CN104406470B - Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method - Google Patents

Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method Download PDF

Info

Publication number
CN104406470B
CN104406470B CN201410557642.1A CN201410557642A CN104406470B CN 104406470 B CN104406470 B CN 104406470B CN 201410557642 A CN201410557642 A CN 201410557642A CN 104406470 B CN104406470 B CN 104406470B
Authority
CN
China
Prior art keywords
keyhole
group
explosive
main armament
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410557642.1A
Other languages
Chinese (zh)
Other versions
CN104406470A (en
Inventor
杨仁树
杨立云
杨国梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Original Assignee
China University of Mining and Technology Beijing CUMTB
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CN201410557642.1A priority Critical patent/CN104406470B/en
Publication of CN104406470A publication Critical patent/CN104406470A/en
Application granted granted Critical
Publication of CN104406470B publication Critical patent/CN104406470B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Radar Systems Or Details Thereof (AREA)

Abstract

The present invention discloses a kind of western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method, reducing under the condition to the destruction of freezing pipe, can improve blasting efficiency.Described method comprises: around having freezed vertical center arrangement first group of keyhole, at first group of keyhole peripheral disposition, second group of keyhole, arranges that first lap main armament hole, the second circle main armament hole, the 3rd circle main armament hole are until complete tunneling boring steel for shot; First paragraph explosive and second segment explosive is installed in first group of keyhole; Conventional charge is carried out in second group of keyhole and main armament hole, second segment explosive-the second group keyhole-first lap main armament hole-the second circle main armament hole-three according to first paragraph explosive-the first group keyhole of first group of keyhole encloses main armament hole ... firing order, adopt ms postpone detonation mode to detonate, complete full face blasting.The present invention is applicable to western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting.

Description

Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method
Technical field
The present invention relates to a kind of development blasting technology, particularly relate to a kind of western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method.
Background technology
In the western Cretaceous System bottom of China, because its stratum is mostly sand, argillaceous agglutination, loosely organized, hole agensis, crack Communicating is poor, in addition rock has the advantages that intensity is low, meet water softening argillization, the rock dust that rock crack has easily been softened under the effect of water and slurries when slip casting blocks, and significantly limit the range of scatter of slurries, grouting curtain can not be formed very well, thus make slip casting can not play good effect, do not reach the object of water shutoff.As can be seen here, when excavating vertical shaft in western Cretaceous strata, because of the particularity of other layers, when water yield is larger, general employing slip casting method poor effect, mostly adopts engineering with artificial freezing method sinking shaft to construct at present.
Engineering with artificial freezing method sinking shaft is the special construction method adopting artificial cooling technology temporarily to reinforce caving ground and isolated underground water; it is around the pit shaft that will dig, first form frost wall that is fluid-tight and opposing certain pressure, and carries out self well digging work safely under the protection of frost wall.In order to improve speed of application, reducing labor intensity, can drilling and blasting method be adopted.Because Frozen-soil Blasting is under subzero temperature condition, there is freezing pipe around pit shaft, so Frozen-soil Blasting is different from common rock section explosion, it requires under the condition of freezing pipe safety, improves blasting efficiency simultaneously.
Adopt drilling and blasting method when constructing, the impact that the damage effect of freezing pipe brings from concussion of blasting.
In order to improve blasting efficiency, realizing the rapid construction target that the moon enters more than 100m, needing to adopt more than 5m deep hole blasting technology.But realize more than 5m deep hole blasting, need larger Cut Blasting energy, and find based on early-stage Study, do not have the scope of freedom due to during keyhole explosion, the shock-effect of generation is maximum.Therefore, the vibrations disaster how weakening Cut Blasting is key problem in technology; Therefore, how to meet the damaging influence of vibrations to freezing pipe that rapid construction target weakens Cut Blasting simultaneously, be the problem to be solved in the present invention simultaneously.
Summary of the invention
In view of this, the embodiment of the present invention provides a kind of western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method, at minimizing concussion of blasting under the condition of the destruction of freezing pipe, can improve blasting efficiency.
For achieving the above object, embodiments of the invention adopt following technical scheme:
A kind of western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method, comprising:
Around the pre-explosion vertical center arrangement first group of keyhole freezed, at first group of keyhole peripheral disposition, second group of keyhole, centered by second group of keyhole, outwards arrange first lap main armament hole, the second circle main armament hole, the 3rd circle main armament hole successively ... until complete tunneling boring steel for shot;
In first group of keyhole, install first paragraph explosive and second segment explosive, between first paragraph explosive and second segment explosive with yellow stemming as blank medium;
Conventional charge is carried out in second group of keyhole and main armament hole, after yellow stemming sealing, second segment explosive-the second group keyhole-first lap main armament hole-the second circle main armament hole-three according to first paragraph explosive-the first group keyhole of first group of keyhole encloses main armament hole ... firing order, ms postpone detonation mode is adopted to detonate, complete full face blasting, realize the onepull driving of vertical.
Alternatively, the waste footpath of described pre-explosion vertical is greater than 10m.
Alternatively, the degree of depth in described keyhole and/or main armament hole is not less than 5m, and diameter is 60mm.
Alternatively, the explosive classification of employing is freeze proof emulsion or freeze proof aqueous gels, powder stick diameter 45mm.
Alternatively, detonating capsule is the long payment to a porter millisecond delay electric detonator of 7m.
Alternatively, in described first group of keyhole, the spacing of adjacent keyhole is 1.6 ~ 1.8m, and in second group of keyhole, the spacing of adjacent keyhole is 2.0 ~ 2.4m; 0.4-0.6m is spaced apart between first group of keyhole and second group of keyhole.
Alternatively, in first group of keyhole, install first paragraph explosive and second segment explosive, between first paragraph explosive and second segment explosive with yellow stemming as blank medium, yellow stemming length is not less than 0.5m, achieves broken charges powder charge.
Alternatively, the length of first paragraph explosive installed in described first group of keyhole and the length ratio of second segment explosive are 1 ~ 1.2.
Alternatively; two sections of explosives in described first group of keyhole adopt the 1st section and the 3rd section of millisecond delay electric detonator to detonate respectively; more than millisecond crushing blasting 20ms; achieve In-hole short delay explosion; complete when keyhole total charge is constant; by reducing single explosive quantity, reducing concussion of blasting effect, protecting the safety of freezing pipe.
Alternatively, the detonating capsule in described second group of keyhole is the 5th section of millisecond delay electric detonator, increases time delay, reduces the synergistic effect of Explosive stress wave, reduces concussion of blasting effect.
The western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method that the embodiment of the present invention provides, owing to adopting full face blasting, improves blasting efficiency; And slotting effect can be strengthened owing to there being the second group of keyhole carrying out auxiliary slotting first group of keyhole peripheral disposition, first paragraph explosive and second segment explosive is installed at least one keyhole in first group of keyhole, and enclose main armament hole according to second segment explosive-the second group keyhole-first lap main armament hole-the second circle main armament hole-three of first paragraph explosive-the first group keyhole of first group of keyhole ... firing order, ms postpone detonation mode is adopted to detonate, can concussion of blasting be alleviated like this, thus the destruction of concussion of blasting to freezing pipe can be reduced.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the planar structure schematic diagram of pit shaft in major diameter freezing shaft deep hole Cut Blasting method one embodiment of a kind of western Cretaceous System Soft Rock Area of the present invention;
Fig. 2 is the explosive arrangement schematic diagram in Fig. 1 in first group of keyhole 1 and second group of keyhole 2;
Fig. 3 is the arrangement schematic diagram of first paragraph explosive 11 and second segment explosive 12 in first group of keyhole 1 in Fig. 1.
Detailed description of the invention
Below in conjunction with accompanying drawing, a kind of western Cretaceous System Soft Rock Area of embodiment of the present invention major diameter freezing shaft deep hole Cut Blasting method is described in detail.
Should be clear and definite, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making other embodiments all obtained under creative work prerequisite, belong to the scope of protection of the invention.
Fig. 1 is the planar structure schematic diagram of pit shaft in the major diameter freezing shaft deep hole Cut Blasting embodiment of the method for a kind of western Cretaceous System Soft Rock Area of the present invention.
Referring to Fig. 1, the detailed description of the invention of a kind of western Cretaceous System Soft Rock Area of the present invention major diameter freezing shaft deep hole Cut Blasting method, comprises the steps:
S11, around the pre-explosion vertical center arrangement first group of keyhole 1 freezed, at first group of keyhole peripheral disposition, second group of keyhole 2, centered by second group of keyhole 2, outwards arrange that main armament hole 4, the 3rd circle main armament hole 5...... are enclosed until complete tunneling boring steel for shot in first lap main armament hole 3, second successively.
In the present embodiment, pre-explosion vertical is the major diameter vertical of western Cretaceous System Soft Rock Area, and the waste footpath of pre-explosion vertical is greater than 10m.The waste footpath peripheral disposition of pre-explosion vertical has freezing pipe 6.
Alternatively, in the present embodiment, the degree of depth in described keyhole and/or main armament hole is not less than 5m, and diameter is 60mm.Alternatively, the hole depth of described first group of keyhole is 5m ~ 6m.The present invention is not limited thereto, the hole depth of first group of keyhole also can be greater than 5m, as being 5.5m or 6m.The hole depth of first group of keyhole is preferably 5m, while both can improving development blasting efficiency, can reduce single hole explosive payload again, the vibrations that controlled blasting preferably produces.
Alternatively, in described first group of keyhole, the spacing of adjacent keyhole is 1.6 ~ 1.8m, and in second group of keyhole, the spacing of adjacent keyhole is 2.0 ~ 2.4m; 0.4-0.6m is spaced apart between first group of keyhole and second group of keyhole.
Alternatively, in described second group of keyhole, each keyhole is perpendicular to ground, and the shock wave produced when being beneficial to second group of keyhole explosion is to being propagated by the free face formed after first group of keyhole explosion and forming larger space.
S12, in first group of keyhole 1, install first paragraph explosive 11 and second segment explosive 12, between first paragraph explosive 11 and second segment explosive 12 with yellow stemming as blank medium.
Referring to Fig. 3 and Fig. 4, between first paragraph explosive 11 and second segment explosive 12 with yellow stemming as blank medium, yellow stemming length is not less than 0.5m, achieves broken charges powder charge, prevents first paragraph from igniting second segment explosive, cannot produce subsection efect.When adopting yellow stemming as blank medium, too compacting should be avoided and occur that the situation that second segment explosive cannot be ignited occurs.
In first group of keyhole, install first paragraph explosive and second segment explosive, segmentation can be carried out and detonate, like this from blast initial stage just concussion of blasting is controlled at floor level.
Alternatively, the length of first paragraph explosive 11 installed in described first group of keyhole and the length ratio of second segment explosive 12 are 1 ~ 1.2, the concussion of blasting produced when being conducive to minimizing first group of keyhole explosion.
In order to improve blast hole utilization factor, the explosive classification that the explosive installed in described first group of keyhole adopts is freeze proof emulsion or freeze proof aqueous gels, powder stick diameter 45mm.
S13, in second group of keyhole and main armament hole, carry out conventional charge, after yellow stemming sealing, second segment explosive-the second group keyhole-first lap main armament hole-the second circle main armament hole-three according to first paragraph explosive-the first group keyhole of first group of keyhole encloses main armament hole ... firing order, ms postpone detonation mode is adopted to detonate, complete full face blasting, realize the onepull driving of vertical.
In the present embodiment, the explosive filled in second group of keyhole and main armament hole is preferably above-mentioned freeze proof emulsion or freeze proof aqueous gels.Detonating capsule is the long payment to a porter millisecond delay electric detonator of 7m.Two sections of explosives in described first group of keyhole adopt the 1st section and the 3rd section of millisecond delay electric detonator to detonate respectively; more than millisecond crushing blasting 20ms; achieve In-hole short delay explosion; complete when keyhole total charge is constant; by reducing single explosive quantity; reduce concussion of blasting effect, protect the safety of freezing pipe.Detonating capsule in described second group of keyhole is the 5th section of millisecond delay electric detonator, increases time delay, reduces the synergistic effect of Explosive stress wave, reduces concussion of blasting effect.
In the present embodiment, the defer time of 1-15 section millisecond delay electric detonator and correspondence thereof is: ms-1:< 13ms, ms-2:25ms, ms-3:50ms, ms-4:75ms, ms-5:110ms, ms-6:150ms, ms-7:200ms, ms-8:250ms, ms-9:310ms, ms-10:380ms, ms-11:460ms, ms-12:550ms, ms-13:650ms, ms-14:760ms, ms-15:880ms.
Show according to early-stage Study: Cut Blasting explosive payload is maximum, the concussion of blasting effect produced is the strongest, next is the concussion of blasting effect of the periphery hole nearest apart from freezing pipe, so, the topmost approach reducing concussion of blasting effect reduces the explosive payload of Cut Blasting, namely reduces the explosive quantity of first paragraph explosive in first group of keyhole, so that after Cut Blasting, for follow-up detonating provides the scope of freedom, greatly reduce the shock-effect of freezing pipe; And the overall parcel received of deep hole blasting needs more explosive payload, to realize good slotting effect.Adopt sublevel Application of Sectional Cutting mode to add the cut shot method of auxiliary slotting in the embodiment of the present invention, good slotting effect can be realized, and reduce single explosive quantity, reduce concussion of blasting effect.
The western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method that the embodiment of the present invention provides, the major diameter be only applicable in Cretaceous System soft rock strata freezes the deep hole blasting construction of shaft of vertical well, establish two circle keyholes in major diameter wellbore centre, solve in major diameter pit shaft blast working and need larger slotting space to provide the problem on the scope of freedom for follow-up shot hole blasting.
In a word, the western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method that the embodiment of the present invention provides, owing to adopting full face blasting, improves blasting efficiency; And slotting effect can be strengthened owing to there being the second group of keyhole carrying out auxiliary slotting first group of keyhole peripheral disposition, first paragraph explosive and second segment explosive is installed at least one keyhole in first group of keyhole, and enclose main armament hole according to second segment explosive-the second group keyhole-first lap main armament hole-the second circle main armament hole-three of first paragraph explosive-the first group keyhole of first group of keyhole ... firing order, ms postpone detonation mode is adopted to detonate, can concussion of blasting be alleviated like this, thus the destruction of concussion of blasting to freezing pipe can be reduced.
The above; be only the specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, is anyly familiar with those skilled in the art in the technical scope that the present invention discloses; the change that can expect easily or replacement, all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of claim.

Claims (6)

1. a western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method, is characterized in that, comprising:
Around the pre-explosion vertical center arrangement first group of keyhole freezed, at first group of keyhole peripheral disposition, second group of keyhole, centered by second group of keyhole, outwards arrange first lap main armament hole, the second circle main armament hole, the 3rd circle main armament hole successively ... until complete tunneling boring steel for shot; Wherein, the degree of depth in described keyhole and main armament hole is not less than 5m, and diameter is 60mm; In described first group of keyhole, the spacing of adjacent keyhole is 1.6 ~ 1.8m, and in second group of keyhole, the spacing of adjacent keyhole is 2.0 ~ 2.4m; 0.4 ~ 0.6m is spaced apart between first group of keyhole and second group of keyhole;
In first group of keyhole, install first paragraph explosive and second segment explosive, between first paragraph explosive and second segment explosive with yellow stemming as blank medium, yellow stemming length is not less than 0.5m; The length of first paragraph explosive installed in described first group of keyhole and the length ratio of second segment explosive are 1 ~ 1.2;
Conventional charge is carried out in second group of keyhole and main armament hole, after yellow stemming sealing, second segment explosive-the second group keyhole-first lap main armament hole-the second circle main armament hole-three according to first paragraph explosive-the first group keyhole of first group of keyhole encloses main armament hole ... firing order, ms postpone detonation mode is adopted to detonate, complete full face blasting, realize the onepull driving of vertical.
2. deep hole Cut Blasting method according to claim 1, is characterized in that, the waste footpath of described pre-explosion vertical is greater than 10m.
3. deep hole Cut Blasting method according to claim 1, is characterized in that, the explosive classification of employing is freeze proof emulsion or freeze proof aqueous gels, powder stick diameter 45mm.
4. deep hole Cut Blasting method according to claim 1, is characterized in that, detonating capsule is the long payment to a porter millisecond delay electric detonator of 7m.
5. deep hole Cut Blasting method according to claim 1, is characterized in that, two sections of explosives in described first group of keyhole adopt the 1st section and the 3rd section of millisecond delay electric detonator to detonate respectively, more than millisecond crushing blasting 20ms.
6. deep hole Cut Blasting method according to claim 5, is characterized in that, the detonating capsule in described second group of keyhole is the 5th section of millisecond delay electric detonator.
CN201410557642.1A 2014-10-20 2014-10-20 Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method Active CN104406470B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410557642.1A CN104406470B (en) 2014-10-20 2014-10-20 Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410557642.1A CN104406470B (en) 2014-10-20 2014-10-20 Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method

Publications (2)

Publication Number Publication Date
CN104406470A CN104406470A (en) 2015-03-11
CN104406470B true CN104406470B (en) 2016-03-09

Family

ID=52644118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410557642.1A Active CN104406470B (en) 2014-10-20 2014-10-20 Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method

Country Status (1)

Country Link
CN (1) CN104406470B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105486181B (en) * 2015-11-19 2017-03-29 中国华冶科工集团有限公司 Vertical shaft deep-hole step blasting method
CN105823387A (en) * 2016-02-25 2016-08-03 中铁十八局集团有限公司 Rapid construction method for deep hole blasting of vertical shaft frozen bedrock
CN105823546B (en) * 2016-03-22 2018-11-23 中国矿业大学(北京) A kind of major diameter freezes vertical Blast Vibration Monitoring, oscillation damping method and system
CN108007285B (en) * 2017-12-05 2019-01-01 中国矿业大学(北京) A kind of efficient Cut Blasting method of stone head deep hole sublevel segmentation
CN109029176A (en) * 2018-08-30 2018-12-18 西北矿冶研究院 Sectional type cutting method
CN110196002B (en) * 2019-05-28 2021-11-02 三明学院 Safe and efficient blasting construction method for vertical shaft wall beam nest
CN111595214A (en) * 2020-05-06 2020-08-28 安徽理工大学 Small-hole reinforced cracking explosive column and single-face annular joint-cutting explosive column combined cutting method
ZA202110030B (en) * 2021-12-06 2022-03-30 Univ Henan Polytechnic Deep hole vibration reduction blasting method based on artificial frozen soft rock in deep shaft

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1560557A (en) * 2004-03-10 2005-01-05 马芹永 Technology method of artificial frozen soil control blasting by deep surface forzen method
CN102401616A (en) * 2011-10-11 2012-04-04 中国矿业大学(北京) Blasting excavation method of vertical shaft
CN103575172A (en) * 2013-11-21 2014-02-12 安徽理工大学 Novel roadway blasting construction method
CN103983152A (en) * 2014-05-06 2014-08-13 中煤第五建设有限公司第四十九工程处 Blasting construction method for freezing shaft and unstable rock stratum

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1560557A (en) * 2004-03-10 2005-01-05 马芹永 Technology method of artificial frozen soil control blasting by deep surface forzen method
CN102401616A (en) * 2011-10-11 2012-04-04 中国矿业大学(北京) Blasting excavation method of vertical shaft
CN103575172A (en) * 2013-11-21 2014-02-12 安徽理工大学 Novel roadway blasting construction method
CN103983152A (en) * 2014-05-06 2014-08-13 中煤第五建设有限公司第四十九工程处 Blasting construction method for freezing shaft and unstable rock stratum

Also Published As

Publication number Publication date
CN104406470A (en) 2015-03-11

Similar Documents

Publication Publication Date Title
CN104406470B (en) Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method
CN107764144B (en) A kind of tunnel Millisecond Controlled Blasting method
CN103821516B (en) The method of secondary release preventing and treating bump
CN104457465B (en) A kind of deep-lying tunnel Blasting Excavation effect control method
CN105333778A (en) Medium-deep hole large-section composite cut blasting structure and method
CN107631669B (en) A kind of Cut Blasting optimum design method under large ground pressure
CN102914226A (en) Hollow-hole rhombic parallel cut blasting damping method
CN102401616A (en) Blasting excavation method of vertical shaft
CN103575172A (en) Novel roadway blasting construction method
CN104819670B (en) Pre-drilling mesopore shaft excavation blasting method
CN109281672A (en) A kind of hard rock tunnel excavation method
CN107060773B (en) A kind of underground chamber drilling and blasting method damping excavation method of static(al) explosion presplitting shock insulation
CN104390538A (en) Stress relief blasting method based on tunnel face notching
CN105823387A (en) Rapid construction method for deep hole blasting of vertical shaft frozen bedrock
CN107762511B (en) A kind of class strip-type coal-mining method cut top filling and close on goaf
CN103697775A (en) Method of loose blasting by high-pressure water jet helical cutting
CN111238329A (en) Method for performing geometric forming blasting on semi-coal rock roadway by adopting instantaneous bursting device
CN108050902A (en) A kind of tunnel blasting excavation method
CN106437712B (en) Coal mine surrounding cities Strong tremor disaster reduction method
CN108088338A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 1.1-1.3m
CN108061492A (en) A kind of Pile Diameter is the bridge cylinder pile foundation blasting method of 0.8-1m
CN208171108U (en) A kind of lateral opening shock dropping charge constitution that protection stope two is helped
CN113587760B (en) Combined rock breaking method for thermal expansion rock breaking pipe and hard rock stratum foundation pit
CN102927863B (en) A kind of new method of total rock tunnel blasting construction
CN202648554U (en) Rock mass engineering blasting excavation damping device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant