SU1765402A1 - Ore block completion method - Google Patents

Ore block completion method Download PDF

Info

Publication number
SU1765402A1
SU1765402A1 SU904872050A SU4872050A SU1765402A1 SU 1765402 A1 SU1765402 A1 SU 1765402A1 SU 904872050 A SU904872050 A SU 904872050A SU 4872050 A SU4872050 A SU 4872050A SU 1765402 A1 SU1765402 A1 SU 1765402A1
Authority
SU
USSR - Soviet Union
Prior art keywords
blasting
workings
wells
ore
horizon
Prior art date
Application number
SU904872050A
Other languages
Russian (ru)
Inventor
Василий Александрович Конаныхин
Михаил Борисович Макаренко
Василий Кузьмич Васильков
Александр Илларионович Конаныхин
Борис Васильевич Покровский
Ольга Владимировна Залесская
Сергей Николаевич Жигун
Виктор Владимирович Дорогунцов
Василий Лукьянович Меер
Original Assignee
Восточный научно-исследовательский горнорудный институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Восточный научно-исследовательский горнорудный институт filed Critical Восточный научно-исследовательский горнорудный институт
Priority to SU904872050A priority Critical patent/SU1765402A1/en
Application granted granted Critical
Publication of SU1765402A1 publication Critical patent/SU1765402A1/en

Links

Landscapes

  • Earth Drilling (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Изобретение относитс  к подземной разработке месторождений полезных ископаемых . Цель - снижение трудозатрат на отработку блока за счет сокращени  обьема - горнопроходческих работ. В границах отрабатываемого блока образуют компенсационные полости между горизонтом подсечки и буровым горизонтом взрыванием скважин , пробуренных до выработок подсечки. Формируют взрывные камеры расширением компенсационных полостей взрыванием скважин, оформленных с недобуром до выработок подсечки. После выпуска руды образованные камеры на выходе в выработки подсечки перекрывают и производ т их зар жание , а массовое обрушение руды осуществл ют отбойкой взрывных камер с миллисекундным замедлением. Руду выпу- л екают через выработки днища. 2 ил.5 (ЛThis invention relates to the underground mining of mineral deposits. The goal is to reduce labor costs for the development of the unit by reducing the volume - mining operations. Within the limits of the block being worked out, compensatory cavities are formed between the cutting horizon and the drilling horizon by blasting wells drilled before the cutting excavations. Explosive chambers are formed by expanding the compensation cavities by blasting wells that were designed with a shortage of undercut before undercutting. After the ore has been discharged, the formed chambers at the exit to the excavation of the sweep are blocked and charged, and the massive ore collapse is carried out by blasting the explosive chambers with a millisecond delay. The ore is discharged through the workings of the bottom. 2 Il.5 (L

Description

Изобретение относитс  к горнодобывающей промышленности и может быть использовано при отработке блоков при подземной разработке месторождений.The invention relates to the mining industry and can be used in mining blocks for underground mining.

Известен способ отработки блоков, включающий выемку руды массовым обрушением , проходку доставочных выработок днищ блоков с образованием высокой подсечки , подэтажных выработок, вертикальных выработок, бурение скважин и ее выпуск.There is a method of mining blocks, including the excavation of ore mass collapse, penetration of the delivery workings of the bottoms of the blocks with the formation of high hooking, sublevel workings, vertical workings, drilling wells and its release.

Известен способ отработки блоков, включающий проведение подготовительных и нарезных выработок, формирование днища блока, образование выработок горизонта подсечки и выработок бурового горизонта , бурение нисход щих скважин, зар жание и секционное взрывание скважин , отбойку руды массовым обрушением и выпуск руды.There is a method of mining blocks, including preparatory and rifled workings, forming the bottom of the block, forming workings of the sweep horizon and workings of the drilling horizon, drilling downhole wells, charging and sectional blasting of wells, breaking the ore by massive collapse and production of ore.

Недостатками известных способов  вл ютс  сложность конструкции системы отработки и трудоемкость в выполнении таких операций, как проведение плоских выработок с доставкой горной массы силой взрыва, оформление достаточно высокой подсечки блока дл  поглощени  сейсмических волн от плоских зар дов ВВ. направленных на подсечку .The disadvantages of the known methods are the complexity of the design of the mining system and the complexity of performing such operations as carrying out flat workings with the delivery of rock mass by the force of an explosion, designing a sufficiently high hook of the unit to absorb seismic waves from flat explosive charges. aimed at cutting.

Цель изобретени  - снижение трудозатрат на отработку блока за счет сокращени  объема горнопроходческих работ.The purpose of the invention is to reduce labor costs for the development of the block by reducing the volume of mining operations.

Сущность предлагаемого способа заключаетс  в том, что в способе отработки блоков, включающем проведение подготовительных и нарезных выработок, формирование днища блока, образование выработок горизонта подсечки и выработок бурового горизонта, бурение нисход щих скважин, зар жание и секционное взрывание скваXI СЬThe essence of the proposed method lies in the fact that in the method of working out blocks, including carrying out preparatory and rifled workings, forming the bottom of the block, forming workings of the sweep horizon and workings of the drilling horizon, drilling downhole wells, XI and Cb

сл N о юsl N o y

жин, отбойку руды массовым обрушением и выпуск руды через выработки днища, в границах отрабатываемого блока образуют компенсационные полости между горизонтом подсечки и буровым горизонтом взрыванием скважин, пробуренных до выработок подсечки, формируют взрывные камеры расширением компенсационных полостей взрыванием скважин, оформленных с недобуром до выработок подсечки, после выпуска отбитой руды образованные камеры на выходе в выработки подсечки перекрывают и производ т их зар жание, а массовое обрушение руды осуществл ют отбойкой взрывных камер с миллисекунд- ным замедлением.The crushing, ore blasting by mass collapse and ore production through the bottom workings, form compensatory cavities within the block’s limits, compensate cavities between the cutting horizon and the drilling horizon by blasting wells drilled to the excavation wells, form explosive chambers by expanding the compensation cavities by blasting wells decorated with a drill to the excavating wells, after the release of broken ore, the formed chambers at the exit to the production of the sweep are blocked and charged, and the massive collapse of the ore is carried out koi blast chambers with millisecond deceleration.

На фиг.1 изображена схема массива блока, подготовленного к обрушению, разрез; на фиг.2 - разрез А-А на фиг.1.Figure 1 shows the block array diagram prepared for the collapse, section; figure 2 - section aa in figure 1.

Способ реализуетс  следующим образом .The method is implemented as follows.

При подготовке к обрушению массива блока проход т откаточные выработки 1 и выработки днища 2 с образованием подсечки 3, высотой, определ емой необходимостью создани  инертного сло  на подсечке дл  предохранени  днища блока от разрушений массива при взрыве. На уровне бурового горизонта 4 (ранее откаточный горизонт при отработке вышележащего этажа ) проход т буровые выработки 5, из которых бур т пионерные скважины 6 в плане будущих полостей (щелей) 7, которые в зависимости от назначени  зар дов В В имеют различную форму. Далее бур т поперек полости в плане сопр женные скважины 8, количество которых определ ют в зависимости от ширины полости или от величины зар да ВВ. Скважины 8 вместе с пионерной скважиной бур т с бурового горизонта с выходом на подсечку. Затем бур т также из такого количества скважин параллельные полости сопр женных скважин, причем вторую полость 9 сопр женных скважин бур т параллельно первой также до уровн  подсечки , а все последующие полости 10 не добуривают до уровн  подсечки на величину 2/3 ЛНС зар да полости. Полости сопр женных скважин располагают: втора  полость от первой на рассто нии трех диаметров скважин, последующие р ды бур т на рассто нии, приближающемс  к расчетной ЛНС и проверенном экспериментальным взрывом.In preparation for the collapse of the block array, the haulage openings 1 and the bottom 2 are formed with the formation of an undercut 3, the height determined by the need to create an inert layer on the notch to protect the bottom of the block from destruction of the array during the explosion. At the level of the drilling horizon 4 (previously the haulage horizon when mining the overlying floor), drilling workings 5 are made, of which drilling wells 6 in terms of future cavities (slots) 7, which, depending on the purpose of charges B, have a different shape. Next, adjacent wells 8 are drilled across the cavity in terms of their number, depending on the width of the cavity or the amount of explosive charge. Wells 8 together with the pioneer well are drilled from the drilling horizon with access to the undercut. Then, from this number of wells, parallel cavities of adjacent wells are also drilled, and the second cavity of 9 adjacent wells is drilled parallel to the first one also to the undercut level, and all subsequent cavities 10 are not drilled to the undercut level by 2/3 LNS of the cavity charge. The cavities of the conjugate wells have: the second cavity from the first one at a distance of three diameters of the wells, the subsequent rows are drilled at a distance approaching the calculated LNS and verified by an experimental explosion.

Вертикальные полости оформл ют взрывным способом: компенсационную полость 11 до бурового горизонта 4 путем взрывани  секций первой и второй пол остиThe vertical cavities are shaped in an explosive manner: a compensation cavity 11 to the drilling horizon 4 by blasting sections of the first and second cavities

сопр женных скважин с подсечки и взрывную полость 7, также секционным взрыванием третьей и последующих полостей с нижнего уровн  расширени  12 взрывают полости, т.е. с высоты 2/3 ЛНС взрывнойconjugate wells from the undercut and the explosive cavity 7, also by sectional blasting of the third and subsequent cavities from the lower level of expansion 12 blow up the cavities, i.e. from a height of 2/3 LNS explosive

полости до уровн  кровли подсечки. Предварительно перед оформлением взрывной полости опускают по компенсационной полости канат на подсечку дл  ликвидации возможных пробок из горной массы.cavities to the level of the roof sweeps. Prior to the design of the explosive cavity, the rope is lowered along the compensation cavity to a hook to eliminate possible plugs from the rock mass.

После оформлени  вертикальных полостей на выходе их на подсечку устанавливают пробки 13, подвешенные на распорах 14 и засыпают горной массой до уровн  полостей буровым шламом. После подготовкиAfter registration of the vertical cavities at the exit of their cutting, the plugs 13 are installed, suspended on the spacers 14, and are filled up with rock mass to the level of the cavities with drill cuttings. After preparation

взрывных полостей (камер) к зар дке укладывают зар дный шланг в устье полостей и производ т их зар жание с установлением боевиков с замедлением в каждом последующем зар де 50 мс. Далее производ т взрывание зар дов ВВ, размещенных во взрывных камерах. После массового обрушени  массива руды осуществл ют его выпуск .The explosive cavities (chambers) charge the charging hose to the mouth of the cavities and charge them with the installation of militants with a slowdown in each subsequent charge of 50 ms. Then, explosive charges placed in explosive chambers are exploded. After a massive collapse of the ore mass, the ore mass is produced.

Claims (1)

Формула изобретени Invention Formula Способ отработки блоков, включающий проведение подготовительных и нарезных выработок, формирование днища блока, образование выработок горизонта подсечки и выработок бурового горизонта, бурение нисход щих скважин, зар жание и секционное взрывание скважин, отбойку, руды массовым обрушением и выпуск руды через выработки днища, отличающийс  тем, что, с целью снижени  трудозатрат на отработку блока за счет сокращени  объема горнопроходческих работ, в границах отрабатываемого блока образуют компенсационные полости между горизонтом под- сечки и буровым горизонтом взрываниемA method of working out blocks, including preparatory and rifled workings, forming the bottom of the block, forming workings of the sweep horizon and workings of the drilling horizon, drilling downhole wells, loading and sectional blasting of wells, blasting, ore through bottom mining, characterized by that, in order to reduce labor costs for the development of the block by reducing the volume of mining operations, within the limits of the block being worked out, compensatory cavities are formed between the horizon under - chipping and drilling horizon blasting скважин, пробуренных до выработок подсечки , формируют взрывные камеры расширением компенсационных полостей взрыванием скважин, оформленных с недобуром до выработок подсечки, после выпуска отбитой руды образованные камеры на выходе в выработки подсечки перекрывают и производ т их зар жание, а массовое обрушение руды осуществл ют отбойкой взрывных камер с миллисекундным замедлением .wells drilled before the workings of the sweep are formed by blasting chambers by expanding the compensation cavities by blasting wells decorated with a shortage of drills before the workings of the sweeping, after the release of broken ore, the formed chambers at the exit to the workings of the sweep are blocked and charged, and the massive ore is crushed by blasting cameras with millisecond delay. 66 а-but- о Јabout Ј ИЛ CDIL CD %л.Ј% l.Ј 4four Редактор З.ХодаковаEditor Z. Khodakova Составитель О.Залесска Compiled by O. Zalesska Техред М.МоргенталКорректор Л.ЛивринцTehred M.MorgentalKorrektor L.Livrints б a 3 b a 3 ИННTIN ЈJ шsh ОABOUT ITIT жwell && ЖF 4four алесска Alesska
SU904872050A 1990-09-06 1990-09-06 Ore block completion method SU1765402A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU904872050A SU1765402A1 (en) 1990-09-06 1990-09-06 Ore block completion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU904872050A SU1765402A1 (en) 1990-09-06 1990-09-06 Ore block completion method

Publications (1)

Publication Number Publication Date
SU1765402A1 true SU1765402A1 (en) 1992-09-30

Family

ID=21539319

Family Applications (1)

Application Number Title Priority Date Filing Date
SU904872050A SU1765402A1 (en) 1990-09-06 1990-09-06 Ore block completion method

Country Status (1)

Country Link
SU (1) SU1765402A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2557274C1 (en) * 2014-02-05 2015-07-20 Общество с ограниченной ответственностью "Восточный научно-исследовательский горнорудный институт" (ООО "ВостНИГРИ") Method of shooting of ore cavities

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Мец Ю.С. и др. Опыт отбойки крепких железных руд, Горный журнал, № 2, 1984, с. 41-44. Авторское свидетельство СССР №1599542, кл. Е 21 С 41/16, 1988. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2557274C1 (en) * 2014-02-05 2015-07-20 Общество с ограниченной ответственностью "Восточный научно-исследовательский горнорудный институт" (ООО "ВостНИГРИ") Method of shooting of ore cavities

Similar Documents

Publication Publication Date Title
EP0692611B1 (en) Method for excavating a working face
CN106121643B (en) Reserved two step nesting of retaining wall mine combines the method for mining by the way of filling
CN111058847B (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
US3466094A (en) Blasting arrangement for oil shale mining
US4135450A (en) Method of underground mining
SU1765402A1 (en) Ore block completion method
SU1642001A1 (en) Method of mining ore deposits
SU1116177A1 (en) Method of driving a mine working in rock body with gas-dynamic hazard
SU1661422A1 (en) Method for working inclined ore obstructions
SU1634784A1 (en) Method for sealing off mine workings
SU1384755A1 (en) Method of mining gently-sloping and sloping ore bodies
RU1770571C (en) Method for making raise mine working
SU1640515A1 (en) Method for breaking ore
SU1028847A1 (en) Method of mining thick ore deposits
RU2203419C2 (en) Process of underground development of thick ore deposits
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
SU1491103A1 (en) Method of blast-crushing of rock
SU1510453A1 (en) Method of erecting storring in mine working
SU1638303A1 (en) Method of making opening slot
RU2103509C1 (en) Block working method
SU1580008A1 (en) Method of mining thick steep ore bodies
RU2114994C1 (en) Method for winning minerals in quarry side
SU1456575A1 (en) Method of excavating ore pillars in combination mining of ore bodies
RU2166631C2 (en) Method of opening of mine horizons from deep openpits in mining of kimberlite deposits
RU2097679C1 (en) Method of driving of mine working