SU1642007A1 - Method of rock pressure control in mining of a mineral bed - Google Patents

Method of rock pressure control in mining of a mineral bed Download PDF

Info

Publication number
SU1642007A1
SU1642007A1 SU884476594A SU4476594A SU1642007A1 SU 1642007 A1 SU1642007 A1 SU 1642007A1 SU 884476594 A SU884476594 A SU 884476594A SU 4476594 A SU4476594 A SU 4476594A SU 1642007 A1 SU1642007 A1 SU 1642007A1
Authority
SU
USSR - Soviet Union
Prior art keywords
mining
rocks
shock wave
workings
delineating
Prior art date
Application number
SU884476594A
Other languages
Russian (ru)
Inventor
Трофим Васильевич Сон
Анатолий Афанасьевич Федянин
Георгий Геннадиевич Ким
Original Assignee
Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КНИУИ"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КНИУИ" filed Critical Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КНИУИ"
Priority to SU884476594A priority Critical patent/SU1642007A1/en
Application granted granted Critical
Publication of SU1642007A1 publication Critical patent/SU1642007A1/en

Links

Abstract

Изобретение относитс  к горной промети , Цель изобретени  - повышение безопасности горных работ при наличии обводненных пород в кровле (К). Впереди очистного забо  из оконтуривающих выработок бур т в обводненные породы К скважины (С) Затем на породы К через С воздействуют ударной волной, например взрыванием в С зар дов ВВ. Под воздействием ударной волны происходит разделение твердой и жидкой фаз и формирование несущего сло  в К. Дл  плавного опускани  вышележащей толщи через несущий слой бур т дополнительные С Их обсаживают перфорированными трубами и выпускают через них жидкую фазу. 2 ил.The invention relates to mining promet. The purpose of the invention is to improve the safety of mining operations in the presence of water-cut rocks in the roof (K). Ahead of the sewage from the delineating workings, we drill into the flooded rocks of the K well (C). Then, rocks K through C are impacted by a shock wave, for example, blasting C explosive charges. Under the influence of a shock wave, the solid and liquid phases are separated and the supporting layer is formed in K. For a smooth lowering of the overlying stratum through the supporting layer, additional C is drilled. They are planted with perforated pipes and release the liquid phase through them. 2 Il.

Description

Изобретение относитс  к горной промышленности и предназначено дл  управлени  торным давлением при разработке пластов полезных ископаемых.The invention relates to the mining industry and is intended to control torus pressure in the development of mineral formations.

Цель изобретени  - повышение безопасности горных работ при наличии обводненных пород в кровлеThe purpose of the invention is to improve the safety of mining in the presence of flooded rocks in the roof

На фиг. 1 представлена схема бурени  скважин из оконтурировающих выработок; на фиг. 2 - выпуск жидкой фазы через дополнительные скважины.FIG. 1 shows a well drilling pattern from contour workings; in fig. 2 - release of the liquid phase through additional wells.

Способ осуществл ют следующим образом .The method is carried out as follows.

При проведении оконтуривающих выработок конвейерного 1 и вентил ционного 2 штреков в плоскости, параллельной поперечному сечению выработок, бур т впереди очистного забо  скважины, которые обсаживают металлическими грубами 3, один конец которых заглушен. В трубы помещают, например, зар д ВВ 4 с помощью зар дной машины или вручную. Величина зар да ВВWhen conducting delineating workings of conveyor 1 and ventilation 2 drifts in a plane parallel to the cross-section of the workings, we drill in front of the treatment hole of the well, which are surrounded with metal rough 3, one end of which is plugged. The tubes are placed, for example, the charge of explosive 4 using a charging machine or manually. Value of charge and explosive

в одной трубе зависит от длины скважины и рассто ни  между зар дами От почвы обводненных пород, например плывуна, зар д располагают на рассто нии Нin one pipe it depends on the length of the well and the distance between the charges. From the soil of the watered rocks, such as mud, the charge is located at the distance H

После размещени  зар дов ВВ их взрывают и ударной волной раздел ют плывун на твердую 5 и жидкую 6 фазы, чем формируют несущий слои в кровле Твердые частицы 5 по истечении определенного времени консолидируютс  и не поддаютс  обратному разжижению Дл  выпуска жидкой фазы 6 и плавного опускани  вышележащих пород из конвейерного штрека 1 через несущий слой бур т дополнительные скважины и обсаживают их перфорированными трубами 7, через которые выпускают жидкую фазу 6.After placement of explosives, they are blown up and the shockwave separates the plivun into solid 5 and liquid 6 phases, which form the bearing layers in the roof. Solid particles 5 after a certain time consolidate and do not reverse liquidate. To release the liquid phase 6 and smoothly lower overlying rocks From the conveyor drift 1, additional wells are drilled through the bearing layer and they are surrounded with perforated pipes 7, through which the liquid phase 6 is discharged.

Дл  более полного выпуска жидкой фазы 6 при проходке монтажной камеры 8 производ т такие же работы, как и в штреке 1, т.е. бур т дополнительные скважины обсаСПFor a more complete release of the liquid phase 6, the same works as in drift 1, i.e. drill additional wells obasSP

сwith

о ю о оoh oh oh

VIVI

живают их перфорированными трубами и через них выпускают жидкую фазу 6.live by their perforated pipes and through them release the liquid phase 6.

Claims (1)

Работы по формированию несущего сло  ведут по мере проведени  штреков 1 и 2 либо сразу по окончании их проведени . Формула изобретени  Способ управлени  горным давлением при разработке пласта полезного ископаемого , включающий бурение скважин из оконтуривающих выработок впереди очистного забо  и воздействие на породы кровли ударной волной, отличающийс  тем, что, с целью повышени  безопасности горных рэбсч npw наличии обводненных породWork on the formation of the carrier layer is carried out as drifts 1 and 2 are made or immediately after they are completed. Claim method The method of controlling rock pressure in mining a mineral reservoir, including drilling wells from delineating workings ahead of a clearing and impacting roof rocks with a shock wave, characterized in that, in order to increase the safety of mining rebsch npw, the presence of flooded rocks в кров е. в последней формируют несущий слой разделением твердой и жидкой фаз ударной волной, затем из оконтуривающих выработок бур т дополнительные скважины через несущий слой и выпускают по нимin the blood, in the latter, a carrier layer is formed by separating the solid and liquid phases with a shock wave, then additional wells are drilled from the delineating workings through the carrier layer and are discharged through them жидкую фазу.liquid phase. .-:Л:тг .-: L: tg // 77 Редактор А. ДолиничEditor A. Dolinich 8/, Фиг, I 8 /, I Составитель Б. МашковцевCompiled by B. Mashkovtsev Техред М.МоргентэлКорректор Н.КорольTehred M. Morgentelkorrektor N. Korol JT Jt , ° . . о ,   , ° . about , -about . . . -о . -about //
SU884476594A 1988-06-17 1988-06-17 Method of rock pressure control in mining of a mineral bed SU1642007A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884476594A SU1642007A1 (en) 1988-06-17 1988-06-17 Method of rock pressure control in mining of a mineral bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884476594A SU1642007A1 (en) 1988-06-17 1988-06-17 Method of rock pressure control in mining of a mineral bed

Publications (1)

Publication Number Publication Date
SU1642007A1 true SU1642007A1 (en) 1991-04-15

Family

ID=21396643

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884476594A SU1642007A1 (en) 1988-06-17 1988-06-17 Method of rock pressure control in mining of a mineral bed

Country Status (1)

Country Link
SU (1) SU1642007A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 582402, хл. Е21 С 41/04, 1974. Авторское свидетельство СССР Nfe 883440,кл. Е 21 С 41/04, 1980 *

Similar Documents

Publication Publication Date Title
US4536035A (en) Hydraulic mining method
CA2789896C (en) Underground mining
US7493951B1 (en) Under-balanced directional drilling system
CN111058847B (en) Continuous large-aperture deep hole blasting mechanized mining method for thick and large ore body
GB2079823A (en) Mining method
SU1642007A1 (en) Method of rock pressure control in mining of a mineral bed
RU2148171C1 (en) Method of mineral deposit mining
RU2184850C1 (en) Method of underground mining of thick flat deposits of low-hardness ores
SU1071003A1 (en) Method of underground leaching of useful minerals from ore bodies
SU1028846A1 (en) Method of mining steep ore deposit
SU1642001A1 (en) Method of mining ore deposits
SU1298404A1 (en) Method of degassing coal-bearing strata
RU94026581A (en) Method for exploitation minerals deposits
SU1125373A1 (en) Method of mining unstable ores
SU714012A1 (en) Ore deposit mining method
SU1479683A1 (en) Method of degassing coal bed
SU1659656A1 (en) Method of winning panel pillars
SU1452992A1 (en) Method of remining of mineral deposits
SU1025890A1 (en) Method of working steep ore deposits
SU1666772A1 (en) Hydraulic fiiling of chambers
SU898080A1 (en) Mine shaft sinking method
SU700653A1 (en) Method of driving ascending mine workings
SU720161A1 (en) Method of mining steep sloping ore bodies
SU901525A1 (en) Method for combined working of steeply sloping mineral deposits
SU1293342A1 (en) Method of hydraulic mining of minerals through wells