SU912937A1 - Method of preparing a block bottom - Google Patents
Method of preparing a block bottom Download PDFInfo
- Publication number
- SU912937A1 SU912937A1 SU802954145A SU2954145A SU912937A1 SU 912937 A1 SU912937 A1 SU 912937A1 SU 802954145 A SU802954145 A SU 802954145A SU 2954145 A SU2954145 A SU 2954145A SU 912937 A1 SU912937 A1 SU 912937A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- ore
- workings
- block
- trench
- preparing
- Prior art date
Links
Landscapes
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Description
Изобретение относится к горной промышленности и может быть использовано при подземной разработке месторождений полезных ископаемых.The invention relates to the mining industry and can be used in underground mining of mineral deposits.
Известен способ подготовки днища блока при котором выше горизонта доставки в дни- 5 ще образуют рудоприемные траншеи и выпускные щели [1].There is a known method of preparing the bottom of the block in which ore receiving trenches and outlet slots form in the bottom 5 days above the delivery horizon [1].
Наиболее близким к предлагаемому является способ подготовки днища блока, вклю-. чающий проведение выработки доставки, вы- 10 пускных выработок, буровой выработки для образования рудоприемной траншеи и проведение самой траншеи [2).Closest to the proposed is a method of preparing the bottom of the block, including. learning the delivery development, the 10 output workings, the drilling production for the formation of the ore receiving trench and the trench itself [2).
Недостатком данного способа является сравнительно большие затраты на подготовку днища блока. 15 The disadvantage of this method is the relatively high cost of preparing the bottom of the block. fifteen
Цель изобретения — уменьшение затрат на подготовку днища блока путем сокращения числа проводимых горных выработок.The purpose of the invention is to reduce the cost of preparing the bottom of the block by reducing the number of mine workings.
Поставленная цель достигается тем, что выработку доставки и выпускные выработки* 20 проходят одновременно, а отбитую при проходке выпускных выработок руду частично выпускают до образования в верхней части выпускных выработок свободного простран2 ства, с почвы.которого производят проходку рудоприемной траншеи.This goal is achieved by the fact that the delivery output and output openings * 20 pass simultaneously, and the ore beaten during the excavation of the output openings is partially exhausted until a free space is formed in the upper part of the exhaust openings, from the soil, which the mine receiving trench is excavated.
На фиг. 1 представлено рудное тело при подготовке днища блока, продольный разрез; на фиг. 2 — разрез А—А на фиг. I; на фиг. 3 — рудоприемная траншея в момент ее образования, продольный разрез; на фиг. 4 разрез Б—Б на фиг. 3.In FIG. 1 shows the ore body during the preparation of the bottom of the block, a longitudinal section; in FIG. 2 — section A — A in FIG. I; in FIG. 3 - ore receiving trench at the time of its formation, a longitudinal section; in FIG. 4, section B — B in FIG. 3.
Подготовка днища блока осуществляется в следующей последовательности.Preparation of the bottom of the block is carried out in the following sequence.
Одновременно с проведением доставочной выработки 1 засекают ниши 2 для проходки щелей 3. После установки крепления 4 из ниши 2 проходят щели 3 (высотой, равной суммарной высоте выпускной щели и буровой выработки), в которых дозированным выпуском отбитой горной массы при помощи механизмов выпуска и доставки образуют полость 5, предназначенную для выбуривания взрывных скважин 6, необходимых для проходки рудоприемной траншеи 7. Полость 5 представляет собой горную выработку с кровлей и боковыми стенками из массива горных пород и подошвой из отбитой горной массы. Участки выработки над междущелевыми целиками 8 проходят одновременно с проход912937 кой щели 3, выбуривая шпуры 9 в целиках 10. Щели 3 проходят под углом, обеспечивающим самотечный выпуск отбиваемой в них горной массы. После образования полости 5 между крепежными рамами устанавливают перемычки И на время производства буро- 5 взрывных работ в последней. Для образования рудоприемной траншеи 7 последовательно взрывают веера скважин 6. Вспомогательные работы при проходке траншеи 7 выполняют через восстающий 12 и сбойку 13, ко- 1С торые соединяют горизонт доставки с полостью 5. Выпуск отбитой в траншее 7 горной массы 14 производят через предварительно расперемыченные щели 3.Simultaneously with the delivery excavation 1, niches 2 are cut for driving the cracks 3. After the fastening 4 is installed, niches 2 pass through the cracks 3 (with a height equal to the total height of the outlet gap and the drill hole), in which the beaten rock mass is dosed by release and delivery mechanisms form a cavity 5, designed for drilling blast holes 6, necessary for sinking of the ore receiving trench 7. Cavity 5 is a mine working with a roof and side walls from an array of rocks and a sole from beaten off oh rock mass. The development sites above the inter-slit pillars 8 pass simultaneously with the passage 912937 of the slot 3, drilling the holes 9 in the pillars 10. The slots 3 pass at an angle providing gravity release of the rock mass beaten into them. After the cavity 5 is formed, jumpers And are installed between the mounting frames And for the duration of the drilling and blasting 5 in the latter. For the formation of the trench 7 rudopriemnoy successively blow fan wells 6. The auxiliary work when drilling is performed through the trench 7 revolting sboyka 12 and 13, Ko 1C torye delivery horizon connected with the cavity 5. Release chipped in the trench 7 rock mass 14 produced through the gap 3 previously rasperemychennye .
Преимущество предлагаемого способа заключается в сокращении нарезных работ за О счет исключения процесса проходки буровой выработки, предназначенной для проходки траншеи. Буровзрывные работы производят из выработки, которую образуют дозированным выпуском горной массы из выпуск- # ных щелей, что позволяет снизить трудоемкость и уменьшить стоимость подготовки днища блока.The advantage of the proposed method is to reduce rifling due to the exclusion of the process of sinking of a drilling designed for sinking a trench. Blasting works produced from production, which release dosage form of the rock mass graduates # nyh slots, thus reducing the complexity and reduce the cost of preparing the block bottom.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802954145A SU912937A1 (en) | 1980-07-09 | 1980-07-09 | Method of preparing a block bottom |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802954145A SU912937A1 (en) | 1980-07-09 | 1980-07-09 | Method of preparing a block bottom |
Publications (1)
Publication Number | Publication Date |
---|---|
SU912937A1 true SU912937A1 (en) | 1982-03-15 |
Family
ID=20907417
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802954145A SU912937A1 (en) | 1980-07-09 | 1980-07-09 | Method of preparing a block bottom |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU912937A1 (en) |
-
1980
- 1980-07-09 SU SU802954145A patent/SU912937A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US3917346A (en) | Method of blasting a subterranean deposit | |
US3897107A (en) | Method of mining | |
US3917348A (en) | Method of developing permeable underground zones | |
SU912937A1 (en) | Method of preparing a block bottom | |
SU987103A1 (en) | Method of working thick horizontal and gently sloping deposits | |
SU1314060A1 (en) | Method of combination mining of mineral deposits | |
SU1461930A1 (en) | Method of combined mining of mineral deposits | |
RU2030581C1 (en) | Method for combined mining of thick ore bodies | |
RU2059809C1 (en) | Method for formation of kerf hollow | |
SU1335702A1 (en) | Method of mining ore in chamber-and-pillar system | |
SU602684A1 (en) | Method of mining mineral deposits | |
RU1770571C (en) | Method for making raise mine working | |
SU1737117A1 (en) | Method of preparing block bottom for cleanup job | |
SU1580010A1 (en) | Method of preparing block foundation | |
RU2229600C1 (en) | Method for excavation of steep-falling ore deposits | |
SU1608345A1 (en) | Method of mining mineral deposits | |
SU1271972A1 (en) | Method of working mineral deposits | |
SU1125373A1 (en) | Method of mining unstable ores | |
SU1071763A1 (en) | Method of opening-up a blowout-hazardous coal bed | |
SU1617143A1 (en) | Method of mining sloping thin ore deposits | |
SU1765402A1 (en) | Ore block completion method | |
SU1580009A1 (en) | Method of mining thick ore zones | |
SU998771A1 (en) | Method of excavating outburst-hazard coal formation | |
SU1364726A1 (en) | Method of mining gently-sloping ore deposits | |
SU1599545A1 (en) | Method of mining sloping and incline ore bodies |