SU907254A1 - Method of extinguishing voids - Google Patents

Method of extinguishing voids Download PDF

Info

Publication number
SU907254A1
SU907254A1 SU802942242A SU2942242A SU907254A1 SU 907254 A1 SU907254 A1 SU 907254A1 SU 802942242 A SU802942242 A SU 802942242A SU 2942242 A SU2942242 A SU 2942242A SU 907254 A1 SU907254 A1 SU 907254A1
Authority
SU
USSR - Soviet Union
Prior art keywords
rocks
pillars
voids
width
collapse
Prior art date
Application number
SU802942242A
Other languages
Russian (ru)
Inventor
Анатолий Петрович Артеменко
Original Assignee
Институт горного дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт горного дела filed Critical Институт горного дела
Priority to SU802942242A priority Critical patent/SU907254A1/en
Application granted granted Critical
Publication of SU907254A1 publication Critical patent/SU907254A1/en

Links

Description

(54) СПОСОБ ПОГАШЕНИЯ ПУСТОТ(54) METHOD OF REPAYMENT OF EMPTINESS

1one

Изобретение относитс  к горной промышленности и может быть использовано при погашении пустот после отработки камерных запасов с открытым очистным пространством .The invention relates to the mining industry and can be used in the repayment of voids after mining chamber stocks with an open refining space.

Известен способ разработки рудных месторождений , включаюш,ий обрушение налегаюших пород на высоту, равную мош,ности рудного тела 1.There is a method of developing ore deposits, including the collapse of the overlying rocks to a height equal to the crush of the ore body 1.

Недостатком данного способа  вл етс  возможность внезапного обрушени  основной толши налегаюши.х пород.The disadvantage of this method is the possibility of a sudden collapse of the main stratum of the loose rocks.

Известен также способ погашени  пустот , включающий обрушение сло  пород вис чего бока в выработанное пространство над камерами и целиками в пределах шага естественного обрушени  2.There is also a known method for eliminating voids, which includes the collapse of a layer of rocks hanging on the sides of the excavated space above the chambers and pillars within the limits of the natural collapse step 2.

Недостатком данного способа  вл ютс  сравнительно большие затраты на обрушение сло  пород вис чего бока.The disadvantage of this method is the relatively high cost of collapsing the layer of rocks hanging on the sides.

Цель изобретени  - уменьшение затрат на обрушение сло  пород вис чего бока.The purpose of the invention is to reduce the cost of the collapse of the layer of rocks hanging on the sides.

Поставленна  цель достигаетс  тем, что обрушение сло  пород вис чего бока над камерами производ т в прилегающей к целикам зоне шириной равной 0,2-0,8 щирины целиков.The goal is achieved by the collapse of a layer of rocks hanging on the sides of the chambers in an area adjacent to the pillars with a width equal to 0.2-0.8 pitch width.

На фиг. 1 представлен план погашаемого выработанного пространства (пустоты) отработанной камеры; на фиг. 2 - разрез А-А на фиг. 1 после обрушени  сло  пород над камерами и целиками перед обрушением основной массы налегаюших пород.FIG. 1 shows the plan of the redeemed developed space (void) of the spent chamber; in fig. 2 shows section A-A in FIG. 1 after a layer of rocks collapses over chambers and pillars before the bulk of the overlying rocks collapses.

Способ погашени  пустот при разработке месторождений системами с открытым очистным пространством начинают, когда открытое очистное пространство 1, чередующеес  с блоковыми целиками 2, достигает площади, равной или превышающей площадь естественного шага обрушени  пород . Дл  этого породы вис чего блока 3 над блоковыми целиками и прилегающей к 15 ним зоне обуривают скважинами 4 из буровых выработок 5. Породы вис чего бока над целиками обуривают по схеме, обеспечивающей их отброс после взрыва в открытое очистное пространство.The method of settling the voids in the development of fields with systems with an open treatment space begins when the open treatment space 1, alternating with block pillars 2, reaches an area equal to or greater than the area of the natural rock break. For this breed, the hanging unit 3 above the block pillars and the zone adjacent to it is drilled with 4 wells from drilling workings 5. The rocks of the hanging of the sides above the pillars are loaded according to a scheme that ensures their waste after the explosion into the open treatment space.

Ширина обуривани  пород вис чего бо20 ка в прилегающей к целикам зоне равна или превышает ширину движушегос  сло  пород с учетом коэффициента их разрыхлени  после взрыва породных опор (ножек) над целиками или отдельных их частей при замедленном взрывании. Только при таких параметрах прилегающей зоны вс  отбита  порода над целиками поступает в открытое очистное пространство. Абсолютное значение ширины приграничной зоны измен етс  от 0,2 до 0,8 ширины целика и зависит от параметров буровзрывных работ и способа взрывани  зар дов взрывчатого веш,ества (ВВ). Минимальна  ширина приграничной к целикам зоны равн етс  0,2 и допускаетс  при рассто нии между веерами скважин 1 -1,5 м и взрывании скважинных зар дов с интервалом замедлени  между веерами превышающем 100 мс. Максимальную ширину приграничной зоны, равную 0,8 ширины целика примен ют при мгновенном взрывании всех зар дов ВВ над целиками.The width of the cutting of the rocks of the hang of the side in the zone adjacent to the pillars is equal to or greater than the width of the moving rock layer, taking into account the coefficient of their loosening after the explosion of the rock supports (legs) above the pillars or their individual parts during slow blasting. Only with such parameters of the adjacent zone, the rock above the pillars is repelled into the open clearing space. The absolute value of the width of the border area varies from 0.2 to 0.8 of the rear sight width and depends on the parameters of the drilling and blasting operations and the method of detonation of explosive charges. The minimum width of the border-to-pitch zone is 0.2 and is allowed when the distance between the fans of the wells is 1 -1.5 m and the blasting of the well charges with a slowdown interval between the fans is greater than 100 ms. The maximum width of the border zone, equal to 0.8 of the pillar width, is used for instant blasting of all explosive charges over the columns.

Породы вис чего бока над целиками и прилегающей, к ним зоне обрушают взрывным способом в определенной последовательности с замедлением между отдельными сло ми. За один массовый взрыв сначала обрущают породы в прилегающей к целикам зоне 1, затем породы над междукамерными целиками И и последними - породы над междублоковыми (междупанель ными) целиками III.The rocks of the sides of which hang over the pillars and the adjacent, to them, zone are collapsed in an explosive manner in a certain sequence with a slowdown between the individual layers. During one mass explosion, first, rocks are crushed in the adjacent to the pillars zone 1, then the rocks above the inter-chamber pillars I and the latter - the rocks above the interblock (inter-panel) pillars III.

В результате массового взрыва ВВ произойдет обнажение пород вис чего бока в пределах шага обрущени  пород и дальнейшее обрушение основной толши пород с погашением всех пустот.As a result of a massive explosion of explosives, outcrops of rocks will hang out, of which the sides will be within the limits of the rock collapse and further collapse of the main strata of rocks with all the voids canceled.

Предлагаемый способ погашени  пустот более экономичный по сравнению с известным за счет уменьшени  затрат на погашение пустот.The proposed void repayment method is more economical than the known one by reducing the costs of void repayment.

Экономический эффект тем выше, чем меньше удельный вес целиков в блоковых запасах руды. Максимальный экономический эффект получаетс  при использовании предлагаемого способа пргашени  пустот в самых устойчивых вмещающих породах .The economic effect is higher, the smaller the proportion of the pillars in the block ore reserves. The maximum economic effect is obtained when using the proposed method of production of voids in the most stable host rocks.

Claims (2)

1.Агошков М. И и Малахов Г. И. Подземна  разработка рудных месторождений. М., «Педра, 1966, с. 572.1. Agoshkov M. I and Malakhov GI. Underground mining of ore deposits. M., “Pedra, 1966, p. 572. 2.Авторское свидетельство СССР по за вке № 2363430103, кл. Е 21 С 4/06, 1976 (прототип).2. USSR author's certificate in application number 2363430103, cl. E 21 C 4/06, 1976 (prototype). II «Nl"Nl j 5j 5 ee
SU802942242A 1980-06-16 1980-06-16 Method of extinguishing voids SU907254A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU802942242A SU907254A1 (en) 1980-06-16 1980-06-16 Method of extinguishing voids

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU802942242A SU907254A1 (en) 1980-06-16 1980-06-16 Method of extinguishing voids

Publications (1)

Publication Number Publication Date
SU907254A1 true SU907254A1 (en) 1982-02-23

Family

ID=20902779

Family Applications (1)

Application Number Title Priority Date Filing Date
SU802942242A SU907254A1 (en) 1980-06-16 1980-06-16 Method of extinguishing voids

Country Status (1)

Country Link
SU (1) SU907254A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4601518A (en) * 1983-03-23 1986-07-22 Jcc Johnson Construction Company Ab Method of excavating rock caverns by blasting
RU2563857C1 (en) * 2014-10-10 2015-09-20 Общество с ограниченной ответственностью "Институт Гипроникель" Method of development of inclined ore deposits in range of bedding angles 15-35 degrees and thickness of ore bodies 15-30 meters with caving of ore and surrounding rocks

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4601518A (en) * 1983-03-23 1986-07-22 Jcc Johnson Construction Company Ab Method of excavating rock caverns by blasting
RU2563857C1 (en) * 2014-10-10 2015-09-20 Общество с ограниченной ответственностью "Институт Гипроникель" Method of development of inclined ore deposits in range of bedding angles 15-35 degrees and thickness of ore bodies 15-30 meters with caving of ore and surrounding rocks

Similar Documents

Publication Publication Date Title
SU907254A1 (en) Method of extinguishing voids
Kurchin et al. Calculation methodology of blasting and explosion operations' parameters for construction of horizontal and inclined excavations
RU2634597C1 (en) Method for developing mine workings and conducting stoping operations
RU2449240C1 (en) Method of ore and rock breakage in development of solid mineral deposits
SU1263868A1 (en) Method of controlling the strained state of rock about mine working
RU2184850C1 (en) Method of underground mining of thick flat deposits of low-hardness ores
SU1314066A1 (en) Method of mining ore bodies
SU1640515A1 (en) Method for breaking ore
SU901525A1 (en) Method for combined working of steeply sloping mineral deposits
SU1116177A1 (en) Method of driving a mine working in rock body with gas-dynamic hazard
RU2047768C1 (en) Method for working mineral deposits
SU1375819A1 (en) Method of mining thick ore deposits
RU2078211C1 (en) Method of mining thick steep coal seams
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
SU855209A1 (en) Method of caving overlapping rocks
SU994771A1 (en) Method of preventing outbursts of coal, rock and gas when driving preparatory workings
SU924497A1 (en) Method of decreasing seismic effect at blasting in open pits
SU1490419A1 (en) Method of moving rock by explosion
RU2074321C1 (en) Method for preventing rock ground in workings from heaving
RU2012804C1 (en) Method for protection of workings from rock pressure
RU1803559C (en) Method of mining thin and medium-thick seams of mineral resource out of protective pillars under water objects
SU1506109A1 (en) Method of protecting development workings
SU1362213A1 (en) Method of blast-breaking of rock
SU901535A1 (en) Method for driving mine shafts
SU1765403A1 (en) Mine field recompletion method