CN108035742B - A method of active and passive harmonious support for extremely weak coal seam roadway - Google Patents

A method of active and passive harmonious support for extremely weak coal seam roadway Download PDF

Info

Publication number
CN108035742B
CN108035742B CN201711135383.3A CN201711135383A CN108035742B CN 108035742 B CN108035742 B CN 108035742B CN 201711135383 A CN201711135383 A CN 201711135383A CN 108035742 B CN108035742 B CN 108035742B
Authority
CN
China
Prior art keywords
hollow
anchor
grouting
roadway
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201711135383.3A
Other languages
Chinese (zh)
Other versions
CN108035742A (en
Inventor
韦四江
晁建伟
贺拿
熊祖强
李辉辉
吴怡凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201711135383.3A priority Critical patent/CN108035742B/en
Publication of CN108035742A publication Critical patent/CN108035742A/en
Application granted granted Critical
Publication of CN108035742B publication Critical patent/CN108035742B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0006Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by the bolt material
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Road Signs Or Road Markings (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明为一种极端软弱煤层巷道主被动和谐支护方法,公开提出一种超前自钻玻璃钢注浆锚杆强化巷帮和强化顶板控制极端松软煤层回采巷道围岩控制技术,包括以下步骤:在掘进工作面迎头巷道断面轮廓线处超前布置外扎自钻式玻璃钢锚杆,根据巷道两帮煤体松软程度确定锚杆的长度、间距和注浆参数;利用风动锚杆钻机在指定的位置安装自钻式玻璃钢锚杆后,即可安装止浆塞,连接双液气动注浆泵,开始注浆;浆液凝结时间应先快后慢,注浆压力达到给定值即可结束;待浆液凝固后即可安装托板,施加预紧力;继续掘进若干循环进尺,顶板安设高强锚杆、锚索,并保证金属网、钢筋梯等护表构件的安设配合良好。

Figure 201711135383

The present invention is an active and passive harmonious support method for roadways in extremely soft coal seams. It discloses an advanced self-drilling glass fiber reinforced plastic grouting anchor rod to strengthen roadsides and reinforced roofs to control the surrounding rock control technology of mining roadways in extremely soft coal seams, including the following steps: Arrange externally tied self-drilling glass fiber reinforced plastic anchor rods at the contour line of the front roadway section of the excavation working face in advance, and determine the length, spacing and grouting parameters of the anchor rods according to the softness of the two sides of the roadway coal; After installing the self-drilling FRP bolt, you can install the grout stopper, connect the double-liquid pneumatic grouting pump, and start grouting; the grouting time should be fast first and then slow, and the grouting pressure can reach a given value to end; After solidification, the supporting plate can be installed, and the pre-tightening force can be applied; continue to excavate for several cycles, install high-strength anchor rods and anchor cables on the roof, and ensure that the installation and coordination of metal mesh, steel ladder and other surface protection components are good.

Figure 201711135383

Description

一种极端软弱煤层巷道主被动和谐支护方法A method of active and passive harmonious support for extremely weak coal seam roadway

技术领域technical field

本发明涉及一种极端软弱煤层巷道围岩控制技术,属于岩土支护工程领域,尤其涉及到地下采矿工程回采巷道围岩加固顶板与强化两帮的矿压控制技术。The invention relates to a surrounding rock control technology of an extremely weak coal seam roadway, which belongs to the field of geotechnical support engineering, and in particular relates to a mine pressure control technology for backing the roadway surrounding rock to reinforce the roof and strengthen the two sides of the underground mining engineering.

背景技术Background technique

河南中西部的平禹煤田、新密煤田、偃师-龙门煤田,煤层受到强烈地质构造作用,其原始结构被破坏,整体性差,煤层为糜棱状碎裂介质,普氏系数在0.15-0.25之间。布置在极端松软煤层中的回采巷道多采用工字钢梯形金属支架被动支护,在服务期间要翻修3-4次,严重影响了工作面的正常回采,消耗了大量的人力、物力和财力。因此,提高极端松软煤层回采巷道围岩自承载能力和支护状况就显得尤为迫切。In Pingyu Coalfield, Xinmi Coalfield, and Yanshi-Longmen Coalfield in central and western Henan, the coal seam is subjected to strong geological tectonic action, its original structure is destroyed, and its integrity is poor. The coal seam is a mylonitic fragmentation medium with a Platts coefficient of 0.15-0.25 between. The mining roadways arranged in extremely soft coal seams are mostly passively supported by I-steel trapezoidal metal brackets. During the service period, they need to be renovated 3-4 times, which seriously affects the normal mining of the working face and consumes a lot of manpower, material and financial resources. Therefore, it is particularly urgent to improve the self-bearing capacity and support status of the surrounding rock of the extremely soft coal seam mining roadway.

目前,极端松软煤层回采巷道支护方法有:强顶固帮法、两帮卸压+注浆强化方法;强顶固帮方法采用高强锚杆-锚索强化支护顶板,两帮采用小间距工字钢对棚,配合蛇皮袋子装煤架后充填方法;但现场矿压观测表明,随着两帮的变形,支架弯曲变形严重,顶板实际跨度随着两帮的变形而增加,无形中增加了巷道跨度和巷道两帮支承压力,二者相互促进,造成巷道围岩状况恶化。两帮卸压+注浆强化方法,采用大直径卸压钻孔吸收围岩变形、转移高应力到深部围岩中,滞后卸压孔一定范围再次对围岩进行注浆加固,提高其自承载能力;但卸压钻孔进一步扩大了巷道破裂区的范围,在两帮注浆之前就会造成巷道支护物的变形和破坏。因此,针对极端松软巷道围岩控制问题,上述方法难以达到较好的支护效果。At present, the roadway support methods for extremely soft coal seam recovery include: strong roof reinforcement method, two sides pressure relief + grouting strengthening method; strong roof reinforcement method adopts high-strength anchor rod-anchor cable to strengthen the roof support, and two sides adopt small spacing The I-beam paired shed is filled with snakeskin bags for coal racks; however, the on-site mine pressure observation shows that with the deformation of the two sides, the bending deformation of the bracket is serious, and the actual span of the roof increases with the deformation of the two sides. The span of the roadway and the supporting pressure of the two sides of the roadway are increased, and the two promote each other, resulting in the deterioration of the surrounding rock condition of the roadway. Two-side pressure relief + grouting strengthening method, using large-diameter pressure relief drilling to absorb the deformation of the surrounding rock, transfer high stress to the deep surrounding rock, and then carry out grouting reinforcement on the surrounding rock within a certain range of the lagging pressure relief hole to improve its self-bearing capacity However, the pressure relief drilling further expands the scope of the roadway rupture zone, which will cause deformation and damage to the roadway support before the two sides of the grouting. Therefore, it is difficult for the above method to achieve a better supporting effect for the control of extremely soft roadway surrounding rock.

发明内容Contents of the invention

本发明针对极端松软煤层回采巷道两帮锚固效果差、金属支架变形严重、注浆效果差、翻修次数多的难题,提出一种超前自钻玻璃钢注浆锚杆强化巷帮和强化顶板控制极端松软煤层回采巷道围岩控制技术,旨在解决极端松软煤层回采巷道两帮锚固问题,实现极端松软煤帮的承载问题,以减少翻修次数、降低支护成本,达到回采巷道服务期间安全使用的目的。Aiming at the problems of poor anchoring effect of the two sides of the mining roadway in extremely soft coal seams, serious deformation of the metal support, poor grouting effect, and many renovation times, the present invention proposes an advanced self-drilling glass fiber reinforced plastic grouting bolt to strengthen the roadside and strengthen the roof to control extreme softness The coal seam mining roadway surrounding rock control technology aims to solve the problem of anchorage of the two sides of the extremely soft coal seam mining roadway, realize the bearing problem of the extremely soft coal side, reduce the number of renovations, reduce the support cost, and achieve the purpose of safe use of the mining roadway during service.

为实现上述目的,本发明基于超前自钻玻璃钢注浆锚杆强化巷帮和强化顶板控制技术,其采取的技术方案是一种极端软弱煤层巷道主被动和谐支护方法,包括以下步骤:In order to achieve the above object, the present invention is based on the advanced self-drilling glass fiber reinforced plastic grouting anchor bolt strengthening roadside and strengthening roof control technology, and the technical solution it adopts is an active and passive harmonious support method for extremely weak coal seam roadway, including the following steps:

步骤一:在极端软弱煤层回采巷道掘进头的超前段,顺着掘进方向,布置超前自钻式玻璃钢锚杆;超前自钻式玻璃钢锚杆包括中空玻璃钢锚杆,中空玻璃钢锚杆的两端设置有内螺纹,Step 1: Arrange advanced self-drilling FRP bolts along the direction of excavation in the advanced section of the excavation head of the extremely weak coal seam recovery roadway; the advanced self-drilling FRP bolts include hollow FRP bolts, and the two ends of the hollow FRP bolts are set with internal thread,

中空玻璃钢锚杆上钻有三花形布置的出浆孔,中空玻璃钢锚杆一端螺纹连接有六棱柱驱动端,另一端螺纹连接有钻头;六棱柱驱动端内部为一个中空螺纹孔,六棱柱驱动端的一端设置有圆环形凸台,圆环形凸台的外侧面设置有外螺纹,圆环形凸台的外螺纹与中空玻璃钢锚杆的内螺纹相匹配,六棱柱驱动端通过圆环形凸台与中空玻璃钢锚杆螺纹连接;Hollow fiberglass anchor rods are drilled with three flower-shaped slurry outlet holes. One end of the hollow fiberglass anchor rods is threaded with a hexagonal prism drive end, and the other end is threaded with a drill bit; the interior of the hexagonal prism drive end is a hollow threaded hole. There is a ring-shaped boss, and the outer surface of the ring-shaped boss is provided with external threads. The external thread of the ring-shaped boss matches the internal thread of the hollow glass fiber reinforced plastic anchor rod, and the driving end of the hexagonal column passes through the ring-shaped boss. Threaded connection with hollow fiberglass anchor rod;

步骤二:用锚杆钻机驱动自钻式玻璃钢锚杆上的六棱柱驱动端,钻至给定深度;如果需要加长,则卸下六棱柱驱动端,用连接套连接另一个中空玻璃钢锚杆,另一个中空玻璃钢锚杆的另一端安装上六棱驱动端,然后继续钻进至给定深度;Step 2: Drive the driving end of the hexagonal prism on the self-drilling FRP anchor with a rock bolt rig and drill to a given depth; if it needs to be lengthened, remove the driving end of the hexagonal prism and connect another hollow FRP anchor with a connecting sleeve. The other end of the other hollow FRP bolt is installed with the hexagonal driving end, and then continues to drill to a given depth;

步骤三,安装止浆塞,连接注浆泵,将无机双液注浆材料通过六棱柱驱动端的中空螺纹孔注入超前自钻式玻璃钢锚杆,达到给定压力后停止注浆,浆液凝固后安装托板、驱动螺母,施加预紧力;Step 3, install the grout stopper, connect the grouting pump, inject the inorganic double-liquid grouting material into the advanced self-drilling FRP anchor rod through the hollow threaded hole at the driving end of the hexagonal prism, stop the grouting after reaching a given pressure, and install it after the grout solidifies Support plate, drive nut, apply pre-tightening force;

步骤四,安装顶板高强预应力锚杆;滞后掘进工作面一定距离安装U型钢支架,并用金属网和编织袋对巷道两帮进行封闭;Step 4: install high-strength prestressed anchors on the roof; install U-shaped steel brackets at a certain distance on the lagging excavation face, and seal the two sides of the roadway with metal mesh and woven bags;

步骤五,穿过U型钢支架安装锚索,锚索锁具作用在U型钢支架上。Step five, install the anchor cable through the U-shaped steel bracket, and the anchor cable lock acts on the U-shaped steel bracket.

优选的,所述超前自钻式玻璃钢锚杆与巷道掘进方向的夹角为30°。Preferably, the included angle between the advanced self-drilling FRP bolt and the driving direction of the roadway is 30°.

优选的,钻头由铸铁制作而成。Preferably, the drill bit is made of cast iron.

优选的,所述U型钢支架滞后掘进工作面10-15m安装,保证平行作业。Preferably, the U-shaped steel support is installed 10-15m behind the excavation face to ensure parallel operation.

优选的, U型钢支架采用三心拱型U型钢支架,锚索穿过U型钢支架,实现主动和被动和谐支护。Preferably, the U-shaped steel bracket adopts a three-core arched U-shaped steel bracket, and the anchor cable passes through the U-shaped steel bracket to realize active and passive harmonious support.

本发明的有益成果是:本发明实现了超前极端松软煤体锚固孔坍塌问题,同时提高了极端松软煤体自承载能力;强化顶板支护,减小了作用在巷道两帮煤体;三心拱型U型钢支架和穿架锚索提高了其支护抗力,实现了主动-被动支护的和谐支护。本发明基于超前锚注加固,提高两帮自承载能力的方法,克服了巷道掘出后松软煤体受到破坏,锚固效果差,安装锚杆和注浆管时塌孔的不足,且工作面回采时不必再拆除金属锚杆,减小对采煤机截齿的损耗;该技术能够减少巷道翻修的次数,降低支护成本。The beneficial results of the present invention are: the present invention realizes the problem of the collapse of the anchor hole of the extremely soft coal body in advance, and at the same time improves the self-bearing capacity of the extremely soft coal body; The arched U-shaped steel bracket and the anchor cable through the frame improve the support resistance and realize the harmonious support of active-passive support. The present invention is based on advanced anchoring and grouting reinforcement, and improves the self-bearing capacity of the two gangs, which overcomes the damage of the soft coal body after the excavation of the roadway, the poor anchoring effect, the lack of hole collapse when installing the anchor rod and the grouting pipe, and the working face mining It is no longer necessary to dismantle the metal anchor rod, reducing the loss of the shearer pick; this technology can reduce the number of roadway renovations and reduce support costs.

附图说明Description of drawings

图1为超前自钻式玻璃钢锚杆布置俯视图;Figure 1 is a top view of the layout of advanced self-drilling FRP bolts;

图2 为超前自钻式玻璃钢锚杆布置侧视图;Figure 2 is a side view of the advanced self-drilling FRP anchor arrangement;

图3 为超前自钻式玻璃钢锚杆布置正视图;Figure 3 is a front view of the advanced self-drilling FRP bolt arrangement;

图4 为超前自钻式玻璃钢锚杆结构图;Figure 4 is a structural diagram of the advanced self-drilling FRP bolt;

图5 为超前自钻式玻璃钢锚杆六棱柱驱动端结构图;Figure 5 is a structural diagram of the driving end of the hexagonal prism of the advanced self-drilling FRP anchor;

图6 为极端软弱煤层巷道主被动支护断面图;Figure 6 is a section view of the active and passive support of the extremely weak coal seam roadway;

图7为超前自钻式玻璃钢锚杆六棱柱驱动端剖面结构示意图。Fig. 7 is a schematic diagram of the cross-sectional structure of the driving end of the hexagonal prism of the advanced self-drilling FRP bolt.

图中:1为巷道掘进方向;2为煤体;3为超前自钻式玻璃钢锚杆;4为巷道;5为出浆孔;6为止浆塞;8为六棱柱驱动端;9为中空螺纹孔;10为锚杆连接套;11为中空玻璃钢锚杆;12为自钻钻头;13为锚索;14为顶板高强预应力锚杆;15为锚索索具;16为U型钢支架;17为金属网和编织袋;18为螺母;19为堵浆塞;20圆环形凸台;21为托板。In the figure: 1 is the tunneling direction; 2 is the coal body; 3 is the advanced self-drilling FRP bolt; 4 is the roadway; 5 is the grout hole; 6 is the grout stopper; Hole; 10 is the anchor rod connecting sleeve; 11 is the hollow fiberglass anchor rod; 12 is the self-drilling bit; 13 is the anchor cable; 14 is the roof high-strength prestressed anchor rod; 15 is the anchor cable sling; 18 is a nut; 19 is a slurry plug; 20 is an annular boss; 21 is a supporting plate.

具体实施方式Detailed ways

为了使本发明的目的、技术方案及优点更加清晰明了,下面结合附图和实例对本发明作进一步详细的描述。In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and examples.

实施例1Example 1

如图1-7所述, 一种极端软弱煤层巷道主被动和谐支护方法,包括以下步骤:As shown in Figure 1-7, an active and passive harmonious support method for extremely weak coal seam roadway includes the following steps:

步骤一:在极端软弱煤层回采巷道掘进头的超前段,顺着掘进方向,布置超前自钻式玻璃钢锚杆3,超前自钻式玻璃钢锚杆与巷道掘进方向的夹角为30°;超前自钻式玻璃钢锚杆3包括中空玻璃钢锚杆11,中空玻璃钢锚杆11的两端设置有内螺纹,中空玻璃钢锚杆11上钻有三花形布置的出浆孔5,中空玻璃钢锚杆11一端螺纹连接有六棱柱驱动端8,另一端螺纹连接有自钻钻头12;六棱柱驱动端8内部有一个中空螺纹孔9(可起到注浆连接头的作用),六棱柱驱动端8的一端设置有圆环形凸台20,圆环形凸台20的外侧面设置有外螺纹,圆环形凸台20的外螺纹与中空玻璃钢锚杆11的内螺纹相匹配,六棱柱驱动端8通过圆环形凸台20与中空玻璃钢锚杆11螺纹连接;Step 1: Arrange advanced self-drilling FRP bolts 3 along the direction of excavation in the advanced section of the tunneling head of the recovery roadway in extremely weak coal seams. The angle between the advanced self-drilling FRP bolts and the tunneling direction is 30°; The drill type FRP bolt 3 includes a hollow FRP bolt 11, the two ends of the hollow FRP bolt 11 are provided with internal threads, the hollow FRP bolt 11 is drilled with three flower-shaped slurry outlet holes 5, and one end of the hollow FRP bolt 11 is threaded. There is a hexagonal prism driving end 8, and the other end is threadedly connected with a self-drilling bit 12; there is a hollow threaded hole 9 inside the hexagonal prism driving end 8 (which can function as a grouting joint), and one end of the hexagonal prism driving end 8 is provided with An annular boss 20, the outer surface of the annular boss 20 is provided with an external thread, the external thread of the annular boss 20 matches the internal thread of the hollow fiberglass anchor rod 11, and the hexagonal prism driving end 8 passes through the ring Shaped boss 20 is threadedly connected with hollow fiberglass anchor rod 11;

步骤二:用锚杆钻机(风动锚杆钻机)驱动自钻式玻璃钢锚杆上的六棱柱驱动端8,钻至给定深度;如果需要加长,则卸下六棱柱驱动端8,用锚杆连接套10(连接套与中空玻璃钢锚杆采用螺纹连接)连接另一个中空玻璃钢锚杆,另一个中空玻璃钢锚杆的另一端安装上六棱驱动端,然后继续钻进至给定深度;Step 2: Drive the hexagonal prism driving end 8 on the self-drilling FRP anchor with a rock bolter (pneumatic rocker rig) and drill to a given depth; Rod connecting sleeve 10 (the connecting sleeve and the hollow FRP bolt are threaded) connected to another hollow FRP bolt, and the other end of the other hollow FRP bolt is installed with a hexagonal driving end, and then continues to drill to a given depth;

步骤三,安装止浆塞6,连接注浆泵,将无机双液注浆材料通过六棱柱驱动端的中空螺纹孔9注入超前自钻式玻璃钢锚杆,达到给定压力后停止注浆,浆液凝固后安装托板21、驱动螺母18,施加预紧力;Step 3, install the grout stopper 6, connect the grouting pump, inject the inorganic double-liquid grouting material into the advanced self-drilling FRP anchor rod through the hollow threaded hole 9 at the driving end of the hexagonal prism, stop the grouting after reaching a given pressure, and the grout solidifies Install supporting plate 21, drive nut 18 afterward, apply pretightening force;

步骤四,将高强预应力锚杆14紧跟掘进工作面安装在巷道顶板;滞后掘进工作面10-15m安装U型钢支架16,并用金属网和编织袋对巷道两帮进行封闭;Step 4, install the high-strength prestressed anchor rod 14 on the roadway roof following the excavation working face; install the U-shaped steel bracket 16 on the lagging excavation working face 10-15m, and seal the two sides of the roadway with metal mesh and woven bags;

步骤五,穿过U型钢支架16安装锚索13(U型钢金属支架柱腿和拱肩部位打孔,锚索穿过U型钢支架安设在注浆加固后的煤体中,实现锚杆-U型钢支架的和谐支护),锚索锁具15作用在U型钢支架16上,实现主动和被动和谐支护;U型钢支架17断面为三心拱形,锚索13穿过U型钢;金属网和编织袋17 置于U型钢支架17后面,填入矸石或碎煤,背紧背实。Step 5, install the anchor cable 13 through the U-shaped steel bracket 16 (the U-shaped steel metal bracket column leg and the spandrel are drilled, the anchor cable passes through the U-shaped steel bracket and is installed in the coal body after grouting reinforcement, and the anchor rod- Harmonious support of U-shaped steel bracket), the anchor cable lock 15 acts on the U-shaped steel bracket 16 to realize active and passive harmonious support; the section of the U-shaped steel bracket 17 is a three-centered arch, and the anchor cable 13 passes through the U-shaped steel; metal mesh Place behind the U-shaped steel support 17 with woven bag 17, fill in gangue or crushed coal, the back is tight and the back is solid.

本实施例实现了超前极端松软煤体锚固孔坍塌问题,同时提高了极端松软煤体自承载能力;强化顶板支护,减小了作用在巷道两帮煤体;三心拱型U型钢支架和穿架锚索提高了其支护抗力,实现了主动-被动支护的和谐支护,减小了翻修次数。This embodiment has realized the collapse of the anchor hole of the extremely soft coal body ahead of time, and at the same time improved the self-bearing capacity of the extremely soft coal body; strengthened the roof support, and reduced the effect on the two side coal bodies of the roadway; the three-core arched U-shaped steel bracket and The threaded anchor cable improves its support resistance, realizes the harmonious support of active-passive support, and reduces the number of repairs.

本发明不仅仅局限于本实施方式的描述,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应含在本发明的保护范围之内。The present invention is not limited to the description of this embodiment, and any modification, equivalent replacement and improvement made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims (5)

1.一种极端软弱煤层巷道主被动和谐支护方法,其特征在于包括以下步骤:1. An active and passive harmonious support method for an extremely weak coal seam roadway, characterized in that it comprises the following steps: 步骤一:在极端软弱煤层回采巷道掘进头的超前段,顺着掘进方向,布置超前自钻式玻璃钢锚杆;超前自钻式玻璃钢锚杆包括中空玻璃钢锚杆,中空玻璃钢锚杆的两端设置有内螺纹,Step 1: Arrange advanced self-drilling FRP bolts along the direction of excavation in the advanced section of the excavation head of the extremely weak coal seam recovery roadway; the advanced self-drilling FRP bolts include hollow FRP bolts, and the two ends of the hollow FRP bolts are set with internal thread, 中空玻璃钢锚杆上钻有三花形布置的出浆孔,中空玻璃钢锚杆一端螺纹连接有六棱柱驱动端,另一端螺纹连接有钻头;六棱柱驱动端内部为一个中空螺纹孔,六棱柱驱动端的一端设置有圆环形凸台,圆环形凸台的外侧面设置有外螺纹,圆环形凸台的外螺纹与中空玻璃钢锚杆的内螺纹相匹配,六棱柱驱动端通过圆环形凸台与中空玻璃钢锚杆螺纹连接;Hollow fiberglass anchor rods are drilled with three flower-shaped slurry outlet holes. One end of the hollow fiberglass anchor rods is threaded with a hexagonal prism drive end, and the other end is threaded with a drill bit; the interior of the hexagonal prism drive end is a hollow threaded hole. There is a ring-shaped boss, and the outer surface of the ring-shaped boss is provided with external threads. The external thread of the ring-shaped boss matches the internal thread of the hollow glass fiber reinforced plastic anchor rod, and the driving end of the hexagonal column passes through the ring-shaped boss. Threaded connection with hollow fiberglass anchor rod; 步骤二:用锚杆钻机驱动自钻式玻璃钢锚杆上的六棱柱驱动端,钻至给定深度;如果需要加长,则卸下六棱柱驱动端,用连接套连接另一个中空玻璃钢锚杆,另一个中空玻璃钢锚杆的另一端安装上六棱驱动端,然后继续钻进至给定深度;Step 2: Drive the driving end of the hexagonal prism on the self-drilling FRP anchor with a rock bolt rig and drill to a given depth; if it needs to be lengthened, remove the driving end of the hexagonal prism and connect another hollow FRP anchor with a connecting sleeve. The other end of the other hollow FRP bolt is installed with the hexagonal driving end, and then continues to drill to a given depth; 步骤三,安装止浆塞,连接注浆泵,将无机双液注浆材料通过六棱柱驱动端的中空螺纹孔注入超前自钻式玻璃钢锚杆,达到给定压力后停止注浆,安装托板、驱动螺母,施加预紧力;Step 3, install the grout stopper, connect the grouting pump, inject the inorganic double-liquid grouting material into the advanced self-drilling FRP anchor rod through the hollow threaded hole at the driving end of the hexagonal prism, stop the grouting after reaching a given pressure, install the supporting plate, drive nut, apply preload; 步骤四,安装顶板高强预应力锚杆;滞后掘进工作面一定距离安装U型钢支架,并用金属网和编织袋对巷道两帮进行封闭;Step 4: install high-strength prestressed anchors on the roof; install U-shaped steel brackets at a certain distance on the lagging excavation face, and seal the two sides of the roadway with metal mesh and woven bags; 步骤五,穿过U型钢支架安装锚索,锚索锁具作用在U型钢支架上。Step five, install the anchor cable through the U-shaped steel bracket, and the anchor cable lock acts on the U-shaped steel bracket. 2.如权利要求1所述极端软弱煤层巷道主被动和谐支护方法,其特征在于:所述超前自钻式玻璃钢锚杆与巷道掘进方向的夹角为30°。2. The active and passive harmonious support method for roadways in extremely weak coal seams according to claim 1, characterized in that: the included angle between the advanced self-drilling glass fiber reinforced plastic bolt and the driving direction of the roadway is 30°. 3.如权利要求1所述极端软弱煤层巷道主被动和谐支护方法,其特征在于:钻头由铸铁制作而成。3. The active and passive harmonious support method for roadways in extremely weak coal seams according to claim 1, characterized in that: the drill bit is made of cast iron. 4.如权利要求1所述极端软弱煤层巷道主被动和谐支护方法,其特征在于:所述U型钢支架滞后掘进工作面10-15m安装,保证平行作业。4. The active and passive harmonious support method for roadways in extremely weak coal seams according to claim 1, characterized in that: the U-shaped steel support is installed 10-15m behind the excavation face to ensure parallel operation. 5.如权利要求1所述极端软弱煤层巷道主被动和谐支护方法,其特征在于:U型钢支架采用三心拱型U型钢支架,锚索穿过U型钢支架,实现主动和被动和谐支护。5. The active and passive harmonious support method for extremely weak coal seam roadway as claimed in claim 1, characterized in that: the U-shaped steel support adopts a three-core arched U-shaped steel support, and the anchor cable passes through the U-shaped steel support to realize active and passive harmonious support .
CN201711135383.3A 2017-11-16 2017-11-16 A method of active and passive harmonious support for extremely weak coal seam roadway Active CN108035742B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711135383.3A CN108035742B (en) 2017-11-16 2017-11-16 A method of active and passive harmonious support for extremely weak coal seam roadway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711135383.3A CN108035742B (en) 2017-11-16 2017-11-16 A method of active and passive harmonious support for extremely weak coal seam roadway

Publications (2)

Publication Number Publication Date
CN108035742A CN108035742A (en) 2018-05-15
CN108035742B true CN108035742B (en) 2023-04-14

Family

ID=62093642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711135383.3A Active CN108035742B (en) 2017-11-16 2017-11-16 A method of active and passive harmonious support for extremely weak coal seam roadway

Country Status (1)

Country Link
CN (1) CN108035742B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108678772A (en) * 2018-07-17 2018-10-19 湖南科技大学 A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel
CN109026024B (en) * 2018-08-30 2020-09-25 河南理工大学 Roadway roof deformation control method under high-level stress action
CN109404007A (en) * 2018-11-22 2019-03-01 浙江大学 A kind of underground engineering support antiknock integration composite construction
CN110219672A (en) * 2019-05-24 2019-09-10 贵州大学 A kind of tunnel broken coal petrography grouting strengthening method for main haulage roadway working face
CN112431624A (en) * 2020-11-16 2021-03-02 河南理工大学 One-step anchor rod and supporting operation method thereof
CN113090304B (en) * 2021-04-30 2023-11-24 中煤科工开采研究院有限公司 Anchor injection and bolt support construction method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10234255A1 (en) * 2002-06-27 2004-01-15 Friedr. Ischebeck Gmbh Use of drill injection anchors made from cold-rolled steel having longitudinal channels open in the region of the drill crown for rinsing and injecting cement as flat reinforcements for tunnel roofs
CN102493821A (en) * 2011-12-10 2012-06-13 太原理工大学 Support method for high stress roadway coal-rock mass
CN103032087A (en) * 2012-11-30 2013-04-10 上海旭尧玻璃钢制品有限公司 Self-drilling type hollow grouting anchor rod and production method thereof
CN103195441A (en) * 2013-04-01 2013-07-10 平顶山天安煤业股份有限公司 Supporting and reinforcing structure of coal mine tunnel and construction technology thereof
CN103233751A (en) * 2013-05-07 2013-08-07 中国矿业大学 Double-layer anchoring and balancing arch supporting system for coal roadway with extremely-weak top plates
CN103850688A (en) * 2014-03-24 2014-06-11 昆明理工大学 Method for dynamically superimposing coupling support on large-section roadway in complicated fault fracture zone
CN105041353A (en) * 2015-08-17 2015-11-11 河南理工大学 Roadway anchor net re-jetting double-folded-shed surrounding rock control technology
CN105134269A (en) * 2015-08-17 2015-12-09 河南理工大学 Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
CN105178981A (en) * 2015-09-30 2015-12-23 中国矿业大学 Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway
CN106677797A (en) * 2017-03-13 2017-05-17 安徽理工大学 U-shaped steel composite support structure for deep dynamic pressure soft rock roadway and construction method of U-shaped steel composite support structure
CN107143338A (en) * 2017-06-28 2017-09-08 陕西煤业化工技术研究院有限责任公司 A kind of coal mine roadway driving and method for protecting support

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10234255A1 (en) * 2002-06-27 2004-01-15 Friedr. Ischebeck Gmbh Use of drill injection anchors made from cold-rolled steel having longitudinal channels open in the region of the drill crown for rinsing and injecting cement as flat reinforcements for tunnel roofs
CN102493821A (en) * 2011-12-10 2012-06-13 太原理工大学 Support method for high stress roadway coal-rock mass
CN103032087A (en) * 2012-11-30 2013-04-10 上海旭尧玻璃钢制品有限公司 Self-drilling type hollow grouting anchor rod and production method thereof
CN103195441A (en) * 2013-04-01 2013-07-10 平顶山天安煤业股份有限公司 Supporting and reinforcing structure of coal mine tunnel and construction technology thereof
CN103233751A (en) * 2013-05-07 2013-08-07 中国矿业大学 Double-layer anchoring and balancing arch supporting system for coal roadway with extremely-weak top plates
CN103850688A (en) * 2014-03-24 2014-06-11 昆明理工大学 Method for dynamically superimposing coupling support on large-section roadway in complicated fault fracture zone
CN105041353A (en) * 2015-08-17 2015-11-11 河南理工大学 Roadway anchor net re-jetting double-folded-shed surrounding rock control technology
CN105134269A (en) * 2015-08-17 2015-12-09 河南理工大学 Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
CN105178981A (en) * 2015-09-30 2015-12-23 中国矿业大学 Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway
CN106677797A (en) * 2017-03-13 2017-05-17 安徽理工大学 U-shaped steel composite support structure for deep dynamic pressure soft rock roadway and construction method of U-shaped steel composite support structure
CN107143338A (en) * 2017-06-28 2017-09-08 陕西煤业化工技术研究院有限责任公司 A kind of coal mine roadway driving and method for protecting support

Also Published As

Publication number Publication date
CN108035742A (en) 2018-05-15

Similar Documents

Publication Publication Date Title
CN101967984B (en) Deep well tunnel cable anchor rigid-flexible coupling support and surrounding rock overall reinforced support method
CN108316941B (en) Broken surrounding rock and soft rock roadway U-shaped steel canopy supporting method
CN102937030B (en) Bolting-grouting integrated support method for zonal disintegration of deep roadway surrounding rock
CN102278130B (en) Process method for reinforcing and grouting of high-pressure water-rich solution cavity of tunnel
CN103195426B (en) A kind of large-inclination-angle coal bed long-wall working face coal pillar-free mining method
CN105804767B (en) A kind of the surrounding rock supporting construction method and surrounding rock supporting structure in the aqueous tunnel of coal mine
CN108035742A (en) A kind of passive harmonious method for protecting support of extreme rockburst tunnel master
CN102518436B (en) Prevention and control method of structural rockburst during coal mine roadway excavation
CN205532656U (en) Deep well weak surrounding rock roadway support device
CN107780955B (en) A controllable grouting reinforcement device and construction method for broken surrounding rock roadway
CN106321119A (en) Double-layer anchor net cable supporting structure for controlling mining roadway surrounding rock deformation and method thereof
CN109026024B (en) Roadway roof deformation control method under high-level stress action
CN105178981A (en) Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway
CN103195454B (en) Support method for roadway and chamber in filling body
CN102322273A (en) A kind of roadway floor anchor is annotated integrated reinforcement means
CN102877858A (en) Reinforcing method for crushed top plate of coal face
CN202882966U (en) Recoverable soft rock self-tapping anchor rod
CN112647969B (en) Traffic tunnel surrounding rock cooperative control system and construction method
CN107143338A (en) A kind of coal mine roadway driving and method for protecting support
CN105134249B (en) The big gradual method for protecting support in relaxation zone tunnel of mine
CN207554077U (en) The passive harmonious supporting construction of extreme rockburst tunnel master
CN102155248B (en) Method for supporting laneway below coal pillar
CN207583408U (en) A kind of controllable grouting and reinforcing device for breaking surrounding rock tunnel
CN207620820U (en) A kind of breaking surrounding rock and soft-rock tunnel U-shaped steel cover canopy supporting construction
CN206256920U (en) Deformed steel bar high-pressure slip casting stock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant