RU2001120175A - The method of selective extraction of high-quality minerals in the quarry - Google Patents

The method of selective extraction of high-quality minerals in the quarry

Info

Publication number
RU2001120175A
RU2001120175A RU2001120175/03A RU2001120175A RU2001120175A RU 2001120175 A RU2001120175 A RU 2001120175A RU 2001120175/03 A RU2001120175/03 A RU 2001120175/03A RU 2001120175 A RU2001120175 A RU 2001120175A RU 2001120175 A RU2001120175 A RU 2001120175A
Authority
RU
Russia
Prior art keywords
ore
wells
quality
ledge
strike
Prior art date
Application number
RU2001120175/03A
Other languages
Russian (ru)
Other versions
RU2208221C2 (en
Inventor
Андрей Андреевич Еременко
Сергей Николаевич Эйсмонт
Сергей Михайлович Смирнов
Григорий Михайлович Бурмин
Геннадий Павлович Ермак
Original Assignee
ОАО "Восточный научно-исследовательский горнорудный институт"
Filing date
Publication date
Application filed by ОАО "Восточный научно-исследовательский горнорудный институт" filed Critical ОАО "Восточный научно-исследовательский горнорудный институт"
Priority to RU2001120175A priority Critical patent/RU2208221C2/en
Priority claimed from RU2001120175A external-priority patent/RU2208221C2/en
Publication of RU2001120175A publication Critical patent/RU2001120175A/en
Application granted granted Critical
Publication of RU2208221C2 publication Critical patent/RU2208221C2/en

Links

Claims (1)

Способ селективной выемки качественного полезного ископаемого в карьере, включающий бурение скважин в соответствии с проектом массового взрыва, выполнение маркшейдерской съемки блока, изучение естественной блочности горных пород, оконтуривание качественной руды, заряжание скважин взрывчатым веществом, взрывание скважин и экскавацию полезного ископаемого по планограмме добычи руды, отличающийся тем, что в плане простирание борта уступа отработки блока устанавливается вкрест простирание биссектрисы угла α под углом:A method for selectively extracting high-quality minerals in a quarry, including drilling wells in accordance with a mass explosion project, performing surveying of a block, studying natural blocking of rocks, contouring high-quality ore, loading wells with explosives, exploding wells and excavating minerals from an ore mining planogram, characterized in that in terms of the extension of the side of the ledge of the mining block is set across the extension of the bisector of the angle α at an angle:
Figure 00000001
Figure 00000001
где β - угол между простиранием борта уступа и системой трещин I и II, градус;where β is the angle between the strike side of the ledge and the system of cracks I and II, degree; α - угол между простиранием систем трещин I, II градус, в контуре качественной руды бурится дополнительная не заряжаемая взрывчатым веществом скважина на расстоянии 4-6 диаметров скважины от взрываемой в первую очередь взрывной скважины для образования врубовой компенсационной полости, на которую в зажатой среде с замедлением взрываются скважины, пробуренные в качественной руде, скважины, пробуренные в рядовой руде взрываются группами с замедлением по схеме коммутации скважин, обеспечивающей направленную отбойку рядовой руды: в зоне между выработанным пространством и качественной рудой, локализованной внутри блока – в сторону выработанного пространства; в зоне, расположенной по обе стороны от локального участка качественной руды скважины коммутируются по простиранию основных крутопадающих систем трещин, отбойка производится в направлении от локального участка качественной руды; в зоне, расположенной между локальным участком качественной руды и невзрываемым горным массивом, скважины коммутируются вкрест простирания борта уступа, отбойка направлена на взорванную горную массу рядовой руды, таким образом формируют локальный участок крупнокусковой качественной руды не перемещенной взрывом на уступе и по высоте развала сопоставимой с высотой уступа отработки, а добыча этой руды ведется селективно во вторую очередь после добычи рядовой руды.α is the angle between the strike of crack systems I, II degrees, an additional non-explosive well is drilled in the high-quality ore circuit at a distance of 4-6 borehole diameters from the blast hole, primarily blast hole, to form a cut-in compensation cavity, into which, in a clamped medium, it slows down Wells drilled in high-quality ore explode, wells drilled in ordinary ore explode in groups with a slowdown according to the switching circuit of wells, which provides directional breakdown of ordinary ore: in the inter in the worked out space and high-quality ore localized inside the block - towards the worked out space; in the zone located on both sides of the local section of high-quality ore, the wells are switched along the strike of the main steeply falling fracture systems, breaking is carried out in the direction from the local section of high-quality ore; in the zone located between the local site of high-grade ore and the unexploded massif, the wells are switched across the strike of the ledge, the blast is directed to the blasted rock mass of the ordinary ore, thus forming a local section of lumpy high-quality ore not moved by the explosion on the ledge and the height of the collapse is comparable to the height of the collapse comparable to the height step of mining, and the extraction of this ore is carried out selectively in the second turn after the extraction of ordinary ore.
RU2001120175A 2001-07-18 2001-07-18 Method for selective mining extraction of qualitative mineral resource in open pit RU2208221C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2001120175A RU2208221C2 (en) 2001-07-18 2001-07-18 Method for selective mining extraction of qualitative mineral resource in open pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2001120175A RU2208221C2 (en) 2001-07-18 2001-07-18 Method for selective mining extraction of qualitative mineral resource in open pit

Publications (2)

Publication Number Publication Date
RU2001120175A true RU2001120175A (en) 2003-06-27
RU2208221C2 RU2208221C2 (en) 2003-07-10

Family

ID=29210050

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2001120175A RU2208221C2 (en) 2001-07-18 2001-07-18 Method for selective mining extraction of qualitative mineral resource in open pit

Country Status (1)

Country Link
RU (1) RU2208221C2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101266123B (en) * 2007-03-15 2012-07-04 鞍钢集团矿业公司 Crushing station pit digging method
RU2511330C2 (en) * 2012-07-16 2014-04-10 Федеральное государственное бюджетное учреждение науки ИНСТИТУТ ПРОБЛЕМ КОМПЛЕКСНОГО ОСВОЕНИЯ НЕДР РОССИЙСКОЙ АКАДЕМИИ НАУК (ИПКОН РАН) Method for large-scale explosive destruction of mine rock masses of complex structure for selective extraction of mineral deposit at open-pit mining
EA026718B1 (en) * 2014-03-28 2017-05-31 Республиканское Государственное Предприятие На Праве Хозяйственного Ведения "Казахский Национальный Технический Университет Имени К.И. Сатпаева" Министерства Образования И Науки Республики Казахстан Method for selective extraction of marginal minerals in open-pit mining
GB2530528A (en) * 2014-09-25 2016-03-30 Michael Mary Ignatius Mcloughlin Rock drill Position Analyser
RU2653172C1 (en) * 2017-06-13 2018-05-07 федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" Method of explosive preparation of mountain mass to selective excavation
CN110700836A (en) * 2018-07-09 2020-01-17 扎兰屯市国森矿业有限责任公司 Complex lead-zinc mine ore zoning, separate mining, sorting comprehensive development and utilization process
RU2738331C1 (en) * 2020-03-12 2020-12-11 федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" Method of explosive preparation for selective excavation of ore body and covering overburden rocks
CN112683119A (en) * 2020-12-23 2021-04-20 莱芜莱新铁矿有限责任公司 Electronic detonator underground blasting construction method
RU2758312C1 (en) * 2021-04-13 2021-10-28 Федеральное государственное бюджетное учреждение науки Хабаровский Федеральный исследовательский центр Дальневосточного отделения Российской академии наук (ХФИЦ ДВО РАН) Method for developing a stockwork type deposit

Similar Documents

Publication Publication Date Title
RU2001120175A (en) The method of selective extraction of high-quality minerals in the quarry
RU2208221C2 (en) Method for selective mining extraction of qualitative mineral resource in open pit
RU2279546C1 (en) Development method for rock or half-rock deposit with different block structures
RU2418167C1 (en) Method of underground development of thin veins
US4135450A (en) Method of underground mining
CN108362181A (en) A kind of driving recovery method of extra narrow vein ore body
RU2634597C1 (en) Method for developing mine workings and conducting stoping operations
RU2261326C1 (en) Loosening method for rock having different strength
CN108590651B (en) A kind of method of more drilling chamber recycling ore pillars
RU2215147C2 (en) Method of mining of inclined ore deposits
RU2449240C1 (en) Method of ore and rock breakage in development of solid mineral deposits
RU2757619C1 (en) Method for developing low-powered steel ore bodies
RU2200298C2 (en) Procedure of blast breaking of ore blocks cleaved by dike
RU2229602C2 (en) Method for driving vertical shaft
SU1461930A1 (en) Method of combined mining of mineral deposits
SU1411473A1 (en) Method of caving overburden
RU2332567C2 (en) Method of ore extraction from narrow veins employing thermal fragmentation of ore
RU2179243C1 (en) Method of driving of mine workings in mining of thin deposits of hard ores by shearer under conditions of high rock pressure
RU2307936C1 (en) Method for inclined ore deposit development
SU817253A1 (en) Method of driving a mine working
RU2224891C2 (en) Method for extracting mined blocks during subterraneous extraction of blind ore bodies
RU2203419C2 (en) Process of underground development of thick ore deposits
RU2012804C1 (en) Method for protection of workings from rock pressure
RU2659446C1 (en) Method for forming fissure cavity of any configuration in rock mass with use of parallely converged shear and blast-hole charges
RU2047765C1 (en) Method for development of inclined ore body