SU1155774A1 - Method of traversing with bed-following workings the zones of increased rock pressure formed by pillars of coal and marginal parts of adjoining beds - Google Patents

Method of traversing with bed-following workings the zones of increased rock pressure formed by pillars of coal and marginal parts of adjoining beds Download PDF

Info

Publication number
SU1155774A1
SU1155774A1 SU833609590A SU3609590A SU1155774A1 SU 1155774 A1 SU1155774 A1 SU 1155774A1 SU 833609590 A SU833609590 A SU 833609590A SU 3609590 A SU3609590 A SU 3609590A SU 1155774 A1 SU1155774 A1 SU 1155774A1
Authority
SU
USSR - Soviet Union
Prior art keywords
workings
zones
rock pressure
outburst
pressure
Prior art date
Application number
SU833609590A
Other languages
Russian (ru)
Inventor
Михаил Александрович Ильяшов
Иван Алексеевич Новичихин
Николай Владимирович Кротов
Владислав Павлович Кузнецов
Илья Григорьевич Узбек
Валерий Васильевич Хилько
Original Assignee
Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела filed Critical Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела
Priority to SU833609590A priority Critical patent/SU1155774A1/en
Application granted granted Critical
Publication of SU1155774A1 publication Critical patent/SU1155774A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

СПОСОБ ПЕРЕХОДА ПЛАСТОВЬМИ ВЫРАБОТКАМИ ЗОН ПОВЫШЕННОГО ГОРНОГО ДАВЛЕНИЯ, ФОРМИРУЕМЫХ ЦЕЛИКАМИ УГЛЯ И КРАЕВЫМИ ЧАСТЯМИ СМЕЖНЫХ ПЛАСТОВ на выбросоопасных пластах, включающий проведение пластовых выработок с применением противовыбросных меропри тий и контроль эффективности их применени , отличающийс  тем, что, с целью повышени  безопасности проведени  горных выработок в зонах повышенного горного давлени  на выбросоопасных пластах, по направлению горных выработок в каждой зоне повьипенного горного давлени  предварительно определ ют показатель k напр женности массива по формуле iTRANSFER PROCESS increased rock pressure at outburst formations, in the direction of the mine workings in each zone of the puffy rock pressure make the index k of the array intensity by the formula i

Description

Изобретение относитс  к горкой промышленности и может быть использозано при ведении горных работ в зонах повышенного горного давлени . Известен способ эффективной защиты от внезапных выбросов при ведении горних работ в зонах повышенного горного давлени , включакидий надработку (подработку) этих зон защитным пластом , расположенным на определенном рассто нии от выбросоопасного пласта D1Недостатком способа  вл етс  ограниченна  область применени . Известен способ перехода пластовыми выработками зон повышенногг горного давлени , формируемых целиками угл  и краевыми част ми смежных пластов на выбросоопасных пластах, включанлций проведение пластовых вьфаботок с npHменением противовыброснмх меропри тий и контроль эффективности их примене-ни  C2J, Недостатком способа  вл етс  сниже ние безопасности проведени  горных выработок в зонах повышенного горного давлени  Цель изобретени  - повышение безопасности проведени  горных выработок в зонах повышенного горного давлени . Поставленна  цель достигаетс  тем, что согласно способу, включак цему проведение пластовых выработок с применением противовыбросных меропри тий и контроль эффективности их применени  по направлению горных выработок в К 1ждой зоне повышенного горного давле ни , формируемой целиками угл  и крае част ми смежных пластов, предварительно определ ют показатель напр женности К массива по формуле , - - -1Ч . ) где Hi - глубина залегани  i-го целика (краевой части), м Ь; - рассто ние от -го целика (краевой части) до выбросоопасного пласта, м, и при К 7 1 зоны повышенного горного давлени  относ т к особо выбросоопасным зонам, а при подходе пластовых вы работок к этим зонам выработки заглуб  ют в породы почвы нарассто ние Ь от почвы пласта, определ емое из ыражени  Ъ 10-0,125(R -40), м, де R - прочность пород на сжатие,Ша, с выводом этих выработок в пласт за границами особо выбросоопасных зон повьшенного горного давлени . Из заглубленных участков выработок бур т скважины и через них выполн ют противовыбросные меропри ти , например увлажнение, в особо выбросоопасных зонах повьппенного горного давлени , в которых в дальнейшем продолжают проведение пластовых выработок ., . На чертеже показано простирание разрабатываемой свиты угольных пластов с построенными зонами повьш1енного горного давлени , разрез вкрест. Способ осуществл ют следующим образом . От целиков угл  t и 2 и краевой части по известной методике стро т зоны 4-6 повьгшенного горного давлени  на выбросеопасньй пласт 7, по которому провод т выработки 8, По показателю К производ т оценку напр женности массива в зонах 4-6 повышенного горного давлени . При подходе пластовых вьфаботок 8 к особо выбросоопасным зонам 9 повышенного горного давлени  с к / 1 выработки заглубл ют в породы почвы на рассто ние Ь 10-0,125 (R -40)м от почвы угольного пласта, а после прохождени  указанных зон выработки вывод т в пласт. Затем из заглубленных участков выработок 10 бур т скважины и через них выполн ют противовыбросные меропри ти , например увлажнение, в зонах повышенного горного давлени  с показателем К /1, в которых в дальнейшем продолжают проведение пластовых выработок. Применение способа обеспечит повьщ1ение безопасности ведени . горных работ в зонах повьшенного горного давлени  на выбросоопасных угольных пластах.The invention relates to the mining industry and can be used in mining operations in areas of high mining pressure. A known method of effective protection against sudden outliers in the conduct of mining operations in areas of elevated rock pressure, including the additional working hours of these zones, is a protective formation located at a certain distance from the outburst-prone D1 formation. The disadvantage of this method is its limited scope. There is a method of transfer by reservoir workings of zones of elevated rock pressure, formed by the pillars of coal and edge parts of adjacent strata on outburst formations, including conducting reservoir exercises with control of blowout measures and monitoring the effectiveness of their use of C2J. The method has the disadvantage of reducing safety measures mine workings in areas of high rock pressure. The purpose of the invention is to increase the safety of mine workings in areas of high rock pressure. The goal is achieved by the fact that according to the method, including the carrying out of reservoir workings with the use of blowout preventive measures and monitoring the effectiveness of their use in the direction of mine workings in K 1, each zone of increased pressure, formed by the pillars of the coal and the edge of the adjacent layers, index of intensity K of the array by the formula, - - -1Ч. ) where Hi is the depth of the i-th pillar (marginal part), m b; - the distance from the pillar (edge) to the outburst formation, m, and at K 7 1, the zones of increased rock pressure are referred to as especially outburst zones, and at the approach of reservoir mining to these zones, the soil is buried in the rocks B from the soil of the reservoir, determined from expression 10–0.125 (R –40), m, de R — compressive strength of rocks, Sha, with the withdrawal of these workings into the reservoir beyond the boundaries of especially outburst zones of increased rock pressure. From the buried workings of the wells, and through them, blowout measures, such as moistening, are carried out in particularly outburst zones of secondary rock pressure, in which the formation workings continue to be carried out. The drawing shows the strike of the coal formations under development with the constructed rock pressure zones, the section across. The method is carried out as follows. From the pillars of coal t and 2 and the edge part, according to a well-known technique, zones 4–6 of the deposited rock pressure are erected on the outburst formation 7, according to which excavations 8 are carried out. According to the indicator K, the array intensity is estimated in zones 4–6 of the increased rock pressure . At the approach of the reservoir formations 8 to the high-emission zones 9 of elevated rock pressure with K / 1 of the excavation, they are buried in the soil rocks for a distance of L 10–0.125 (R-40) m from the soil of the coal seam, and after passing through the said production zones layer Then, from the recessed areas of the workings 10, wells are drilled and through them blowout measures, for example, moistening, in areas of elevated rock pressure with an indicator K / 1, in which the formation workings continue to be carried out. The application of the method will provide increased safety management. mining operations in areas of increased pressure on outburst coal seams.

3 Ю3 S

Claims (1)

СПОСОБ ПЕРЕХОДА ПЛАСТОВЫМИ ВЫРАБОТКАМИ ЗОН ПОВЫШЕННОГО ГОРНОГО ДАВЛЕНИЯ, ФОРМИРУЕМЫХ ЦЕЛИКАМИ УГЛЯ И КРАЕВЫМИ ЧАСТЯМИ СМЕЖНЫХ ПЛАСТОВ на выбросоопасных пластах, включающий проведение пластовых выработок с применением противовыбросных мероприятий и контроль эффективности их применения, отличающийся тем, что, с целью повышения безопасности проведения горных выработок в зонах повышенного горного давления на выбросоопасных пластах, по направлению горных выработок в каждой зоне повьппенного горного давления предварительно определяют показатель К напряженности массива по формуле где И; - глубина залегания ί-го целика (краевой части)JMETHOD FOR TRANSITION BY PLASTIC PRODUCTION OF ZONE OF INCREASED MINING PRESSURE FORMED BY COALS AND EDGE PARTS OF ADJACENT LAYERS on outburst formations, including conducting reservoir workings with the use of anti-blowout measures and monitoring the effectiveness of mining in order to increase the safety of their use rock pressure on outburst formations, in the direction of the mine workings in each zone of the increased rock pressure, they are preliminarily determined the indicator K of the intensity of the array according to the formula where And; - the depth of the ί-th pillar (edge) J - расстояние от ϊ-го целика (краевой части) до выбросоопасного пласта, м, и при К 1 зоны повышенного горного давления относят к особо выбросоопасным зонам, а при подходе пластовых выработок к этим зонам выработки заглубляют в породы почвы на расстояние t> от почвы пласта, определяемое из выражения- the distance from the ϊ-th pillar (marginal part) to the outburst stratum, m, and at K 1 the zones of high rock pressure are classified as particularly outburst-hazardous zones, and when the workings approach these workout zones, they are buried in soil rocks at a distance t> from the soil formation determined from the expression Ь 4 10-0,125(8 -40), м, где R - прочность пород на сжатие, МПа, с выводом этих выработок в пласт за границами особо выбросоопасных зон повьнпенного горного давления, из заглубленных участков выработок бурят скважины и через них выполняют противовыбросные мероприятия в особо выбросоопасных зонах повьппенного горного давления, в которых в дальнейшем продолжают проведение пластовых выработок .B 4 10-0.125 (8 -40), m, where R is the compressive strength of the rocks, MPa, with the output of these workings into the reservoir beyond the boundaries of the particularly outburst zones of high pressure, from the buried sections of the workings, wells are drilled and anti-blowout measures are carried out through them in particularly hazardous areas of high rock pressure, in which reservoir workings are subsequently continued. SU ,,,,1155774SU ,,,, 1155774 1 11557741 1155774
SU833609590A 1983-06-21 1983-06-21 Method of traversing with bed-following workings the zones of increased rock pressure formed by pillars of coal and marginal parts of adjoining beds SU1155774A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833609590A SU1155774A1 (en) 1983-06-21 1983-06-21 Method of traversing with bed-following workings the zones of increased rock pressure formed by pillars of coal and marginal parts of adjoining beds

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833609590A SU1155774A1 (en) 1983-06-21 1983-06-21 Method of traversing with bed-following workings the zones of increased rock pressure formed by pillars of coal and marginal parts of adjoining beds

Publications (1)

Publication Number Publication Date
SU1155774A1 true SU1155774A1 (en) 1985-05-15

Family

ID=21069959

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833609590A SU1155774A1 (en) 1983-06-21 1983-06-21 Method of traversing with bed-following workings the zones of increased rock pressure formed by pillars of coal and marginal parts of adjoining beds

Country Status (1)

Country Link
SU (1) SU1155774A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Инструкци по безопасному ведению горных работ на пластах, склонных к внезапным выбросам угл , породы и газа. М., Недра, 1977, с. 47, рис. 15. 2. Николин В.И., Болинченко И.М., Симонов А.А. Борьба с выбросами угл и газа в шахтах. М., Недра, 1981, с. 176 (прототип). *

Similar Documents

Publication Publication Date Title
CN112879011B (en) Method for controlling height of water guide crack zone by hard overburden rock pre-cracking weakening under aquifer
CN106014407A (en) Method for controlling disasters by utilizing roof crevice water to weaken main control coal seams and rock strata in situ
Zhu et al. Overburden movement characteristics of top-coal caving mining in multi-seam areas
CN111827878A (en) Method for quickly and accurately probing hidden water inrush channel of coal seam floor
CN107227959B (en) A kind of in-place blasting out boundary coal column/body promotes the water damage control method of closing of fracture
SU1155774A1 (en) Method of traversing with bed-following workings the zones of increased rock pressure formed by pillars of coal and marginal parts of adjoining beds
RU2441167C1 (en) Method for draining out of gases in superimposed seam
CN110985123A (en) High-pressure hydraulic pre-cracking dangerous impact ore pressure crossheading roadway drilling arrangement method
SU825962A1 (en) Method of controlling hard-to-cave roofs
SU836364A1 (en) Method of preventing dynamic phenomena at working of coal beds
SU1490285A1 (en) Method of producing counter-seepage curtain inwertical mine working
SU1348528A1 (en) Method of safeguarding mine workings
CN115288632B (en) Design method for preventing first-row drilling damage of separation layer grouting
CN219548878U (en) Safe green mining device based on overburden separation layer grouting
SU1756585A1 (en) Method for mining gassy and outburst-prone strata
SU1239336A1 (en) Method of mining thick mineral deposits
SU1209894A1 (en) Method of preventing spontaneous outbursts in elevated rock pressure zones
RU2083827C1 (en) Method for development of mineral seam formations
SU1348454A1 (en) Method of protecting objects against adverse effects of underground workings
RU2019705C1 (en) Method for control of heaving of mine working floor
SU1659659A1 (en) Method of traversing an outburst-prone coal seam by mine working
RU2215146C1 (en) Method of salt deposit mining
SU1578336A1 (en) Method of regional control of rock pressure in mining series of strata
SU1642007A1 (en) Method of rock pressure control in mining of a mineral bed
SU1190034A1 (en) Method of working adjoining mineral beds