RU2312218C2 - Combined development method for flat-laying seams of coal field - Google Patents

Combined development method for flat-laying seams of coal field Download PDF

Info

Publication number
RU2312218C2
RU2312218C2 RU2005119046/03A RU2005119046A RU2312218C2 RU 2312218 C2 RU2312218 C2 RU 2312218C2 RU 2005119046/03 A RU2005119046/03 A RU 2005119046/03A RU 2005119046 A RU2005119046 A RU 2005119046A RU 2312218 C2 RU2312218 C2 RU 2312218C2
Authority
RU
Russia
Prior art keywords
mining
underground
drilling
formation
coal
Prior art date
Application number
RU2005119046/03A
Other languages
Russian (ru)
Other versions
RU2005119046A (en
Inventor
Михаил Дмитриевич Новопашин (RU)
Михаил Дмитриевич Новопашин
Петр Назарович Васильев (RU)
Петр Назарович Васильев
Валерий Андреевич Шерстов (RU)
Валерий Андреевич Шерстов
Original Assignee
Институт горного дела Севера им. Н.В. Черского Сибирского отделения Российской академии наук
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела Севера им. Н.В. Черского Сибирского отделения Российской академии наук filed Critical Институт горного дела Севера им. Н.В. Черского Сибирского отделения Российской академии наук
Priority to RU2005119046/03A priority Critical patent/RU2312218C2/en
Publication of RU2005119046A publication Critical patent/RU2005119046A/en
Application granted granted Critical
Publication of RU2312218C2 publication Critical patent/RU2312218C2/en

Links

Images

Abstract

FIELD: mining, particularly methods of underground or surface mining.
SUBSTANCE: method involves sinking underground entries to underground seam part along with seam drilling-out after surface drilling work stopping; leaving barrier pillar; performing developing entries and preparatory workings for underground seam cutting. Production works are carried out after or simultaneously with seam drilling out from surface.
EFFECT: possibility to extract coal beyond drilled-out section.
2 dwg

Description

Изобретение относится к горной промышленности и может быть использовано при комбинированной разработке пологих пластов угольных месторождений.The invention relates to the mining industry and can be used in the combined development of shallow seams of coal deposits.

Известен способ комбинированной разработки пластовых месторождений, включающий ведение открытых горных работ, проведение подземных горных выработок и ведение добычных работ подземным способом [1].A known method of combined development of reservoir deposits, including conducting opencast mining, underground mining and mining operations underground [1].

Недостатком известного способа является то, что добычные работы с участка подземных горных работ могут вестись только после полного окончания открытых горных работ и засыпки вентиляционного штрека пустыми горными породами.The disadvantage of this method is that mining from the underground mining site can be carried out only after the complete completion of open mining and filling the ventilation drift with empty rocks.

Известна технология глубокой разработки угольных пластов, включающая выемку угля комплексом как с выходов угольных пластов на поверхность, так и после выемки угля открытыми горными работами, заключающаяся в проведении ряда параллельных выработок (камер) на глубину до 300 м [2] - прототип.A well-known technology for the deep development of coal seams, including the extraction of coal by the complex both from the exits of the coal seams to the surface, and after the extraction of coal by opencast mining, which consists in conducting a series of parallel workings (chambers) to a depth of 300 m [2] is a prototype.

Основным недостатком данной технологии является то, что исключается возможность выемки угля за пределами извлекаемого участка.The main disadvantage of this technology is that it excludes the possibility of coal mining outside the recoverable area.

Технической задачей являлась необходимость разработки способа извлечения запасов угля, находящихся за пределами выбуриваемого участка.The technical problem was the need to develop a method for extracting coal reserves located outside the drilling area.

Предлагаемый способ отличается тем, что после остановки открытых горных работ и одновременно с выбуриванием пласта из остановленных открытых горных работ проводят в выбранном проектом месте вскрывающие подземные горные выработки на подземный участок пласта, расположенный ниже (дальше) участка, отведенного для выбуривания пласта, оставляют барьерный целик между этими участками, затем ведут подготовительные и нарезные выработки для подземной выемки пласта, а добычные работы ведут после выбуривания пласта с поверхности или одновременно с выбуриванием.The proposed method is characterized in that after stopping the open cast mining and simultaneously drilling the formation from the stopped open cast mining, open underground mine workings are carried out in the place chosen by the project in the underground section of the formation located below (further) the section allotted for drilling the formation, leaving the entire barrier between these sections, then preparatory and rifting workings are carried out for underground excavation of the formation, and mining operations are carried out after drilling the formation from the surface or simultaneously to drill out.

Введенный в формулу такой существенный признак, как то, что после остановки открытых горных работ одновременно с выбуриванием пласта проводят вскрывающие подземные горные выработки на подземный участок пласта, дает возможность своевременно подготовить этот участок для очистной выемки и исключить разрыв во времени после окончания выемки запасов выбуриванием.The essential feature introduced into the formula is that after stopping opencast mining, simultaneously with the drilling of the formation, excavating underground mine workings are conducted to the underground section of the formation, it makes it possible to timely prepare this section for treatment excavation and to eliminate the time gap after the completion of excavation by drilling.

Существенный признак, заключающийся в том, что между участком, предназначенным для выбуривания пласта с поверхности, и участком для подземных горных работ оставляют барьерный целик, обеспечивает независимую отработку указанных участков, предохраняет участок подземных горных работ от прорыва воды в случае затопления выбуренных камер на вышележащем участке.An essential feature is that a barrier pillar is left between the area intended for drilling the formation from the surface and the area for underground mining, provides independent mining of these areas, prevents the underground mining section from breaking through if flooded chambers are flooded in the overlying section .

Существенный признак, заключающийся в том, что добычные работы на подземном участке ведут после выбуривания пласта с поверхности или одновременно с выбуриванием, позволяет исключить разрыв во времени по добыче угля после выбуривания пласта или даже увеличить производственную мощность предприятия при одновременной выемке угля с двух участков.An essential sign that mining operations in the underground section are carried out after drilling the formation from the surface or at the same time as drilling, eliminating the time lag in coal production after drilling the formation or even increasing the production capacity of the enterprise while simultaneously extracting coal from two sections.

Сущность способа поясняется чертежами, где на фиг.1 показаны в плане участки для открытых горных работ, выбуривания пласта и подземных горных работ, на фиг.2 - разрез А-А на фиг.1.The essence of the method is illustrated by drawings, where Fig. 1 shows in plan a section for open cast mining, drilling a formation and underground mining, in Fig. 2 - section AA in Fig. 1.

Условные обозначения, принятые на чертежах:Symbols adopted in the drawings:

1 - угольный пласт; 2 - граница между открытыми и подземными горными работами; 3 - участок для открытых горных работ; 4 - участок для выбуривания угольного пласта; 5 - вскрывающие выработки; 6 - участок для подземных горных работ; 7 - конвейерный штрек; 8 - вентиляционный штрек; 9 - барьерный угольный целик; 10 - монтажная камера; 11 - очистной комплекс.1 - coal seam; 2 - the boundary between open and underground mining; 3 - site for open cast mining; 4 - plot for drilling a coal seam; 5 - opening workings; 6 - site for underground mining; 7 - conveyor drift; 8 - ventilation drift; 9 - barrier coal pillar; 10 - mounting chamber; 11 - treatment plant.

Способ осуществляется следующим образом.The method is as follows.

На месторождении угольного пласта 1 пологого залегания сначала определяют границу 2 между открытыми горными работами и подземными. При ведении горных работ на отведенном участке 3 для открытых работ вскрышные породы вывозят на внешний отвал и обнажают почву пласта. Затем из обнаженного пространства ведут работы по выбуриванию пласта 1 на участке 4, предназначенном для этой цели. Одновременно с работами по выбуриванию ведут вскрывающие выработки 5 на участок 6, предназначенный для подземных горных работ. Из вскрывающих выработок 5 ведут подготовительные выработки: конвейерный штрек 7 и вентиляционный штрек 8. При этом между вентиляционным штреком 8 и участком 4 оставляют барьерный целик 9, исключающий прорывы воды, пульпы, воздуха из участка 4. В монтажной камере 10 монтируют очистной комплекс 11. Очистные работы в подготовленной лаве ведут после окончания выбуривания пласта на участке 4 или одновременно с выбуриванием. В этом случае возможно увеличение производственной мощности угольного предприятия.On the coal seam deposit 1 of a shallow bed, the boundary 2 is first determined between open pit mining and underground mining. When conducting mining operations in the allotted area 3 for open work, overburden is removed to an external dump and expose the soil of the formation. Then, from the exposed space, work is underway on drilling the formation 1 in the area 4 intended for this purpose. Along with the drilling operations, openings 5 are being conducted to section 6 intended for underground mining. From the openings 5 lead preparatory workings: conveyor drift 7 and ventilation drift 8. In this case, between the ventilation drift 8 and section 4 leave the rear pillar 9, eliminating breakthroughs of water, pulp, air from section 4. In the mounting chamber 10, the treatment plant 11 is mounted. Treatment work in the prepared lava is carried out after completion of drilling of the formation in section 4 or simultaneously with drilling. In this case, it is possible to increase the production capacity of a coal enterprise.

Преимуществами предлагаемого способа являются:The advantages of the proposed method are:

- обеспечение полноты выемки угольного пласта на месторождении за счет своевременной подготовки участка, предназначенного для подземных горных работ;- ensuring the completeness of the extraction of the coal seam in the field due to the timely preparation of the site intended for underground mining;

- исключение разрыва во времени по извлечению угля при выбуривании и добычными работами на участке подземных горных работ.- elimination of the time gap in coal extraction during drilling and mining operations at the underground mining site.

Источники информацииInformation sources

1. Патент РФ №2194858, кл. 7 Е21С 41/00, 2002 г.1. RF patent No. 2194858, cl. 7 E21C 41/00, 2002

2. Журнал «Уголь», №2, 2005 г., с.9-10.2. The Coal Magazine, No. 2, 2005, pp. 9-10.

Claims (1)

Способ комбинированной разработки пологих пластов угольных месторождений, включающий ведение открытых горных работ, выбуривание пласта по технологии глубокой разработки угольных пластов после прекращения открытых горных работ, ведение подземных горных работ, отличающийся тем, что после остановки открытых горных работ и одновременно с выбуриванием пласта из остановленных открытых горных работ проводят в выбранном проектом месте вскрывающие подземные горные выработки на подземный участок пласта, расположенный ниже участка, отведенного для выбуривания пласта, оставляют барьерный целик между этими участками, затем ведут подготовительные и нарезные выработки для подземной выемки пласта, а добычные работы ведут после выбуривания пласта с поверхности или одновременно с выбуриванием.A method for the combined development of shallow seams of coal deposits, including open pit mining, drilling of a seam according to the technology of deep mining of coal seams after the cessation of open pit mining, underground mining, characterized in that after the cessation of open pit mining and simultaneously with the drilling of the pit from stopped open pits mining operations are carried out in the place chosen by the project, revealing underground mine workings to the underground section of the reservoir, located below the section allocated To drill the formation, leave the entire barrier between these areas, then carry out preparatory and rifting workings for underground excavation of the formation, and mining operations are carried out after drilling the formation from the surface or simultaneously with drilling.
RU2005119046/03A 2005-06-20 2005-06-20 Combined development method for flat-laying seams of coal field RU2312218C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2005119046/03A RU2312218C2 (en) 2005-06-20 2005-06-20 Combined development method for flat-laying seams of coal field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2005119046/03A RU2312218C2 (en) 2005-06-20 2005-06-20 Combined development method for flat-laying seams of coal field

Publications (2)

Publication Number Publication Date
RU2005119046A RU2005119046A (en) 2006-12-27
RU2312218C2 true RU2312218C2 (en) 2007-12-10

Family

ID=37759385

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2005119046/03A RU2312218C2 (en) 2005-06-20 2005-06-20 Combined development method for flat-laying seams of coal field

Country Status (1)

Country Link
RU (1) RU2312218C2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2455488C2 (en) * 2010-09-27 2012-07-10 Учреждение Российской академии наук Институт горного дела Севера им. Н.В. Черского Сибирского отделения РАН Method to recover outbalance reserves in combined development of coal beds
RU2490456C1 (en) * 2011-12-07 2013-08-20 Учреждение Российской академии наук Институт угля Сибирского отделения РАН (ИУ СО РАН) Method for open-underground mining of thick flat coal bed
RU2490455C1 (en) * 2011-12-20 2013-08-20 Учреждение Российской академии наук Институт угля Сибирского отделения РАН (ИУ СО РАН) Method of open-underground mining of flat coal bed of medium thickness
RU2559272C1 (en) * 2014-04-22 2015-08-10 Федеральное государственное бюджетное учреждение науки Институт горного дела Севера им. Н.В. Черского Сибирского отделения Российской академии наук Method of combined development of flat seams of coal deposits
RU2704061C1 (en) * 2018-12-01 2019-10-23 Владимир Васильевич Галайко Method for combined development of flat seams of coal deposits
RU2715503C1 (en) * 2019-09-25 2020-02-28 Федеральное государственное автономное образовательное учреждение высшего образования "Северо-Восточный федеральный университет имени М.К.Аммосова" Method for open-underground development of flat-lying formations

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
НЕЦВЕТАЕВ А.Г. и др. Технология глубокой разработки угольных пластов. Уголь, №2, 2005, с.9-10. *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2455488C2 (en) * 2010-09-27 2012-07-10 Учреждение Российской академии наук Институт горного дела Севера им. Н.В. Черского Сибирского отделения РАН Method to recover outbalance reserves in combined development of coal beds
RU2490456C1 (en) * 2011-12-07 2013-08-20 Учреждение Российской академии наук Институт угля Сибирского отделения РАН (ИУ СО РАН) Method for open-underground mining of thick flat coal bed
RU2490455C1 (en) * 2011-12-20 2013-08-20 Учреждение Российской академии наук Институт угля Сибирского отделения РАН (ИУ СО РАН) Method of open-underground mining of flat coal bed of medium thickness
RU2559272C1 (en) * 2014-04-22 2015-08-10 Федеральное государственное бюджетное учреждение науки Институт горного дела Севера им. Н.В. Черского Сибирского отделения Российской академии наук Method of combined development of flat seams of coal deposits
RU2704061C1 (en) * 2018-12-01 2019-10-23 Владимир Васильевич Галайко Method for combined development of flat seams of coal deposits
RU2715503C1 (en) * 2019-09-25 2020-02-28 Федеральное государственное автономное образовательное учреждение высшего образования "Северо-Восточный федеральный университет имени М.К.Аммосова" Method for open-underground development of flat-lying formations

Also Published As

Publication number Publication date
RU2005119046A (en) 2006-12-27

Similar Documents

Publication Publication Date Title
RU2312218C2 (en) Combined development method for flat-laying seams of coal field
RU2297533C1 (en) Method for reclamation of open mines
CN103726848A (en) Mining method applicable to recovery of gentle-inclined/inclined thin ore body
RU2524716C1 (en) Strip mining of minerals including working of ore bodies in contact between ore and capping in sub-benches
RU2224107C1 (en) Process of opencast-underground mining of mineral resources
RU2455488C2 (en) Method to recover outbalance reserves in combined development of coal beds
RU2194858C2 (en) Method of combined mining of bedded mineral deposits
RU2360118C1 (en) Method of open development of bedded deposit of minerals
RU2099524C1 (en) Combined method of mining of formation of steeply dipping coal seams
RU2459082C2 (en) Method for extraction of hard mineral resources from deep-lying water-flooded deposit
RU2418168C1 (en) Compound development method of series of gently sloping beds of mine fields
RU2418166C1 (en) Compound development method of series of gently sloping beds of mine fields
RU2285121C1 (en) Method for open underground extraction of series of slightly inclined coal beds
RU2204721C1 (en) Method of opencast mining of mineral beds
RU2205955C1 (en) Method of mineral extraction in filled flanks of opencast
RU2290510C1 (en) Open underground method for extracting formations of mineral resources
RU2539083C1 (en) Openworking with explosion effects on mineral bed
RU2235205C2 (en) Method for opencast mining blanket deposits
RU2187647C1 (en) Method of softening of surface layer of opencast benches in seasonal ground freezing
RU2715503C1 (en) Method for open-underground development of flat-lying formations
SU1083662A1 (en) Method of mining steep-slope ore-bodies
RU2425216C1 (en) Complex development method of bed series of anticline deposits
SU949182A1 (en) Method for working gently sloping mineral seams
SU899952A1 (en) Method of strip mining of minerals in adverse geologic conditions
RU2213224C1 (en) Method of opencast mining of mineral deposits

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20090621

NF4A Reinstatement of patent

Effective date: 20110127

MM4A The patent is invalid due to non-payment of fees

Effective date: 20140621