SU901525A1 - Method for combined working of steeply sloping mineral deposits - Google Patents
Method for combined working of steeply sloping mineral deposits Download PDFInfo
- Publication number
- SU901525A1 SU901525A1 SU802918336A SU2918336A SU901525A1 SU 901525 A1 SU901525 A1 SU 901525A1 SU 802918336 A SU802918336 A SU 802918336A SU 2918336 A SU2918336 A SU 2918336A SU 901525 A1 SU901525 A1 SU 901525A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- mining
- collapse
- zone
- underground
- quarry
- Prior art date
Links
Landscapes
- Earth Drilling (AREA)
- Drilling And Exploitation, And Mining Machines And Methods (AREA)
Description
Изобретение относится к горной промышленности и может быть использовано при разработке крутопадающих залежей полезных ископаемых.The invention relates to the mining industry and can be used in the development of steeply dipping mineral deposits.
Известен способ комбинированной , разработки крутопадающих залежей 5 полезных ископаемых, включающий совместное в вертикальной плоскости ведение открытых и подземных горных работ [1].There is a method of combined development of steeply dipping deposits of 5 minerals, including joint vertical and open mining underground mining [1].
Известен также способ комбинированной разработки крутопадающих залежей полезных ископаемых, включающий ведение открытых горных работ в карьере совместно с ведением подземных горных работ, образующих зо- 15 ну обрушения в пределах карьера [21.It is also known a combination of steep development of mineral deposits, including the conduct of open pit mining in the quarry, together with the conduct of underground mining, forming zo- 15 well collapse within Career [21.
Однако оба указанных способа характеризуются недостаточной эффектив- _ ностью.However, both of these methods are characterized by insufficient efficiency.
Цель изобретения - повышение эффективности комбинированной разработки .The purpose of the invention is to increase the efficiency of combined development.
Поставленная цель достигается тем, что фронт горных работ в карьере развивают вокруг зоны обрушения от подземных работ с оставлением временных целиков вокруг последней, при этом выпуск горной массы из зоны обрушения производят из подземных выработок со скоростью понижения уровня зоны обрушения равной скорости понижения горных работ в карьере.This goal is achieved by the fact that the front of mining operations in the quarry is developed around the collapse zone from underground operations, leaving temporary pillars around the latter, while the release of the rock mass from the collapse zone is made from underground workings with a rate of decrease in the level of the collapse zone equal to the speed of lowering mining operations in the quarry .
Временные целики погашают путем их разбуривания горизонтальными скважинами .из карьера и взрывания зарядов взрывчатого вещества в указанных скважинах.Temporary pillars are repaid by drilling them with horizontal wells. From a quarry and detonating explosive charges in these wells.
Способ заключается в следующем.The method is as follows.
При разработке крутопадающих рудных залежей одновременно ведут открытые горные работы в карьере и подземные горные работы. В результате подземных горных работ в пределах карьера образуется зона обрушения. Фронт открытых горных работ развивают вокруг указанной зоны обрушения ?0 с оставлением временных целиков вокруг этой зоны. Горную массу из зоны обрушения выпускают на подземном горизонте в выработки, при этом выпуск производят таким образом, чтобы скорость понижения уровня зоны обрушения была равна скорости понижения горных работ в карьере. По мере понижения горных работ временные целики у зоны обрушения погашают путем разбуривания их горизонтальными скважинами из карьера и взрывания в указанных скважинах зарядов взрывчатого вещества.When developing steeply falling ore deposits, open pit mining and underground mining are simultaneously conducted. As a result of underground mining, a collapse zone forms within the quarry. The front of open-pit mining is developing around the indicated zone of collapse? 0, leaving temporary pillars around this zone. The rock mass from the collapse zone is released on the underground horizon into the mine workings, while the release is made so that the rate of decrease in the level of the collapse zone is equal to the rate of decrease in mining operations in the quarry. As mining operations decrease, temporary pillars near the collapse zone are extinguished by drilling them with horizontal wells from the quarry and blasting explosive charges in these wells.
Предлагаемый способ позволит повысить эффективность комбинированной разработки.The proposed method will improve the efficiency of combined development.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802918336A SU901525A1 (en) | 1980-04-25 | 1980-04-25 | Method for combined working of steeply sloping mineral deposits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802918336A SU901525A1 (en) | 1980-04-25 | 1980-04-25 | Method for combined working of steeply sloping mineral deposits |
Publications (1)
Publication Number | Publication Date |
---|---|
SU901525A1 true SU901525A1 (en) | 1982-01-30 |
Family
ID=20893196
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802918336A SU901525A1 (en) | 1980-04-25 | 1980-04-25 | Method for combined working of steeply sloping mineral deposits |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU901525A1 (en) |
-
1980
- 1980-04-25 SU SU802918336A patent/SU901525A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lozynskyi et al. | Using sectional blasting to improve the efficiency of making cut cavities in underground mine workings | |
SU901525A1 (en) | Method for combined working of steeply sloping mineral deposits | |
SU1461930A1 (en) | Method of combined mining of mineral deposits | |
SU1116177A1 (en) | Method of driving a mine working in rock body with gas-dynamic hazard | |
SU1634784A1 (en) | Method for sealing off mine workings | |
SU1125373A1 (en) | Method of mining unstable ores | |
SU1510453A1 (en) | Method of erecting storring in mine working | |
SU907254A1 (en) | Method of extinguishing voids | |
RU2047769C1 (en) | Method for working steeply dipping ore bodies | |
RU1802139C (en) | Method for driving raises | |
SU924497A1 (en) | Method of decreasing seismic effect at blasting in open pits | |
SU866201A1 (en) | Method of driving raises | |
SU591586A1 (en) | Method of mining slightly inclined thin orebodies with filling mined-out space with blasted rock | |
SU775320A1 (en) | Method of working gently sloping mineral deposits | |
SU901535A1 (en) | Method for driving mine shafts | |
SU1427076A1 (en) | Method of driving a mine working | |
O’telbayev | DETERMINATION OF FIELD BOUNDARY PARAMETERS IN DRILLING AND BLASTING PROCESSES IN OPEN PIT MINES | |
SU1625986A1 (en) | Method of mining mineral deposits | |
RU2078211C1 (en) | Method of mining thick steep coal seams | |
SU1627728A1 (en) | Method of preventing spontaneous outbursts of salt and gas | |
SU1518651A1 (en) | Method of mining benches in quarry | |
SU1666710A1 (en) | Method for development of mineral deposits | |
SU1659656A1 (en) | Method of winning panel pillars | |
SU639995A1 (en) | Method of shoring slopes | |
SU1314066A1 (en) | Method of mining ore bodies |