CN110030888A - The steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method - Google Patents

The steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method Download PDF

Info

Publication number
CN110030888A
CN110030888A CN201910306713.3A CN201910306713A CN110030888A CN 110030888 A CN110030888 A CN 110030888A CN 201910306713 A CN201910306713 A CN 201910306713A CN 110030888 A CN110030888 A CN 110030888A
Authority
CN
China
Prior art keywords
rock
slotting
hole
coefficient
avalanche
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910306713.3A
Other languages
Chinese (zh)
Other versions
CN110030888B (en
Inventor
陈胜云
张鏖
吴华杰
苏荣华
田志敏
王雪明
郑磊
王静
李凤玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Academy of Defense Engineering of PLA Academy of Military Science
Original Assignee
National Academy of Defense Engineering of PLA Academy of Military Science
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Academy of Defense Engineering of PLA Academy of Military Science filed Critical National Academy of Defense Engineering of PLA Academy of Military Science
Priority to CN201910306713.3A priority Critical patent/CN110030888B/en
Publication of CN110030888A publication Critical patent/CN110030888A/en
Application granted granted Critical
Publication of CN110030888B publication Critical patent/CN110030888B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting

Abstract

A kind of steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method, the present invention is arranged by the way that slotting is crushed hole with the arrangement mode of equilateral triangle, then emptying aperture etc. is set in the centroid of triangle, effectively avoid Sidewall Surrounding Rock by the destruction of multiple blast disturbance, it allows quick-fried slag to stay in after quick-fried and does temporary support in well, prevent Sidewall Surrounding Rock from loosening and collapsing;Prevented also from Sidewall Surrounding Rock stress release excessively, pine is swollen and collapse, the problem at Cut Blasting in well technology is excavated in effective solution underground shaft onepull, and the present invention has the characteristics that easy to operate, demolition effect is good, is suitble to large-scale promotion and application.

Description

The steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method
Technical field
The present invention relates to a kind of method for arranging of blasthole, and in particular to a kind of deep hole subregion triangulation network slotting onepull at The steel for shot method of well engineering method.
Background technique
Known, there are mainly two types of methods, i.e. downlink construction method, uplink construction method for traditional Construction Technique of Shaft.Wherein Downlink construction method, i.e. drilling from top to bottom explosion, discharge fume, get rid of the danger, slagging tap, modifying, supporting, measurement etc., so repeatedly follow repeatedly Ring, stage excavation gradually downward, until digging through well.With this construction method, because of underground work faciostenosis, divulges information and be stranded Difficult, lifting is frequently, operating condition is severe, work efficiency is low, and when meeting falling object or plate indicates nature of danger, underground operators are nowhere hidden, Therefore the excavating shaft in fragmented rock body, belong to one of large labor intensity, the operation of safe Customers ' Legal Right.Since Sidewall Surrounding Rock clamps down on item Part is determined that the explosion of the driving explosive payload of downlink construction method disturbs than more serious, in the feelings that rock is more broken rock convergence measure Under condition, so that the borehole wall often occurs backbreaking or collapsing phenomenon, many difficulties are brought to subsequent construction.In addition, in circulation driving Blast disturbance is repeated, the cumulative effect of neighbouring tunnel country rock also can not be ignored, it is further that it can lead to the rock mass being crushed It loosens, the tunnel lining system structure already under the effect of country rock complex stress is made to make the matter worse.The brill of this construction method Quick-fried operation, the also restriction by the supporting age of concrete in last circulation, cause construction period to lengthen, it is difficult to meet Construction of Silo Progress demand.
The traditional excavation method of another kind of vertical shaft is uplink construction method, it be by cage or job platform from bottom to top Carry out tunneling construction.This construction method, it all has in addition to not slagging tap in well manually, the shortcomings that downlink construction method, and Risk is bigger.
Underground shaft construction has excavation difficulty high, security risk big, long construction period, production cost height etc. are a series of to ask Topic, problem above directly affect national project construction, also perplex unit in charge of construction always.Therefore, how a kind of deep hole subregion is provided The engineering method of triangulation network slotting shaft formatting by one blasting is just particularly important, and in deep hole subregion triangulation network slotting shaft formatting by one blasting Steel for shot method is key therein in engineering method, then how to provide a kind of deep hole subregion triangulation network slotting shaft formatting by one blasting The steel for shot method of engineering method is similarly important.
Summary of the invention
To overcome deficiency present in background technique, the present invention provides a kind of deep hole subregion triangulation network slotting onepulls At the steel for shot method of well engineering method, the present invention is arranged by the way that slotting is crushed hole with the arrangement mode of equilateral triangle, then Emptying aperture etc. is set in the centroid of triangle, effectively avoids Sidewall Surrounding Rock by the destruction of multiple blast disturbance, allows quick-fried slag after quick-fried It stays in and does temporary support in well, prevent Sidewall Surrounding Rock from loosening and collapsing;It is excessive prevented also from Sidewall Surrounding Rock stress release, loose swollen With collapsing, the problem at Cut Blasting in well technology is excavated in effective solution underground shaft onepull.
To realize that goal of the invention as described above, the present invention use technical solution as described below:
A kind of steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method, the steel for shot method Specifically comprise the following steps:
The first step, slotting crush hole and emptying aperture arrangement:
The center of vertical shaft selected first is slotting disintegrating area, and slotting is crushed hole and arranged with the arrangement mode of equilateral triangle, Emptying aperture is set in the position of form center of equilateral triangle, slotting crushes hole and emptying aperture cooperates, after slotting crushes hole detonation, in slotting powder Broken area forms a circular cavity contour with vertical shaft, provides the scope of freedom for the explosion that avalanche is crushed hole and quick-fried slag accommodates sky Between;
Second step, avalanche are crushed hole arrangement:
It takes the next step, it is avalanche fracture area that shaft excavation edge line is arrived except slotting disintegrating area, and avalanche is arranged in avalanche fracture area Broken hole, avalanche are crushed hole centered on central disintegrating area, form circumferentially be arranged in the outline excavation sideline of vertical shaft with by Slotting crushes between the triangle web area of hole composition, and avalanche is crushed hole and is crushed the progress avalanche of avalanche fracture area rock;
Third step, pre- ceasma arrangement:
It takes the next step, pre- ceasma is arranged on the outline excavation sideline of vertical shaft, linear along outline excavation after pre- ceasma detonation At precracking, excavation area rock mass in vertical shaft contour line is separated with the rock mass outside contour line.
The steel for shot method of the deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method, the slotting disintegrating area Diameter be 75mm~250mm, wherein it is preferred that 80mm~150mm.
The steel for shot method of the deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method, the slotting crush hole The arrangement spacing that two adjacent slottings crush hole when the arrangement mode of equilateral triangle arrangement is divided into a manner of the following two kinds:
A, under coupling charging blasting condition, adjacent triangulation network keyhole arranges distance computation formula are as follows:
In formula:
ψE is broken--- pitch of holes correction factor takes 1.45;
The speed of D --- detonation wave, m/s;
ρ0--- the density under explosive original state, kg/m3;
ρm--- the density of rock, kg/m3;
Cm--- the velocity of sound in rock, m/s;
rb--- blasthole radius, m;
A——
B --- it is lateral stress coefficient,
μd--- the dynamical possion ratio of rock, it is believed that μd=0.8 μ, μ are the quiet Poisson's ratio of rock;
α --- it is loading propagation damped expoential,μdFor the dynamical possion ratio of rock;
σcd--- rock dynamic compression strength, MPa;Dynamic compression strength σcd=8 σc
B, under Uncoincided charge blasting condition, adjacent triangulation network keyhole arranges distance computation formula are as follows:
In formula:
ψE is broken--- pitch of holes correction factor takes 1.45;
The radial not coefficient of coup of κ --- column charge;
η --- column charge axial direction coefficient of charge
Pressure enhancement coefficient when n --- detonation product hits blasthole palisades, generally takes n=10;
The speed of D --- detonation wave, m/s;
ρ0--- the density under explosive original state, kg/m3;
rb--- blasthole radius, m;
A——
B --- it is lateral stress coefficient,
μd--- the dynamical possion ratio of rock, it is believed that μd=0.8 μ, μ are the quiet Poisson's ratio of rock;
α --- it is loading propagation damped expoential,μdFor the dynamical possion ratio of rock;
σcd--- rock dynamic compression strength, MPa;Dynamic compression strength σcd=8 σc
It is 1.2~1.6 that wherein slotting, which crushes the radial not coefficient of coup κ of hole column charge, and axial coefficient of charge η is 1.
The steel for shot method of the deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method, the pre- ceasma arrangement The calculation formula of two adjacent presplitting pitchs of holes when on the outline excavation sideline of vertical shaft are as follows:
In formula:
ψE is split--- pitch of holes correction factor takes 1.45;
ψE folding--- pitch of holes reduction coefficient takes 0.85;
The speed of D --- detonation wave, m/s;
ρ0--- the density under explosive original state, kg/m3;
rb--- blasthole radius, m;
The radial not coefficient of coup of κ --- column charge;
η --- column charge axial direction coefficient of charge;
Pressure enhancement coefficient when n --- detonation product hits blasthole palisades, generally takes n=10;
σtd--- Rock Under Uniaxial Compression moves tensile strength, MPa;
α --- Dynamic load of nuclear blast propagation attenuation index load in rock
A——
B --- it is lateral stress coefficient,
μd--- the dynamical possion ratio of rock, it is believed that μd=0.8 μ, μ are the quiet Poisson's ratio of rock;
Wherein column charge radial not coefficient of coup κ in presplitting hole is 1.8~3.0, and axial coefficient of charge η is 0.8~1.
The steel for shot method of the deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method, the pre- ceasma it is straight Diameter is 50mm~210mm.
The steel for shot method of the deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method, the arrangement avalanche are broken Two adjacent avalanches are crushed pitch of holes calculation formula when broken hole are as follows:
In formula:
γ --- spacing regulation coefficient is arranged for pack, takes 0.8.
Q --- explosive payload, kg;
H --- shaft height, m;
K --- the explosive consumption of unit volume rock, kg/m3
W --- minimum burden, kg/m3
The steel for shot method of the deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method, the breaking hole it is straight Diameter is 75~250mm.
Using technical solution as described above, the present invention has superiority as described below:
The present invention is arranged by the way that slotting is crushed hole with the arrangement mode of equilateral triangle, then in the centroid of triangle Emptying aperture etc. is set, effectively avoids Sidewall Surrounding Rock by the destruction of multiple blast disturbance, allows quick-fried slag to stay in well after quick-fried and do interim branch Support body prevents Sidewall Surrounding Rock from loosening and collapsing;, loose swollen and collapsing excessive prevented also from Sidewall Surrounding Rock stress release, effective solution The problem at Cut Blasting in well technology is excavated in underground shaft of having determined onepull, and the present invention has easy to operate, demolition effect Good feature, is suitble to large-scale promotion and application.
Detailed description of the invention
Fig. 1 is the schematic diagram of steel for shot of the present invention;
Fig. 2 is the schematic diagram that slotting crushes hole and emptying aperture triangle network arrangements in the present invention;
Fig. 3 is another schematic diagram that slotting crushes hole and emptying aperture triangle network arrangements in the present invention;
Specific embodiment
The present invention can be explained in more detail by the following examples, the invention is not limited to the following examples;
A kind of steel for shot side of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method in conjunction with described in attached drawing 1~3 Method, the steel for shot method specifically comprise the following steps:
The first step, slotting crush hole and emptying aperture arrangement:
The center of vertical shaft selected first is slotting disintegrating area, and slotting is crushed hole and arranged with the arrangement mode of equilateral triangle, Serve and crush slotting, emptying aperture is set in the position of form center of equilateral triangle, it is specific as shown in Figure 1, slotting crushes hole and emptying aperture Cooperation after slotting crushes hole detonation, forms a circular cavity contour with vertical shaft in slotting disintegrating area, is crushed hole for avalanche Explosion the scope of freedom and quick-fried slag accommodation space are provided;
Wherein the diameter of the slotting disintegrating area is 75mm~250mm, wherein it is preferred that 80mm~150mm;
By having obtained adjacent to C-J detonation theory, rock impact wave, stress wave propagation theory and Mises criterion research Explosion forms the rule between continuous pulverized zone and blasthole spacing, blast hole projectile filling under the conditions of deep hole column charge, proposes without limit The maximum blasthole distance equation of continuous curshed zone is formed in rock under the conditions of adjacent deep hole coupling charging and non-coupled column charge, Solves the key technical problem that the slotting in novel construction method shaft excavation crushes hole explosive payload and arrangement, the slotting crushes The hole arrangement spacing that two adjacent slottings crush hole when the arrangement mode of equilateral triangle arrangement is divided into a manner of the following two kinds:
A, under coupling charging blasting condition, adjacent triangulation network keyhole arranges distance computation formula are as follows:
In formula:
ψE is broken--- pitch of holes correction factor takes 1.45;
The speed of D --- detonation wave, m/s;
ρ0--- the density under explosive original state, kg/m3;
ρm--- the density of rock, kg/m3;
Cm--- the velocity of sound in rock, m/s;
rb--- blasthole radius, m;
A——
B --- it is lateral stress coefficient,
μd--- the dynamical possion ratio of rock, it is believed that μd=0.8 μ, μ are the quiet Poisson's ratio of rock;
α --- it is loading propagation damped expoential,μdFor the dynamical possion ratio of rock;
σcd--- rock dynamic compression strength, MPa;Dynamic compression strength σcd=8 σc
B, under Uncoincided charge blasting condition, adjacent triangulation network keyhole arranges distance computation formula are as follows:
In formula:
ψE is broken--- pitch of holes correction factor takes 1.45;
The radial not coefficient of coup of κ --- column charge;
η --- column charge axial direction coefficient of charge
Pressure enhancement coefficient when n --- detonation product hits blasthole palisades, generally takes n=10;
The speed of D --- detonation wave, m/s;
ρ0--- the density under explosive original state, kg/m3;
rb--- blasthole radius, m;
A——
B --- it is lateral stress coefficient,
μd--- the dynamical possion ratio of rock, it is believed that μd=0.8 μ, μ are the quiet Poisson's ratio of rock;
α --- it is loading propagation damped expoential,μdFor the dynamical possion ratio of rock;
σcd--- rock dynamic compression strength, MPa;Dynamic compression strength σcd=8 σc
Slotting crushes the radial not coefficient of coup K of hole column charge and is generally 1.2~1.6 or so, rock higher for intensity Layer, should not take large values.Axial coefficient of charge η, which is generally taken as 1, to be advisable, i.e., axial is coupling charging.
There are two the effects of emptying aperture: first is that crushing the rock slag under the explosion of hole for slotting provides compensation space, second is that being slotting The explosion for crushing hole provides the scope of freedom.
For the rock blasting on no scope of freedom, explosion space is restrained, and the rock mass that explosion destroys is compressed in limited To form rock again in space, by quick-fried rock mass, once secondary diagenesis, expression explosion fail.Avoiding the key of secondary diagenesis is In blasting process enough expansion spaces can be provided for the broken of rock.
Ensure that minimum compensation space necessary to avoiding secondary diagenesis is that the broken swelling volume of rock blasting subtracts rock Volume when stone is unbroken.Wherein determine that the broken swelling volume of rock blasting is relatively difficult, because rock blasting is broken Swelling volume after broken is not the quick-fried loose volume fallen after simple catalase, though and it is obtained after referring to catalase The volume for expanding but centainly being squeezed, on the one hand it is freely loose, another aspect that this extruding force ensures fractured rock not Ensure that fractured rock can be thrown out under the effect of this extruding force by detonation gas again.In conjunction with the engineering experience of many years, and After live test of many times, the broken swelling volume V of rock blasting is determinedIt is brokenSize are as follows:
VIt is brokenIt is swollen·VSystem
γ in formulaIt is swollenIt is higher for rock strength and contain between generally 1.18~1.21 for the coefficient that swells of fractured rock The few rock of colloidal materials, using low value;It is lower for rock strength and containing the rock more than colloidal materials, using high level.
Second step, avalanche are crushed hole arrangement:
It takes the next step, it is avalanche fracture area that shaft excavation edge line is arrived except slotting disintegrating area, and avalanche is arranged in avalanche fracture area Broken hole, avalanche are crushed hole centered on central disintegrating area, form circumferentially be arranged in the outline excavation sideline of vertical shaft with by Slotting crushes between the triangle web area of hole composition, and avalanche is crushed hole and is crushed the progress avalanche of avalanche fracture area rock;
Avalanche is crushed hole effect: rock progress avalanche in avalanche fracture area is crushed.Avalanche is crushed hole around crushing slotting area It is arranged with ring shape, is crushed breaking hole by the sequence from inner lane to outer ring, from coil to coil explosion, until entire vertical shaft explosion finishes,
By showing that avalanche is crushed between hole explosive payload, arrangement spacing and avalanche rock mass to livingston theoretical research Rule proposes avalanche and is crushed hole explosive payload, arrangement distance computation formula, and the avalanche solved in novel construction method shaft excavation is broken.
Two adjacent avalanches are crushed pitch of holes calculation formula when the arrangement avalanche is crushed hole are as follows:
In formula:
γ --- spacing regulation coefficient is arranged for pack, takes 0.8.
Q --- explosive payload, kg;
H --- shaft height, m;
K --- the explosive consumption of unit volume rock, kg/m3
W --- minimum burden, kg/m3
Engineering practice shows that avalanche is crushed the arrangement in hole using the arrangement of " small array pitch, big pitch-row ", is more advantageous to rock Stone is crushed.The close coefficient (spacing of blasthole and the ratio of minimum burden) of blasthole is generally between 1.0~2.0, intensively Explosion of the coefficient greater than 2.0 is broad-ovate leaf.It is to weaken pinpoint blasting funnel, the opening of funnel that avalanche, which is crushed hole explosive funnel, Angle θ < 900.In practical projects, vertex angle theta, which is arranged as 550~900, is advisable.Avalanche is crushed the spacing in hole and circle remote is mutually to close Connection, in Practical Project practice, the determination that avalanche is crushed the spacing and circle remote in hole is a mutually coordinated result.
Avalanche is crushed hole and is arranged between disintegrating area and presplitting boundary in the form of concentric circles, and neighboring concentric circle spacing claims Circle remote.It is minimum burden W that avalanche, which is crushed hole circle remote,.First lap avalanche is crushed hole and closes on slotting disintegrating area, so the circle remote Set it is less than normal, so as to slotting chamber carry out regular and further expansion.
The diameter of breaking hole generally takes 75~250mm.Generally the same diameter in hole is crushed with slotting.
The explosive payload Q of breaking hole determines that explosive payload is small compared with the dose that slotting crushes hole according to avalanche fragmented rock, so Uncoincided charge is generally used, the coefficient of coup is not determined according to actual dose.
Third step, pre- ceasma arrangement:
It takes the next step, pre- ceasma is arranged on the outline excavation sideline of vertical shaft, linear along outline excavation after pre- ceasma detonation At precracking, excavation area rock mass in vertical shaft contour line is separated with the rock mass outside contour line;
The effect of pre- ceasma is: after pre- ceasma detonation, forming precracking along excavation contour line, will open in vertical shaft contour line Area's rock mass is dug to separate with the rock mass outside contour line.
By having obtained adjacent to C-J detonation theory, rock impact wave, stress wave propagation theory and Mises criterion research Explosion forms the rule between perforation fissure zone and blasthole spacing, blast hole projectile filling under the conditions of deep hole column charge, and it is unlimited to propose The maximum blasthole distance equation for forming perforation fissure zone in rock under the conditions of the adjacent non-coupled column charge of deep hole, solves new work The key technical problem of pre- ceasma explosive payload and arrangement spacing in method shaft excavation.
The calculation formula of two adjacent presplitting pitchs of holes when the pre- ceasma is arranged on the outline excavation sideline of vertical shaft are as follows:
In formula:
ψE is split--- pitch of holes correction factor takes 1.45;
ψE folding--- pitch of holes reduction coefficient takes 0.85;
The speed of D --- detonation wave, m/s;
ρ0--- the density under explosive original state, kg/m3;
rb--- blasthole radius, m;
The radial not coefficient of coup of κ --- column charge;
η --- column charge axial direction coefficient of charge;
Pressure enhancement coefficient when n --- detonation product hits blasthole palisades, generally takes n=10;
σtd--- Rock Under Uniaxial Compression moves tensile strength, MPa;
α --- Dynamic load of nuclear blast propagation attenuation index load in rock
A——
B --- it is lateral stress coefficient,
μd--- the dynamical possion ratio of rock, it is believed that μd=0.8 μ, μ are the quiet Poisson's ratio of rock;
Wherein [σtd] be rock dynamic ultimate tensile strength, dynamic stress effect under, the dynamic ultimate tensile strength of rock with Quiet ultimate tensile strength less, can use same value compared to variation.
Column charge radial not coefficient of coup κ in presplitting hole is generally 1.8~3.0 or so, rock stratum higher for intensity, no Preferably take large values.Axial coefficient of charge η, which is generally taken as 0.8~1, to be advisable.
The diameter of pre- ceasma generally takes 50mm~210mm, if requiring height to explosion surface smoothness, bore diameter should be selected With 50~120mm.
In the specific implementation, slotting disintegrating area is arranged in the center of quasi- excavating shaft to the present invention, as shown in Figure 1.Through multiple Experiment shows that the diameter of slotting disintegrating area is the 3/20~5/20 more appropriate of excavating shaft diameter, and vertical shaft diameter is greater than 8.5 meters It can get the small value, can take large values less than 8.5 meters.The external circle diameter of the triangulation network acts on lower nothing plus independent deep hole column blasting Limiting rock and crushing the sum of diameter of circle just is the diameter of slotting disintegrating area.
Further, traditional cutting method is all based on pinpoint blasting funnel theory, and what is formed after slotting of exploding draws The cavity of slot is conical hopper, and the slotting of this form is shallow bore hole slotting, and the depth of shallow blasthole is generally less than 2m, Cut Blasting When working face be the scope of freedom carry out throwing, but this cutting method be unsuitable for underground shaft shaft formatting by one blasting construction skill Art.In the construction of underground shaft shaft formatting by one blasting, blasthole is deep hole, generally as deep as more than 20 meters or more, certainly without explosion By face, being using traditional cutting method progress slotting cannot be successful, even if loading onto a large amount of explosive by force carries out explosion, most The much bigger hollow place of excavating shaft of comparing that can be only formed one afterwards, can not achieve the intention of shaft excavation.
Underground shaft shaft formatting by one blasting requires the slotting cavity formed after Cut Blasting to be necessary for the circle contour with vertical shaft Cylindricality can be only achieved the purpose of slotting in this way.Based on this purpose, the invention proposes the new cutting methods of triangulation network slotting. Triangulation network cutting method are as follows: in slotting disintegrating area, slotting is crushed hole and arranged that emptying aperture is arranged in the form of equilateral triangle net The position of form center of side triangle, arrangement form are as shown in Figure 1 and Figure 2.If it is larger to crush slotting area, the extension of the triangulation network can be used Mode arranges, as shown in Figure 3.Slotting crush hole effect be by the rock blasting in slotting disintegrating area and crushing, it is smashed Rock slag is spilled under the action of gravity and detonation gas, forms a slotting cavity;Emptying aperture not blasting charge, there are two effects: First is that crushing the rock slag under the explosion of hole for slotting provides compensation space, second is that providing the scope of freedom for the explosion that slotting crushes hole.
The present invention has the advantage that
Project research and innovation achievement is as follows:
1, it is studied by the theoretical, cutting method to traditional slotting, proposes deep hole and crush the thinking of slotting, and mention for the first time The new cutting method of triangulation network burn cut is gone out, has solved underground shaft onepull and excavate into Cut Blasting in well technology Problem.
2, by having obtained phase to C-J detonation theory, rock impact wave, stress wave propagation theory and Mises criterion research Explosion forms the rule between continuous pulverized zone and blasthole spacing, blast hole projectile filling under the conditions of adjacent deep hole column charge, proposes nothing The maximum blasthole spacing for forming continuous curshed zone in limit rock under the conditions of adjacent deep hole coupling charging and non-coupled column charge is public Formula solves the key technical problem that the slotting in novel construction method shaft excavation crushes hole explosive payload and arrangement.
3, by having obtained phase to C-J detonation theory, rock impact wave, stress wave propagation theory and Mises criterion research Explosion forms the rule between perforation fissure zone and blasthole spacing, blast hole projectile filling under the conditions of adjacent deep hole column charge, proposes nothing The maximum blasthole distance equation for forming perforation fissure zone in rock under the conditions of the adjacent non-coupled column charge of deep hole is limited, is solved new The key technical problem of pre- ceasma explosive payload and arrangement spacing in engineering method shaft excavation.
4, by showing that avalanche is crushed between hole explosive payload, arrangement spacing and avalanche rock mass to livingston theoretical research Rule, propose avalanche and be crushed hole explosive payload, arrangement distance computation formula, it is broken to solve avalanche in novel construction method shaft excavation The key technical problem of hole arrangement.
Part not in the detailed description of the invention is the prior art.
The embodiment selected herein to disclose goal of the invention of the invention, is presently considered to be suitable, still, It is to be understood that the present invention is intended to include all changes and improvement that all belong to the embodiment in this design and invention scope.

Claims (7)

1. the steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method, it is characterized in that: the steel for shot Method specifically comprises the following steps:
The first step, slotting crush hole and emptying aperture arrangement:
The center of vertical shaft selected first is slotting disintegrating area, and slotting is crushed hole and arranged with the arrangement mode of equilateral triangle, waited Emptying aperture is arranged in the position of form center of side triangle, and slotting crushes hole and emptying aperture cooperates, after slotting crushes hole detonation, in slotting disintegrating area A circular cavity contour with vertical shaft is formed, the explosion for being crushed hole for avalanche provides the scope of freedom and quick-fried slag accommodation space;
Second step, avalanche are crushed hole arrangement:
It takes the next step, it is avalanche fracture area that shaft excavation edge line is arrived except slotting disintegrating area, and avalanche fracture area arranges that avalanche is broken Hole, avalanche are crushed hole centered on central disintegrating area, and form circumferentially is arranged in the outline excavation sideline of vertical shaft and by slotting Between the triangle web area for crushing hole composition, avalanche is crushed hole and is crushed the progress avalanche of avalanche fracture area rock;
Third step, pre- ceasma arrangement:
It takes the next step, pre- ceasma is arranged on the outline excavation sideline of vertical shaft, after pre- ceasma detonation, is formed along excavation contour line pre- Crack separates excavation area rock mass in vertical shaft contour line with the rock mass outside contour line.
2. the steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method according to claim 1, Be characterized in: the diameter of the slotting disintegrating area is 75mm~250mm, wherein it is preferred that 80mm~150mm.
3. the steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method according to claim 1, Be characterized in: two adjacent slottings crush the arrangement spacing point in hole when the arrangement mode arrangement that the slotting crushes hole with equilateral triangle For the following two kinds mode:
A, under coupling charging blasting condition, adjacent triangulation network keyhole arranges distance computation formula are as follows:
In formula:
ψE is broken--- pitch of holes correction factor takes 1.45;
The speed of D --- detonation wave, m/s;
ρ0--- the density under explosive original state, kg/m3;
ρm--- the density of rock, kg/m3;
Cm--- the velocity of sound in rock, m/s;
rb--- blasthole radius, m;
A——
B --- it is lateral stress coefficient,
μd--- the dynamical possion ratio of rock, it is believed that μd=0.8 μ, μ are the quiet Poisson's ratio of rock;
α --- it is loading propagation damped expoential,μdFor the dynamical possion ratio of rock;
σcd--- rock dynamic compression strength, MPa;Dynamic compression strength σcd=8 σc
B, under Uncoincided charge blasting condition, adjacent triangulation network keyhole arranges distance computation formula are as follows:
In formula:
ψE is broken--- pitch of holes correction factor takes 1.45;
The radial not coefficient of coup of κ --- column charge;
η --- column charge axial direction coefficient of charge
Pressure enhancement coefficient when n --- detonation product hits blasthole palisades, generally takes n=10;
The speed of D --- detonation wave, m/s;
ρ0--- the density under explosive original state, kg/m3;
rb--- blasthole radius, m;
A——
B --- it is lateral stress coefficient,
μd--- the dynamical possion ratio of rock, it is believed that μd=0.8 μ, μ are the quiet Poisson's ratio of rock;
α --- it is loading propagation damped expoential,μdFor the dynamical possion ratio of rock;
σcd--- rock dynamic compression strength, MPa;Dynamic compression strength σcd=8 σc
It is 1.2~1.6 that wherein slotting, which crushes the radial not coefficient of coup κ of hole column charge, and axial coefficient of charge η is 1.
4. the steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method according to claim 1, It is characterized in: the calculation formula of two adjacent presplitting pitchs of holes when the pre- ceasma is arranged on the outline excavation sideline of vertical shaft are as follows:
In formula:
ψE is split--- pitch of holes correction factor takes 1.45;
ψE folding--- pitch of holes reduction coefficient takes 0.85;
The speed of D --- detonation wave, m/s;
ρ0--- the density under explosive original state, kg/m3;
rb--- blasthole radius, m;
The radial not coefficient of coup of κ --- column charge;
η --- column charge axial direction coefficient of charge;
Pressure enhancement coefficient when n --- detonation product hits blasthole palisades, generally takes n=10;
σtd--- Rock Under Uniaxial Compression moves tensile strength, MPa;
α --- Dynamic load of nuclear blast propagation attenuation index load in rock
A——
B --- it is lateral stress coefficient,
μd--- the dynamical possion ratio of rock, it is believed that μd=0.8 μ, μ are the quiet Poisson's ratio of rock;
Wherein column charge radial not coefficient of coup κ in presplitting hole is 1.8~3.0, and axial coefficient of charge η is 0.8~1.
5. the steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method according to claim 1, Be characterized in: the diameter of the pre- ceasma is 50mm~210mm.
6. the steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method according to claim 1, Be characterized in: two adjacent avalanches are crushed pitch of holes calculation formula when the arrangement avalanche is crushed hole are as follows:
In formula:
γ --- spacing regulation coefficient is arranged for pack, takes 0.8.
Q --- explosive payload, kg;
H --- shaft height, m;
K --- the explosive consumption of unit volume rock, kg/m3
W --- minimum burden, kg/m3
7. the steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method according to claim 1, Be characterized in: the diameter of the breaking hole is 75~250mm.
CN201910306713.3A 2019-04-17 2019-04-17 Blast hole arrangement method for deep hole partition triangular mesh undermining one-time blasting well-forming construction method Active CN110030888B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910306713.3A CN110030888B (en) 2019-04-17 2019-04-17 Blast hole arrangement method for deep hole partition triangular mesh undermining one-time blasting well-forming construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910306713.3A CN110030888B (en) 2019-04-17 2019-04-17 Blast hole arrangement method for deep hole partition triangular mesh undermining one-time blasting well-forming construction method

Publications (2)

Publication Number Publication Date
CN110030888A true CN110030888A (en) 2019-07-19
CN110030888B CN110030888B (en) 2021-04-27

Family

ID=67238756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910306713.3A Active CN110030888B (en) 2019-04-17 2019-04-17 Blast hole arrangement method for deep hole partition triangular mesh undermining one-time blasting well-forming construction method

Country Status (1)

Country Link
CN (1) CN110030888B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110514079A (en) * 2019-09-11 2019-11-29 中交路桥建设有限公司 A kind of right angled triangle presplit cut method
CN112880503A (en) * 2021-03-29 2021-06-01 云南迪庆有色金属有限责任公司 Blind raise hole-by-hole micro-differential blasting one-time well-forming blast hole arrangement structure and method
CN113686215A (en) * 2021-09-09 2021-11-23 昆明理工大学 Rock roadway large-diameter double-hole charging accurate time-delay hole-by-hole vertical cut blasting method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2271513C2 (en) * 2003-11-28 2006-03-10 Открытое акционерное общество "Приаргунское производственное горно-химическое объединение" Method for driving of raises with rock breaking by deep-hole charges
CN101338999A (en) * 2008-08-26 2009-01-07 中国科学院武汉岩土力学研究所 Method for blasting seepage enhancement for low infiltration sandrock -type uranium deposit
CN102401616A (en) * 2011-10-11 2012-04-04 中国矿业大学(北京) Blasting excavation method of vertical shaft
KR20120034328A (en) * 2010-10-01 2012-04-12 흥도이엔지 주식회사 Blast method for center hole of tunnel
KR101286128B1 (en) * 2011-12-14 2013-07-15 (주)성풍건설 Method for reaming vertical tunnel
CN104989405A (en) * 2015-06-12 2015-10-21 北京科技大学 Large-dip-angle coal mining rock burst orientation prevention method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2271513C2 (en) * 2003-11-28 2006-03-10 Открытое акционерное общество "Приаргунское производственное горно-химическое объединение" Method for driving of raises with rock breaking by deep-hole charges
CN101338999A (en) * 2008-08-26 2009-01-07 中国科学院武汉岩土力学研究所 Method for blasting seepage enhancement for low infiltration sandrock -type uranium deposit
KR20120034328A (en) * 2010-10-01 2012-04-12 흥도이엔지 주식회사 Blast method for center hole of tunnel
CN102401616A (en) * 2011-10-11 2012-04-04 中国矿业大学(北京) Blasting excavation method of vertical shaft
KR101286128B1 (en) * 2011-12-14 2013-07-15 (주)성풍건설 Method for reaming vertical tunnel
CN104989405A (en) * 2015-06-12 2015-10-21 北京科技大学 Large-dip-angle coal mining rock burst orientation prevention method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈胜云 等: "深孔一次爆破成井技术研究及应用", 《矿业研究与开发》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110514079A (en) * 2019-09-11 2019-11-29 中交路桥建设有限公司 A kind of right angled triangle presplit cut method
CN110514079B (en) * 2019-09-11 2021-09-14 中交路桥建设有限公司 Right-angled triangle presplitting cut method
CN112880503A (en) * 2021-03-29 2021-06-01 云南迪庆有色金属有限责任公司 Blind raise hole-by-hole micro-differential blasting one-time well-forming blast hole arrangement structure and method
CN113686215A (en) * 2021-09-09 2021-11-23 昆明理工大学 Rock roadway large-diameter double-hole charging accurate time-delay hole-by-hole vertical cut blasting method
CN113686215B (en) * 2021-09-09 2022-06-21 昆明理工大学 Rock roadway large-diameter double-hole charging accurate time-delay hole-by-hole vertical cut blasting method

Also Published As

Publication number Publication date
CN110030888B (en) 2021-04-27

Similar Documents

Publication Publication Date Title
CN103615941B (en) The blasting method of modernized railway shallow-buried sector
CN110030888A (en) The steel for shot method of deep hole subregion triangulation network slotting shaft formatting by one blasting engineering method
CN107631669B (en) A kind of Cut Blasting optimum design method under large ground pressure
CN106767205B (en) The bustling micro- vibration comprehensively control blasting method of urban district subway running tunnel
CN113279622B (en) Method for dismantling thin-wall reinforced concrete chimney through high-notch blasting
CN101806066B (en) Method for molding vertical wall of deep foundation pit
CN111664761B (en) Cut blasting method based on pre-blasting
CN106643361A (en) Construction method for excavating upper drift heading and lower drift heading in two side walls of ultra-large subsurface tunnel
CN108007285A (en) A kind of stone head deep hole sublevel is segmented efficient Cut Blasting method
CN108871131B (en) Carbon dioxide static blasting construction method for roadbed rock
CN106014421B (en) A kind of limited rock tunnel excavation method of concussion of blasting
CN110118084B (en) Ultra-deep shaft construction method
CN107843156A (en) Gallery(Tunnel)The method of driving enhancing Cut Blasting efficiency
CN106225617A (en) A kind of rock-burst prevention method based on quick-fried rammer hydrofracturing
CN107060773B (en) A kind of underground chamber drilling and blasting method damping excavation method of static(al) explosion presplitting shock insulation
CN112901179B (en) Carbon dioxide pneumatic rock breaking method based on creation of free surface in tunnel
CN104596375A (en) Fully mechanized excavation construction method for rock roadway
CN107607009A (en) The blasting demolishing method that a kind of building fore-and-aft tilt is collapsed district by district
CN112880501B (en) Flight-limited hole drilling and blasting method for controlling tunnel blasting flyrock
CN110030889A (en) A kind of method of deep hole subregion triangulation network slotting shaft formatting by one blasting
CN108088338A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 1.1-1.3m
CN108061492A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 0.8-1m
CN114018112B (en) Nuclear island and corridor foundation pit negative excavation blasting structure and blasting method
CN108195242B (en) Rock blasting method
CN208171108U (en) A kind of lateral opening shock dropping charge constitution that protection stope two is helped

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant