CN109441456A - A kind of the tunnel structure and its construction method of weakness Facility-sliding strata - Google Patents
A kind of the tunnel structure and its construction method of weakness Facility-sliding strata Download PDFInfo
- Publication number
- CN109441456A CN109441456A CN201811540479.2A CN201811540479A CN109441456A CN 109441456 A CN109441456 A CN 109441456A CN 201811540479 A CN201811540479 A CN 201811540479A CN 109441456 A CN109441456 A CN 109441456A
- Authority
- CN
- China
- Prior art keywords
- lid
- pile
- tunnel
- facility
- joist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 45
- 239000011435 rock Substances 0.000 claims abstract description 43
- 239000004575 stone Substances 0.000 claims abstract description 18
- 239000002344 surface layer Substances 0.000 claims abstract description 14
- 239000010410 layer Substances 0.000 claims abstract description 13
- 238000013461 design Methods 0.000 claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 18
- 239000010959 steel Substances 0.000 claims description 18
- 230000003014 reinforcing effect Effects 0.000 claims description 11
- 238000009412 basement excavation Methods 0.000 claims description 10
- 238000009434 installation Methods 0.000 claims description 10
- 230000002787 reinforcement Effects 0.000 claims description 7
- 238000004519 manufacturing process Methods 0.000 claims description 6
- 239000004567 concrete Substances 0.000 claims description 5
- 230000005641 tunneling Effects 0.000 claims description 5
- 238000004873 anchoring Methods 0.000 claims description 3
- 239000011148 porous material Substances 0.000 claims description 3
- 239000011150 reinforced concrete Substances 0.000 claims description 3
- 239000002689 soil Substances 0.000 abstract description 11
- 230000015572 biosynthetic process Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000001514 detection method Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000013517 stratification Methods 0.000 description 2
- 239000004927 clay Substances 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 230000008595 infiltration Effects 0.000 description 1
- 238000001764 infiltration Methods 0.000 description 1
- 239000012466 permeate Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000002352 surface water Substances 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/04—Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F7/00—Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
- E01F7/04—Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/20—Securing of slopes or inclines
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/08—Lining with building materials with preformed concrete slabs
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/23—Dune restoration or creation; Cliff stabilisation
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Architecture (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses the tunnel structures and its construction method of a kind of weak Facility-sliding strata, it include the two rows of anchor piles being equipped in tunnel portal into hole structure, the joist being equipped on every row's anchor pile, and the lid being connected between two joists, and backfill stone is backfilled at the top of lid, anchor pile passes through the surface layer soft rock at hole and is embedded in lower layer's basement rock;Construction method includes performing anchor pile;Joist is performed after anchor pile reaches design strength, performs lid after the completion of joist construction;After lid reaches design strength, backfill stone is backfilled at the top of lid.Anchor pile of the invention passes through surface layer soft rock and is embedded in lower layer's basement rock, is effective against the skid force of two sides side slope, improves formation strength;Lid is performed at hole, solves the problems, such as that hole face-upward slope slump influences staff's construction safety;Different height soil stone is backfilled according to soft rock range at the top of lid, back-pressure is formed to slope soft rock is faced upward, can effectively ensure that the stability for facing upward slope and side slope.
Description
Technical field
The present invention relates to technical field of tunnel construction, in particular to the tunnel structure of a kind of weak Facility-sliding strata and its
Construction method.
Background technique
Weak Facility-sliding strata is that surface layer is soft rock, and lower layer is the geological stratification of basement rock, is normally at mountain area, and this geological stratification is special
Sign is exactly that the surface layer soft rock is easily generated along Weak face by external force (such as earthquake, heavy rain, mud-rock flow or other perturbed forces act on)
The phenomenon that displacement slides out existing collapsing.Therefore, when tunnel portal is located in soft rock, when the start tunneling of hole, soft rock is being applied
Under the external factor such as infiltration act under work disturbance and under surface rain, easily there is the sliding of soft rock and cause Landslide, jeopardize tunnel
Road safe construction.
For this purpose, Design of Tunnel Portal is both needed to carry out brush slope to face-upward slope under normal circumstances, if without other reinforcement measures, side
It is relatively slow to face upward slope ratio of slope, brush slope range is larger.In soft rock entrance construction, face-upward slope brush slope range is big, after face-upward slope excavates, is formed
Biggish free face, the unloading of face-upward slope slope foot;The loose lower layer in soft rock upper layer is closely knit, and surface water easily permeates softening country rock;In synthesis
Outer two kinds of factors easily cause face-upward slope to generate displacement along weak bedding surface, cause slope instability, and form tunnel portal and apply into hole
The pattern of work difficulty, constructing tunnel duration are even more to be difficult to control.
Summary of the invention
It is an object of the invention to overcome the above-mentioned deficiency in the presence of the prior art, a kind of weak Facility-sliding strata is provided
Tunnel structure and its construction method.
In order to achieve the above-mentioned object of the invention, the present invention provides following technical schemes:
A kind of tunnel structure of weakness Facility-sliding strata, including the two rows of anchor piles being equipped in tunnel portal, in every row
The joist being equipped on anchor pile, and the lid being connected between two joists, and be backfilled with back at the top of the lid
Banket stone, and the anchor pile passes through the surface layer soft rock at hole and is embedded in lower layer's basement rock.
Tunnel structure of the present invention is integrally to be different from existing open cut tunnel knot positioned at the outside of tunnel portal
Structure, guiding wall construction etc., tunnel structure of the present invention primarily serves protective action, to guarantee construction safety.Specifically
, anchor pile passes through surface layer soft rock and is embedded in lower layer's basement rock, is effective against the skid force of two sides side slope, while improving stratum
Intensity;Lid is performed at hole, solves the problems, such as that hole face-upward slope slump influences staff's construction safety, ensure that
Construction safety;Further, different height soil stone is backfilled according to soft rock range at the top of lid, forms back-pressure to slope soft rock is faced upward,
It can effectively ensure that the stability for facing upward slope and side slope.The present invention is since equipment is simple, place is easy to arrange, it is weak easy to be conducive to stablize
Sliding stratum reduces the features such as construction risk, forms preferable economic benefit.
Preferably, the lid is domes, at this point, the size of lid can be roughly the same with the guiding size of wall,
Lid is directly connected with guiding wall, forms overall structure, facilitates construction.Certainly, lid is also possible to other shapes, such as slot
The material of type, rectangle etc., lid is also unlimited, as long as can play the role of rock-fall protection.
Preferably, the anchor pile, joist and lid are reinforced concrete structure, and the position that is connected is connect by reinforcing bar
Stubble is connected, easy for construction, and bonding strength is high, and durability is good.
Preferably, further include face upward slope and with the safeguard structure and drainage system facing upward the adjacent side slope in slope and being equipped with.
The drainage system mainly includes performing earth's surface drain dyke, and the construction of drainage system carries out at first, and the purpose is to reduce
Extraneous factor is to the influence to hole face-upward slope soft rock stability.The safeguard structure includes rotary churning pile and/or anchored pile, and/
Or steel floral tube and/or steel tube shed, safeguard structure can effectively stable face-upward slope, avoid face-upward slope stability failure and slide and influence tunnel and apply
Work safety.
The invention also discloses a kind of construction methods of the tunnel structure of weak Facility-sliding strata, and one as described in any
The tunnel structure of kind of weak Facility-sliding strata, construction method the following steps are included:
Step 1: two rows of anchor piles, including pore digging and protection, pile body reinforcement fabrication and peace are performed in tunnel portal
Dress and pour stake body by concrete;
Step 2: after the anchor pile reaches design strength, joist is performed at the top of every row's anchor pile, to the support
After the completion of beam construction, lid is performed between two joists;
Step 3: after the lid reaches design strength, backfill stone is backfilled at the top of lid.
Potential slide surface is truncated by anchor pile in the present invention, and open cut tunnel and back-pressure backfill stablize the method for facing upward slope, ensure that hole
The stability of the mouth easy gliding mass of soft rock.Technology construction feasibility is high, using conventional construction equipment it is achieved that than traditional
It excavates and shifts to an earlier date into the hole mode duration, unit in charge of construction can be with effectively save manpower and material resources.Tunnel is effectively reduced using the technology
The depth and width of excavation can reduce about 40% land area compared with traditional slope is excavated, and total investment is controllable,
It can effectively estimate investment.
Preferably, before the step 1, earth's surface drain dyke is first performed, and perform on facing upward slope and/or side slope
Rotary churning pile or anchored pile or steel floral tube, the rotary churning pile or anchored pile or steel floral tube pass through surface layer soft rock and are embedded in lower layer's basement rock.
It preferably, further include performing guiding wall and steel tube shed before backfilling backfill stone, the basis of the guiding wall is set
It is placed on the joist, prevents guiding wall from sinking, after the completion of subject-oriented wall applies, the guiding wall wall aperture applies described
Steel tube shed advance support.
Preferably, performing joist includes joist template construct and installation, joist reinforcement fabrication and installation and joist concrete
It pours;Performing lid includes lid template construct and installation, lid reinforcement fabrication and installation, and maintenance detection.
It preferably, further include that tunneling section, the first step are excavated to the anchoring stake top in two steps at open cut tunnel hole
Elevation location, after the lid construction after the completion of, second step excavate be from it is described anchoring stake top elevation location be excavated to
Tunnel bottom elevation location.In this way, excavation height can be effectively controlled, small to the disturbance of easy sliding bottom, excavation is small, securely and reliably.
Compared with prior art, it is of the present invention into hole structure the utility model has the advantages that
Anchor pile of the invention passes through surface layer soft rock and is embedded in lower layer's basement rock, is effective against the skid force of two sides side slope,
The intensity on stratum is improved simultaneously;Lid is performed at hole, efficiently solving hole face-upward slope slump influences staff's construction peace
Full problem, ensure that construction safety;Further, different height soil stone is backfilled according to soft rock range at the top of lid, to facing upward
Slope soft rock forms back-pressure, can effectively ensure that the stability for facing upward slope and side slope.The present invention due to equipment is simple, place is easy to arrange,
Be conducive to stablize weak Facility-sliding strata, reduce the features such as construction risk, forms preferable economic benefit.
Compared with prior art, the construction method of the present invention into hole structure the utility model has the advantages that
Potential slide surface is truncated by anchor pile in the present invention, and open cut tunnel and back-pressure backfill stablize the method for facing upward slope, ensure that hole
The stability of the mouth easy gliding mass of soft rock.Technology construction feasibility is high, using conventional construction equipment it is achieved that than traditional
It excavates and shifts to an earlier date into the hole mode duration, unit in charge of construction can be with effectively save manpower and material resources.Tunnel is effectively reduced using the technology
The depth and width of excavation can reduce about 40% land area compared with traditional slope is excavated, and total investment is controllable,
It can effectively estimate investment.
Detailed description of the invention:
Fig. 1 is a kind of structure of the tunnel structure (concealing backfill stone) of weak Facility-sliding strata of the present invention
Schematic diagram.
Fig. 2 is a kind of tunnel structure of weak Facility-sliding strata of the present invention (including guiding wall and steel tube shed)
Structural schematic diagram.
Fig. 3 is the structural schematic diagram of guiding wall and steel tube shed of the present invention.
Marked in the figure: 1- anchor pile, 2- joist, 3- lid, 4- backfill stone, 5- guiding wall, 6- steel tube shed, the tunnel 7-,
01- faces upward slope, 02- side slope, the surface layer 03- soft rock, 04- lower layer basement rock.
Specific embodiment
Below with reference to test example and specific embodiment, the present invention is described in further detail.But this should not be understood
It is all that this is belonged to based on the technology that the content of present invention is realized for the scope of the above subject matter of the present invention is limited to the following embodiments
The range of invention.
Embodiment 1
As Figure 1-Figure 2, a kind of tunnel structure of weak Facility-sliding strata, including the two rows being equipped in tunnel portal
Anchor pile 1, the joist 2 being equipped on every row's anchor pile 1, and the lid 3 of arch being connected between two joists 2,
And backfill stone 4 is backfilled at the top of the lid 3, the anchor pile 1 passes through the surface layer soft rock 03 at hole and is embedded in lower layer's base
Rock 04.The anchor pile 1, joist 2 and lid 3 are reinforced concrete structure, and the position that is connected connects stubble by reinforcing bar and is connected
It connects.
It further include in the safeguard structure for facing upward slope 01 and side slope 02 is equipped with, specifically, slope 01 can faced upward and side slope 02 carries out
Rotary churning pile carries out the above-mentioned construction into hole structure after reinforcing again, to guarantee construction safety.Meanwhile as shown in figure 3, in order to smoothly
Tunneling 7, the safeguard structure further include the guiding wall 5 and steel tube shed 6 being equipped in the penumbra in tunnel 7, are played super
The effect of preceding supporting, guiding 5 basis of wall are placed on the joist 2, are provided vertical counter-force for guiding wall 5, are reduced sedimentation, be oriented to wall
Open cut tunnel is closely followed at 5 rears, provides horizontal direction counter-force for guiding wall 5, reduces the outside extrusion displacement of guiding wall 5.
In the construction process, the shape of lid 3 can be similar with guiding wall 5, and lid 3 can directly withstand on guiding wall 5
On, or can be connected by reinforcing bar therebetween, then cast-in-place integral.After the completion of lid 3 and guiding wall 5 are constructed,
Again in the top backfill stone and concrete of lid 3 and guiding wall 5, backfill stone 4 forms back-pressure to slope soft rock is faced upward, so as to have
Effect guarantees to face upward the stability on slope.
Embodiment 2
A kind of construction method of the tunnel structure of weakness Facility-sliding strata, comprising the following steps:
Step 1: preparation of construction, including earth's surface drain dyke is performed, to reduce extraneous factor to hole face-upward slope soft rock
The influence of stability, to slope 01 is faced upward and side slope 02 is reinforced, specifically, surface layer can be fixed by rotary churning pile or steel-pipe pile
Soft rock 03.
Step 2: two rows of anchor piles 1, including pore digging and protection, pile body reinforcing bar system are performed in the earth's surface of tunnel portal
Work and installation and pour stake body by concrete.Pile foundation uses diameter for the drilled pile of 1.5m, the long thickness according to surface layer soft rock 03 of stake
Degree is drafted, stake spacing 4.5m.It is protected between stake using soil nail wall, soil nail wall is set between each stake, soil nail wall metope uses C35 reinforcing bar
Concreting, wall high 3~4m laterally use 3 column soil nailings between stake, be anyhow 1.0m, soil nailing bore diameter 32mm to spacing,
Soil nail wall metope ratio of slope 1: 0.2,11.31 ° of soil nailing angle with horizontal plane, soil-nail parameter 10m.
Step 3: after the anchor pile 1 reaches design strength, performing joist 2 at the top of every row's anchor pile 1 respectively,
Including joist template construct and installation, joist reinforcement fabrication and installation and joist concreting, 2 sectional dimension 1.5m of joist
The bound fraction reinforcing bar of × 1.5m, mono- section of every 8m, the outer cantilever 1m of pile foundation, joist 2 and anchor pile 1 connects stubble.
Step 4: after the completion of pile foundation joist 2 applies, lid 3 is applied between two joists 2, lid 3 is mixed using reinforcing bar
Xtah Crude Clay structure performs lid 3 and includes lid template construct and installation, lid reinforcement fabrication and installation, and maintenance detection, lid 3
Thickness 80cm, be placed on joist 2 and connect stubble in binding site reinforcing bar.
Step 5: after the lid 3 reaches design strength, backfill stone 4 and C20 coagulation are backfilled at the top of lid 3
Soil after Tunnel slope protection, faces upward slope back-pressure and carries out on tunnel 7 half section excavation again after the completion of earth's surface reinforcing applies and apply into hole
Work.In open cut tunnel hole tunneling section in two steps, the first step is excavated to elevation location (and the dark hole of 1 stake top of anchor pile
Top bar it is similar), second step excavation be to be excavated to tunnel bottom elevation location from the elevation location of 1 stake top of anchor pile
(similar with getting out of a predicament or an embarrassing situation for dark hole).Excavating in two steps can be effectively controlled excavation height, small to the disturbance of easy sliding bottom, and excavation is small,
Securely and reliably.
The construction of guiding wall 5 and steel tube shed 6 can be carried out while performing anchor pile 1, joist 2 and lid 3, it is described to lead
To wall 5 basis instrument on the joist 2, the 5 wall aperture of guiding wall applies the steel tube shed 6, advanced to play
The effect of supporting lays the foundation for the smooth excavation in tunnel, finally native stone backfill is carried out in guiding wall and lid 3 again, to rise
To the effect for facing upward slope back-pressure.
Above embodiments are only to illustrate the present invention and not limit the technical scheme described by the invention, although this explanation
The present invention has been described in detail referring to above-mentioned each embodiment for book, but the present invention is not limited to above-mentioned specific implementation
Mode, therefore any couple of present invention modifies or equivalent replacement;And the technical side of all spirit and scope for not departing from invention
Case and its improvement, are intended to be within the scope of the claims of the invention.
Claims (10)
1. a kind of tunnel structure of weakness Facility-sliding strata, which is characterized in that including the two rows of anchorings being equipped in tunnel portal
Stake (1), the joist (2) being equipped on every row's anchor pile (1), and the lid (3) being connected between two joists (2),
And be backfilled with backfill stone (4) at the top of the lid (3), the anchor pile (1) passes through the surface layer soft rock (03) at hole and embedding
Enter lower layer's basement rock (04).
2. a kind of tunnel structure of weak Facility-sliding strata according to claim 1, which is characterized in that the lid
It (3) is domes.
3. a kind of tunnel structure of weak Facility-sliding strata according to claim 1, which is characterized in that the anchor pile
(1), joist (2) and lid (3) are reinforced concrete structure, and the position that is connected connects stubble by reinforcing bar and is connected.
4. a kind of tunnel structure of weak Facility-sliding strata according to claim 1 to 3, which is characterized in that also wrap
It includes in the safeguard structure facing upward slope (01) and being equipped with.
5. a kind of tunnel structure of weak Facility-sliding strata according to claim 4, which is characterized in that the protection knot
Structure includes rotary churning pile and/or anchored pile and/or steel floral tube and/or steel tube shed.
6. a kind of tunnel structure of weak Facility-sliding strata according to claim 4, which is characterized in that faced upward with described
The safeguard structure also is provided in the adjacent side slope (02) in slope (01).
7. a kind of construction method of the tunnel structure of weakness Facility-sliding strata, which is characterized in that such as any institute of claim 1-6
A kind of tunnel structure for the weak Facility-sliding strata stated, construction method the following steps are included:
Step 1: performing two rows of anchor piles (1), including pore digging and protection, pile body reinforcement fabrication and installation in tunnel portal,
And pour stake body by concrete;
Step 2: after the anchor pile (1) reaches design strength, performing joist (2) at the top of every row's anchor pile (1), to
After the completion of joist (2) construction, lid (3) are performed between two joists (2);
Step 3: after the lid (3) reaches design strength, backfill stone (4) are backfilled at the top of lid (3).
8. a kind of construction method of the tunnel structure of weak Facility-sliding strata according to claim 7, which is characterized in that
Before the step 1, first perform earth's surface drain dyke, and perform on facing upward slope (01) and/or side slope (02) rotary churning pile or
Anchored pile or steel floral tube, the rotary churning pile or anchored pile or steel floral tube pass through surface layer soft rock (03) and are embedded in lower layer's basement rock (04).
9. a kind of construction method of the tunnel structure of weak Facility-sliding strata according to claim 7, which is characterized in that
Further include performing guiding wall (5) and steel tube shed (6) before backfill backfill stone (4), the basis instrument for being oriented to wall (5) in
On the joist (2), guiding wall (5) the wall aperture applies the steel tube shed (6).
10. special according to a kind of construction method of the tunnel structure of any weak Facility-sliding strata of claim 7-9
Sign is, further includes that tunneling section, the first step are excavated to the absolute altitude of the anchor pile (1) stake top in two steps at open cut tunnel hole
Position, second step excavation is to be excavated to tunnel bottom elevation location from the elevation location of the anchor pile (1) stake top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811540479.2A CN109441456B (en) | 2018-12-14 | 2018-12-14 | Tunnel entering structure of weak and slippery stratum and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811540479.2A CN109441456B (en) | 2018-12-14 | 2018-12-14 | Tunnel entering structure of weak and slippery stratum and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109441456A true CN109441456A (en) | 2019-03-08 |
CN109441456B CN109441456B (en) | 2024-04-09 |
Family
ID=65559802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811540479.2A Active CN109441456B (en) | 2018-12-14 | 2018-12-14 | Tunnel entering structure of weak and slippery stratum and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109441456B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110159294A (en) * | 2019-05-08 | 2019-08-23 | 中铁二十二局集团第五工程有限公司 | A kind of high steep landform tunnel immediately adjacent to bridge section spreading open cut tunnel construction method |
CN110924434A (en) * | 2019-12-12 | 2020-03-27 | 岳阳市公路桥梁基建总公司 | UHPC (ultra high performance polycarbonate) fabricated tunnel open cut tunnel lining structure and construction method |
CN111101966A (en) * | 2019-12-29 | 2020-05-05 | 中铁二院工程集团有限责任公司 | Large karst cavity rockfall-preventing elastic tunnel structure and construction method |
CN111305866A (en) * | 2019-12-29 | 2020-06-19 | 中铁二院工程集团有限责任公司 | Large karst cavity tunnel structure and construction method |
CN111305849A (en) * | 2020-03-19 | 2020-06-19 | 重庆渝高科技产业(集团)股份有限公司 | Construction method of anti-sinking shed tunnel structure for tunnel construction |
CN112663625A (en) * | 2020-12-29 | 2021-04-16 | 哈尔滨工业大学 | Construction and protection method for shallow-buried bias-pressure weak surrounding rock tunnel portal in alpine region |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102071949A (en) * | 2011-02-24 | 2011-05-25 | 湖南省交通规划勘察设计院 | Pile type composite tube roofing cover arch structure for tunnel portal and construction method thereof |
CN102444405A (en) * | 2011-10-19 | 2012-05-09 | 重庆大学 | Anti-slide pile and frame arch combined structure and construction method |
CN204419195U (en) * | 2014-12-29 | 2015-06-24 | 山西省交通科学研究院 | A kind of supporting and protection structure pattern being applicable to tunnel portal section |
CN104727834A (en) * | 2015-01-21 | 2015-06-24 | 中铁五局(集团)有限公司 | Summer-time face excavation construction method for high and cold permafrost ultra-long highway tunnel |
CN204609899U (en) * | 2015-05-14 | 2015-09-02 | 贵州省公路工程集团有限公司 | A kind of supporting and protection structure for soft soil layer tunnel |
CN105840207A (en) * | 2016-03-24 | 2016-08-10 | 杭州江润科技有限公司 | Cross shallow buried bias pressure loose accumulation body large-span tunnel comprehensive entrance structure construction method |
CN105839643A (en) * | 2016-05-23 | 2016-08-10 | 浙江省交通规划设计研究院 | Tunnel in-hole construction method adopting foundation pit support |
KR101655217B1 (en) * | 2016-06-08 | 2016-09-07 | 우경기술주식회사 | Construction method for open cutting in tunnel portal area |
CN106246200A (en) * | 2016-08-30 | 2016-12-21 | 中铁第勘察设计院集团有限公司 | Tunnel weakness substrate small-sized pile tube reinforcement system and construction method thereof |
CN106321106A (en) * | 2015-06-30 | 2017-01-11 | 中交二公局第六工程有限公司 | Construction method for tunnel-entering of tunnel weak surrounding rock and semi-open and semi-underground bias section portal abutment |
CN106988760A (en) * | 2017-04-12 | 2017-07-28 | 中铁二院工程集团有限责任公司 | Facility-sliding strata tunnel portal reinforcing construction and construction method |
CN207297019U (en) * | 2017-08-31 | 2018-05-01 | 中铁二院工程集团有限责任公司 | Tunnel portal is oriented to wall beam frame structure in length and breadth |
CN108798679A (en) * | 2018-06-11 | 2018-11-13 | 中铁二局第工程有限公司 | Steel tube shed goes out cavity construction method in shallow embedding single-track railway tunnel hole |
CN108843341A (en) * | 2018-06-20 | 2018-11-20 | 昆明理工大学 | A kind of the cut-and-cover tunnel structure and its construction method of mixture of piles and concrete wall formula |
CN208220781U (en) * | 2018-04-10 | 2018-12-11 | 惠安集睿信息科技有限公司 | A kind of high steep biased substrate sheet-pile structure in tunnel |
CN209195412U (en) * | 2018-12-14 | 2019-08-02 | 中铁二院工程集团有限责任公司 | A kind of tunnel structure suitable for weak Facility-sliding strata |
-
2018
- 2018-12-14 CN CN201811540479.2A patent/CN109441456B/en active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102071949A (en) * | 2011-02-24 | 2011-05-25 | 湖南省交通规划勘察设计院 | Pile type composite tube roofing cover arch structure for tunnel portal and construction method thereof |
CN102444405A (en) * | 2011-10-19 | 2012-05-09 | 重庆大学 | Anti-slide pile and frame arch combined structure and construction method |
CN204419195U (en) * | 2014-12-29 | 2015-06-24 | 山西省交通科学研究院 | A kind of supporting and protection structure pattern being applicable to tunnel portal section |
CN104727834A (en) * | 2015-01-21 | 2015-06-24 | 中铁五局(集团)有限公司 | Summer-time face excavation construction method for high and cold permafrost ultra-long highway tunnel |
CN204609899U (en) * | 2015-05-14 | 2015-09-02 | 贵州省公路工程集团有限公司 | A kind of supporting and protection structure for soft soil layer tunnel |
CN106321106A (en) * | 2015-06-30 | 2017-01-11 | 中交二公局第六工程有限公司 | Construction method for tunnel-entering of tunnel weak surrounding rock and semi-open and semi-underground bias section portal abutment |
CN105840207A (en) * | 2016-03-24 | 2016-08-10 | 杭州江润科技有限公司 | Cross shallow buried bias pressure loose accumulation body large-span tunnel comprehensive entrance structure construction method |
CN105839643A (en) * | 2016-05-23 | 2016-08-10 | 浙江省交通规划设计研究院 | Tunnel in-hole construction method adopting foundation pit support |
KR101655217B1 (en) * | 2016-06-08 | 2016-09-07 | 우경기술주식회사 | Construction method for open cutting in tunnel portal area |
CN106246200A (en) * | 2016-08-30 | 2016-12-21 | 中铁第勘察设计院集团有限公司 | Tunnel weakness substrate small-sized pile tube reinforcement system and construction method thereof |
CN106988760A (en) * | 2017-04-12 | 2017-07-28 | 中铁二院工程集团有限责任公司 | Facility-sliding strata tunnel portal reinforcing construction and construction method |
CN207297019U (en) * | 2017-08-31 | 2018-05-01 | 中铁二院工程集团有限责任公司 | Tunnel portal is oriented to wall beam frame structure in length and breadth |
CN208220781U (en) * | 2018-04-10 | 2018-12-11 | 惠安集睿信息科技有限公司 | A kind of high steep biased substrate sheet-pile structure in tunnel |
CN108798679A (en) * | 2018-06-11 | 2018-11-13 | 中铁二局第工程有限公司 | Steel tube shed goes out cavity construction method in shallow embedding single-track railway tunnel hole |
CN108843341A (en) * | 2018-06-20 | 2018-11-20 | 昆明理工大学 | A kind of the cut-and-cover tunnel structure and its construction method of mixture of piles and concrete wall formula |
CN209195412U (en) * | 2018-12-14 | 2019-08-02 | 中铁二院工程集团有限责任公司 | A kind of tunnel structure suitable for weak Facility-sliding strata |
Non-Patent Citations (1)
Title |
---|
许占良: "长昆客专湖南段隧道洞口设计研究", 《隧道建设(中英文)》, vol. 38, pages 115 - 120 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110159294A (en) * | 2019-05-08 | 2019-08-23 | 中铁二十二局集团第五工程有限公司 | A kind of high steep landform tunnel immediately adjacent to bridge section spreading open cut tunnel construction method |
CN110924434A (en) * | 2019-12-12 | 2020-03-27 | 岳阳市公路桥梁基建总公司 | UHPC (ultra high performance polycarbonate) fabricated tunnel open cut tunnel lining structure and construction method |
CN110924434B (en) * | 2019-12-12 | 2021-06-01 | 岳阳市公路桥梁基建总公司 | UHPC (ultra high performance polycarbonate) fabricated tunnel open cut tunnel lining structure and construction method |
CN111101966A (en) * | 2019-12-29 | 2020-05-05 | 中铁二院工程集团有限责任公司 | Large karst cavity rockfall-preventing elastic tunnel structure and construction method |
CN111305866A (en) * | 2019-12-29 | 2020-06-19 | 中铁二院工程集团有限责任公司 | Large karst cavity tunnel structure and construction method |
CN111305849A (en) * | 2020-03-19 | 2020-06-19 | 重庆渝高科技产业(集团)股份有限公司 | Construction method of anti-sinking shed tunnel structure for tunnel construction |
CN112663625A (en) * | 2020-12-29 | 2021-04-16 | 哈尔滨工业大学 | Construction and protection method for shallow-buried bias-pressure weak surrounding rock tunnel portal in alpine region |
Also Published As
Publication number | Publication date |
---|---|
CN109441456B (en) | 2024-04-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109441456A (en) | A kind of the tunnel structure and its construction method of weakness Facility-sliding strata | |
CN104264688B (en) | Manually digging hole non-uniform pile support construction process | |
CN105239586B (en) | Method for supporting foundation pit by adopting support structure | |
CN103206219A (en) | Holed excavation supporting structure for light and dark junction section of tunnel in bias pressure state and construction method | |
CN201433344Y (en) | Composite protection structure for stabilizing road bed in mountain road | |
CN106930321B (en) | The construction method of underground structure is built in a kind of stake of pipe-jacking with large diameter combination hole | |
CN102704957A (en) | Shed-frame method for shallowly burying large-sized underground structure construction | |
CN205013013U (en) | Secretly dig station supporting construction suitable for last soft hard formation down | |
CN105587320B (en) | Rich water sand-pebble layer abnormal shape deep shaft structural system and its construction method | |
CN109487804A (en) | The low disturbance reinforcement protection system of red soft rock cut slope and construction method | |
CN108979659A (en) | The ruggedized construction and method of structures are worn under weak soil rich water large cross-section tunnel group | |
CN103321234B (en) | Constructing method of load-bearing structure built on high slope or geological complex area | |
CN106049195A (en) | Method for strengthening subgrade basement of existing high speed railway line | |
CN106640096A (en) | Construction method for penetrating through tunnel of backfilling soil section and transition section | |
CN108914954A (en) | Slope support method of the pre support in conjunction with permanent support | |
CN109610473A (en) | A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration | |
CN109056810A (en) | The transverse direction that open cut or lid dig underground main structure below existing building digs construction and its construction method | |
CN100513705C (en) | Underground Beam-Pile Frame Structure for Slope Reinforcement | |
CN209195412U (en) | A kind of tunnel structure suitable for weak Facility-sliding strata | |
CN108035360B (en) | A method of for pattern foundation pit supporting structure | |
CN109538236A (en) | A kind of tunnel structure and tunnel construction method | |
CN109881683A (en) | A kind of more sublevel retaining structures and its construction method for combining artificial earth fill's grouting reinforcement technique | |
CN205576990U (en) | Cross section and wear bridge pier tunnel slip casting supporting construction | |
CN218813764U (en) | Stress-maintaining type faces combination continuous pile wall supporting construction forever | |
CN208605199U (en) | The ruggedized construction of structures is worn under a kind of weak soil rich water large cross-section tunnel group |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |