CN101793487A CN 201010136157 CN201010136157A CN101793487A CN 101793487 A CN101793487 A CN 101793487A CN 201010136157 CN201010136157 CN 201010136157 CN 201010136157 A CN201010136157 A CN 201010136157A CN 101793487 A CN101793487 A CN 101793487A
Authority
CN
China
Prior art keywords
tunnel
controlled blasting
construction
blasting
shallow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010136157
Other languages
Chinese (zh)
Inventor
钟冬望
余刚
陈浩
磨季云
姜翠香
韩芳
吴亮
陈江伟
陈桂娟
胡卫华
梁炫
王难烂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN 201010136157 priority Critical patent/CN101793487A/en
Publication of CN101793487A publication Critical patent/CN101793487A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a controlled blasting technique for small-clear-distance tunnel construction. The invention adopts a technical scheme comprising the following: step 1, determining that the safety standard of blasting vibration is 3 to 5 cm/s according to safety requirements of adjacent tunnels or buildings (structures); step 2, performing excavation shallow-hole multi-cycle micro-differential controlled blasting on a construction tunnel according to three steps, namely, to excavate a first step I in an excavation length of 5 to 10 meters by adopting shallow-hole micro-differential controlled blasting and then to successively excavate a second step II and a third step III in an excavation length of 5 to 10 meters by adopting shallow-hole micro-differential controlled blasting as well; and step 3, repeat the step 2 until all tunnel construction is finished. The technique has the characteristics of effectively protecting the stability of surrounding rock and the safety of adjacent tunnels or buildings (structures) and ensuring construction progress and construction safety.

Description

Controlled blasting technique for small-clear-distance tunnel construction
Technical field
The invention belongs to Geotechnical Engineering blasting technique field, relate in particular to a kind of controlled blasting technique for small-clear-distance tunnel construction.
Background technology
Along with the acceleration of Urbanization in China and the extensive expansion of traffic capital construction, many cities have begun the construction of new round subway engineering, civil air defense constructions and installations and urban light rail railway engineering; Simultaneously, a large amount of single-track tunnels need increase builds the tunnel, two wires, or the ew line tunnel need build up parallel two-wire, and these engineerings often need be constructed near existing buildings or structures inevitably, or pass through under some important face of land buildings or structures.In these engineering constructions, tunnel piercing blasting technique as a kind of main construction method, its blasting parameter choose with construction technology determine whether reasonable, not only directly have influence on blasting quality, constructing tunnel efficient and economic benefit of engineering, but also have influence on the effect and the safety of buildings or structures on every side of stable, the tunnel support of tunnel surrounding.How this influence being reduced to bottom line, is the key problem of constructing under proximity condition in the underground structure.
Compare with other blasting engineering, Tunnel Blasting is the bursting work that is in a kind of relative small space.At present, China mainly concentrates on the Cut Blasting technology to the research of tunnel piercing blasting technique, the periphery hole blasting technique, aspect (Fang Junbo such as driving blasting technique when no slotting driving blasting technique and tunnel pass through face of land building, Cui Tianlin. the interval blasting vibration of shallow embedding subway is to influence [J] tunnel, the world .2000 (5) of surface buildings: 28~31), (Zhu Zebing, Zhang Dongming. the control [J] of big level ground tunnel piercing concussion of blasting. engineering explosion .2002,8 (4): 65~70), (Dai Qinrong, Li Liangyun. interior elder brother's railway No. 1 tunnel control Technology of Blasting in Yanjin [J] tunnel, the world (supplementary issue) .2000:316~322), (Zhou Chunfeng. city shallow tunnel excavation damping controlled blasting technology [J]. engineering explosion .2001,7 (1): 57~61), though these technology have its advantage, but the situation that construction surface is crowded and part work post workmen constructs nowhere can occur, influence construction speed; The arrangement and method for construction very flexible, when country rock situation and execution conditions changed, former arrangement and method for construction was difficult to make timely, suitable adjustment; Especially can influence the stability of country rock and the safety of closing on tunnel or adjacent buildings or structures, also influence construction safety.
Summary of the invention
Task of the present invention provides a kind of stability of country rock and safety of closing on tunnel or adjacent buildings or structures can protected effectively, can guarantee the controlled blasting technique for small-clear-distance tunnel construction of construction speed and construction safety again.
For realizing above-mentioned task, the technical solution adopted in the present invention is: the first step, according to the safety requirements that closes on tunnel or adjacent buildings or structures, determine that safety criterion of blasting vibration is 3~5cm/s; Second step, construction tunnel is tunneled the controlled blasting of shallow many circulations of eye elementary errors by three steps, promptly at first the 1st step is implemented driving, Excavation Length is 5~10m, driving adopts the controlled blasting of shallow eye elementary errors, successively the 2nd step and the 3rd step are implemented driving again, Excavation Length is 5~10m, and driving also adopts the controlled blasting of shallow eye elementary errors; The 3rd step repeated for second step, all constructed until finishing the tunnel.
The controlled blasting parameter is:
Maximum single hop dose is 5~8kg;
The explosion cyclic advance is 0.8~1.5m;
Coupling parameter is not 2.0~2.5;
Spacing spacing E is (10~15) D, D---blasthole diameter, m;
Borehole proximity parameter m is 0.8~1.0;
Linear charging density ρ is 100~250g/m;
Charge constitution is a coupling charging not;
The slotting form is V-cut.
Owing to adopt technique scheme, one of main feature of the present invention be to construction tunnel by the three steps driving that circulates more, for each different work post that circulate provides enough working faces, make each work post construction be connected more compact, improve efficiency of construction, accelerating construction progress 40%~55%; Another characteristics of the present invention are the controlled blasting of shallow eye elementary errors, and the selection of blasting parameter is dynamically adjusted according to real-time Monitoring Data, in the zone with higher-security, can suitably strengthen single hop dose and single cycle drilling depth; When the distance protected object was nearer, the strictness control by to blasting parameter such as hole depth, maximum single hop dose and explosion cyclic advance can guarantee its security.Use this method explosion, blast hole utilizing factor improves greatly, can protect the stability of country rock effectively, guarantees the safety and the construction speed of constructing; By the practical engineering application contrast, blast hole utilizing factor reaches more than 90%, and the horizontal blasting vibration had descended 36.8%~43.5% than originally, and the veritcal shooting vibration had descended 29.1%~40.8% than originally.
Therefore, the present invention has the stability that can protect country rock effectively and the safety of closing on tunnel or adjacent buildings or structures, can guarantee the characteristics of construction speed and construction safety again.
Description of drawings
Fig. 1 is a kind of three steps driving of the present invention schematic diagram.
The specific embodiment
The present invention will be further described below in conjunction with the drawings and specific embodiments, is not the restriction to protection domain:
Embodiment 1
A kind of controlled blasting technique for small-clear-distance tunnel construction.The minimum distance at two centers in this construction tunnel and existing tunnel is 8~15m.The controlled blasting technology that present embodiment is taked is: the first step, according to the safety requirements that closes on the tunnel, determine that safety criterion of blasting vibration is 3~5cm/s; Second step, construction tunnel is tunneled the controlled blasting of shallow many circulations of eye elementary errors by three steps, as shown in Figure 1, be that upper step I implements driving at first to the 1st step, Excavation Length is 5~10m, and driving adopts the controlled blasting of shallow eye elementary errors, successively the 2nd the step II and the 3rd step III of bottom is implemented driving again, Excavation Length is 5~10m, and driving also adopts the controlled blasting of shallow eye elementary errors; The 3rd step repeated for second step, all constructed until finishing the tunnel.
The controlled blasting parameter is:
Maximum single hop dose is 5~5.5kg;
The explosion cyclic advance is 0.8~0.9m;
Spacing E is (10~15) D, D---blasthole diameter, m;
Borehole proximity parameter m is 0.8~1.0;
Linear charging density ρ is 100~250g/m;
Charge constitution is a coupling charging not;
Coupling parameter is not 2.0~2.5;
The slotting form is V-cut.
Embodiment 2
A kind of controlled blasting technique for small-clear-distance tunnel construction.The minimum distance at two centers in this construction tunnel and existing tunnel is 15~25m.
The controlled blasting parameter is:
Maximum single hop dose is 5~6kg;
The explosion cyclic advance is 0.9~1m;
Spacing E is (10~15) D.
All the other are with embodiment 1.
Embodiment 3
A kind of controlled blasting technique for small-clear-distance tunnel construction.The minimum distance at two centers in this construction tunnel and existing tunnel is 25~35m.
The controlled blasting parameter is:
Maximum single hop dose is 5.5~7kg;
The explosion cyclic advance is 1.0~1.2m;
Spacing E is (15~20) D.
All the other are with embodiment 1.
Embodiment 4
A kind of controlled blasting technique for small-clear-distance tunnel construction.The minimum distance at two centers in this construction tunnel and existing tunnel is 35~75m.
The controlled blasting parameter is:
Maximum single hop dose is 7~8kg;
The explosion cyclic advance is 1.2~1.5m;
Spacing E is (15~20) D.
All the other are with embodiment 1.
This specific embodiment by the three steps driving that circulates, for each different work post that circulate provides enough working faces, makes each work post construction be connected more compact, raising efficiency of construction, accelerating construction progress 40%~55% to construction tunnel more; Adopt the controlled blasting of shallow eye elementary errors simultaneously, blasting parameter is selected dynamically to adjust according to real-time Monitoring Data, in the zone with higher-security, can suitably strengthen single hop dose and single cycle drilling depth; When the distance protected object is nearer, by strictness control, to guarantee its security to blasting parameters such as hole depth, maximum single hop dose and explosion cyclic advances.Use this method explosion, blast hole utilizing factor improves greatly, can protect the stability of country rock effectively, guarantees the safety and the construction speed of constructing; By the practical engineering application contrast, blast hole utilizing factor reaches more than 90%, and the horizontal blasting vibration had descended 36.8%~43.5% than originally, and the veritcal shooting vibration had descended 29.1%~40.8% than originally.
Therefore, this specific embodiment has the stability that can protect country rock effectively and the safety of closing on tunnel or adjacent buildings or structures, can guarantee the characteristics of construction speed and construction safety again.

Claims (2)

1. controlled blasting technique for small-clear-distance tunnel construction is characterized in that this controlled blasting technology is: the first step, according to the safety requirements that closes on tunnel or adjacent buildings, determine that safety criterion of blasting vibration is 3~5cm/s; Second step, construction tunnel is tunneled the controlled blasting of shallow many circulations of eye elementary errors by three steps, promptly at first the 1st step is implemented driving, Excavation Length is 5~10m, driving adopts the controlled blasting of shallow eye elementary errors, successively the 2nd step and the 3rd step are implemented driving again, Excavation Length is 5~10m, and driving also adopts the controlled blasting of shallow eye elementary errors; The 3rd step repeated for second step, all constructed until finishing the tunnel.
2. controlled blasting technique for small-clear-distance tunnel construction according to claim 1 is characterized in that described controlled blasting parameter is:
Maximum single hop dose is 5~8kg;
The explosion cyclic advance is 0.8~1.5m;
Coupling parameter is not 2.0~2.5;
Spacing E is (10~15) D, D---blasthole diameter, m;
Borehole proximity parameter m is 0.8~1.0;
Linear charging density ρ is 100~250g/m;
Charge constitution is a coupling charging not;
The slotting form is V-cut.
CN 201010136157 2010-03-30 2010-03-30 Controlled blasting technique for small-clear-distance tunnel construction Pending CN101793487A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010136157 CN101793487A (en) 2010-03-30 2010-03-30 Controlled blasting technique for small-clear-distance tunnel construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010136157 CN101793487A (en) 2010-03-30 2010-03-30 Controlled blasting technique for small-clear-distance tunnel construction

Publications (1)

Publication Number Publication Date
CN101793487A true CN101793487A (en) 2010-08-04

Family

ID=42586314

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010136157 Pending CN101793487A (en) 2010-03-30 2010-03-30 Controlled blasting technique for small-clear-distance tunnel construction

Country Status (1)

Country Link
CN (1) CN101793487A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103123247A (en) * 2013-01-07 2013-05-29 重庆建工集团股份有限公司 Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation
CN103344154A (en) * 2013-07-05 2013-10-09 武汉科技大学 Carbonaceous schist tunnel blasting method and construction method
CN104196537A (en) * 2014-08-26 2014-12-10 广东省建筑工程机械施工有限公司 Construction method of three parallel metro tunnels with ultra-small clear distance
CN104457466A (en) * 2014-12-08 2015-03-25 上海市政工程设计研究总院(集团)有限公司 Explosion method of open-cut tunnel segment
CN105865281A (en) * 2016-04-27 2016-08-17 杨毅 Method for transverse open excavation controlled blasting construction adjacent to power station and booster station
CN106021937A (en) * 2016-05-24 2016-10-12 北京科技大学 Calculation method for tunnel blasting explosive quantities under different vibration velocities for building structures
CN106288987A (en) * 2016-08-23 2017-01-04 中国铁建大桥工程局集团有限公司 A kind of small interval top-bottom cross constructing tunnel engineering method
CN107191189A (en) * 2017-06-09 2017-09-22 中铁建大桥工程局集团第五工程有限公司 Extra small clear-distance tunnel controlled blasting construction method
CN114963907A (en) * 2022-06-30 2022-08-30 北京住总集团有限责任公司 Rock tunnel blasting excavation method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6431075B2 (en) * 1999-12-31 2002-08-13 Dong Soo Shim Center-cut method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split
CN101144384A (en) * 2007-11-01 2008-03-19 中铁二局股份有限公司 Tunnel engineering non-blasting weak disturbance excavating method
KR20090008810A (en) * 2007-07-19 2009-01-22 두준기 Blasting method of loading non-electric ms detonator and connecting with detonating fuse in contour holes
CN100543269C (en) * 2006-06-23 2009-09-23 董淑练 The excavation method of constructing tunnel

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6431075B2 (en) * 1999-12-31 2002-08-13 Dong Soo Shim Center-cut method for tunnel excavation utilizing large unloaded blast holes and a circular pre-split
CN100543269C (en) * 2006-06-23 2009-09-23 董淑练 The excavation method of constructing tunnel
KR20090008810A (en) * 2007-07-19 2009-01-22 두준기 Blasting method of loading non-electric ms detonator and connecting with detonating fuse in contour holes
CN101144384A (en) * 2007-11-01 2008-03-19 中铁二局股份有限公司 Tunnel engineering non-blasting weak disturbance excavating method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《中国优秀硕士学位论文全文数据库工程科技Ⅱ》 20080815 戴向胜 长距离小净距隧道爆破开挖振动标准的研究 第7-14,17,19,37-38页 1-2 第卷, 第8期 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103123247A (en) * 2013-01-07 2013-05-29 重庆建工集团股份有限公司 Damping blasting method for steep dip small crossing angle layered surrounding rock small-distance tunnel excavation
CN103344154B (en) * 2013-07-05 2015-04-08 武汉科技大学 Carbonaceous schist tunnel blasting method and construction method
CN103344154A (en) * 2013-07-05 2013-10-09 武汉科技大学 Carbonaceous schist tunnel blasting method and construction method
CN104196537A (en) * 2014-08-26 2014-12-10 广东省建筑工程机械施工有限公司 Construction method of three parallel metro tunnels with ultra-small clear distance
CN104457466B (en) * 2014-12-08 2018-06-15 上海市政工程设计研究总院(集团)有限公司 A kind of blasting method of tunnel open excavation section
CN104457466A (en) * 2014-12-08 2015-03-25 上海市政工程设计研究总院(集团)有限公司 Explosion method of open-cut tunnel segment
CN105865281A (en) * 2016-04-27 2016-08-17 杨毅 Method for transverse open excavation controlled blasting construction adjacent to power station and booster station
CN106021937A (en) * 2016-05-24 2016-10-12 北京科技大学 Calculation method for tunnel blasting explosive quantities under different vibration velocities for building structures
CN106021937B (en) * 2016-05-24 2018-12-18 重庆巨能建设(集团)有限公司 It is a kind of for construction of structures difference vibration velocity require under Tunnel Blasting medicine calculation method
CN106288987A (en) * 2016-08-23 2017-01-04 中国铁建大桥工程局集团有限公司 A kind of small interval top-bottom cross constructing tunnel engineering method
CN107191189A (en) * 2017-06-09 2017-09-22 中铁建大桥工程局集团第五工程有限公司 Extra small clear-distance tunnel controlled blasting construction method
CN114963907A (en) * 2022-06-30 2022-08-30 北京住总集团有限责任公司 Rock tunnel blasting excavation method
CN114963907B (en) * 2022-06-30 2024-03-15 北京住总集团有限责任公司 Rock tunnel blasting excavation method

Similar Documents

Publication Publication Date Title
CN101793487A (en) Controlled blasting technique for small-clear-distance tunnel construction
CN102220868B (en) Urban shallow buried large-section tunnel five-step excavating method
CN103527198B (en) Cut a tight roof/top coal hydraulic fracture control method
CN104790978B (en) The tunnel ring-shaped base tunnel construction method of small interval crossings on different level
CN104197796B (en) The annular segment blasting isolation method of existing building is worn under Shallow tunnel with large cross-section
CN103195058B (en) Be convenient to solution cavity and grow the method that regional bridge pier adopts many casings to construct
CN106869966B (en) A kind of method for blocking of absciss layer water supply source
CN104564085B (en) Large section tunnel excavation comprehensive construction method under an ultra shallow underground layering part of city
CN103306682B (en) Long-span and high-side-wall underground space building and excavation support method thereof
CN103114857A (en) Shield tunnel construction method
CN103017620A (en) Controlled blasting construction method for rock foundation pit
CN110529151A (en) A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method
CN203594035U (en) Multilevel combined protection structure for shallow hole blasting excavation bridge foundation pit construction
CN107881995A (en) Underground workshop palisades crane beam excavating construction method under unfavorable geological condition
CN103967024A (en) United construction method for forming holes and grooves in deep sandy gravel stratum
Yao et al. Numerical analysis of the influence of isolation piles in metro tunnel construction of adjacent buildings
CN203822311U (en) Advanced detection and pre-reinforcing structure for shield tunnel crossing existing station construction
CN102435114A (en) Explosion vibration control construction method of advance and following expanding excavation method of lower large heading of tunnel
CN109555502A (en) A kind of antireflective type approval test method of high methane coal road presplitting
CN103777235B (en) A kind of stage excavation buried hard rock tunnel microseismic monitoring sensor method for arranging
CN103306248A (en) High dam spillway foundation drainage system and excavation method
Song et al. The overall design of Qingdao Jiaozhou Bay subsea tunnel
Wang et al. Numerical analysis of the influence of foundation pit blasting on a nearby metro tunnel
Jun et al. Water-inrush mechanism during construction and determination of safety distance from the water source in a karst tunnel
CN104762989A (en) Method for speeding up diaphragm retaining wall construction at hard rock strata

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20100804