CN102401616A - Blasting excavation method of vertical shaft - Google Patents

Blasting excavation method of vertical shaft Download PDF

Info

Publication number
CN102401616A
CN102401616A CN2011103051815A CN201110305181A CN102401616A CN 102401616 A CN102401616 A CN 102401616A CN 2011103051815 A CN2011103051815 A CN 2011103051815A CN 201110305181 A CN201110305181 A CN 201110305181A CN 102401616 A CN102401616 A CN 102401616A
Authority
CN
China
Prior art keywords
big gun
hole
gun hole
cut
blasting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103051815A
Other languages
Chinese (zh)
Inventor
杨仁树
杨国梁
李清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN2011103051815A priority Critical patent/CN102401616A/en
Publication of CN102401616A publication Critical patent/CN102401616A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a blasting excavation method of a vertical shaft. A short delay blasting way for a directed fracture blast hole, a relatively shallow wedged cutting blast hole group, a relatively deep wedged cutting blast hole group, a two-circle hole, a three-circle hole and the like is adopted, and the directed fracture blasting technology and the dual wedged cutting blasting technology are combined, so the vertical shaft with a large fracture surface is blasted at one time, the blasting process is simplified, the damage to a surrounding rock is reduced, the vibration generated during blasting is reduced, the safety is improved, and the method has the prominent advantages of safety, reliability, high efficiency and low cost and is especially suitable for blasting excavation for the vertical shaft having higher requirements on excavation speed and blasting safety.

Description

Vertical explosion driving method
Technical field
The present invention relates to a kind of explosion driving technology, relate in particular to the driving method that is used for the vertical explosion that a kind of directional fracture blasting technology combines with the wedge shot technology.
Background technology
Generally adopt the mode of explosion during vertical shaft excavation, relatively more typical, like the vertical cut of the various permanent or interim vertical of: coal mine shaft lining construction, subway porch etc.These vertical are when the excavation explosion, and the explosion section is big, generally at tens square meter to tens square meters; Single hop detonating charge amount is big, and blasting vibration harm is big, simultaneously; Because the scope of freedom is single during the vertical explosion, even adopt more explosive also to be difficult to obtain higher cyclic advance, the explosive utilization rate is lower.
At present, the blasting method that adopts in the vertical blast working mainly contains two kinds: a kind of is segment blast, promptly in construction, vertical is divided into several sections, carries out blasting in groups.The advantage of blasting in groups is that the single hop of explosive all is reduced with total dose, thereby blasting harm significantly reduces; Simultaneously, owing to adopt segment blast, the explosion rock mass has two scope of freedoms in advance, thereby the explosive utilization rate obtains raising to a certain degree, has guaranteed blasting efficiency.But the shortcoming of existing segment blast is also fairly obvious, wherein, will carry out the working face scarfing cinder after every completion onepull; Advance drill carriage perforating, powder charge then, prepare the next round explosion, thereby; Each cyclic advance will carry out 2~3 scarfing cinders usually, advance rig, has restricted driving speed greatly, the engineering of particularly having relatively high expectations for speed of application; Like the excavation of subway base station, segment blast can't be satisfied construction requirement.Another kind of blasting method is a full face blasting, and the explosion principle of this method is similar with the tunnelling explosion, adopts Cut Blasting to combine with photoface exploision.At first, carry out Cut Blasting, form the vallecular cavity of certain limit after the explosion at the vertical center; Adopt then to postpone detonating technique, around the vallecular cavity that has formed outwards continuous demolition gradually, last; When arriving the vertical periphery, adopt little dose to carry out photoface exploision again, accomplish the vertical blasting process.The tradition full face blasting is technological, has overcome the drawback of segment blast, each circulation primary perforating, and onepull, a scarfing cinder has improved drivage efficiency to a certain extent.But the explosive use amount is bigger when adopting full face blasting, thereby no matter is to the borehole wall or to above ground structure, and the blasting harm of bringing can not be ignored, and also brings no small influence to normal construction.
How to improve existing vertical Technology of Blasting, improve under the prerequisite of construction speed, reduce harm and influence that blasting process brings neighboring buildings, guarantee construction quality, just become the problem that the present invention will solve.
Summary of the invention
In view of the deficiency of above-mentioned prior art, the present invention aims to provide a kind of safe, reliable, efficient, driving method of vertical explosion cheaply.
The present invention realizes through following technical scheme:
A kind of vertical explosion driving method comprises:
A, edge be the directional fracture big gun hole of explosion vertical periphery one circle sealing in advance; V-cut big gun hole at preparatory two groups of different depths of explosion rock mass center arrangement; With V-cut big gun hole is that the center is outwards arranged two circle holes, three circle holes successively ... In the main armament hole, arrange until accomplishing full section big gun hole; The degree of depth in said main armament hole is less than the degree of depth in V-cut big gun hole.
B, employing axial air spaced loading method are put into explosive in the joint-cutting pipe, and the high-precision electronic detonator are inserted in each section powder charge in the joint-cutting pipe, accomplish the making of joint-cutting cartridge bag.
C, technological according to joint-cutting cartridge bag directional fracture blasting is placed into the joint-cutting cartridge bag in the directional fracture big gun hole of preparatory explosion vertical periphery.
D, according to double-wedge Cut Blasting technology and rock behavio(u)r; In V-cut big gun hole and main armament hole, carry out conventional charge; After the clay stemming sealing, according to directional fracture big gun hole-more shallow V-cut big gun hole group-dark circle hole, group-two circle hole-three, V-cut big gun hole-... Firing order, adopt the millisecond delay detonation mode; Accomplish full face blasting, realize the explosion driving of vertical.
Spacing between the said directional fracture big gun hole is 400mm~800mm.
The angle on said V-cut big gun hole and ground is 70~85 degree.
Blast hole depth is 2000mm~3000mm in the group of said more shallow V-cut big gun hole, and blast hole depth is 5000mm~6000mm in the group of dark V-cut big gun hole, and the distance between two groups of V-cut big gun holes is 400mm~600mm.
The degree of depth in said main armament hole is less than the blast hole depth 100mm~300mm in dark V-cut big gun hole.
The width of slit of said joint-cutting pipe is 2mm~6mm, and the joint-cutting bore is identical with the diameter of explosive.
In the said joint-cutting cartridge bag, other high-precision electronic detonator of same section is inserted into respectively in each powder charge section, after the joint-cutting cartridging axially not the coupling charging coefficient be 1~2.
The mode in said joint-cutting cartridge bag filling big gun hole is coupling charging not radially, and radially the coupling charging coefficient is not 1.3~2.6.
Explosive specific charge is 1.00~1.40kg/m in the said V-cut big gun hole 3Said two circle holes, three circle holes ... Deng explosive specific charge in the main armament hole is 0.60~1.20kg/m 3
The upper and lower in the V-cut big gun hole of said two groups of different depths upwards also can be provided with 4-6 auxiliary keyhole, two circle holes, three circle holes ... Be centered around the V-cut big gun hole and the auxiliary keyhole outside in the main armament hole; Firing order be directional fracture big gun hole-more shallow V-cut big gun hole group-dark V-cut big gun hole group-auxiliary circle hole, keyhole-two circle hole-three-... In the main armament hole, auxiliary keyhole is a conventional charge, and explosive specific charge is 0.60~1.20kg/m in the auxiliary keyhole 3
Vertical explosion driving method of the present invention adopts the high-precision electronic detonator, and directional fracture blasting technology and double-wedge Cut Blasting technology are combined, and has realized the onepull of big section vertical.Owing at first adopt directional fracture blasting to form precracking at the vertical periphery, reduced destruction greatly to country rock, precracking plays the effect that reduces blasting vibration simultaneously, has increased security.Double-wedge Cut Blasting The Application of Technology has improved the explosive charge energy utilization ratio, has improved driving speed, has reduced cost.The application of high-precision electronic detonator makes that the maximum dose of single hop is controlled, has further reduced blasting vibration.That driving method according to the invention has is safe, reliable, efficient, outstanding advantage cheaply, is particularly suitable for that the vertical that driving speed and shotfiring safety have higher requirements is carried out explosion and tunnels.
Description of drawings
Fig. 1 is that the method for the invention is arranged sketch map in the overall big gun hole of circular cross section vertical in the explosion tunneling process;
Fig. 2 is that the B-B of Fig. 1 is to cutaway view;
Structural representation when Fig. 3 is joint-cutting cartridge bag filling big gun according to the invention hole;
Fig. 4 is that the A-A of Fig. 3 is to cutaway view.
The specific embodiment
The objective of the invention is vertical is carried out fast, efficient, safe explosion driving, shaft section area shape wherein both can be circular, also can be rectangle or other shape of subway station mining process, did not have any restriction at this.
With the circular shaft section is example:
Step 1 is in the circular directional fracture big gun hole of preparatory explosion vertical periphery one circle.
Blocking-up explosion part and non-explosion stress conduction path are partly mainly played in circular directional fracture big gun hole, to reduce blasting process to the influence of non-explosion part and the vibration of generation.Like Fig. 1, shown in Figure 2, directional fracture big gun hole 3 is scattered in the circle of sealing in this example, and near the periphery of preparatory explosion vertical.Wherein, the spacing in directional fracture big gun hole 3 is 400mm~800mm, and the spacing in directional fracture big gun hole 3 should be by the Protodyakonov coefficient decision of actual rock, and formation hardness is big more, and borehole spacing is more little, but ultimate range should not surpass 800mm, could guarantee the fracture effect like this.
Step 2 is according to V-cut big gun hole technology; V-cut big gun hole at preparatory two groups of different depths of explosion rock mass center arrangement; Promptly more shallow V-cut big gun hole group and dark V-cut big gun hole group, the blast hole depth of dark V-cut big gun hole group be greater than the blast hole depth of more shallow V-cut big gun hole group, and be that main armament holes such as two circle holes and three circle holes are outwards arranged at the center successively with V-cut big gun hole; Form big gun hole crowd with the directional fracture big gun hole of outermost, accomplish full section big gun hole and arrange.
Wherein, for guaranteeing the demolition effect in V-cut big gun hole, like Fig. 1, shown in Figure 2; The distribution number in more shallow V-cut big gun hole 1 and dark V-cut big gun hole 2 is 10 altogether; Between 70~85 degree, rock is hard more usually for the angle on its big gun hole and ground, and angle is more little.And the explosion section is big more, and the distribution number in V-cut big gun hole is also many more.
For further improving the demolition effect in V-cut big gun hole; Bring into play the effect in V-cut big gun hole to greatest extent; Guarantee driving speed; Blast hole depth is made as between 2000mm~3000mm in the group of more shallow V-cut big gun hole, and blast hole depth is made as between 5000mm~6000mm in the group of dark V-cut big gun hole, and the spacing in two groups of V-cut big gun holes is made as between 400mm~600mm.
For making the explosion of main armament hole thorough; Be distributed in the blast hole depth 100mm~300mm of the degree of depth in main armament holes such as two peripheral circle holes 5 of V-cut big gun hole and three circle holes 4 less than dark V-cut big gun hole 2; Like this; The blasting process in main armament hole acts on the top in dark V-cut big gun hole 2, can effectively guarantee blasting efficiency, and explosion is carried out in controlled range.
Certainly, the hardness according to explosion section size and rock also can continue distribute four circle holes, five circle holes or the like outside three circle holes 4, be arranged as standard to realize full section big gun hole.
Step 3 is put into the joint-cutting pipe to explosive, adopts axial air spaced loading method to carry out the axially spaced-apart powder charge, and other high-precision electronic detonator of same section is inserted into respectively in each powder charge section, accomplishes the making of joint-cutting cartridge bag.
Like Fig. 3, shown in Figure 4, usually, the spaced loading in the joint-cutting pipe 10 is the 2-3 section, and powder charge section 8 is two sections in this example, is air section 9 between two sections explosives, after the powder charge axially not the coupling charging coefficient be 1~2, promptly the ratio of coyote hole total length and loaded length is 1~2.And joint-cutting pipe 10 selects for use hard material to process, and like the PVC material, the width of joint-cutting 7 is 2mm~6mm, and the internal diameter of joint-cutting pipe 10 is identical with the diameter of explosive.The high-precision electronic detonator of same levels is inserted into respectively in each powder charge section 8, is used for igniting respectively the explosive of each powder charge section 8.Such structural design and Blasting Control can be brought into play explosive strength more fully, reduce the explosive use amount, reduce the vibration that blasting process produces to greatest extent.
Step 4 is placed into the joint-cutting cartridge bag in the directional fracture big gun hole of preparatory explosion vertical periphery; Simultaneously, according to double-wedge Cut Blasting technology and rock behavio(u)r, in V-cut big gun hole and main armament hole, carry out powder charge by the conventional charge mode respectively; And with after the clay stemming sealing; According to firing order is the millisecond delay detonation mode in directional fracture big gun hole-more shallow V-cut big gun hole group-dark circle hole, group-two circle hole-three, V-cut big gun hole, accomplishes full face blasting, realizes vertical explosion driving.
This process mainly produces according to joint-cutting cartridge bag directional fracture blasting technology and double-wedge Cut Blasting technology.The directional fracture blasting technology is to utilize directional energy to produce the blasting process of expection, controlled blasting developing direction.Double-wedge Cut Blasting technology is to utilize the angle of inclination and the corresponding distribution position relation in big gun hole, and the rock fragment that explosion is produced is discharged by the predetermined direction explosion, forms the explosion of slotting formula.Wherein, explosive specific charge is 1.00~1.40kg/m in two groups of V-cut big gun holes 3, explosive specific charge is 0.60~1.20kg/m in two circle holes and the three circle holes 3
Like Fig. 3, shown in Figure 4, the joint-cutting cartridge bag adopts radially not coupling charging mode when filling big gun hole 11, and radially the coupling charging coefficient is not 1.3~2.6, and promptly the ratio of the diameter in big gun hole 11 and explosive diameter is 1.3~2.6.Tight for guaranteeing to connect airtight between every group of explosive cartridge, also fill up tamping, and guarantee that the shutoff length of clay stemming 6 on the big gun hole 11 is not less than 800mm with clay stemming 6.
Like Fig. 1, shown in Figure 2,, make whole explosion driving under controlled condition, carry out in order owing to adopt the millisecond delay detonating technique; It at first is preparatory quick-fried process near preparatory explosion vertical periphery directional fracture big gun hole 3; Producing the line that breaks in advance, then is the sequence blasting of more shallow V-cut big gun hole group and dark V-cut big gun hole group, makes the section center produce burn cut; Be two circle holes 5 and 4 explosions of three circle holes carried out of from coil to coil from inside to outside at last; Make the section vertical realize the onepull tunneling process, simplified the step of vertical explosion driving greatly, improved drivage efficiency.
Certainly; Above-mentioned is to describe with circular shaft for example; When need carry out the explosion driving to the rectangle vertical; Usually also can 4-6 auxiliary keyhole, two circle holes, three circle holes upwards be set at the upper and lower in the V-cut big gun hole of two groups of different depths ... Be centered around the outside of V-cut big gun hole and auxiliary keyhole in the main armament hole.Auxiliary keyhole plays the effect that enlarges the wedge shape vallecular cavity corresponding to the length direction of rectangle vertical in explosion.Correspondingly firing order then becomes: directional fracture big gun hole-more shallow V-cut big gun hole group-dark V-cut big gun hole group-auxiliary circle hole, keyhole-two circle hole-three-... In the main armament hole.Wherein, the auxiliary keyhole of setting up also is conventional charge, and explosive specific charge is 0.60~1.20kg/m 3Get final product.
The above; Be merely the preferable specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, any technical staff who is familiar with the present technique field is in the technical scope that the present invention discloses; The variation that can expect easily or replacement all should be encompassed within protection scope of the present invention.

Claims (10)

1. vertical explosion driving method is characterized in that concrete steps comprise:
A, edge be the directional fracture big gun hole of explosion vertical periphery one circle sealing in advance; V-cut big gun hole at preparatory two groups of different depths of explosion rock mass center arrangement; With V-cut big gun hole is that the center is outwards arranged two circle holes, three circle holes successively ... In the main armament hole, arrange until accomplishing full section big gun hole; The degree of depth in said main armament hole is less than the degree of depth in V-cut big gun hole;
B, employing axial air spaced loading method are put into explosive in the joint-cutting pipe, and the high-precision electronic detonator are inserted in each section powder charge in the joint-cutting pipe, accomplish the making of joint-cutting cartridge bag;
C, technological according to joint-cutting cartridge bag directional fracture blasting is placed into the joint-cutting cartridge bag in the directional fracture big gun hole of preparatory explosion vertical periphery;
D, according to double-wedge Cut Blasting technology and rock behavio(u)r; In V-cut big gun hole and main armament hole, carry out conventional charge; After the clay stemming sealing, according to directional fracture big gun hole-more shallow V-cut big gun hole group-dark circle hole, group-two circle hole-three, V-cut big gun hole-... Firing order, adopt the millisecond delay detonation mode; Accomplish full face blasting, realize the explosion driving of vertical.
2. vertical explosion driving method according to claim 1 is characterized in that, the spacing between the said directional fracture big gun hole is 400mm~800mm.
3. vertical explosion driving method according to claim 1 is characterized in that, the angle on said V-cut big gun hole and ground is 70~85 degree.
4. vertical explosion driving method according to claim 1; It is characterized in that; Blast hole depth is 2000mm~3000mm in the group of said more shallow V-cut big gun hole; Blast hole depth is 5000mm~6000mm in the group of dark V-cut big gun hole, and the distance between two groups of V-cut big gun holes is 400mm~600mm.
5. vertical explosion driving method according to claim 1 is characterized in that, the degree of depth in said main armament hole is less than the blast hole depth 100mm~300mm in dark V-cut big gun hole.
6. vertical explosion driving method according to claim 1 is characterized in that the width of slit of said joint-cutting pipe is 2mm~6mm, and the joint-cutting bore is identical with the diameter of explosive.
7. vertical explosion driving method according to claim 1 is characterized in that, among the said step B, other high-precision electronic detonator of same section is inserted into respectively in each powder charge section, after the joint-cutting cartridging axially not the coupling charging coefficient be 1~2.
8. vertical explosion driving method according to claim 1 is characterized in that, among the said step C, the mode in joint-cutting cartridge bag filling big gun hole is coupling charging not radially, and radially the coupling charging coefficient is not 1.3~2.6.
9. vertical explosion driving method according to claim 1 is characterized in that, explosive specific charge is 1.00~1.40kg/m in the said V-cut big gun hole 3Said two circle holes, three circle holes ... Deng explosive specific charge in the main armament hole is 0.60~1.20kg/m 3
10. vertical explosion driving method according to claim 1; It is characterized in that; The upper and lower in the V-cut big gun hole of said two groups of different depths upwards also can be provided with 4-6 auxiliary keyhole, two circle holes, three circle holes ... Be centered around the V-cut big gun hole and the auxiliary keyhole outside in the main armament hole; Firing order be directional fracture big gun hole-more shallow V-cut big gun hole group-dark V-cut big gun hole group-auxiliary circle hole, keyhole-two circle hole-three-... In the main armament hole, auxiliary keyhole is a conventional charge, and explosive specific charge is 0.60~1.20kg/m in the auxiliary keyhole 3
CN2011103051815A 2011-10-11 2011-10-11 Blasting excavation method of vertical shaft Pending CN102401616A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103051815A CN102401616A (en) 2011-10-11 2011-10-11 Blasting excavation method of vertical shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103051815A CN102401616A (en) 2011-10-11 2011-10-11 Blasting excavation method of vertical shaft

Publications (1)

Publication Number Publication Date
CN102401616A true CN102401616A (en) 2012-04-04

Family

ID=45884069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103051815A Pending CN102401616A (en) 2011-10-11 2011-10-11 Blasting excavation method of vertical shaft

Country Status (1)

Country Link
CN (1) CN102401616A (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103063094A (en) * 2013-02-04 2013-04-24 山东科技大学 Channeling method in rapid roadway explosion
CN103411491A (en) * 2013-07-31 2013-11-27 中国人民解放军后勤工程学院 Oil-gas pipeline emergency maintenance working pit blasthole layout structure
CN103575172A (en) * 2013-11-21 2014-02-12 安徽理工大学 Novel roadway blasting construction method
CN103758524A (en) * 2013-12-30 2014-04-30 安徽水安建设集团股份有限公司 Stage blasting tunneling vertical shaft construction method
CN104406470A (en) * 2014-10-20 2015-03-11 中国矿业大学(北京) Deep-hole slotting blasting method for large-diameter freezing shaft in west cretaceous system soft rock area
CN104482816A (en) * 2014-12-03 2015-04-01 中国矿业大学(北京) Gradient pre-splitting blasting method and device of lancing cartridges around vertical shaft
CN104806249A (en) * 2015-04-03 2015-07-29 核工业井巷建设公司 Guiding and tunneling construction method of short silo
CN104990471A (en) * 2015-07-22 2015-10-21 中国矿业大学(北京) Extremely short-range blasting construction vibration absorbing method and vibration absorbing and energy gathering lancing cartridge
CN105486181A (en) * 2015-11-19 2016-04-13 中国华冶科工集团有限公司 Vertical shaft deep-hole sectional blasting method
CN105674825A (en) * 2016-02-25 2016-06-15 中铁十八局集团有限公司 Construction method for additionally forming perimeter auxiliary holes in peripheries of perimeter holes of vertical shaft
CN105823546A (en) * 2016-03-22 2016-08-03 中国矿业大学(北京) Large-diameter mine freezing shaft blasting vibration monitoring and damping method and system
CN106285689A (en) * 2016-08-09 2017-01-04 孙丽君 A kind of reinforcing sealing device for ore deposit blast in well to pithead
CN106871752A (en) * 2017-03-08 2017-06-20 淮南矿业(集团)有限责任公司 A kind of multiple V-cut structure and cut shot method
CN107367204A (en) * 2017-07-26 2017-11-21 中国电建集团华东勘测设计研究院有限公司 Gneiss terrains circular reservoir photoface exploision and rock burst substep release method
CN107478524A (en) * 2017-09-21 2017-12-15 武汉科技大学 The experimental provision and its method that simulation oil storage tank responds under Blast Load effect
CN109489510A (en) * 2019-01-04 2019-03-19 河南理工大学 A kind of method of mine shaft recovery project borehole wall fluting explosion
CN110030888A (en) * 2019-04-17 2019-07-19 中国人民解放军军事科学院国防工程研究院 The steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method
CN110671981A (en) * 2019-10-10 2020-01-10 昆明理工大学 Smooth blasting method for vertical shaft tunneling in high stress environment
CN111551086A (en) * 2020-05-06 2020-08-18 安徽理工大学 Vertical hole progressive slotting method based on reinforced fracturing charge and single-face joint-cutting charge

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1560557A (en) * 2004-03-10 2005-01-05 马芹永 Technology method of artificial frozen soil control blasting by deep surface forzen method
CN101261103A (en) * 2008-04-17 2008-09-10 中国矿业大学(北京) Alignment hole strong cutting method
CN101799261A (en) * 2010-03-26 2010-08-11 重庆钢铁(集团)有限责任公司 Hole distributing and blasting method of foundation pit excavation
CN101936690A (en) * 2010-08-30 2011-01-05 中铁十九局集团有限公司 Duplex-type wedge-shaped cut and graded construction technology thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1560557A (en) * 2004-03-10 2005-01-05 马芹永 Technology method of artificial frozen soil control blasting by deep surface forzen method
CN101261103A (en) * 2008-04-17 2008-09-10 中国矿业大学(北京) Alignment hole strong cutting method
CN101799261A (en) * 2010-03-26 2010-08-11 重庆钢铁(集团)有限责任公司 Hole distributing and blasting method of foundation pit excavation
CN101936690A (en) * 2010-08-30 2011-01-05 中铁十九局集团有限公司 Duplex-type wedge-shaped cut and graded construction technology thereof

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103063094A (en) * 2013-02-04 2013-04-24 山东科技大学 Channeling method in rapid roadway explosion
CN103411491A (en) * 2013-07-31 2013-11-27 中国人民解放军后勤工程学院 Oil-gas pipeline emergency maintenance working pit blasthole layout structure
CN103575172A (en) * 2013-11-21 2014-02-12 安徽理工大学 Novel roadway blasting construction method
CN103758524A (en) * 2013-12-30 2014-04-30 安徽水安建设集团股份有限公司 Stage blasting tunneling vertical shaft construction method
CN103758524B (en) * 2013-12-30 2016-06-29 安徽水安建设集团股份有限公司 A kind of segment blast driving shaft construction method
CN104406470B (en) * 2014-10-20 2016-03-09 中国矿业大学(北京) Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method
CN104406470A (en) * 2014-10-20 2015-03-11 中国矿业大学(北京) Deep-hole slotting blasting method for large-diameter freezing shaft in west cretaceous system soft rock area
CN104482816A (en) * 2014-12-03 2015-04-01 中国矿业大学(北京) Gradient pre-splitting blasting method and device of lancing cartridges around vertical shaft
CN104806249A (en) * 2015-04-03 2015-07-29 核工业井巷建设公司 Guiding and tunneling construction method of short silo
CN104806249B (en) * 2015-04-03 2016-05-04 核工业井巷建设公司 A kind of short vertical shaft pilot shaft tunneling construction method
CN104990471A (en) * 2015-07-22 2015-10-21 中国矿业大学(北京) Extremely short-range blasting construction vibration absorbing method and vibration absorbing and energy gathering lancing cartridge
CN105486181A (en) * 2015-11-19 2016-04-13 中国华冶科工集团有限公司 Vertical shaft deep-hole sectional blasting method
CN105674825A (en) * 2016-02-25 2016-06-15 中铁十八局集团有限公司 Construction method for additionally forming perimeter auxiliary holes in peripheries of perimeter holes of vertical shaft
CN105823546A (en) * 2016-03-22 2016-08-03 中国矿业大学(北京) Large-diameter mine freezing shaft blasting vibration monitoring and damping method and system
CN105823546B (en) * 2016-03-22 2018-11-23 中国矿业大学(北京) A kind of major diameter freezes vertical Blast Vibration Monitoring, oscillation damping method and system
CN106285689A (en) * 2016-08-09 2017-01-04 孙丽君 A kind of reinforcing sealing device for ore deposit blast in well to pithead
CN106285689B (en) * 2016-08-09 2018-10-09 重庆川九建设有限责任公司 It is a kind of to be used for reinforcing sealing device of the mine blast in well to pithead
CN108708728A (en) * 2016-08-09 2018-10-26 孙丽君 It is a kind of to be used for reinforcing sealing device of the mine blast in well to pithead
CN108708728B (en) * 2016-08-09 2019-07-19 烟台三新新能源科技有限公司 It is a kind of for mine blast in well to the reinforcing sealing device of pithead
CN106871752A (en) * 2017-03-08 2017-06-20 淮南矿业(集团)有限责任公司 A kind of multiple V-cut structure and cut shot method
CN107367204A (en) * 2017-07-26 2017-11-21 中国电建集团华东勘测设计研究院有限公司 Gneiss terrains circular reservoir photoface exploision and rock burst substep release method
CN107478524A (en) * 2017-09-21 2017-12-15 武汉科技大学 The experimental provision and its method that simulation oil storage tank responds under Blast Load effect
CN109489510A (en) * 2019-01-04 2019-03-19 河南理工大学 A kind of method of mine shaft recovery project borehole wall fluting explosion
CN110030888A (en) * 2019-04-17 2019-07-19 中国人民解放军军事科学院国防工程研究院 The steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method
CN110030888B (en) * 2019-04-17 2021-04-27 中国人民解放军军事科学院国防工程研究院 Blast hole arrangement method for deep hole partition triangular mesh undermining one-time blasting well-forming construction method
CN110671981A (en) * 2019-10-10 2020-01-10 昆明理工大学 Smooth blasting method for vertical shaft tunneling in high stress environment
CN110671981B (en) * 2019-10-10 2021-09-21 昆明理工大学 Smooth blasting method for vertical shaft tunneling in high stress environment
CN111551086A (en) * 2020-05-06 2020-08-18 安徽理工大学 Vertical hole progressive slotting method based on reinforced fracturing charge and single-face joint-cutting charge

Similar Documents

Publication Publication Date Title
CN102401616A (en) Blasting excavation method of vertical shaft
CN103175451B (en) A kind of construction method of tunnel shock-absorbing hole controlled blasting
CN108132006B (en) Anti-clogging quick well formation undercut blast hole arragement construction and its blasting method
CN104482816B (en) A kind of vertical periphery segment algorithm gradient presplit blasting method and device
CN101441055A (en) Presplit blasting method
CN113154974B (en) Tunnel roof pressing smooth blasting method
CN107816353B (en) A kind of excessive drop tomography new method of fully-mechanized mining working
CN104596375A (en) Fully mechanized excavation construction method for rock roadway
CN103306679A (en) '|'-shaped free surface holing one-step well completion technology
CN104406470A (en) Deep-hole slotting blasting method for large-diameter freezing shaft in west cretaceous system soft rock area
CN108362179A (en) A kind of energy saving cut shot method of star
CN111521069A (en) Carbon dioxide phase change directional pressure relief fracturing device for tunneling and use method thereof
CN104180733B (en) Existing buildings hard rock tunnel is descended to mix the comprehensive shock-dampening method of explosion closely
CN105370280B (en) A kind of double-deck thin jade ore deposit nondestructive blasting mining methods of underground low-angle dip
CN112880501B (en) Flight-limited hole drilling and blasting method for controlling tunnel blasting flyrock
CN208171108U (en) A kind of lateral opening shock dropping charge constitution that protection stope two is helped
CN103307941A (en) Method for improving tunneling, channeling and blasting effect of mine roadway
CN112964143B (en) Three-time blasting method for hollow hole straight-hole cut
CN102494575B (en) Efficient filling method for outdoor chamber blasting
CN110030889A (en) A kind of method of deep hole subregion triangulation network slotting shaft formatting by one blasting
CN112945035B (en) Construction method for pre-splitting blasting excavation of middle and lower layers of diversion tunnel
CN110440648A (en) A kind of excavation method excavated based on local section explosion and development machine
CN114413697A (en) Charging device for roadway peripheral hole presplitting blasting
CN114264202A (en) Rock roadway deep hole layered cut blasting method
CN104180732B (en) Existing buildings hard rock tunnel is descended to mix the zoning of explosion closely

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120404