SU899952A1 - Method of strip mining of minerals in adverse geologic conditions - Google Patents
Method of strip mining of minerals in adverse geologic conditions Download PDFInfo
- Publication number
- SU899952A1 SU899952A1 SU802937871A SU2937871A SU899952A1 SU 899952 A1 SU899952 A1 SU 899952A1 SU 802937871 A SU802937871 A SU 802937871A SU 2937871 A SU2937871 A SU 2937871A SU 899952 A1 SU899952 A1 SU 899952A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- slope
- trenches
- extreme part
- pit
- development
- Prior art date
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
(54) СПОСОБ ОТКРЫТОЙ РАЗРАБОТКИ МЕСТОРОЖДЕНИЙ ПОЛЕЗНЫХ ИСКОПАЕМЫХ В СЛОЖНЫХ ГОРНО-ГЕОЛОГИЧЕСКИХ(54) METHOD OF OPEN DEVELOPMENT OF MINERAL DEPOSITS OF MINERAL RESOURCES IN COMPLEX MINING AND GEOLOGICAL
1one
Изобретение относитс к горной промышленности и может использоватьс при открытой разработке месторождений полезных ископаемых с м гкими покрывающими породами .The invention relates to the mining industry and can be used in open pit mining of mineral deposits with soft overburden.
Известен способ открытой разработки месторождений с легкими покрывающими породами , включающий обработку вскрытых пород уступами 1.There is a method of opencast mining with light overburden, including the treatment of exposed rocks with ledges 1.
Недостатком способа вл етс то, что в сложных горно-геологических услови х он не позвол ет обеспечить стабильную производительность оборудовани .The disadvantage of this method is that, under complex mining and geological conditions, it does not ensure the stable performance of the equipment.
Известен также способ открытой разработки месторождений полезных ископаемых в сложных горно-геологических услови х , при наличии в пределах карьерного пол балки, включающий отработку экстремальной части борта карьера уступами и проведение опережающей выработки rjo тальвегу или на склоне балки параллельно ее экстремальной части 2.There is also known a method for open mining of mineral deposits in complex mining and geological conditions, if there is a beam within the mine floor, which includes working out the extreme part of the open pit side with ledges and conducting advance production of rjo thalweg or on the slope of the beam parallel to its extreme part 2.
Недостатком этого способа вл етс то, что требуетс значительное врем дл создани необходимого опережени и осушени вскрытных пород.The disadvantage of this method is that it takes considerable time to create the necessary advance and drainage of overburden.
УСЛОВИЯХCONDITIONS
Цель изобретени - повышение эффективности разработки за счет сокращени объемов работ при опережающем осушении разрабатываемых вскрытных пород и повышение интенсивности осушени .The purpose of the invention is to increase the efficiency of development by reducing the amount of work during the advanced drainage of developed unsealed rocks and increasing the intensity of drainage.
Поставленна цель достигаетс тем, чтоThe goal is achieved by the fact that
опережающую выработку проход т по тальвегу или на склоне балки параллельно ее .экстремальной части, а затем проход т по склону балйи одну или несколько траншей на глубину, обеспечивающую вскрытие вышележащих водоносных горизонтов, которые располагают под углом к опережающей выработке и соедин ют с ней, при этом породы от проходки траншеи и опережающей- выработки укладывают на склонеthe advance development is carried out along the thalweg or on the slope of the beam parallel to its extreme part, and then one or more trenches pass along the slope of the Balya to a depth that provides for the opening of the overlying aquifers that are at an angle to the advanced development and connected to it at This rock from the penetration of the trench and advanced-excavation is laid on the slope
балки и обрабатывают их и экстремальную часть балки совместно с бортом карьера. beams and process them and the extreme part of the beam together with the pit side.
На чертеже изображена схема разработки месторождени .The drawing shows the scheme of field development.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802937871A SU899952A1 (en) | 1980-05-05 | 1980-05-05 | Method of strip mining of minerals in adverse geologic conditions |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802937871A SU899952A1 (en) | 1980-05-05 | 1980-05-05 | Method of strip mining of minerals in adverse geologic conditions |
Publications (1)
Publication Number | Publication Date |
---|---|
SU899952A1 true SU899952A1 (en) | 1982-01-23 |
Family
ID=20900986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802937871A SU899952A1 (en) | 1980-05-05 | 1980-05-05 | Method of strip mining of minerals in adverse geologic conditions |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU899952A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2539511C1 (en) * | 2013-08-06 | 2015-01-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Кабардино-Балкарский государственный университет им. Х.М. Бербекова (КБГУ) | Method of desalination of high-altitude dumps |
-
1980
- 1980-05-05 SU SU802937871A patent/SU899952A1/en active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2539511C1 (en) * | 2013-08-06 | 2015-01-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования Кабардино-Балкарский государственный университет им. Х.М. Бербекова (КБГУ) | Method of desalination of high-altitude dumps |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2297533C1 (en) | Method for reclamation of open mines | |
RU2312218C2 (en) | Combined development method for flat-laying seams of coal field | |
Chistyakov et al. | Investigation of the geomechanical processes while mining thick ore deposits by room systems with backfill of worked-out area | |
SU899952A1 (en) | Method of strip mining of minerals in adverse geologic conditions | |
RU2418166C1 (en) | Compound development method of series of gently sloping beds of mine fields | |
RU2114307C1 (en) | Method for opencast mining of flooded mineral deposits | |
SU581282A1 (en) | Method of mining thick ore bodies | |
RU2418168C1 (en) | Compound development method of series of gently sloping beds of mine fields | |
SU639995A1 (en) | Method of shoring slopes | |
SU812922A1 (en) | Method of consolidating slopes | |
RU2425216C1 (en) | Complex development method of bed series of anticline deposits | |
RU2290510C1 (en) | Open underground method for extracting formations of mineral resources | |
SU891924A1 (en) | Method of open-cast mining of bed-type mineral deposits | |
SU748005A1 (en) | Method of mining thick sloping beds of minerals | |
SU855209A1 (en) | Method of caving overlapping rocks | |
SU706530A1 (en) | Trenching method | |
SU1129354A1 (en) | Method of underground working of mineral deposits | |
SU949182A1 (en) | Method for working gently sloping mineral seams | |
SU861606A1 (en) | Method of mining thin steeply deeping veins | |
SU589399A1 (en) | Method of working thick steep coal-bearing seams | |
SU998756A1 (en) | Method of working coal beds in suit within safety pillar under water basins | |
SU723140A1 (en) | Method of controlling a roof which is caving-proof | |
SU763596A1 (en) | Method of working thick steep coal seams | |
SU866190A1 (en) | Method of working a mine face by bucket-wheel excavator | |
SU872758A1 (en) | Method of opening up horizontal and sloping mineral deposits |