SU1765403A1 - Mine field recompletion method - Google Patents

Mine field recompletion method Download PDF

Info

Publication number
SU1765403A1
SU1765403A1 SU904881622A SU4881622A SU1765403A1 SU 1765403 A1 SU1765403 A1 SU 1765403A1 SU 904881622 A SU904881622 A SU 904881622A SU 4881622 A SU4881622 A SU 4881622A SU 1765403 A1 SU1765403 A1 SU 1765403A1
Authority
SU
USSR - Soviet Union
Prior art keywords
pillars
ore
chambers
workings
block
Prior art date
Application number
SU904881622A
Other languages
Russian (ru)
Inventor
Владимир Нилович Ельников
Аркадий Львович Требуков
Екатерина Федоровна Воскобойникова
Original Assignee
Научно-исследовательский институт по проблемам Курской магнитной аномалии им.Л.Д.Шевякова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-исследовательский институт по проблемам Курской магнитной аномалии им.Л.Д.Шевякова filed Critical Научно-исследовательский институт по проблемам Курской магнитной аномалии им.Л.Д.Шевякова
Priority to SU904881622A priority Critical patent/SU1765403A1/en
Application granted granted Critical
Publication of SU1765403A1 publication Critical patent/SU1765403A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Description

(21)4881622/03(21) 4881622/03

(22)11.11.90(22) 11.11.90

(46) 30.09.92. Бюл. № 36(46) 09/30/92. Bul Number 36

(71)Научно-исследовательский институт по проблемам Курской магнитной аномалии им. Л.Д.Шев кова(71) Research Institute for the Kursk Magnetic Anomaly L.D.Shev Kova

(72)В.Н.Ельников,.А.Л.Требуков и Е Ф.Воскобой никова(72) V.N. Yelnikov, .AL.T. Trebukov and E. F. Voskoboy Nikova

(56)Скорн ков Ю.Г. Системы разработки и комплексы самоходных машин при подземной добыче руд. М,: Недра, 1978, с. 62-66.(56) Skornov Yu.G. Development systems and complexes of self-propelled machines for underground mining of ores. M: Nedra, 1978, p. 62-66.

Авторское свидетельство СССР ГФ 1234629,кл. Е 21 С 41/16. 1984.USSR author's certificate GF 1234629, cl. E 21 C 41/16. 1984

(54) СПОСОБ ПОВТОРНОЙ ОТРАБОТКИ ШАХТНОГО ПОЛЯ(54) METHOD FOR REPEATED DEVELOPMENT OF MINE FIELD

(57)Изобретение относитс  к разработке рудных месторождений Цель - снижение(57) The invention relates to the development of ore deposits. The purpose is to reduce

затрат на добычу за счет уменьшени  объема буро-взрывных работ и подготовительно- нарезных выработок Способ осуществл ют следующим образом. Выемочный блок формируют вокруг четырех отработанных камер в границах, проход щих по центральным ос м междукамерных целиков, Обуривают рудный массив целиков глубокими взрывными скважинами. На первом этапе отработки производ т отбойку центральной части выемочного блока в границах, проход щих через центры отработанных камер После выпуска отбитой руды отбивают запасы целиков из периферийной части блока на обнаженную поверхность отработанных камер . Отбитую руду перемещают по выпускным и транспортным выработкам ранее отработанных камер. 2 ил.production costs due to a decrease in the volume of drilling and blasting operations and preparatory rifled workings. The method is carried out as follows. The extraction block is formed around four waste chambers within the boundaries passing along the central axes of interchamber pillars. The ore array of pillars is drilled with deep explosive wells. At the first stage of mining, the central part of the excavation block is broken within the boundaries passing through the centers of the spent chambers. After the release of the broken ore, stocks of pillars from the peripheral part of the block are beaten out onto the exposed surface of the spent chambers. Repulsed ore is moved through the exhaust and transport workings of previously spent chambers. 2 Il.

(L

СWITH

Изобретение относитс  к горной промышленности и может быть использовано при подземной разработке рудных месторождений .The invention relates to the mining industry and can be used in the underground mining of ore deposits.

Известен способ выемки целиков на пологих и наклонных пластах, в котором разрушение р дов целиков ведут последовательно по простиранию пласта очеред ми через один.A known method of excavation of pillars on flat and inclined seams, in which the destruction of a series of pillars is carried out successively along the strike of the reservoir in turns through one.

Недостатком этого способа  вл етс  повышенный объем подготовительно-нарезных выработок и увеличенный расход ВВ.The disadvantage of this method is the increased volume of preparatory-rifled workings and the increased consumption of explosives.

Наиболее близким по технической сущности и достигаемому результату  вл етс  способ обрушени  междукамерных целиков , согласно которому сначала производ т отбойку участков междукамерных целиков по границе блока, смежной с рудоспуском, а затем отбивают оставшиес  участки междукамерных целиков на образовавшеес  выработанное пространство и формируют при этом навал отбитой руды вдоль транспортной выработки.The closest in technical essence and the achieved result is a method of the collapse of intercameral pillars, according to which first the sections of intercameral pillars are broken along the block boundary adjacent to the ore pass, and then the remaining portions of the intercameral pillars are beaten to the resulting space and form the bulk of broken ore along the transport workings.

Недостатком этого способа  вл етс  большой объем подготовительно-нарезных выработок и взрывчатых веществThe disadvantage of this method is the large volume of preparatory-rifled workings and explosives.

Целью изобретени   вл етс  снижение затрат на добычу за счет уменьшени  объема буровзрывных работ и подготовительно- нарезных выработок.The aim of the invention is to reduce the cost of production by reducing the volume of drilling and blasting operations and preparatory rifled workings.

Поставленна  цель достигаетс  тем, что в способе, включающем обуривание рудного массива междукамерных целиков глубокими взрывными скважинами, отбойку запасов целиков в два этапа на открытое выработанное пространство камер, выпуск руды через выпускные выработки и доставку руды, шахтное поле отрабатывают выемочч оThe goal is achieved by the fact that in a method that involves drilling the ore massif between interchamber pillars by deep explosive wells, plowing up reserves of pillars in two stages into the open space of chambers, producing ore through exhaust workings and delivering the ore, the mine field

СПSP

1 о1 o

WW

ными блоками, которые формируют вокруг четырех отработанных камер в границах, проход щих по центральным ос м междукамерных целиков, на первом этапе отработки производ т отбойку центральной части вы- емочного блока в границах, проход щих через центры отработанных камер, и выпускуют руду через выпускные выработки отработанных камер, после выпуска руды из центральной части блока производ т отбой- ку запасов целиков из периферийной части блока на обнаженную поверхность отработанных камер.These blocks, which form around the four waste chambers within the boundaries passing along the central axes of interchamber pillars, at the first stage of mining, break down the central part of the extraction block within the boundaries passing through the centers of the spent chambers, and produce ore through the exhaust workings waste chambers, after the ore is released from the central part of the block, stocks of pillars from the peripheral part of the block are blasted onto the exposed surface of the waste chambers.

На фиг.1 изображена схема осуществлени  способа; на фиг.2 - разрез А-А на .фиг.1.Figure 1 shows a flow chart of the method; figure 2 - section aa on. 1.

Способ осуществл етс  следующим образом .The method is carried out as follows.

При первичной добыче рудной залежи камерами 1 были оставлены целики 2, кото- рые необходимо извлечь. Повторна  отработка запасов руды производитс  выемочными блоками, которые формируют вокруг четырех отработанных камер 1 в границах , проход щих по центральным ос м междукамерных целиков 3. Выемочный блок состоит Из центральной части 4, оконтуренной вертикальными плоскост ми 5, проход щих через центры отработанных камер и периферийной б, ограниченной вер- тикальными плоскост ми 3, Транспортные 7 и выпускные 8 выработки были пройдены ранее при отработке камер. Из выработок 9 бурового горизонта выемочный блок обури V During the primary mining of ore deposits, chambers 1 left pillars 2, which must be removed. Re-mining of ore reserves is carried out by excavation blocks that form around the four waste chambers 1 within the boundaries passing along the central axes of the inter-chamber pillars 3. The extraction block consists of the central part 4, outlined by vertical planes 5, passing through the centers of the spent chambers and peripheral b, bounded by vertical planes 3, Transport 7 and final 8 workings were passed earlier during the development of chambers. From the workings of 9 drilling horizon excavation block shoe V

вэют глубокими скважинами. Зар жают и взрывают вначале скважины первой очереди , т.е. центральную часть 4 выемочного блока, а затем после выпуска отбитой руды взрывают запасы целиков из периферийной части. При этом действие взрыва направл ют в сторону ранее отработанных камер, которые в данном случае служат обнаженной поверхностью.deep wells. First wells of the first stage are charged and exploded, i.e. the central part 4 of the excavation block, and then after the release of the broken ore, the reserves of the pillars from the peripheral part are blown up. In this case, the explosion effect is directed towards the previously spent chambers, which in this case serve as an exposed surface.

Claims (1)

Формула изобретени  Способ повторной отработки шахтного пол , включающий обуривание рудного массива междукамерных целиков глубокими взрывными скважинами, отбойку запасов целиков в два этапа на открытое выработанное пространство камер, выпуск руды через выпускные выработки и доставку руды, отличающийс  тем, что, с целью снижени  затрат на добычу за счет уменьшени  объема буровзрывных работ и подготовительно-нарезных выработок, шахтное поле отрабатывают выемочными блоками, которые формиру от вокруг четырех отработанных камер в границах, проход щих по центральным ос м междукамерных целиков, на первом этапе отработки производ т отбойку центральной части выемочного блока в границах, проход щих через центры отработанных камер, и выпускают руду через выпускные выработки отработанных камер, после выпуска руды из центральной части блока производ т отбойку запасов целиков из периферийной части блока на обнаженную поверхность отработанных камер.Claim Method A way to re-mine a mine floor, including drilling the ore massif between the chamber pillars by deep explosive wells, blasting the pillars in two stages into the open chamber space, ore production through exhaust workings and delivering the ore, characterized in that, in order to reduce the cost of production by reducing the volume of drilling and blasting operations and preparatory workings, the mine field is worked out by excavation blocks, which are formed from around four spent chambers into gran At the first stage of mining, the central part of the excavation block within the limits passing through the centers of the spent chambers is crushed at the first axes of the inter-chamber pillars, and the ore is discharged through the exhaust workings of the exhausted chambers. breaking down stocks of pillars from the peripheral part of the block to the bare surface of the spent chambers. Фиг. tFIG. t
SU904881622A 1990-11-11 1990-11-11 Mine field recompletion method SU1765403A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU904881622A SU1765403A1 (en) 1990-11-11 1990-11-11 Mine field recompletion method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU904881622A SU1765403A1 (en) 1990-11-11 1990-11-11 Mine field recompletion method

Publications (1)

Publication Number Publication Date
SU1765403A1 true SU1765403A1 (en) 1992-09-30

Family

ID=21544742

Family Applications (1)

Application Number Title Priority Date Filing Date
SU904881622A SU1765403A1 (en) 1990-11-11 1990-11-11 Mine field recompletion method

Country Status (1)

Country Link
SU (1) SU1765403A1 (en)

Similar Documents

Publication Publication Date Title
EP0692611B1 (en) Method for excavating a working face
RU2208221C2 (en) Method for selective mining extraction of qualitative mineral resource in open pit
RU2634597C1 (en) Method for developing mine workings and conducting stoping operations
SU1765403A1 (en) Mine field recompletion method
RU2184850C1 (en) Method of underground mining of thick flat deposits of low-hardness ores
SU883421A1 (en) Method of explosion-breaking of ore
SU1460275A1 (en) Method of excavating sloping mineral deposits
SU768985A1 (en) Method of working seam formations of minerals
RU2078211C1 (en) Method of mining thick steep coal seams
RU2047769C1 (en) Method for working steeply dipping ore bodies
SU1461930A1 (en) Method of combined mining of mineral deposits
RU2012804C1 (en) Method for protection of workings from rock pressure
SU840364A1 (en) Method of stripping worked-out blocks
SU787658A1 (en) Method of working sloping ore bodies
SU1666710A1 (en) Method for development of mineral deposits
SU1460276A1 (en) Method of excavating pillars in sloping seams
SU1234629A1 (en) Method of caving-in inter-chamber pillars
RU2046941C1 (en) Pillars demolition method
SU1659656A1 (en) Method of winning panel pillars
RU2101500C1 (en) Method of mining of thick steeply dipping seams by strings on the strike
RU2047765C1 (en) Method for development of inclined ore body
SU1113655A1 (en) Method of blasting mineral deposits
RU1840800C (en) Method for directed breaking of rocks
SU1645525A1 (en) Method of open-cast mining of inclined mineral deposits
SU901525A1 (en) Method for combined working of steeply sloping mineral deposits