally symmetrically arranged in the center-cut holes 1 in the order of detonation in an upward direction.
- the cut spreader holes 2 , the floor holes 3 and the roof holes 4 are loaded with delay detonators in such a way that the detonators are arranged in the holes 2 , 3 and 4 in the progressing order from the center to the outside.
- the tunnel is blasted by detonating the detonators using a triggering device.
- the detonations of the detonators are sequentially performed in the progressing order; the center-cut holes 1 , the cut spreader holes 2 , the floor holes 3 and the roof holes 4 .
- Tunnel blasting is mostly performed using a single free surface, and generally employs center-cut blasting so as to create new free surfaces.
- the center-cut blasting creates dual free surfaces by blasting the center portion of the working face, and is an important factor that governs the success of the entire tunnel blasting.
- reference characters 1 ′, 2 ′, 3 ′ and 4 ′ designate a center-cut region, a cut spreader region, a floor region and a roof region, respectively.
- the “free surface” denotes the surface of rock in contact with an alien sphere, such as air or water.
- the free surface considerably affects blasting. That is, a blasting effect is in proportion to the number of free surfaces and the degree of proximity of loaded positions to the free surfaces. The reason for this is that resistance is weak in a free surface side and thus blasting energy generates heavy stresses in the free surface side.
- a “burden” denotes the shortest distance from a free surface to the center of an explosive.
- the “center-cut hole” denotes blast holes within a center-cut region of 1.5 to 2.5 m by 1.5 to 2.5 m.
- a “central center-cut hole” denotes a single loaded blast hole at the center of the center-cut region.
- auxiliary center-cut holes denote the center-cut holes except for the central center-cut hole arranged around the central center-cut hole in a circle having a predetermined diameter.
- the auxiliary center-cut holes are comprised of unloaded and loaded auxiliary (blast) holes.
- “Spreader center-cut holes” denote loaded holes that are arranged in circles around the auxiliary center-cut holes.
- a conventional tunnel blasting is performed, in such a way that center-cut blast is primarily performed using a cylinder-cut method to obtain dual free surfaces, and the spreader center-cut holes, the cut spreader holes 2 , the floor holes 3 and the roof holes 4 are secondly and sequentially blasted.
- the conventional tunnel blasting is the blasting in which the spreader center-cut holes, the cut spreader holes 2 , the floor holes 3 and the roof holes 4 are sequentially blasted after center-cut blasting is performed by blasting the loaded holes (center-cut holes) each having a diameter of 38 to 45 mm drilled around one to four unloaded holes each having a diameter of 65 to 120 mm.
- center-cut blasting is performed by slant hole center-cut blasting (that is, V-cut blasting) or horizontal center-cut blasting (that is, cylinder-cut blasting; the cylinder-cut blasting is an improvement from burn-cut blasting).
- the V-cut blasting is applied where slant center-cut holes are short, outside holes (such as cut spreader holes, floor holes and roof holes) are long, and the drill footages and drill angles of blast holes can vary.
- the V-cut blasting is chiefly applied to the blasting of short holes in which its advance is less than 2 m.
- the cylinder-cut blasting is applied where one to four unloaded holes each having a diameter shorter than the diameter of each loaded hole are drilled in parallel with the tunnel axis to the same drill depth as that of the loaded hole.
- the cylinder-cut blasting is chiefly applied to the blasting of long holes in which its advance is longer than 2 m.
- the V-cut blasting is performed in such a way that three or four sets of loaded central holes are drilled in the central region of a tunnel in parallel with one another with each set comprised of two opposite loaded central holes, the loaded central holes are simultaneously blasted to create a new free surface, and outer holes are blasted in the order of spreader center-cut holes, cut spreader holes, floor holes and the roof holes to expand the created free surface.
- the V-cut blasting is center-cut blasting that has been employed for the longest time.
- the bottoms of the drilled center-cut holes are situated in a line with two center-cut holes of each set facing each other, and the interval between two burdens is 100 to 150 mm. Accordingly, the volume of a fractured rock portion is large and the projected area of blasting is wide due to the slant center-cut holes, large fragments are easily formed during center-cut blasting, and the center-cut holes can be drilled in various patterns.
- the V-cut blasting is advantageous in that in comparison with the burn-cut and cylinder-cut blasting, the drilling of holes is easy, the drilling footages of holes are short, the flying distance of fracture is short owing to the creation of large fragments, the V-cut blasting is effectively applied to the blasting of short holes or a soft rock, the occurrence of dead pressure may be generated, and a target drill footage can be achieved regardless of inferior drilling due to a large free surface.
- the V-cut blasting is disadvantageous in that its advance is restricted, a plastic region and extra excavation are increased due to its blast vibrations, the actual drill footages of the holes are short and blasting efficiency is low owing to slant drilling, secondary blasting is required due to the creating of large fragments, and the V-cut blasting is improper for precision rock blasting because of its great vibrations.
- the V-cut blasting has defects in that blasting failure may occur due to the drilling error of V-shaped holes, large fragments may be created due to concentrative loading, and the creation of free surfaces is not easy.
- the V-cut blasting has a mechanism in which the V-shaped holes are initially blasted and thereafter the other holes are sequentially blasted.
- the horizontal center-cut blasting is applied to the blasting of long holes.
- Burn-cut blasting and cylinder-cut blasting are generally employed for the horizontal center-cut blasting.
- a plurality of unloaded holes each having the same diameter as that of each loaded hole are drilled.
- the cylinder-cut blasting one to four unloaded holes each having a diameter greater than that of each loaded hole, for example, 65 to 120 mm, are drilled.
- drilled but unloaded holes serve as auxiliary free surfaces (small free surfaces) during the blasting of the loaded holes, so a center-cut operation is facilitated.
- a free surface F formed after the blasting of the center-cut holes is sequentially expanded to the cut spreader holes, floor holes and roof holes in order.
- center-cut holes are drilled perpendicular to the free surface F and in parallel with one another, so that long holes can be drilled and thereby the drill footage each time is longer.
- the interval between a loaded hole and an unloaded hole is different depending upon the property of the explosive used and the quality of the rock, but generally 10 to 30 cm.
- the center-cut holes are blasted in a concentrative blasting fashion, or using precise delay detonators.
- the horizontal center-cut blasting is advantageous in that its blast vibrations are weak in comparison with the V-cut blasting, the sectional area of a tunnel is not restricted due to horizontal drilling, dead pressure is not generated, and transportation and storage efficiency is superior due to the uniformly sized fractures.
- the horizontal center-cut blasting is disadvantageous in that the charge applied to surrounding holes around a burn-hole is large in the case of burn-cut blasting, and blast vibrations may be increased when unloaded holes do not serve as free surfaces due to their small diameters.
- the charge applied to center-cut region is large due to the small fractured volume of the center-cut holes, a working face and surrounding rock portions are damaged, and drilling time is lengthened due to the drilling of large unloaded holes and a plurality of loaded holes around the large unloaded holes.
- a center-cut blasting method for tunnel excavation is developed by introducing pre-splitting technique and sub-drilling technique.
- pre-splitting technique a circular pre-split is created by drilling large unloaded holes and loaded holes in a circle and blasting the loaded holes utilizing a detonating fuse and precision explosives, so as to facilitate the achievement of free surfaces.
- sub-drilling technique the center-cut holes are drilled additionally but outsides holes except for center-cut holes are not drilled additionally, so as to maximize the advance per blasting set, minimizing the remaining holes and eliminating the sub-drilling of outside holes.
- an object of the present invention is to provide a center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and pre-splitting, in which the binding force of an initial rock is weakened by utilizing large unloaded blast holes and pre-splitting so as to easily form dual free surfaces, thereby facilitating center-cut blasting and thereby improving the efficiency of tunnel blasting.
- Another object of the present invention is to provide a center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and pre-splitting in which loaded blast holes and unloaded blast holes are additionally drilled to achieve the maximum advance, thereby shortening the period of tunnel excavation and improving the economical efficiency of tunnel excavation.
- the present invention provides a center-cut blasting method for tunnel excavation, comprising the steps of: drilling a single central center-cut hole at the center of a center-cut region, drilling a plurality of auxiliary center-cut holes comprised of large unloaded auxiliary holes and loaded auxiliary holes that are alternately arranged around the central center-cut hole to be situated in a circle having a predetermined diameter, and drilling a plurality of spreader center-cut holes outside the auxiliary center-cut holes to be situated in concentric circles centered by the central center-cut hole; loading the center-cut holes with delay detonators and explosives and stemming the center-cut holes with stemming material at their entrances; blasting the loaded auxiliary holes of the auxiliary center-cut holes so as to create a circular pre-split; blasting the central center-cut hole so as to create initial dual free surfaces; and sequentially blasting the spreader center-cut holes with a time delay so as to create final dual free surfaces.
- FIG. 1 is a front view showing blasting regions in the case of the full face blasting of a tunnel
- FIG. 2 a is a diagram showing the full face blasting pattern of a tunnel in accordance with a prior art
- FIG. 2 b is a cross section taken along line A-A of FIG. 2 a;
- FIG. 3 a is a cross section showing center-cut holes in accordance with a conventional V-cut blasting technique
- FIG. 3 b is a diagram showing the drilling pattern corresponding to FIG. 3 a;
- FIG. 4 a is a cross section showing center-cut holes in accordance with a conventional cylinder-cut blasting technique
- FIG. 4 b is a diagram showing the drilling pattern corresponding to FIG. 4 a;
- FIG. 5 a is a diagram showing the full face blasting pattern of a tunnel in accordance with the present invention.
- FIG. 5 b is a cross section taken along line B-B of FIG. 5 a;
- FIG. 6 a is a diagram showing the drilling pattern for a center-cut region
- FIG. 6 b is a diagram showing the principle of a center-cut blasting method in accordance with the present invention.
- FIG. 7 a is a view showing a state in which an auxiliary center-cut hole is loaded in accordance with a first embodiment of the present invention
- FIG. 7 b is a view showing a state in which an auxiliary center-cut hole is loaded in accordance with a second embodiment of the present invention.
- FIG. 7 c is a view showing a state in which a central center-cut hole is loaded in accordance with the first embodiment of the present invention.
- FIGS. 8 a to 8 e are views showing the stages in which the full face of a tunnel is blasted in due order.
- the step of drilling a plurality of blast holes in the working face of a tunnel is performed, as depicted in FIG. 6 a. That is, a single central center-cut hole 7 is drilled in the working face at the center of a center-cut region, five large unloaded auxiliary holes 5 are drilled in the working face to be situated in a circle having a diameter of ⁇ around the central center-cut hole 7 , and five unloaded auxiliary holes 6 are each drilled between one large unloaded auxiliary holes 5 and another (if necessary, the numbers of the unloaded auxiliary holes 5 and the loaded blast auxiliary holes 6 can be increased).
- the large unloaded auxiliary holes 5 should be situated within a fracture region created by blasting, the large loaded auxiliary holes 5 and the loaded auxiliary holes 6 are drilled perpendicular to a single free surface F 1 in the form of cylinder-cuts, and auxiliary center-cut holes 8 comprised of the large loaded auxiliary holes 5 and the loaded auxiliary holes 6 are drilled to be situated in a circle around the central center-cut hole 7 .
- a plurality of spreader center-cut holes 9 are drilled outside the auxiliary center-cut holes 8 to be situated in concentric circles around the central center-cut hole 7 .
- the drilled depth of each of the unloaded auxiliary holes 5 and the loaded auxiliary holes 6 is drilled to be greater than that of each of the cut spreader holes 2 by (2 to 3) ⁇ 0.3W, so that sub-drilling for rooting ways the center-cut holes can be achieved and thereby the auxiliary center-cut holes 8 serve as pre-free surfaces u 1 .
- W denotes a burden.
- the burden W the shortest distance from the central center-cut hole 7 to one of the large unloaded auxiliary holes 5 is (4 to 6) ⁇ d.
- the diameter ⁇ of the circular center-cut region within a first concentric circle is about 450 to 550 mm.
- ⁇ 2 ⁇ W, where ⁇ is the diameter of the circular center-cut region and W is the radius of the circular center-cut region.
- W (4 to 6) ⁇ d, where W is the radius of the circular center-cut region and d is the diameter of a loaded hole.
- S (2 to 3) ⁇ dl, where S is the shortest distance from one unloaded hole to its neighboring unloaded hole and d 1 is the diameter of an unloaded hole.
- a 1.1 ⁇ 2W, where “a” is the distance from the central center-cut hole to the second concentric circle and W is the radius of the circular center-cut region.
- W 1 1.2 ⁇ W, where W 1 is the burden of a second center-cut and W is the radius of the circular center-cut region.
- S 1 ⁇ square root ⁇ square root over (2) ⁇ a, where S 1 is the hole interval of the second center-cut and “a” is the distance from the central center-cut hale to the second concentric circle.
- W 2 (0.95 to 1.0) ⁇ W 1 , where W 2 is the burden of a third center-cut and W 1 is the burden of the second center-cut.
- S 2 ⁇ square root ⁇ square root over (2) ⁇ K ⁇ W 2 , where S 2 is the hole interval of the third center-cut, K is a burden constant (1.86 to 1.94) and W 2 is the burden of the third center-cut.
- W 3 (2.3 to 2.5) ⁇ W 2 , where W 3 is the burden of a fourth center-cut and W 2 is the burden of the third center-cut.
- S 3 ⁇ square root ⁇ square root over (2) ⁇ K ⁇ W 3 , where S 3 is the hole interval of the fourth center-cut, K is a burden constant (1.86 to 1.94) and W 3 is the burden of the fourth center-cut.
- the drill intervals and drill depths of cut spreader holes 2 , the floor holes 3 and the roof holes 4 except the central center-cut hole 1 are determined depending upon the condition of the rock and blasting conditions, which are performed similarly to the conventional cylinder-cut method in principle.
- the blast holes are arranged as illustrated in FIGS. 5 a and 5 b and are drilled as indicated in the following table 1.
- the step of loading the blast holes with explosives is performed. Attention should be paid to the loading of the central center-cut hole 7 and auxiliary center-cut holes 8 .
- the loading of the other blast holes except the central center-cut hole 7 and auxiliary center-cut holes 8 is the same as in the burn-cut and cylinder-cut methods in principle.
- the inner portion of a blast hole is loaded with dynamite GD of 0.375 kg, and a detonating fuse of 40 g/m is connected to the dynamite with its outer end situated out of the hole.
- a detonating fuse of 40 g/m is connected to the dynamite with its outer end situated out of the hole.
- full stemming is performed at two positions, respectively in lengths of 300 mm and 400 mm.
- the reason for the utilization of the detonating fuse is to create a pre-splitting effect by underloading.
- a precision explosive such as Finex-1 having a low specific gravity and a low detonation velocity is employed instead of the detonating fuse.
- This method has been employed in controlled blasting so as to prevent the damage of a mother rock and extra excavation, and serves to maximize a pre-splitting effect by providing a decoupling effect to center-cut holes.
- the setting of the delays in the detonators is one of principal factors that govern the success of center-cut blasting.
- the explosives loaded in the loaded auxiliary holes 6 that are initially detonated to create a pre-split are simultaneously blasted, whereas the explosives loaded in the central center-cut hole 7 and the second, third and fourth spreader center-cut holes are detonated using electric delay detonators having time delay ranging from 20 ms to 100 ms.
- detonation time delay as described above, is set to be within a range of 20 to 100 ms is that a time delay sufficient for a portion of the rock to be fractured and moved can be provided.
- the fractured rock is moved at a speed of 40 to 60 m/s when explosives loaded in the central center-cut hole 7 have been detonated after explosives loaded in the loaded auxiliary holes 6 are detonated to create a circular pre-split. Accordingly, in order to completely blast away the center-cut region in which the blast holes are drilled in a depth of 4 m, the time delay between the central center-cut hole and the loaded auxiliary holes preferably is 40 ms.
- first spreader center-cut holes 9 are detonated with a time delay of 60 ms so as to provide the time for the fracture and movement of the rock sufficient to create the dual free surfaces F 1 and F 2 .
- the explosives loaded in the second and third spreader center-cut holes 9 are detonated using delay detonators having a time delay of 20 to 100 ms, so that the center-cut region is completely rooted out, thereby creating the dual free surfaces F 1 and F 2 .
- the charges and detonating time delays of the cut spreader holes 2 , the floor holes 3 and the roof holes 4 are determined in accordance with the same principle as that of the cylinder-cut method.
- the cut spreader holes 2 , the floor holes 3 and the roof holes 4 are blasted in the blasting order indicated in the following table 4 while one of the dual free surfaces F 2 is expanded in the progressing order from FIG. 8 c to FIG. 8 e.
- detonating methods may be classified into a non-multistage detonating method and a multistage detonating method.
- the non-multistage detonating method is a detonating method utilizing conventional electric detonators
- the multistage detonating method is a detonating method utilizing a multistage blasting apparatus.
- the multistage detonating method can control blast vibrations and minimize the damage of an original rock.
- the blast holes are loaded with the explosives as indicated in table 3 and blasted in a multistage blasting fashion.
- the working face is divided into six regions.
- An auxiliary detonator wire No. 1 , an auxiliary detonator wire No. 1 , an auxiliary detonator wire No. 2 , an auxiliary detonator wire No. 3 , an auxiliary detonator wire No. 4 , an auxiliary detonator wire No. 5 , and an auxiliary detonator wire No. 6 are connected at their first ends to the center-cut region, a lower left region, a lower right region, an upper left region, an upper right region and an upper center region, respectively, and are connected at their second ends to a multistage blasting apparatus.
- a time delay for each wire is set at 20 ms, and the detonating time delays are indicated in the following table 4 in detail.
- the time delay when the time delay is set at 20 ms and six wires are utilized, the time period until electricity is applied to the sixth wire is 100 ms. Accordingly, in the center-cut blasting method of the present invention, an initially detonated detonator should be detonated after a time period of 100 ms so as to prevent cutoff.
- auxiliary detonator wires can be connected to the multistage detonating apparatus. However, in these tests, six auxiliary detonator wires were connected to six regions by which total one hundred and eighty one holes were divided. In consideration of the time period for which electricity is applied to the sixth wire, an initially detonated detonator should have the time delay greater than the time period for which electricity is applied to the sixth wire. In these tests, 140 ms (MS No. 7 ) was employed as the initially detonated detonator.
- the central center-cut hole 1 is completely blasted to achieve the dual free surfaces F 1 and F 2 and thereafter the cut spreader holes 2 , the floor holes 3 and the roof holes 4 are sequentially blasted with a time difference set by region, as shown in FIGS. 8 a to 8 e.
- TABLE 4 Time delays for detonation (set time delay: 20 ms) Remark 1 Wire (number of total No.
- the center-cut blasting method of the present invention is characterized in that a center region is blasted in an underloading fashion to create a pre-split in the rock so as to achieve a large-scale center cut having effective free surfaces F 1 and F 2 , thereby improving the fracture effect by the blasting of the central center-cut hole 7 .
- the center-cut blast of the present invention is characterized in that a large hole having the dual free surfaces F 1 and F 2 .
- the center-cut blasting method of the present invention achieves an advance of about 98% of a drill footage, (the advance/the drill footage) is approximately on a par except for the center-cut region.
- the center-cut hole 1 is drilled to a depth 20 to 30 cm greater than the cut spreader holes 2 .
- test blasting according to the present invention and another test blasting according to the prior art were performed under the same rock conditions and with the same tunnel size so as to compare the tunnel blasting of the present invention with the tunnel blasting of the prior art in technical efficiency, the facility of execution and economical efficiency.
- the test results are compared with respect to excavation efficiency, specific charge, excavating time, flying distance of rock fragments and the sizes of the rock fragment in the following table 5.
- the tunnel blasting of the present invention achieves an efficiency of 98 to 100%, and achieves high efficiency in comparison with the prior art.
- the reason for this high efficiency is that the binding force of an original rock is weakened by circular pre-splitting blasting in a first stage to allow one of the initial dual free surfaces F 2 to be easily formed, so that a center cut having a large diameter of 450 to 550 mm is formed by the center-cut blasting method and complete blasting is performed to cause the depth of the remaining holes to be less than 2 cm.
- the specific charge denotes the quantity of explosives consumed per unit volume of the rock. As the specific charge is less, the quantity of explosives consumed to blast the rock is reduced.
- the specific charge for the present invention is 1.297 kg/m 2 , and so the specific charge for the present invention is less than the specific charge for the prior art.
- blasting costs are reduced by a reduction in the quantity of explosives consumed, so that the blasting method of the present invention can be regarded as an economical blasting method.
- the specific charge generally is less in comparison with the conventional blasting, so that the blasting method of the present invention can be regarded as an efficient and economical blasting method.
- the reason for this is that the binding force of the original rock is weakened by the operation of the auxiliary center-cut holes 8 to facilitate the creation of the dual free surfaces F 1 and F 2 and thereby the dual free surfaces F 1 and F 2 are created by the blasting of the central center-cut hole 1 , so that the cut spreader holes 2 , the floor holes 3 and the roof holes 4 can be blasted with a small quantity of explosives.
- the blasting of the present invention requires a short drilling time in comparison with the blasting of the prior art.
- the drilling time for the blasting of the present invention is shorter than the drilling time for the blasting of the prior art by about 17 minutes.
- the reason for this is that in the blasting of the prior art the drill footages of the cut spreader holes 2 , the floor holes 3 and the roof holes 4 are the same as the drill footages of the center-cut holes so as to achieve a target advance.
- the target advance can be achieved by drilling only each of the center-cut holes to a depth 5 to 10% longer than the target advance (this additional depth is designated by u 1 )
- this additional depth is designated by u 1
- the additional time for which the cut spreader holes 2 , the floor holes 3 and the roof holes 4 are additionally drilled can be saved, thereby reducing the drilling time for the blasting of the present invention in comparison with the blasting of the prior art.
- the flying distance denotes the maximum distance a fragment flies from the working face.
- the flying distance for the blasting of the present invention is also shorter in comparison with the blasting of the prior art. Since a ventilation duct, an electric panel and a drilling water pipe can be situated near the working face owing to this short flying distance, working time can be saved.
- the blasting of the present invention allows the rock to be fractured so as to easily achieve the dual free surfaces F 1 and F 2 , thereby fracturing the rock into fragments each having a small size.
- the greatest vibrations are generally created by the center-cut blasting.
- the center-cut blasting method of the present invention since the binding force of the original rock is considerably weakened by the creation of the circular pre-split and the center-cut blasting is easily performed to achieve the dual free surfaces F 1 and F 2 , so the blast vibrations during center-cut blasting is considerably decreased. Additionally, the blasting of the cut spreader holes 2 , the floor holes 3 and the roof holes are easily blasted utilizing complete dual free surfaces F 1 and F 2 , thereby also reducing the blast vibrations.
- the binding force of the original rock in the center-cut region is weakened by the application of pre-splitting blasting and sub-drilling to facilitate the creation of the dual free surfaces F 1 and F 2 and the blasting of the cut spreader holes 2 can be effectively performed utilizing the dual free surfaces F 1 and F 2 , so that the excavation effect can be maximized.
- the center-cut blasting can be performed utilizing a multistage blasting apparatus, thereby minimizing the damage of a mother rock, reducing blast pollution (such as noise pollution and vibration pollution) and preventing flying fragments.
- the center-cut blasting method of the present invention has advantages with respect to technical efficiency, economical efficiency and safety.
- the center-cut blasting method of the present invention can be effectively applied to the blasting of long holes in the unsupported region of a tunnel, that is, the blasting of a hard rock in the center portion of tunnel.
- the advance per blasting set can be lengthened in comparison with the conventional blasting. If the center-cut blasting method of the present invention is utilized in combination with multistage blasting method, the damage of the mother rock can be minimized and superior effects can be achieved with respect to blast vibrations, blast noise, fragment sizes and flying fragments in the comparison with the conventional blasting methods.
- the free surface F 2 is easily created by weakening the binding force of an original rock by means of the creation of a circular pre-split and the advance corresponding to the drill footage can be achieved, so the excavation efficiency is maximized, operation can be performed safely and protection for a mother rock can be secured, thereby creating advantages with respect to quality control and safety.
- the binding force of an original rock is weakened by circular pre-splitting using large unloaded auxiliary holes and loaded auxiliary holes arranged in a circle, so that dual free surfaces F 1 and F 2 can be easily achieved, thereby facilitating center-cut blasting.
- the advance per blasting set can be lengthened in comparison with a conventional blasting by horizontal drilling and thus excavation efficiency is increased, thereby improving working efficiency.
- V-cut and cylinder-cut methods are not utilized at the same time to blast long holes, blast holes can be easily drilled without a skilled worker, blast vibrations are reduced in comparison with the V-cut and cylinder-cut methods, the size to which center-cut blasting can be applied is not restricted and a working face and surrounding rock portions are not seriously damaged.
- the center-cut blasting method for tunnel excavation in accordance with the present invention has advantages with respect to the facility of execution, economical efficiency and safety.
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
- Earth Drilling (AREA)
Abstract
Description
- 1. Field of the Invention
- The present invention relates generally to tunnel excavating methods, and more particularly to a center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split, which employs a pre-splitting technique that blasts loaded auxiliary holes alternately arranged along with large unloaded auxiliary holes in a circle and a sub-drilling technique of rooting away blast holes, thereby facilitating a center-cut operation by weakening the binding force of an original rock and easily achieving dual free surfaces, and shortening the period of execution and reducing execution costs.
- 2. Description of the Prior Art
- Recently, in order to excavate tunnels and underground spaces for underground storage facilities, communication or electrical cable tunnels, waterway tunnels and traffic tunnels, blasting for tunnel excavation is frequently performed.
- In general, such tunnel blasting is performed in the following three stages.
- With reference to FIG. 1, a first stage of the tunnel blasting is the stage of drilling center-
cut holes 1, cutspreader holes 2,floor holes 3 androof holes 4 to predetermined depths, a second stage is the stage of loading the drilledholes holes 1 to theouter holes - The center-
cut holes 1 are loaded with delay detonators in such a way that the detonators are bilaterally symmetrically arranged in the center-cut holes 1 in the order of detonation in an upward direction. Thecut spreader holes 2, thefloor holes 3 and theroof holes 4 are loaded with delay detonators in such a way that the detonators are arranged in theholes cut holes 1, thecut spreader holes 2, thefloor holes 3 and theroof holes 4. - Tunnel blasting is mostly performed using a single free surface, and generally employs center-cut blasting so as to create new free surfaces.
- The center-cut blasting creates dual free surfaces by blasting the center portion of the working face, and is an important factor that governs the success of the entire tunnel blasting.
- In FIG. 1,
reference characters 1′, 2′, 3′ and 4′ designate a center-cut region, a cut spreader region, a floor region and a roof region, respectively. - The “free surface” denotes the surface of rock in contact with an alien sphere, such as air or water. The free surface considerably affects blasting. That is, a blasting effect is in proportion to the number of free surfaces and the degree of proximity of loaded positions to the free surfaces. The reason for this is that resistance is weak in a free surface side and thus blasting energy generates heavy stresses in the free surface side. A “burden” denotes the shortest distance from a free surface to the center of an explosive.
- The “center-cut hole” denotes blast holes within a center-cut region of 1.5 to 2.5 m by 1.5 to 2.5 m. A “central center-cut hole” denotes a single loaded blast hole at the center of the center-cut region. “Auxiliary center-cut holes” denote the center-cut holes except for the central center-cut hole arranged around the central center-cut hole in a circle having a predetermined diameter. The auxiliary center-cut holes are comprised of unloaded and loaded auxiliary (blast) holes. “Spreader center-cut holes” denote loaded holes that are arranged in circles around the auxiliary center-cut holes.
- As illustrated in FIGS. 2a and 2 b, a conventional tunnel blasting is performed, in such a way that center-cut blast is primarily performed using a cylinder-cut method to obtain dual free surfaces, and the spreader center-cut holes, the
cut spreader holes 2, thefloor holes 3 and theroof holes 4 are secondly and sequentially blasted. - That is, the conventional tunnel blasting is the blasting in which the spreader center-cut holes, the
cut spreader holes 2, thefloor holes 3 and theroof holes 4 are sequentially blasted after center-cut blasting is performed by blasting the loaded holes (center-cut holes) each having a diameter of 38 to 45 mm drilled around one to four unloaded holes each having a diameter of 65 to 120 mm. - In the conventional tunnel blasting employing the cylinder-cut method, when center-cut blasting is not sufficiently performed, dual free surfaces are not easily formed during the blasting of the other blast holes, thereby causing many remaining holes to exist. Accordingly, the excavation efficiency is relatively low, that is, about 90% of a drill footage (less than 80%, depending upon the quality of rock). As a result, the advance formed by a single set of blasting is relatively short, so that the number of sets of blasting should be increased.
- Because of the problem, there occur problems in which the work period cannot be shortened owing to a long excavation period and a long reinforcement period, excavating costs and drilling costs per blasting set are excessively high, and divisional blasting should be performed to minimize blast vibrations.
- In the meantime, conventional center-cut blasting is performed by slant hole center-cut blasting (that is, V-cut blasting) or horizontal center-cut blasting (that is, cylinder-cut blasting; the cylinder-cut blasting is an improvement from burn-cut blasting).
- The V-cut blasting is applied where slant center-cut holes are short, outside holes (such as cut spreader holes, floor holes and roof holes) are long, and the drill footages and drill angles of blast holes can vary. The V-cut blasting is chiefly applied to the blasting of short holes in which its advance is less than 2 m. The cylinder-cut blasting is applied where one to four unloaded holes each having a diameter shorter than the diameter of each loaded hole are drilled in parallel with the tunnel axis to the same drill depth as that of the loaded hole. The cylinder-cut blasting is chiefly applied to the blasting of long holes in which its advance is longer than 2 m.
- As illustrated in FIGS. 3a and 3 b, the V-cut blasting is performed in such a way that three or four sets of loaded central holes are drilled in the central region of a tunnel in parallel with one another with each set comprised of two opposite loaded central holes, the loaded central holes are simultaneously blasted to create a new free surface, and outer holes are blasted in the order of spreader center-cut holes, cut spreader holes, floor holes and the roof holes to expand the created free surface.
- The V-cut blasting is center-cut blasting that has been employed for the longest time. In the V-cut blasting, the bottoms of the drilled center-cut holes are situated in a line with two center-cut holes of each set facing each other, and the interval between two burdens is 100 to 150 mm. Accordingly, the volume of a fractured rock portion is large and the projected area of blasting is wide due to the slant center-cut holes, large fragments are easily formed during center-cut blasting, and the center-cut holes can be drilled in various patterns.
- The V-cut blasting is advantageous in that in comparison with the burn-cut and cylinder-cut blasting, the drilling of holes is easy, the drilling footages of holes are short, the flying distance of fracture is short owing to the creation of large fragments, the V-cut blasting is effectively applied to the blasting of short holes or a soft rock, the occurrence of dead pressure may be generated, and a target drill footage can be achieved regardless of inferior drilling due to a large free surface.
- However, the V-cut blasting is disadvantageous in that its advance is restricted, a plastic region and extra excavation are increased due to its blast vibrations, the actual drill footages of the holes are short and blasting efficiency is low owing to slant drilling, secondary blasting is required due to the creating of large fragments, and the V-cut blasting is improper for precision rock blasting because of its great vibrations.
- In addition, accidents due to falling rocks fall may occur due to the remaining holes, a planed excavation time is lengthened due to the delay of floating rock removal time and next drilling time, and the sectional area of a blasted tunnel is limited owing to slant drilling.
- Furthermore, the V-cut blasting has defects in that blasting failure may occur due to the drilling error of V-shaped holes, large fragments may be created due to concentrative loading, and the creation of free surfaces is not easy. The V-cut blasting has a mechanism in which the V-shaped holes are initially blasted and thereafter the other holes are sequentially blasted.
- On the other hand, as depicted in FIGS. 4a and 4 b, the horizontal center-cut blasting is applied to the blasting of long holes. Burn-cut blasting and cylinder-cut blasting are generally employed for the horizontal center-cut blasting. In the burn-cut blasting, a plurality of unloaded holes each having the same diameter as that of each loaded hole are drilled. In the cylinder-cut blasting, one to four unloaded holes each having a diameter greater than that of each loaded hole, for example, 65 to 120 mm, are drilled.
- In those horizontal center-cut blasting methods, drilled but unloaded holes serve as auxiliary free surfaces (small free surfaces) during the blasting of the loaded holes, so a center-cut operation is facilitated. A free surface F formed after the blasting of the center-cut holes is sequentially expanded to the cut spreader holes, floor holes and roof holes in order.
- Accordingly, center-cut holes are drilled perpendicular to the free surface F and in parallel with one another, so that long holes can be drilled and thereby the drill footage each time is longer. The interval between a loaded hole and an unloaded hole is different depending upon the property of the explosive used and the quality of the rock, but generally 10 to 30 cm. The center-cut holes are blasted in a concentrative blasting fashion, or using precise delay detonators.
- The horizontal center-cut blasting is advantageous in that its blast vibrations are weak in comparison with the V-cut blasting, the sectional area of a tunnel is not restricted due to horizontal drilling, dead pressure is not generated, and transportation and storage efficiency is superior due to the uniformly sized fractures.
- On the other hand, the horizontal center-cut blasting is disadvantageous in that the charge applied to surrounding holes around a burn-hole is large in the case of burn-cut blasting, and blast vibrations may be increased when unloaded holes do not serve as free surfaces due to their small diameters.
- In addition, a bit and a rod should be replaced with new ones in order to drill large holes, the remaining holes exist, advanced drilling technique is required to prevent blasting efficiency due to a drilling error, and the flying distance of the smallest fragment is long.
- Further, the charge applied to center-cut region is large due to the small fractured volume of the center-cut holes, a working face and surrounding rock portions are damaged, and drilling time is lengthened due to the drilling of large unloaded holes and a plurality of loaded holes around the large unloaded holes.
- In the conventional center-cut blasting methods, explosives of the quantity greater than a standard the charge is loaded in the blast holes so as to achieve complete free surfaces in a center-cut region, so that strong vibrations occur owing to the excessive charge per delay, thereby allowing the strong vibrations to damage a mother rock.
- Additionally, when the V-cut blasting or cylinder-cut blasting is applied to the center-cut blasting, the remaining holes each having a depth corresponding to 10 to 20% of a drilling footage exist in the center-cut region and the sounding region. In this case, the next blasting should be delayed, so that excavation efficiency is lowered.
-
- In order to overcome the problems of the conventional center-cut blasting methods, a center-cut blasting method for tunnel excavation is developed by introducing pre-splitting technique and sub-drilling technique. In accordance with the pre-splitting technique, a circular pre-split is created by drilling large unloaded holes and loaded holes in a circle and blasting the loaded holes utilizing a detonating fuse and precision explosives, so as to facilitate the achievement of free surfaces. In accordance with the sub-drilling technique, the center-cut holes are drilled additionally but outsides holes except for center-cut holes are not drilled additionally, so as to maximize the advance per blasting set, minimizing the remaining holes and eliminating the sub-drilling of outside holes.
- Accordingly, the present invention has been made keeping in mind the above problems occurring in the prior art, and an object of the present invention is to provide a center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and pre-splitting, in which the binding force of an initial rock is weakened by utilizing large unloaded blast holes and pre-splitting so as to easily form dual free surfaces, thereby facilitating center-cut blasting and thereby improving the efficiency of tunnel blasting.
- Another object of the present invention is to provide a center-cut blasting method for tunnel excavation utilizing large unloaded blast holes and pre-splitting in which loaded blast holes and unloaded blast holes are additionally drilled to achieve the maximum advance, thereby shortening the period of tunnel excavation and improving the economical efficiency of tunnel excavation.
- In order to accomplish the above object, the present invention provides a center-cut blasting method for tunnel excavation, comprising the steps of: drilling a single central center-cut hole at the center of a center-cut region, drilling a plurality of auxiliary center-cut holes comprised of large unloaded auxiliary holes and loaded auxiliary holes that are alternately arranged around the central center-cut hole to be situated in a circle having a predetermined diameter, and drilling a plurality of spreader center-cut holes outside the auxiliary center-cut holes to be situated in concentric circles centered by the central center-cut hole; loading the center-cut holes with delay detonators and explosives and stemming the center-cut holes with stemming material at their entrances; blasting the loaded auxiliary holes of the auxiliary center-cut holes so as to create a circular pre-split; blasting the central center-cut hole so as to create initial dual free surfaces; and sequentially blasting the spreader center-cut holes with a time delay so as to create final dual free surfaces.
- The above and other objects, features and other advantages of the present invention will be more clearly understood from the following detailed description taken in conjunction with the accompanying drawings, in which:
- FIG. 1 is a front view showing blasting regions in the case of the full face blasting of a tunnel;
- FIG. 2a is a diagram showing the full face blasting pattern of a tunnel in accordance with a prior art;
- FIG. 2b is a cross section taken along line A-A of FIG. 2a;
- FIG. 3a is a cross section showing center-cut holes in accordance with a conventional V-cut blasting technique;
- FIG. 3b is a diagram showing the drilling pattern corresponding to FIG. 3a;
- FIG. 4a is a cross section showing center-cut holes in accordance with a conventional cylinder-cut blasting technique;
- FIG. 4b is a diagram showing the drilling pattern corresponding to FIG. 4a;
- FIG. 5a is a diagram showing the full face blasting pattern of a tunnel in accordance with the present invention;
- FIG. 5b is a cross section taken along line B-B of FIG. 5a;
- FIG. 6a is a diagram showing the drilling pattern for a center-cut region;
- FIG. 6b is a diagram showing the principle of a center-cut blasting method in accordance with the present invention;
- FIG. 7a is a view showing a state in which an auxiliary center-cut hole is loaded in accordance with a first embodiment of the present invention;
- FIG. 7b is a view showing a state in which an auxiliary center-cut hole is loaded in accordance with a second embodiment of the present invention;
- FIG. 7c is a view showing a state in which a central center-cut hole is loaded in accordance with the first embodiment of the present invention; and
- FIGS. 8a to 8 e are views showing the stages in which the full face of a tunnel is blasted in due order.
- Reference now should be made to the drawings, in which the same reference numerals are used throughout the different drawings to designate the same or similar components.
- First of all, the step of drilling a plurality of blast holes in the working face of a tunnel is performed, as depicted in FIG. 6a. That is, a single central center-
cut hole 7 is drilled in the working face at the center of a center-cut region, five large unloadedauxiliary holes 5 are drilled in the working face to be situated in a circle having a diameter of φ around the central center-cut hole 7, and five unloadedauxiliary holes 6 are each drilled between one large unloadedauxiliary holes 5 and another (if necessary, the numbers of the unloadedauxiliary holes 5 and the loaded blastauxiliary holes 6 can be increased). - In such a case, the large unloaded
auxiliary holes 5 should be situated within a fracture region created by blasting, the large loadedauxiliary holes 5 and the loadedauxiliary holes 6 are drilled perpendicular to a single free surface F1 in the form of cylinder-cuts, and auxiliary center-cut holes 8 comprised of the large loadedauxiliary holes 5 and the loadedauxiliary holes 6 are drilled to be situated in a circle around the central center-cut hole 7. - In the meantime, a plurality of spreader center-
cut holes 9 are drilled outside the auxiliary center-cut holes 8 to be situated in concentric circles around the central center-cut hole 7. - In this case, as shown in6 a, the positions of the center-cut holes are determined so that the diameter of the circular center-cut region is φ=2W, the radius of the circular center-cut region is W=(4 to 6)d, and the interval between neighboring unloaded auxiliary holes is S+dl×(2 to 3). The drilled depth of each of the unloaded
auxiliary holes 5 and the loadedauxiliary holes 6 is drilled to be greater than that of each of thecut spreader holes 2 by (2 to 3)×0.3W, so that sub-drilling for rooting ways the center-cut holes can be achieved and thereby the auxiliary center-cut holes 8 serve as pre-free surfaces u1. - In such a case, W denotes a burden. As shown in FIG. 6a, the burden W, the shortest distance from the central center-
cut hole 7 to one of the large unloadedauxiliary holes 5 is (4 to 6)×d. The diameter φ of the circular center-cut region within a first concentric circle is about 450 to 550 mm. - In this description and the drawings, the following definitions are utilized.
- φ=2×W, where φ is the diameter of the circular center-cut region and W is the radius of the circular center-cut region.
- W=(4 to 6)×d, where W is the radius of the circular center-cut region and d is the diameter of a loaded hole.
- S=(2 to 3)×dl, where S is the shortest distance from one unloaded hole to its neighboring unloaded hole and d1 is the diameter of an unloaded hole.
- a=1.1×2W, where “a” is the distance from the central center-cut hole to the second concentric circle and W is the radius of the circular center-cut region.
- W1=1.2×W, where W1 is the burden of a second center-cut and W is the radius of the circular center-cut region.
- S1={square root}{square root over (2)}×a, where S1 is the hole interval of the second center-cut and “a” is the distance from the central center-cut hale to the second concentric circle.
- W2=(0.95 to 1.0)×W1, where W2 is the burden of a third center-cut and W1 is the burden of the second center-cut.
- S2={square root}{square root over (2)} K×W2, where S2 is the hole interval of the third center-cut, K is a burden constant (1.86 to 1.94) and W2 is the burden of the third center-cut.
- W3=(2.3 to 2.5)×W2, where W3 is the burden of a fourth center-cut and W2 is the burden of the third center-cut.
- S3={square root}{square root over (2)} K×W3, where S3 is the hole interval of the fourth center-cut, K is a burden constant (1.86 to 1.94) and W3 is the burden of the fourth center-cut.
- The drill intervals and drill depths of
cut spreader holes 2, the floor holes 3 and the roof holes 4 except the central center-cut hole 1 are determined depending upon the condition of the rock and blasting conditions, which are performed similarly to the conventional cylinder-cut method in principle. The blast holes are arranged as illustrated in FIGS. 5a and 5 b and are drilled as indicated in the following table 1.TABLE 1 Drilling and loading conditions for prior art and present invention Kind of art Prior art Present invention Kind of rock Hard rock Hard rock Cross sectional area (m2) 87.775 87.775 Drill footage (m) Central center-cut 4.2 4.0 Outer hole 4.2 4.0 Advance (m) 3.8 3.8 Number of holes Unloaded holes 4 5 Loaded holes 186 181 Total charge (kg) 454.2 432.5 Specific charge (kg) 1.362 1.297 Maximum charge per delay (kg/delay) 26.25 26.25 - After the step of drilling a plurality of blast holes in the working face of a tunnel, the step of loading the blast holes with explosives is performed. Attention should be paid to the loading of the central center-
cut hole 7 and auxiliary center-cut holes 8. The loading of the other blast holes except the central center-cut hole 7 and auxiliary center-cut holes 8 is the same as in the burn-cut and cylinder-cut methods in principle. - The loading of the auxiliary center-
cut holes 8 for creating a pre-split can be performed in two ways as indicated in the following table 3. - First, as shown in FIG. 7a, the inner portion of a blast hole is loaded with dynamite GD of 0.375 kg, and a detonating fuse of 40 g/m is connected to the dynamite with its outer end situated out of the hole. In order to filly utilize the power of the explosives, full stemming is performed at two positions, respectively in lengths of 300 mm and 400 mm. In this case, the reason for the utilization of the detonating fuse is to create a pre-splitting effect by underloading.
- Second, as shown in FIG. 7b, a precision explosive (such as Finex-1) having a low specific gravity and a low detonation velocity is employed instead of the detonating fuse. This method has been employed in controlled blasting so as to prevent the damage of a mother rock and extra excavation, and serves to maximize a pre-splitting effect by providing a decoupling effect to center-cut holes.
- Though the loading of the central center-
cut hole 7 is different depending upon the conditions of the rock, the standard example of the loading is described in the following table 3. That is, as shown in FIG. 7c, 70 to 80% of the drill footage is loaded with the explosives such as gelatin dynamite and 20 to 30% are fully stemmed. - The reason for loading the central center-
cut hole 6 in a standard loading fashion is to obtain such explosives as to fracture and move the pre-split region created in the previous stage.TABLE 2 Specification of full-face charges in accordance with prior art Number Charge Total of per hole charge Kind holes (kg) (kg) Remark Unloaded 4 — — Gelatin dynamite explosive: hole φ 32 m/m × 400 m/m × 375 g Center-hole 13 3.0 39.0 Precision explosive: Spreader 114 2.625 299.25 φ 17 m/m × 425 m/m × 100 g cut hole Roof hole 37 1.35 49.95 Floor hole 22 3.00 66.0 Total 190 — 454.2 -
TABLE 3 Specification of full-face charges in accordance with present invention Number Charge per hole Kind of holes (kg) Total charge (kg) Remark Unloaded 5 — — Gelatin auxiliary dynamite hole explosive: Loaded 5 Dyna- Deto- Dyna- Deto- φ 32 m/m × auxiliary mite nating mite nating 400 m/m × hole 0.315 fuse 1.875 fuse 375 g 0.16 0.8 Precision Central 1 3.375 3.375 explosive: center- φ 17 m/m × hole 425 m/m × Spreader 16 3.0 48.0 100 g center- Detonating hole fuse: Spreader 100 2.625 262.5 40 g/m cut hole Roof hole 37 1.35 49.95 Floor hole 22 3.00 66.0 Total 186 — 432.5 - The setting of the delays in the detonators is one of principal factors that govern the success of center-cut blasting. The explosives loaded in the loaded
auxiliary holes 6 that are initially detonated to create a pre-split are simultaneously blasted, whereas the explosives loaded in the central center-cut hole 7 and the second, third and fourth spreader center-cut holes are detonated using electric delay detonators having time delay ranging from 20 ms to 100 ms. - Hereinafter, the process of creating the dual free surfaces F1 and F2 according to the center-cut blasting method of the present invention is described.
- The reason why the detonation time delay, as described above, is set to be within a range of 20 to 100 ms is that a time delay sufficient for a portion of the rock to be fractured and moved can be provided.
- It is proved that the fractured rock is moved at a speed of 40 to 60 m/s when explosives loaded in the central center-
cut hole 7 have been detonated after explosives loaded in the loadedauxiliary holes 6 are detonated to create a circular pre-split. Accordingly, in order to completely blast away the center-cut region in which the blast holes are drilled in a depth of 4 m, the time delay between the central center-cut hole and the loaded auxiliary holes preferably is 40 ms. - After the explosives loaded in the central center-cut hole are detonated, first spreader center-
cut holes 9 are detonated with a time delay of 60 ms so as to provide the time for the fracture and movement of the rock sufficient to create the dual free surfaces F1 and F2. - The explosives loaded in the second and third spreader center-
cut holes 9 are detonated using delay detonators having a time delay of 20 to 100 ms, so that the center-cut region is completely rooted out, thereby creating the dual free surfaces F1 and F2. - That is, when the loaded
auxiliary holes 6 are blasted, a circular pre-split is created. When the central center-cut hole 7 situated at the center of a pre-split region is blasted with a predetermined time delay, the dual free surfaces F1 and F2 are created by the combined operation of the large unloadedauxiliary holes 5 and the loaded auxiliary holes 6. Thereafter, as the spreader center-cut holes 9 are sequentially blasted, one of the dual free surfaces F2 is expanded to form a large hole having a diameter of 450 to 550 mm, thereby achieving the same effect as that achieved when the free surface is formed by boring. - As the spreader center-
cut holes 9 are blasted, one of the dual free surfaces F2 is expanded. At this time, the size of the center-cut region is 1.5 to 2.5 m by 1.5 to 2.5 m. As apparent from FIG. 8b, one of the dual free surfaces F2 is distinctly expanded. - Thereafter, the charges and detonating time delays of the
cut spreader holes 2, the floor holes 3 and the roof holes 4 are determined in accordance with the same principle as that of the cylinder-cut method. Thecut spreader holes 2, the floor holes 3 and the roof holes 4 are blasted in the blasting order indicated in the following table 4 while one of the dual free surfaces F2 is expanded in the progressing order from FIG. 8c to FIG. 8e. - These detonating methods may be classified into a non-multistage detonating method and a multistage detonating method. The non-multistage detonating method is a detonating method utilizing conventional electric detonators, while the multistage detonating method is a detonating method utilizing a multistage blasting apparatus. The multistage detonating method can control blast vibrations and minimize the damage of an original rock. These two detonating methods can be applied to the center-cut blasting method of the present invention.
- In this embodiment, the blast holes are loaded with the explosives as indicated in table 3 and blasted in a multistage blasting fashion. The working face is divided into six regions. An auxiliary detonator wire No.1, an auxiliary detonator wire No. 1, an auxiliary detonator wire No. 2, an auxiliary detonator wire No. 3, an auxiliary detonator wire No. 4, an auxiliary detonator wire No. 5, and an auxiliary detonator wire No. 6 are connected at their first ends to the center-cut region, a lower left region, a lower right region, an upper left region, an upper right region and an upper center region, respectively, and are connected at their second ends to a multistage blasting apparatus.
- A time delay for each wire is set at 20 ms, and the detonating time delays are indicated in the following table 4 in detail.
- In the multistage detonating apparatus, when the time delay is set at 20 ms and six wires are utilized, the time period until electricity is applied to the sixth wire is 100 ms. Accordingly, in the center-cut blasting method of the present invention, an initially detonated detonator should be detonated after a time period of 100 ms so as to prevent cutoff.
- Ten auxiliary detonator wires can be connected to the multistage detonating apparatus. However, in these tests, six auxiliary detonator wires were connected to six regions by which total one hundred and eighty one holes were divided. In consideration of the time period for which electricity is applied to the sixth wire, an initially detonated detonator should have the time delay greater than the time period for which electricity is applied to the sixth wire. In these tests, 140 ms (MS No.7) was employed as the initially detonated detonator.
- In the tunnel blasting employing the center-cut blasting method of the present invention, the central center-
cut hole 1 is completely blasted to achieve the dual free surfaces F1 and F2 and thereafter thecut spreader holes 2, the floor holes 3 and the roof holes 4 are sequentially blasted with a time difference set by region, as shown in FIGS. 8a to 8 e.TABLE 4 Time delays for detonation (set time delay: 20 ms) Remark 1 Wire (number of total No. 1 (0 ms) 2 (20 ms) 3 (40 ms) 4 (60 ms) 5 (80 ms) 6 (100 ms) detonators) Remark 2 M 7 140(5) 5 Center-cut S 9 180(1) 1 region 12 240(1) 1 (twenty two 13 260(1) 1 holes) 14 260(1) 1 15 260(1) 1 16 320(1) 1 17 340(1) 1 18 360(1) 1 19 380(1) 1 L 4 400(1) 1 P 5 500(1) 1 6 600(1) 1 7 700(1) 1 8 800(1) 1 9 900(1) 1 10 1000(1) 1 11 1200(1) 1 12 1420(3) 1440(3) 1460(1) 1480(1) 1500(3) 11 Outside region 13 1620(3) 1640(3) 1660(2) 1680(2) 1700(2) 12 (one hundred 14 1820(3) 1840(3) 1860(2) 1880(2) 1900(2) 12 fifty nine holes) 15 2020(3) 2040(3) 2060(2) 2080(2) 2100(2) 12 16 2520(3) 2540(3) 2560(3) 2580(3) 2600(3) 15 17 3020(3) 3040(3) 3060(1) 3080(1) 3100(3) 11 18 3520(1) 3540(2) 3560(3) 3580(3) 3600(2) 11 19 4020(1) 4040(1) 4060(3) 4080(3) 4100(3) 11 20 4520(4) 4540(4) 4560(2) 4580(2) 4600(3) 15 21 5020(2) 5040(2) 5060(3) 5080(3) 5100(1) 11 22 5520(2) 5540(2) 5560(3) 5580(2) 5600(2) 12 23 6020(2) 6040(2) 6060(2) 6080(2) 6100(2) 10 24 6520(2) 6540(2) 6560(2) 6580(2) 6600(2) 10 23 7020(2) 7040(2) 7100(2) 6 Total 181 - One of the principal characteristics of this center-cut blasting method is to achieve a pre-splitting effect. So far, pre-splitting blasting has been utilized so as to control blast vibrations and prevent the enlargement of a damaged area.
- The center-cut blasting method of the present invention is characterized in that a center region is blasted in an underloading fashion to create a pre-split in the rock so as to achieve a large-scale center cut having effective free surfaces F1 and F2, thereby improving the fracture effect by the blasting of the central center-
cut hole 7. In brief, the center-cut blast of the present invention is characterized in that a large hole having the dual free surfaces F1 and F2. - Since the center-cut blasting method of the present invention achieves an advance of about 98% of a drill footage, (the advance/the drill footage) is approximately on a par except for the center-cut region. The center-
cut hole 1 is drilled to a depth 20 to 30 cm greater than the cut spreader holes 2. - As a result, in accordance with the center-cut blasting method of the present invention, the combined effects of the pre-split in the center-cut region, the unloaded
auxiliary holes 5 and the loadedauxiliary holes 6 allow the center-cut region to be blasted without remaining holes. Since the charge per hole is little in comparison with the prior art, side effects do not occur. - Accordingly, since one of the initial dual free surfaces F2 is completely created by the sub-drilling of the center-cut region and the other loaded blast holes are blasted to expand one of the dual free surfaces F2, so that the excavating effect is considerably improved. If necessary, the damage of the surrounding portions of the rock can be considerably reduced by controlled blasting. Since high excavation efficiency can be achieved by the sub-drilling of 5 to 10% without the sub-drilling of the
cut spreader holes 2, the floor holes 3 and the roof holes 4, effective blasting can be performed. - A test blasting according to the present invention and another test blasting according to the prior art were performed under the same rock conditions and with the same tunnel size so as to compare the tunnel blasting of the present invention with the tunnel blasting of the prior art in technical efficiency, the facility of execution and economical efficiency. The test results are compared with respect to excavation efficiency, specific charge, excavating time, flying distance of rock fragments and the sizes of the rock fragment in the following table 5.
TABLE 5 Comparison of test blasting of prior art and test blasting of present invention Item Prior art Present invention Drilling efficiency 90 to 95% 98 to 100% Mean flying distance of fragments 63.5 48.63 (m) Mean depth of remaining holes 30.0 2.0 (cm) Total drilling footage (m) 798 712.2 Reduction ratio of drilling footage 10.75% (85.8 m reduced) (on the basis of conventional type, %), Drilling time (on the basis of 223.30 (¤ 3 hours 206.38 (¤ 3 hours three-boom jumbo drill, minute) and 43 minutes) and 26 minutes) Reduction ratio of drilling time 7.58% (16.92 reduced) (on the basis of conventional type, %) - With respect to drilling efficiency, the tunnel blasting of the present invention achieves an efficiency of 98 to 100%, and achieves high efficiency in comparison with the prior art. The reason for this high efficiency is that the binding force of an original rock is weakened by circular pre-splitting blasting in a first stage to allow one of the initial dual free surfaces F2 to be easily formed, so that a center cut having a large diameter of 450 to 550 mm is formed by the center-cut blasting method and complete blasting is performed to cause the depth of the remaining holes to be less than 2 cm.
- The specific charge denotes the quantity of explosives consumed per unit volume of the rock. As the specific charge is less, the quantity of explosives consumed to blast the rock is reduced. The specific charge for the present invention is 1.297 kg/m2, and so the specific charge for the present invention is less than the specific charge for the prior art. In accordance with the present invention, blasting costs are reduced by a reduction in the quantity of explosives consumed, so that the blasting method of the present invention can be regarded as an economical blasting method.
- In the blasting of the present invention, the specific charge generally is less in comparison with the conventional blasting, so that the blasting method of the present invention can be regarded as an efficient and economical blasting method. The reason for this is that the binding force of the original rock is weakened by the operation of the auxiliary center-
cut holes 8 to facilitate the creation of the dual free surfaces F1 and F2 and thereby the dual free surfaces F1 and F2 are created by the blasting of the central center-cut hole 1, so that thecut spreader holes 2, the floor holes 3 and the roof holes 4 can be blasted with a small quantity of explosives.TABLE 6 Comparison of drilling times (on the basis of three boom jumbo drill) Prior art Present invention Drill Drilling time Drill Drilling time Total Number footage per hole Total drilling Number footage per hole drilling time Kind of holes (m) (minute) time (minute) of holes (m) (minute) (minute) Unloaded 4 4.2 21 84 5 4.0 20 100 hole Center-cut 13 4.2 3.15 40.35 22 4.0 3 66 hole Cut spreader 173 4.2 3.15 544.95 159 3.8 2.85 453.15 hole, floor hole, roof hole Total 190 669.9 186 619.15 Actual 223.3 206.38 drilling time - The blasting of the present invention requires a short drilling time in comparison with the blasting of the prior art. The drilling time for the blasting of the present invention is shorter than the drilling time for the blasting of the prior art by about 17 minutes. The reason for this is that in the blasting of the prior art the drill footages of the
cut spreader holes 2, the floor holes 3 and the roof holes 4 are the same as the drill footages of the center-cut holes so as to achieve a target advance. - On the other hand, in the blasting of the present invention, since the target advance can be achieved by drilling only each of the center-cut holes to a
depth 5 to 10% longer than the target advance (this additional depth is designated by u1), the additional time for which thecut spreader holes 2, the floor holes 3 and the roof holes 4 are additionally drilled can be saved, thereby reducing the drilling time for the blasting of the present invention in comparison with the blasting of the prior art. - The flying distance denotes the maximum distance a fragment flies from the working face. The flying distance for the blasting of the present invention is also shorter in comparison with the blasting of the prior art. Since a ventilation duct, an electric panel and a drilling water pipe can be situated near the working face owing to this short flying distance, working time can be saved.
TABLE 7 Comparison of fragment sizes Kind Prior art Present invention Size of fragment Less than 50 cm 60% 70% 50 to 80 cm 40% 30% - With regard to the fragment sizes, the blasting of the present invention allows the rock to be fractured so as to easily achieve the dual free surfaces F1 and F2, thereby fracturing the rock into fragments each having a small size.
- In general, principal factors affecting the quantity of blast vibrations are the maximum charge per delay and a distance to a blast source. Of these factors, a blasting operation is restricted by the maximum charge per delay that can be controlled.
- In the tunnel blasting, the greatest vibrations are generally created by the center-cut blasting. In accordance with the center-cut blasting method of the present invention, since the binding force of the original rock is considerably weakened by the creation of the circular pre-split and the center-cut blasting is easily performed to achieve the dual free surfaces F1 and F2, so the blast vibrations during center-cut blasting is considerably decreased. Additionally, the blasting of the
cut spreader holes 2, the floor holes 3 and the roof holes are easily blasted utilizing complete dual free surfaces F1 and F2, thereby also reducing the blast vibrations. - Meanwhile, in accordance with the center-cut blasting method of the present invention, the binding force of the original rock in the center-cut region is weakened by the application of pre-splitting blasting and sub-drilling to facilitate the creation of the dual free surfaces F1 and F2 and the blasting of the
cut spreader holes 2 can be effectively performed utilizing the dual free surfaces F1 and F2, so that the excavation effect can be maximized. - Accordingly, the sub-drilling of the
cut spreader holes 2, the floor holes 3 and the roof holes 4 is not required, and the advance per blasting set can be improved by effective center-cut blasting in comparison with the conventional center-cut blasting. Additionally, if necessary, the center-cut blasting can be performed utilizing a multistage blasting apparatus, thereby minimizing the damage of a mother rock, reducing blast pollution (such as noise pollution and vibration pollution) and preventing flying fragments. - As apparent from the test results, the center-cut blasting method of the present invention has advantages with respect to technical efficiency, economical efficiency and safety.
- The center-cut blasting method of the present invention can be effectively applied to the blasting of long holes in the unsupported region of a tunnel, that is, the blasting of a hard rock in the center portion of tunnel. The advance per blasting set can be lengthened in comparison with the conventional blasting. If the center-cut blasting method of the present invention is utilized in combination with multistage blasting method, the damage of the mother rock can be minimized and superior effects can be achieved with respect to blast vibrations, blast noise, fragment sizes and flying fragments in the comparison with the conventional blasting methods.
- Additionally, since the free surface F2 is easily created by weakening the binding force of an original rock by means of the creation of a circular pre-split and the advance corresponding to the drill footage can be achieved, so the excavation efficiency is maximized, operation can be performed safely and protection for a mother rock can be secured, thereby creating advantages with respect to quality control and safety.
- As a result, in accordance with the present invention, the binding force of an original rock is weakened by circular pre-splitting using large unloaded auxiliary holes and loaded auxiliary holes arranged in a circle, so that dual free surfaces F1 and F2 can be easily achieved, thereby facilitating center-cut blasting. The advance per blasting set can be lengthened in comparison with a conventional blasting by horizontal drilling and thus excavation efficiency is increased, thereby improving working efficiency.
- In addition, complete dual free surfaces are created by the sub-drilling of the large unloaded auxiliary holes and the loaded auxiliary holes, so that the maximum advance per blasting set can be achieved and the free surface F2 can be easily achieved. Consequently, the sub-drilling of the outside holes are not required to obtain sufficient drilling footages differently from a conventional blasting method and the remaining holes do not exist, so that the working period is shortened and blasting costs are reduced, thus improving economical efficiency.
- V-cut and cylinder-cut methods are not utilized at the same time to blast long holes, blast holes can be easily drilled without a skilled worker, blast vibrations are reduced in comparison with the V-cut and cylinder-cut methods, the size to which center-cut blasting can be applied is not restricted and a working face and surrounding rock portions are not seriously damaged.
- In brief, the center-cut blasting method for tunnel excavation in accordance with the present invention has advantages with respect to the facility of execution, economical efficiency and safety.
- Although the preferred embodiments of the present invention have been disclosed for illustrative purposes, those skilled in the art will appreciate that various modifications, additions and substitutions are possible, without departing from the scope and spirit of the invention as disclosed in the accompanying claims.
Claims (9)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1999-67903 | 1999-12-31 | ||
KR99-67903 | 1999-12-31 | ||
KR1019990067903A KR100323151B1 (en) | 1999-12-31 | 1999-12-31 | Tunnel blasting method with large empty holes and pre-splitting of circular cut |
Publications (2)
Publication Number | Publication Date |
---|---|
US20010025583A1 true US20010025583A1 (en) | 2001-10-04 |
US6431075B2 US6431075B2 (en) | 2002-08-13 |
Family
ID=19634992
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
US09/750,842 Expired - Fee Related US6431075B2 (en) | 1999-12-31 | 2000-12-28 | Center-cut method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split |
Country Status (2)
Country | Link |
---|---|
US (1) | US6431075B2 (en) |
KR (1) | KR100323151B1 (en) |
Cited By (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102607343A (en) * | 2012-02-27 | 2012-07-25 | 薛世忠 | Tunnel blasting excavation method |
CN102607342A (en) * | 2012-02-27 | 2012-07-25 | 薛世忠 | Blasting method controlling damage of damage rings of tunnel |
CN102927863A (en) * | 2011-08-11 | 2013-02-13 | 李立华 | New method for blasting construction of all-rock tunnel |
CN103063094A (en) * | 2013-02-04 | 2013-04-24 | 山东科技大学 | Channeling method in rapid roadway explosion |
JP2013092274A (en) * | 2011-10-24 | 2013-05-16 | Kayaku Japan Co Ltd | Control blasting system |
CN103557758A (en) * | 2013-11-01 | 2014-02-05 | 中铁四局集团有限公司 | Expanded excavation area hole inside and outside combined delay subarea differential initiation network in tunnel blasting |
CN103557756A (en) * | 2013-11-01 | 2014-02-05 | 中铁四局集团有限公司 | Advanced pilot tunnel hole-by-hole delay detonation network in tunnel blasting |
CN103868420A (en) * | 2014-03-31 | 2014-06-18 | 江西稀有金属钨业控股集团有限公司 | Mine gallery driving cut blasting method |
CN103940309A (en) * | 2014-03-26 | 2014-07-23 | 南京梅山冶金发展有限公司 | Underground-blasting shaft forming method |
CN104390535A (en) * | 2014-10-11 | 2015-03-04 | 中国矿业大学(北京) | Medium-hard rock deep-hole cut blasting method |
CN104613830A (en) * | 2014-12-18 | 2015-05-13 | 招金矿业股份有限公司夏甸金矿 | One-time-formed smooth blasting method for laneway |
RU2554359C1 (en) * | 2014-03-17 | 2015-06-27 | Ибрагим Магомедович Паланкоев | Method of destruction of frozen soil during drill and fire excavation |
CN104864783A (en) * | 2015-05-21 | 2015-08-26 | 南京梅山冶金发展有限公司 | Underground jack shaft uncovering method |
CN105021096A (en) * | 2015-07-17 | 2015-11-04 | 中铁四局集团第四工程有限公司 | Five-segment-type millisecond electric detonator secondary blasting construction method applied to blasting of high-gas large-section tunnel |
JP2017032162A (en) * | 2015-07-29 | 2017-02-09 | 鹿島建設株式会社 | Blast construction method |
CN107289827A (en) * | 2017-08-11 | 2017-10-24 | 中铁四局集团有限公司 | Double-side wedge cut tunneling blasting method for extra-large section tunnel |
CN108756899A (en) * | 2018-06-11 | 2018-11-06 | 中铁二局第工程有限公司 | A kind of control of large deformation tunnel becomes excavation method |
CN110332861A (en) * | 2019-06-25 | 2019-10-15 | 中铁十二局集团有限公司 | City underground complex environment controls blasting construction method |
CN110595306A (en) * | 2019-09-05 | 2019-12-20 | 中国科学技术大学 | Construction method of efficient blasting pile foundation based on principle that external free surface forms tensile wave superposition boundary region |
CN111043923A (en) * | 2019-12-10 | 2020-04-21 | 中铁隆工程集团有限公司 | Blasting method suitable for adjacent important buildings |
CN111307002A (en) * | 2020-03-25 | 2020-06-19 | 安徽理工大学 | Closed free surface cut blasting method for improving blasting efficiency |
CN111664761A (en) * | 2020-05-08 | 2020-09-15 | 安徽理工大学 | Cut blasting method based on pre-blasting |
CN111964544A (en) * | 2020-07-03 | 2020-11-20 | 中国水利水电第九工程局有限公司 | Blasting construction process for diversion tunnel strong-water-seepage rock plug |
CN112179225A (en) * | 2020-09-27 | 2021-01-05 | 鞍钢集团矿业有限公司 | One-time well-completion blasting method |
CN112254598A (en) * | 2020-10-16 | 2021-01-22 | 重庆大学 | Hard rock large-section trolley tunneling control blasting method |
CN112595192A (en) * | 2021-01-14 | 2021-04-02 | 大冶有色金属有限责任公司 | Variable-diameter cut structure and method for roadway excavation |
CN112709573A (en) * | 2019-10-24 | 2021-04-27 | 西安闪光能源科技有限公司 | Hard coal face rock burst prevention and control method based on controllable shock wave pre-splitting |
CN113188391A (en) * | 2021-06-10 | 2021-07-30 | 嵩县金牛有限责任公司 | Blasting method for soft rock roadway tunneling |
CN113465462A (en) * | 2021-05-07 | 2021-10-01 | 北京科技大学 | Mining method for eliminating sublevel caving mining suspended roof without sill pillar |
CN113865454A (en) * | 2021-10-20 | 2021-12-31 | 长安大学 | Tunnel cut hole mixed detonation method |
CN114018113A (en) * | 2021-11-15 | 2022-02-08 | 中铁三局集团有限公司 | Small-section tunnel blasting hole distribution structure and construction method thereof |
CN114485304A (en) * | 2022-01-06 | 2022-05-13 | 安徽开发矿业有限公司 | Simple light explosion drilling and charging method for medium-hard rock |
CN115420157A (en) * | 2022-03-17 | 2022-12-02 | 中铁三局集团广东建设工程有限公司 | Tunnel section hole distribution structure close to existing shield zone and blasting method |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20020082501A (en) * | 2001-03-20 | 2002-10-31 | 티앤알비 주식회사 | Bench rock blasting method for controlling drill hole space, loading amount and blasting sequence |
KR100438028B1 (en) * | 2001-07-11 | 2004-06-30 | 조영동 | A tunnel blasting method favorable to the environment,which utilizes pre-splitting and an upper center cut |
KR100445098B1 (en) * | 2001-11-02 | 2004-08-21 | 주식회사 지오제니컨설턴트 | method for blasting center-cut of tunnel |
KR100443578B1 (en) * | 2002-01-05 | 2004-08-09 | 주식회사 성보이엔씨 | blasting method relaxation before hand cut core hole for long hole blasting |
KR100676914B1 (en) * | 2006-06-13 | 2007-02-01 | 주식회사 무진네오테크 | Excavating method of tunnel with slight vibration |
KR100866105B1 (en) * | 2007-03-20 | 2008-10-31 | 정영문 | blast construction working method for a tunnel |
CN101793487A (en) * | 2010-03-30 | 2010-08-04 | 武汉科技大学 | Controlled blasting technique for small-clear-distance tunnel construction |
CN101846484A (en) * | 2010-04-02 | 2010-09-29 | 攀钢集团冶金工程技术有限公司 | Blasting method of driving, mining and cutting drift under ultrahard fault |
KR101887146B1 (en) * | 2017-12-12 | 2018-08-10 | 주식회사 무진네오테크 | Method stepped blaster tunnel of controlling vibration of blasting tunnel |
CN110219653A (en) * | 2019-07-11 | 2019-09-10 | 中铁隧道集团三处有限公司 | A kind of rectangular hydraulic splitting excavation method of Tunneling by mining method |
CN110295912B (en) * | 2019-07-18 | 2021-02-09 | 中铁隧道集团一处有限公司 | Non-explosive efficient excavation method for hard rock large-section tunnel with good integrity in sensitive area |
CN111692931B (en) * | 2019-12-05 | 2022-07-05 | 南京铁道职业技术学院 | Intelligent hole distribution method for tunnel blasting |
CN111412802B (en) * | 2020-01-03 | 2020-12-15 | 重庆中环建设有限公司 | Precise blasting method for protecting ultra-small clear distance middle clamped rock column of tunnel |
KR102158534B1 (en) * | 2020-02-04 | 2020-09-22 | 에스케이건설 주식회사 | Controlled Blasting Excavation Method Using Formation of Multiple Free Surfaces |
KR102532272B1 (en) * | 2020-03-06 | 2023-05-12 | 안진현 | Non-electric detonator deck charge blasting method with expanding free face |
CN113188384B (en) * | 2021-04-20 | 2023-03-03 | 白银有色集团股份有限公司 | Cut parameter optimization method based on rock hardness classification |
CN114264202B (en) * | 2021-08-16 | 2023-05-12 | 北方工业大学 | Rock roadway deep hole layered slitting blasting method |
CN115355785B (en) * | 2022-09-15 | 2024-04-19 | 中南大学 | Sectional blasting well forming method considering blast hole deflection |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4194788A (en) * | 1978-03-01 | 1980-03-25 | Gulf Oil Corporation | Method of forming a rubblized in-situ retort |
US4353598A (en) * | 1980-04-18 | 1982-10-12 | Occidental Oil Shale, Inc. | Method of blasting pillars with vertical blastholes |
US4440447A (en) * | 1980-09-02 | 1984-04-03 | Occidental Oil Shale, Inc. | Method for forming an in situ oil shale retort with explosive expansion towards a horizontal free face |
US4396231A (en) * | 1981-01-23 | 1983-08-02 | Occidental Oil Shale, Inc. | Horizontal free face blasting for minimizing channeling and mounding |
US4611856A (en) * | 1981-03-23 | 1986-09-16 | Occidental Oil Shale, Inc. | Two-level, horizontal free face mining system for in situ oil shale retorts |
US4560206A (en) * | 1983-07-26 | 1985-12-24 | Occidental Oil Shale, Inc. | Method for explosively expanding a pillar |
JPH0390796A (en) * | 1989-09-04 | 1991-04-16 | Kajima Corp | Tunnel excavation method |
JPH06323796A (en) * | 1993-05-12 | 1994-11-25 | Asahi Chem Ind Co Ltd | Blasting method |
US6014933A (en) * | 1993-08-18 | 2000-01-18 | Weatherford Us Holding, L.P. A Louisiana Limited Partnership | Downhole charge carrier |
KR960013597B1 (en) * | 1993-12-03 | 1996-10-09 | 백일건업 주식회사 | Tunnel construction method |
KR970007384B1 (en) * | 1994-07-13 | 1997-05-08 | Sunkyong Const Co | Method for excavating a working face |
KR0158532B1 (en) * | 1995-01-16 | 1999-01-15 | 강대우 | Tunnel blasting method with multi-step blasting apparatus |
JPH08270374A (en) * | 1995-03-31 | 1996-10-15 | Hazama Gumi Ltd | Blasting type tunnel construction method |
JPH09113200A (en) * | 1995-10-10 | 1997-05-02 | Yasuji Nakajima | Setting method for explosion by rod-form charge |
JP3229851B2 (en) * | 1997-12-16 | 2001-11-19 | 靖二 中島 | Numerical setting method of elements required for construction of blasting work with rod-shaped charge |
KR19990037866A (en) * | 1999-02-06 | 1999-05-25 | 김철수 | A Constructing Method for Excavating for Tunnel |
KR100294819B1 (en) * | 1999-02-24 | 2002-01-19 | 정희용 | Blast method vibration control of multistage for blast perpendicular hole and tunnel |
KR100358780B1 (en) * | 1999-10-30 | 2002-10-30 | 강대우 | Tunnel Blasting Method for using Air Tube |
-
1999
- 1999-12-31 KR KR1019990067903A patent/KR100323151B1/en not_active IP Right Cessation
-
2000
- 2000-12-28 US US09/750,842 patent/US6431075B2/en not_active Expired - Fee Related
Cited By (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102927863A (en) * | 2011-08-11 | 2013-02-13 | 李立华 | New method for blasting construction of all-rock tunnel |
JP2013092274A (en) * | 2011-10-24 | 2013-05-16 | Kayaku Japan Co Ltd | Control blasting system |
CN102607343A (en) * | 2012-02-27 | 2012-07-25 | 薛世忠 | Tunnel blasting excavation method |
CN102607342A (en) * | 2012-02-27 | 2012-07-25 | 薛世忠 | Blasting method controlling damage of damage rings of tunnel |
CN103063094A (en) * | 2013-02-04 | 2013-04-24 | 山东科技大学 | Channeling method in rapid roadway explosion |
CN103557758A (en) * | 2013-11-01 | 2014-02-05 | 中铁四局集团有限公司 | Expanded excavation area hole inside and outside combined delay subarea differential initiation network in tunnel blasting |
CN103557756A (en) * | 2013-11-01 | 2014-02-05 | 中铁四局集团有限公司 | Advanced pilot tunnel hole-by-hole delay detonation network in tunnel blasting |
RU2554359C1 (en) * | 2014-03-17 | 2015-06-27 | Ибрагим Магомедович Паланкоев | Method of destruction of frozen soil during drill and fire excavation |
CN103940309A (en) * | 2014-03-26 | 2014-07-23 | 南京梅山冶金发展有限公司 | Underground-blasting shaft forming method |
CN103868420A (en) * | 2014-03-31 | 2014-06-18 | 江西稀有金属钨业控股集团有限公司 | Mine gallery driving cut blasting method |
CN104390535A (en) * | 2014-10-11 | 2015-03-04 | 中国矿业大学(北京) | Medium-hard rock deep-hole cut blasting method |
CN104613830A (en) * | 2014-12-18 | 2015-05-13 | 招金矿业股份有限公司夏甸金矿 | One-time-formed smooth blasting method for laneway |
CN104864783A (en) * | 2015-05-21 | 2015-08-26 | 南京梅山冶金发展有限公司 | Underground jack shaft uncovering method |
CN105021096A (en) * | 2015-07-17 | 2015-11-04 | 中铁四局集团第四工程有限公司 | Five-segment-type millisecond electric detonator secondary blasting construction method applied to blasting of high-gas large-section tunnel |
JP2017032162A (en) * | 2015-07-29 | 2017-02-09 | 鹿島建設株式会社 | Blast construction method |
CN107289827A (en) * | 2017-08-11 | 2017-10-24 | 中铁四局集团有限公司 | Double-side wedge cut tunneling blasting method for extra-large section tunnel |
CN108756899A (en) * | 2018-06-11 | 2018-11-06 | 中铁二局第工程有限公司 | A kind of control of large deformation tunnel becomes excavation method |
CN110332861A (en) * | 2019-06-25 | 2019-10-15 | 中铁十二局集团有限公司 | City underground complex environment controls blasting construction method |
CN110595306A (en) * | 2019-09-05 | 2019-12-20 | 中国科学技术大学 | Construction method of efficient blasting pile foundation based on principle that external free surface forms tensile wave superposition boundary region |
CN112709573A (en) * | 2019-10-24 | 2021-04-27 | 西安闪光能源科技有限公司 | Hard coal face rock burst prevention and control method based on controllable shock wave pre-splitting |
CN111043923A (en) * | 2019-12-10 | 2020-04-21 | 中铁隆工程集团有限公司 | Blasting method suitable for adjacent important buildings |
CN111307002A (en) * | 2020-03-25 | 2020-06-19 | 安徽理工大学 | Closed free surface cut blasting method for improving blasting efficiency |
CN111664761A (en) * | 2020-05-08 | 2020-09-15 | 安徽理工大学 | Cut blasting method based on pre-blasting |
CN111964544A (en) * | 2020-07-03 | 2020-11-20 | 中国水利水电第九工程局有限公司 | Blasting construction process for diversion tunnel strong-water-seepage rock plug |
CN112179225A (en) * | 2020-09-27 | 2021-01-05 | 鞍钢集团矿业有限公司 | One-time well-completion blasting method |
CN112254598A (en) * | 2020-10-16 | 2021-01-22 | 重庆大学 | Hard rock large-section trolley tunneling control blasting method |
CN112595192A (en) * | 2021-01-14 | 2021-04-02 | 大冶有色金属有限责任公司 | Variable-diameter cut structure and method for roadway excavation |
CN113465462A (en) * | 2021-05-07 | 2021-10-01 | 北京科技大学 | Mining method for eliminating sublevel caving mining suspended roof without sill pillar |
CN113188391A (en) * | 2021-06-10 | 2021-07-30 | 嵩县金牛有限责任公司 | Blasting method for soft rock roadway tunneling |
CN113865454A (en) * | 2021-10-20 | 2021-12-31 | 长安大学 | Tunnel cut hole mixed detonation method |
CN114018113A (en) * | 2021-11-15 | 2022-02-08 | 中铁三局集团有限公司 | Small-section tunnel blasting hole distribution structure and construction method thereof |
CN114485304A (en) * | 2022-01-06 | 2022-05-13 | 安徽开发矿业有限公司 | Simple light explosion drilling and charging method for medium-hard rock |
CN115420157A (en) * | 2022-03-17 | 2022-12-02 | 中铁三局集团广东建设工程有限公司 | Tunnel section hole distribution structure close to existing shield zone and blasting method |
Also Published As
Publication number | Publication date |
---|---|
KR100323151B1 (en) | 2002-02-06 |
US6431075B2 (en) | 2002-08-13 |
KR20010066304A (en) | 2001-07-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6431075B2 (en) | Center-cut method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split | |
US6532874B2 (en) | Method of blasting bench of rock with improved blasting efficiency and reduced blasting nuisance | |
EP0692611B1 (en) | Method for excavating a working face | |
BR112012026220B1 (en) | METHOD FOR ROCK FRAGMENTATION AND FRACTURING | |
CN102401616A (en) | Blasting excavation method of vertical shaft | |
CN114166082B (en) | Tunnel advanced drilling hole combination accurate control blasting structure and construction process | |
CN113587753A (en) | Axial non-coupling water spaced charging structure and smooth blasting method using same | |
CN110196002B (en) | Safe and efficient blasting construction method for vertical shaft wall beam nest | |
CN112880501B (en) | Flight-limited hole drilling and blasting method for controlling tunnel blasting flyrock | |
CN109900175B (en) | Low-damage blasting method for underground mine roadway tunneling | |
CN109322668A (en) | Kerve method in high-dipping and pole unstable ore body | |
CN112964143B (en) | Three-time blasting method for hollow hole straight-hole cut | |
KR20000038502A (en) | Method of stage advance blasting burn cut | |
KR20030009743A (en) | 2 Double Bench omitted | |
CN111578802A (en) | High-acquisition-degree mine smooth blasting mining method | |
CN110823030A (en) | Method for protecting rear rock mass by large-scale blasting of strip mine | |
KR20000047500A (en) | V-cut blasting method with stage advanced blasting | |
KR100431951B1 (en) | New Deck Charge method for minimizing the overbreak in tunnel blasting | |
CN115493466B (en) | Rapid rock blasting excavation method based on rod jet group | |
CN115468464B (en) | Deep metal mine full-section deep hole blasting method based on accurate time delay of electronic detonator | |
RU2059070C1 (en) | Method for making kerf cavity | |
RU2017960C1 (en) | Method for rock breaking by blasting | |
SU1634784A1 (en) | Method for sealing off mine workings | |
CN113203330B (en) | One-time detonation method for large-section tunnel | |
KR200229396Y1 (en) | Smooth Blasting Tunnels |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AS | Assignment |
Owner name: MOOJIN NEWO TECH, CO., LTD., KOREA, REPUBLIC OF Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SHIM, DONG SOO;LIM, HAN UK;CHO, YOUNG DONG;REEL/FRAME:011426/0865 Effective date: 20001226 Owner name: SHIM, DONG SOO, KOREA, REPUBLIC OF Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SHIM, DONG SOO;LIM, HAN UK;CHO, YOUNG DONG;REEL/FRAME:011426/0865 Effective date: 20001226 |
|
AS | Assignment |
Owner name: MOOJIN NEO TECH. CO., LTD., KOREA, REPUBLIC OF Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SHIM, DONG SOO;LIM, HAN UK;CHO, YOUNG DONG;REEL/FRAME:012679/0970 Effective date: 20001226 Owner name: SHIM, DONG SOO, KOREA, REPUBLIC OF Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNORS:SHIM, DONG SOO;LIM, HAN UK;CHO, YOUNG DONG;REEL/FRAME:012679/0970 Effective date: 20001226 |
|
CC | Certificate of correction | ||
FPAY | Fee payment |
Year of fee payment: 4 |
|
SULP | Surcharge for late payment | ||
REMI | Maintenance fee reminder mailed | ||
LAPS | Lapse for failure to pay maintenance fees | ||
STCH | Information on status: patent discontinuation |
Free format text: PATENT EXPIRED DUE TO NONPAYMENT OF MAINTENANCE FEES UNDER 37 CFR 1.362 |
|
FP | Lapsed due to failure to pay maintenance fee |
Effective date: 20100813 |