CN103821516B - The method of secondary release preventing and treating bump - Google Patents

The method of secondary release preventing and treating bump Download PDF

Info

Publication number
CN103821516B
CN103821516B CN201410086020.5A CN201410086020A CN103821516B CN 103821516 B CN103821516 B CN 103821516B CN 201410086020 A CN201410086020 A CN 201410086020A CN 103821516 B CN103821516 B CN 103821516B
Authority
CN
China
Prior art keywords
slot
coal
rock
bump
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410086020.5A
Other languages
Chinese (zh)
Other versions
CN103821516A (en
Inventor
吕有厂
代志旭
康勇
王晓川
陈建忠
王峰
高建成
仝艳军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingdingshan Tianan Coal Mining Co Ltd
Original Assignee
Pingdingshan Tianan Coal Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingdingshan Tianan Coal Mining Co Ltd filed Critical Pingdingshan Tianan Coal Mining Co Ltd
Priority to CN201410086020.5A priority Critical patent/CN103821516B/en
Publication of CN103821516A publication Critical patent/CN103821516A/en
Application granted granted Critical
Publication of CN103821516B publication Critical patent/CN103821516B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The method that the present invention relates to a kind of secondary release preventing and treating bump, in conjunction with coal and rock geology occurrence condition and crustal stress distribution characteristics, uses different water jet slot mode that coal and rock is carried out slot, subsequently charge explosion for different bump types.Its advantage is: use high-pressure water jet to having the coal and rock of shock hazard along after borehole axial grooving, radially slot, make surrouding rock stress redistribution, stress-concentrated area shifts to deep, meanwhile, the slot group (plane of weakness) that high-pressure water jet slot is formed plays release effect, carries out standing subsequently, crack is made to further expand, coal and rock deformation energy discharges again, obtains secondary release, thus is effectively prevented punching and only presses.The present invention compares the most frequently used coal-bed flooding and relieving shot has advantage the shortest, effective, that relief range is wide, risk is little.

Description

The method of secondary release preventing and treating bump
Technical field
The method that the present invention relates to prevent and treat bump, a kind of side being applicable to coal and rock secondary release preventing and treating bump Method, belongs to technical field of mine safety.
Background technology
During mining, when the stress around digging space or tunnel exceedes the bearing capacity of coal and rock, it may appear that coal The unexpected dynamic property of rock mass is destroyed, and deforms in a large number to digging space or lane space moment or launches, and discharges substantial amounts of elastic energy, Here it is bump (metal mine or tunnel claim rock burst).Bump threatens the life security of the mankind and affects mining work It is normally carried out, is mine one of major disaster.
At present, administer bump method mainly have Mining Protective Seam, exploiting field reasonable Arrangement, coal-bed flooding, relieving shot, Big boring, roof break explosion etc., wherein once construct not malleable in Mining Protective Seam and reasonable Arrangement exploiting field, cost of holing greatly High, weak effect, is most commonly used that coal-bed flooding and relieving shot.But, coal-bed flooding is the most time-consumingly grown, is run into the ground such as tomography Cannot construct during matter structure, simple relieving shot is inevasible causes disturbance, easily causes the bump that hand excavation causes. Thus, the new method preventing and treating bump of low cost high in the urgent need to a kind of efficiency.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, it is proposed that a kind of technique is simple and convenient to operate, safe and reliable, controlling good, The method of respond well secondary release preventing and treating bump, its essence is and combined with standing by water jet slot, it is achieved Have complementary advantages, structure type bump, roof break type bump and coal body compression-type bump are cut in different ways Seam, carries out first release to coal and rock, then carries out loose quick-fried, and the energy utilizing explosive to produce makes coal and rock crack further expand, Reduce coal and rock elastic strain energy, thus reach the purpose of secondary release.
The technical solution used in the present invention is as follows:
A kind of method of secondary release preventing and treating bump, its step includes:
1) desire relief area and bump type are determined according to coal and rock geological state;
2) to being intended to relief area construction drill, utilize water jet that coal and rock is carried out slot in the borehole according to bump type;
3) carrying out standing by boring, detonate after-explosion stress wave and detonation gas are propagated along slot direction, make coal seam produce Raw abundant crack, reaches the purpose of release.
Further, need to carry out through hole before and after carrying out described slot, rock dust cinder in boring is cleaned out.
Further, the concrete mode of described slot is:
To structure type bump, use the slot combined in tunnel-surrounding coal and rock along borehole axial grooving and radial direction slot Mode is constructed, and makes the uniform release of roadway surrounding rock, and forms gridding slot group;
To roof break type bump, carry out radial water jet slot, make concentrated stress toward slot end-transfer, by difference The region release of slot bore arrangement mode;
To coal body compression-type bump, use at coal and rock region, deep radial direction slot, make concentrated stress shift to deep, from And reduce this plastic region pressure-bearing.
Further, when utilizing water jet that coal and rock is carried out slot, the high-pressure water pressure of employing is 25-35MPa;Radially slot Radius is 0.5-2m, and radially slot thickness is 2-4mm;Axially cutting groove depth is 0.5-2m, and axial notch width is 2-4mm.
Further, slot hole (for the boring of slot) between row and row in quincuncial arrangement, often row slot pitch of holes be 15m-25m。
Further, described explosion method particularly includes:
A) powder charge: powder stick and detonating capsule are sent into boring according to design, uses Uncoincided charge and forward detonation way;
B) sealing of hole: use yellow mud and yellow sand sealing of hole, and ensure that initiation system is intact;
C) explosion: use power ignition system to detonate, detonate after-explosion stress wave and detonation gas are propagated along slot direction, make Coal seam produces abundant crack.
Further, described sealing of hole yellow mud a length of 2~4m, yellow sand segment length 8~12m;A length of the 0.5 of polyurethane~0.8m; The pvc pipe of yellow sand section 1~3m mono-section, totally 5~10 sections.
Further, the length of described powder charge is no less than 2m.
The advantage of secondary release of the present invention preventing and treating bump method is:
Water jet slot is combined by the present invention with standing, it is possible to preferably prevents and treats bump and improves efficiency, reducing into This.Utilize water jet that coal and rock is carried out slot, slot group crack can be realized by slot hole interlaced arrangement and be mutually communicated, from And form large area crack field, be equivalent to a structure plane of weakness, can shield or slacken crustal stress and weaken coal body elastic deformation energy Transmission, thus prevent and treat the bump destruction to tunnel, overcome coal-bed flooding and cannot process fault tectonic, time-consuming long, effect The shortcoming of difference.After slot, concentrated stress shifts to rock mass deep further, it may have release effect, the simultaneously appearance of presplitting slot Standing for next step provides compensation space, can effectively reduce the simple pine close coal and rock of detonation pressure and produce large disturbances induction The risk of impact.Used in this method, water jet slot mode is owing to there being the existence of water, can be glibly by the rock ballast in big gun hole Clean out, it is simple to the carrying out of follow-up powder charge, in view of the jet slot degree of depth can utilize cutting speed and pressure to adjust at any time, therefore There is not the problem affecting demolition effect because joint-cutting is shallow.Therefore, the water jet slot standing preventing and treating bump of the present invention Method low cost, efficiency is high, effective, relief range is wide, risk is little, has bigger application and popularization value.
Accompanying drawing explanation
Fig. 1 is that water jet slot standing of the present invention prevents and treats bump schematic diagram.
Fig. 2 is big gun hole of the present invention sealing of hole section schematic diagram.
Fig. 3 is the present invention radially slot schematic diagram.
Fig. 4 is the present invention axial slot schematic diagram.
Fig. 5 is the radial and axial slot schematic diagram that combines of the present invention.
Fig. 6 is gridding slot schematic diagram of the present invention.
Fig. 7 be the slot hole of the present invention be the schematic diagram of quincuncial arrangement.
In figure, 1 is rock mass, and 2 is coal body, and 3 is big gun hole, and 4 is pvc pipe, and 5 is explosive, and 6 is slot, and 7 is polyurethane, 8 is yellow sand, and 9 is yellow mud, 10 slot thickness, 11 slot radiuses, 12 notch widths, 13 cutting groove depths.
Detailed description of the invention
Below by specific embodiments and the drawings, the present invention will be further described.
The method of the secondary release preventing and treating bump of the present invention, its concrete measure is as follows:
(1) addressing: according to coal and rock geological state, determines pilot region, and tentatively concludes bump type.
(2) pore-forming: to being intended to relief area construction drill hole flushing.
(3) water jet slot: structure type bump is used and along borehole axial grooving and radially cuts in tunnel-surrounding coal and rock The slot mode that seam combines is constructed, and makes the uniform release of roadway surrounding rock, and forms gridding slot group;To roof break type Bump carries out radial water jet slot, make concentrated stress toward slot end-transfer, by different slot bore arrangement modes Region release;Coal body compression-type bump is used at coal and rock region, deep radial direction slot, makes concentrated stress shift to deep, Thus reduce this plastic region pressure-bearing.Preferably, slot hole (for the boring of slot) between row and row in quincuncial arrangement, As it is shown in fig. 7, often row's slot pitch of holes is 15m-25m.
(4) hole flushing: clean slot hole, gets rid of the coal petrography slag in boring.
(5) powder charge: powder stick and detonating capsule are sent into boring according to design, uses Uncoincided charge and forward detonation way.
(6) sealing of hole: use yellow mud and yellow sand sealing of hole, and ensure that initiation system is intact.
(7) explosion: use power ignition system to detonate, detonate after-explosion stress wave and detonation gas are propagated along slot direction, Coal seam is made to produce abundant crack.
Provide below specific embodiment.
Embodiment one
Certain ore deposit, rock consolidating coefficient f=3, the solid coefficient f=1 of coal, punch layer at the position rig chosen to coal and rock Boring, as it is shown in figure 1, rock mass 1 thickness 32m, coal body 2 thickness 3m, hole depth 36m, aperture is 113mm;Then lead to Hole, cleans out the rock dust cinder in boring, carries out radially hydraulic slotted liner technique, as shown in schematic diagram 3, and wherein (b) on the right Figure be the left side (a) figure in the schematic diagram of Section A-A, in figure, 3 is big gun hole, and 6 is slot;Then will install the explosive of detonator 5 put into pvc pipe 4, each section of pipe range 2m, send into 11 sections of pvc pipes;Then by the dress of same length (being 2m equally) The pvc pipe of full yellow sand 8 sends into big gun hole, and at the polyurethane 7 of every section of middle part binding 0.5m, it is ensured that pvc pipe is central in big gun hole, Send into 5 sections altogether;Then with yellow mud 9 sealing of hole, length 4m, consolidate with rod;Finally connect initiation system, confirm errorless after Detonate.Thus reach the purpose that pine is quick-fried.Fig. 2 is the schematic diagram of big gun hole sealing of hole section.
Embodiment two
Certain ore deposit, rock consolidating coefficient f=5, the solid coefficient f=2 of coal, punch layer at the position rig chosen to coal and rock Boring, rock mass 1 thickness 37m, coal body 2 thickness 4m, hole depth 42, aperture is 94mm;Then through hole, by the rock in boring Pulverized coal dregs is cleaned out, and carries out axial slot, as shown in schematic diagram 4 wherein the right (a) figure that (b) figure is the left side in B-B The schematic diagram in cross section, in figure, 3 is big gun hole, and 6 is slot;Then the explosive 5 installing detonator is put into pvc pipe 4, pipe range 2m, Send into 15 sections of pvc pipes;Then by the pvc pipe feeding big gun hole filling yellow sand 8 of same length (being 2m equally), and The polyurethane 7 of every section of middle part binding 0.5m, it is ensured that pvc pipe, in big gun hole central authorities, sends into 5 sections altogether;Then with yellow mud 9 sealing of hole, Length 3m, consolidates with rod;Finally connect initiation system, confirm errorless after detonate.Thus reach the purpose that pine is quick-fried.
Embodiment three
Certain ore deposit, rock consolidating coefficient f=4, the solid coefficient f=3 of coal, punch layer at the position rig chosen to coal and rock Boring, rock mass 1 thickness 50m, coal body 2 thickness 5m, hole depth 56, aperture is 94mm;Then through hole, by the rock in boring Pulverized coal dregs is cleaned out, and uses the mode that radially slot and axial grooving combine to prevent and treat bump, as shown in schematic diagram 5, The wherein schematic diagram in C-C cross section in (a) figure that (b) figure is the left side on the right, in figure, 3 is big gun hole, and 6 is slot;Then The explosive 5 installing detonator is put into pvc pipe 4, pipe range 2m, sends into 25 sections of pvc pipes;Then same length is (same 2m) fill yellow sand 8 pvc pipe send into big gun hole, and every section middle part binding 0.5m polyurethane 7, it is ensured that PVC Pipe, in big gun hole central authorities, sends into 5 sections altogether;Then with yellow mud 9 sealing of hole, length 5m, consolidate with rod;Finally connecting detonates is System, confirm errorless after detonate.Thus reach the purpose that pine is quick-fried.
In addition to the implementation, other embodiments can also use the mode of multiple radial direction slot, form gridding slot, as Shown in Fig. 6.In this, the advantage of gridding slot is uniform release, and the stress forming regional area after preventing slot is concentrated.
Above example is only limited in order to technical scheme to be described, those of ordinary skill in the art can Technical scheme is modified or equivalent, without departing from the spirit and scope of the present invention, the guarantor of the present invention The scope of protecting should be as the criterion with described in claim.

Claims (8)

1. a method for secondary release preventing and treating bump, its step includes:
1) desire relief area and bump type are determined according to coal and rock geological state;
2) to being intended to relief area construction drill, utilize water jet that coal and rock is carried out slot in the borehole according to bump type, Realize slot group crack to be mutually communicated, form large area crack field;The concrete mode of described slot is:
To structure type bump, use the slot combined in tunnel-surrounding coal and rock along borehole axial grooving and radial direction slot Mode is constructed, and makes the uniform release of roadway surrounding rock, and forms gridding slot group;
To roof break type bump, carry out radial water jet slot, make concentrated stress toward slot end-transfer, by difference The region release of slot bore arrangement mode;
To coal body compression-type bump, use at coal and rock region, deep radial direction slot, make concentrated stress shift to deep, from And reduce plastic region pressure-bearing;
3) using explosive to carry out standing by boring, detonate after-explosion stress wave and detonation gas are propagated along slot direction, Make coal seam produce abundant crack, reach the purpose of release.
2. the method for claim 1, it is characterised in that: carry out through hole before and after carrying out described slot, rock dust coal in holing Slag is cleaned out.
3. the method for claim 1, it is characterised in that: when utilizing water jet that coal and rock is carried out slot, the water under high pressure of employing Pressure is 25~35MPa;Radially slot radius is 0.5~2m, and radially slot thickness is 2~4mm;Axially cutting groove depth is 0.5~2m, axial notch width is 2~4mm.
4. the method for claim 1, it is characterised in that: boring between row and row in quincuncial arrangement, every row hole drilling spacing For 15m~25m.
5. the method for claim 1, it is characterised in that described explosion method particularly includes:
A) powder charge: powder stick and detonating capsule are sent into boring according to design, uses Uncoincided charge and forward detonation way;
B) sealing of hole: use yellow mud and yellow sand sealing of hole, and ensure that initiation system is intact;
C) explosion: use power ignition system to detonate, detonate after-explosion stress wave and detonation gas are propagated along slot direction, make Coal seam produces abundant crack.
6. method as claimed in claim 5, it is characterised in that: sealing of hole yellow mud a length of 2~4m, yellow sand segment length 8~12m;Poly- A length of the 0.5 of urethane~0.8m.
7. method as claimed in claim 6, it is characterised in that: in pvc pipe, load yellow sand, form yellow sand section, every section of PVC Pipe range 1~3m, totally 5~10 sections.
8. method as claimed in claim 5, it is characterised in that: the length of described powder charge is not less than 2m.
CN201410086020.5A 2014-03-10 2014-03-10 The method of secondary release preventing and treating bump Active CN103821516B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410086020.5A CN103821516B (en) 2014-03-10 2014-03-10 The method of secondary release preventing and treating bump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410086020.5A CN103821516B (en) 2014-03-10 2014-03-10 The method of secondary release preventing and treating bump

Publications (2)

Publication Number Publication Date
CN103821516A CN103821516A (en) 2014-05-28
CN103821516B true CN103821516B (en) 2016-09-21

Family

ID=50756778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410086020.5A Active CN103821516B (en) 2014-03-10 2014-03-10 The method of secondary release preventing and treating bump

Country Status (1)

Country Link
CN (1) CN103821516B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057813A (en) * 2018-07-09 2018-12-21 中南大学 A method of pit shaft rock burst is prevented and treated using high-pressure water jet

Families Citing this family (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594898B (en) * 2014-11-10 2016-08-31 山东科技大学 A kind of tight roof water filling release processing method
CN105571414A (en) * 2015-12-15 2016-05-11 武汉大学 Jet flow slotting assisted slight blasting method for underground construction
CN105569659B (en) * 2015-12-25 2018-10-16 中国矿业大学 A kind of tunnel hydraulic slotted liner technique directional blasting cuts top pressure relief method
CN107227976B (en) * 2017-06-09 2019-03-05 中南大学 A kind of underground pressure management method suitable for underground mine deep mining
CN108801086A (en) * 2018-05-04 2018-11-13 中国矿业大学 Deep hole loosens stress pre-released hydraulically blasting method and device
CN108915686B (en) * 2018-06-20 2019-11-05 山东科技大学 A kind of coal road danger of burst area bore hole axis-two-way pressure relief method of diameter
CN109779633B (en) * 2019-01-17 2020-12-04 中煤科工集团重庆研究院有限公司 Hydraulic directional fracturing weakening method for hard roof of coal mine
CN111270987B (en) * 2020-01-20 2020-12-25 中国矿业大学 Method for accurately preventing and controlling rock burst in remote area under coal mine
CN111911158B (en) * 2020-08-12 2022-02-25 华北科技学院 Directional fracturing top-control pressure relief device for hard top plate
CN111927456B (en) * 2020-09-10 2022-04-19 山东科技大学 Dynamic-loading deep mining area coal pillar instability unloading-fixing-letting multistage prevention and control method
CN112483095A (en) * 2020-12-18 2021-03-12 山东科技大学 Method for preventing and controlling rock burst of roadway in fault fracture area
CN113153293A (en) * 2021-05-21 2021-07-23 重庆大学 Water jet mining method for metal ore vein
CN114033375A (en) * 2021-11-26 2022-02-11 重庆大学 Hydraulic grooving and high-pressure splitting coupled hard top plate seam forming method
CN114135288B (en) * 2021-12-06 2022-09-13 中国矿业大学 Method for optimizing high-pressure water jet slotting pressure relief parameters of rock burst coal seam roadway
CN114810005B (en) * 2022-05-19 2022-12-23 贵州大学 Coal seam fracturing method under coal roadway horizontal joint cutting-carbon dioxide blasting synergistic effect
CN116663097B (en) * 2023-04-17 2024-02-02 中国科学院武汉岩土力学研究所 Method for designing advanced stress release hole parameters of rock burst source region of deep-buried hard rock construction tunnel
CN116335701B (en) * 2023-05-30 2023-09-22 华能煤炭技术研究有限公司 Pressure relief method for rock burst roadway

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1411473A1 (en) * 1986-11-19 1988-07-23 Ленинградский горный институт им.Г.В.Плеханова Method of caving overburden
RU2381369C1 (en) * 2008-08-28 2010-02-10 Открытое акционерное общество "Научно-исследовательский институт горной геомеханики и маркшейдерского дела - Межотраслевой научный центр ВНИМИ" Method for prevention of rock bursts in rocks of mine soil
CN102536240A (en) * 2012-01-17 2012-07-04 河南省煤层气开发利用有限公司 Method for preventing rock burst by adopting high-pressure fracturing
CN102852506A (en) * 2012-10-17 2013-01-02 中国矿业大学 High-pressure pneumatic blasting pressure relieving and transmission increasing method
CN103195466A (en) * 2013-03-30 2013-07-10 重庆大学 Directional water pressure blasting method for improving coal bed gas permeability
CN103499255A (en) * 2013-09-29 2014-01-08 武汉大学 Method for directional energy-gathered blasting of retaining wall with low damage

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1411473A1 (en) * 1986-11-19 1988-07-23 Ленинградский горный институт им.Г.В.Плеханова Method of caving overburden
RU2381369C1 (en) * 2008-08-28 2010-02-10 Открытое акционерное общество "Научно-исследовательский институт горной геомеханики и маркшейдерского дела - Межотраслевой научный центр ВНИМИ" Method for prevention of rock bursts in rocks of mine soil
CN102536240A (en) * 2012-01-17 2012-07-04 河南省煤层气开发利用有限公司 Method for preventing rock burst by adopting high-pressure fracturing
CN102852506A (en) * 2012-10-17 2013-01-02 中国矿业大学 High-pressure pneumatic blasting pressure relieving and transmission increasing method
CN103195466A (en) * 2013-03-30 2013-07-10 重庆大学 Directional water pressure blasting method for improving coal bed gas permeability
CN103499255A (en) * 2013-09-29 2014-01-08 武汉大学 Method for directional energy-gathered blasting of retaining wall with low damage

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
我国冲击地压分布、类型、机理及防治研究;潘一山等;《岩石力学与工程学报》;20031130(第11期);第1844-1850页 *
穿层深孔松爆技术在防突和防冲中的应用;吴建宇等;《中州煤炭》;20111231(第08期);第71-74页 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109057813A (en) * 2018-07-09 2018-12-21 中南大学 A method of pit shaft rock burst is prevented and treated using high-pressure water jet

Also Published As

Publication number Publication date
CN103821516A (en) 2014-05-28

Similar Documents

Publication Publication Date Title
CN103821516B (en) The method of secondary release preventing and treating bump
CN102678120B (en) Method for releasing pressure and removing danger of rock burst
CN103195466B (en) A kind of directed hydraulic pressure demolition improves the method for gas permeability of coal seam
CN102518436B (en) Method for controlling tectonic rock burst in coal mine tunneling
CN101864961B (en) Method for actively preventing and controlling rock burst
CN102937399B (en) Stress relief blasting method based on ground stress transient release
CN102635388A (en) Interaction permeability-increasing method of pre-splitting blasting and hydraulic cracking of coal seam
CN104406470B (en) Western Cretaceous System Soft Rock Area major diameter freezing shaft deep hole Cut Blasting method
CN101441055A (en) Presplit blasting method
CN103244180B (en) Gob-side entry driving surrounding rock control method using remaining small pillars
CN2929636Y (en) Multiway energy focus blasting device
CN110067558A (en) A kind of severe inclined thick coal seam stope drift active workings joint release prevention and treatment impulsion pressure method
CN103499255A (en) Method for directional energy-gathered blasting of retaining wall with low damage
CN107120137B (en) A kind of coal roadway tunneling is along seat earth Deephole pre-splitting blasting pumping method
CN102808621B (en) Method for blasting heavy-inclined thick ore bodies
CN103541734A (en) Comprehensive damping method for blasting of tunnel passing through heritage conservation building
CN104390538B (en) A kind of stress relieving blasting method based on face grooving
CN102506623A (en) Deep-hole and shallow-hole combined bench blasting method capable of reducing blasting boulder rate
CN103697775B (en) A kind of high-pressure water jet helical cutting standing method
CN104482817B (en) A kind of deep-lying tunnel stress relieving presplit blasting method
CN102322267A (en) Method for preventing and controlling rock burst in soft rock of deep well
CN106401588A (en) Method for preventing and treating rock burst during exploiting of working face in fault zone
CN105571414A (en) Jet flow slotting assisted slight blasting method for underground construction
CN105443133B (en) Subsurface rock beehive-shaped charge demolition set and method in a kind of non-excavating construction
CN104594903A (en) Ore breaking method for whole-section high combination rock drilling blasting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant