CN106988760A - Facility-sliding strata tunnel portal reinforcing construction and construction method - Google Patents

Facility-sliding strata tunnel portal reinforcing construction and construction method Download PDF

Info

Publication number
CN106988760A
CN106988760A CN201710237273.1A CN201710237273A CN106988760A CN 106988760 A CN106988760 A CN 106988760A CN 201710237273 A CN201710237273 A CN 201710237273A CN 106988760 A CN106988760 A CN 106988760A
Authority
CN
China
Prior art keywords
hole
construction
tunnel
facility
glass fibre
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710237273.1A
Other languages
Chinese (zh)
Inventor
杨建民
谯啸海
李现宾
杨波
徐怀仁
何韬
余大龙
何聪
舒东利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201710237273.1A priority Critical patent/CN106988760A/en
Publication of CN106988760A publication Critical patent/CN106988760A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Abstract

Facility-sliding strata tunnel portal reinforcing construction and construction method, effectively to strengthen the security reliability that tunnel meets Facility-sliding strata construction.Facility-sliding strata tunnel portal reinforcing construction includes:Anchor pile and glass fibre drilled pile, anchor pile are arranged at hole both sides, and glass fibre drilled pile is set in a row along hole light and shade boundary lateral separation, and anchor pile and glass fibre drilled pile bottom pass through embedded basement rock behind slip fracture face;Hole open cut tunnel, is arranged at the outside of hole light and shade boundary;Open cut tunnel backfill stone, is filled at the top of the open cut tunnel of hole and both sides, to front face-upward slope formation back-pressure.

Description

Facility-sliding strata tunnel portal reinforcing construction and construction method
Technical field
The invention belongs to Environment in Railway Engineering Construction technical field, more particularly to a kind of Facility-sliding strata tunnel portal reinforcing construction and Construction method.
Background technology
In recent years, gradually southwester area is promoted railway construction in China, and Southwest Mountainous Areas is more, complex geologic conditions, on mountain In the railway construction of ridge, tunnel portal construction is always all difficult point.Particularly tunnel portal meets Facility-sliding strata massif, and entrance construction is more Plus it is difficult, the stability of Facility-sliding strata body should be ensured, ensure the security and stability of tunnel portal construction again.
According to current research, during the developmental joint fissure of hole, advance anchor bolt or pipe canopy are beaten beyond the excavation line of hole, so Excavate side and carry out supporting in back;If Portal Section rock is relatively crushed, cranny development or because geological structure stability it is poor when, take pre- anchor Gu, pre-pouring grout, set the reinforcing of the methods such as prestress anchorage cable, then take the methods such as expansions after first pilot tunnel, partial excavation, elder generation's wall rear arch Construction.
Traditional construction method hole excavated volume is big, increases construction investment, at the same it is serious to environmental disruption, can not be effective Guarantee Facility-sliding strata stability, the larger consolidation effect of cost is obvious.With the application development of glass-fibre technology, to solution Certainly such issues that, will have larger breakthrough.
At present, also compare and lack Facility-sliding strata tunnel portal start tunneling measure and the research of method, and tunnel portal The stability of construction is difficult to ensure.Therefore, the safety that the selection of Facility-sliding strata hole tunnel method is constructed to tunnel portal The stability of property and side slope plays vital effect
The content of the invention
The technical problems to be solved by the invention are to provide a kind of Facility-sliding strata tunnel portal reinforcing construction, effectively to strengthen Tunnel meets the security reliability of Facility-sliding strata construction.
The technical solution adopted for the present invention to solve the technical problems is as follows:
The Facility-sliding strata tunnel portal reinforcing construction of the present invention, it is characterized in that it includes:Anchor pile and glass fibre drilling Stake, anchor pile is arranged at hole both sides, and glass fibre drilled pile is set in a row along hole light and shade boundary lateral separation, anchor pile and Glass fibre drilled pile bottom passes through embedded basement rock behind slip fracture face;Hole open cut tunnel, is arranged at the outside of hole light and shade boundary; Open cut tunnel backfill stone, is filled at the top of the open cut tunnel of hole and both sides, to front face-upward slope formation back-pressure.
The technical problems to be solved by the invention are to provide a kind of construction method of Facility-sliding strata tunnel portal reinforcing construction, This method comprises the following steps:
1. construct hole both sides anchor pile;
2. in hole light and shade boundary construction glass fibre drilled pile;
3. bored tunnel upper semisection face, and advance support structure of constructing are excavated;
4. construction hole open cut tunnel and tunnel portal in time;
5. open cut tunnel backfill stone is filled in hole open cut tunnel top and both sides, to front face-upward slope formation back-pressure;
6. glass fibre drilled pile in hole is blocked, hole is entered in tunneling.The beneficial effects of the invention are as follows drilled using glass fibre The method that stake is combined with anchor pile is reinforced after Facility-sliding strata, and combination hole open cut tunnel and backfill back-pressure face-upward slope, stable side slope Stake is cut again and enters hole, the stability of Facility-sliding strata is can guarantee that, face-upward slope brush slope is reduced, and reduces the destruction to environment, it is effective to solve Tunnel portal enters the problem in hole;The design for entering hole method for Facility-sliding strata tunnel portal provides scientific basis, strengthens tunnel Road enters the security reliability that Facility-sliding strata construction is met in hole, and economic, reasonable, safe efficient, reduction is realized most possibly and is damaged Lose.
Brief description of the drawings
This specification includes following width accompanying drawing:
Fig. 1 is the front view of Facility-sliding strata tunnel portal reinforcing construction of the present invention;
Fig. 2 is the side view of Facility-sliding strata tunnel portal reinforcing construction of the present invention;
Toponym and corresponding mark are shown in figure:Brush slope line 11, clay aquiclude 12, crack 13, mortar flag stone 14, bored tunnel 15, anchor pile 16, glass fibre drilled pile 17, open cut tunnel backfill stone 18, above-ground route 19, slip fracture face 20, Hole light and shade boundary 21, hole open cut tunnel 22.
Embodiment
The present invention is further described with reference to the accompanying drawings and examples.
Referring to Figures 1 and 2, Facility-sliding strata tunnel portal reinforcing construction of the invention is included:Anchor pile 16 and glass fibre are bored Hole stake 17, anchor pile 16 is arranged at hole both sides, and glass fibre drilled pile 17 is in a row set along 21 lateral separations of hole light and shade boundary Put, anchor pile 16 and the bottom of glass fibre drilled pile 17 pass through embedded basement rock behind slip fracture face 20;Hole open cut tunnel 22, is arranged at The outside of hole light and shade boundary 21;Open cut tunnel backfill stone 18, is filled in the top of hole open cut tunnel 22 and both sides, to front face-upward slope shape Into back-pressure.The method combined using glass fibre drilled pile 17 with anchor pile 16 reinforces Facility-sliding strata, and combines hole open cut tunnel 22 and the back-pressure face-upward slope of open cut tunnel backfill stone 18, stake is cut again after stable side slope and enters hole, be can guarantee that the stability of Facility-sliding strata, is subtracted Few face-upward slope brush slope, reduces the destruction to environment, effectively solves the problem that tunnel portal enters hole
Reference picture 1, the horizontal each interval of anchor pile 16 is set in a row.The arrangement of reinforcement of the anchor pile 16 is regular reinforcement, institute The arrangement of reinforcement for stating glass fibre drilled pile is glass fibre.
Referring to Figures 1 and 2, the construction method of Facility-sliding strata tunnel portal reinforcing construction of the present invention, comprises the following steps:
1. construct hole both sides anchor pile 16;
2. in the construction glass fibre drilled pile 17 of hole light and shade boundary 21;
3. the upper semisection face of bored tunnel 15, and advance support structure of constructing are excavated;
4. construction hole open cut tunnel 22 and tunnel portal in time;
5. open cut tunnel backfill stone 18 is filled in the top of hole open cut tunnel 22 and both sides, to front face-upward slope formation back-pressure;
6. glass fibre drilled pile 17 in hole is blocked, hole is entered in tunneling.
The advance support structure includes the ductule set first and guiding wall, the steel tube shed then constructed.
Some of simply explain through diagrams Facility-sliding strata tunnel portal reinforcing construction of the present invention and construction method described above Principle, be not intended to by the present invention be confined to shown in and described concrete structure and the scope of application in, therefore it is every be possible to by The corresponding modification utilized and equivalent, belong to apllied the scope of the claims of the invention.

Claims (5)

1. Facility-sliding strata tunnel portal reinforcing construction, it is characterized in that it includes:Anchor pile (16) and glass fibre drilled pile (17), Anchor pile (16) is arranged at hole both sides, and glass fibre drilled pile (17) is in a row set along hole light and shade boundary (21) lateral separation Put, anchor pile (16) and glass fibre drilled pile (17) bottom are embedded in basement rock afterwards through slip fracture face (20);Hole open cut tunnel (22), it is arranged at the outside of hole light and shade boundary (21);Open cut tunnel backfill stone (18), is filled in hole open cut tunnel (22) top and two Side, to front face-upward slope formation back-pressure.
2. Facility-sliding strata tunnel portal reinforcing construction as claimed in claim 1, it is characterized in that:The anchor pile (16) is horizontal each Every setting in a row.
3. Facility-sliding strata tunnel portal reinforcing construction as claimed in claim 1, it is characterized in that:The arrangement of reinforcement of the anchor pile (16) For regular reinforcement, the arrangement of reinforcement of the glass fibre drilled pile is glass fibre.
4. the construction method of Facility-sliding strata tunnel portal reinforcing construction as claimed in claim 1, comprises the following steps:
1. construction hole both sides anchor pile (16);
2. in hole light and shade boundary (21) construction glass fibre drilled pile (17);
3. bored tunnel (15) upper semisection face, and advance support structure of constructing are excavated;
4. construction hole open cut tunnel (22) and tunnel portal in time;
5. open cut tunnel backfill stone (18) is filled in hole open cut tunnel (22) top and both sides, to front face-upward slope formation back-pressure;
6. glass fibre drilled pile (17) in hole are blocked, hole is entered in tunneling.
5. the construction method of Facility-sliding strata tunnel portal reinforcing construction as claimed in claim 3, it is characterized in that:The advanced branch Protection structure includes the ductule set first and guiding wall, the steel tube shed then constructed.
CN201710237273.1A 2017-04-12 2017-04-12 Facility-sliding strata tunnel portal reinforcing construction and construction method Pending CN106988760A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710237273.1A CN106988760A (en) 2017-04-12 2017-04-12 Facility-sliding strata tunnel portal reinforcing construction and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710237273.1A CN106988760A (en) 2017-04-12 2017-04-12 Facility-sliding strata tunnel portal reinforcing construction and construction method

Publications (1)

Publication Number Publication Date
CN106988760A true CN106988760A (en) 2017-07-28

Family

ID=59416113

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710237273.1A Pending CN106988760A (en) 2017-04-12 2017-04-12 Facility-sliding strata tunnel portal reinforcing construction and construction method

Country Status (1)

Country Link
CN (1) CN106988760A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441456A (en) * 2018-12-14 2019-03-08 中铁二院工程集团有限责任公司 A kind of the tunnel structure and its construction method of weakness Facility-sliding strata
CN109915150A (en) * 2019-04-26 2019-06-21 重庆交通大学 A kind of pile foundation pre-reinforcement supporting construction and its construction method controlling tunnel subsidence
CN110424460A (en) * 2019-08-22 2019-11-08 中铁隧道集团三处有限公司 A kind of tunnel open excavation construction technology
CN111926856A (en) * 2020-07-01 2020-11-13 中铁二院重庆勘察设计研究院有限责任公司 Tunnel entering construction method based on longitudinal anti-skid open cut tunnel structure
CN112922635A (en) * 2021-02-04 2021-06-08 中工武大设计研究有限公司 Hydraulic tunnel excavation supporting structure and construction method
CN114718582A (en) * 2022-06-08 2022-07-08 中铁九局集团第七工程有限公司 Construction method for small-clear-distance horizontal joint shale geological tunnel portal section

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100711576B1 (en) * 2005-11-08 2007-04-27 삼성물산 주식회사 Reinforcement structure for entrance of tunnel and construction method thereof
CN102767379A (en) * 2012-08-10 2012-11-07 中国建筑第四工程局有限公司 Shallow-buried unsymmetrical pressure section tunnel drilling construction method
CN203961997U (en) * 2014-07-11 2014-11-26 北京建筑大学 Shield structure hole glass fiber muscle fender post partial reinforced structure
CN204000900U (en) * 2014-07-17 2014-12-10 陕西路桥集团第一工程有限公司 A kind of ruggedized construction that is applied to the landslide of unsymmetrial loading tunnel hole
CN204163734U (en) * 2014-08-19 2015-02-18 舟山市宏达交通工程有限责任公司 Highway tunnel structure
CN204283438U (en) * 2014-11-28 2015-04-22 中铁第四勘察设计院集团有限公司 Portal supporting and protection structure
CN104806267A (en) * 2015-04-29 2015-07-29 中铁第一勘察设计院集团有限公司 Shield end socket reinforcing system of scree soil layer advance large pipe roof and construction method thereof
CN204877484U (en) * 2015-05-18 2015-12-16 中铁三局集团广东建设工程有限公司 A steel reinforcement cage structure for reducing shield structure discrepancy station degree of difficulty
CN105736003A (en) * 2016-01-29 2016-07-06 济南轨道交通集团有限公司 Structure of shield launching portal and shield launching construction method
CN105840207A (en) * 2016-03-24 2016-08-10 杭州江润科技有限公司 Cross shallow buried bias pressure loose accumulation body large-span tunnel comprehensive entrance structure construction method
CN105839643A (en) * 2016-05-23 2016-08-10 浙江省交通规划设计研究院 Tunnel in-hole construction method adopting foundation pit support
KR101655217B1 (en) * 2016-06-08 2016-09-07 우경기술주식회사 Construction method for open cutting in tunnel portal area
CN206000551U (en) * 2016-08-10 2017-03-08 中铁第一勘察设计院集团有限公司 A kind of Tunneling by mining method airtight advance support system of stream plastic state mud
CN206015689U (en) * 2016-08-26 2017-03-15 中铁二院工程集团有限责任公司 Whole slide large landslide joint reinforcement is constructed
CN207297022U (en) * 2017-04-12 2018-05-01 中铁二院工程集团有限责任公司 Facility-sliding strata tunnel portal reinforcing construction

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100711576B1 (en) * 2005-11-08 2007-04-27 삼성물산 주식회사 Reinforcement structure for entrance of tunnel and construction method thereof
CN102767379A (en) * 2012-08-10 2012-11-07 中国建筑第四工程局有限公司 Shallow-buried unsymmetrical pressure section tunnel drilling construction method
CN203961997U (en) * 2014-07-11 2014-11-26 北京建筑大学 Shield structure hole glass fiber muscle fender post partial reinforced structure
CN204000900U (en) * 2014-07-17 2014-12-10 陕西路桥集团第一工程有限公司 A kind of ruggedized construction that is applied to the landslide of unsymmetrial loading tunnel hole
CN204163734U (en) * 2014-08-19 2015-02-18 舟山市宏达交通工程有限责任公司 Highway tunnel structure
CN204283438U (en) * 2014-11-28 2015-04-22 中铁第四勘察设计院集团有限公司 Portal supporting and protection structure
CN104806267A (en) * 2015-04-29 2015-07-29 中铁第一勘察设计院集团有限公司 Shield end socket reinforcing system of scree soil layer advance large pipe roof and construction method thereof
CN204877484U (en) * 2015-05-18 2015-12-16 中铁三局集团广东建设工程有限公司 A steel reinforcement cage structure for reducing shield structure discrepancy station degree of difficulty
CN105736003A (en) * 2016-01-29 2016-07-06 济南轨道交通集团有限公司 Structure of shield launching portal and shield launching construction method
CN105840207A (en) * 2016-03-24 2016-08-10 杭州江润科技有限公司 Cross shallow buried bias pressure loose accumulation body large-span tunnel comprehensive entrance structure construction method
CN105839643A (en) * 2016-05-23 2016-08-10 浙江省交通规划设计研究院 Tunnel in-hole construction method adopting foundation pit support
KR101655217B1 (en) * 2016-06-08 2016-09-07 우경기술주식회사 Construction method for open cutting in tunnel portal area
CN206000551U (en) * 2016-08-10 2017-03-08 中铁第一勘察设计院集团有限公司 A kind of Tunneling by mining method airtight advance support system of stream plastic state mud
CN206015689U (en) * 2016-08-26 2017-03-15 中铁二院工程集团有限责任公司 Whole slide large landslide joint reinforcement is constructed
CN207297022U (en) * 2017-04-12 2018-05-01 中铁二院工程集团有限责任公司 Facility-sliding strata tunnel portal reinforcing construction

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
刘晓勇;: "瑞坡隧道左幅进口滑坡治理", 交通科技, no. 01, pages 64 - 66 *
戴培义;: "半明半暗隧道安全进洞施工技术", 铁道建筑技术, no. 03, pages 68 - 71 *
陈代昆;王青;成果;: "玻璃纤维筋在盾构工作井围护结构中的应用分析", no. 02, pages 165 - 168 *
韩华轩;马志富;: "山区高速铁路隧道高陡偏压洞口设计与实践", no. 12, pages 60 - 64 *
韩华轩;马志富;许占良;李冬生;: "高速铁路隧道洞口工程设计研究" *
韩华轩;马志富;许占良;李冬生;: "高速铁路隧道洞口工程设计研究", 石家庄铁道大学学报(自然科学版), no. 2, pages 13 - 17 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441456A (en) * 2018-12-14 2019-03-08 中铁二院工程集团有限责任公司 A kind of the tunnel structure and its construction method of weakness Facility-sliding strata
CN109441456B (en) * 2018-12-14 2024-04-09 中铁二院工程集团有限责任公司 Tunnel entering structure of weak and slippery stratum and construction method thereof
CN109915150A (en) * 2019-04-26 2019-06-21 重庆交通大学 A kind of pile foundation pre-reinforcement supporting construction and its construction method controlling tunnel subsidence
CN110424460A (en) * 2019-08-22 2019-11-08 中铁隧道集团三处有限公司 A kind of tunnel open excavation construction technology
CN111926856A (en) * 2020-07-01 2020-11-13 中铁二院重庆勘察设计研究院有限责任公司 Tunnel entering construction method based on longitudinal anti-skid open cut tunnel structure
CN112922635A (en) * 2021-02-04 2021-06-08 中工武大设计研究有限公司 Hydraulic tunnel excavation supporting structure and construction method
CN114718582A (en) * 2022-06-08 2022-07-08 中铁九局集团第七工程有限公司 Construction method for small-clear-distance horizontal joint shale geological tunnel portal section
CN114718582B (en) * 2022-06-08 2022-09-06 中铁九局集团第七工程有限公司 Construction method for small-clear-distance horizontal joint shale geological tunnel portal section

Similar Documents

Publication Publication Date Title
CN110242301B (en) Two-step grouting modification water-retention coal mining method for roof aquifer
CN106988760A (en) Facility-sliding strata tunnel portal reinforcing construction and construction method
CN100577986C (en) Goaf surrounding rock around gob-side supporting method under three soft geological condition
CN103306687B (en) Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
CN205977229U (en) Arcading tunnel non - flushes entrance to a cave structure suitable for bias voltage condition
CN109826667A (en) The I-shaped checkdam of coal mine underground reservoir
CN103206219A (en) Holed excavation supporting structure for light and dark junction section of tunnel in bias pressure state and construction method
CN104763433A (en) Underground excavation construction method of large-span subway station in flexible-top and hard-bottom stratum
CN101709651A (en) Grouting water blocking method for undersea tunnel
CN103485808B (en) Electro-osmosis home position modified roadway anchoring method of underground swelling soft rock
CN109098714A (en) A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN105089668A (en) Longwall working face coal-pillar-free mining method
CN104847362A (en) Large-span subway station underground excavation construction method for hard rock stratum
CN104763434A (en) Non-coal-pillar double tunneling method
CN109611103B (en) Method for reinforcing shield section suspended boulder group
CN105863650A (en) Tunneling construction method with first wall construction and second tunneling construction
CN110529151A (en) A kind of fully mechanized workface Grading And Zoning integrative consolidation passing sunk pillars on full method
CN111535817A (en) Working face double-lane tunneling small coal pillar reinforcement construction method
CN103244157A (en) Spalling prevention method through full-length anchoring of rib with soft bolt
CN107605509A (en) Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN103939115B (en) A kind of method of half shallow mining method hangar tunnel and structure
CN113153295A (en) Mining method for extremely thick hard coal
CN207513614U (en) Shallow tunnel subsurface excavation method advance support structure and combined type advanced tubule
CN201288586Y (en) Structure for preventing slipping of filled wall body along spatially keeping lane

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination