CN204163734U - Highway tunnel structure - Google Patents

Highway tunnel structure Download PDF

Info

Publication number
CN204163734U
CN204163734U CN201420470466.3U CN201420470466U CN204163734U CN 204163734 U CN204163734 U CN 204163734U CN 201420470466 U CN201420470466 U CN 201420470466U CN 204163734 U CN204163734 U CN 204163734U
Authority
CN
China
Prior art keywords
arch
fender pile
supported
highway tunnel
protecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420470466.3U
Other languages
Chinese (zh)
Inventor
方贤飞
段玮玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Engineering Co Ltd Of Zhoushan Htc
Zhejiang Ocean University ZJOU
Original Assignee
Traffic Engineering Co Ltd Of Zhoushan Htc
Zhejiang Ocean University ZJOU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Traffic Engineering Co Ltd Of Zhoushan Htc, Zhejiang Ocean University ZJOU filed Critical Traffic Engineering Co Ltd Of Zhoushan Htc
Priority to CN201420470466.3U priority Critical patent/CN204163734U/en
Application granted granted Critical
Publication of CN204163734U publication Critical patent/CN204163734U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses the highway tunnel structure of a kind of pair of fender pile braced structures, highway tunnel structure, comprise and protect arch, the main fender pile protecting arch two ends described in being supported in and the secondary fender pile protected described in being supported between arch two ends, protect arch and be provided with in both sides for by the plane structure supported for circular arc, described time fender pile is supported in the described plane structure of protecting arch, described plane structure and the same side arc length of protecting between arch abutment portion is 1/5th of Inner arc overall length, the utility model is applicable to hole partial sector certain thickness sand bed or soil layer, barrel part is the geological conditions of stone matter country rock, and structure is simple, cost is low.

Description

Highway tunnel structure
Technical field
The utility model relates to highway tunnel building technology, particularly relates to the highway tunnel structure of a kind of pair of fender pile braced structures.
Technical background
In the engineering in urban construction tunnel, often run into big vast alluviation silty clay, sandy silt soil stratum, soil layer (or sand bed) is passed through according to Wan Jin hole, tunnel, hole heavy cut scheme, very easily cause cut slope too high, the problem that preventive works amount is larger, destroy greatly natural environment, the stability of side slope is difficult to ensure, and construction and operations risks larger; Carry out tunnel and boring construction according to traditional New Austrian Tunneling Method, ancillary method is more, and construction risk is large, and design difficulty is larger.
A kind of highway tunnel structure is described, to solve the problems of the technologies described above in the patent document of application number 201210304864.3.Wherein, for preventing surrouding rock deformation or caving in, have employed liner structure, but cost is too high, in this highway tunnel structure, the utility model provides the highway tunnel structure of a kind of pair of fender pile braced structures, and structure is simple, and cost is low, can reach human and vehicle shunting and travel.
Summary of the invention
The problem that the utility model solves is: provide a kind of and be applicable to the highway tunnel with two fender pile braced structures that hole partial sector has certain thickness sand bed or soil layer, barrel part is stone matter country rock.
The technical scheme that the utility model is taked is:. a kind of highway tunnel structure, comprise protect arch, be supported in described in protect arch two ends main fender pile and the secondary fender pile that protects described in being supported between arch two ends, protect arch and be provided with in both sides for by the plane structure supported for circular arc, described time fender pile is supported in the described plane structure of protecting arch, and described plane structure and the same side arc length of protecting between arch abutment portion is 1/5th of Inner arc overall length.This structure is applicable to the geological conditions that hole partial sector has certain thickness sand bed or soil layer, barrel part is stone matter country rock, after protecting arch construction complete, protect dome portions and can carry out backfill stone soil immediately, shorten the open-assembly time of side slope, improve working security, and be easy to recover original place looks and vegetation, during operation without avalanche, broken fall or slope instability etc. jeopardize the engineering disease of traffic safety, and structure is simple.
Further, the angular range protecting arch circular arc described in is 120-140 degree.Circular arc can be made like this to protect arch is partial to flat, is conducive to time fender pile and supports, and the pressure shared on primary and secondary fender pile is reasonable, and structure is more firm.
Further, described highway tunnel structure also comprises the anchoring-bolt system be fixed on described fender pile, and described anchoring-bolt system is installed on the inner surface of described fender pile, and the Shi Tuzhong running through described fender pile and be anchored in outside fender pile.
Further, the road surfacing layer of concrete between arch is protected in both sides time, and layer of concrete is that middle high both sides are low, is provided with sewer pipe at low side.For preventing surface gathered water, be conducive to safe driving of vehicle.
Further, laying mixed dirt bed between the main fender pile in the same side and secondary fender pile.This structure can be used for walkway in tunnel and Refuge Point.
Accompanying drawing explanation
Fig. 1 the utility model structural representation
Detailed description of the invention
Embodiment 1 as shown in the figure, highway tunnel structure, comprise and protect arch 1, the main fender pile 2 protecting arch two ends described in being supported in and the secondary fender pile 3 protected described in being supported between arch two ends, protect arch 1 be circular arc and be provided with in both sides for by the plane structure 10 supported, protect arch 1 below original ground 7 and between both sides side slope 6, described two ends protecting arch 1 are set up on vertical described fender pile 2, for carrying the stone soil protecting and fill out above arch 1 and put, avoid caving in, ensure the safety in main hole, tunnel, described time fender pile 3 is supported in the described plane structure 10 of protecting arch 1, play the effect of supplemental support.For the ease of main fender pile 2 and protect connection effective, firm between arch 1, secondary fender pile 3 and protect connection effective, firm between arch 1, be equipped with shaped steel or reinforcing cage in described main fender pile 2 and time fender pile 3, and form via concrete-agitating soil, cement high-pressure rotary-spray or concreting.Described plane structure 10 and the same side arc length of protecting between arch 1 end is 1/5th of Inner arc overall length; Optimum selecting ground, the angular range protecting arch circular arc is 120-140 degree, is conducive to time fender pile and supports, and the pressure shared on primary and secondary fender pile is reasonable, and structure is more firm.In order to improve the retaining design stability in tunnel, ensure working security, reduce unstability risk, described main fender pile 2 is fixedly installed anchoring-bolt system 8, described anchoring-bolt system 8 is installed on the inner surface of described main fender pile 2, and the Shi Tuzhong running through described main fender pile 2 and be anchored in outside main fender pile 2.
In addition, in order to prevent surface gathered water, the road surfacing layer of concrete 4 between arch 3 is protected in both sides time, and layer of concrete 4 is that middle high both sides are low, is provided with sewer pipe 11 at low side.
In addition, laying mixed dirt bed 5 between the main fender pile in the same side and secondary fender pile.This structure can be used for walkway in tunnel and Refuge Point.
The utility model is applicable to the geological conditions that hole partial sector has certain thickness sand bed or soil layer, barrel part is stone matter country rock, after protecting arch construction complete, protect dome portions and can carry out backfill stone soil immediately, shorten the open-assembly time of side slope, improve working security, and be easy to recover original place looks and vegetation, during operation without avalanche, broken fall or slope instability etc. jeopardize the engineering disease of traffic safety, and structure is simple, cost is low.

Claims (5)

1. highway tunnel structure, comprise protect arch, be supported in described in protect arch two ends main fender pile, it is characterized in that: also comprise the secondary fender pile protecting described in being supported in and encircle between two ends, protect arch and be provided with in both sides for by the plane structure supported for circular arc, described time fender pile is supported in the described plane structure of protecting arch, and described plane structure and the same side arc length of protecting between arch abutment portion is 1/5th of Inner arc overall length.
2. highway tunnel structure according to claim 1, is characterized in that: described in protect arch circular arc angular range be 120-140 degree.
3. highway tunnel structure according to claim 1, is characterized in that, also comprises the anchoring-bolt system be fixed on described fender pile, and described anchoring-bolt system is installed on the inner surface of described fender pile, and the Shi Tuzhong running through described fender pile and be anchored in outside fender pile.
4. according to highway tunnel structure according to claim 1, it is characterized in that, the road surfacing layer of concrete between arch is protected in both sides time, and layer of concrete is that middle high both sides are low, is provided with sewer pipe at low side.
5. according to highway tunnel structure according to claim 1, it is characterized in that, laying mixed dirt bed between the main fender pile in the same side and secondary fender pile.
CN201420470466.3U 2014-08-19 2014-08-19 Highway tunnel structure Expired - Fee Related CN204163734U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420470466.3U CN204163734U (en) 2014-08-19 2014-08-19 Highway tunnel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420470466.3U CN204163734U (en) 2014-08-19 2014-08-19 Highway tunnel structure

Publications (1)

Publication Number Publication Date
CN204163734U true CN204163734U (en) 2015-02-18

Family

ID=52537433

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420470466.3U Expired - Fee Related CN204163734U (en) 2014-08-19 2014-08-19 Highway tunnel structure

Country Status (1)

Country Link
CN (1) CN204163734U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761771A (en) * 2016-11-22 2017-05-31 宁波市交通规划设计研究院有限公司 A kind of construction method for crossing native shallow tunnel on rock under the location of mountain valley
CN106988760A (en) * 2017-04-12 2017-07-28 中铁二院工程集团有限责任公司 Facility-sliding strata tunnel portal reinforcing construction and construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761771A (en) * 2016-11-22 2017-05-31 宁波市交通规划设计研究院有限公司 A kind of construction method for crossing native shallow tunnel on rock under the location of mountain valley
CN106988760A (en) * 2017-04-12 2017-07-28 中铁二院工程集团有限责任公司 Facility-sliding strata tunnel portal reinforcing construction and construction method

Similar Documents

Publication Publication Date Title
CN203308470U (en) Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section
CN108756894B (en) Tunnel micro- three step top Core Soil construction
CN104847362B (en) Ground consisting of hard rock construction method across underground digging in subway station greatly
CN108204240A (en) Newly built tunnels closely on across existing tunnel anti-floating reinforcement system and its reinforcement means
CN102562077B (en) Excavation construction method of frame tunnel penetrating special structure at lower portion
CN102966358B (en) Construction method for shield-cut reinforced concrete pile under main line of operational railway
CN102182465A (en) Tunnel-entering construction method for tunnel
CN102606176B (en) Collapsible loess tunnel construction method
CN103485790A (en) Shallow tunneling method for pipe-proof-supporting structure combined system
CN104532868B (en) High abrupt change shape sloped region bridge anchor pull-type high cap pile group basis construction method
CN104612696B (en) Overpass column hole method construction method is passed through in big cross section tunneling subway station in fine sand layer
CN207934910U (en) A kind of newly built tunnels closely on across existing tunnel anti-floating reinforcement system
CN103670448A (en) Underground pipeline protection device and support method applying underground pipeline protection device
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN211500658U (en) Shallow tunnel supporting construction that nearly connects that buries suitable for sand ground
CN107165641B (en) High inclination-angle ladder way opposite direction excavating construction method in thin layer breaking up hard rock stratum
CN102839980A (en) Highway tunnel structure and construction method thereof
CN203716046U (en) Steel trestle for earthwork transportation of foundation pit
CN204163734U (en) Highway tunnel structure
CN107420115A (en) A kind of shallow-depth-excavation tunnel fall changes arch processing unit and its processing method
CN107237332A (en) A kind of foundation pit stope support containing drifting sand layer method of use composite soil-nailed retaining wall
CN110230273A (en) A kind of safeguard structure of small-sized rockfall
CN103850692A (en) Shield construction protection method for annular flyover
CN201635745U (en) Ribbed-arch multi-arch tunnel
CN210946536U (en) Protective structure of small dangerous rock falling stone

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150218

Termination date: 20150819

EXPY Termination of patent right or utility model