SU825962A1 - Method of controlling hard-to-cave roofs - Google Patents

Method of controlling hard-to-cave roofs Download PDF

Info

Publication number
SU825962A1
SU825962A1 SU792814282A SU2814282A SU825962A1 SU 825962 A1 SU825962 A1 SU 825962A1 SU 792814282 A SU792814282 A SU 792814282A SU 2814282 A SU2814282 A SU 2814282A SU 825962 A1 SU825962 A1 SU 825962A1
Authority
SU
USSR - Soviet Union
Prior art keywords
roof
hard
controlling hard
roofs
cave
Prior art date
Application number
SU792814282A
Other languages
Russian (ru)
Inventor
Геннадий Федосеевич Бобров
Григорий Егорович Посохов
Олег Игнатьевич Чернов
Original Assignee
Inst Gornogo Dela Sibirskogo O
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inst Gornogo Dela Sibirskogo O filed Critical Inst Gornogo Dela Sibirskogo O
Priority to SU792814282A priority Critical patent/SU825962A1/en
Application granted granted Critical
Publication of SU825962A1 publication Critical patent/SU825962A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

Изобретение относитс  к горной промышленности и может быть использовано при разработке угольных пластов с труцнообрушаемой кровлей. Известен способ управлени трудноо&рушаемой кровлей при разработке угольных пластов, включакхций бурение скважи в породы т|эуднообрушаемой кровли, размещение в скважинах зар дов взрывчатог вещества и взрывание указанных зар  дов 1J. Известен также способ управлени  труднообрушаемой кровлей при разработке угольных пластов, включающий бурение скважин в породы труднообрушаемой кров ли, герметизацию скважин и нагнетание в скважины жидкости до гидроразрыва по род 2j. Однако указанные способы в опреде,ленных горно-геологических услови х недостаточно эффективны. Цель изобретени  - повышение эффективности управлени  кровлей. Поставленна  цель достигаетс  тем, что в породах труднообрушаемой кровли изнутри каждой скважины прорезают щели, герметизируют каждую шель и производ т нагнетание жидкости, при этс и нагнетание жидкости производ т последовательно начина  от щели со стороны усть  скважины к щели со стороны забо  скважины, осуществл   послойный гидроразрыв. Способ осуществл етс  следующим образом . В породы труднообрушаемой кровли по заданной сетке 6 зависимости от конкретных гс но-геологических усповий нормально поверхности кровли бур т скважины. Затем на штанге станка, с помсшью которого пробурены скважины, креп т специальный инструмент, посредством которого изнутри каждой скважины прорезают щели, выполн ющие роль зародышевых трещин. После этого начина  от первой щели со стороны усть  скважины к щели со стороны забо  скважины каждую щель герметизируют и последовательно производ т нагнетанис жидкости в режиме гидроразрыва . Такое последовательное нагнетание жидкости с герметизацией каждой щели позвол ет получить послойный гидроразрыв с расслоением и последовательным изломом образующихс  слоев пород.The invention relates to the mining industry and can be used in the development of coal seams with a pipe-shielded roof. There is a known method of controlling a difficult-to-collapsible roof in the development of coal seams, including drilling a well in rocks of an eruptive roof, placing explosives in the wells, and blasting the indicated charges 1J. There is also known a method of controlling a hard-to-collapse roof when developing coal seams, including drilling wells in rocks of a hard-to-collapse roof, sealing wells and injecting fluid into wells before hydraulic fracturing (genus 2j). However, these methods are not effective enough in certain mining and geological conditions. The purpose of the invention is to increase the efficiency of roof management. The goal is achieved by slitting openings in the rocks of a hard-to-collapsing roof, slits are cut through each well and fluid is injected, and the fluid is injected sequentially from the wellhead to the slit from the bottom of the well, and hydraulic fracturing is performed. . The method is carried out as follows. In rocks of a hard-to-collapse roof, according to a given grid of 6, depends on the specific rc geo-geological conditions of the normal surface of the roof of the wellbore. Then, on the bar of the machine, with which the wells were drilled, a special tool is fastened, through which slits that play the role of germinal cracks are cut through the inside of each well. Thereafter, starting from the first slot from the wellhead side to the well bottom side, each slot is sealed and the fluid is subsequently injected in the fracture mode. Such sequential fluid injection with sealing of each slit allows to obtain layer-by-layer hydraulic fracturing with stratification and successive fracture of the resulting rock layers.

Предлагаемый способ позвол ет повысить эффективность управлени  К1эовдей.The proposed method makes it possible to increase the efficiency of the control of K1D.

Claims (2)

1.Авторское свидетельство СССР1. USSR author's certificate № 519542, кл. Е 21 С 41/О4, 1974.No. 519542, cl. E 21 C 41 / O4, 1974. 2.Авторское свидетельство СССР2. USSR author's certificate № 615730, кл. Е 21 С41/04, 1975.No. 615730, cl. E 21 C41 / 04, 1975.
SU792814282A 1979-08-23 1979-08-23 Method of controlling hard-to-cave roofs SU825962A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU792814282A SU825962A1 (en) 1979-08-23 1979-08-23 Method of controlling hard-to-cave roofs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU792814282A SU825962A1 (en) 1979-08-23 1979-08-23 Method of controlling hard-to-cave roofs

Publications (1)

Publication Number Publication Date
SU825962A1 true SU825962A1 (en) 1981-04-30

Family

ID=20848241

Family Applications (1)

Application Number Title Priority Date Filing Date
SU792814282A SU825962A1 (en) 1979-08-23 1979-08-23 Method of controlling hard-to-cave roofs

Country Status (1)

Country Link
SU (1) SU825962A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2472941C1 (en) * 2011-07-26 2013-01-20 Учреждение Российской академии наук Институт горного дела Сибирского отделения РАН Coal bed hydraulic fracturing method
RU2659292C1 (en) * 2017-03-06 2018-06-29 Федеральное государственное бюджетное научное учреждение "Федеральный исследовательский центр угля и углехимии Сибирского отделения Российской академии наук (ФИЦ УУХ СО РАН) Method of efficient management of hard-to-break roof in mechanized faces

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2472941C1 (en) * 2011-07-26 2013-01-20 Учреждение Российской академии наук Институт горного дела Сибирского отделения РАН Coal bed hydraulic fracturing method
RU2659292C1 (en) * 2017-03-06 2018-06-29 Федеральное государственное бюджетное научное учреждение "Федеральный исследовательский центр угля и углехимии Сибирского отделения Российской академии наук (ФИЦ УУХ СО РАН) Method of efficient management of hard-to-break roof in mechanized faces

Similar Documents

Publication Publication Date Title
SU825962A1 (en) Method of controlling hard-to-cave roofs
RU2388911C2 (en) Complex method for development of beds that are dangerous by gas and dust, disposed to mountain bumps and spontaneous emissions
RU2076923C1 (en) Method of formation of flagging screen in water-encroached rocks
SU1168731A1 (en) Method of opening up a gently-sloping seam with spontaneous coal and gas outburst hazards
SU823580A1 (en) Method of mining sloping coal seams
SU812922A1 (en) Method of consolidating slopes
SU1453022A1 (en) Method of driving mine working
RU2455488C2 (en) Method to recover outbalance reserves in combined development of coal beds
SU1155774A1 (en) Method of traversing with bed-following workings the zones of increased rock pressure formed by pillars of coal and marginal parts of adjoining beds
SU1239336A1 (en) Method of mining thick mineral deposits
RU2015329C1 (en) Method for mining thick salt outburst-prone seams with complicated hypsometry of their occurrence
SU898080A1 (en) Mine shaft sinking method
RU2215146C1 (en) Method of salt deposit mining
SU1717823A1 (en) Method of ore mining under complicated mining and geological conditions
RU2059817C1 (en) Method for mining thick steeply dipping coal seams with filling of worked-out space
SU1705576A1 (en) Method of protection of mine vertical shafts
SU1125373A1 (en) Method of mining unstable ores
SU1553679A1 (en) Method of control of solid roof in layer-wise mining of sloping seams
RU96109970A (en) COMBINED METHOD FOR DEVELOPING STEPS OF STEEP COAL COAST
RU2083833C1 (en) Method for development of steep coal seams with backing worked-out area
SU987111A1 (en) Method of driving mine working along outburst-hazardous bed
SU934052A1 (en) Method of starting a sloping coal bed by entry-driving set
SU1479655A1 (en) Method of water insulation of vertical shafts
SU914773A1 (en) Method of filling an excavated space
SU617601A1 (en) Method of drawing pillars at chamber-and-pillar system of mining minerals