SU1375819A1 - Method of mining thick ore deposits - Google Patents

Method of mining thick ore deposits Download PDF

Info

Publication number
SU1375819A1
SU1375819A1 SU864099209A SU4099209A SU1375819A1 SU 1375819 A1 SU1375819 A1 SU 1375819A1 SU 864099209 A SU864099209 A SU 864099209A SU 4099209 A SU4099209 A SU 4099209A SU 1375819 A1 SU1375819 A1 SU 1375819A1
Authority
SU
USSR - Soviet Union
Prior art keywords
sections
workings
drilling
adjacent
section
Prior art date
Application number
SU864099209A
Other languages
Russian (ru)
Inventor
Леонид Маркович Цинкер
Владимир Викторович Болденков
Евгений Григорьевич Фурсов
Original Assignee
Восточный научно-исследовательский горнорудный институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Восточный научно-исследовательский горнорудный институт filed Critical Восточный научно-исследовательский горнорудный институт
Priority to SU864099209A priority Critical patent/SU1375819A1/en
Application granted granted Critical
Publication of SU1375819A1 publication Critical patent/SU1375819A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Изобретение относитс  к горно- добьгоающей пром-ти и позвол ет улучшить дробление руды и уменьшить сей- смическо:е воздействие взрывных работ. Способ включает проведение подготовительных , нарезных и буровых 3, 4 вы работок (БВ), выемку руды блоками, в пределах которых подготавливают выемочные секции. Причем БВ 4 в каждой секции проход т наклонно по диагонали секции. В смежных по ширине секци х в местах пересечени  БВ формируют камеры 5. Из них проход т БВ 3, 4 в секци х, смежных по высоте. Обурива- ние запасов каждой секции веерами горизонтальных скважин 7 осуществл ют навстречу друг другу из БВ 3, 4 отрабатываемой и смежных с ней секций. Скважины зар жают взрывчатым веществом , и последовательно их взрывают. 4 ил. CS лThe invention relates to the mining industry and allows for improved ore crushing and reduced seismic impact of blasting operations. The method includes carrying out preparatory, rifled and boring 3, 4 workings (BV), excavation of ore in blocks, within which the excavation sections are prepared. Moreover, BV 4 in each section runs obliquely along the diagonal of the section. In the sections adjacent in width at the intersections of the pool, chambers 5 are formed. Of them, the BVs 3, 4 pass in sections adjacent in height. The drilling of the reserves of each section with fans of horizontal wells 7 is carried out towards each other from the BV 3, 4 working out and adjacent sections. The wells are charged with explosives and subsequently exploded. 4 il. CS l

Description

Фиг.}Fig.}

113113

Изобретение относитс  к горнодобывающей промьгошенности и предназначено дл  отработки мощных месторождений полезных ископаемых подземным способом . The invention relates to the mining industry and is intended for mining powerful mineral deposits by underground mining.

Цель изобретени  - улучшение дроблени  руды и уменьшение сейсмического воздействи  взрывных работ.The purpose of the invention is to improve the crushing of ore and reduce the seismic effect of blasting.

На фиг.1 и 2 Локазан очистной блок разрезы; на фиг.З - разрез А-А на фиг.1; на фиг.4 - разрез Б-В на фиг,2.In Figures 1 and 2 Lokazan treatment unit cuts; on fig.Z - section aa in figure 1; figure 4 - section BB in Fig, 2.

Способ осуществл ют следующим образом . Из откаточного орта 1 проход т ходок 2, сбивающийс  с горизонталь- ной буровой выработкой 3, из которой проход т восход щие наклонные буровые выработки 4, ориентированные по диагонали секции. В двух смежных по- ши The method is carried out as follows. From the haulage ort 1, a walker 2 passes through a horizontal drill hole 3, from which upward slant drill holes 4 are oriented along the diagonal of the section. In two adjacent pyshi

встречными веерами скважин 7 минимальной длины. Отбойку руды производ т последовательным взрьшанием в скважинах на высоту секции ( HJ по всей площади блока, следующий слой отбиваетс  на частично выпущенную руду.counter fans of wells 7 minimum length. Ore blasting is carried out by sequential snapping in the wells to the height of the section (HJ over the entire area of the block, the next layer is beaten off on the partially released ore.

Ф о р м ула изобре те н и  Fo rm ula inven tion

Способ разработки мощных рудных месторождений, включающий проведение подготовительных, нарезных и буровых выработок, выемку руды блоками, в пределах которых подготавливают выемочные секции, обуривание запасов секций веерами горизонтальных скважин из буровых выработок,зар жание скважин ВВ и их последовательное взрываA method of developing powerful ore deposits, including preparatory, rifled and drilling workings, ore excavation in blocks within which the excavation sections are prepared, drilling of section stocks with fans of horizontal wells from drilling workings, exploding wells of explosives and their sequential explosion

рине блока секци х восход щие буровые 20 ние, отличающийс  тем.Rhinestone block sections ascending drilling units 20, characterized in that.

выработки 4 проход тс  под углом, обеспечивающим сходимость и расхождение выработок в одной точке, где проход т горизонтальные камеры 5, из коточто , с целью улучшени  дроблени  ру ды и уменьшени  сейсмического возде стви  взрывных работ, буровые выработки в каждой секции проход т накрых проход т буровые выработки в сек- 25 лонно по диагонали секции, при этомexcavations 4 are held at an angle ensuring convergence and divergence of openings at one point where horizontal chambers 5 pass from which, in order to improve the crushing of the ore and reduce the seismic rise of blasting operations, drilling excavations in each section pass through drilling developments in a 25 diagonal section diagonal, while

в смежных по ширине блока секци х в местах пересечени  буровых выработок формируют камеры, из которых проход т буровые выработки в секци х 30 смежных по высоте, а обуривание запасов каждой секции веерами горизонтальных скважин осуществл ют навстречу друг ДРУГУ из буровых выработок отрабатьшаемой и смежных с ней секций .in the sections adjacent in width to the block at the intersections of drilling workings, chambers are formed, from which drilling workings are made in sections 30 adjacent in height, and the reserves of each section are drowned by horizontal fans with each other from the drill workings of the working and adjacent ones sections.

ци х, смежных по высоте.qi x, adjacent in height.

В восход щих буровых выработках 4 проход т буровые заходки 6. Из них последовательно бур т горизонтальные веера скважин 7 причем обуривание секции ведут из выработок, пройденных собственно в секции, и из выработок , пройденных в смежных по дпине (а) и ширине (в) секци х таким образом , чтобы массив секций обуривалс In the ascending drilling workings 4 passes drilling drillings 6. Of these, horizontal fans of wells 7 are successively drilled, with the section being curved from the workings passed in the section itself, and from the workings passed in the dpine (a) and width (c) adjacent sections so that the array of sections is curled

3535

1one

что, с целью улучшени  дроблени  руды и уменьшени  сейсмического воздействи  взрывных работ, буровые выработки в каждой секции проход т накв м 30 сthat, in order to improve the crushing of the ore and reduce the seismic effect of blasting, drilling workings in each section take place on the ground for 30 s

3535

Фиг 2Fig 2

13758191375819

б /l-XJ 6b / l-xj 6

Claims (1)

Способ разработки мощных рудных месторождений, включающий проведение подготовительных, нарезных и буровых выработок, выемку руды блоками, в пределах которых подготавливают выемочные секции, обуривание запасов секций веерами горизонтальных скважин из буровых выработок,заряжание скважин ВВ и их последовательное взрывание, отличающийся тем, что, с целью улучшения дробления руды и уменьшения сейсмического воздействия взрывных работ, буровые выработки в каждой секции проходят наклонно по диагонали секции, при этом циях, смежных по высоте.The method of developing powerful ore deposits, including carrying out preparatory, rifled and drilling workings, excavating the blocks, within which they prepare excavating sections, drilling sections stocks with fans of horizontal wells from drilling workings, loading explosive wells and their subsequent blasting, characterized in that, with In order to improve ore crushing and reduce the seismic effects of blasting, drilling workings in each section are oblique along the diagonal of the section, while these are adjacent in height. В восходящих буровых выработках 4 проходят буровые заходки 6. Из них последовательно бурят горизонтальные веера скважин 7, причем обуривание секции ведут из выработок, пройденных собственно в секции, и из выработок, пройденных в смежных по длине (а) и ширине (в) секциях таким обра- в смежных по ширине блока секциях в местах пересечения буровых выработок формируют камеры, из которых проходят буровые выработки в секциях^ смежных по высоте, а обуривание запасов каждой секции веерами горизонтальных скважин осуществляют навстречу друг другу из буровых выработок отрабатываемой и смежных с ней сек-In ascending drilling workings 4, drilling passes 6 are made. Of these, horizontal fans of wells 7 are drilled sequentially, and sections are drilled from workings drilled in the sections proper and from workings drilled in sections that are adjacent in length (a) and width (b). chambers are formed in the sections adjacent to the width of the block at the intersections of the drilling workings, from which the drilling workings pass in sections adjacent in height, and the reserves of each section are drilled with fans of horizontal wells towards each other from level workings worked out and adjacent to it
SU864099209A 1986-08-11 1986-08-11 Method of mining thick ore deposits SU1375819A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU864099209A SU1375819A1 (en) 1986-08-11 1986-08-11 Method of mining thick ore deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU864099209A SU1375819A1 (en) 1986-08-11 1986-08-11 Method of mining thick ore deposits

Publications (1)

Publication Number Publication Date
SU1375819A1 true SU1375819A1 (en) 1988-02-23

Family

ID=21249619

Family Applications (1)

Application Number Title Priority Date Filing Date
SU864099209A SU1375819A1 (en) 1986-08-11 1986-08-11 Method of mining thick ore deposits

Country Status (1)

Country Link
SU (1) SU1375819A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Малахов Г.М. и др. Развитие технологии подземных горных работ. - Горный журнал, 1986, № 1, с.25-30. Дубьшин Н.Г. и др. Технологи подземной разработки руд. М.: Недра, 1983, с.23-27. *

Similar Documents

Publication Publication Date Title
RU2208221C2 (en) Method for selective mining extraction of qualitative mineral resource in open pit
SU1375819A1 (en) Method of mining thick ore deposits
RU2634597C1 (en) Method for developing mine workings and conducting stoping operations
SU907254A1 (en) Method of extinguishing voids
RU2224891C2 (en) Method for extracting mined blocks during subterraneous extraction of blind ore bodies
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
SU1461930A1 (en) Method of combined mining of mineral deposits
SU1460275A1 (en) Method of excavating sloping mineral deposits
SU617601A1 (en) Method of drawing pillars at chamber-and-pillar system of mining minerals
SU1125373A1 (en) Method of mining unstable ores
SU901535A1 (en) Method for driving mine shafts
SU994771A1 (en) Method of preventing outbursts of coal, rock and gas when driving preparatory workings
SU1017796A1 (en) Method of developing a thick ore deposit
SU855209A1 (en) Method of caving overlapping rocks
RU2012804C1 (en) Method for protection of workings from rock pressure
SU829929A1 (en) Method of breaking-off a rock block
RU2074321C1 (en) Method for preventing rock ground in workings from heaving
RU2078211C1 (en) Method of mining thick steep coal seams
RU1796023C (en) Method for formation of shaped slot
RU94028321A (en) Method for unloading marginal mine working and cumulative explosive charge for forming initial fractures
RU1770571C (en) Method for making raise mine working
SU1461937A1 (en) Method of mining ore bodies
SU1765403A1 (en) Mine field recompletion method
SU817261A1 (en) Method of controlling a solid roof
SU1314065A1 (en) Method of mining ore bodies