A kind of ribbed arch formula multiple-arch tunnel
Technical field
The utility model belongs to highway tunnel, is specifically related to a kind ofly be applicable to that shallow embedding is close to the multiple-arch tunnel of two-way road, mountain traffic.
Background technology
Multiple-arch tunnel is highway tunnel a kind of form of structure commonly used, have occupation of land less, linear smoothness, avoid the advantage of route framing outside the hole, be specially adapted to the sidehill tunnel built along the river valley, mountain area and on the hills, the short tunnel group that builds of low-relief terrain.Traditional multiple-arch tunnel up-downgoing route all is embedded in underground.But if orographic condition is subjected to further restriction, the side buried depth in the up-downgoing road is bigger, can build the tunnel, and the opposite side buried depth is less, can't build the tunnel.For such orographic condition, all only built single hole tunnel in the big side of buried depth in the past, then adopt the cutting scheme to pass through in the little side of buried depth.Adopt such technical scheme, often bring following technical problem: (1) needs the excavation cut slope in order to build the road of the more shallow side of buried depth, must destroy massif nature and ecological environment, and the formation high slope, not only increase construction costs, also can increase road operation maintenance difficulty; (2) during the more shallow dypass moat of buried depth excavation, can the disturbance massif, reduce sloping body stability, face greater risk when causing the bigger side tunneling of buried depth; (3) the bigger side tunnel excavation of buried depth further produces disturbance to massif, influences the side slope of the less side of buried depth and the safety of retaining structure thereof, and may cause in the operation process massif slump or Rolling Stone to be fallen on the road surface of the less side of buried depth, threatens traffic safety; (4) in order to guarantee that buried side builds the safety in tunnel, the cutting that must make the less side of buried depth promptly adopts the route form of up-downgoing framing away from the bigger side tunnel of buried depth, give linear bring unfavorable.This shows, in the hill side road line of the strict restriction of landform, adopt buried side to repair the repair the roads scheme of moat of tunnel, shallow embedding side, all having problems aspect economy, safety, environment and the construction operability.
Summary of the invention
Should build the tunnel more greatly in order to solve in the up-downgoing circuit side buried depth, and the less restricted landform problem that can not build the tunnel according to a conventional method of opposite side buried depth, the utility model provides a kind of ribbed arch formula multiple-arch tunnel.
Concrete technical solution is as follows:
A kind of ribbed arch formula multiple-arch tunnel comprises the dark hole tunnel of a side, mid-board; Opposite side is ribbed arch formula open cut tunnel tunnel, and the buried depth in described ribbed arch formula open cut tunnel tunnel is dark cavity portion than ninor feature one side, and opposite side is the ribbed arch open cut tunnel part of being made up of two above ribbed arches, and the spacing between the adjacent ribbed arch is a 4-8 rice; Dark cavity portion and ribbed arch open cut tunnel part adjacent top along the length direction in ribbed arch formula open cut tunnel tunnel are provided with the rock-fall proof block, are provided with the backfill body between rock-fall proof block adjacent with dark cavity portion and the above-ground route.
Described ribbed arch open cut tunnel bottom is provided with the open cut tunnel basis, and described open cut tunnel basis is grouted anchor bar or pile foundation.
The ribbed arch circular arc excursion of described ribbed arch open cut tunnel is the 1/3-1/6 circular arc.
Ribbed arch in the described ribbed arch formula open cut tunnel is reinforced concrete ribbed arch or concrete filled steel tube ribbed arch or steel reinforced concrete ribbed arch or shaped steel ribbed arch.
Ribbed arch formula multiple-arch tunnel is with the form of structure of multiple-arch tunnel, adopt the tunnel structure that buries entirely in the bigger side of buried depth, the less side of buried depth then adopts penetrating ribbed arch formula open cut tunnel structure, both can avoid cutting excavation to cause massif disturbance and environmental disruption, reduce side slope protection and retaining structure, can avoid up-downgoing route framing again, favorable applicability be arranged at mountain area shallow embedding short tunnel difficult wiring section.
Useful technique effect of the present utility model is: compare with the cutting form, adopt ribbed arch formula open cut tunnel structure in the less side of buried depth, geotechnical body beyond the tunnel can not excavated fully, disturbance, the inboard geotechnical body of tunneling, excavated volume significantly reduces, can reduce the engineering quantity of earthwork evacuation amount, side slope protection and retaining structure greatly, reduce to environment damage with to the disturbance of massif, and help the construction and the operation security in buried side tunnel, also improve the safety of road traffic simultaneously, reduced the maintenance cost of operation phase.
Description of drawings
Fig. 1 is the elevation of ribbed arch formula multiple-arch tunnel;
Fig. 2 is the vertical view of ribbed arch formula multiple-arch tunnel;
Fig. 3 is a ribbed arch formula multiple-arch tunnel open cut tunnel lateral view;
Ribbed arch formula multiple-arch tunnel when Fig. 4 accounts for 1/3 circular arc for ribbed arch;
Ribbed arch formula multiple-arch tunnel when Fig. 5 accounts for 1/6 circular arc for ribbed arch.
Among the figure: the dark hole tunnel of 1-, 2-mid-board, 3-ribbed arch formula open cut tunnel tunnel, 4-inverted arch, 5-open cut tunnel basis, 6-rock-fall proof block, 7-backfill body, 8-above-ground route, 9-anchor pole, 10-ribbed arch, 11-grouted anchor bar, 12-pile foundation.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described by embodiment.
Embodiment 1:
Referring to Fig. 1, Fig. 2 and Fig. 3, a kind of ribbed arch formula multiple-arch tunnel comprises the dark hole tunnel 1 of a side, mid-board 2, and opposite side is ribbed arch formula open cut tunnel tunnel 3.The buried depth in ribbed arch formula open cut tunnel tunnel 3 is dark cavity portion than ninor feature one side, and opposite side is that the spacing between the adjacent ribbed arch 10 is 6 meters by four roots arch, the 10 ribbed arch open cut tunnel parts of forming, and dark hole tunnel 1 and 3 bottoms, ribbed arch formula open cut tunnel tunnel are inverted arch 4; Dark cavity portion and ribbed arch open cut tunnel part adjacent top along the length direction in ribbed arch formula open cut tunnel tunnel 3 are provided with rock-fall proof block 6, are provided with backfill body 7 between rock-fall proof block 6 adjacent with dark cavity portion and the above-ground route 8, the damage tunnel structure in case falling stop stone drops.Backfill body 7 can be soil, rubble, sheet stone concrete or above-mentioned three's assembly.Ribbed arch open cut tunnel part bottom is provided with open cut tunnel basis 5, and this open cut tunnel basis 5 is a grouted anchor bar 11, and ribbed arch 10 arc length of ribbed arch open cut tunnel part are 1/3 circular arc, see Fig. 4.Ribbed arch 10 in the ribbed arch formula open cut tunnel part is reinforced concrete ribbed arch or concrete filled steel tube ribbed arch or steel reinforced concrete ribbed arch or shaped steel ribbed arch.
For construction safety, before the construction ribbed arch open cut tunnel part, also should carry out necessary reinforcing to massif, as adopting anchor pole 9 according to the actual landform geological conditions.
Embodiment 2:
The open cut tunnel basis 5 of ribbed arch open cut tunnel part bottom is a pile foundation 12, and ribbed arch 10 arc length of ribbed arch open cut tunnel part are 1/6 circular arc, see Fig. 5.Ribbed arch 10 in the ribbed arch open cut tunnel part is steel reinforced concrete ribbed arch or shaped steel ribbed arch.
Other is with embodiment 1.