SU977789A1 - Method for plugging rocks - Google Patents

Method for plugging rocks Download PDF

Info

Publication number
SU977789A1
SU977789A1 SU813303972A SU3303972A SU977789A1 SU 977789 A1 SU977789 A1 SU 977789A1 SU 813303972 A SU813303972 A SU 813303972A SU 3303972 A SU3303972 A SU 3303972A SU 977789 A1 SU977789 A1 SU 977789A1
Authority
SU
USSR - Soviet Union
Prior art keywords
cracks
well
plugging
opened
fracture
Prior art date
Application number
SU813303972A
Other languages
Russian (ru)
Inventor
Вениамин Анатольевич Хямяляйнен
Евгений Георгиевич Дуда
Олег Игнатьевич Чернов
Original Assignee
Научно-исследовательский институт строительства угольных и горнорудных предприятий
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-исследовательский институт строительства угольных и горнорудных предприятий filed Critical Научно-исследовательский институт строительства угольных и горнорудных предприятий
Priority to SU813303972A priority Critical patent/SU977789A1/en
Application granted granted Critical
Publication of SU977789A1 publication Critical patent/SU977789A1/en

Links

Description

(St) СПОСОБ ТАМПОНИРОВАНИЯ ГОРНЫХ ПОРОД(St) METHOD OF DAMPING OF MOUNTAIN BREEDS

1one

Изобретение относитс  к проведению горных выработок с тампонированием горных пород.FIELD: mining operations with plugging of rocks.

Известен способ тампонировани  горных пооод путем бурени  скважин инагнетани  в них тампонажных растворов Ij.There is a known method of plugging mountainous waterways by drilling wells and injecting cementing solutions Ij into them.

Недостатком этого способа  вл етс  то, что при тампонировании ropHoi го массива не всегда удаетс  в,один прием добитьс  качественной цементации , а Св зи с че.м часто приходитс  вторично разбуривать зацементированные скважины и производить тампонажные работы. Кроме.того необходимо бурить большое количество скважин дл  вскрыти  всех трещин в зоне тампонировани .The disadvantage of this method is that when plugging the ropHoi massif it is not always possible to achieve high-quality carburization in one step, and connection with which we often have to re-drill the cemented wells and carry out cement work. In addition, it is necessary to drill a large number of wells to open all cracks in the plugging zone.

Наиболее близким по технической сущности и достигаемому результату к предлагаемому  вл етс  способ, включакичий вскрытие трещин в породе проходной скважины, образование тоещин гидроразрывом породы и нагнетание в трещины через скважины тампонажного раствопа 2. «The closest in technical essence and the achieved result to the proposed method is to include the opening of cracks in the rock of the borehole, the formation of hydraulic fracturing of the rock and the injection of the cement slurry 2 into the cracks through the wells.

Недостаток известного Способа необходимость бурени  большого количества скважин дл  вскрыти  всех трещин в зоне тампонировани  вследствие разрыва массива по одной из имеющихс  трещин, а не образовани  новых трещин.The disadvantage of the known Method is the necessity of drilling a large number of wells to open all cracks in the plugging zone due to the fracture of the array along one of the existing cracks, rather than the formation of new cracks.

10ten

Цель изобретени  - увеличение зоны тампонировани .The purpose of the invention is to increase the area of the plug.

Поставленна  цель достигаетс  тем, что согласно способу тампонировани , включающему вскрытие тре15 щин в породе проходной скважины, образование трещин гидроразрывом и нагнетание в трещины через скважину тампонажного раствора, гидрораз20 рыв производ т в зоне непроницаемого массива, вскрытого скважиной.This goal is achieved by the fact that according to the plugging method, including the opening of cracks in the rock of a borehole, the formation of cracks by hydraulic fracturing and the injection of cracks in the cracks through the well, in the zone of an impermeable array opened by the well.

Claims (2)

На чертеже изображена схема тампонировани  горных пород. 3 На схеме показана скважина 1 , вскрытые ею трещины 2, направл ющие щели 3, трещина гидрораэрыва 4, вскрывающа  трешины 5. К трещина 6 вскрывающа  трещины 7Способ реализуетс  следующим образом . Производ т бурение тампонажной скважины 1 с определением поглощающей способности горного массива. По длине скважины 1 выдел ют непроницаемые и проницаемые участки вскрывающие естественные трещины 2 массива . Известным.способом тампонируют вскрытые скважиной трещины 2. После окончани  нагнетани  раствора в скв жину 1 производ т ее промывку, буро вой снар д(долото,.коронку) замен ю специальным устройством и с его помощью на непроницаемых участках скв жины поинтервально и по периметру с скважины прорезают щели 3 глубиной, равной примерно радиусу скважины. З тем изолируют с двух сторон пакераМ одну прорезанную щель и производ т одновременно гидроразрыв массива с образованием искусственной трещины щели 4 и заполнение ее и вскрытых трещин 5 одним и тем же тампонажным раствором. S процессе гидроразрыва .искусственна  трещина 4, развива сь, пересекает уплотненные тампонажным раст сором трещины 2, доходит до естественных трещин 5. 3 дальнейшем проис ходит заполнение вскрытых тре1чин 5Производ  следующий гидроразрыв в другом интервале, искусственна  трещина 6 гидроразрыва пересекает уплотненные тампонажным раствором трещины 2 и 5 и вскрывает естественные трещины У.После поинтервально го проведени  всех намеченных разрывов и заполнени  вскрытых естественных трещин скважину под давлением заполн пт таипонажным раствором. 9 Использование предлагаемого способа тампонировани  горных пород позвол ет осуществить качественное создание как противофильтрационных завес , так и упрочненной зоны горного массива вокруг соору)чаемых выработок через минимально возможное количество скважин. Так, если известные способы при сооружении вертикальных стволов шахт диаметром 6-8 м предусматривают бурение 7-9 скважин дл  . тампонировани , то предлагаемый способ позвол ет выполнить тампонаж в тех же услови х через одну скважину. За счет выполнени  в способе гидроразрыва в непроницаемой части массива затраты на тампонирование уменьшаютс  в 2-3 раза., Формула изобретени  1.Способ тампонировани  горных пород, включающий вскрытие трещин в породе проходкой скважины, образощэние трещин гидроразрывом породы и йагнетание в трещины через скважину тампонажного раствора, отличающийс  тем, ,что, с целью увеличени  зоны тампонировани , гидроразрыв производ т в зоне непроницаемого массива, вскрытого скважиной. 2.Способ поп.1,отл1 чающ и и. с   тем, что гидроразрыв производ т после заполнени  тампонаж ным раствором трещин, вскрытых скважиной . Источники информации, прин тые во внимание при экспертизе 1.Маньковский Г. И. Специальные способы сооружени  стволов шахт. М., Наука, 1965, с. 168. The drawing shows a diagram of the plugging of rocks. 3 The diagram shows a well 1, cracks 2 opened by it, guiding slots 3, hydraulic fracture crack 4, opening cracks 5. By way of crack 6, opening cracks 7 The method is implemented as follows. The cement hole 1 is drilled to determine the absorption capacity of the rock mass. Along the length of the borehole 1, impermeable and permeable areas are revealed that reveal the natural fractures of the 2nd massif. The cracks 2 opened by the well are plugged in a known manner. After completion of the injection of the solution into the well 1, it is washed, the drill bit (chisel, crown) is replaced with a special device and with it in the impermeable parts of the well at intervals and along the perimeter wells cut slits 3 depth approximately equal to the radius of the well. At that, one cut-out slot is isolated from the two sides of the packerM and at the same time the hydraulic fracture of the massif is formed with the formation of an artificial crack of the gap 4 and filling it and opened cracks 5 with the same cement slurry. S fracturing process. An artificial crack 4, which develops, intersects cracks compacted by cementing stretch 2, reaches natural cracks 5. 3 further, the opened fractures occur 5 The next fracture is produced in another interval, the artificial fracture 6 of the fracture intersects the cracks sealed with a cement slurry 2 and 5 and opens the natural cracks. After the interval, all the planned fractures and filling of the opened natural cracks are made, the well under pressure is filled with a pressure gauge. create. 9 The use of the proposed method of plugging rocks allows for the qualitative creation of both impervious curtains and reinforced zone of the mountain massif around the constructed workings through the minimum possible number of wells. So, if the known methods for the construction of vertical shafts of mines with a diameter of 6-8 m provide for drilling 7-9 wells for. plugging, the proposed method allows for tamping in the same conditions through a single well. By performing in the method of fracturing in the impenetrable part of the array, plugging costs are reduced by a factor of 2-3. Claim 1. The method of plugging rocks, including the opening of cracks in the rock by drilling a well, cracking the fracture through a well of cement slurry wherein, in order to increase the plugging zone, fracturing is carried out in the zone of an impermeable array opened by the well. 2. Method pop.1, excluding and. due to the fact that hydraulic fracturing is performed after filling the cracks opened with the well with a cement slurry. Sources of information taken into account during the examination 1.Mankovsky G.I. Special methods for constructing shafts. M., Science, 1965, p. 168. 2.Авторское свидетельство СССР № 6k60S5, кл.-Е 21 D 1/16, 1972 (прототип).2. USSR author's certificate number 6k60S5, CL-E 21 D 1/16, 1972 (prototype).
SU813303972A 1981-04-28 1981-04-28 Method for plugging rocks SU977789A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU813303972A SU977789A1 (en) 1981-04-28 1981-04-28 Method for plugging rocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU813303972A SU977789A1 (en) 1981-04-28 1981-04-28 Method for plugging rocks

Publications (1)

Publication Number Publication Date
SU977789A1 true SU977789A1 (en) 1982-11-30

Family

ID=20964082

Family Applications (1)

Application Number Title Priority Date Filing Date
SU813303972A SU977789A1 (en) 1981-04-28 1981-04-28 Method for plugging rocks

Country Status (1)

Country Link
SU (1) SU977789A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047236A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Repair method of vehicle bump pavement of bridgehead
CN104047235B (en) * 2014-05-26 2016-04-27 江苏鼎泰工程材料有限公司 The Bridge back wall place of road pavement carries out the method for repairing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104047236A (en) * 2014-05-26 2014-09-17 江苏鼎泰工程材料有限公司 Repair method of vehicle bump pavement of bridgehead
CN104047236B (en) * 2014-05-26 2016-04-13 江苏鼎泰工程材料有限公司 The restorative procedure on bumping at bridge-head road surface
CN104047235B (en) * 2014-05-26 2016-04-27 江苏鼎泰工程材料有限公司 The Bridge back wall place of road pavement carries out the method for repairing

Similar Documents

Publication Publication Date Title
CN106194244B (en) Lower permeability seam liquid phase CO2Phase transformation fracturing is anti-reflection grid type gas pumping method
RU2537711C1 (en) Erection of tunnels in structurally unstable soils with karst phenomena and/or boil processes
CN102878874A (en) Deep-hole pre-splitting blasting grouting method
SU977789A1 (en) Method for plugging rocks
CN110940242B (en) Blasting excavation method for deep crack containing slope rock mass
CN106285777B (en) The method that flood mine mineral building discharges water in advance
RU2038469C1 (en) Method of joining wells in soluble rock beds
CN113622907A (en) Single-hole synchronous monitoring method for movement and fracture distribution in coal seam mining overburden rock
RU2076923C1 (en) Method of formation of flagging screen in water-encroached rocks
RU2006581C1 (en) Process of destruction of rocks with driving of working in them
RU2002127100A (en) METHOD FOR DRIVING MINING DRAINAGE IN DISTURBED AND WATERWATED ARRAY
SU977836A1 (en) Method of erecting bridge in mine working
SU397867A1 (en) METHOD FOR ELIMINATING USED EXPLOSIVE DRILLS IN SEISMIC EXPLOSION
SU825962A1 (en) Method of controlling hard-to-cave roofs
SU688630A1 (en) Method of cementing rock in individual runs
SU812922A1 (en) Method of consolidating slopes
RU2059809C1 (en) Method for formation of kerf hollow
SU142241A1 (en) METHOD OF BLOODING THE NEW WELLS IN SIDE
SU987111A1 (en) Method of driving mine working along outburst-hazardous bed
RU2183273C2 (en) Method of rocks grouting with nonuniform jointing
RU2065955C1 (en) Method for formation of impervious paving
SU1656130A1 (en) Method of driving the under-vault part of large-span underground structure
SU1033751A1 (en) Method of hydraulic isolation of rock about mine working
SU1696713A2 (en) Method of drilling in-seam openings in seams prone to coal and gas bursts
SU1163000A1 (en) Method of fighting gas-dynamic phenomena in mines when driving entry workings