Method for preventing and controlling rock burst of roadway in fault fracture area Download PDF

Info

Publication number
CN112483095A
CN112483095A CN202011504868.7A CN202011504868A CN112483095A CN 112483095 A CN112483095 A CN 112483095A CN 202011504868 A CN202011504868 A CN 202011504868A CN 112483095 A CN112483095 A CN 112483095A
Authority
CN
China
Prior art keywords
fault
roadway
area
rock burst
braided bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011504868.7A
Other languages
Chinese (zh)
Inventor
潘立友
孙久政
欧阳振华
陈建强
毕强
陈理强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN202011504868.7A priority Critical patent/CN112483095A/en
Publication of CN112483095A publication Critical patent/CN112483095A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D15/00Props; Chocks, e.g. made of flexible containers filled with backfilling material
    • E21D15/48Chocks or the like
    • E21D15/483Chocks or the like made of flexible containers, e.g. inflatable, with or without reinforcement, e.g. filled with water, backfilling material or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/01Methods or apparatus for enlarging or restoring the cross-section of tunnels, e.g. by restoring the floor to its original level

Abstract

The invention discloses a method for preventing and treating rock burst of a roadway in a fault fracture area, which comprises the following steps of: step one, determining a dangerous area under the influence of a fault: according to the revealed fault occurrence and roadway display, a fault rock burst occurring section is researched and judged in advance to be used as a regional prevention and treatment key point; step two, erecting a flexible body and a closed bracket: expand earlier group, dig the end, expand group department and prop up and establish the braided bag, fill the coal body in the braided bag in-band, the braided bag is compressible, has the flexibility, then prop up and establish gantry support to the tunnel, and the support takes the floorbar, has the blocking effect: step three, local pressure relief: blasting and pressure relief are carried out on the area with large deformation and strong power display of the surrounding rock of the roadway, a broken body structure is formed, high stress of the fault area is buffered, and impact energy is dissipated and released.

Description

Method for preventing and controlling rock burst of roadway in fault fracture area
Technical Field
The invention belongs to the technical field of coal mining, and particularly relates to a method for preventing and controlling rock burst of a roadway in a fault fracture area.
Background
Theories and practices show that rock burst and geological structures are closely related dynamic disasters, and the dynamic disasters mainly occur in fault, flexure and other parts. Along with the increase of coal mining depth, the frequency and the strength of roadway rock burst in a fault fracture area are continuously increased, the rock burst generated in the fault area occupies a greater proportion of structural rock burst, and the fault fracture area impact disaster seriously restricts the safety production of coal mines in China. Practice proves that the roadway in the fault fracture area is relatively soft in rock stratum of the fault fracture area, the coal seam is high in impact risk, high stress exists around the roadway, the concealment of rock burst is high, the rock burst is caused by the rock burst, the roadway space is blocked, and the prevention difficulty is extremely high. The prevention and control of the rock burst are different from the conventional types, and the prevention and control are difficult by adopting conventional measures. Because the coal rock mass crushing area is large, the pertinence of the conventional support is poor, and if the conventional support is subjected to the strong disturbance action of a dynamic stress field of a working face, the rock burst with serious locality is easy to occur.
The rock burst of a fault fracture zone and a strong impact dangerous coal seam has strong concealment and is often suddenly impacted in a roadway dynamic influence area. For high stress concentration areas such as fault crossing and fault pinch-out zones, the continuous action of a dynamic and static stress field exists, the broken zone is continuously expanded, the stress distribution difference changes greatly, and the impact is difficult to prevent and control. Therefore, for the rock burst with hidden characteristics in the fault fracture area, a method for preventing and controlling the rock burst, which is suitable for a high-stress fracture zone and can be stably used for a long time, needs to be invented, and the method has important significance for preventing and controlling the disaster of the rock burst of the structure.
Disclosure of Invention
Technical problem to be solved
The invention aims to provide an anti-impact method which is suitable for a high-stress fracture zone and can stably release energy for a long time, aiming at the reality that a fault type rock burst disaster occurs in a fault fracture zone and a coal seam with large mining depth and is difficult to prevent.
(II) technical scheme
In order to achieve the purpose, the invention is realized by the following technical scheme: a method for preventing and controlling rock burst of a roadway in a fault fracture area comprises the following steps:
step one, determining a dangerous area under the influence of a fault: according to the revealed fault occurrence and roadway display, a fault rock burst occurring section is researched and judged in advance to be used as a regional prevention and treatment key point;
step two, erecting a flexible body and a closed bracket: expand earlier group, dig the end, expand group department and prop up and establish the braided bag, fill the coal body in the braided bag in-band, the braided bag is compressible, has the flexibility, then prop up and establish gantry support to the tunnel, and the support takes the floorbar, has the blocking effect:
step three, local pressure relief: blasting and pressure relief are carried out on the area with large deformation and strong power display of the surrounding rock of the roadway, a broken body structure is formed, high stress of the fault area is buffered, and impact energy is dissipated and released.
The invention has the positive effects that: for the mine with fault zone and deep rock burst, the whole support of the fault zone is realized through the support of the flexible and closed supports, the flexible body can dissipate and release energy, and the effective prevention of the rock burst in the fault zone is realized.
Drawings
Fig. 1 is a schematic view of a hazardous area, fig. 2 is a schematic view of a flexible body design, and fig. 3 is a schematic view of partial pressure relief.
Detailed Description
The embodiment of the invention provides a method for preventing and treating rock burst of a roadway in a fault fracture area, which comprises the following steps:
firstly, defining a dangerous area: determining an impact dangerous area according to fault and roadway crushing conditions and by taking a danger monitoring result as a basis and combining a stope mining environment, wherein A is a dangerous area, and is shown in figure 1;
secondly, supporting a flexible body and a bracket: expanding the tunnel, digging the bottom, erecting a wall body of a woven belt along the line of expanding the tunnel, erecting a bottom-sealing gantry support after the flexible body is erected, and absorbing and supporting a fault crushing area by the combined body, wherein 1 is a flexible body, 2 is a gantry support, and the figure is 2.
Thirdly, local pressure relief: for the area with strong mine pressure display and obvious dynamic effect in the roadway, a deep hole blasting technology is adopted, and the stress is slowly transferred to the deep part by using a plurality of holes and a small amount of explosive, as shown in figure 3.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (1)

1. A method for preventing and controlling rock burst of a roadway in a fault fracture area is characterized by comprising the following steps: the method comprises the following steps:
step one, determining a dangerous area under the influence of a fault: according to the revealed fault occurrence and roadway display, a fault rock burst occurring section is researched and judged in advance to be used as a regional prevention and treatment key point;
step two, erecting a flexible body and a closed bracket: expand earlier group, dig the end, expand group department and prop up and establish the braided bag, fill the coal body in the braided bag in-band, the braided bag is compressible, has the flexibility, then prop up and establish gantry support to the tunnel, and the support takes the floorbar, has the blocking effect:
step three, local pressure relief: blasting and pressure relief are carried out on the area with large deformation and strong power display of the surrounding rock of the roadway, a broken body structure is formed, high stress of the fault area is buffered, and impact energy is dissipated and released.
CN202011504868.7A 2020-12-18 2020-12-18 Method for preventing and controlling rock burst of roadway in fault fracture area Pending CN112483095A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011504868.7A CN112483095A (en) 2020-12-18 2020-12-18 Method for preventing and controlling rock burst of roadway in fault fracture area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011504868.7A CN112483095A (en) 2020-12-18 2020-12-18 Method for preventing and controlling rock burst of roadway in fault fracture area

Publications (1)

Publication Number Publication Date
CN112483095A true CN112483095A (en) 2021-03-12

Family

ID=74914673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011504868.7A Pending CN112483095A (en) 2020-12-18 2020-12-18 Method for preventing and controlling rock burst of roadway in fault fracture area

Country Status (1)

Country Link
CN (1) CN112483095A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821516A (en) * 2014-03-10 2014-05-28 平顶山天安煤业股份有限公司 Method for preventing rock burst through secondary pressure relief
CN109915142A (en) * 2019-04-13 2019-06-21 山东科技大学 A kind of major fault fringe region Controlling of Coal Outburst method
CN110219649A (en) * 2019-06-13 2019-09-10 山东科技大学 Buffering release drainage and wide lane flexible wall prevention and treatment tight roof stay lane bump method
CN110259448A (en) * 2019-06-13 2019-09-20 山东科技大学 Unload crush the lane Ding Yukuan flexible wall prevention and treatment tight roof stay lane bump method
CN111411962A (en) * 2020-03-13 2020-07-14 陈卫军 Coal mine rock burst treatment method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821516A (en) * 2014-03-10 2014-05-28 平顶山天安煤业股份有限公司 Method for preventing rock burst through secondary pressure relief
CN109915142A (en) * 2019-04-13 2019-06-21 山东科技大学 A kind of major fault fringe region Controlling of Coal Outburst method
CN110219649A (en) * 2019-06-13 2019-09-10 山东科技大学 Buffering release drainage and wide lane flexible wall prevention and treatment tight roof stay lane bump method
CN110259448A (en) * 2019-06-13 2019-09-20 山东科技大学 Unload crush the lane Ding Yukuan flexible wall prevention and treatment tight roof stay lane bump method
CN111411962A (en) * 2020-03-13 2020-07-14 陈卫军 Coal mine rock burst treatment method

Similar Documents

Publication Publication Date Title
CN107165638B (en) A kind of deep tunnel rock burst active preventing control method
Wang et al. Fracture failure analysis of hard–thick sandstone roof and its controlling effect on gas emission in underground ultra-thick coal extraction
Zhang et al. An innovative non-pillar coal-mining technology with automatically formed entry: a case study
Zhu et al. Mechanism of the dynamic pressure caused by the instability of upper chamber coal pillars in Shendong coalfield, China
AU2021453348B2 (en) Method for preventing and controlling rock bursts in development roadway group
CN111927470B (en) Microwave-assisted pressure relief and support method for deep hard rock engineering
CN109184762B (en) Rock bolt modified surrounding rock impact ground pressure prevention method for extra-thick coal seam
CN104832198A (en) Roadway surrounding rock deformation, rock burst and coal and gas outburst comprehensive treatment method
CN107060773B (en) A kind of underground chamber drilling and blasting method damping excavation method of static(al) explosion presplitting shock insulation
CN107023295B (en) Hard coal erosion-prevention pressure-relief drilling construction method and equipment
CN110173264A (en) Lane bump method is stayed with conventional release prevention and treatment tight roof in disconnected top
CN110924945A (en) Safe working method under condition of lateral suspended roof rock burst
CN105156110A (en) Dynamic disaster mine district roadway structure and method for developing same
JP2023538226A (en) Tertiary preventive control method for mountain bouncing tunnels
CN111005764A (en) Rock burst multi-parameter monitoring and early warning system under two hard conditions
CN109915141A (en) The control method of not wide protection pillar mining roadway bump
CN111322076A (en) Method for forming roadway scour-prevention weak structure through coal rock hydraulic fracturing
Xue et al. Mechanism and energy evolution characteristics of coal burst in mining thick, deep, and large inclined coal seams: a case study from a Chinese coal mine
He et al. Rock dynamics in deep mining
CN109915142A (en) A kind of major fault fringe region Controlling of Coal Outburst method
ZHU et al. Prevention of rockburst by guide holes based on numerical simulations
CN106437712B (en) Coal mine surrounding cities Strong tremor disaster reduction method
CN112483095A (en) Method for preventing and controlling rock burst of roadway in fault fracture area
Pengfei et al. The mechanical criterion of activation and instability of normal fault induced by the movement of key stratum and its disaster-causing mechanism of rockburst in the hanging wall mining
CN215979369U (en) Coal mine rock burst prevention and control system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210312