CN107605509A - Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method - Google Patents

Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method Download PDF

Info

Publication number
CN107605509A
CN107605509A CN201711090976.2A CN201711090976A CN107605509A CN 107605509 A CN107605509 A CN 107605509A CN 201711090976 A CN201711090976 A CN 201711090976A CN 107605509 A CN107605509 A CN 107605509A
Authority
CN
China
Prior art keywords
ductule
steel
self
floral tube
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711090976.2A
Other languages
Chinese (zh)
Inventor
曾来仕
常春章
孙延琳
陈东
黄峻峻
郭玉鹏
张学飞
张海霞
杨成达
赵坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN201711090976.2A priority Critical patent/CN107605509A/en
Publication of CN107605509A publication Critical patent/CN107605509A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method.Some self-advancing type ductules and some spray of molten steel pipe constructions are used during construction, are comprised the following steps:(1) after the first Pin steel arch-shelfs installation and area face closure, steel floral tube is squeezed into face vault stratum and Grouting Consolidation;(2) the tunneling earthwork, excavation drilling depth is a Pin steel arch-shelf spacing, then closes face, installs the 2nd Pin steel arch-shelfs, after completing preliminary bracing by design, self-advancing type ductule is pierced in face vault stratum and the space of ductule surrounding is filled in slip casting;(3) the tunneling earthwork, excavation drilling depth is a Pin steel arch-shelf spacing, then face is closed, 3rd Pin steel arch-shelfs are installed, preliminary bracing is completed by design, then by step 1 construction upper strata steel floral tube, the advance support structure construction of repeat step one and step 2, eventually forms stable advance support structural system backward.

Description

Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method
Technical field
The present invention relates to a kind of sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support structure, belong to tunnel Technical field of construction.The invention further relates to the combined type in the construction method of above-mentioned advance support structure and construction is small in advance Conduit.
Background technology
In recent years, to solve the problems, such as urban traffic congestion, each main cities in the whole nation have had started to building for track traffic If the main construction method of wherein underground line engineering has shield method, cut and cover method and subsurface excavation method.Shield method is mainly used in geology bar In the constructing tunnel that part is good, circuit is long, sweep is big.Cut and cover method is simple and easy, but to remove and repair substantial amounts of buried pipe Net and above ground structure, normal operation and the development of traffic above-ground and business activity are influenceed to some extent, can give neighbouring resident Bring many inconveniences.Subsurface excavation method is applied to the various stratum of unsuitable open-cut, especially transports busy, underground to city traffic Pipeline gathers, and the shallow tunnel built to land subsidence requirement in the case of strict is more applicable.
Shallow burial hidden digging is on the basis of New Austrian Tunneling Method, is grown up for the characteristics of city underground engineering, by dividing The auxiliary methods such as excavation and advance support are walked to ensure safety for tunnel engineering, at present Tunnels in Shallow Buried subsurface excavation method advanced support method master There are steel tube shed or advanced tubule supporting scheme.Sand-pebble layer small curve radius shallow tunnel advance support exists larger Risk and construction difficult problem:One is due to that tunnel sweep is small, with the increase of pipe canopy length, pipe canopy deviate tunnel vault away from From gradual increase, so as to limit the supporting length of steel tube shed;And daguanpeng construction Xu Guan canopies operating room, opened in shallow tunnel Wa Guan canopies operating room, due to increasing excavated section so as to add the risk of tunnel excavation, so being propped up in advance using steel tube shed Shield scheme is applied in small curve radius shallow tunnel has larger limitation and security risk;Second, surpass in sand-pebble layer It is big that preceding ductule throws difficulty of construction into, is such as thrown into using paddle type mill, due to the presence of major diameter cobble, paddle type mill, which is thrown into, to be hit Crushed gravel is so as to cause conduit to throw limited length into, and steel pipe easily rebounds so as to aggravate the disturbance to stratum, it is easier to causes Landslide;Such as use drawing hole construction technique, the easy collapse hole of sandy gravel after drilling rod is extracted and ductule is not headed into;Such as use sleeve pipe Follow up construction technology, needs larger construction space because equipment is larger, in narrow-bore tunnel using be limited, and cost it is higher, Construction speed is slow.Therefore, existed in sand-pebble layer small curve radius shallow tunnel using ductule advance support scheme larger Difficulty of construction and security risk.
At present, tried one's best in sandy gravel area shallow tunnel and avoid being designed to small curve radius, but some areas are by peripheral ring Border influences, and Chinese yeast line shallow tunnel inevitably occurs, surpasses at present in sand-pebble layer small curve radius shallow tunnel Preceding supporting there is no ripe, stable technical scheme.
The content of the invention
For the above-mentioned problems in the prior art, the invention provides a kind of efficiency of construction height, construction safety, stably Property is good, intensity is high, the good sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support structure of advance support effect.
The technical solution adopted for the present invention to solve the technical problems is:A kind of sand-pebble layer small curve radius shallow embedding tunnel Road subsurface excavation method advance support structure, it is characterized in that:Using some self-advancing type ductules squeeze into tunnel tunnel face vault front end compared with Deep stratum forms self-advancing type ductule layer, and formation spray of molten steel tube layer in tunnel vault stratum is squeezed into using some steel floral tubes, described Spray of molten steel tube layer is located at the top of the self-advancing type ductule layer, and the steel floral tube and the self-advancing type ductule are staggeredly spaced cloth Put, vault stratum is noted by injecting the double slurries of cement-sodium silicate into the self-advancing type ductule and the steel floral tube Slurry reinforcing forms advance support structure;The self-advancing type ductule includes steel pipe and the alloy installed in the steel pipe front end bores Head, the stomata connected with the steel pipe is provided with the alloy bit, the steel floral tube includes steel pipe body, the steel pipe sheet The front end of body is in cone-shaped, and the afterbody of the steel pipe body is welded with reinforcement, is drilled with the tube wall of the steel pipe body some Individual injected hole, the afterbody of the steel pipe body are provided with only slurry section, and the length of the self-advancing type ductule is more than the steel floral tube Length.
Further, it is the consolidation effect that ensures supporting construction, the length of the self-advancing type ductule is 3-6 rice, extrapolation Angle is 11-17 °, and horizontal * longitudinal pitches are 0.35*1m;The length of the steel floral tube is 2-3 rice, and outer limb is 14-20 °, horizontal It is 0.35*1m to * longitudinal pitches.
Further, it is guarantee grouting consolidation effect, the injected hole on the steel floral tube is in quincuncial arrangement.
Present invention also offers a kind of the compound of sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support Formula advanced tubule, it is characterized in that:Including self-advancing type ductule and steel floral tube, the self-advancing type ductule includes steel pipe and installation Alloy bit in the steel pipe front end, the stomata connected with the steel pipe, the steel floral tube are provided with the alloy bit Including steel pipe body, the front end of the steel pipe body is in cone-shaped, and the afterbody of the steel pipe body is welded with reinforcement, the steel Several injected holes are drilled with the tube wall of tube body, the afterbody of the steel pipe body is provided with only slurry section, the self-advancing type ductule Length be more than the steel floral tube length.
Further, the injected hole on the steel floral tube is in quincuncial arrangement, a diameter of 10mm of injected hole.
Further, the length of the only slurry section is the afterbody 0.5-1m away from steel pipe body.
Present invention also offers above-mentioned sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support structure Construction method, it is characterized in that:Comprise the following steps:(1) after the first Pin steel arch-shelfs installation and area face closure, utilize The split type jumbolter of ZSY-50 types squeezes into steel floral tube in face vault stratum, and the outer limb of the steel floral tube is 14- 20 °, horizontal * longitudinal pitches are 0.35*1m, then carry out the disposable grouting and reinforcing sand-pebble layer of complete opening by steel floral tube (3), Grouting serous fluid is the double slurries of cement-sodium silicate;(2) after the slip casting in step 1 is completed and reaches intensity, tunneling soil Side, excavation drilling depth is a Pin steel arch-shelf spacing, then closes face, installs the 2nd Pin steel arch-shelfs, by design completion branch at initial stage After shield, self-advancing type ductule is pierced in face vault stratum using ZSY-50 types split type jumbolter, then by certainly The stomata entered on the drill bit of formula ductule front end carries out the space of reverse slip casting filling ductule surrounding, and grouting serous fluid is cement-water The double slurries of glass, the outer limb of the self-advancing type ductule is 11-17 °, and horizontal * longitudinal pitches are 0.35*1m;(3) step is treated After self-advancing type grouting with small pipe in two is completed and reaches intensity, the tunneling earthwork, excavation drilling depth is a Pin steel arch-shelf spacing, Then face is closed, the 3rd Pin steel arch-shelfs are installed, preliminary bracing is completed by design, then by the step 1 construction upper strata spray of molten steel Pipe, the advance support structure construction of repeat step one and step 2, eventually forms stable advance support structural system backward.
In the present invention, lower floor squeezes into face vault front end layer deeper using longer self-advancing type ductule, to meet There is enough " anchoring " length advanced tubule front end, and upper strata carries out grouting and reinforcing using shorter steel floral tube to vault stratum, Vault sandy gravel is consolidated, the two is combined forms the protective casing that stability is good, intensity is higher in tunnel vault, reaches advanced branch The purpose of shield.Wherein, self-advancing type ductule carries alloy bit due to front end, can be relatively easily small by self-advancing type using rig Conduit is pierced in sand-pebble layer, is solved ductule and is thrown difficulty into sandy gravel, throws the problem of limited length into, and leads to The stomata crossed on the drill bit of self-advancing type ductule front end carries out the space of reverse slip casting filling ductule surrounding, can improve self-advancing type The adhesion strength of ductule and sand-pebble layer.And steel floral tube can then make up slip casting of the self-advancing type ductule in sand-pebble layer The defects of ineffective, the two mutual supplement with each other's advantages form combined type advanced tubule supporting construction, and supporting construction stability is good, supporting Effect is good.
Further, a diameter of 38-50mm of the self-advancing type ductule, length are 3-6 rice;The diameter of the steel floral tube For 38-42mm, length is 2-3 rice.
Further, the length of the only slurry section on the steel floral tube is the afterbody 0.5-1m away from steel pipe body.
The beneficial effects of the invention are as follows:
1st, the present invention using self-advancing type ductule solve ductule thrown into sandy gravel difficulty, throw limited length into Problem, the defects of slip casting effect of the self-advancing type ductule in sand-pebble layer is bad is compensate for by using steel floral tube, utilized The mutual supplement with each other's advantages of the two, form stable advance support system;
2nd, the present invention is applicable not only to the advance support of sand-pebble layer small curve radius shallow tunnel, is also applied for various The advance support in stratum stratum small curve radius tunnel;
3rd, efficiency of construction of the present invention is high, and advance support effect is good, is advantageous to shorten the duration;
4th, the present invention construction strong operability, cost after simple training are cheap, have higher practicality.
Brief description of the drawings
Fig. 1 is the front elevation of the advance support structure in the present invention;
Fig. 2 is that supporting construction in the present invention is longitudinally arranged schematic diagram;
Fig. 3 is the structural representation of the self-advancing type ductule in the present invention;
Fig. 4 is the structural representation of the steel floral tube in the present invention;
In figure, 1, Tunnel, 2, tunnel double-lining, 3, steel floral tube, 4, self-advancing type ductule, 5, steel arch-shelf, 6, the palm Sub- face, 7, steel pipe, 8, alloy bit, 9, drill bit stomata, 10, muscle of putting more energy into, 11, steel pipe body, 12, injected hole, 13, only slurry section.
Embodiment
The present invention is further illustrated by way of example and in conjunction with the accompanying drawings:
As shown in drawings, a kind of sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support structure, it is used Some self-advancing type ductules 4 squeeze into tunnel tunnel face vault front end, and layer forms self-advancing type ductule layer deeper, and use is some Root steel floral tube 3 squeezes into formation spray of molten steel tube layer, the spray of molten steel tube layer in tunnel vault stratum and is located at the self-advancing type ductule layer Top, the steel floral tube 3 and the self-advancing type ductule 4 interlock arranged for interval, by the self-advancing type ductule 4 and described The double slurries of injection cement-sodium silicate carry out grouting and reinforcing to vault stratum and form advance support structure in steel floral tube 3.It is described to enter certainly Formula ductule 4 and the steel floral tube 3 are used as combined type advanced tubule.The self-advancing type ductule 4 includes steel pipe 7 and is arranged on The alloy bit 8 of the front end of steel pipe 7, the stomata 9 connected with the steel pipe 7, the steel pipe are provided with the alloy bit 8 Injected hole is not opened on 7.The steel floral tube 3 includes steel pipe body 11, and the front end of the steel pipe body 11 is in cone-shaped, the steel pipe The afterbody of body 11 is welded with reinforcement 10, and several injected holes 12, the steel pipe are drilled with the tube wall of the steel pipe body 11 The afterbody of body 11 is provided with only slurry section 13, only starches and is not provided with injected hole in section 13, the length of the self-advancing type ductule 4 is more than institute State the length of steel floral tube 3.
Preferably, a diameter of 38-50mm of the self-advancing type ductule 4, length are 3-6 rice, and outer limb is 11-17 °, Horizontal * longitudinal pitches are 0.35*1m;A diameter of 38-42mm of the steel floral tube 3, length are 2-3 rice, and outer limb is 14-20 °, Horizontal * longitudinal pitches are 0.35*1m.
Preferably, two φ 10mm injected hole 12 is bored every 150mm on the steel floral tube 3, injected hole 12 is in plum blossom Shape arranges that steel pipe body afterbody 0.5-1m does not drill as only slurry section.
The construction method of above-mentioned sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support structure is:Including Following steps:(1) after the installation of the first Pin steel arch-shelfs 5 and area face closure, the split type jumbolter of ZSY-50 types is utilized Steel floral tube 3 is squeezed into face vault stratum according to shown in Fig. 1 and Fig. 2, the outer limb of the steel floral tube 3 is 14-20 °, horizontal It is 0.35*1m to * longitudinal pitches, the disposable grouting and reinforcing sand-pebble layer of complete opening, grouting serous fluid is then carried out by steel floral tube 3 For the double slurries of cement-sodium silicate;Because steel floral tube 3 is shorter, steel floral tube 3, in case of that can not be thrown into compared with cobble stone, boulder, can pull out when throwing into Go out the injection again of somewhat adjustment position or angle;(2) after the slip casting in step 1 is completed and reaches intensity, tunneling soil Side, excavations drilling depth be a Pin steel arch-shelfs spacing (50cm), then closing face 6, the 2nd Pin steel arch-shelfs 5 of installation, by having designed Into after preliminary bracing, self-advancing type ductule 4 is pierced into area as shown in Fig. 1 and Fig. 2 using the split type jumbolter of ZSY-50 types In the vault stratum of face, pierce after depth meets the requirements, then carried out instead by the stomata 9 on the front end drill bit of self-advancing type ductule 4 To the space of slip casting filling ductule surrounding, to improve the adhesion strength of self-advancing type ductule 4 and sand-pebble layer, grouting serous fluid For the double slurries of cement-sodium silicate, the outer limb of the self-advancing type ductule 4 is 11-17 °, and horizontal * longitudinal pitches are 0.35*1m; (3) after the slip casting of self-advancing type ductule 4 in step 2 is completed and reaches intensity, the tunneling earthwork, excavation drilling depth is a Pin Steel arch-shelf spacing (50cm), face 6 is then closed, the 3rd Pin steel arch-shelfs 5 are installed, completed preliminary bracing by design, then press Step 1 construction upper strata steel floral tube, the advance support structure construction of repeat step one and step 2, eventually forms stabilization backward Advance support structural system.
For prior art, concrete structure will not be repeated here the split type jumbolter of ZSY-50 types used in the present invention. The rig jointed rod part separates with operating platform, is easy to operate in small space, using flexible, it is small to be not only suitable for self-advancing type The drilling of conduit, it is applied to throwing into for steel floral tube again.When self-advancing type ductule is crept into, when cobble content is low or particle diameter is small, impact Work(more greatly, mainly by percussion drilling;When running into cobble stone, boulder, turn pricker speed height, ballistic work is smaller, and ovum is drilled mainly by drill bit Stone, reduce conduit bounce-back.Steel floral tube is thrown into be thrown into mainly by ballistic work hammering.
Other parts in the embodiment of the present invention use known technology, will not be repeated here.

Claims (9)

1. a kind of sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support structure, it is characterized in that:Using some Self-advancing type ductule (4) squeezes into tunnel tunnel face vault front end, and layer forms self-advancing type ductule layer deeper, using some steel Floral tube (3) squeezes into formation spray of molten steel tube layer, the spray of molten steel tube layer in tunnel vault stratum and is located at the upper of the self-advancing type ductule layer Portion, the steel floral tube (3) and the self-advancing type ductule (4) interlock arranged for interval, by the self-advancing type ductule (4) and The double slurries of injection cement-sodium silicate carry out grouting and reinforcing to vault stratum and form advance support structure in the steel floral tube (3);Institute Stating self-advancing type ductule (4) includes steel pipe (7) and the alloy bit (8) installed in the steel pipe (7) front end, the alloy bit (8) stomata (9) connected with the steel pipe (7) is provided with, the steel floral tube (3) includes steel pipe body (11), the steel pipe The front end of body (11) is in cone-shaped, and the afterbody of the steel pipe body (11) is welded with reinforcement (10), the steel pipe body (11) be drilled with several injected holes (12) on tube wall, the afterbody of the steel pipe body (11) is provided with only slurry section (13), it is described from The length for entering formula ductule (4) is more than the length of the steel floral tube (3).
2. sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support structure according to claim 1, it is special Sign is:The length of the self-advancing type ductule (4) is 3-6 rice, and outer limb is 11-17 °, and horizontal * longitudinal pitches are 0.35*1m; The length of the steel floral tube (3) is 2-3 rice, and outer limb is 14-20 °, and horizontal * longitudinal pitches are 0.35*1m.
3. sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support structure according to claim 1, it is special Sign is:Injected hole (12) on the steel floral tube (3) is in quincuncial arrangement.
4. a kind of combined type advanced tubule of sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support, it is special Sign is:Including self-advancing type ductule (4) and steel floral tube (3), the self-advancing type ductule (4) includes steel pipe (7) and installed in institute The alloy bit (8) of steel pipe (7) front end is stated, the stomata (9) connected with the steel pipe (8) is provided with the alloy bit (8), The steel floral tube (3) includes steel pipe body (11), and the front end of the steel pipe body (11) is in cone-shaped, the steel pipe body (11) Afterbody be welded with reinforcement (10), several injected holes (12), the steel pipe are drilled with the tube wall of the steel pipe body (11) The afterbody of body (11) is provided with only slurry section (13), and the length of the self-advancing type ductule (4) is more than the length of the steel floral tube (3) Degree.
5. the combined type of sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support according to claim 4 Advanced tubule, it is characterized in that:Injected hole (2) on the steel floral tube (3) is in quincuncial arrangement, injected hole (12) it is a diameter of 10mm。
6. the combined type of sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support according to claim 4 Advanced tubule, it is characterized in that:The length of the only slurry section (13) is the afterbody 0.5-1m away from steel pipe body (11).
7. a kind of sand-pebble layer small curve radius shallow tunnel subsurface excavation method advance support structure as claimed in claim 1 is applied Work method, it is characterized in that:Comprise the following steps:(1) after the first Pin steel arch-shelfs (5) installation and area face closure, utilize The split type jumbolter of ZSY-50 types squeezes into steel floral tube (3) in face vault stratum, and the outer limb of the steel floral tube (3) is 14-20 °, horizontal * longitudinal pitches are 0.35*1m, then by steel floral tube (3) with carrying out the disposable grouting and reinforcing sandy gravel of complete opening Layer, grouting serous fluid are the double slurries of cement-sodium silicate;(2) after the slip casting in step 1 is completed and reaches intensity, tunneling Cubic metre of earth, excavations drilling depth be a Pin steel arch-shelf spacing, then closes face, the 2nd Pin steel arch-shelfs of installation, by designing completion initial stage After supporting, self-advancing type ductule (4) is pierced in face vault stratum using ZSY-50 types split type jumbolter, Ran Houtong The stomata (9) crossed on the drill bit of self-advancing type ductule (4) front end carries out the space of reverse slip casting filling ductule surrounding, grouting serous fluid For the double slurries of cement-sodium silicate, the outer limb of the self-advancing type ductule (4) is 11-17 °, and horizontal * longitudinal pitches are 0.35* 1m;(3) after self-advancing type ductule (4) slip casting in step 2 is completed and reaches intensity, the tunneling earthwork, drilling depth is excavated For a Pin steel arch-shelf spacing, face is then closed, the 3rd Pin steel arch-shelfs are installed, preliminary bracing is completed by design, then by step Rapid construction upper strata steel floral tube, the advance support structure construction of repeat step one and step 2, eventually forms stable surpass backward Preceding supporting structure system.
8. construction method according to claim 7, it is characterized in that:A diameter of 38- of the self-advancing type ductule (4) 50mm, length are 3-6 rice;A diameter of 38-42mm of the steel floral tube (3), length are 2-3 rice.
9. construction method according to claim 7, it is characterized in that:The length of only slurry section (13) on the steel floral tube (3) For the afterbody 0.5-1m away from steel pipe body (11).
CN201711090976.2A 2017-11-08 2017-11-08 Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method Pending CN107605509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711090976.2A CN107605509A (en) 2017-11-08 2017-11-08 Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711090976.2A CN107605509A (en) 2017-11-08 2017-11-08 Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method

Publications (1)

Publication Number Publication Date
CN107605509A true CN107605509A (en) 2018-01-19

Family

ID=61086272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711090976.2A Pending CN107605509A (en) 2017-11-08 2017-11-08 Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method

Country Status (1)

Country Link
CN (1) CN107605509A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578027A (en) * 2019-01-14 2019-04-05 中铁十局集团有限公司 Upper-soft lower-hard ground tunnel excavation support structure and tunnel excavation construction method
CN112253185A (en) * 2020-10-21 2021-01-22 福建江夏学院 Protection mechanism for water-rich sand fault tunnel and construction method
CN112360524A (en) * 2020-11-09 2021-02-12 紫金矿业集团股份有限公司 Advanced support method for plate-bonded residual ore pile roadway
CN112855172A (en) * 2021-01-14 2021-05-28 中铁二十局集团第三工程有限公司 Tunnel advanced support structure and construction method
CN115030165A (en) * 2022-05-13 2022-09-09 中交一公局第四工程有限公司 Ultra-shallow buried tunnel underpass highway structure and construction method

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003138552A (en) * 2001-10-30 2003-05-14 Kyokado Eng Co Ltd Soil grouting method
CN101899838A (en) * 2010-04-27 2010-12-01 河海大学 Bottom-grouting-enlarged small-diameter prestressed tubular pile composite foundation construction method
CN102235151A (en) * 2010-04-21 2011-11-09 成都中铁隆工程有限公司 Advanced hole-forming method of sand gravel boulder layer
KR20120020570A (en) * 2010-08-30 2012-03-08 (주)하경엔지니어링 Tunnel reinforcing method by multi-forepoling
CN102678134A (en) * 2012-05-18 2012-09-19 中铁十二局集团第二工程有限公司 Collapse and sink intrusion limit construction method for treating wind accumulated sand loess tunnel through stride shed pipe
CN102966360A (en) * 2012-11-26 2013-03-13 中铁四局集团第二工程有限公司 Method for reinforcing rock walls in neighborhood tunnel
CN104533427A (en) * 2014-11-25 2015-04-22 广东省长大公路工程有限公司 Construction method for excavating surrounding rock of granite tunnel at mountainous region in rainy season
CN204627621U (en) * 2015-01-16 2015-09-09 宏润建设集团股份有限公司 A kind of grouting with small pipe support system
CN104929648A (en) * 2015-06-03 2015-09-23 西华大学 Method for constructing branch guide pits of tunnels
CN205013011U (en) * 2015-09-28 2016-02-03 中铁二十局集团有限公司 Pyroclastic flow stratum tunnel advance support structure
WO2016095630A1 (en) * 2014-12-15 2016-06-23 中铁第四勘察设计院集团有限公司 Method for constructing extra-large variable cross section tunnel
CN106194204A (en) * 2016-09-08 2016-12-07 长安大学 A kind of drift cobble tunnel advanced support structure and method for protecting support
CN206174963U (en) * 2016-10-31 2017-05-17 中铁二十局集团第五工程有限公司 Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone
CN107165652A (en) * 2017-06-02 2017-09-15 大唐林州热电有限责任公司 A kind of tunnel monoblock type collapse after construction method
CN207513614U (en) * 2017-11-08 2018-06-19 中铁十局集团有限公司 Shallow tunnel subsurface excavation method advance support structure and combined type advanced tubule
US20180252104A1 (en) * 2015-11-25 2018-09-06 Dong-Hyun Seo Tunnel construction method using pre-support and post-support and apparatus suitable for same

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003138552A (en) * 2001-10-30 2003-05-14 Kyokado Eng Co Ltd Soil grouting method
CN102235151A (en) * 2010-04-21 2011-11-09 成都中铁隆工程有限公司 Advanced hole-forming method of sand gravel boulder layer
CN101899838A (en) * 2010-04-27 2010-12-01 河海大学 Bottom-grouting-enlarged small-diameter prestressed tubular pile composite foundation construction method
KR20120020570A (en) * 2010-08-30 2012-03-08 (주)하경엔지니어링 Tunnel reinforcing method by multi-forepoling
CN102678134A (en) * 2012-05-18 2012-09-19 中铁十二局集团第二工程有限公司 Collapse and sink intrusion limit construction method for treating wind accumulated sand loess tunnel through stride shed pipe
CN102966360A (en) * 2012-11-26 2013-03-13 中铁四局集团第二工程有限公司 Method for reinforcing rock walls in neighborhood tunnel
CN104533427A (en) * 2014-11-25 2015-04-22 广东省长大公路工程有限公司 Construction method for excavating surrounding rock of granite tunnel at mountainous region in rainy season
WO2016095630A1 (en) * 2014-12-15 2016-06-23 中铁第四勘察设计院集团有限公司 Method for constructing extra-large variable cross section tunnel
CN204627621U (en) * 2015-01-16 2015-09-09 宏润建设集团股份有限公司 A kind of grouting with small pipe support system
CN104929648A (en) * 2015-06-03 2015-09-23 西华大学 Method for constructing branch guide pits of tunnels
CN205013011U (en) * 2015-09-28 2016-02-03 中铁二十局集团有限公司 Pyroclastic flow stratum tunnel advance support structure
US20180252104A1 (en) * 2015-11-25 2018-09-06 Dong-Hyun Seo Tunnel construction method using pre-support and post-support and apparatus suitable for same
CN106194204A (en) * 2016-09-08 2016-12-07 长安大学 A kind of drift cobble tunnel advanced support structure and method for protecting support
CN206174963U (en) * 2016-10-31 2017-05-17 中铁二十局集团第五工程有限公司 Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone
CN107165652A (en) * 2017-06-02 2017-09-15 大唐林州热电有限责任公司 A kind of tunnel monoblock type collapse after construction method
CN207513614U (en) * 2017-11-08 2018-06-19 中铁十局集团有限公司 Shallow tunnel subsurface excavation method advance support structure and combined type advanced tubule

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
姚伟振;: "超前小导管注浆技术在浅埋暗挖法隧道施工中的应用", 国防交通工程与技术, vol. 13, no. 1, pages 131 - 132 *
李强;彭军;陈东东;彭芳;: "临近桥桩暗挖地铁车站施工技术", 西部探矿工程, no. 09, pages 183 - 185 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578027A (en) * 2019-01-14 2019-04-05 中铁十局集团有限公司 Upper-soft lower-hard ground tunnel excavation support structure and tunnel excavation construction method
CN112253185A (en) * 2020-10-21 2021-01-22 福建江夏学院 Protection mechanism for water-rich sand fault tunnel and construction method
CN112360524A (en) * 2020-11-09 2021-02-12 紫金矿业集团股份有限公司 Advanced support method for plate-bonded residual ore pile roadway
CN112855172A (en) * 2021-01-14 2021-05-28 中铁二十局集团第三工程有限公司 Tunnel advanced support structure and construction method
CN115030165A (en) * 2022-05-13 2022-09-09 中交一公局第四工程有限公司 Ultra-shallow buried tunnel underpass highway structure and construction method
CN115030165B (en) * 2022-05-13 2024-01-19 中交一公局第四工程有限公司 Under-penetration highway structure for ultra-shallow buried tunnel and construction method

Similar Documents

Publication Publication Date Title
CN107605509A (en) Sand-pebble layer small curve radius shallow tunnel subsurface excavation method advanced supporting construction method
CN103306687B (en) Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
CN103089275B (en) Control method of surrounding rocks in water-rich very-broken surrounding rock tunnel collapse sections
CN106437726B (en) Shallow-depth-excavation tunnel crosses ground fissure crushed zone construction method
CN108756894B (en) Tunnel micro- three step top Core Soil construction
CN104989425B (en) A kind of tunneling is into hole supporting construction and its method for protecting support
CN105839643A (en) Tunnel in-hole construction method adopting foundation pit support
CN106567717A (en) Construction oblique channel structure utilizing subway exit and entrance and construction method
CN104847362B (en) Ground consisting of hard rock construction method across underground digging in subway station greatly
CN108915736A (en) The water damage control method of digging laneway under the strong weak cementing water-bearing layer of rich water
CN103899318B (en) The milling of medium ground tunnel is dug and supporting machinery construction
CN105863648B (en) A kind of tunneling is shallow to cover large-section tunnel construction method
CN106917627B (en) The advanced support method of pilot tunnel under a kind of water rich strata boring construction
CN109441479B (en) Collapse treatment method for underground excavation tunnel
CN105781573A (en) Railway down-traversing highway tunnel double-layer casing pipe reinforcement double-pipe shed follow-pipe drilling construction method
CN107023300A (en) A kind of use canopy, which is defended the doctrine, builds the construction method of subway station
CN206174963U (en) Cross shallow undercut tunnel supporting construction of burying of ground fissure crushed zone
CN104234062A (en) Landslide control method of ionic type rare earth in-situ mineral leaching stope
CN109487804A (en) The low disturbance reinforcement protection system of red soft rock cut slope and construction method
CN113073983B (en) Enclosure type grouting construction method for submarine tunnel to penetrate through water-rich fault fracture zone
CN106640096A (en) Construction method for penetrating through tunnel of backfilling soil section and transition section
CN105863650A (en) Tunneling construction method with first wall construction and second tunneling construction
CN109611103B (en) Method for reinforcing shield section suspended boulder group
CN110318772A (en) Canal in Loess Area is greatly across the asymmetric bore tunnel supporting construction of small interval and construction method
CN109372520A (en) One kind passing through Debris Flow Deposition area tunnel support structure and its construction method

Legal Events