- CN108035742B CN108035742B CN201711135383.3A CN201711135383A CN108035742B CN 108035742 B CN108035742 B CN 108035742B CN 201711135383 A CN201711135383 A CN 201711135383A CN 108035742 B CN108035742 B CN 108035742B
- Authority
- CN
- China
- Prior art keywords
- hollow
- anchor
- grouting
- roadway
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000003245 coal Substances 0.000 title claims abstract description 35
- 238000000034 method Methods 0.000 title claims abstract description 16
- 238000005553 drilling Methods 0.000 claims abstract description 30
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 27
- 239000010959 steel Substances 0.000 claims abstract description 27
- 239000011152 fibreglass Substances 0.000 claims abstract description 16
- 238000009412 basement excavation Methods 0.000 claims abstract description 13
- 239000011435 rock Substances 0.000 claims abstract description 13
- 239000002184 metal Substances 0.000 claims abstract description 9
- 229910052751 metal Inorganic materials 0.000 claims abstract description 9
- 239000011440 grout Substances 0.000 claims abstract description 8
- 230000008093 supporting effect Effects 0.000 claims abstract description 6
- 239000007788 liquid Substances 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims description 4
- 238000011084 recovery Methods 0.000 claims description 4
- 239000002002 slurry Substances 0.000 claims description 4
- 229910001018 Cast iron Inorganic materials 0.000 claims description 2
- 230000036316 preload Effects 0.000 claims 1
- 238000005065 mining Methods 0.000 abstract description 10
- 238000005516 engineering process Methods 0.000 abstract description 6
- 238000009434 installation Methods 0.000 abstract 1
- 238000007711 solidification Methods 0.000 abstract 1
- 230000008023 solidification Effects 0.000 abstract 1
- 230000002787 reinforcement Effects 0.000 description 5
- 230000000694 effects Effects 0.000 description 4
- 238000005728 strengthening Methods 0.000 description 4
- 238000004873 anchoring Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 238000009418 renovation Methods 0.000 description 3
- 230000005641 tunneling Effects 0.000 description 3
- 241000139306 Platt Species 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006866 deterioration Effects 0.000 description 1
- 238000013467 fragmentation Methods 0.000 description 1
- 238000006062 fragmentation reaction Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/14—Lining predominantly with metal
- E21D11/18—Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0006—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by the bolt material
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D21/00—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
- E21D21/0026—Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Road Signs Or Road Markings (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本发明为一种极端软弱煤层巷道主被动和谐支护方法,公开提出一种超前自钻玻璃钢注浆锚杆强化巷帮和强化顶板控制极端松软煤层回采巷道围岩控制技术,包括以下步骤:在掘进工作面迎头巷道断面轮廓线处超前布置外扎自钻式玻璃钢锚杆,根据巷道两帮煤体松软程度确定锚杆的长度、间距和注浆参数;利用风动锚杆钻机在指定的位置安装自钻式玻璃钢锚杆后,即可安装止浆塞,连接双液气动注浆泵,开始注浆;浆液凝结时间应先快后慢,注浆压力达到给定值即可结束;待浆液凝固后即可安装托板,施加预紧力;继续掘进若干循环进尺,顶板安设高强锚杆、锚索,并保证金属网、钢筋梯等护表构件的安设配合良好。
The present invention is an active and passive harmonious support method for roadways in extremely soft coal seams. It discloses an advanced self-drilling glass fiber reinforced plastic grouting anchor rod to strengthen roadsides and reinforced roofs to control the surrounding rock control technology of mining roadways in extremely soft coal seams, including the following steps: Arrange externally tied self-drilling glass fiber reinforced plastic anchor rods at the contour line of the front roadway section of the excavation working face in advance, and determine the length, spacing and grouting parameters of the anchor rods according to the softness of the two sides of the roadway coal; After installing the self-drilling FRP bolt, you can install the grout stopper, connect the double-liquid pneumatic grouting pump, and start grouting; the grouting time should be fast first and then slow, and the grouting pressure can reach a given value to end; After solidification, the supporting plate can be installed, and the pre-tightening force can be applied; continue to excavate for several cycles, install high-strength anchor rods and anchor cables on the roof, and ensure that the installation and coordination of metal mesh, steel ladder and other surface protection components are good.
Description
技术领域technical field
本发明涉及一种极端软弱煤层巷道围岩控制技术,属于岩土支护工程领域,尤其涉及到地下采矿工程回采巷道围岩加固顶板与强化两帮的矿压控制技术。The invention relates to a surrounding rock control technology of an extremely weak coal seam roadway, which belongs to the field of geotechnical support engineering, and in particular relates to a mine pressure control technology for backing the roadway surrounding rock to reinforce the roof and strengthen the two sides of the underground mining engineering.
背景技术Background technique
河南中西部的平禹煤田、新密煤田、偃师-龙门煤田,煤层受到强烈地质构造作用,其原始结构被破坏,整体性差,煤层为糜棱状碎裂介质,普氏系数在0.15-0.25之间。布置在极端松软煤层中的回采巷道多采用工字钢梯形金属支架被动支护,在服务期间要翻修3-4次,严重影响了工作面的正常回采,消耗了大量的人力、物力和财力。因此,提高极端松软煤层回采巷道围岩自承载能力和支护状况就显得尤为迫切。In Pingyu Coalfield, Xinmi Coalfield, and Yanshi-Longmen Coalfield in central and western Henan, the coal seam is subjected to strong geological tectonic action, its original structure is destroyed, and its integrity is poor. The coal seam is a mylonitic fragmentation medium with a Platts coefficient of 0.15-0.25 between. The mining roadways arranged in extremely soft coal seams are mostly passively supported by I-steel trapezoidal metal brackets. During the service period, they need to be renovated 3-4 times, which seriously affects the normal mining of the working face and consumes a lot of manpower, material and financial resources. Therefore, it is particularly urgent to improve the self-bearing capacity and support status of the surrounding rock of the extremely soft coal seam mining roadway.
目前,极端松软煤层回采巷道支护方法有:强顶固帮法、两帮卸压+注浆强化方法;强顶固帮方法采用高强锚杆-锚索强化支护顶板,两帮采用小间距工字钢对棚,配合蛇皮袋子装煤架后充填方法;但现场矿压观测表明,随着两帮的变形,支架弯曲变形严重,顶板实际跨度随着两帮的变形而增加,无形中增加了巷道跨度和巷道两帮支承压力,二者相互促进,造成巷道围岩状况恶化。两帮卸压+注浆强化方法,采用大直径卸压钻孔吸收围岩变形、转移高应力到深部围岩中,滞后卸压孔一定范围再次对围岩进行注浆加固,提高其自承载能力;但卸压钻孔进一步扩大了巷道破裂区的范围,在两帮注浆之前就会造成巷道支护物的变形和破坏。因此,针对极端松软巷道围岩控制问题,上述方法难以达到较好的支护效果。At present, the roadway support methods for extremely soft coal seam recovery include: strong roof reinforcement method, two sides pressure relief + grouting strengthening method; strong roof reinforcement method adopts high-strength anchor rod-anchor cable to strengthen the roof support, and two sides adopt small spacing The I-beam paired shed is filled with snakeskin bags for coal racks; however, the on-site mine pressure observation shows that with the deformation of the two sides, the bending deformation of the bracket is serious, and the actual span of the roof increases with the deformation of the two sides. The span of the roadway and the supporting pressure of the two sides of the roadway are increased, and the two promote each other, resulting in the deterioration of the surrounding rock condition of the roadway. Two-side pressure relief + grouting strengthening method, using large-diameter pressure relief drilling to absorb the deformation of the surrounding rock, transfer high stress to the deep surrounding rock, and then carry out grouting reinforcement on the surrounding rock within a certain range of the lagging pressure relief hole to improve its self-bearing capacity However, the pressure relief drilling further expands the scope of the roadway rupture zone, which will cause deformation and damage to the roadway support before the two sides of the grouting. Therefore, it is difficult for the above method to achieve a better supporting effect for the control of extremely soft roadway surrounding rock.
发明内容Contents of the invention
本发明针对极端松软煤层回采巷道两帮锚固效果差、金属支架变形严重、注浆效果差、翻修次数多的难题,提出一种超前自钻玻璃钢注浆锚杆强化巷帮和强化顶板控制极端松软煤层回采巷道围岩控制技术,旨在解决极端松软煤层回采巷道两帮锚固问题,实现极端松软煤帮的承载问题,以减少翻修次数、降低支护成本,达到回采巷道服务期间安全使用的目的。Aiming at the problems of poor anchoring effect of the two sides of the mining roadway in extremely soft coal seams, serious deformation of the metal support, poor grouting effect, and many renovation times, the present invention proposes an advanced self-drilling glass fiber reinforced plastic grouting bolt to strengthen the roadside and strengthen the roof to control extreme softness The coal seam mining roadway surrounding rock control technology aims to solve the problem of anchorage of the two sides of the extremely soft coal seam mining roadway, realize the bearing problem of the extremely soft coal side, reduce the number of renovations, reduce the support cost, and achieve the purpose of safe use of the mining roadway during service.
为实现上述目的,本发明基于超前自钻玻璃钢注浆锚杆强化巷帮和强化顶板控制技术,其采取的技术方案是一种极端软弱煤层巷道主被动和谐支护方法,包括以下步骤:In order to achieve the above object, the present invention is based on the advanced self-drilling glass fiber reinforced plastic grouting anchor bolt strengthening roadside and strengthening roof control technology, and the technical solution it adopts is an active and passive harmonious support method for extremely weak coal seam roadway, including the following steps:
步骤一:在极端软弱煤层回采巷道掘进头的超前段,顺着掘进方向,布置超前自钻式玻璃钢锚杆;超前自钻式玻璃钢锚杆包括中空玻璃钢锚杆,中空玻璃钢锚杆的两端设置有内螺纹,Step 1: Arrange advanced self-drilling FRP bolts along the direction of excavation in the advanced section of the excavation head of the extremely weak coal seam recovery roadway; the advanced self-drilling FRP bolts include hollow FRP bolts, and the two ends of the hollow FRP bolts are set with internal thread,
中空玻璃钢锚杆上钻有三花形布置的出浆孔,中空玻璃钢锚杆一端螺纹连接有六棱柱驱动端,另一端螺纹连接有钻头;六棱柱驱动端内部为一个中空螺纹孔,六棱柱驱动端的一端设置有圆环形凸台,圆环形凸台的外侧面设置有外螺纹,圆环形凸台的外螺纹与中空玻璃钢锚杆的内螺纹相匹配,六棱柱驱动端通过圆环形凸台与中空玻璃钢锚杆螺纹连接;Hollow fiberglass anchor rods are drilled with three flower-shaped slurry outlet holes. One end of the hollow fiberglass anchor rods is threaded with a hexagonal prism drive end, and the other end is threaded with a drill bit; the interior of the hexagonal prism drive end is a hollow threaded hole. There is a ring-shaped boss, and the outer surface of the ring-shaped boss is provided with external threads. The external thread of the ring-shaped boss matches the internal thread of the hollow glass fiber reinforced plastic anchor rod, and the driving end of the hexagonal column passes through the ring-shaped boss. Threaded connection with hollow fiberglass anchor rod;
步骤二:用锚杆钻机驱动自钻式玻璃钢锚杆上的六棱柱驱动端,钻至给定深度;如果需要加长,则卸下六棱柱驱动端,用连接套连接另一个中空玻璃钢锚杆,另一个中空玻璃钢锚杆的另一端安装上六棱驱动端,然后继续钻进至给定深度;Step 2: Drive the driving end of the hexagonal prism on the self-drilling FRP anchor with a rock bolt rig and drill to a given depth; if it needs to be lengthened, remove the driving end of the hexagonal prism and connect another hollow FRP anchor with a connecting sleeve. The other end of the other hollow FRP bolt is installed with the hexagonal driving end, and then continues to drill to a given depth;
步骤三,安装止浆塞,连接注浆泵,将无机双液注浆材料通过六棱柱驱动端的中空螺纹孔注入超前自钻式玻璃钢锚杆,达到给定压力后停止注浆,浆液凝固后安装托板、驱动螺母,施加预紧力;
步骤四,安装顶板高强预应力锚杆;滞后掘进工作面一定距离安装U型钢支架,并用金属网和编织袋对巷道两帮进行封闭;Step 4: install high-strength prestressed anchors on the roof; install U-shaped steel brackets at a certain distance on the lagging excavation face, and seal the two sides of the roadway with metal mesh and woven bags;
步骤五,穿过U型钢支架安装锚索,锚索锁具作用在U型钢支架上。Step five, install the anchor cable through the U-shaped steel bracket, and the anchor cable lock acts on the U-shaped steel bracket.
优选的,所述超前自钻式玻璃钢锚杆与巷道掘进方向的夹角为30°。Preferably, the included angle between the advanced self-drilling FRP bolt and the driving direction of the roadway is 30°.
优选的,钻头由铸铁制作而成。Preferably, the drill bit is made of cast iron.
优选的,所述U型钢支架滞后掘进工作面10-15m安装,保证平行作业。Preferably, the U-shaped steel support is installed 10-15m behind the excavation face to ensure parallel operation.
优选的, U型钢支架采用三心拱型U型钢支架,锚索穿过U型钢支架,实现主动和被动和谐支护。Preferably, the U-shaped steel bracket adopts a three-core arched U-shaped steel bracket, and the anchor cable passes through the U-shaped steel bracket to realize active and passive harmonious support.
本发明的有益成果是:本发明实现了超前极端松软煤体锚固孔坍塌问题,同时提高了极端松软煤体自承载能力;强化顶板支护,减小了作用在巷道两帮煤体;三心拱型U型钢支架和穿架锚索提高了其支护抗力,实现了主动-被动支护的和谐支护。本发明基于超前锚注加固,提高两帮自承载能力的方法,克服了巷道掘出后松软煤体受到破坏,锚固效果差,安装锚杆和注浆管时塌孔的不足,且工作面回采时不必再拆除金属锚杆,减小对采煤机截齿的损耗;该技术能够减少巷道翻修的次数,降低支护成本。The beneficial results of the present invention are: the present invention realizes the problem of the collapse of the anchor hole of the extremely soft coal body in advance, and at the same time improves the self-bearing capacity of the extremely soft coal body; The arched U-shaped steel bracket and the anchor cable through the frame improve the support resistance and realize the harmonious support of active-passive support. The present invention is based on advanced anchoring and grouting reinforcement, and improves the self-bearing capacity of the two gangs, which overcomes the damage of the soft coal body after the excavation of the roadway, the poor anchoring effect, the lack of hole collapse when installing the anchor rod and the grouting pipe, and the working face mining It is no longer necessary to dismantle the metal anchor rod, reducing the loss of the shearer pick; this technology can reduce the number of roadway renovations and reduce support costs.
附图说明Description of drawings
图1为超前自钻式玻璃钢锚杆布置俯视图;Figure 1 is a top view of the layout of advanced self-drilling FRP bolts;
图2 为超前自钻式玻璃钢锚杆布置侧视图;Figure 2 is a side view of the advanced self-drilling FRP anchor arrangement;
图3 为超前自钻式玻璃钢锚杆布置正视图;Figure 3 is a front view of the advanced self-drilling FRP bolt arrangement;
图4 为超前自钻式玻璃钢锚杆结构图;Figure 4 is a structural diagram of the advanced self-drilling FRP bolt;
图5 为超前自钻式玻璃钢锚杆六棱柱驱动端结构图;Figure 5 is a structural diagram of the driving end of the hexagonal prism of the advanced self-drilling FRP anchor;
图6 为极端软弱煤层巷道主被动支护断面图;Figure 6 is a section view of the active and passive support of the extremely weak coal seam roadway;
图7为超前自钻式玻璃钢锚杆六棱柱驱动端剖面结构示意图。Fig. 7 is a schematic diagram of the cross-sectional structure of the driving end of the hexagonal prism of the advanced self-drilling FRP bolt.
图中:1为巷道掘进方向;2为煤体;3为超前自钻式玻璃钢锚杆;4为巷道;5为出浆孔;6为止浆塞;8为六棱柱驱动端;9为中空螺纹孔;10为锚杆连接套;11为中空玻璃钢锚杆;12为自钻钻头;13为锚索;14为顶板高强预应力锚杆;15为锚索索具;16为U型钢支架;17为金属网和编织袋;18为螺母;19为堵浆塞;20圆环形凸台;21为托板。In the figure: 1 is the tunneling direction; 2 is the coal body; 3 is the advanced self-drilling FRP bolt; 4 is the roadway; 5 is the grout hole; 6 is the grout stopper; Hole; 10 is the anchor rod connecting sleeve; 11 is the hollow fiberglass anchor rod; 12 is the self-drilling bit; 13 is the anchor cable; 14 is the roof high-strength prestressed anchor rod; 15 is the anchor cable sling; 18 is a nut; 19 is a slurry plug; 20 is an annular boss; 21 is a supporting plate.
具体实施方式Detailed ways
为了使本发明的目的、技术方案及优点更加清晰明了,下面结合附图和实例对本发明作进一步详细的描述。In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and examples.
实施例1Example 1
如图1-7所述, 一种极端软弱煤层巷道主被动和谐支护方法,包括以下步骤:As shown in Figure 1-7, an active and passive harmonious support method for extremely weak coal seam roadway includes the following steps:
步骤一:在极端软弱煤层回采巷道掘进头的超前段,顺着掘进方向,布置超前自钻式玻璃钢锚杆3,超前自钻式玻璃钢锚杆与巷道掘进方向的夹角为30°;超前自钻式玻璃钢锚杆3包括中空玻璃钢锚杆11,中空玻璃钢锚杆11的两端设置有内螺纹,中空玻璃钢锚杆11上钻有三花形布置的出浆孔5,中空玻璃钢锚杆11一端螺纹连接有六棱柱驱动端8,另一端螺纹连接有自钻钻头12;六棱柱驱动端8内部有一个中空螺纹孔9(可起到注浆连接头的作用),六棱柱驱动端8的一端设置有圆环形凸台20,圆环形凸台20的外侧面设置有外螺纹,圆环形凸台20的外螺纹与中空玻璃钢锚杆11的内螺纹相匹配,六棱柱驱动端8通过圆环形凸台20与中空玻璃钢锚杆11螺纹连接;Step 1: Arrange advanced self-
步骤二:用锚杆钻机(风动锚杆钻机)驱动自钻式玻璃钢锚杆上的六棱柱驱动端8,钻至给定深度;如果需要加长,则卸下六棱柱驱动端8,用锚杆连接套10(连接套与中空玻璃钢锚杆采用螺纹连接)连接另一个中空玻璃钢锚杆,另一个中空玻璃钢锚杆的另一端安装上六棱驱动端,然后继续钻进至给定深度;Step 2: Drive the hexagonal
步骤三,安装止浆塞6,连接注浆泵,将无机双液注浆材料通过六棱柱驱动端的中空螺纹孔9注入超前自钻式玻璃钢锚杆,达到给定压力后停止注浆,浆液凝固后安装托板21、驱动螺母18,施加预紧力;
步骤四,将高强预应力锚杆14紧跟掘进工作面安装在巷道顶板;滞后掘进工作面10-15m安装U型钢支架16,并用金属网和编织袋对巷道两帮进行封闭;
步骤五,穿过U型钢支架16安装锚索13(U型钢金属支架柱腿和拱肩部位打孔,锚索穿过U型钢支架安设在注浆加固后的煤体中,实现锚杆-U型钢支架的和谐支护),锚索锁具15作用在U型钢支架16上,实现主动和被动和谐支护;U型钢支架17断面为三心拱形,锚索13穿过U型钢;金属网和编织袋17 置于U型钢支架17后面,填入矸石或碎煤,背紧背实。
本实施例实现了超前极端松软煤体锚固孔坍塌问题,同时提高了极端松软煤体自承载能力;强化顶板支护,减小了作用在巷道两帮煤体;三心拱型U型钢支架和穿架锚索提高了其支护抗力,实现了主动-被动支护的和谐支护,减小了翻修次数。This embodiment has realized the collapse of the anchor hole of the extremely soft coal body ahead of time, and at the same time improved the self-bearing capacity of the extremely soft coal body; strengthened the roof support, and reduced the effect on the two side coal bodies of the roadway; the three-core arched U-shaped steel bracket and The threaded anchor cable improves its support resistance, realizes the harmonious support of active-passive support, and reduces the number of repairs.
本发明不仅仅局限于本实施方式的描述,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应含在本发明的保护范围之内。The present invention is not limited to the description of this embodiment, and any modification, equivalent replacement and improvement made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711135383.3A CN108035742B (en) | 2017-11-16 | 2017-11-16 | A method of active and passive harmonious support for extremely weak coal seam roadway |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711135383.3A CN108035742B (en) | 2017-11-16 | 2017-11-16 | A method of active and passive harmonious support for extremely weak coal seam roadway |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108035742A CN108035742A (en) | 2018-05-15 |
| CN108035742B true CN108035742B (en) | 2023-04-14 |
Family
ID=62093642
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201711135383.3A Active CN108035742B (en) | 2017-11-16 | 2017-11-16 | A method of active and passive harmonious support for extremely weak coal seam roadway |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108035742B (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108678772A (en) * | 2018-07-17 | 2018-10-19 | 湖南科技大学 | A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel |
| CN109026024B (en) * | 2018-08-30 | 2020-09-25 | 河南理工大学 | Roadway roof deformation control method under high-level stress action |
| CN109404007A (en) * | 2018-11-22 | 2019-03-01 | 浙江大学 | A kind of underground engineering support antiknock integration composite construction |
| CN110219672A (en) * | 2019-05-24 | 2019-09-10 | 贵州大学 | A kind of tunnel broken coal petrography grouting strengthening method for main haulage roadway working face |
| CN112431624A (en) * | 2020-11-16 | 2021-03-02 | 河南理工大学 | One-step anchor rod and supporting operation method thereof |
| CN113090304B (en) * | 2021-04-30 | 2023-11-24 | 中煤科工开采研究院有限公司 | Anchor injection and bolt support construction method |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE10234255A1 (en) * | 2002-06-27 | 2004-01-15 | Friedr. Ischebeck Gmbh | Use of drill injection anchors made from cold-rolled steel having longitudinal channels open in the region of the drill crown for rinsing and injecting cement as flat reinforcements for tunnel roofs |
| CN102493821A (en) * | 2011-12-10 | 2012-06-13 | 太原理工大学 | Support method for high stress roadway coal-rock mass |
| CN103032087A (en) * | 2012-11-30 | 2013-04-10 | 上海旭尧玻璃钢制品有限公司 | Self-drilling type hollow grouting anchor rod and production method thereof |
| CN103195441A (en) * | 2013-04-01 | 2013-07-10 | 平顶山天安煤业股份有限公司 | Supporting and reinforcing structure of coal mine tunnel and construction technology thereof |
| CN103233751A (en) * | 2013-05-07 | 2013-08-07 | 中国矿业大学 | Double-layer anchoring and balancing arch supporting system for coal roadway with extremely-weak top plates |
| CN103850688A (en) * | 2014-03-24 | 2014-06-11 | 昆明理工大学 | Method for dynamically superimposing coupling support on large-section roadway in complicated fault fracture zone |
| CN105041353A (en) * | 2015-08-17 | 2015-11-11 | 河南理工大学 | Roadway anchor net re-jetting double-folded-shed surrounding rock control technology |
| CN105134269A (en) * | 2015-08-17 | 2015-12-09 | 河南理工大学 | Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds |
| CN105178981A (en) * | 2015-09-30 | 2015-12-23 | 中国矿业大学 | Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway |
| CN106677797A (en) * | 2017-03-13 | 2017-05-17 | 安徽理工大学 | U-shaped steel composite support structure for deep dynamic pressure soft rock roadway and construction method of U-shaped steel composite support structure |
| CN107143338A (en) * | 2017-06-28 | 2017-09-08 | 陕西煤业化工技术研究院有限责任公司 | A kind of coal mine roadway driving and method for protecting support |
-
2017
- 2017-11-16 CN CN201711135383.3A patent/CN108035742B/en active Active
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE10234255A1 (en) * | 2002-06-27 | 2004-01-15 | Friedr. Ischebeck Gmbh | Use of drill injection anchors made from cold-rolled steel having longitudinal channels open in the region of the drill crown for rinsing and injecting cement as flat reinforcements for tunnel roofs |
| CN102493821A (en) * | 2011-12-10 | 2012-06-13 | 太原理工大学 | Support method for high stress roadway coal-rock mass |
| CN103032087A (en) * | 2012-11-30 | 2013-04-10 | 上海旭尧玻璃钢制品有限公司 | Self-drilling type hollow grouting anchor rod and production method thereof |
| CN103195441A (en) * | 2013-04-01 | 2013-07-10 | 平顶山天安煤业股份有限公司 | Supporting and reinforcing structure of coal mine tunnel and construction technology thereof |
| CN103233751A (en) * | 2013-05-07 | 2013-08-07 | 中国矿业大学 | Double-layer anchoring and balancing arch supporting system for coal roadway with extremely-weak top plates |
| CN103850688A (en) * | 2014-03-24 | 2014-06-11 | 昆明理工大学 | Method for dynamically superimposing coupling support on large-section roadway in complicated fault fracture zone |
| CN105041353A (en) * | 2015-08-17 | 2015-11-11 | 河南理工大学 | Roadway anchor net re-jetting double-folded-shed surrounding rock control technology |
| CN105134269A (en) * | 2015-08-17 | 2015-12-09 | 河南理工大学 | Control technology for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds |
| CN105178981A (en) * | 2015-09-30 | 2015-12-23 | 中国矿业大学 | Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway |
| CN106677797A (en) * | 2017-03-13 | 2017-05-17 | 安徽理工大学 | U-shaped steel composite support structure for deep dynamic pressure soft rock roadway and construction method of U-shaped steel composite support structure |
| CN107143338A (en) * | 2017-06-28 | 2017-09-08 | 陕西煤业化工技术研究院有限责任公司 | A kind of coal mine roadway driving and method for protecting support |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108035742A (en) | 2018-05-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101967984B (en) | Deep well tunnel cable anchor rigid-flexible coupling support and surrounding rock overall reinforced support method | |
| CN108316941B (en) | Broken surrounding rock and soft rock roadway U-shaped steel canopy supporting method | |
| CN102937030B (en) | Bolting-grouting integrated support method for zonal disintegration of deep roadway surrounding rock | |
| CN102278130B (en) | Process method for reinforcing and grouting of high-pressure water-rich solution cavity of tunnel | |
| CN103195426B (en) | A kind of large-inclination-angle coal bed long-wall working face coal pillar-free mining method | |
| CN105804767B (en) | A kind of the surrounding rock supporting construction method and surrounding rock supporting structure in the aqueous tunnel of coal mine | |
| CN108035742A (en) | A kind of passive harmonious method for protecting support of extreme rockburst tunnel master | |
| CN102518436B (en) | Prevention and control method of structural rockburst during coal mine roadway excavation | |
| CN205532656U (en) | Deep well weak surrounding rock roadway support device | |
| CN107780955B (en) | A controllable grouting reinforcement device and construction method for broken surrounding rock roadway | |
| CN106321119A (en) | Double-layer anchor net cable supporting structure for controlling mining roadway surrounding rock deformation and method thereof | |
| CN109026024B (en) | Roadway roof deformation control method under high-level stress action | |
| CN105178981A (en) | Total-section closed type deep-shallow coupling yielding, bolting-grouting and supporting method for incompact and fractured soft-rock roadway | |
| CN103195454B (en) | Support method for roadway and chamber in filling body | |
| CN102322273A (en) | A kind of roadway floor anchor is annotated integrated reinforcement means | |
| CN102877858A (en) | Reinforcing method for crushed top plate of coal face | |
| CN202882966U (en) | Recoverable soft rock self-tapping anchor rod | |
| CN112647969B (en) | Traffic tunnel surrounding rock cooperative control system and construction method | |
| CN107143338A (en) | A kind of coal mine roadway driving and method for protecting support | |
| CN105134249B (en) | The big gradual method for protecting support in relaxation zone tunnel of mine | |
| CN207554077U (en) | The passive harmonious supporting construction of extreme rockburst tunnel master | |
| CN102155248B (en) | Method for supporting laneway below coal pillar | |
| CN207583408U (en) | A kind of controllable grouting and reinforcing device for breaking surrounding rock tunnel | |
| CN207620820U (en) | A kind of breaking surrounding rock and soft-rock tunnel U-shaped steel cover canopy supporting construction | |
| CN206256920U (en) | Deformed steel bar high-pressure slip casting stock |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |