RU2012804C1 - Method for protection of workings from rock pressure - Google Patents

Method for protection of workings from rock pressure Download PDF

Info

Publication number
RU2012804C1
RU2012804C1 SU4910095A RU2012804C1 RU 2012804 C1 RU2012804 C1 RU 2012804C1 SU 4910095 A SU4910095 A SU 4910095A RU 2012804 C1 RU2012804 C1 RU 2012804C1
Authority
RU
Russia
Prior art keywords
rocks
zone
circuit
production
wells
Prior art date
Application number
Other languages
Russian (ru)
Inventor
В.И. Штеле
Original Assignee
Красноярский отдел Института горного дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Красноярский отдел Института горного дела filed Critical Красноярский отдел Института горного дела
Priority to SU4910095 priority Critical patent/RU2012804C1/en
Application granted granted Critical
Publication of RU2012804C1 publication Critical patent/RU2012804C1/en

Links

Images

Abstract

FIELD: mining. SUBSTANCE: when driving working, two leading zones of camouflet blasting of rocks are formed. One zone within design outline of working, and the other, beyond the design outline. Formed between two zones of blasted rocks is ring-shaped pillar. Working driving is carried out with use of light explosive charges that reduces intensity of seismic effect on rocks adjacent to zone outlines. EFFECT: higher efficiency. 2 dwg

Description

Изобретение относится к горной промышленности и может быть использовано при ведении подземных горных работ на больших глубинах в условиях повышенного горного давления. The invention relates to the mining industry and can be used in underground mining at great depths under high rock pressure.

Известен способ, включающий создание камуфлетной зоны разрушенных горных пород и ее упрочнение. A known method, including the creation of a camouflage zone of destroyed rocks and its hardening.

Недостатком способа является низкая устойчивость выработки. The disadvantage of this method is the low stability of the output.

Наиболее близким аналогом по технической сущности и достигаемому результату является способ, включающий бурение опережающих скважин, размещение в них зарядов ВВ и камуфлетное разрушение горных пород за проектным контуром горной выработки. The closest analogue in technical essence and the achieved result is a method that includes drilling advanced wells, placing explosive charges in them and camouflage rock destruction beyond the design contour of the mine.

Недостатком способа является то, что при взрывной отбойке горных пород в процессе проходки выработки упрочненная зона камуфлетного разрушения подвергается интенсивному сейсмическому воздействию, что снижает устойчивость горной выработки. The disadvantage of this method is that during explosive breaking of rocks during mining, the hardened zone of camouflage destruction is subjected to intense seismic action, which reduces the stability of the mine.

Цель - повышение устойчивости горной выработки. The goal is to increase the stability of mining.

С этой целью, согласно известному изобретению, включающему бурение опережающих скважин по горным породам на расстоянии от проектного контура выработки, размещение в них зарядов ВВ и формирование зоны разрушенных горных пород камуфлетным взрыванием за контуром выработки и проведение выработки, опережающие скважины бурят дополнительно внутри контура выработки и оформляют зону неразрушенных пород за контуром выработки формированием зоны разрушенных пород камуфлетным взрыванием дополнительных скважин внутри контура выработки. To this end, according to the well-known invention, comprising drilling leading wells in rocks at a distance from the design development circuit, placing explosive charges in them and forming a zone of destroyed rocks by camouflage blasting behind the production circuit and conducting production, leading wells are additionally drilled inside the production circuit and they form the zone of undestructed rocks behind the production circuit by forming the zone of destroyed rocks by camouflage blasting of additional wells inside the production circuit.

На фиг. 1 показан продольный разрез по трассе выработки; на фиг. 2 - вертикальный разрез А-А на фиг. 1. In FIG. 1 shows a longitudinal section along a production line; in FIG. 2 is a vertical section AA in FIG. 1.

Способ заключается в следующем. The method is as follows.

По трассе выработки 1, в ее контуре, пробуривают одну или несколько параллельных скважин, которые заряжают ВВ, и производят камуфлетный взрыв с образованием зоны 2 разрушенных горных пород. Граница этой зоны может совпадать с проектным контуром выработки 1. Затем пробуривают скважины за контур выработки и производят опережающее разрушение горных пород камуфлетными взрывами с образованием замкнутой кольцевой зоны 3. Между зонами 2 и 3 разрушенных горных пород оставляют кольцевой целик 4. В зону 3 нагнетают упрочняющий раствор, например, цемента и производят ее передовое упрочнение. Затем осуществляют дальнейшую проходку выработки 1. При этом, учитывая наличие зоны 2 разрушенных пород, заряды ВВ в шпурах и их количество значительно уменьшают, что снижает сейсмическое воздействие взрывов при проходке на законтурные породы горной выработки 1. Это увеличивает ее устойчивость. Along the production line 1, in its circuit, one or several parallel wells are drilled that charge explosives and produce a camouflage explosion with the formation of zone 2 of destroyed rocks. The boundary of this zone may coincide with the design contour of production 1. Then, wells are drilled beyond the production circuit and the rocks are advanced by camouflage explosions to form a closed ring zone 3. An annular pillar is left between zones 2 and 3 of the destroyed rocks 4. A reinforcing ring is injected into zone 3 mortar, for example, cement and produce its advanced hardening. Then, excavation 1 is further drilled. Moreover, taking into account the presence of zone 2 of the destroyed rocks, explosive charges in the bore holes and their number are significantly reduced, which reduces the seismic effect of explosions during sinking on the near-edge rocks of mine 1. This increases its stability.

Claims (1)

СПОСОБ ЗАЩИТЫ ВЫРАБОТОК ОТ ГОРНОГО ДАВЛЕНИЯ, включающий бурение опережающих скважин по горным породам на расстоянии от проектного контура выработки, размещение в них зарядов ВВ, формирование зоны разрушенных пород камуфлетным взрыванием пород за контуром выработки и проведение выработки, отличающийся тем, что, с целью повышения устойчивости выработки, опережающие скважины бурят дополнительно внутри контура выработки и оформляют зону неразрушенных пород за контуром выработки формированием зоны разрушенных пород камуфлетным взрыванием дополнительных скважин внутри контура выработки. METHOD FOR PROTECTING PRODUCTIONS FROM MINING PRESSURE, including drilling leading wells in rocks at a distance from the design development circuit, placing explosive charges in them, forming a zone of destroyed rocks by camouflage blasting of rocks behind the production circuit, and conducting production, characterized in that, in order to increase stability workings, leading wells are drilled additionally inside the workout circuit and form an area of undisturbed rocks beyond the workout circuit by forming a zone of destroyed rocks by camouflage blasting we have additional wells inside the production circuit.
SU4910095 1991-02-11 1991-02-11 Method for protection of workings from rock pressure RU2012804C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU4910095 RU2012804C1 (en) 1991-02-11 1991-02-11 Method for protection of workings from rock pressure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU4910095 RU2012804C1 (en) 1991-02-11 1991-02-11 Method for protection of workings from rock pressure

Publications (1)

Publication Number Publication Date
RU2012804C1 true RU2012804C1 (en) 1994-05-15

Family

ID=21559888

Family Applications (1)

Application Number Title Priority Date Filing Date
SU4910095 RU2012804C1 (en) 1991-02-11 1991-02-11 Method for protection of workings from rock pressure

Country Status (1)

Country Link
RU (1) RU2012804C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2573663C1 (en) * 2014-12-03 2016-01-27 Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН) Relief of rock-bump and structurally disordered deposits

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2573663C1 (en) * 2014-12-03 2016-01-27 Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН) Relief of rock-bump and structurally disordered deposits

Similar Documents

Publication Publication Date Title
RU2208221C2 (en) Method for selective mining extraction of qualitative mineral resource in open pit
RU2012804C1 (en) Method for protection of workings from rock pressure
RU2634597C1 (en) Method for developing mine workings and conducting stoping operations
RU2001120175A (en) The method of selective extraction of high-quality minerals in the quarry
SU1263868A1 (en) Method of controlling the strained state of rock about mine working
SU1469137A1 (en) Roof control method
RU95107529A (en) Method of mining impact-risky seams in complex geological conditions
RU2019705C1 (en) Method for control of heaving of mine working floor
SU730965A1 (en) Method of breaking-out blowout-hazardous rock
SU1314066A1 (en) Method of mining ore bodies
RU2047769C1 (en) Method for working steeply dipping ore bodies
SU817253A1 (en) Method of driving a mine working
SU1071773A1 (en) Method of forming a partition in mine working
SU1446310A1 (en) Mine working protection method
SU1446304A1 (en) Method of explosion-induced relieving and subsequent consolidating of ground rock
SU675191A1 (en) Method of preventing rock burst shocks
SU1691527A1 (en) Method for preventing working soil from expanding
SU1180518A1 (en) Method of enhancing the stability of fissured rock when driving mine workings
SU791975A1 (en) Method of driving preparatory working in beds prezenting coal and gas outburst hazard
SU1469178A1 (en) Method of relieving rock around a working
SU617600A1 (en) Method of excavating mineral deposits
Rao et al. Effect of priming and explosive initiation location on pull in hard rock underground mine
RU2094613C1 (en) Method for driving underground working close to outburst-risky rock mass
SU898080A1 (en) Mine shaft sinking method
SU1004644A1 (en) Mine monitoring driving work