CN110529151A - A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method - Google Patents

A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method Download PDF

Info

Publication number
CN110529151A
CN110529151A CN201910807808.3A CN201910807808A CN110529151A CN 110529151 A CN110529151 A CN 110529151A CN 201910807808 A CN201910807808 A CN 201910807808A CN 110529151 A CN110529151 A CN 110529151A
Authority
CN
China
Prior art keywords
tunnel
zoning
grading
fully mechanized
reinforcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910807808.3A
Other languages
Chinese (zh)
Inventor
罗明坤
杨计先
张亮
唐平
苟云用
胡良
何平
郭雅尘
王琨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Lu'an Environmental Protection Energy Development Co Ltd Zhangcun Coal
Original Assignee
Shanxi Lu'an Environmental Protection Energy Development Co Ltd Zhangcun Coal
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Lu'an Environmental Protection Energy Development Co Ltd Zhangcun Coal filed Critical Shanxi Lu'an Environmental Protection Energy Development Co Ltd Zhangcun Coal
Priority to CN201910807808.3A priority Critical patent/CN110529151A/en
Publication of CN110529151A publication Critical patent/CN110529151A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/28Longitudinal struts, i.e. longitudinal connections between adjoining arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D17/00Caps for supporting mine roofs
    • E21D17/01Caps for supporting mine roofs characterised by the shape of the cap, e.g. of specified cross-section
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full methods.The present invention is mainly to solve the technical problem that tunnel existing for existing passing sunk pillars on full method cannot safeguard for a long time, roadway deformation amount helps greatly the amount of shifting near with two and helps drum amount big.The technical scheme is that including the following steps: step 1: the roadway's sides at driving face rear lay two ear drill sites;Step 2: it meets head on respectively from driving face, drill site lateral wall is constructed to karst collapse col umn, horizontal this layer of position, top plate and bottom plate where coal petrography interface brill injected hole and slip casting, injected hole radiation tunnel;Step 3: after karst collapse col umn grouting and reinforcing, digging laneway, using anchor pole and rete cord combined supporting;Step 4: to reinforcing laneway area surface gunite;Step 5: implementing long short-bore cement injection technology to reinforcing laneway area country rock, forms multiple bearing-load arch around tunnel and pressure is allowed to encircle;Step 6: tool steel shed is set up to reinforcing laneway area, enhances the passive bearing capacity in tunnel.

Description

A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method
Technical field
The present invention relates to a kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full methods, and it is raw that it belongs to safety of coal mines Produce technical field.
Background technique
It in coal production organizational process, is influenced by geological conditions, inevitably in driving or exploitation process Encounter this kind of geological structure of karst collapse col umn.Karst collapse col umn possession matter exceptions area, the especially country rock of coal petrography interface be discontinuous, intensity compared with It is low, or even the water of other layer of position is imported into working face.When tunnelling passes through the region, back sinking, two are easily caused Phenomena such as amount of shifting near is big, side drum pucking is serious generation is helped, there are larger security risks, and it is raw to seriously affect ventilation, transport, pedestrian etc. Production process.In order to solve karst collapse col umn abnormal area roadway deformation destabilization problems, needs to take special control measures, be adopted at present Administering method substantially has following several:
1. by enhancing supporting parameter, the modes such as array pitch, reinforcement placing canopy between diminution anchor shaft anchor cable;
2. by implementing grouting and reinforcing to roadway surrounding rock;
3. passing through brushing repeatedly, the modes such as caunch, undercut;
But by implementing existing passing sunk pillars on full method, discovery tunnel cannot still safeguard for a long time, roadway deformation amount Still very big, it especially shows as two and helps the amount of shifting near and side drum amount larger, seriously affect the ventilation and transport of exploiting field main entry;Meanwhile Larger security risk is still remained in tunneling process.
Summary of the invention
Present invention aim to address tunnels existing for existing passing sunk pillars on full method cannot still safeguard for a long time, tunnel becomes Shape amount is big and two help the amount of shifting near and side drum to measure big technical problem, and it is excessively sunken to provide a kind of fully mechanized workface Grading And Zoning integrative consolidation Fall column method.Karst collapse col umn abnormal area tunnel is effectively reduced in the roadway deformation amount of viability, guarantee dash, transport, Smooth, the safe construction during guarantee tunnelling of the production processes such as pedestrian.
To achieve the above object, the technical solution adopted by the present invention is that:
A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method comprising following steps:
Step 1: the position karst collapse col umn 15m is met in front of driving face and stops driving, in the tunnel two at driving face rear Side lays two ear drill sites, expands the treatment range of karst collapse col umn;
Step 2: meet head on respectively from driving face, drill site lateral wall to karst collapse col umn construct, coal petrography interface bore injected hole And slip casting, injected hole radiate this layer of position, top plate and the bottom plate of level where tunnel, make the coal petrography interface within the scope of tunnel repair Roof and floor increases without water, rock mass strength enhancing, bonding degree;
Step 3: after karst collapse col umn grouting and reinforcing, digging laneway, within the scope of karst collapse col umn cylinder and its 20m reinforcing laneway of front and back Area uses anchor pole and rete cord combined supporting, and two shoulder of tunnel lays two fillet anchor poles;
Step 4: to reinforcing laneway area surface gunite, enhance the globality of support system, prevent roadway surrounding rock fast Fast weathering and reduce bearing capacity of the wall rock;
Step 5: implement long short-bore cement injection technology to reinforcing laneway area country rock, form multiple pressure-bearings around tunnel Encircle and pressure is allowed to encircle, enhances the survivability in tunnel;
Step 6: tool steel shed is set up to reinforcing laneway area, enhances the passive bearing capacity in tunnel, guarantees the stability in tunnel.
Further, the ear drill site is laid in the coal wall two for stopping digging 5~10m of line position rear and helps, larger to avoid Unsupported back span, two drill site step types arrangement, mode of taking a step is to greatest extent close to coal petrography interface as principle.
Further, the coal petrography interface inlet well uses three-dimensional arrangement, and drilling over long distances uses km drilling machine Orientation construction, Grouting Pipe are diameter 25mm steel pipe, and slip casting bore end spacing is not more than 2m, guarantees that the coal petrography interface of the zone of influence is complete Cover slip casting.
Further, the coal petrography interface range of grouting is 3~5 times of tunnel effective radius.
Further, the cement slurry jet thickness is 30~50mm.
Further, the Grouting Pipe of the long short-bore cement injection technology is steel pipe, and diameter 25mm, short slip casting length of tube is 2~3m, long slip casting length of tube are 5~7m, and short-bore slip casting uses low pressure and mass flow grouting mode, and long hole slip casting uses the small stream of high pressure Measure grouting mode.
Further, the tool steel shed is made of 20A model steel I-beam and steel leg, and ceiling timber wedge and top plate connect reality, It is connected between canopy with metal pull bar, 0.8~1.2m of canopy spacing.
The invention has the benefit that
Passing sunk pillars on full method provided by the invention increases karst collapse col umn and administers region, improves the punching of tunnel resisting mining stress The ability hit increases roadway support intensity, and the Grading And Zoning for constituting " grouting and reinforcing+active support+passive protecting " is comprehensive Passing sunk pillars on full scheme is reinforced, the deflection in tunnel within the scope of passing sunk pillars on full is effectively reduced, ensures safety production.
Detailed description of the invention
Fig. 1 is that fully mechanized workface karst collapse col umn of the present invention reinforces floor map;
Fig. 2 meets head on for fully mechanized workface of the present invention, two help, injected hole sets sectional elevation schematic diagram in drill site;
Fig. 3 meets head on for fully mechanized workface of the present invention, two help, injected hole sets sectional schematic diagram in drill site;
Fig. 4 is that digging laneway wall rock grouting of the present invention protects lane schematic diagram;
Fig. 5 is digging laneway of the present invention " anchor rete cord+tool steel shed " comprehensive support schematic diagram;
In figure: 1-karst collapse col umn, 2-tunnels, 3-stop digging line position, 4-drill sites I, 5-drill sites II, 6-driving faces It meets head on, 7-injected holes, 8-karst collapse col umn grouting and reinforcing ranges, 9-cement slurries, 10-bearing-load arch I, 11-bearing-load arch II, 12- Allow pressure arch I, 13-allow pressure arch II, 14-anchor poles, 15-anchor cables, 16-steel legs, 17-pull rods, 18-girder steels, 19-timber wedges.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples.
As shown in fig. 1~fig. 5, one of the present embodiment fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full side Method comprising following steps:
Step 1: it is met in front of driving face and stops driving at the position 15m of karst collapse col umn 1, at driving face rear 2 liang of tunnel side lays two ear drill site, that is, drill sites I 4 and drill site II 5, expands the treatment range of karst collapse col umn;
Step 2: it constructs respectively from meet head on 6, drill site I 4 and II 5 lateral wall of drill site of driving face to karst collapse col umn 1, in coal petrography Interface bores injected hole 7 and slip casting, and injected hole 7 radiates this layer of position, top plate and the bottom plate of level where tunnel, influences tunnel 2 Coal petrography interface roof and floor in range increases without water, rock mass strength enhancing, bonding degree;
Step 3: after 1 grouting and reinforcing of karst collapse col umn, digging laneway 2, within the scope of 1 cylinder of the karst collapse col umn and its front and back tunnel 20m adds Gu Qu forms combined support with bolt-net-cable using anchor pole 14 and anchor cable 15, and two shoulder of tunnel lays two fillet anchor poles 14;
Step 4: to 2 stabilization zone surface gunite 9 of tunnel, enhance the globality of support system, prevent roadway surrounding rock Rapid-weathering and reduce bearing capacity of the wall rock;
Step 5: implement long short-bore cement injection technology to 2 stabilization zone country rock of tunnel, form multiple hold around tunnel 2 Pressure encircles I 10, bearing-load arch II 11 and allows pressure to encircle I 12, allows and press arch II 13, the survivability in enhancing tunnel 2;
Step 6: tool steel shed is set up to 2 stabilization zone of tunnel, enhances the passive bearing capacity in tunnel 2, guarantees the stabilization in tunnel 2 Property.
The ear drill site I 4 and drill site II 5 be laid in stop dig 3 5~10m of rear of line position coal wall two help, for avoid compared with Big unsupported back span, two drill site step types arrangement, mode of taking a step is to greatest extent close to coal petrography interface as principle.
The injected hole 7 of the coal petrography interface uses three-dimensional arrangement, and drilling over long distances orients construction using km drilling machine, Grouting Pipe is diameter 25mm steel pipe, and 7 end spacing of injected hole is not more than 2m, guarantees the coal petrography interface all standing note of the zone of influence Slurry.
The coal petrography interface range of grouting is 3~5 times of 2 effective radius of tunnel.
9 jet thickness of cement slurry is 30~50mm.
The Grouting Pipe of the long short-bore cement injection technology is steel pipe, and diameter 25mm, short slip casting length of tube is 2~3m, long Slip casting length of tube is 5~7m, and short-bore slip casting uses low pressure and mass flow grouting mode, and long hole slip casting uses high-pressure low-flow slip casting side Formula.
The tool steel shed is made of 20A model steel I-beam 18 and steel leg 16, and ceiling timber wedge 19 and top plate connect reality, between canopy It is connected with metal pull bar 17,0.8~1.2m of canopy spacing.

Claims (7)

1. a kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method, it is characterised in that include the following steps:
Step 1: the position karst collapse col umn 15m is met in front of driving face and stops driving, the roadway's sides cloth at driving face rear If two ear drill sites, expand the treatment range of karst collapse col umn;
Step 2: meeting head on from driving face, drill site lateral wall is constructed to karst collapse col umn respectively, bores and injected hole and infuses in coal petrography interface Slurry, injected hole radiate this layer of position, top plate and the bottom plate of level where tunnel, make the coal petrography interface top bottom within the scope of tunnel repair Plate increases without water, rock mass strength enhancing, bonding degree;
Step 3: after karst collapse col umn grouting and reinforcing, digging laneway, within the scope of karst collapse col umn cylinder and its front and back 20m reinforcing laneway area is adopted With anchor pole and rete cord combined supporting, two shoulder of tunnel lays two fillet anchor poles;
Step 4: to reinforcing laneway area surface gunite, enhancing the globality of support system, prevents the quick wind of roadway surrounding rock Change and reduces bearing capacity of the wall rock;
Step 5: implementing long short-bore cement injection technology to reinforcing laneway area country rock, formed around tunnel multiple bearing-load arch and It allows pressure to encircle, enhances the survivability in tunnel;
Step 6: tool steel shed is set up to reinforcing laneway area, enhances the passive bearing capacity in tunnel, guarantees the stability in tunnel.
2. a kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method according to claim 1, feature exist In: the ear drill site is laid in the coal wall two for stopping digging 5~10m of line position rear and helps, and to avoid larger unsupported back span, two drill sites are stepped Step formula arrangement, mode of taking a step is to greatest extent close to coal petrography interface as principle.
3. a kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method according to claim 1, feature exist In: the coal petrography interface inlet well uses three-dimensional arrangement, and drilling is using the orientation construction of km drilling machine, Grouting Pipe over long distances For diameter 25mm steel pipe, slip casting bore end spacing is not more than 2m, guarantees the coal petrography interface all standing slip casting of the zone of influence.
4. a kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method according to claim 3, feature exist In: the coal petrography interface range of grouting is 3~5 times of tunnel effective radius.
5. a kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method according to claim 1, feature exist In: the cement slurry jet thickness is 30~50mm.
6. a kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method according to claim 1, feature exist In: the Grouting Pipe of the long short-bore cement injection technology is steel pipe, and diameter 25mm, short slip casting length of tube is 2~3m, long Grouting Pipe Length is 5~7m, and short-bore slip casting uses low pressure and mass flow grouting mode, and long hole slip casting uses high-pressure low-flow grouting mode.
7. a kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method according to claim 1, feature exist In: the tool steel shed is made of 20A model steel I-beam and steel leg, and ceiling timber wedge and top plate connect reality, uses metal pull bar between canopy It is connected, 0.8~1.2m of canopy spacing.
CN201910807808.3A 2019-08-29 2019-08-29 A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method Pending CN110529151A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910807808.3A CN110529151A (en) 2019-08-29 2019-08-29 A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910807808.3A CN110529151A (en) 2019-08-29 2019-08-29 A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method

Publications (1)

Publication Number Publication Date
CN110529151A true CN110529151A (en) 2019-12-03

Family

ID=68665069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910807808.3A Pending CN110529151A (en) 2019-08-29 2019-08-29 A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method

Country Status (1)

Country Link
CN (1) CN110529151A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111075482A (en) * 2020-01-02 2020-04-28 华北科技学院 Working face collapse column grouting waterproof treatment method
CN111828036A (en) * 2020-08-04 2020-10-27 天津爱纷销科技有限公司 Tunnel supporting structure
CN111828014A (en) * 2020-08-04 2020-10-27 天津爱纷销科技有限公司 Tunnel construction method
CN111894601A (en) * 2020-07-14 2020-11-06 中煤科工开采研究院有限公司 Coal seam roadway surrounding rock structure passing geological structure and advanced modification tunneling method thereof
CN111894600A (en) * 2020-07-14 2020-11-06 中煤科工开采研究院有限公司 Three-soft coal seam roadway surrounding rock structure and tunneling method thereof
CN112112559A (en) * 2020-08-26 2020-12-22 山西晋城无烟煤矿业集团有限责任公司 Method for segmented grouting of same grouting hole of underground mining face collapse column roadway
CN113431578A (en) * 2021-06-11 2021-09-24 中国煤炭地质总局水文地质局 Coal mine collapse column reinforcing construction process

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448214A (en) * 2017-08-18 2017-12-08 天地科技股份有限公司 The large-scale lane pre-pouring grout method of geological structure crack coal and rock superdeep holes high pressure two
CN109763821A (en) * 2019-03-15 2019-05-17 山西潞安矿业(集团)有限责任公司 A kind of compound shield lane method of dynamic pressure exploiting field main entry

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107448214A (en) * 2017-08-18 2017-12-08 天地科技股份有限公司 The large-scale lane pre-pouring grout method of geological structure crack coal and rock superdeep holes high pressure two
CN109763821A (en) * 2019-03-15 2019-05-17 山西潞安矿业(集团)有限责任公司 A kind of compound shield lane method of dynamic pressure exploiting field main entry

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘建民: "化学注浆加固和复合支护在掘进工作面过陷落柱中的应用", 《矿业装备》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111075482A (en) * 2020-01-02 2020-04-28 华北科技学院 Working face collapse column grouting waterproof treatment method
CN111894601A (en) * 2020-07-14 2020-11-06 中煤科工开采研究院有限公司 Coal seam roadway surrounding rock structure passing geological structure and advanced modification tunneling method thereof
CN111894600A (en) * 2020-07-14 2020-11-06 中煤科工开采研究院有限公司 Three-soft coal seam roadway surrounding rock structure and tunneling method thereof
CN111828036A (en) * 2020-08-04 2020-10-27 天津爱纷销科技有限公司 Tunnel supporting structure
CN111828014A (en) * 2020-08-04 2020-10-27 天津爱纷销科技有限公司 Tunnel construction method
CN112112559A (en) * 2020-08-26 2020-12-22 山西晋城无烟煤矿业集团有限责任公司 Method for segmented grouting of same grouting hole of underground mining face collapse column roadway
CN113431578A (en) * 2021-06-11 2021-09-24 中国煤炭地质总局水文地质局 Coal mine collapse column reinforcing construction process

Similar Documents

Publication Publication Date Title
CN110529151A (en) A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
CN101864987B (en) Building method of filled wall body for gob-side entry retaining of large-inclination coal seam
CN104533482B (en) A kind of reinforcement means improving gob side entry driving fender stability
CN104389628B (en) Landslide location tunnel reinforcement device and reinforced construction method
CN104074529B (en) A kind of cave continuous bivalve, lane, deep reinforcement means
CN108087008B (en) A kind of three-soft seam gob side entry method for protecting support
CN109098714A (en) A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN201991017U (en) Subway large-span station body structure based on arch cover method construction forming
CN109611103B (en) Method for reinforcing shield section suspended boulder group
CN108035742B (en) Active and passive harmonious support method for extremely soft coal seam roadway
CN103216244B (en) Roadway soft and weak top plate anchoring beam-arch combined structure support system and support method
CN103306713A (en) Networking reinforcement method for cross drilling holes of outburst coal seam
CN108316941A (en) A kind of breaking surrounding rock and soft-rock tunnel U-shaped steel cover canopy method for protecting support
CN104047613A (en) Method for anchoring coal mine tunnel bottom plate
CN104763434A (en) Non-coal-pillar double tunneling method
CN102966359A (en) Working face ventilation oxidization zone roof control method
CN102587962A (en) Methods for arranging and supporting wall-expanded gas extraction drill sites
CN109707422B (en) High-pressure grouting reinforcing and supporting method for small coal pillars along empty conveying roadway
CN109026024A (en) A kind of great horizontal stress effect back deformation control method
CN109630168A (en) Comprehensive extracting and caving face tunnel is arranged along floor strata and support pattern
CN106988760A (en) Facility-sliding strata tunnel portal reinforcing construction and construction method
CN109488329A (en) A kind of broken water drenching country rock administering method of Deep Soft Rock Tunnel large deformation
CN109457709A (en) A kind of supporting construction and construction method of double-row pile combination wide-angle anchor cable

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191203