CN201635745U - Ribbed-arch multi-arch tunnel - Google Patents

Ribbed-arch multi-arch tunnel Download PDF

Info

Publication number
CN201635745U
CN201635745U CN2010201550557U CN201020155055U CN201635745U CN 201635745 U CN201635745 U CN 201635745U CN 2010201550557 U CN2010201550557 U CN 2010201550557U CN 201020155055 U CN201020155055 U CN 201020155055U CN 201635745 U CN201635745 U CN 201635745U
Authority
CN
China
Prior art keywords
tunnel
arch
ribbed
open cut
ribbed arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010201550557U
Other languages
Chinese (zh)
Inventor
陈修和
张胜
王飞
沈洪波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Transport Consulting and Design Institute Co Ltd
Original Assignee
Anhui Transport Consulting and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Transport Consulting and Design Institute Co Ltd filed Critical Anhui Transport Consulting and Design Institute Co Ltd
Priority to CN2010201550557U priority Critical patent/CN201635745U/en
Application granted granted Critical
Publication of CN201635745U publication Critical patent/CN201635745U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model relates to a ribbed-arch multi-arch tunnel, which comprises a side dark-cave tunnel and a middle separation wall as well as a ribbed-arch open cut tunnel, wherein the side with small burial depth landform of the ribbed-arch open cut tunnel is of a dark cave part, the other side is of a ribbed-arch open cut part consists of two or more ribbed arch, and the distance between two adjacent ribbed arch is 4 to 8m; the top part at the adjacency of the dark-cave part and the ribbed-arch open cut tunnel along the length direction of the ribbed-arch open cut tunnel is provided with anti-falling stone check blocks, and backfill bodies are arranged between the anti-falling stone check blocks which are adjacent to the dark-cave part and the ground line. The ribbed-arch multi-arch tunnel has the advantages that: compared with cutting form, the rock body outside the tunnel can be completely free from being dug and disturbed, and only the rock body at the inner side the tunnel is dug, so the digging quantity is remarkably reduced, the digging quantity of the earth and stone can be greatly reduced, the work amount of the slope protection and the supporting structure can be greatly reduced, the damage of the environment and the disturbance of the mountain can be reduced, the construction and the operation safety of the deeply-buried side tunnel can be realized, the road traffic safety can also be improved, and the maintenance cost during the operation period can be reduced.

Description

A kind of ribbed arch formula multiple-arch tunnel
Technical field
The utility model belongs to highway tunnel, is specifically related to a kind ofly be applicable to that shallow embedding is close to the multiple-arch tunnel of two-way road, mountain traffic.
Background technology
Multiple-arch tunnel is highway tunnel a kind of form of structure commonly used, have occupation of land less, linear smoothness, avoid the advantage of route framing outside the hole, be specially adapted to the sidehill tunnel built along the river valley, mountain area and on the hills, the short tunnel group that builds of low-relief terrain.Traditional multiple-arch tunnel up-downgoing route all is embedded in underground.But if orographic condition is subjected to further restriction, the side buried depth in the up-downgoing road is bigger, can build the tunnel, and the opposite side buried depth is less, can't build the tunnel.For such orographic condition, all only built single hole tunnel in the big side of buried depth in the past, then adopt the cutting scheme to pass through in the little side of buried depth.Adopt such technical scheme, often bring following technical problem: (1) needs the excavation cut slope in order to build the road of the more shallow side of buried depth, must destroy massif nature and ecological environment, and the formation high slope, not only increase construction costs, also can increase road operation maintenance difficulty; (2) during the more shallow dypass moat of buried depth excavation, can the disturbance massif, reduce sloping body stability, face greater risk when causing the bigger side tunneling of buried depth; (3) the bigger side tunnel excavation of buried depth further produces disturbance to massif, influences the side slope of the less side of buried depth and the safety of retaining structure thereof, and may cause in the operation process massif slump or Rolling Stone to be fallen on the road surface of the less side of buried depth, threatens traffic safety; (4) in order to guarantee that buried side builds the safety in tunnel, the cutting that must make the less side of buried depth promptly adopts the route form of up-downgoing framing away from the bigger side tunnel of buried depth, give linear bring unfavorable.This shows, in the hill side road line of the strict restriction of landform, adopt buried side to repair the repair the roads scheme of moat of tunnel, shallow embedding side, all having problems aspect economy, safety, environment and the construction operability.
Summary of the invention
Should build the tunnel more greatly in order to solve in the up-downgoing circuit side buried depth, and the less restricted landform problem that can not build the tunnel according to a conventional method of opposite side buried depth, the utility model provides a kind of ribbed arch formula multiple-arch tunnel.
Concrete technical solution is as follows:
A kind of ribbed arch formula multiple-arch tunnel comprises the dark hole tunnel of a side, mid-board; Opposite side is ribbed arch formula open cut tunnel tunnel, and the buried depth in described ribbed arch formula open cut tunnel tunnel is dark cavity portion than ninor feature one side, and opposite side is the ribbed arch open cut tunnel part of being made up of two above ribbed arches, and the spacing between the adjacent ribbed arch is a 4-8 rice; Dark cavity portion and ribbed arch open cut tunnel part adjacent top along the length direction in ribbed arch formula open cut tunnel tunnel are provided with the rock-fall proof block, are provided with the backfill body between rock-fall proof block adjacent with dark cavity portion and the above-ground route.
Described ribbed arch open cut tunnel bottom is provided with the open cut tunnel basis, and described open cut tunnel basis is grouted anchor bar or pile foundation.
The ribbed arch circular arc excursion of described ribbed arch open cut tunnel is the 1/3-1/6 circular arc.
Ribbed arch in the described ribbed arch formula open cut tunnel is reinforced concrete ribbed arch or concrete filled steel tube ribbed arch or steel reinforced concrete ribbed arch or shaped steel ribbed arch.
Ribbed arch formula multiple-arch tunnel is with the form of structure of multiple-arch tunnel, adopt the tunnel structure that buries entirely in the bigger side of buried depth, the less side of buried depth then adopts penetrating ribbed arch formula open cut tunnel structure, both can avoid cutting excavation to cause massif disturbance and environmental disruption, reduce side slope protection and retaining structure, can avoid up-downgoing route framing again, favorable applicability be arranged at mountain area shallow embedding short tunnel difficult wiring section.
Useful technique effect of the present utility model is: compare with the cutting form, adopt ribbed arch formula open cut tunnel structure in the less side of buried depth, geotechnical body beyond the tunnel can not excavated fully, disturbance, the inboard geotechnical body of tunneling, excavated volume significantly reduces, can reduce the engineering quantity of earthwork evacuation amount, side slope protection and retaining structure greatly, reduce to environment damage with to the disturbance of massif, and help the construction and the operation security in buried side tunnel, also improve the safety of road traffic simultaneously, reduced the maintenance cost of operation phase.
Description of drawings
Fig. 1 is the elevation of ribbed arch formula multiple-arch tunnel;
Fig. 2 is the vertical view of ribbed arch formula multiple-arch tunnel;
Fig. 3 is a ribbed arch formula multiple-arch tunnel open cut tunnel lateral view;
Ribbed arch formula multiple-arch tunnel when Fig. 4 accounts for 1/3 circular arc for ribbed arch;
Ribbed arch formula multiple-arch tunnel when Fig. 5 accounts for 1/6 circular arc for ribbed arch.
Among the figure: the dark hole tunnel of 1-, 2-mid-board, 3-ribbed arch formula open cut tunnel tunnel, 4-inverted arch, 5-open cut tunnel basis, 6-rock-fall proof block, 7-backfill body, 8-above-ground route, 9-anchor pole, 10-ribbed arch, 11-grouted anchor bar, 12-pile foundation.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described by embodiment.
Embodiment 1:
Referring to Fig. 1, Fig. 2 and Fig. 3, a kind of ribbed arch formula multiple-arch tunnel comprises the dark hole tunnel 1 of a side, mid-board 2, and opposite side is ribbed arch formula open cut tunnel tunnel 3.The buried depth in ribbed arch formula open cut tunnel tunnel 3 is dark cavity portion than ninor feature one side, and opposite side is that the spacing between the adjacent ribbed arch 10 is 6 meters by four roots arch, the 10 ribbed arch open cut tunnel parts of forming, and dark hole tunnel 1 and 3 bottoms, ribbed arch formula open cut tunnel tunnel are inverted arch 4; Dark cavity portion and ribbed arch open cut tunnel part adjacent top along the length direction in ribbed arch formula open cut tunnel tunnel 3 are provided with rock-fall proof block 6, are provided with backfill body 7 between rock-fall proof block 6 adjacent with dark cavity portion and the above-ground route 8, the damage tunnel structure in case falling stop stone drops.Backfill body 7 can be soil, rubble, sheet stone concrete or above-mentioned three's assembly.Ribbed arch open cut tunnel part bottom is provided with open cut tunnel basis 5, and this open cut tunnel basis 5 is a grouted anchor bar 11, and ribbed arch 10 arc length of ribbed arch open cut tunnel part are 1/3 circular arc, see Fig. 4.Ribbed arch 10 in the ribbed arch formula open cut tunnel part is reinforced concrete ribbed arch or concrete filled steel tube ribbed arch or steel reinforced concrete ribbed arch or shaped steel ribbed arch.
For construction safety, before the construction ribbed arch open cut tunnel part, also should carry out necessary reinforcing to massif, as adopting anchor pole 9 according to the actual landform geological conditions.
Embodiment 2:
The open cut tunnel basis 5 of ribbed arch open cut tunnel part bottom is a pile foundation 12, and ribbed arch 10 arc length of ribbed arch open cut tunnel part are 1/6 circular arc, see Fig. 5.Ribbed arch 10 in the ribbed arch open cut tunnel part is steel reinforced concrete ribbed arch or shaped steel ribbed arch.
Other is with embodiment 1.

Claims (4)

1. ribbed arch formula multiple-arch tunnel, comprise the dark hole tunnel of a side, mid-board, it is characterized in that: opposite side is ribbed arch formula open cut tunnel tunnel, the buried depth in described ribbed arch formula open cut tunnel tunnel is dark cavity portion than ninor feature one side, opposite side is the ribbed arch open cut tunnel part of being made up of two above ribbed arches, and the spacing between the adjacent ribbed arch is a 4-8 rice; Dark cavity portion and ribbed arch open cut tunnel part adjacent top along the length direction in ribbed arch formula open cut tunnel tunnel are provided with the rock-fall proof block, are provided with the backfill body between rock-fall proof block adjacent with dark cavity portion and the above-ground route.
2. a kind of ribbed arch formula multiple-arch tunnel according to claim 1 is characterized in that: described ribbed arch open cut tunnel bottom is provided with the open cut tunnel basis, and described open cut tunnel basis is grouted anchor bar or pile foundation.
3. a kind of ribbed arch formula multiple-arch tunnel according to claim 1 is characterized in that: the ribbed arch circular arc excursion of described ribbed arch open cut tunnel is the 1/3-1/6 circular arc.
4. a kind of ribbed arch formula multiple-arch tunnel according to claim 1 is characterized in that: the ribbed arch in the described ribbed arch formula open cut tunnel is reinforced concrete ribbed arch or concrete filled steel tube ribbed arch or steel reinforced concrete ribbed arch or shaped steel ribbed arch.
CN2010201550557U 2010-04-08 2010-04-08 Ribbed-arch multi-arch tunnel Expired - Lifetime CN201635745U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201550557U CN201635745U (en) 2010-04-08 2010-04-08 Ribbed-arch multi-arch tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201550557U CN201635745U (en) 2010-04-08 2010-04-08 Ribbed-arch multi-arch tunnel

Publications (1)

Publication Number Publication Date
CN201635745U true CN201635745U (en) 2010-11-17

Family

ID=43080234

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201550557U Expired - Lifetime CN201635745U (en) 2010-04-08 2010-04-08 Ribbed-arch multi-arch tunnel

Country Status (1)

Country Link
CN (1) CN201635745U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244127A (en) * 2013-04-22 2013-08-14 中交路桥北方工程有限公司 Method for quickening construction of multiple-arch tunnel
CN104405419A (en) * 2014-10-13 2015-03-11 中铁二院重庆勘察设计研究院有限责任公司 Parallel middle separation wall construction method for hidden type middle wall multi-arch tunnel
CN105626083A (en) * 2016-01-07 2016-06-01 安徽省交通控股集团有限公司 Construction method for permeable ribbed multiple-arch tunnel
CN106638509A (en) * 2017-01-04 2017-05-10 中国电建集团贵阳勘测设计研究院有限公司 Tunnel structure capable of reducing slope excavation and construction method thereof
CN114718582A (en) * 2022-06-08 2022-07-08 中铁九局集团第七工程有限公司 Construction method for small-clear-distance horizontal joint shale geological tunnel portal section

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244127A (en) * 2013-04-22 2013-08-14 中交路桥北方工程有限公司 Method for quickening construction of multiple-arch tunnel
CN104405419A (en) * 2014-10-13 2015-03-11 中铁二院重庆勘察设计研究院有限责任公司 Parallel middle separation wall construction method for hidden type middle wall multi-arch tunnel
CN105626083A (en) * 2016-01-07 2016-06-01 安徽省交通控股集团有限公司 Construction method for permeable ribbed multiple-arch tunnel
CN106638509A (en) * 2017-01-04 2017-05-10 中国电建集团贵阳勘测设计研究院有限公司 Tunnel structure capable of reducing slope excavation and construction method thereof
CN114718582A (en) * 2022-06-08 2022-07-08 中铁九局集团第七工程有限公司 Construction method for small-clear-distance horizontal joint shale geological tunnel portal section
CN114718582B (en) * 2022-06-08 2022-09-06 中铁九局集团第七工程有限公司 Construction method for small-clear-distance horizontal joint shale geological tunnel portal section

Similar Documents

Publication Publication Date Title
CN203308470U (en) Cover arch structure suitable for large-section unsymmetrical loading tunnel portal section
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN102704957A (en) Shed-frame method for shallowly burying large-sized underground structure construction
CN105839643A (en) Tunnel in-hole construction method adopting foundation pit support
CN102182465A (en) Tunnel-entering construction method for tunnel
CN105239598A (en) Integral sinking construction method for well-type full-automatic stereo garage
CN101598028A (en) Lining structure for super large section water-rich loess tunnel of high-speed railroad
CN108612117A (en) A kind of seabed water-retaining structure across municipal tunnel greatly and construction method
CN201635745U (en) Ribbed-arch multi-arch tunnel
CN103334452B (en) A kind of underground construction mixed construction method
CN104895121B (en) Transverse partition method for reducing ground surface settlement and building structure deformation of underground structure construction
CN104532853A (en) Deep foundation pit supporting method and system characterized by steel reinforced cement-soil piles, bolts easy to detach and automatic monitoring and early warning
CN204940298U (en) A kind of Composite Enclosure Structure of base pit engineering
CN110230273A (en) A kind of safeguard structure of small-sized rockfall
CN106401618A (en) Basin-shaped freezing water-stop system for water-enriched sandy gravel stratum deep-buried metro station
CN207047796U (en) A kind of light-duty mud-rock flow arch blocking dam
CN101481913A (en) Construction method of rock-socketed underground continuous wall punching slot section
CN102425179B (en) Structure of reinforced soil sewer supported by bored concrete piles of mini steel tubes
CN102953392A (en) Pile foundation structure of photovoltaic power station and construction process of pile foundation
CN210946536U (en) Protective structure of small dangerous rock falling stone
CN111926856A (en) Tunnel entering construction method based on longitudinal anti-skid open cut tunnel structure
CN107700434A (en) A kind of dome grating formula armored concrete mud-rock flow blocking dam and its construction process
CN204703189U (en) A kind of cutting barricade being applicable to crevice water, diving growth
CN208266896U (en) A kind of seabed water-retaining structure across municipal tunnel greatly
CN109869163A (en) A kind of construction method and structure of tunnel

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: ANHUI TRANSPORT CONSULTING + DESIGN INSTITUTE CO.,

Free format text: FORMER NAME: ANHUI TRANSPORTATION CONSULTING + DESIGN INSTITUTE

CP03 Change of name, title or address

Address after: 230088 Hefei high tech Zone, Anhui camphor Road, No. 180

Patentee after: ANHUI TRAFFIC PLANNING AND DESIGN INSTITUTE CO., LTD.

Address before: 230088, 180 camphor Road, hi tech Development Zone, Anhui, Hefei

Patentee before: Anhui Communications Consulting & Design Institue

CX01 Expiry of patent term

Granted publication date: 20101117

CX01 Expiry of patent term