SU829952A1 - Method of working mineral deposits - Google Patents
Method of working mineral deposits Download PDFInfo
- Publication number
- SU829952A1 SU829952A1 SU792792826A SU2792826A SU829952A1 SU 829952 A1 SU829952 A1 SU 829952A1 SU 792792826 A SU792792826 A SU 792792826A SU 2792826 A SU2792826 A SU 2792826A SU 829952 A1 SU829952 A1 SU 829952A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- mineral
- ore
- release
- delivery
- mineral deposits
- Prior art date
Links
Landscapes
- Manufacture And Refinement Of Metals (AREA)
Description
(54) СПОСОБ РАЗРАБОТКИ МЕСТОРОЖДЕНИИ ПОЛЕЗНЫХ ИСКОПАЕМЫХ(54) METHOD FOR DEVELOPING THE MINE OF USEFUL MINERALS
ГR
Изобретение относитс к горному делУ, в частности к подземным способам разработки горных пород.The invention relates to mining, in particular to underground mining methods.
Известен способ подготовки днища блока, при котором прие.мные окна дучек на уровне подошвы подсечной траншеи располагают по ее длине в р д 1.There is a known method of preparing the bottom of a block, in which the m.muchy duchek windows at the level of the heel of the scab trenches are placed along its length in row 1.
Известен способ разработки месторождений полезных ископаемых, при котором выработку, пройденную в дниш,е, закрепл ют секци ми подъемно-опускающейс крепи 2.There is a known method for the development of mineral deposits, in which the output, passed in the bottom, e, is secured by sections of lift-down lining 2.
Недостатком этого способа вл етс больша трудоем1 рсть возведени подъемно-опускающейс секционной крепи.The disadvantage of this method is the large amount of labor involved in the erection of elevated sectional lining.
Цель изобретени - уменьшение трудоемкости при выпуске полезного ископаемого и улучшение проветривани выработки доставки.The purpose of the invention is to reduce the labor intensity at the release of the mineral and to improve the ventilation of the delivery generation.
Указанна цель достигаетс тем, что После полного выпуска руды из дучки проход т в соприкосновении с последней последующую дучку, при этом взорванную руду от проходки указанной дучки размещают в ранее пройденную, после чего ее закрепл ют твердеющим раствором, далее цикл работ повтор етс .This goal is achieved by the fact that, after the ore is completely discharged from the duchka, the subsequent duchka passes in contact with the latter, the ore from the sinking of the duch being drilled is placed in the previously passed, after which it is fixed with a hardening solution, then the cycle of work is repeated.
Способ осуществл етс следующим образом .The method is carried out as follows.
На нижнем подэтаже проход т выработку доставки, из которой бур т шпуры дл образовани дучек. После образовани дучек ранее отбитую руду верхнего подэтажа выпускают на подощву выработки. После полного выпуска руды из дучки ее креп т. На подощву дучки укладывают два р да бревен и устанавливают гидростойки, затем в выпускном окне монтируют изолирующую перемычку. После этого в соприкосновении с первой дучкой образуют следующую, причем горную массу из нее помещают в предыдущую дучку.In the lower substage, delivery delivery is made, from which a hole is drilled to form duchek. After duchek formation, the previously broken off ore of the upper substage is produced on the base of the mine. After the ore is completely discharged from the grab, it is secured. Two rows of logs are placed on the graft base and hydraulic racks are installed, then an insulating bridge is installed in the discharge box. After that, in contact with the first duchka form the next, and the mountain mass of it is placed in the previous duchka.
Использование данного способа позвол ет снизить затраты за счет уменьшени Using this method reduces costs by reducing
5 объема нарезных и подготовительных работ.5 volume rifled and preparatory work.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792792826A SU829952A1 (en) | 1979-07-09 | 1979-07-09 | Method of working mineral deposits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU792792826A SU829952A1 (en) | 1979-07-09 | 1979-07-09 | Method of working mineral deposits |
Publications (1)
Publication Number | Publication Date |
---|---|
SU829952A1 true SU829952A1 (en) | 1981-05-15 |
Family
ID=20839172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU792792826A SU829952A1 (en) | 1979-07-09 | 1979-07-09 | Method of working mineral deposits |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU829952A1 (en) |
-
1979
- 1979-07-09 SU SU792792826A patent/SU829952A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2312218C2 (en) | Combined development method for flat-laying seams of coal field | |
SU829952A1 (en) | Method of working mineral deposits | |
RU95106332A (en) | Method for degassing partially extracted guiding bed | |
RU2004803C1 (en) | Method for opencast mining of mineral deposits | |
SU669053A1 (en) | Method of mining an excavation level | |
SU998759A1 (en) | Method of controlling rock pressure | |
SU934006A1 (en) | Method of working gently-sloping mineral beds | |
SU1665038A1 (en) | Method of driving narrow-face workings with separate coal and rock extraction | |
RU2224891C2 (en) | Method for extracting mined blocks during subterraneous extraction of blind ore bodies | |
SU817261A1 (en) | Method of controlling a solid roof | |
SU899952A1 (en) | Method of strip mining of minerals in adverse geologic conditions | |
SU581282A1 (en) | Method of mining thick ore bodies | |
SU1344906A1 (en) | Method of driving reserved-dome mine workings | |
SU636394A1 (en) | Method of mining mineral deposits | |
SU912937A1 (en) | Method of preparing a block bottom | |
SU977789A1 (en) | Method for plugging rocks | |
SU939783A1 (en) | Method of degassing when driving preparatary workings | |
SU690181A1 (en) | Method of combined mining of mineral fields | |
SU875043A1 (en) | Method of solid roof control | |
RU1809060C (en) | Method for mining thin manganese ore beds | |
SU836355A1 (en) | Method of mining thick coal beds | |
SU754064A1 (en) | Method of mining thick ore bodies | |
SU573596A1 (en) | Method of mining ores | |
SU870717A1 (en) | Method of working steeply deeping ore bodies | |
SU723152A1 (en) | Method of driving large-section tunnel |